FR1358711A - Procédé de réalisation d'excavations au moyen d'un bouclier en terrain ébouleux ou aquifère - Google Patents

Procédé de réalisation d'excavations au moyen d'un bouclier en terrain ébouleux ou aquifère

Info

Publication number
FR1358711A
FR1358711A FR931229A FR931229A FR1358711A FR 1358711 A FR1358711 A FR 1358711A FR 931229 A FR931229 A FR 931229A FR 931229 A FR931229 A FR 931229A FR 1358711 A FR1358711 A FR 1358711A
Authority
FR
France
Prior art keywords
aquifer
shield
rocky terrain
making excavations
excavations
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
FR931229A
Other languages
English (en)
Inventor
Hans Lorenz
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ENTPR JOYA CHABERT
ENTREPRISES LEON CHAGNAUD AND FILS
Original Assignee
ENTPR JOYA CHABERT
ENTREPRISES LEON CHAGNAUD AND FILS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ENTPR JOYA CHABERT, ENTREPRISES LEON CHAGNAUD AND FILS filed Critical ENTPR JOYA CHABERT
Priority to FR931229A priority Critical patent/FR1358711A/fr
Application granted granted Critical
Publication of FR1358711A publication Critical patent/FR1358711A/fr
Expired legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/06Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
FR931229A 1963-04-11 1963-04-11 Procédé de réalisation d'excavations au moyen d'un bouclier en terrain ébouleux ou aquifère Expired FR1358711A (fr)

Priority Applications (1)

Application Number Priority Date Filing Date Title
FR931229A FR1358711A (fr) 1963-04-11 1963-04-11 Procédé de réalisation d'excavations au moyen d'un bouclier en terrain ébouleux ou aquifère

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
FR931229A FR1358711A (fr) 1963-04-11 1963-04-11 Procédé de réalisation d'excavations au moyen d'un bouclier en terrain ébouleux ou aquifère

Publications (1)

Publication Number Publication Date
FR1358711A true FR1358711A (fr) 1964-04-17

Family

ID=8801457

Family Applications (1)

Application Number Title Priority Date Filing Date
FR931229A Expired FR1358711A (fr) 1963-04-11 1963-04-11 Procédé de réalisation d'excavations au moyen d'un bouclier en terrain ébouleux ou aquifère

Country Status (1)

Country Link
FR (1) FR1358711A (fr)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2188002A1 (fr) * 1972-06-03 1974-01-18 Wayss & Freytag Ag
CN111535857A (zh) * 2020-05-18 2020-08-14 浙江交工宏途交通建设有限公司 一种全风化花岗岩浅埋富水层铣挖机隧道开挖施工方法
CN120313976A (zh) * 2025-06-16 2025-07-15 北京市政建设集团有限责任公司 盾构渣土取样装置

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2188002A1 (fr) * 1972-06-03 1974-01-18 Wayss & Freytag Ag
CN111535857A (zh) * 2020-05-18 2020-08-14 浙江交工宏途交通建设有限公司 一种全风化花岗岩浅埋富水层铣挖机隧道开挖施工方法
CN120313976A (zh) * 2025-06-16 2025-07-15 北京市政建设集团有限责任公司 盾构渣土取样装置

Similar Documents

Publication Publication Date Title
OA03580A (fr) Procédé et dispositif pour l'investigation de formations de terrain traversées par un forage.
GB1244065A (en) Method and arrangement for purifying water
IT1088186B (it) Impianto per l'irrigazione del suolo
DK135054B (da) Redskab koblet til et trækkøretøj og til løsning i dybden af jord af enhver art.
FR1358711A (fr) Procédé de réalisation d'excavations au moyen d'un bouclier en terrain ébouleux ou aquifère
OA04461A (fr) Procédé de titrage par diagraphie de l'uranium dans les formations traversées par un forage.
DK360776A (da) Sammensat borerorforlengelse til et jordslagbor
FR1443392A (fr) Procédé et dispositif pour l'ancrage de tirants en terrains meubles et tirants ainsi réalisés
FR1338375A (fr) Procédé et dispositif pour le percement de tunnels ou galeries dans les terrains instables
FR1503292A (fr) Procédé et dispositif de détermination d'accidents dans des couches de terrain, notamment dans les mines
FR1370029A (fr) Procédé de consolidation et d'étanchement de roches
FR1496454A (fr) Excavatrice et procédé d'exécution des fouilles
FR1546995A (fr) Procédé et dispositif pour l'étude des formations traversées par un sondage
FR89096E (fr) Procédé de consolidation et d'ancrage de roches
OA03071A (fr) Procédé de prospection des terrains situés autour d'un forage.
FR1532802A (fr) Procédé d'affermissement de terrains meubles, en particulier de talus
JPS5364914A (en) Method of improving weak ground by injection
CH400813A (de) Procédé de fabrication d'un outil abrasif de profilage au moyen d'un moule
GR23257B (el) Μεθοδος διορυξεως σηραγγος μεγαλης διατομης εντοσχαλαρου ισχυρως υδροφορου εδαφους δια βοηθητικης υδρομαστευτικης στοας.
FR1546095A (fr) Perfectionnement apporté aux combinés d'abatage du charbon utilisés dans les tailles en dressant
Prest Varved clays overlapping gravels. Borrow Pit in Esker, 200 yds north of Bug River Bridge, five miles south of Balmertown road cut-off, south of Red Lake, NW Ontario. Vein to north showing unctuous varved clays lapping up on west flank of ridge to an altitude of 29 feetabove the highway, Northward the esker rises rapidly to an altitude of about 75 feet above the road. There is no clearly evident wave-washed surface.
FR1367212A (fr) Procédé de formation d'une couche de végétation sur un terrain particulièrementtrès abrupt et rocheux
FR1546994A (fr) Procédé et dispositif pour l'étude des formations traversées par un sondage
FR1487714A (fr) Procédé et dispositif de mise en place de pieux et étais pour l'extraction minière souterraine
FR96508E (fr) Procédé de prospection des terrains situés autour d'un forage.