[go: up one dir, main page]

GB201509576D0 - Improvements in or relating to hydrocarbon production from shale - Google Patents

Improvements in or relating to hydrocarbon production from shale

Info

Publication number
GB201509576D0
GB201509576D0 GBGB1509576.3A GB201509576A GB201509576D0 GB 201509576 D0 GB201509576 D0 GB 201509576D0 GB 201509576 A GB201509576 A GB 201509576A GB 201509576 D0 GB201509576 D0 GB 201509576D0
Authority
GB
United Kingdom
Prior art keywords
shale
relating
hydrocarbon production
hydrocarbon
production
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
GBGB1509576.3A
Other versions
GB2539001A (en
GB2539001B (en
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Geomec Engineering Ltd
Original Assignee
Geomec Engineering Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Geomec Engineering Ltd filed Critical Geomec Engineering Ltd
Priority to GB1509576.3A priority Critical patent/GB2539001B/en
Publication of GB201509576D0 publication Critical patent/GB201509576D0/en
Priority to GB1513655.9A priority patent/GB2539056A/en
Priority to EP16736550.1A priority patent/EP3303771A1/en
Priority to MX2017015001A priority patent/MX2017015001A/en
Priority to EP16736551.9A priority patent/EP3303769A1/en
Priority to MX2017014999A priority patent/MX2017014999A/en
Priority to US15/574,695 priority patent/US10641089B2/en
Priority to CN201680030166.5A priority patent/CN107923239A/en
Priority to EA201792190A priority patent/EA036110B1/en
Priority to CA2986356A priority patent/CA2986356A1/en
Priority to MX2017015000A priority patent/MX2017015000A/en
Priority to US15/573,997 priority patent/US10570729B2/en
Priority to CA2986355A priority patent/CA2986355A1/en
Priority to CN201680030129.4A priority patent/CN108076649A/en
Priority to AU2016272530A priority patent/AU2016272530A1/en
Priority to PCT/GB2016/051624 priority patent/WO2016193732A1/en
Priority to PCT/GB2016/051625 priority patent/WO2016193733A1/en
Priority to EA201792189A priority patent/EA201792189A1/en
Priority to EA201792188A priority patent/EA037344B1/en
Priority to CN201680030159.5A priority patent/CN107923237A/en
Priority to AU2016272529A priority patent/AU2016272529A1/en
Priority to EP16736548.5A priority patent/EP3303768B1/en
Priority to PCT/GB2016/051621 priority patent/WO2016193729A1/en
Priority to AU2016272526A priority patent/AU2016272526A1/en
Priority to CA2986313A priority patent/CA2986313A1/en
Priority to US15/576,832 priority patent/US10570730B2/en
Publication of GB2539001A publication Critical patent/GB2539001A/en
Application granted granted Critical
Publication of GB2539001B publication Critical patent/GB2539001B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/25Methods for stimulating production
    • E21B43/26Methods for stimulating production by forming crevices or fractures
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • E21B47/10Locating fluid leaks, intrusions or movements
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B49/00Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
    • E21B49/008Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells by injection test; by analysing pressure variations in an injection or production test, e.g. for estimating the skin factor

Landscapes

  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Fluid Mechanics (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Chemical & Material Sciences (AREA)
  • Analytical Chemistry (AREA)
  • Geophysics (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
GB1509576.3A 2015-06-03 2015-06-03 Improvements in or relating to hydrocarbon production from shale Active GB2539001B (en)

Priority Applications (26)

Application Number Priority Date Filing Date Title
GB1509576.3A GB2539001B (en) 2015-06-03 2015-06-03 Improvements in or relating to hydrocarbon production from shale
GB1513655.9A GB2539056A (en) 2015-06-03 2015-08-03 Improvements in or relating to injection wells
AU2016272530A AU2016272530A1 (en) 2015-06-03 2016-06-02 A downhole pressure measuring tool with a high sampling rate
EA201792189A EA201792189A1 (en) 2015-06-03 2016-06-02 DEVICE FOR MEASURING WELL PRESSURE WITH HIGH FREQUENCY DISCRETIZATION
EP16736551.9A EP3303769A1 (en) 2015-06-03 2016-06-02 A downhole pressure measuring tool with a high sampling rate
MX2017014999A MX2017014999A (en) 2015-06-03 2016-06-02 A downhole pressure measuring tool with a high sampling rate.
US15/574,695 US10641089B2 (en) 2015-06-03 2016-06-02 Downhole pressure measuring tool with a high sampling rate
CN201680030166.5A CN107923239A (en) 2015-06-03 2016-06-02 The cracking initiation through hydrocarbon filling carried out before shale pressure break is tested
EA201792190A EA036110B1 (en) 2015-06-03 2016-06-02 Hydrocarbon filled fracture formation testing before shale fracturing
CA2986356A CA2986356A1 (en) 2015-06-03 2016-06-02 A downhole pressure measuring tool with a high sampling rate
MX2017015000A MX2017015000A (en) 2015-06-03 2016-06-02 Hydrocarbon filled fracture formation testing before shale fracturing.
US15/573,997 US10570729B2 (en) 2015-06-03 2016-06-02 Thermally induced low flow rate fracturing
CA2986355A CA2986355A1 (en) 2015-06-03 2016-06-02 Thermally induced low flow rate fracturing
CN201680030129.4A CN108076649A (en) 2015-06-03 2016-06-02 Heat induces low flow rate pressure break
EP16736550.1A EP3303771A1 (en) 2015-06-03 2016-06-02 Hydrocarbon filled fracture formation testing before shale fracturing
PCT/GB2016/051624 WO2016193732A1 (en) 2015-06-03 2016-06-02 Hydrocarbon filled fracture formation testing before shale fracturing
PCT/GB2016/051625 WO2016193733A1 (en) 2015-06-03 2016-06-02 A downhole pressure measuring tool with a high sampling rate
MX2017015001A MX2017015001A (en) 2015-06-03 2016-06-02 Thermally induced low flow rate fracturing.
EA201792188A EA037344B1 (en) 2015-06-03 2016-06-02 Thermally induced low flow rate fracturing
CN201680030159.5A CN107923237A (en) 2015-06-03 2016-06-02 Down-hole pressure survey tool with high sampling rate
AU2016272529A AU2016272529A1 (en) 2015-06-03 2016-06-02 Hydrocarbon filled fracture formation testing before shale fracturing
EP16736548.5A EP3303768B1 (en) 2015-06-03 2016-06-02 Thermally induced low flow rate fracturing
PCT/GB2016/051621 WO2016193729A1 (en) 2015-06-03 2016-06-02 Thermally induced low flow rate fracturing
AU2016272526A AU2016272526A1 (en) 2015-06-03 2016-06-02 Thermally induced low flow rate fracturing
CA2986313A CA2986313A1 (en) 2015-06-03 2016-06-02 Hydrocarbon filled fracture formation testing before shale fracturing
US15/576,832 US10570730B2 (en) 2015-06-03 2016-06-02 Hydrocarbon filled fracture formation testing before shale fracturing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
GB1509576.3A GB2539001B (en) 2015-06-03 2015-06-03 Improvements in or relating to hydrocarbon production from shale

Publications (3)

Publication Number Publication Date
GB201509576D0 true GB201509576D0 (en) 2015-07-15
GB2539001A GB2539001A (en) 2016-12-07
GB2539001B GB2539001B (en) 2021-04-21

Family

ID=53677679

Family Applications (1)

Application Number Title Priority Date Filing Date
GB1509576.3A Active GB2539001B (en) 2015-06-03 2015-06-03 Improvements in or relating to hydrocarbon production from shale

Country Status (1)

Country Link
GB (1) GB2539001B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2563643B (en) * 2017-06-22 2022-02-16 Geomec Eng Ltd Improvements in or relating to injection wells

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7389185B2 (en) * 2005-10-07 2008-06-17 Halliburton Energy Services, Inc. Methods and systems for determining reservoir properties of subterranean formations with pre-existing fractures
RU2383727C2 (en) * 2007-11-30 2010-03-10 Шлюмберже Текнолоджи Б.В. Method of estimation of oil well operation implementing technology of formation hydraulic breakdown
US9677337B2 (en) * 2011-10-06 2017-06-13 Schlumberger Technology Corporation Testing while fracturing while drilling
US9366122B2 (en) * 2012-08-22 2016-06-14 Baker Hughes Incorporated Natural fracture injection test

Also Published As

Publication number Publication date
GB2539001A (en) 2016-12-07
GB2539001B (en) 2021-04-21

Similar Documents

Publication Publication Date Title
GB201415334D0 (en) Improvement in or relating to crawlers
GB201513655D0 (en) Improvements in or relating to injection wells
GB201410668D0 (en) Improvements in or relating to stairlifts
GB201702982D0 (en) Improvements in or relating to centralisers
GB201511915D0 (en) Improvements in or relating to closures
GB2530912B (en) Improvements in or relating to morphing tubulars
GB201413606D0 (en) Improvement in or relating to closures
AP2016009629A0 (en) Shale gas extraction
GB201414603D0 (en) Improvements in or relating to closures
GB2536321B (en) Improvements in or relating to morphing tubulars
GB201419234D0 (en) Hydrocarbon production process
GB2526621B (en) Improvements in or relating to stairlifts
GB2536314B (en) Hydrocarbon exploitation
GB2531123B (en) Improvements in or relating to morphing tubulars
GB2539002B (en) Improvements in or relating to hydrocarbon production from shale
GB2529132B (en) Improvements in or relating to stairlifts
GB201400699D0 (en) Improvements in or relating to servewear
GB2539001B (en) Improvements in or relating to hydrocarbon production from shale
GB201408137D0 (en) Improvements in or relating to mine ploughs
GB201405174D0 (en) Improvements in or relating to guttering
GB201515238D0 (en) Hydrocarbon production process
GB2526378B (en) Improvements in or relating to geological logging
GB201414882D0 (en) Improvements in or relating to closures
GB201418307D0 (en) Improvements in or relating to stairlifts
GB2524127B (en) Asphalt production