[go: up one dir, main page]

ES2614241B2 - Land preparation method for landscape planting on unfavorable soils and its implementation system - Google Patents

Land preparation method for landscape planting on unfavorable soils and its implementation system Download PDF

Info

Publication number
ES2614241B2
ES2614241B2 ES201700367A ES201700367A ES2614241B2 ES 2614241 B2 ES2614241 B2 ES 2614241B2 ES 201700367 A ES201700367 A ES 201700367A ES 201700367 A ES201700367 A ES 201700367A ES 2614241 B2 ES2614241 B2 ES 2614241B2
Authority
ES
Spain
Prior art keywords
unfavorable
fertile
soils
land
modules
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
ES201700367A
Other languages
Spanish (es)
Other versions
ES2614241R1 (en
ES2614241A2 (en
Inventor
Rafael CEBALLOS JIMÉNEZ
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to ES201700367A priority Critical patent/ES2614241B2/en
Publication of ES2614241A2 publication Critical patent/ES2614241A2/en
Publication of ES2614241R1 publication Critical patent/ES2614241R1/en
Application granted granted Critical
Publication of ES2614241B2 publication Critical patent/ES2614241B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G9/00Cultivation in receptacles, forcing-frames or greenhouses; Edging for beds, lawn or the like
    • A01G9/02Receptacles, e.g. flower-pots or boxes; Glasses for cultivating flowers
    • A01G9/029Receptacles for seedlings
    • A01G9/0295Units comprising two or more connected receptacles

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Environmental Sciences (AREA)
  • Cultivation Of Plants (AREA)

Abstract

Método de preparación del terreno para la plantación paisajística en suelos desfavorables y sistema de puesta en práctica del mismo.#El método consiste en formar columnas de suelo fértil de forma simultánea a la construcción de una escombrera o similar por vertido (1) de material estéril, mediante un conjunto de módulos (2) tubulares, hasta alcanzar la cota final de dicho terreno desfavorable que será cubierta por una capa (3) de tierra vegetal. Una capa (3) de escaso espesor sólo permitiría el normal desarrollo de vegetales de pequeña envergadura, mientras que las columnas de suelo fértil obtenidas mediante el relleno de los módulos (2) con suelo fértil y estructurado permitirán el enraizado de árboles y arbustos de gran porte, consiguiéndose así una integración paisajística óptima.Method of preparing the land for landscape planting in unfavorable soils and its implementation system. # The method consists of forming columns of fertile soil simultaneously to the construction of a debris or similar by pouring (1) of sterile material , by means of a set of tubular modules (2), until reaching the final level of said unfavorable terrain that will be covered by a layer (3) of topsoil. A layer (3) of low thickness would only allow the normal development of small plants, while the columns of fertile soil obtained by filling the modules (2) with fertile and structured soil will allow rooting of large trees and shrubs bearing, thus achieving optimal landscape integration.

Description

MÉTODO DE PREPARACiÓN DEL TERRENO PARA LA PLANTACiÓN PAISAJíSTICA LAND PREPARATION METHOD FOR LANDSCAPE PLANTATION

EN SUELOS DESFAVORABLES Y SISTEMA DE PUESTA EN PRÁCTICA DEL MISMO IN UNFAVORABLE SOILS AND PUTTING SYSTEM IN PRACTICE OF THE SAME

OBJ ETO DE LA INVENCiÓN OBJECT OF THE INVENTION

La presente invención se refiere a un método de preparación del terreno para la plantación paisajística en suelos desfavorables, previsto concretamente para permitir el crecimiento de árboles y arbustos de cualquier porte sobre suelos degradados o modificados desfavorablemente, como son las escombreras, escolleras, vertederos o similares generados por trabajos de ingeniería civil o relacionados con ella. The present invention relates to a method of preparing the land for landscape planting on unfavorable soils, specifically intended to allow the growth of trees and shrubs of any size on degraded or unfavorably modified soils, such as debris, breakwaters, landfills or the like generated by civil engineering works or related to it.

Es igualmente objeto de la invención el sistema para la puesta en práctica de dicho método. The system for implementing said method is also the object of the invention.

ANTECEDENTES DE LA INVENCiÓN BACKGROUND OF THE INVENTION

Las plantaciones de árboles y arbustos con objetivos paisajísticos, son eficaces cuando se realizan, entre muchos otros condicionantes, sobre suelos profundos, fértiles y estructurados que permitan el desarrollo de un sistema radical potente yequilibrado. Tree and shrub plantations with landscape objectives are effective when, among many other conditions, they are carried out on deep, fertile and structured soils that allow the development of a powerful and balanced balanced system.

Ahora bien, cuando las plantaciones se realizan sobre ~suelos desfavorablesM como los However, when plantations are carried out on unfavorable soils M such as

, ,

que se encuentran en ámbitos que se corresponden con escombreras, escolleras, rellenos de huecos mineros y/o espacios generados como consecuencia de la construcción de obra civil, la falta de suelo fértil es evidente, de manera que la escasa potencia de la capa de tierra vegetal que se suele utilizar en el cubrimiento de dichos terrenos desfavorables impide que los árboles o arbustos que posteriormente se plantan en dichos terrenos progresen adecuadamente y es su raquitismo y falta de vigor lo que pone de manifiesto el fracaso ante los objetivos paisajistas. that are in areas that correspond to dumps, breakwaters, fillings of mining holes and / or spaces generated as a result of the construction of civil works, the lack of fertile soil is evident, so that the low power of the earth layer The plant that is usually used to cover these unfavorable lands prevents the trees or shrubs that are subsequently planted in these lands from progressing properly and it is their rickets and lack of vigor that demonstrates the failure of landscape objectives.

El estado actual de la técnica para la preparación del terreno para plantaciones con objetivo principal de integración paisajística en este tipo de espacios, viene dado por métodos de incorporación, sobre el terreno estéril, de una capa de tierra vegetal de espesor variable (15-50 centímetros), para la implantación de tapices herbáceos y semiarbustivos y por la apertura de hoyos de profundidad también variable (0,5-1,2 metros), para su relleno con tierra vegetal y plantación posterior de árboles y arbustos. The current state of the art for the preparation of the land for plantations with the main objective of landscape integration in this type of spaces, is given by methods of incorporating, on the sterile ground, a layer of vegetal soil of variable thickness (15-50 centimeters), for the implantation of herbaceous and semi-combustible tapestries and for the opening of holes of varying depth (0.5-1.2 meters), for filling with topsoil and subsequent planting of trees and shrubs.

No obstante, cuando el objetivo que se persigue con la plantación arbórea y arbustiva, es la integración paisajística de la escombrera en su cuenca visual basada en el arbolado y grandes vegetales, las técnicas actuales no alcanzan el resultado apetecido, debido particularmente a que el reducido volumen de suelo fértil de que dispone la planta para el normal desarrollo de sus raíces, tronco y copa, se encuentra concentrado en un núcleo de escaso volumen y en una capa superficial de tierra vegetal con un espesor muy pequeño. However, when the objective pursued with tree and shrub plantation, is the landscape integration of the debris in its visual basin based on woodland and large plants, current techniques do not reach the desired result, particularly because the reduced Volume of fertile soil available to the plant for the normal development of its roots, trunk and crown, is concentrated in a nucleus of small volume and in a superficial layer of topsoil with a very small thickness.

Si bien el aumento de espesor de la capa de tierra vegetal parece ser una solución obvia, el caso es que los costes en que se incurre para la adquisición del volumen necesario de dicha tierra para un normal desarrollo de los arboles y la pérdida de ingresos por la merma del mismo volumen en acogida de estériles asciende, en la mayoría de los casos, a un importe que hace inviable la operación. Although the increase in the thickness of the topsoil seems to be an obvious solution, the cost is incurred for the acquisition of the necessary volume of said land for normal tree development and loss of income from the decrease of the same volume in sterile reception amounts, in most cases, to an amount that makes the operation unfeasible.

DESCRIPCiÓN DE LA INVENCiÓN DESCRIPTION OF THE INVENTION

El método que se preconiza resuelve de forma plenamente satisfactoria la problemática anteriormente expuesta, minimizando los costes en su ejecución. The recommended method solves in a completely satisfactory way the problem previously exposed, minimizing the costs in its execution.

Para ello, y de forma más concreta, el método de la invención se basa en establecer un conjunto de columnas de suelo fértil inserto en el propio terreno desfavorable construidas de manera simultánea al proceso de vertido de las tierras estériles que forman dicho terreno desfavorable, permitiendo el desarrollo radicular óptimo de cualquier especie vegetal que se plante en la cabeza de la columna, incluidos los árboles de gran porte. To do this, and more specifically, the method of the invention is based on establishing a set of columns of fertile soil inserted in the unfavorable terrain constructed simultaneously with the process of dumping the sterile lands that form said unfavorable land, allowing the optimal root development of any plant species that arises at the head of the column, including large trees.

A diferencia de los procedimientos actuales, la ejecución del método de preparación del terreno de la invención se acompasa con la construcción de la escombrera o terreno desfavorable, y no se espera a que este esté conformado, de manera tal que el volumen de suelo fértil y estructurado se pone a disposición de la planta, con la debida potencia o espesor para que el desarrollo de las raíces esté equilibrado en comparación con el Unlike the current procedures, the execution of the method of preparation of the land of the invention is accompanied by the construction of the debris or unfavorable land, and is not expected to be shaped, so that the volume of fertile soil and structured is made available to the plant, with the proper power or thickness so that the development of the roots is balanced compared to the

volumen de copa o masa foliar del vegetal tipo, sin necesidad de tener que realizar hoyos de la misma capacidad sobre la superficie de la escombrera o terreno desfavorable. Las columnas de suelo fértil se construyen de manera modular, ascendiendo según se eleva el nivel de la escombrera. La cota inicial de la columna, es decir la profundidad del plano sobre el que se apoya la columna vendrá dada por la geometría de la escombrera y por las características organográficas del vegetal a implantar. cup volume or leaf mass of the type vegetable, without having to make holes of the same capacity on the surface of the debris or unfavorable ground. The columns of fertile soil are constructed in a modular way, rising as the level of the debris rises. The initial level of the column, that is to say the depth of the plane on which the column rests, will be given by the geometry of the debris and by the organizational characteristics of the plant to be implanted.

A partir del diseño de integración paisajística mediante plantaciones, el sistema para la puesta en practica del método de la invención consiste en utilizar una serie de módulos tubulares que se sitúan en las zonas previstas para la plantación de los árboles y, tras rellenarlos con suelo fértil y estructurado, se verterán en la escombrera los estériles que serán compactados sin afectar la verticalidad de dichos módulos, de manera tal que cada módulo soporte de la columna de tierra fértil presentará unas dimensiones variables de acuerdo con el desarrollo de la especie vegetal que se vaya a implantar, pudiéndose considerar como estándar un módulo de configuración circular, de 1,5 metros de alto y 1,5 metros de diámetro, sin descartar otras medidas y configuraciones tubulares. From the landscape integration design through plantations, the system for the implementation of the method of the invention consists in using a series of tubular modules that are located in the areas planned for planting the trees and, after filling them with fertile soil and structured, the sterile ones that will be compacted without affecting the verticality of said modules will be poured into the dump, so that each support module of the fertile soil column will have variable dimensions according to the development of the plant species that leaves to be implemented, being able to consider as standard a circular configuration module, 1.5 meters high and 1.5 meters in diameter, without discarding other measures and tubular configurations.

Considerando el volumen de tierra necesario para el desarrollo radicular medio de la mayor parte de los árboles en las situaciones más generales, se considera como dato estándar, que no limitativo, que el módulo columnar inicial se coloque a cota de -12 metros, tomando como cota cero la de la superficie final de la escombrera, siendo recomendable su prolongación hasta entrar en contacto con el terreno natural. Considering the volume of land necessary for the average root development of most of the trees in the most general situations, it is considered as standard, not limiting, that the initial columnar module be placed at a height of -12 meters, taking as Zero the level of the final surface of the debris, and its extension is recommended until it comes into contact with the natural terrain.

La construcción de la columna de suelo fértil mediante módulos tubulares puede realizarse según dos procedimientos: Uno, siguiendo el apilamiento de un módulo sobre otro, de manera ascendente, acompasado al crecimiento de la propia escombrera; otro, realizando la extracción parcial del módulo, deslizándolo hacia la superficie, hasta alcanzar la cota cero. The construction of the fertile soil column by means of tubular modules can be carried out according to two procedures: One, following the stacking of one module on the other, in an ascending manner, accompanied by the growth of the debris itself; another, making the partial extraction of the module, sliding it towards the surface, until reaching the zero level.

Estos procedimientos los definimos "por apilamienton y "por deslizamientoB We define these procedures "by stacking and" by sliding B

, ,

respectivamente. respectively.

Aún cuando cualquier material es susceptible de utilizarse en la construcción de los módulos, siempre que posea la suficiente rigidez para soportar la columna de suelo Even when any material is capable of being used in the construction of the modules, provided that it has sufficient rigidity to support the floor column

durante el proceso constructivo, la elección adecuada del material estará en relación con el procedimiento constructivo y con las características contaminantes o no de los materiales que constituyen la escombrera. During the construction process, the appropriate choice of the material will be in relation to the construction procedure and the contaminant characteristics or not of the materials that constitute the dump.

Así, a modo de ejemplo: Thus, by way of example:

a) Si los materiales estuvieran contaminados, el procedimiento constructivo deberá ser el de apilamiento y el material de los módulos tendrá que ser impermeable. a) If the materials were contaminated, the construction procedure must be stacking and the material of the modules must be impermeable.

b) Si se optara por el apilamiento y la escombrera fuera inerte, los módulos podrían estar perforados para permitir la emigración de las raíces, en su caso, y el material con el que se construyan podría ser biodegradable. b) If stacking were chosen and the debris were inert, the modules could be perforated to allow the migration of the roots, where appropriate, and the material with which they were constructed could be biodegradable.

e) El método por deslizamiento se empleará en aquellos casos en que los materiales de la escombrera sean totalmente inertes y no estén contaminados. Este método optimiza la integración del sistema radical de la planta en el conjunto del terreno, a la par que minimiza costes pues, dado el carácter tubular de los módulos, una vez enrasada la cota de avance de la escombrera con la superior del módulo, éste podrá deslizarse ascendentemente para volver a rellenarse con suelo fértil y progresar sin solución de continuidad la construcción de la escombrera. e) The sliding method will be used in those cases where the materials in the dump are totally inert and not contaminated. This method optimizes the integration of the radical system of the plant in the whole of the land, while minimizing costs because, given the tubular nature of the modules, once the level of progress of the debris is flush with the upper one of the module, this one it can slide upwards to be refilled with fertile soil and to progress without building continuity the construction of the debris.

Los módulos, una vez alcanzada la cota cero de la escombrera podrán retirarse para su reutilización en la misma o en otra escombrera. The modules, once reached the zero level of the debris can be removed for reuse in the same or in another dump.

Así pues, se consigue un método/sistema que con unos costes minimos, permite implantar árboles de gran porte en suelos desfavorables, con la consecuente integración paisajística y beneficiosa repercusión medioambiental que ello supone. Thus, a method / system is achieved that, with minimal costs, allows large trees to be implanted in unfavorable soils, with the consequent landscape integration and beneficial environmental impact that this entails.

DESCRIPCiÓN DE LOS DIBUJOS DESCRIPTION OF THE DRAWINGS

Para complementar la descripción que seguidamente se va a realizar y con objeto de ayudar a una mejor comprensión de las características del invento, de acuerdo con un ejemplo preferente de realización práctica del mismo, se acompaña como parte integrante de dicha descripción, un plano en donde con carácter ilustrativo y no limitativo, se ha representado lo siguiente: To complement the description that will then be made and in order to help a better understanding of the features of the invention, according to a preferred example of practical implementation thereof, an accompanying plan is attached as an integral part of said description. In an illustrative and non-limiting manner, the following has been represented:

La figura 1.-Muestra una vista en sección de un suelo desfavorable el cual ha sido construido de acuerdo con el método, objeto de la invención, de preparación del terreno para llevar a cabo una plantación paisajística. Figure 1 shows a sectional view of an unfavorable soil which has been constructed according to the method, object of the invention, of preparing the land to carry out a landscape plantation.

REALIZACiÓN PREFERENTE DE LA INVENCiÓN PREFERRED EMBODIMENT OF THE INVENTION

A la vista de las figuras reseñadas puede observarse cómo el método de preparación del terreno para la plantación paisajística en suelos desfavorables objeto de la invención se basa en que de forma simultanea al vertido (1) de material estéril, se disponen una serie de módulos (2) tubulares, apilables verticalmente y susceptibles de ser acoplados entre sí de forma ascendente, que se rellenan de suelo fértil y estructurado, al objeto de que sobre la escollera, escombrera, o terreno desfavorable, pueda crecer cualquier vegetal de gran porte, disponiendo para ello de un gran volumen en el que extender sus ralees. In view of the aforementioned figures, it can be seen how the method of preparing the land for landscape planting on unfavorable soils that is the object of the invention is based on the fact that, simultaneously with the pouring (1) of sterile material, a series of modules ( 2) tubular, vertically stackable and capable of being coupled to each other in an ascending manner, which are filled with fertile and structured soil, so that any large plant can grow on the breakwater, rubble, or unfavorable ground, providing for this of a great volume in which to extend its ralees.

Los módulos (2) se irán apilando verticalmente, tal y como muestra la figura 1, según se vayan disponiendo las distintas capas (1) de material estéril o bien, de acuerdo con una segunda variante de realización de la invención, para cada columna, un módulo podrá deslizarse o ser desplazado verticalmente, en virtud de su naturaleza tubular, en orden tanto a ser reutilizado al final de la construcción de la escombrera como con el objeto de conseguir un mejor contacto de la columna de suelo y del sistema radical de la planta con la totalidad del terreno, a la par que se favorece el desarrollo de las primeras raices horizontales dentro de la capa de tierra vegetal (3) que corona la escombrera, de acuerdo con las técnicas expuestas en los actuales proyectos de integración paisajística. The modules (2) will be stacked vertically, as shown in Figure 1, as the different layers (1) of sterile material are arranged or, according to a second variant of the invention, for each column, a module may slide or be displaced vertically, by virtue of its tubular nature, in order both to be reused at the end of the construction of the dump and in order to achieve better contact of the floor column and the radical system of the plant with all the land, while promoting the development of the first horizontal roots within the layer of topsoil (3) that crowns the debris, according to the techniques outlined in the current landscape integration projects.

Claims (5)

REIVINDICACIONES •• Método de preparación del terreno para la plantación paisajística en suelos desfavorables, entendiéndose por tales los suelos degradados o modificados desfavorablemente por actividades humanas, como son las escombreras, escolleras, vertederos o similares generados por trabajos de ingeniería civil o relacionados con ella. Este método se caracteriza porque consiste en establecer columnas de suelo fértil y estructurado mediante el uso de módulos tubulares (2) rellenos de suelo fértil y estructurado insertos en el propio terreno desfavorable de form a simultánea a la construcción de la escombrera que se obtiene por aportación de sucesivas capas de materiales estériles hasta llegar a un nivel superior final que es cubierto por una capa (3) de tierra vegetal que queda en contacto con dichas columnas de suelo fértiL •• Method of preparing the land for landscape planting on unfavorable soils, understood as such degraded or unfavorably modified soils by human activities, such as the rubble, breakwaters, landfills or similar generated by civil engineering works or related to it. This method is characterized in that it consists in establishing columns of fertile and structured soil through the use of tubular modules (2) filled with fertile and structured soil inserted in the unfavorable land itself, simultaneously to the construction of the debris that is obtained by contribution of successive layers of sterile materials until reaching a final upper level that is covered by a layer (3) of topsoil that is in contact with said fertile soil columns 2a._ Método de preparación del terreno para la plantación paisajística en suelos desfavorables, según reivindicación 111 , caracterizado porque los módulos tubulares (2) rellenos de suelo fértil y estructurado se van apilando unos sobre otros de forma simultánea a la construcción de la escombrera mediante la aportación estratificada (1) de materiales estériles. 2a._ Method of preparing the land for landscape planting on unfavorable soils, according to claim 111, characterized in that the tubular modules (2) filled with fertile and structured soil are stacked on top of each other simultaneously to the construction of the debris by the stratified contribution (1) of sterile materials. 8 ._ Método de preparación del terreno para la plantación paisajística en suelos desfavorables, según reivindicación 111 , caracterizado porque los módulos tubulares (2) rellenos de suelo fértil y estructurado se desplazan verticalmente, según avanza la construcción de la escombrera o terreno desfavorable de que se trate, de manera que vuelvan a ser rellenados de suelo fértil de forma simultánea al vertido a su alrededor de las sucesivas tongadas de materiales estériles. 8 ._ Method of preparing the land for landscape planting in unfavorable soils, according to claim 111, characterized in that the tubular modules (2) filled with fertile and structured soil move vertically, as the construction of the debris or unfavorable land of which progresses be treated, so that they are filled again with fertile soil simultaneously to the discharge around the successive toned of sterile materials. 48 ._ Sistema de preparación del terreno para la plantación paisajística en suelos desfavorables, caracterizado porque en el mismo participan una pluralidad de módulos 48 ._ Site preparation system for landscape planting on unfavorable soils, characterized in that a plurality of modules participate in it
(2) (2)
tubulares apilables verticalmente, rellena bies de suelo fértil y estructurado para la formación de columnas verticales ascendentes. vertically stackable tubular, fills fertile and structured soil bias for the formation of ascending vertical columns.
8 ._ Sistema de preparación del terreno para la plantación paisajística en suelos desfavorables, según reivindicación 411 , caracterizado porque los módulos (2) se quedan en el terreno e incluyen medios de acoplamiento entre sí. 8 ._ Site preparation system for landscape planting in unfavorable soils, according to claim 411, characterized in that the modules (2) remain in the field and include coupling means to each other.
68 ._ Sistema de preparación del terreno para la plantación paisajistica en suelos desfavorables, según reivindicación 48, caracterizado porque los módulos (2) tubulares son rigidos e indeformables y van provistos de elementos que permiten su deslizamiento y extracción ascendente en la columna, presentando un carácter recuperable al final de la construcción de la escombrera. 68 ._ Site preparation system for landscape planting on unfavorable soils, according to claim 48, characterized in that the tubular modules (2) are rigid and non-deformable and are provided with elements that allow their sliding and upward extraction in the column, presenting a recoverable character at the end of the construction of the dump.
ES201700367A 2017-03-31 2017-03-31 Land preparation method for landscape planting on unfavorable soils and its implementation system Active ES2614241B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
ES201700367A ES2614241B2 (en) 2017-03-31 2017-03-31 Land preparation method for landscape planting on unfavorable soils and its implementation system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
ES201700367A ES2614241B2 (en) 2017-03-31 2017-03-31 Land preparation method for landscape planting on unfavorable soils and its implementation system

Publications (3)

Publication Number Publication Date
ES2614241A2 ES2614241A2 (en) 2017-05-30
ES2614241R1 ES2614241R1 (en) 2017-06-27
ES2614241B2 true ES2614241B2 (en) 2018-01-03

Family

ID=58762755

Family Applications (1)

Application Number Title Priority Date Filing Date
ES201700367A Active ES2614241B2 (en) 2017-03-31 2017-03-31 Land preparation method for landscape planting on unfavorable soils and its implementation system

Country Status (1)

Country Link
ES (1) ES2614241B2 (en)

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3257863B2 (en) * 1993-04-28 2002-02-18 原田株式会社 Embankment block and embankment method using the block
TW316939B (en) * 1995-06-07 1997-10-01 Keystone Retaining Wall System
KR20100012436U (en) * 2009-06-05 2010-12-15 이종만 Pro-Environment Landscape Facilities Using Synthetic Wood
KR101077244B1 (en) * 2010-08-17 2011-10-27 유흥식 Retaining Wall Construction System and Construction Method for Preventing Tsunami and Flood Damage
KR102042226B1 (en) * 2012-02-24 2019-11-07 최종선 Reinforced block with installable flowerpot
CN102704441A (en) * 2012-05-30 2012-10-03 中水东北勘测设计研究有限责任公司 Arrangement method of ecological gabion chamber revetment type
CN104818731A (en) * 2015-05-06 2015-08-05 安徽普氏生态环境工程有限公司 Combined ecological retaining wall building block and construction technology thereof

Also Published As

Publication number Publication date
ES2614241R1 (en) 2017-06-27
ES2614241A2 (en) 2017-05-30

Similar Documents

Publication Publication Date Title
Armillas Gardens on swamps: archeological research verifies historical data on Aztec land reclamation in the valley of Mexico.
CA2797478C (en) Structure for creating housings for setting trees into the ground, and method for setting trees into the ground
CN111316853A (en) Stone mountain damaged surface vegetation and planting method thereof
CN101743828A (en) Method for growing plants on slope
CN103190259A (en) Deep planting method for desertification prevention and control
CN104770270B (en) Shrub planting and establishing method and its seedling protecting cover in a kind of side slope protection
ES2614241B2 (en) Land preparation method for landscape planting on unfavorable soils and its implementation system
CN205232722U (en) Slot type ecological isolation takes terraced fields in xeothermic river valley district
CN211498731U (en) River course side slope protective structure
CN205232872U (en) Xeothermic river valley district ecological isolation takes terraced fields
CN203827782U (en) Water-accumulation-preventing arbor planting hole structure
CN202627005U (en) Rock mountain ecological restoration structure
KR20090113984A (en) Retaining Wall Retaining Method through Various Wildflower Vegetation
CN109937783A (en) A kind of method of barren mountainous region afforestation
RU97111654A (en) METHOD FOR CREATING LONG-TERM PLANTATIONS OF GLYCYRRHIZA GLABRA L. LICORICE AND GLYCYRRHIZA URALENSIS FISCH
CN105009721B (en) Base of the rail robot isolation implant farmland
CN210094189U (en) A planting structure of cherry tree on steep slope
CN109006213A (en) Restore the method for vegetation plantation on a kind of rock terrace land
CN107853052A (en) A kind of rock side-slope is quickly administered and afforests and beautifies method
KR101069309B1 (en) A method of revegetation for retaining wall using vegetation filter
Cong Tianshan as a bridge: New studies of Bronze Age archaeology in the western Tianshan, Xinjiang, China
KR20140072481A (en) vegetation sack and tree planting method of construction used thereof
KR101698035B1 (en) Soil layer structure at reclaimed land near seaside for plantation
CN113545236B (en) Covering and planting rod structure suitable for mountain slope treatment and covering and planting treatment method thereof
CN215948081U (en) Plant-growing type pervious concrete block

Legal Events

Date Code Title Description
FG2A Definitive protection

Ref document number: 2614241

Country of ref document: ES

Kind code of ref document: B2

Effective date: 20180103