GB2428444A - Rail track arrangement and installation - Google Patents
Rail track arrangement and installation Download PDFInfo
- Publication number
- GB2428444A GB2428444A GB0514786A GB0514786A GB2428444A GB 2428444 A GB2428444 A GB 2428444A GB 0514786 A GB0514786 A GB 0514786A GB 0514786 A GB0514786 A GB 0514786A GB 2428444 A GB2428444 A GB 2428444A
- Authority
- GB
- United Kingdom
- Prior art keywords
- container
- rail
- arrangement
- mounting points
- spacing device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
- 238000009434 installation Methods 0.000 title claims description 38
- 238000000034 method Methods 0.000 claims abstract description 34
- 238000013461 design Methods 0.000 claims description 14
- 239000011440 grout Substances 0.000 claims description 9
- 239000000945 filler Substances 0.000 claims description 7
- 230000006835 compression Effects 0.000 claims description 6
- 238000007906 compression Methods 0.000 claims description 6
- 230000014759 maintenance of location Effects 0.000 claims description 6
- 239000000853 adhesive Substances 0.000 claims description 3
- 230000001070 adhesive effect Effects 0.000 claims description 3
- 125000006850 spacer group Chemical group 0.000 claims description 2
- 230000008569 process Effects 0.000 abstract description 5
- 238000003780 insertion Methods 0.000 description 5
- 230000037431 insertion Effects 0.000 description 5
- 230000008901 benefit Effects 0.000 description 3
- 239000002184 metal Substances 0.000 description 3
- 229910000831 Steel Inorganic materials 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 238000011900 installation process Methods 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 239000010959 steel Substances 0.000 description 2
- 241001669679 Eleotris Species 0.000 description 1
- 238000005266 casting Methods 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 238000004140 cleaning Methods 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 230000008878 coupling Effects 0.000 description 1
- 238000010168 coupling process Methods 0.000 description 1
- 238000005859 coupling reaction Methods 0.000 description 1
- 238000013016 damping Methods 0.000 description 1
- 230000009977 dual effect Effects 0.000 description 1
- 239000000428 dust Substances 0.000 description 1
- 229920001971 elastomer Polymers 0.000 description 1
- 239000000806 elastomer Substances 0.000 description 1
- 238000010438 heat treatment Methods 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000000717 retained effect Effects 0.000 description 1
- 238000007789 sealing Methods 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B9/00—Fastening rails on sleepers, or the like
- E01B9/62—Rail fastenings incorporating resilient supports
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Machines For Laying And Maintaining Railways (AREA)
- Bridges Or Land Bridges (AREA)
- Electric Cable Arrangement Between Relatively Moving Parts (AREA)
- Railway Tracks (AREA)
- Power-Operated Mechanisms For Wings (AREA)
- Chain Conveyers (AREA)
- Linear Motors (AREA)
- Leg Units, Guards, And Driving Tracks Of Cranes (AREA)
Abstract
A rail track arrangement has a rail, a container which receives the rail and a resilient layer between the container and the rail. The container has mounting points at an upper surface of each side of the container, and upper side portions of the resilient layer extends laterally over the mounting points at each side of the container and engage with the mounting points. The upper surface mounting points for the container can be used for positioning of the container, and enable the container to be grouted into position in a one stage process. The mounting points enable the container to be installed without the rail, with high accuracy.
Description
1 2428444
RAIL TRACK ARRANGEMENT AND INSTALLATION
Field of the invention
This invention relates to rail track arrangements, particularly in which the rails are mounted in a continuous open channel.
Background of the invention
A conventional rail essentially comprises an I-beam, having a head, a narrow web and a base. The rails are supported at regular intervals by sleepers, and span the spacing between sleepers. The I-beam structure provides the required vertical strength of the rail across these spans.
An alternative rail design uses a continuous open channel, sometimes formed by a shell, to receive the rail. The rail has a substantially constant width, to enable it to be lowered into the channel. Any differences in width over the height of the rail are provided only to enable a push fit of the rail into the channel. The rail may have an Ibeam cross section which is converted into the desired shape for lowering into the channel, using filler pieces. This invention relates to either of these types of rail configuration.
A resilient pad is typically provided between the rail and the channel. This resilient pad may be a preformed pad or alternatively may be an elastomer which is cast in place. The pad needs to provide some resilience, as the channel is typically cast into a fixed concrete base. Additional elements or components may be included in the assembly, such as filler pieces or noise or vibration damper components.
The use of a channel enables the concrete to be constructed to civil engineering tolerances, while the rail can be independently aligned to the tighter tolerances required for train support, and then cast in place.
This invention relates to the installation of railway track systems which utilise this open channel design, and this channel is referred to below as the container.
The rail, when fully installed and fixed in the track structure, may be held in place within the container using an arrangement which provides vertical, lateral, or longitudinal retention, or a combination of any of these. The container is typically arranged to continuously support the rail and resilient pad, and is concreted or grouted into or onto a solid base which may be continuous or in short or long segments, and may be concrete or steel for example. Typically the rail, the pad and the container are accurately aligned to the tight tolerance required for train operation before being grouted or concreted or fixed into their final position.
Various methods of supporting the components prior to and during concreting exist, which suspend the rail, the pad and container as a subassembly. These include support by gripping the railhead or by supporting or suspending the container.
The known installation methods of this and other embedded rail systems also require the rail to be in place prior to concreting, grouting or otherwise fixing in place in order to ensure it is in the correct position for operational train traffic.
Summary of the invention
According to the invention, there is provided a rail track arrangement comprising: a rail; a container which receives the rail; and a resilient layer between the container and the rail, wherein the container has mounting points at an upper region of each side of the container, and wherein upper side portions of the resilient layer extend laterally over the mounting points at each side of the container and engage with the mounting points.
This aspect of the invention provides upper mounting points for the container (for example in the form of a "shell"). These can be used for positioning of the container, and can enable the container to be grouted into position in a one stage process. Furthermore, the mounting points may also be used to provide fixing locations for a seal, so that the full sealed assembly can be defined by three components (rail, pad and container).
The invention enables the process by which the rail alignment is set to be separated from the rail fixing. In particular, the mounting points can be used to hold the container in a manner which simulates the presence of a rail in the container.
This also provides the opportunity for the alignment and grouting to be mechanised, if required. It also enables the railing to be undertaken as a separate, fast and efficient operation with plant designed for that purpose.
This provides a simple railway solution with minimum components and a quick, easy implementation of a continuously supported track on concrete base. The installation costs are reduced as activities can be separated in time and mechanisation is facilitated. The resulting stable rail gives reduced maintenance requirements, and increased safety (as a result of lack of buckling and containment of broken rails).
The container is preferably grouted into a track slab, for example using a one- stage grouting operation into a channel in a concrete base. The grout may then reach substantially the level of the mounting points, and the upper side portions of the resilient layer extend laterally over the top of a part of the grout layer. In this way, the two side top parts of the resilient layer define a seal extending over the top edges of the container and across to the finished grout.
The invention also provides a support arrangement for receiving a rail, comprising: a container for receiving the rail; and a resilient layer lining an inner channel of the container, wherein the container is grouted into a track slab, and the container has mounting points on each side of the container, the mounting points being set with a predetermined spacing so as to provide a designed compression of the resilient layer and thereby the desired retention and support of the rail when inserted.
This support arrangement is installed without needing the rail, and is designed to provide the required dimensions for the container to grip a subsequently JO inserted rail in the desired manner.
The invention also provides a method of laying a rail track arrangement, comprising: temporarily fixing a spacing device to a rail container, the spacing device being fixed to the container using mounting points at upper regions of side walls of the container, wherein the spacing device provides a fixed dimension between the side walls of the container; suspending and moving the container to a desired position; fixing the container to a base; removing the spacing device; and inserting a rail into the container.
This method provides the advantages discussed above, that the rail is not required during installation of the container, as the spacing device holds the container side walls in a manner and position which fixes the dimensions to an acceptable tolerance. The resilient layer can be inserted just before the rail.
The step of fixing the container to a base may comprise grouting or concreting the container into a concrete base, particularly grouting to a level substantially flush with the upper surfaces of the side walls of the container.
When inserting the resilient layer, upper lateral portions of the resilient layer can be clipped into the mounting points thereby to provide fixing of lateral seals.
The mounting points of the container can thus provide the dual function of holding the container during positioning, and subsequently retaining the resilient layer to define lateral seals.
The spacing device preferably comprises a lid which covers the top open part of the container. The lid may comprise a bracing strut which gives the required spacing between the lateral side walls of the container, with this spacing corresponding to the desired spacing when a rail is gripped in the container.
For example, the lid may have at least a portion which references the position of a portion of the rail when inserted into the container, and the lid portion is then used as a reference point for the step of moving the container to a desired position.
The lid may be shaped to correspond to the shape of the top of an inserted rail, so that the lid can be used for positioning in the same way that the rail itself would be used in previous installation methods.
The lid may be continuous, and this gives the advantage or preventing debris entering the container channel. However, the fixing operation provided by the lid can also be achieved with a discontinuous lid arrangement, for example a series of lid braces.
The invention also provides rail installation equipment for installing a rail track arrangement comprising a rail, a container which receives the rail and a resilient layer between the container and the rail, the equipment comprising: a spacing device for releasably suspending the container using fixings which engage with mounting points at upper regions of side walls of the container, wherein the spacing device provides a fixed distance between the side walls of the container; and a positioning arrangement for positioning the container by moving the spacing device.
The invention also provides a rail container arrangement for a rail track arrangement comprising a rail, the container which receives the rail and a resilient layer between the container and the rail, the rail container arrangement comprising: a base part having lateral side walls and defining a channel for receiving a rail, each lateral side wall having a mounting point at an upper region; and a top part, the top part having fixing points for releasable fixing to the mounting points, the top part providing a fixed relative position between the side walls during positioning and installation of the base part.
Brief description of the drawings
Examples of the invention will now be described in detail with reference to the accompanying drawings in which: Figure 1 shows a known rail cross section for use in the so-called embedded Rail Track" system; and Figure 2 shows a rail track arrangement of the invention and installed using the method of the invention; Figure 3 shows a second example of rail track arrangement of the invention and installed using the method of the invention; Figure 4 shows a first way of implementing the installation method of the invention; Figure 5 shows a second way of implementing the installation method of the invention; Figure 6 shows an alternative design of container and lid of the invention, releasably fixed together; Figure 7 shows the design of container and lid of Figure 5, released from each other; and Figure 8 shows the invention applied to a tramway rail.
Figure 1 shows a known embedded rail design. The rail 20 is held in a container or shell 22 set in a bed or slab 24 of concrete. The container 22 has an inner profile of an open channel to receive the rail 20 whilst also clamping the rail 20 in place. A resilient filler 26 is provided between the container 22 and the rail 20.
The rail cross section comprises a head portion 20A and a supporting portion 20B. In the example shown in Figure 2, the top of the supporting portion 20B has a pinched part 28. To insert the rail 20 into the container 22, the wider lower part of the supporting portion 20B has to pass through the pinched region of the fill 26, so that the rail must effectively be sprung into the container with a snap-action fit.
Despite this pinched part 28 of the rail cross section, the head portion 20A and the supporting portion 20B have substantially the same width. The only differences in width are provided to enable the snap-action fitting of the rail into the container as described above.
The bed or slab 24 is lower on one side of the rail than on the other side, to allow the passage of the flange of a wheel of the railed vehicle. However, the container 22 provides support on both sides of the rail.
The rail design of Figure 1 is described in greater detail in WO 99/63160. The container 22 defines a continuous supporting structure for the rail 20, rather than the discontinuous sleeper arrangement of more conventional rail designs.
The invention relates to the installation of rail arrangements using a container to receive the rail in a push fit manner, as described above. Conventional installation involves forming a sub-assembly of the rail, resilient pad and container, and holding these in the position which gives the desired rail position.
The rail position is monitored during the installation adjustments, and the sub- assembly is fixed into position when the desired rail position is obtained.
This technique, requiring all components including the rail, pad and temporary support system to be present during aligning and fixing, limits the possibilities of optimising the installation process and mechanisation parts of the process.
The known installation methods also present difficulties in maintaining the dimension tolerances required for: (i) the cast in place assembly to avoid water and material ingress particularly where and when the intent is that the rail is removable; (ii) the insertion, retention and the removal of a rail; and (iii) the desired lateral and longitudinal gripping of the rail.
Figure 2 shows an installed rail installation of the invention.
The installation again comprises a rail 20 (with substantially rectangular cross section), a container 22 in the form of a shell which receives the rail; and a resilient layer 26 between the container and the rail. In accordance with the invention, the container 22 has mounting points 30 at an upper region of each side 22a, 22b of the container. These mounting points are shown as tapered channels for receiving a lug. The lug may snap into and out of the tapered channel. Many other forms of clipping or latching arrangement could be envisaged. However, the mounting points are preferably defined as a shape feature of the container 22 so that the container can simply be produced in the desired shape, with the shape defining the mounting points 30.
The primary function of the mounting points is to enable the dimension between the side walls of the container 22 to be fixed during installation, as will be discussed below. This enables the correct gripping characteristics of the rail.
Upper side portions 32 of the resilient layer 26 extend laterally over the mounting points 30 at each side of the container and engage with the mounting points 30. These portions 32 thus have lugs 34 for clipping into the tapered recess. The later insertion of the resilient layer 26, which may be a pre-formed extruded member, into the container thus also covers the joint between the grout layer 24 and the track slab.
The mounting points 30 perform an additional function to the sealing function described above, and this additional function relates to the installation method, which is described below. In particular, the mounting points 30 are used for positioning of the container, and enable the container to be grouted into position in a one stage process.
An I-beam shaped rail can also be used, in conjunction with filler blocks that simulate the substantially rectangular shape of the assembly to enable the same rail retention method.
Figure 3 shows a second example of installed rail installation of the invention, and uses the same reference numbers as Figure 2 In this case, the rail 20 has an I-beam cross section, and filler pieces 35 on each side of the web convert the outer shape of the rail into a substantially rectangular cross section to be received as a push fit in the container. Figure 3 also shows that the side walls 22a, 22b of the container 22 may have the same height.
The method of the invention will be explained with reference to Figures 4 and 5.
In order to position the container 22, it is suspended in an opening in the concrete base 40 using a spacing device 42. In the example shown in Figure 4, the spacing device is essentially a strut brace which fixes the spacing between the sides of the container. This strut is temporarily fixed to the container using the mounting points 30, as shown. The container can then be moved to a desired position using the spacing device 42, and Figure 4 shows screw adjustment legs 44 which seat at the base of the opening in the concrete base for this purpose. These are adjusted until the container is in the desired position, and it is then fixing into the base, for example by a first stage of a grouting operation. The spacing device 42 is then removed, and the grouting is finished if need be. Only then are the resilient layer and rail inserted into the container.
The spacing device 42 is designed to ensure that the dimensions are accurate to give the desired characteristics for the subsequent insertion of the rail and resilient layer. This ensures the assembly seals well, and that the rail is retained within, and can be removed from, the container with the desired forces.
The spacing device may fix the distance between the sides walls to prevent any movement of the side walls together or apart, as in the examples above.
However, the spacing device may only be required to prevent inward collapse of the side walls, as the grouting operation will force the sides inwardly, and there may then be no need to resist outward movement of the side walls. This could then allow easier removal of the spacing device from the container after the container has been fixed in place.
Figure 5 shows a similar arrangement to Figure 3, but shows the spacing device suspending the container from above. Adjustment screws 44 are again provided for positioning, but in this example, once the desired position has been reached, a one-stage grouting step can be carried out, right up to the level of the mounting points 30, to provide the full grout layer 24 as shown in Figure 2.
The grouting can be mechanised.
If the container is gripped, it is generally not possible to implement a one-stage grouting operation. Instead, an initial grouting step needs to be performed up to or around the grip points, and the container is then released. A second grouting step then completes the installation.
If the rail head is gripped, there may be some relaxation of the shape of the container, so that once it has been grouted (or fixed using a different method) into place, the desired retention characteristics of the rail may not be maintained. Thus, the existing installation methods also do not facilitate, to the degree required for well engineered track, the holding of the rail with the ideal force at all positions around its surface and along its length.
In this design, the spacing device is fixed to the container such that the spacing device does not impede any grout or concrete.
The spacing device holds the container by the mounting points with sufficient strength to enable movement of the container into position. However, once the grouting has been completed (or a partial grouting has been completed), the strength of the coupling between the spacing device and the container can be overcome by lifting the spacing device fixing points 46. Additional or alternative fixing devices could be used, such as clips, bolts etc, if desired.
Once the container is in place, the resilient layer is clipped into place in the manner explained above, and the rail is inserted as a separate operation.
In another example, shown in Figures 6 and 7, the spacing device comprises a lid 50 which closes the top open part of the container 22. In the previous examples, a bracing strut was used. In this example, in addition to giving the required spacing between the lateral side walls of the container 22, the lid is also shaped to correspond to the shape of the top of an inserted rail, so that the lid can be used for positioning in the same way that the rail itself would be used in previous installation methods.
In particular, currently available rail alignment equipment can run along the top surface of the cover as if running along the final rail.
For example, the lid has a portion 52 which corresponds in position to the position of a portion of the rail when inserted into the container 22. This lid portion is then used as a reference point for the step of moving the container to a desired position.
The lid also has additional support elements 54, and these can be used for automated positioning of the container assembly. Any fixings suitable for the positioning equipment can be provided.
For the purposes of this description, the lid, or other design of spacing device 42, may be considered to form part of the rail installation equipment, particularly as the spacing device can be reused for the installation of successive lengths of rail.
Figure 7 shows the rail container arrangement of Figure 5 with the lid 50 and base 22 separated.
The invention enables a rail support system to be set accurately in place and enables the position to be checked prior to final casting the support system, without the presence of the rail such that when the rail is later installed it has the required alignment tolerances. The space for the rail and resilient pad can be consistently and accurately pre-defined, without the need to apply compressive forces at the alignment stage, which can be required with the rail in position.
By maintaining the internal dimensions of the container, it is possible to provide, through the pad and its compression on installation of the rail, a designed horizontal (lateral and longitudinal) grip and support to the rail and the required value of the horizontal resilience and longitudinal restraint.
Different bracing strut or lid designs and dimensions can be used to change the horizontal grip or pre compression on the rail when it is inserted. This enables the characteristics of the installation to be varied at different points, to suit local specific requirements, while still ensuring the rail can be inserted and removed.
Standard rail gauging equipment (trolleys, gauge bars etc.) can be used for the positioning of the container, in particular by providing lid reference points corresponding to the rail.
The use of a lid or bracing strut that covers the channel keeps out the dust and extraneous materials during construction, and this minimises the cost and time of cleaning out the container.
The invention enables the alignment and fixing of a container which has a significantly lower weight per unit length and a greater stiffness to weight ratio.
This requires less force and less complexity of handling equipment than with the rail in place. The rail installation can be a later event when it can be done quickly, efficiently and with cost effective equipment designed for that purpose as the alignment will already be preset.
The supporting and gripping facility 54 on the lid enables the use of lightweight automated equipment to effect container installation. Long lengths of container can be supported and aligned by automated and mechanical means at one time making rapid speed and low cost installation possible. The rail alignment will also remain throughout the life of the rail as it is set by the container installation.
The alignment of the container through joints between consecutive lengths can be kept smooth by staggering the cover joints and the container joints so that they do not coincide, with or without the need for connector pieces.
Resetting of the alignment after rail removal and replacement may be avoided as the alignment remains permanently fixed and within the allowable tolerances.
No time is lost setting up the alignment for subsequent rail insertions. If there is damage to the container or grout, resetting of the assembly may be performed using the same equipment as used for the original installation.
The rail can be removed and replaced from the installation without any need for adjustment of any fixings, as the lateral pre compression of the resilient pad remains consistent and correct along its length.
The cover can be reused for different installations, and does not therefore represent a significant additional cost item for the installation.
When the desired maximum lateral and vertical pad pre compression values are exceeded the rail can slip through the pad or the pad through the container to ensure no damage occurs to the pad or container.
In the example above, the container (shell) is positioned before insertion of the resilient pad and rail. However, the resilient pad may be installed with the container if desired, for example with the side walls of the resilient pad pushed inwardly to reveal the mounting points.
The invention may be applied to tramways as well as railways. By way of example, Figure 8 shows another example of rail track arrangement in which the rail 20 has a channel with a substantially level top surface on each side.
This example also shows the mounting points 30 located at an inner side of the top region of each side wall of the container.
In all examples, the container and cover may be straight, and they could be bent around curves when installed. The closed form of the lid (as clearly seen in Figure 7) prevents buckling when the lid is gently deformed into the desired radius of curvature. However, there may also be curved versions of container and/or cover to more easily provide for certain ranges of required horizontal track geometry. The cover and container can then be designed to cooperate without distorting.
The spacing device (lid) may provide different spacing between the side walls of the container around bends, and also the resilient layer may be designed differently for different curves, or for other differences which affect the load to be experienced. Thus, different lid designs may be used and/or different resilient layer designs for different radii of curvature. Typically, the resilient layer may be provided in relatively short lengths, for example 2m.
This enables a continuously variable track geometry to be defined, and this is made possible by the engineering accuracy with which the container can be fixed into position. The invention thus provides an installation method and apparatus enabling this continuously variable track geometry.
The spacing device, which is used to hold the container in place during fixing, may be an integrated part of the concreting/grouting apparatus.
The mounting points may provide the further function of alignment between container sections, for example they may be designed to accommodate a trace heating cable or a clip, in order to maintain alignment through container joints (whether or not a cover is present).
The rail has been shown as a single metal item. However, as shown in Figure 3, the substantially rectangular outer shape may be defined by an I-beam shaped metal rail together with inserts which convert the I-beam shape into a rectangular shape. These inserts may also perform a damping function as well as providing the desired shape for snap fitting of the rail in the container.
In the examples described above, the container arrangement is grouted into a channel in a concrete base which has previously been installed. The container arrangement can be mounted on a discontinuous base such as sleepers, or for example a steel base such as a bridge. A further alternative is for the concrete base to be provided as part of the installation process, so that the container arrangement is held by the spacing device (the lid) for a one-pour concreting operation which defines the full spacing device around the container. The position of the container can be verified by the spacing device even when a lower part of the container has no easily accessible reference points.
The structure to which the rail container is fastened has been described as a "track slab" in the description and claims. This is intended to cover a continuous structure, such as a concrete or metal base, or a discontinuous set of supports, such as sleepers.
In the examples above, a preformed resilient layer is used between the rail and the container. However, the methods of the invention can also be used to advantage in systems in which the resilient layer is formed onsite as a poured layer. In this case, the resilient layer can be formed byinserting spacers to support the rail at the desired position within the container, and pouring an adhesive, flexible resilient fill between the rail and the container to provide the required support and restraint of the rail. This adhesive cures to form the desired resilient layer.
Vaulous other modifications will be apparent to those skilled in the art.
Claims (27)
1. A rail track arrangement comprising: a rail; a container which receives the rail; and a resilient layer between the container and the rail, wherein the container has mounting points at an upper region of each side of the container, and wherein upper side portions of the resilient layer extend laterally over the mounting points at each side of the container and engage with the mounting points.
2. An arrangement as claimed in claim 1, wherein the container is grouted into a track slab.
3. An arrangement as claimed in claim 2, wherein the track slab comprises a continuous base.
4. An arrangement as claimed in claim 3, wherein the continuous base comprises a concrete base.
5. An arrangement as claimed in claim 2, 3 or 4, wherein the grout reaches the level of the mounting points, and the upper side portions extend laterally over the top of a part of the grout layer.
6. An arrangement as claimed in any preceding claim, wherein the cross section of the rail, perpendicular to the rail length, comprises a head portion and a supporting portion having substantially the same width.
7. An arrangement as claimed in any one of claims I to 6, wherein the cross section of the rail, perpendicular to the rail length, comprises a head portion, a base portion and a narrower intermediate web portion, and wherein filler pieces are provided adjacent each side of the web portion such that the outer shape of the rail and filler portions is substantially rectangular.
8. A support arrangement for receiving a rail, comprising: a container for receiving the rail; and a resilient layer lining an inner channel of the container, wherein the container is grouted into a track slab, and the container has mounting points on each side of the container, the mounting points being set with a predetermined spacing so as to provide a designed compression of the resilient layer and thereby the desired retention and support of the rail when inserted.
9. A support arrangement as claimed in claim 8, wherein the predetermined spacing varies by design along the length of the track.
10. A support arrangement as claimed in claim 8 or 9, wherein the cross sectional shape of the resilient layer, perpendicular to the rail direction, varies by design along the length of the container.
11. A support arrangement as claimed in any one of claims 8 to 10, wherein upper side portions of the resilient layer extend laterally over the mounting points at each side of the container and engage with the mounting points.
12. A method of laying a rail track arrangement, comprising: temporarily fixing a spacing device to a rail container, the spacing device being fixed to the container using mounting points at upper regions of side walls of the container, wherein the spacing device provides a fixed dimension between the side walls of the container; suspending and moving the container to a desired position; fixing the container to a base; removing the spacing device; and inserting a rail into the container.
13. A method as claimed in claim 12, wherein the spacing device is used to move the container to the desired position.
14 A method as claimed in claim 12 or 13, further comprising inserting a resilient layer into the container before inserting the rail, and after removing the spacing device.
15. A method as claimed in claim 12 or 13, further comprising inserting spacers to support the rail and pouring an adhesive, flexible resilient fill between the rail and the container to provide the required support and restraint of the rail.
16. A method as claimed in any one of claims 12 to 15, wherein fixing the container to a base comprises grouting the container into a concrete or other continuous base.
17. A method as claimed in claim 16, wherein grouting the container into a concrete base comprises grouting to a level substantially flush with the upper surfaces of the side walls of the container.
18. A method as claimed in claim 14, wherein inserting a resilient layer comprises clipping upper lateral portions of the resilient layer into the mounting points thereby to provide lateral seals.
19. A method as claimed in any one of claims 12 to 18, wherein the spacing device comprises a lid which covers the top open part of the container.
20. A method as claimed in claim 19, wherein the lid has at least a portion which corresponds in position to the position of a portion of the rail when inserted into the container.
21. A method as claimed in claim 20, wherein the lid portion is used as a reference point for the step of moving the container to a desired position.
22. Rail installation equipment for installing a rail track arrangement comprising a rail, a container which receives the rail and a resilient layer between the container and the rail, the equipment comprising: a spacing device for releasably suspending the container using fixings which engage with mounting points at upper regions of side walls of the container, wherein the spacing device provides a fixed distance between the side walls of the container; and a positioning arrangement for positioning the container by moving the spacing device.
23. Equipment as claimed in claim 22, wherein the spacing device comprises a lid which covers the top open part of the container.
24. Equipment as claimed in claim 23, wherein the lid has at least a portion which corresponds in position to the position of a portion of the rail when inserted into the container.,
25. Equipment as claimed in claim 24, wherein the lid portion is used as a reference point for the positioning arrangement.
26. A rail container arrangement for a rail track arrangement comprising a rail, the container which receives the rail and a resilient layer between the container and the rail, the rail container arrangement comprising: a base part having lateral side walls and defining a channel for receiving a rail, each lateral side wall having a mounting point at an upper region; and a top part, the top part having fixing points for releasable fixing to the mounting points, the top part providing a fixed relative position between the side walls during positioning and installation of the base part.
27. A rail container arrangement as claimed in claim 25, wherein the top part comprises a lid which covers the top open part of the channel.
Priority Applications (7)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| GB0514786A GB2428444A (en) | 2005-07-19 | 2005-07-19 | Rail track arrangement and installation |
| EP06755626A EP1904683B1 (en) | 2005-07-19 | 2006-06-26 | Method and arrangement for rail track fixing |
| CN200680026091XA CN101297081B (en) | 2005-07-19 | 2006-06-26 | Method and arrangement for rail track fixing |
| DE602006012186T DE602006012186D1 (en) | 2005-07-19 | 2006-06-26 | METHOD AND ARRANGEMENT FOR FIXING RAILS |
| US11/988,843 US20110049255A1 (en) | 2005-07-19 | 2006-06-26 | Method and Arrangement for Rail Track Fixing |
| PCT/GB2006/002340 WO2007010180A1 (en) | 2005-07-19 | 2006-06-26 | Method and arrangement for rail track fixing |
| AT06755626T ATE457385T1 (en) | 2005-07-19 | 2006-06-26 | METHOD AND ARRANGEMENT FOR FASTENING RAILS |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| GB0514786A GB2428444A (en) | 2005-07-19 | 2005-07-19 | Rail track arrangement and installation |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| GB0514786D0 GB0514786D0 (en) | 2005-08-24 |
| GB2428444A true GB2428444A (en) | 2007-01-31 |
Family
ID=34897456
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| GB0514786A Withdrawn GB2428444A (en) | 2005-07-19 | 2005-07-19 | Rail track arrangement and installation |
Country Status (7)
| Country | Link |
|---|---|
| US (1) | US20110049255A1 (en) |
| EP (1) | EP1904683B1 (en) |
| CN (1) | CN101297081B (en) |
| AT (1) | ATE457385T1 (en) |
| DE (1) | DE602006012186D1 (en) |
| GB (1) | GB2428444A (en) |
| WO (1) | WO2007010180A1 (en) |
Families Citing this family (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20160083098A1 (en) * | 2014-09-24 | 2016-03-24 | Gulfstream Aerospace Corporation | Aircraft and seat track assemblies for vibration isolation of floor mounted components |
| US11214374B2 (en) * | 2016-08-01 | 2022-01-04 | Gulfstream Aerospace Corporation | Seat track assemblies for vibration isolation of floor mounted components |
| GB201702558D0 (en) * | 2017-02-16 | 2017-04-05 | Embedded Rail Tech Ltd | Rail installation |
| CN108049260B (en) * | 2017-12-15 | 2024-04-26 | 上海工程技术大学 | Filling type adjusting base plate |
| GB202015239D0 (en) * | 2020-09-25 | 2020-11-11 | Embedded Rail Tech Limited | Positioning device |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US5165598A (en) * | 1988-06-01 | 1992-11-24 | Hermann Ortwein | Resiliently mounted rail for rail vehicles |
| GB2272011A (en) * | 1992-10-28 | 1994-05-04 | Charles Penny | Apparatus and method for securing in position a tramway rail. |
| WO1999053141A1 (en) * | 1998-04-15 | 1999-10-21 | Phoenix Aktiengesellschaft | Rail system |
| WO1999063160A1 (en) * | 1998-05-30 | 1999-12-09 | Charles Penny | Railway or tramway rail and rail fastening system |
| GB2393750A (en) * | 2001-08-23 | 2004-04-07 | Hyperlast Ltd | Method of making rail support assemblies |
Family Cites Families (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE8711451U1 (en) * | 1987-08-24 | 1988-12-22 | Phoenix Ag, 2100 Hamburg | Elastic support bearing for grooved or block rails |
| US5513797A (en) * | 1989-08-26 | 1996-05-07 | Lesley; Lewis | Installation of rail tracks in roadways |
| DE4427237A1 (en) * | 1994-08-02 | 1996-02-08 | Hermann Ortwein | Substructure for a track for rail vehicles |
| KR20010030640A (en) * | 1997-09-26 | 2001-04-16 | 푀닉스 악티엔게젤샤프트 | Rail system |
| WO2003012203A2 (en) | 2001-08-02 | 2003-02-13 | Balfour Beatty Plc | Rail arrangement |
| GB2379701A (en) * | 2001-09-17 | 2003-03-19 | Balfour Beatty Plc | Rail installation |
-
2005
- 2005-07-19 GB GB0514786A patent/GB2428444A/en not_active Withdrawn
-
2006
- 2006-06-26 CN CN200680026091XA patent/CN101297081B/en not_active Expired - Fee Related
- 2006-06-26 US US11/988,843 patent/US20110049255A1/en not_active Abandoned
- 2006-06-26 AT AT06755626T patent/ATE457385T1/en not_active IP Right Cessation
- 2006-06-26 EP EP06755626A patent/EP1904683B1/en not_active Not-in-force
- 2006-06-26 WO PCT/GB2006/002340 patent/WO2007010180A1/en not_active Ceased
- 2006-06-26 DE DE602006012186T patent/DE602006012186D1/en active Active
Patent Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US5165598A (en) * | 1988-06-01 | 1992-11-24 | Hermann Ortwein | Resiliently mounted rail for rail vehicles |
| GB2272011A (en) * | 1992-10-28 | 1994-05-04 | Charles Penny | Apparatus and method for securing in position a tramway rail. |
| WO1999053141A1 (en) * | 1998-04-15 | 1999-10-21 | Phoenix Aktiengesellschaft | Rail system |
| WO1999063160A1 (en) * | 1998-05-30 | 1999-12-09 | Charles Penny | Railway or tramway rail and rail fastening system |
| GB2393750A (en) * | 2001-08-23 | 2004-04-07 | Hyperlast Ltd | Method of making rail support assemblies |
Also Published As
| Publication number | Publication date |
|---|---|
| EP1904683A1 (en) | 2008-04-02 |
| CN101297081A (en) | 2008-10-29 |
| GB0514786D0 (en) | 2005-08-24 |
| US20110049255A1 (en) | 2011-03-03 |
| CN101297081B (en) | 2011-09-07 |
| ATE457385T1 (en) | 2010-02-15 |
| DE602006012186D1 (en) | 2010-03-25 |
| EP1904683B1 (en) | 2010-02-10 |
| WO2007010180A1 (en) | 2007-01-25 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| EP1155194B1 (en) | Railway or tramway rail and rail fastening system | |
| KR101040102B1 (en) | Installation method of track rail for maglev train | |
| US20040182946A1 (en) | Method for the continuous laying of a rail on a rigid track in addition to an alignment device and a rigid track | |
| WO2016129001A1 (en) | Modular system for the laying of underground and railroad and tram lines | |
| KR100854479B1 (en) | Rail mounting jig and construction method of embedded railway track using the same | |
| EP1904683B1 (en) | Method and arrangement for rail track fixing | |
| KR101293285B1 (en) | Fixed running track on a bridge structure | |
| KR20080103664A (en) | Landfill railroad track structure with excellent vibration blocking performance | |
| KR20160117923A (en) | Slab track structure of steel-framed reinforced concrete structure (src) for railway bridge, and construction method for the same | |
| KR100948279B1 (en) | Fill up type rail structure having rail adjusting device | |
| JP4858850B2 (en) | Installation method for vibration-proof track of existing track | |
| KR100964734B1 (en) | Fill up type rail structure of composite elastic material | |
| CN110700017A (en) | Construction method of through-type continuous supporting track system | |
| CN110616599A (en) | Temporary steel rail fixing structure and longitudinal groove blocking block installation construction method | |
| KR102122610B1 (en) | Concrete track construction method that can be used suitably for a rapid improvement of ballast track, and concrete slab support device and railway building device for the same | |
| CN108035200A (en) | Bridge-type longeron damper rail system | |
| KR20080091755A (en) | Sleeper placing method and formwork used for this | |
| JP3636624B2 (en) | Ladder-type sleeper anti-vibration rubber mounting structure and construction method | |
| GB2602673A (en) | Railway infrastructure for a light rail system | |
| KR100389562B1 (en) | temporary assembling apparatus used in reilway branching point and method therefor | |
| CN211079786U (en) | Temporary fixing structure for steel rail | |
| KR102138365B1 (en) | Non-ballast track structure for allowing longitudinal direction slip of steel railway bridge | |
| EP1775381A1 (en) | Underground track replacement in tube tunnels | |
| KR200239985Y1 (en) | temporary assembling apparatus used in reilway branching point | |
| EP3825461A1 (en) | Support of a rest baseplate for at least one rail |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| WAP | Application withdrawn, taken to be withdrawn or refused ** after publication under section 16(1) |