ES2228855T3 - PROCEDURE AND DEVICE FOR SEMIAUTOMATIC REALIZATION IN SITU, METAL DEPOSITS. - Google Patents

PROCEDURE AND DEVICE FOR SEMIAUTOMATIC REALIZATION IN SITU, METAL DEPOSITS.

Info

Publication number
ES2228855T3
ES2228855T3 ES01929745T ES01929745T ES2228855T3 ES 2228855 T3 ES2228855 T3 ES 2228855T3 ES 01929745 T ES01929745 T ES 01929745T ES 01929745 T ES01929745 T ES 01929745T ES 2228855 T3 ES2228855 T3 ES 2228855T3
Authority
ES
Spain
Prior art keywords
welding
sheet
sheet metal
ferrule
realization
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
ES01929745T
Other languages
Spanish (es)
Inventor
Colbert Briancon
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HOLDING FINANCIERE C T SARL SO
Holding Financiere Ct Sarl Ste
Original Assignee
HOLDING FINANCIERE C T SARL SO
Holding Financiere Ct Sarl Ste
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HOLDING FINANCIERE C T SARL SO, Holding Financiere Ct Sarl Ste filed Critical HOLDING FINANCIERE C T SARL SO
Application granted granted Critical
Publication of ES2228855T3 publication Critical patent/ES2228855T3/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D51/00Making hollow objects
    • B21D51/16Making hollow objects characterised by the use of the objects
    • B21D51/18Making hollow objects characterised by the use of the objects vessels, e.g. tubs, vats, tanks, sinks, or the like

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Butt Welding And Welding Of Specific Article (AREA)
  • Bending Of Plates, Rods, And Pipes (AREA)
  • Container Filling Or Packaging Operations (AREA)

Abstract

The invention concerns a method whereby a steel strip (41) derived from a roll is gradually straightened out, cambered and engaged on rollers (13) supported on cylinders (12), until, after the corresponding perimeter is obtained, the ends are separated and welded together, then in lifting with the actuators (12) said first hoop to a height sufficient for production, then gradually assembling by welding a second hoop by the above process. All those operations are managed by a programmable automaton.

Description

Procedimiento y dispositivo de realización semiautomática in situ, de depósitos metálicos.Procedure and device of semi-automatic realization in situ , of metallic deposits.

La presente invención se refiere a un procedimiento y a un dispositivo de realización semiautomática, in situ, de depósitos metálicos cilíndricos de gran capacidad.The present invention relates to a method and to a semi-automatic embodiment device, in situ , of large capacity cylindrical metal tanks.

Se plantean problemas de orden económico para la realización de depósitos de acero de gran diámetro, debido a que está excluido, por razones de volumen, realizarlos en otros lugares que no sea in situ, los constructores están obligados a abrir un taller específico en los mismos lugares de la implantación, desplazando un equipo a veces importante de obreros especializados (caldereros industriales, soldadores, etcétera) que sólo disponen, para llevar a cabo su tarea, de un material de base, que facilita el conformado, el oxicorte y la soldadura de placas de chapa cuyas dimensiones deben ser limitadas para facilitar la manutención y ensamblado. Resulta de esto una pérdida de tiempo que se traduce por unos precios de coste elevados y problemas, en cuanto al respeto del plazo impuesto por el cliente, con respecto al planning previamente establecido con los representantes de otros cuerpos de trabajo.Problems of economic order arise for the realization of large diameter steel tanks, because it is excluded, for reasons of volume, to carry them out in places other than in situ , builders are obliged to open a specific workshop in them places of the implantation, displacing a sometimes important team of specialized workers (industrial boilers, welders, etc.) that only have, to carry out their task, a base material, which facilitates the forming, oxycutting and welding of sheet metal plates whose dimensions must be limited to facilitate maintenance and assembly. This results in a waste of time that results in high cost prices and problems, in terms of respecting the deadline imposed by the client, with respect to the planning previously established with the representatives of other labor bodies.

Se conocen ya un procedimiento y un dispositivo de realización de depósitos cilíndricos y de virolas a partir de chapa, tales como los descritos en la patente europea nº 0136581 con los cuales las virolas se obtienen por aplicado de bandas de chapa contra el reborde de un plato giratorio, de diámetro apropiado, sobre el cual dichas bandas son introducidas progresivamente a medida que tiene lugar el desarrollado de la bobina y del enderezado de la chapa.A procedure and a device are already known of realization of cylindrical tanks and ferrules from sheet metal, such as those described in European Patent No. 0136581 with which the ferrules are obtained by applying bands of sheet against the flange of a turntable, diameter appropriate, on which said bands are introduced progressively as the development of the coil and sheet metal straightening.

Este procedimiento y este dispositivo sólo pueden sin embargo ser utilizados para la realización de virolas de pequeño espesor, teniendo en cuenta la flexibilidad de la chapa exigida por este modo de conformado.This procedure and this device can only nevertheless be used to make ferrules of small thickness, taking into account the flexibility of the sheet required by this mode of forming.

Se conocen también un procedimiento y un dispositivo de realización semiautomática de depósitos y de virolas que corresponden al preámbulo de la reivindicación 1 (Patente europea nº 0727264). El procedimiento consiste en efectuar, en este orden, las operaciones siguientes:A procedure and a method are also known. semi-automatic storage device and ferrules corresponding to the preamble of claim 1 (Patent European No. 0727264). The procedure consists in carrying out, in this order, the following operations:

a)to)
Realización de una primera virola.Making a first ferrule

b)b)
Colocación y solidarización de un techo sobre la primera virola.Placement and solidarity of a roof on the first ferrule.

c)C)
Elevación del conjunto realizado en la operación anterior a una altura correspondiente a la anchura de la banda de chapa.Elevation of the set made in the previous operation at a height corresponding to the width of the sheet metal band

d)d)
Realización de una segunda virola bajo la primera.Making a second low ferrule the first.

e)and)
Solidarización progresiva de la virola realizada en la operación (a) con la realizada en la operación anterior (d).Progressive Solidarization of the Ferrule performed in the operation (a) with the one performed in the operation previous (d).

f)F)
Repetición de las operaciones (c) (d) y (e) tantas veces como sea necesario para obtener la altura de cuba deseada.Repeat operations (c) (d) and (e) as many times as necessary to obtain the height of Cuba desired.

g)g)
Colocación del conjunto, realizado según las operaciones anteriores, sobre un fondo de diámetro correspondiente y solidarización de éste con la última virola.Set placement, performed according to the previous operations, on a bottom of diameter corresponding and solidarity of this one with the last ferrule

Las virolas se realizan por curvado, plegado, a medida que tiene lugar el arrastre y el desarrollado de la bobina de chapa. Cuando tiene lugar la realización de una virola, directamente bajo la precedente, la banda de chapa es progresivamente solidarizada a la virola anterior, que arrastra en rotación, estando esta solidarización precedida de un apoyo también progresivo de esta virola anterior sobre el canto de la banda de dicha pared en curso de paso hasta realización completa de esta virola siguiente. El control del curvado de la banda de chapa, según el radio exigido, está asegurado de forma permanente, a medida que tiene lugar el arrastre y el paso de ésta.The ferrules are made by bending, folding, to as the dragging and development of the coil takes place of sheet metal. When the realization of a ferrule takes place, directly below the previous one, the sheet metal band is progressively sympathetic to the previous ferrule, which drags in rotation, this solidarity being preceded by support as well progressive of this previous ferrule on the singing of the band of said wall in the process of passing until complete completion of this next ferrule. The control of the bending of the sheet metal band, according to the required radius is permanently insured, as dragging and passing of it takes place.

El dispositivo de aplicación del procedimiento anteriormente mencionado, está caracterizado principalmente por la utilización de medios de arrastre y de curvado de una banda de chapa que proviene de un rollo y de rodillos asociados a unos gatos de elevación repartidos regularmente sobre una circunferencia para constituir un malacate, de diámetro correspondiente al de las virolas a realizar, destinado a sostener provisionalmente la chapa después de curvado, siendo la chapa arrastrada por un tractor de rodillos motorizados.The device for applying the procedure previously mentioned, it is mainly characterized by the use of dragging and bending means of a band of sheet metal that comes from a roll and rollers associated with some cats lifting regularly distributed on a circumference to constitute a winch, with a diameter corresponding to that of the ferrules to be made, intended to temporarily hold the sheet after bending, the sheet being dragged by a tractor motorized rollers

Si bien el procedimiento y el dispositivo tales como los que acaban de ser descritos, permite de forma innegable la realización de las virolas directamente a partir de rollos de chapa, respetando de forma suficientemente precisa el radio exigido y la concordancia de virolas a fin de obtener una estanqueidad rigurosa en cada nivel, no permiten sin embargo, por sí solos, reducir el efectivo del equipo de obreros especializados ni tener una influencia determinante sobre la duración de la realización.While the procedure and the device such like those just described, it allows undeniably the realization of the ferrules directly from rolls of sheet, sufficiently respecting the required radius and the concordance of ferrules in order to obtain a tightness rigorous at each level, however, they do not allow themselves, reduce the cash of the team of skilled workers or have a determining influence on the duration of the realization.

La presente invención tiene por objetivo evitar estos inconvenientes. Esta invención tal como está caracterizada en las reivindicaciones, resuelve el problema que consiste en definir un procedimiento y en crear un dispositivo que permita la realización semiautomática en un tiempo muy corto, por efectivo de obreros especializados muy reducido, de depósitos de chapa de gran capacidad, a partir de rollos de chapa del comercio.The present invention aims to avoid these inconveniences. This invention as characterized in The claims solve the problem of defining a procedure and in creating a device that allows the semi-automatic realization in a very short time, for cash of highly reduced skilled workers, from large sheet metal warehouses capacity, from rolls of sheet metal of the trade.

El procedimiento de realización in situ de depósitos metálicos cilíndricos de gran capacidad, a partir de bobinas de chapa que utiliza un medio de arrastre, de curvado y de paso de la banda de chapa así como unos medios de corte transversal, de acercamiento y de soldadura longitudinal de las bandas de chapa, que consiste en realizar las virolas por curvado, plegado progresivo en función del diámetro buscado, a medida que tiene lugar el arrastre y el desarrollo de la banda de chapa y en realizar sucesivamente las virolas de arriba hacia abajo realizando cada una de ellas directamente bajo la precedente, arrastrando ésta en rotación por solidarización progresiva de la banda de chapa en curso de conformado, estando esta solidarización precedida de un apoyo también progresivo de la virola precedente sobre el canto de la banda de chapa en el curso del paso hasta la realización completa de una virola siguiente, siendo el techo fijado sobre el canto superior de la primera virola después de realización de ésta o de las dos primeras virolas; siendo la pared solidarizada al fondo en cuanto ha alcanzado la altura deseada, se caracteriza, según la invención, principalmente:The process of realization in situ of cylindrical metal tanks of great capacity, from sheet metal coils that uses a means of dragging, bending and passing of the sheet metal band as well as means of cross-cutting, approach and welding length of the sheet metal bands, which consists of making the ferrules by bending, progressive folding depending on the diameter sought, as the dragging and development of the sheet metal band takes place and in successively performing the top-down ferrules performing each one of them directly under the previous one, dragging it in rotation by progressive solidarity of the sheet metal band in the process of forming, this solidarity being preceded by also a progressive support of the preceding ferrule on the edge of the sheet metal band in the course from the passage to the complete realization of a following ferrule, the roof being fixed on the upper edge of the first ferrule after completion of this or the first two ferrules; the wall being in solidarity at the bottom as soon as it has reached the desired height, it is characterized, according to the invention, mainly:

1º)1st)
porque la realización de las virolas está precedida de las operaciones siguientes:because the realization of the ferrules It is preceded by the following operations:

a)to)
Realización de un fondo por oxicorte circular de un ensamblaje de bandas de chapa previamente solidarizadas lateralmente con referencia a un punto C, determinado arbitrariamente sobre la superficie de este ensamblaje de chapas.Realization of a fund by oxicorte circular of an assembly of sheet metal strips previously solidarity laterally with reference to a point C, determined arbitrarily on the surface of this assembly of plates.

b)b)
Materialización del eje de simetría de las virolas por soldadura de un dispositivo de referencia de eje vertical Y que coincide exactamente con el punto C definido sobre la superficie del fondo en la etapa anterior.Materialization of the axis of symmetry of welding ferrules of a shaft reference device vertical Y that exactly matches the point C defined above the bottom surface in the previous stage.

c)C)
Posicionado preciso, con respecto al eje Y, del dispositivo de referencia, de todos los medios que concurren en el arrastre, en el paso, en el guiado, en el acercamiento y en la soldadura de las bandas de chapa y a la elevación del conjunto a medida que tiene lugar la realización.Precise positioning, with respect to Y axis, of the reference device, of all the means that concur in the drag, in the passage, in the guided, in the approach and welding of the sheet metal bands and to the elevation of the assembly as the realization.

2º)2nd)
Porque la posición vertical de los rodillos de paso de los medios de elevación está controlada a distancia de manera muy precisa, individualmente y colectivamente, en función de la progresión de las operaciones de ensamblado y de las secuencias impuestas por éstas.Because the vertical position of the step rollers of the lifting means is controlled to distance very precisely, individually and collectively, depending on the progression of assembly operations and the sequences imposed by them.

3º)3rd)
Porque la posición respectiva de los dispositivos de soldadura interna y externa está indicada de forma permanente de manera muy precisa en el curso de su utilización, con indicación inmediata de los desplazamientos que puedan aparecer entre los dos dispositivos, a fin de que este desplazamiento pueda ser inmediatamente anulado con el fin de conservar de forma permanente una perfecta concordancia de los puntos de soldadura interna y externa cuando tiene lugar la progresión de este cordón de soldadura en cornisa.Because the respective position of the Internal and external welding devices are indicated permanent very precisely in the course of its use, with immediate indication of the displacements that may appear between the two devices, so that this displacement can be immediately canceled in order to keep permanent a perfect match of welding points internal and external when the progression of this cord takes place Welding on ledge.

4º)4th)
Porque la solidarización por soldadura del techo sobre el canto correspondiente de la virola superior está acompañada de la rotación del conjunto en 360º a una velocidad controlada compatible con la progresión ideal del cordón de soldadura.Because welding solidarity of the roof over the corresponding edge of the upper ferrule is accompanied by the rotation of the whole in 360º at a speed controlled compatible with the ideal progression of the cord welding.

5º)5th)
Porque la soldadura del conjunto sobre el fondo está precedida del apoyo sobre unos tacos móviles del canto libre de la virola inferior, del desmontado de los rodillos de paso, del desplazamiento coordinado hacia abajo de dichos tacos móviles hasta el apoyo de dicho canto libre de la virola inferior, sobre el contorno del fondo, después de la evacuación por el orificio de hombre de los equipos inutilizables para esta operación final.Because the welding of the set over the fund is preceded by the support on some mobile blocks of the free edge of the lower ferrule, of the disassembly of the rollers passing, of the coordinated downward movement of said studs mobile until the support of said free edge of the lower ferrule, on the bottom contour, after evacuation by the man hole of unusable equipment for this operation final.

El dispositivo, según la invención, que permite la aplicación del procedimiento anteriormente expuesto, se caracteriza principalmente porque todos los medios utilizados para el desarrollo, el enderezado, el conformado, el arrastre, el corte, la soldadura y la elevación, están regidos por un autómata programable, controlable a distancia por una caja de mando sin hilos, respetando unos datos predeterminados.The device, according to the invention, which allows The application of the procedure described above is mainly characterized because all the means used to development, straightening, shaping, dragging, cutting, welding and lifting are governed by an automaton programmable, remotely controllable by a control box without threads, respecting predetermined data.

La posición de los electrodos de los dispositivos de soldadura es controlada por unos detectores conectados a un monitor que mide y representa, en tiempo real, las eventuales diferencias de posición en vista a su anulación inmediata.The position of the electrodes of the devices welding is controlled by detectors connected to a monitor that measures and represents, in real time, any position differences in view of immediate cancellation.

Las ventajas obtenidas, gracias a esta invención, consisten esencialmente en que todos los parámetros de conformado, de corte, de ensamblado y de soldadura son determinados previamente de manera muy precisa e introducidos en el autómata programable antes de la apertura del taller, dejando al mismo tiempo a los operarios el control de la totalidad del desarrollo del proceso a través de medios de mando a distancia no filares, lo que permite por tanto desplazar al lugar solamente un número muy limitado de personas, reducido muy a menudo a tres, disminuyendo al mismo tiempo el tiempo de realización, dada la eliminación previa de los tiempos muertos anteriores que resultan de la preparación de los ajustes, de las manutenciones y de los tanteos.The advantages obtained, thanks to this invention, essentially consist of all the forming parameters, cutting, assembly and welding are determined previously very precisely and introduced in the programmable automaton before the opening of the workshop, leaving at the same time Operators control the entire process development to through non-remote remote control means, which allows therefore move to the place only a very limited number of people, reduced very often to three, decreasing to it time of completion, given the prior elimination of previous dead times that result from the preparation of adjustments, maintenance and testing.

Otras características y ventajas aparecerán en la descripción que sigue de un procedimiento y de un dispositivo de realización de cubas destinadas a la industria química, dados a título de ejemplo no limitativo con respecto a los planos anexos, en los cuales:Other features and advantages will appear in the following description of a procedure and a device of realization of tanks for the chemical industry, given to non-limiting example title with respect to the attached plans, in which:

- Las figuras 1 a 6 ilustran esquemáticamente las principales etapas del procedimiento.- Figures 1 to 6 schematically illustrate the Main stages of the procedure.

- La figura 7 representa una vista en alzado esquemática de una cuba en curso de realización.- Figure 7 represents an elevation view schematic of a Cuba in progress.

- La figura 8 representa una vista por encima esquemáticamente parcial de una virola en curso de realización.- Figure 8 represents a view above schematically partial of a ferrule in progress.

- La figura 9 representa una vista por encima del sistema de desarrollo, de curvatura, de corte, de acercamiento y de soldadura.- Figure 9 represents a view above the development system, curvature, cutting, approach and welding.

El dispositivo de realización de cubas, según la invención, comprende principalmente, un malacate 10 constituido por un fondo 11 sobre el cual están montados unos gatos 12 asociados a unos rodillos 13, así como una desarrolladora 20 constituida por un chasis 21, con un gato de puesta a nivel que soporta el portabobina, así como la máquina de desarrollado y de curvado 30 constituida, esencialmente, por tres rodillos 31, 32, 33 de los cuales uno está fijo y motorizado 31, uno móvil y motorizado 32, o inversamente, que aseguran, el pinzado de la chapa 41 contra el rodillo fijo y motorizado 31 bajo la acción de un gato 34, y uno móvil no motorizado 33 que asegura el curvado de la chapa 41, con control del radio de curvatura y del paso de la chapa 41 por medio, por una parte, en lo que concierne al control del radio de curvatura, de un detector de proximidad 50, dispuesto en la parte superior y en alineación con la bisectriz del ángulo obtuso, formado por dos brazos solidarizados uno al otro y que presentan, en su extremo libre, un rodillo calibrado, siendo dichos rodillos calibrados atraidos de forma permanente contra la cara exterior de la chapa por un compás llevado a la posición de apertura por un gato de gas, y por otra parte, en lo que concierne al control del paso de la chapa 41, de una rueda codificadora 60 atraída contra la cara exterior de la chapa 41 por un brazo articulado con respecto al eje de unión del extremo del vástago del gato de gas con el elemento articulado del compás, un puesto de corte transversal 70, un puesto de acercamiento de chapa 80 constituido por rodillos 81, situados en el exterior del malacate 10 y de rodillos 82 situados en el interior de éste, en concordancia unos con respecto a los otros, un puesto de soldadura longitudinal 90, con dispositivo de soldadura interna 91 y externa 92 y un tractor de rodillos motorizados 100.The device for making vats, according to the invention, mainly comprises a winch 10 constituted by a bottom 11 on which cats 12 associated with rollers 13, as well as a developer 20 consisting of a chassis 21, with a leveling jack that supports the bobbin holder, as well as the machine developed and curved 30 consisting essentially of three rollers 31, 32, 33 of the which one is fixed and motorized 31, one mobile and motorized 32, or conversely, that ensure, the clamping of the sheet 41 against the fixed and motorized roller 31 under the action of a jack 34, and one non-motorized mobile 33 which ensures the bending of the sheet 41, with control of the radius of curvature and of the passage of the sheet 41 by means, on the one hand, as regards the radio control of curvature, of a proximity detector 50, arranged in the part superior and in alignment with the bisector of the obtuse angle, formed by two arms in solidarity with each other and presenting, at its free end, a calibrated roller, said rollers being calibrated permanently attracted against the outer face of the sheet by a compass taken to the opening position by a cat of gas, and on the other hand, as regards the control of the passage of the plate 41, of a coding wheel 60 drawn against the face outside of the sheet 41 by an articulated arm with respect to the axis connecting the end of the gas jack stem with the element articulated compass, a cross-cutting post 70, a post of approach of sheet 80 constituted by rollers 81, located in the outside of the winch 10 and of rollers 82 located in the inside of it, in agreement with each other, a longitudinal welding post 90, with welding device internal 91 and external 92 and a motorized roller tractor 100

Examinando más en detalle las figuras 1 a 6, que ilustran las principales etapas del procedimiento utilizado, a la luz de las figuras 7, 8 y 9, se destaca que una primera virola 42 es en principio realizada por arrastre de la chapa 41 de la bobina 40 por los rodillos fijo 31 y presionador 32 motorizados y curvado de dicha chapa 41 por el rodillo curvador 33, que está posicionado en función del radio a obtener. Estando así realizado el inicio de la virola, es entonces necesario realizar el punto cero del desarrollo por el corte preciso del inicio de la banda, y después de hacer pasar ésta con introducción sucesiva sobre los rodillos 13 del malacate 10, hasta que el perímetro correspondiente al diámetro elegido sea alcanzado, el puesto de corte 70 secciona entonces la banda de chapa 41 para separarla de la bobina 40, realizándose entonces el ensamblado vertical y la soldadura correspondiente, está entonces terminada la primera virola 42. Es suficiente a continuación, como muestra la figura 2, soldar un techo 44, y después, según la figura 3, asegurar la elevación del conjunto, con la ayuda de los gatos 12 y de los rodillos 13, en una altura correspondiente a la anchura de una banda de chapa, para permitir, por acoplamiento sucesivo, la presentación de una nueva banda de chapa 41 sobre los rodillos 13 de los gatos 12 progresivamente rebajados, a medida que tiene lugar el paso de la chapa 41, como muestran las figuras 4 y 5, para obtener la realización de una segunda virola 43, que soporta completamente la primera virola 42 equipada con su techo 44, como muestra la figura 6, esto procediendo en todos los puntos como se ha indicado anteriormente para la realización de dicha primera virola 42.Examining in more detail figures 1 to 6, which illustrate the main stages of the procedure used, to the light of figures 7, 8 and 9, it is noted that a first ferrule 42 it is in principle carried out by dragging the sheet 41 of the coil 40 by fixed rollers 31 and pressurized 32 motorized and curved of said sheet 41 by the bending roller 33, which is positioned depending on the radius to obtain. Thus the beginning of the ferrule, it is then necessary to make the zero point of the development by the precise cut of the beginning of the band, and then to pass this one with successive introduction on the rollers 13 of the winch 10, until the perimeter corresponding to the diameter chosen be reached, the cutting post 70 then section the sheet band 41 to separate it from coil 40, performing then the vertical assembly and the corresponding welding, then the first ferrule 42 is finished. It is enough to then, as shown in Figure 2, weld a roof 44, and then, according to figure 3, ensure the elevation of the assembly, with the help of jacks 12 and rollers 13, at a height corresponding to the width of a sheet metal band, to allow, by successive coupling, the presentation of a new band of sheet 41 on the rollers 13 of the jacks 12 progressively lowered, as the passage of the sheet 41 takes place, as Figures 4 and 5 are shown, to obtain the realization of a second ferrule 43, which fully supports the first ferrule 42 equipped with its roof 44, as shown in figure 6, this proceeding at all points as indicated above for the realization of said first ferrule 42.

Se comprende que el conjunto constituido, después de soldadura, por las virolas 42 y 43 y por el techo 44 puede ser de nuevo elevado con la ayuda de los gatos 12 asociados a los rodillos que constituyen el malacate, en vista a la adición de una tercera virola, procediendo como se ha ilustrado en las figuras 3 a 6.It is understood that the set constituted, then welding, by ferrules 42 and 43 and ceiling 44 can be raised again with the help of cats 12 associated with rollers that constitute the winch, in view of the addition of a third ferrule, proceeding as illustrated in figures 3 to 6.

Cuando tiene lugar el desarrollado de nuevo, para realizar la o las virolas adicionales 43, la banda de chapa 41 es introducida, como se acaba de ver, bajo la primera virola 42, y después acercada con la ayuda de los rodillos 81, 82 del puesto de acercamiento 80, que pasan así a presionar la virola 42 y la banda de chapa 41. Después de franqueo del último rodillo del puesto de acercamiento 80, un puesto de soldadura 90 asegura la soldadura por puntos automáticos, a medida que tiene lugar el avance de la chapa. El paso de la banda de chapa 41 es parado antes de cada pie derecho del malacate 10, el gato 12 que soporta la virola es bajado, la banda avanza hasta el pie derecho siguiente, y así sucesivamente. La soldadura en cornisa que asegura la unión y la estanquidad entre las dos virolas 42 y 43, se realiza automáticamente por una estación fija (no representada).When the newly developed takes place, to make the additional ferrule 43, the sheet band 41 is introduced, as just seen, under the first ferrule 42, and then approached with the help of rollers 81, 82 of the post approach 80, which goes on to press the ferrule 42 and the band of sheet metal 41. After postage of the last roller of the post of approach 80, a welding post 90 ensures welding by automatic points, as the advance of the sheet takes place. The passage of the sheet metal band 41 is stopped before each right foot of the winch 10, the cat 12 that supports the ferrule is lowered, the band advances to the next right foot, and so on. The cornice welding that ensures the union and the tightness between the two ferrules 42 and 43, is performed automatically by a station fixed (not represented).

Durante estas operaciones, la virola gira sobre sí misma con la ayuda de tractores de rodillos motorizados 100, así como bajo la acción de los rodillos motorizados 81, 82 del puesto de acercamiento 80.During these operations, the ferrule rotates on itself with the help of 100 motorized roller tractors as well as under the action of motorized rollers 81, 82 of the post Approach 80.

Examinando ahora la figura 9 en relación con las figuras 7 y 8, se destaca que, después de haber introducido en el autómata programable (no representado) los datos relativos a los diámetros de virolas a realizar y a la longitud de bandas a desarrollar, que corresponden al perímetro de dicha virola 42, una función automática posiciona el rodillo curvador 33 por medio del gato 35, después de introducción del extremo de la banda de chapa 41 bajo dicho rodillo 33. Después de paso sobre el rodillo 24, la banda de chapa 41 es introducida sobre el malacate 10, después de paso por delante de los medios de enderezado 23, 36, 37 y de control del radio de curvatura y de paso 31, 32, 33 que serán ahora mencionados.Now examining figure 9 in relation to the Figures 7 and 8, it is highlighted that, after having entered the programmable automaton (not shown) data relating to ferrule diameters to be made and the length of bands to develop, corresponding to the perimeter of said ferrule 42, a automatic function positions the bending roller 33 by means of the cat 35, after introduction of the end of the sheet metal band 41 under said roller 33. After passing on roller 24, the sheet metal band 41 is introduced on winch 10, after step ahead of straightening means 23, 36, 37 and of curvature and pitch radius control 31, 32, 33 which will now be mentioned.

Se destaca en principio, que la posición del rodillo curvador 33 es controlada por el detector de proximidad 50, que mide, de forma precisa, la distancia que lo separa de la superficie externa de la banda de chapa 41, lo que permite obtener, por sustracción, la medida exacta, entre los rodillos de apoyo calibrados de la flecha comunicada a la banda de chapa por el rodillo curvador 33. Unas correcciones, en más o en menos, son así transmitidas de forma permanente automáticamente al sistema de alimentación del gato 35, que asegura el posicionado del rodillo curvador 33. La rueda codificadora 60, en cuanto a sí misma, transmite de forma permanente al autómata programable por medio de un generador incrementador por ejemplo, que la misma arrastra, la longitud exacta de banda de chapa 41 ya formada, a fin de mandar, en el momento oportuno, el paro preciso del arrastre de los rodillos motorizados 31 y 32, que precede al mando del disparo del seccionado por el puesto de corte transversal 70, constituido por una guía 71 con carro motorizado 72, que soporta una herramienta de corte 73.It stands out in principle, that the position of the bending roller 33 is controlled by proximity sensor 50, which measures, precisely, the distance that separates it from the external surface of the sheet metal band 41, which allows to obtain, by subtraction, the exact measurement, between the support rollers calibrated of the arrow communicated to the sheet metal band by the bending roller 33. Corrections, in more or less, are like this permanently transmitted automatically to the system 35 jack feed, which ensures the positioning of the roller bending 33. The coding wheel 60, as for itself, permanently transmits to the programmable controller by means of an incremental generator for example, that the same drag, the exact length of sheet metal band 41 already formed, in order to send, in a timely manner, the precise stoppage of the drag of the motorized rollers 31 and 32, which precedes the trigger control of the sectioned by the cross-sectional post 70, constituted by a guide 71 with motorized carriage 72, which supports a tool cut 73.

Haciendo referencia ahora de nuevo a las figuras 1 a 6 que ilustran el procedimiento, se destaca que como ya ha sido mencionado anteriormente:Referring now to the figures again 1 to 6 illustrating the procedure, it stands out that as it has already been previously mentioned:

1º)1st)
La realización de las virolas 42, 43 está precedida de las operaciones siguientes:The realization of ferrules 42, 43 is preceded by operations following:

a)to)
Fabricación de un fondo 11 por oxicorte circular de un ensamblaje de bandas de chapa, previamente solidarizadas lateralmente, con referencia a un punto C determinado arbitrariamente sobre la superficie de este ensamblaje de chapas.Manufacture of a fund 11 by oxicorte circular of an assembly of sheet metal strips, previously Solidarity laterally, with reference to a specific point C arbitrarily on the surface of this assembly of plates.

b)b)
Materialización del eje de simetría de las virolas 42, 43 por soldadura de un dispositivo de referencia, de eje vertical Y que coincide con el punto C determinado en la etapa precedente.Materialization of the axis of symmetry of the ferrules 42, 43 by welding a reference device, of vertical axis Y that coincides with the point C determined in the previous stage.

c)C)
Posicionado preciso, con respecto al eje Y del dispositivo de referencia, con la ayuda de una plantilla, de todos los medios que concurren en el arrastre, el paso, el guiado, el acercamiento y la soldadura de las bandas de chapa y a la elevación del conjunto a medida que tiene lugar la realización.Precise positioning, with respect to Y axis of the reference device, with the help of a template, of all the means that concur in the drag, the step, the guided, the approach and welding of the sheet metal bands and the  elevation of the assembly as the realization.

2º)2nd)
La posición vertical de los rodillos de paso 13 de los gatos de elevación 12 es controlada a distancia de manera muy precisa, individualmente y colectivamente, en función de la progresión de las operaciones de ensamblado y de las secuencias impuestas por ésta.The vertical position of the step rollers 13 of the jacks elevation 12 is remotely controlled very precisely, individually and collectively, depending on the progression of assembly operations and sequences imposed by is.

3º)3rd)
La posición respectiva de los dispositivos de soldadura interna 91 y externa 92 está indicada de forma permanente de manera muy precisa en el curso de su utilización, con indicación inmediata sobre un monitor, de los desplazamientos que puedan aparecer entre los dos dispositivos de soldadura 91, 92, a fin de que este desplazamiento pueda ser inmediatamente anulado en vista a conservar de forma permanente una perfecta concordancia de los puntos de soldadura interna y externa, cuando tiene lugar la progresión del cordón de soldadura en cornisa.The respective position of the internal welding devices 91 and external 92 is permanently indicated very precisely in the course of its use, with immediate indication of a monitor, of the displacements that may appear between the two welding devices 91, 92, so that this displacement can be immediately canceled in order to keep permanent a perfect match of welding points internal and external, when the cord progression of cornice welding.

4º)4th)
La solidarización por soldadura del techo 44 sobre el canto correspondiente de la virola superior 42 está acompañada de la rotación del conjunto en 360º a una velocidad controlada compatible con la progresión ideal del cordón de soldadura.The solidarity by welding the roof 44 on the edge corresponding of the upper ferrule 42 is accompanied by the 360 ° rotation of the assembly at a compatible controlled speed with the ideal progression of the weld bead.

5º)5th)
La soldadura del conjunto sobre el fondo 11 está precedida de la puesta en apoyo de la virola inferior, sobre tacos móviles que sustituyen los rodillos de paso 13, previamente desmontados.The welding of the assembly on the bottom 11 is preceded by the setting in support of the lower ferrule, on movable studs that replace the step rollers 13, previously disassembled.

Se comprende que para obtener un perfecto paralelismo de las virolas 42, 43 entre ellas y con respecto al fondo 11 utilizado momentáneamente como referencia, los gatos 12 de maniobra de los rodillos de paso 13 y de los tacos (no representados) deben ser de características estrictamente idénticas y que los caudales de aceite a los cuales son sometidos, tanto a la entrada como a la salida, deben ser perfectamente controlados a fin de obtener unas carreras muy precisas de los vástagos de los gatos.It is understood that to obtain a perfect parallelism of ferrules 42, 43 between them and with respect to background 11 used momentarily as a reference, cats 12 of maneuver of the step rollers 13 and the studs (no represented) must be of strictly identical characteristics and that the oil flows to which they are subjected, both to the input and output, must be perfectly controlled in order to get very precise careers of the stems of the cats

Claims (2)

1. Procedimiento de realización in situ de depósitos metálicos cilíndricos de gran capacidad, a partir de bobinas de chapa (40) que utiliza un medio (30) se arrastre, de curvado y de paso de la banda de chapa (41) así como unos medios de corte transversal (70), de acercamiento (80) y de soldadura longitudinal (90) de las bandas de chapa, que consiste en realizar las virolas (42, 43) por curvado, plegado progresivo en función del diámetro buscado, a medida que tiene lugar el arrastre y el desarrollado de la banda de chapa (41) y en realizar sucesivamente las virolas (42, 43) de arriba hacia abajo realizando cada una de ellas (42) directamente bajo la precedente (43) arrastrando ésta en rotación por solidarización progresiva de la banda de chapa en curso de conformado, estando esta solidarización precedida de una puesta en apoyo también progresiva de la virola precedente (43) sobre el canto de la banda de chapa (41) en curso del paso hasta la realización completa de la virola siguiente (42), siendo el techo (44) fijado sobre el canto superior de la primera virola (42) después de realización de ésta o de las dos primeras virolas; siendo la pared solidarizada al fondo (11) desde que ésta alcanza la altura deseada, caracterizado principalmente:1. Procedure for the realization of high capacity cylindrical metal tanks on site , from sheet metal coils (40) using a means (30) to drag, bend and pass the sheet metal band (41) as well as some means for cross-cutting (70), approach (80) and longitudinal welding (90) of the sheet metal bands, which consists of making the ferrules (42, 43) by bending, progressive folding according to the desired diameter, as that the dragging and development of the sheet metal band (41) takes place and in successively performing the ferrules (42, 43) from top to bottom making each of them (42) directly under the preceding one (43) dragging it in rotation by progressive solidarity of the sheet metal band in the process of forming, this solidarity being preceded by a progressive support also of the preceding ferrule (43) on the edge of the sheet metal band (41) in the process of passing through to complete completion of virol to next (42), the roof (44) being fixed on the upper edge of the first ferrule (42) after realization of this or the first two ferrules; the wall being in solidarity at the bottom (11) since it reaches the desired height, characterized mainly:
1º)1st)
Porque la realización de las virolas está precedida de las operaciones siguientes:Because the realization of the ferrules It is preceded by the following operations:
a)to)
Realización de un fondo (11) por oxicorte circular de un ensamblaje de bandas de chapa, previamente solidarizadas lateralmente, con referencia a un punto C determinado arbitrariamente sobre la superficie de este ensamblaje de chapas.Realization of a fund (11) by circular cutting of an assembly of sheet metal bands, previously Solidarity laterally, with reference to a specific point C arbitrarily on the surface of this assembly of plates.
b)b)
Materialización del eje de simetría de las virolas por soldadura de un dispositivo de referencia, de eje vertical Y que coincide exactamente con el punto C definido sobre la superficie del fondo (11) en la etapa precedente.Materialization of the axis of symmetry of the welding ferrules of a reference device, of axis vertical Y that exactly matches the point C defined on the bottom surface (11) in the preceding stage.
c)C)
Posicionado preciso, con respecto al eje Y del dispositivo de referencia, de todos los medios que concurren en el arrastre, el paso, el guiado, el acercamiento y la soldadura de las bandas de chapa y a la elevación del conjunto a medida que tiene lugar la realización.Precise positioning, with respect to Y axis of the reference device, of all the means that they concur in the drag, the step, the guided, the approach and the welding of the sheet bands and to the elevation of the assembly a As the realization takes place.
2º)2nd)
Porque la posición vertical de los rodillos de paso (13) de los medios de elevación (12) es controlada a distancia de manera muy precisa, individualmente y colectivamente, en función de la progresión de las operaciones de ensamblaje y de las secuencias impuestas por éstas.Because the vertical position of the step rollers (13) of the lifting means (12) is controlled at a very precise distance, individually and collectively, depending on the progression of assembly operations and the sequences imposed by them.
3º)3rd)
Porque la posición respectiva de los dispositivos de soldadura interna (91) y externa (92) está indicada de forma permanente de manera muy precisa en el curso de su utilización, con indicación inmediata de los desplazamientos que puedan aparecer entre los dos dispositivos, a fin de que este desplazamiento pueda ser inmediatamente anulado, en vista a conservar de forma permanente una perfecta concordancia de los puntos de soldadura interna y externa, cuando tiene lugar la progresión del cordón de soldadura en cornisa.Because the respective position of the Internal (91) and external (92) welding devices are indicated permanently very precisely in the course of your use, with immediate indication of the displacements may appear between the two devices, so that this displacement can be immediately canceled, in view of permanently retain a perfect agreement of the internal and external welding points, when the progression of the weld bead on cornice.
4º)4th)
Porque la solidarización por soldadura del techo sobre el canto correspondiente de la virola superior está acompañada de la rotación del conjunto en 360º a una velocidad controlada compatible con la progresión ideal del cordón de soldadura.Because welding solidarity of the roof over the corresponding edge of the upper ferrule is accompanied by the rotation of the whole in 360º at a speed controlled compatible with the ideal progression of the cord welding.
5º)5th)
Porque la soldadura del conjunto sobre el fondo (11) está precedida de la puesta en apoyo sobre tacos móviles del canto libre de la virola inferior (43), del desmontado de los rodillos de paso (13), del desplazamiento coordinado hacia abajo de dichos tacos móviles, hasta la puesta en apoyo de dicho canto libre de la virola inferior (43) sobre el contorno del fondo (11) después de la evacuación por el orificio de hombre de los equipos inutilizables para esta operación final.Because the welding of the set over the bottom (11) is preceded by the support on tacos mobile of the free edge of the lower ferrule (43), of the disassembly of the step rollers (13), of the coordinated movement towards below said movable studs, until the support of said movable free edge of the bottom ferrule (43) over the bottom contour (11) after evacuation through the manhole of the unusable equipment for this final operation.
2. Dispositivo para la realización del procedimiento según la reivindicación 1, que comprende unos medios en arrastre, de curvado (30) y de control permanente (60) del curvado y del paso de la banda de chapa (41) así como de unos medios de corte transversal (70) de soldadura transversal, de acercamiento (80) y de soldadura longitudinal (90) de la chapa, estando los medios de arrastre y de curvado de la banda de chapa (41) constituidos por dos rodillos motorizados (31, 32) de los que uno está fijo (31) y el otro (32) es atraído hacia éste por un gato (34) y por un rodillo móvil (33) situado corriente abajo de los dos primeros (31, 32) cuyo desplazamiento está asegurado por un gato (35) en función de la curvatura a dar a la chapa, estando los medios de control permanente del curvado y de paso de la banda de chapa (41) constituidos respectivamente por un detector de proximidad (50) y por una rueda codificadora (60); estando los medios de paso constituidos por rodillos (13) asociados a unos gatos de elevación (12) repartidos regularmente sobre una circunferencia para constituir un malacate (10) de diámetro correspondiente al de la virola (42) a obtener, estando estos rodillos (13) destinados a sostener progresivamente la chapa (41) después del curvado, cuando tiene lugar su arrastre por un tractor de rodillos motorizados (100), caracterizado porque comprende un autómata programable controlable a distancia por una caja de mando sin hilo que rige los medios de arrastre (31, 32, 34), de curvado (33, 35), de corte transversal (70), de control permanente del control y del paso (50, 60), de corte transversal (70), de soldadura (90) y de sostenimiento de la chapa en el curso de paso (12, 13) así como el tractor de rodillos motorizados (100) y por unos detectores conectados a un monitor que mide y representa, en tiempo real, las eventuales diferencias de posición en vista a su anulación inmediata, controlando la posición de los electrodos de los dispositivos de soldadura (91, 92).2. Device for carrying out the method according to claim 1, comprising means for dragging, bending (30) and permanent control (60) of bending and passing of the sheet metal band (41) as well as means of cross-section (70) of transverse welding, approach (80) and longitudinal welding (90) of the sheet, the means for dragging and bending the sheet band (41) consisting of two motorized rollers (31, 32) of which one is fixed (31) and the other (32) is attracted to it by a jack (34) and by a mobile roller (33) located downstream of the first two (31, 32) whose displacement is secured by a jack (35) as a function of the curvature to be given to the sheet, the means of permanent control of the bending and passage of the sheet strip (41) being constituted respectively by a proximity detector (50) and by a coding wheel (60); the passage means being constituted by rollers (13) associated with lifting jacks (12) distributed regularly on a circumference to constitute a winch (10) of diameter corresponding to that of the ferrule (42) to be obtained, these rollers (13 being) ) destined to progressively support the sheet (41) after bending, when its dragging takes place by a motorized roller tractor (100), characterized in that it comprises a programmable automaton remotely controllable by a wireless control box that governs the means of drag (31, 32, 34), bending (33, 35), cross-section (70), permanent control of the control and step (50, 60), cross-section (70), welding (90) and of support of the sheet in the course of passage (12, 13) as well as the tractor of motorized rollers (100) and by some detectors connected to a monitor that measures and represents, in real time, the possible differences of position in view upon immediate cancellation, c by entering the position of the electrodes of the welding devices (91, 92).
ES01929745T 2001-04-27 2001-04-27 PROCEDURE AND DEVICE FOR SEMIAUTOMATIC REALIZATION IN SITU, METAL DEPOSITS. Expired - Lifetime ES2228855T3 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/FR2001/001312 WO2002087804A1 (en) 2001-04-27 2001-04-27 Method and device for semi-automatic on-site production of metal tanks

Publications (1)

Publication Number Publication Date
ES2228855T3 true ES2228855T3 (en) 2005-04-16

Family

ID=8859461

Family Applications (1)

Application Number Title Priority Date Filing Date
ES01929745T Expired - Lifetime ES2228855T3 (en) 2001-04-27 2001-04-27 PROCEDURE AND DEVICE FOR SEMIAUTOMATIC REALIZATION IN SITU, METAL DEPOSITS.

Country Status (5)

Country Link
EP (1) EP1381480B1 (en)
AT (1) ATE275012T1 (en)
DE (1) DE60105323T2 (en)
ES (1) ES2228855T3 (en)
WO (1) WO2002087804A1 (en)

Families Citing this family (52)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2567024C (en) 2006-09-14 2012-10-23 Innovative Tank Manufacturing Inc. Apparatus for manufacturing structures with a continuous sidewall
US8837465B2 (en) 2008-04-02 2014-09-16 Twilio, Inc. System and method for processing telephony sessions
CN102027721B (en) 2008-04-02 2015-05-13 特维里奥公司 Systems and methods for handling telephone conversations
US8964726B2 (en) 2008-10-01 2015-02-24 Twilio, Inc. Telephony web event system and method
JP5671484B2 (en) 2009-03-02 2015-02-18 トゥイリオ インコーポレイテッドTwilio Inc. Method and system for a multi-tenant telephone network
BRPI0902600A2 (en) * 2009-07-24 2011-04-12 Dedini Sa Ind De Base jack for construction of vertical cylindrical tanks
US9210275B2 (en) 2009-10-07 2015-12-08 Twilio, Inc. System and method for running a multi-module telephony application
US20110222998A1 (en) 2010-03-10 2011-09-15 1540049 Alberta Ltd. Method and apparatus for assembling a workpiece
US9459926B2 (en) 2010-06-23 2016-10-04 Twilio, Inc. System and method for managing a computing cluster
US9338064B2 (en) 2010-06-23 2016-05-10 Twilio, Inc. System and method for managing a computing cluster
US20120208495A1 (en) 2010-06-23 2012-08-16 Twilio, Inc. System and method for monitoring account usage on a platform
US9459925B2 (en) 2010-06-23 2016-10-04 Twilio, Inc. System and method for managing a computing cluster
US9590849B2 (en) 2010-06-23 2017-03-07 Twilio, Inc. System and method for managing a computing cluster
US8838707B2 (en) 2010-06-25 2014-09-16 Twilio, Inc. System and method for enabling real-time eventing
US8649268B2 (en) 2011-02-04 2014-02-11 Twilio, Inc. Method for processing telephony sessions of a network
WO2012162397A1 (en) 2011-05-23 2012-11-29 Twilio, Inc. System and method for connecting a communication to a client
US20140044123A1 (en) 2011-05-23 2014-02-13 Twilio, Inc. System and method for real time communicating with a client application
US10182147B2 (en) 2011-09-21 2019-01-15 Twilio Inc. System and method for determining and communicating presence information
WO2013044138A1 (en) 2011-09-21 2013-03-28 Twilio, Inc. System and method for authorizing and connecting application developers and users
US9495227B2 (en) 2012-02-10 2016-11-15 Twilio, Inc. System and method for managing concurrent events
US9602586B2 (en) 2012-05-09 2017-03-21 Twilio, Inc. System and method for managing media in a distributed communication network
US20130304928A1 (en) 2012-05-09 2013-11-14 Twilio, Inc. System and method for managing latency in a distributed telephony network
US9247062B2 (en) 2012-06-19 2016-01-26 Twilio, Inc. System and method for queuing a communication session
US8737962B2 (en) 2012-07-24 2014-05-27 Twilio, Inc. Method and system for preventing illicit use of a telephony platform
US8948356B2 (en) 2012-10-15 2015-02-03 Twilio, Inc. System and method for routing communications
US8938053B2 (en) 2012-10-15 2015-01-20 Twilio, Inc. System and method for triggering on platform usage
US9253254B2 (en) 2013-01-14 2016-02-02 Twilio, Inc. System and method for offering a multi-partner delegated platform
US9282124B2 (en) 2013-03-14 2016-03-08 Twilio, Inc. System and method for integrating session initiation protocol communication in a telecommunications platform
US9001666B2 (en) 2013-03-15 2015-04-07 Twilio, Inc. System and method for improving routing in a distributed communication platform
US9240966B2 (en) 2013-06-19 2016-01-19 Twilio, Inc. System and method for transmitting and receiving media messages
US9338280B2 (en) 2013-06-19 2016-05-10 Twilio, Inc. System and method for managing telephony endpoint inventory
US9225840B2 (en) 2013-06-19 2015-12-29 Twilio, Inc. System and method for providing a communication endpoint information service
US9483328B2 (en) 2013-07-19 2016-11-01 Twilio, Inc. System and method for delivering application content
US9137127B2 (en) 2013-09-17 2015-09-15 Twilio, Inc. System and method for providing communication platform metadata
US9274858B2 (en) 2013-09-17 2016-03-01 Twilio, Inc. System and method for tagging and tracking events of an application platform
US9338018B2 (en) 2013-09-17 2016-05-10 Twilio, Inc. System and method for pricing communication of a telecommunication platform
US9325624B2 (en) 2013-11-12 2016-04-26 Twilio, Inc. System and method for enabling dynamic multi-modal communication
US9553799B2 (en) 2013-11-12 2017-01-24 Twilio, Inc. System and method for client communication in a distributed telephony network
US9344573B2 (en) 2014-03-14 2016-05-17 Twilio, Inc. System and method for a work distribution service
US9226217B2 (en) 2014-04-17 2015-12-29 Twilio, Inc. System and method for enabling multi-modal communication
US9516101B2 (en) 2014-07-07 2016-12-06 Twilio, Inc. System and method for collecting feedback in a multi-tenant communication platform
US9774687B2 (en) 2014-07-07 2017-09-26 Twilio, Inc. System and method for managing media and signaling in a communication platform
US9251371B2 (en) 2014-07-07 2016-02-02 Twilio, Inc. Method and system for applying data retention policies in a computing platform
US9246694B1 (en) 2014-07-07 2016-01-26 Twilio, Inc. System and method for managing conferencing in a distributed communication network
WO2016065080A1 (en) 2014-10-21 2016-04-28 Twilio, Inc. System and method for providing a miro-services communication platform
US9477975B2 (en) 2015-02-03 2016-10-25 Twilio, Inc. System and method for a media intelligence platform
US9948703B2 (en) 2015-05-14 2018-04-17 Twilio, Inc. System and method for signaling through data storage
US10419891B2 (en) 2015-05-14 2019-09-17 Twilio, Inc. System and method for communicating through multiple endpoints
US10659349B2 (en) 2016-02-04 2020-05-19 Twilio Inc. Systems and methods for providing secure network exchanged for a multitenant virtual private cloud
US10686902B2 (en) 2016-05-23 2020-06-16 Twilio Inc. System and method for a multi-channel notification service
US10063713B2 (en) 2016-05-23 2018-08-28 Twilio Inc. System and method for programmatic device connectivity
DK181492B1 (en) * 2022-08-18 2024-03-07 Stiesdal Offshore As Method of assembling a tubular floating structure and its use

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2551370B1 (en) 1983-09-06 1987-02-06 Coteau Const Soudees PROCESS AND INSTALLATION FOR THE MANUFACTURE OF LARGE METAL CYLINDRICAL APPARATUSES
FR2730652B1 (en) 1995-02-17 1997-03-28 Stcm PROCESS AND DEVICE FOR SEMI-AUTOMATIC PRODUCTION OF TANKS AND OILS

Also Published As

Publication number Publication date
WO2002087804A1 (en) 2002-11-07
EP1381480B1 (en) 2004-09-01
EP1381480A1 (en) 2004-01-21
DE60105323T2 (en) 2005-09-22
DE60105323D1 (en) 2004-10-07
ATE275012T1 (en) 2004-09-15

Similar Documents

Publication Publication Date Title
ES2228855T3 (en) PROCEDURE AND DEVICE FOR SEMIAUTOMATIC REALIZATION IN SITU, METAL DEPOSITS.
CN104308547B (en) Tank body production line
ES2988659T3 (en) Apparatus and method for manufacturing wire mesh
KR20070080259A (en) Spiral rebar cage manufacturing device and its manufacturing method
US1740033A (en) Method and apparatus for constructing cylindrical tanks
US6560834B1 (en) Device for forming metallic cages for reinforcement and relative device
CN110640399A (en) Production process for preparing cold-rolled thin-wall sleeve
JP3276199B2 (en) Wire mesh bending device
JPH0211268A (en) Reinforcing cage production machine
US20020157254A1 (en) Method to form metallic cages for reinforcement and relative device
CN214942551U (en) Movable anti-collision guardrail steel bar positioning jig frame
CH640449A5 (en) DEVICE FOR WELDING TUBE SHOTS AND FOLLOWING SCREW-HELD SHAPED WELDING OF A SEMI-PROFILE TAPE TO THE TUBE SHOTS.
CN110847687B (en) Quick installation method of conical direct-discharge chimney
ITBO20010398A1 (en) METHOD AND EQUIPMENT FOR MAKING METAL CAGES FOR ARMORED CONCRETE AND METALLIC CAGE SO OBTAINED
CN204321594U (en) The automated production equipment of steel pipe bundle combining structure component
DE69600249T2 (en) Method and device for the semi-automatic production of accumulators and jackets
CN108067771B (en) Automatic welding equipment and automatic welding method for container
EP0841110B1 (en) Machine to assemble reinforcement stands for foundation piles
KR101138224B1 (en) A process for preparing wire mash for concrete gutter
RU2378092C1 (en) Method and device for contact butt welding of rolled strips in continuous metallurgical units
CN204429912U (en) A kind of steel pipe straightening machine
ES1070231U (en) Machine to form filter cages (Machine-translation by Google Translate, not legally binding)
CN112658176A (en) Reinforcing bar circle processing auxiliary device
ITBO20060576A1 (en) METHOD AND WELDING DEVICE IN MACHINES TO REALIZE CAGES FOR REINFORCED CONCRETE
ES1069428U (en) Machine for the manufacture of footballs (Machine-translation by Google Translate, not legally binding)