Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ros De Oliver Diego
Original Assignee
Ros De Oliver Diego
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ros De Oliver DiegofiledCriticalRos De Oliver Diego
Priority to ES213523ApriorityCriticalpatent/ES213523A1/es
Publication of ES213523A1publicationCriticalpatent/ES213523A1/es
Procédé de fabrication de poutrelles en béton armé, poutrelles fabriquées par ce procédé, entrevous spéciaux, et procédé de construction de planchers en béton armé avec ces poutrelles et entrevous
Procedimiento para la construcción de forjados mediante el acoplamiento de piezas prefabricadas en las que el elemento resistente y el cielorraso sean una sola pieza sobre la que se coloca directamente el solado
Un procedimiento de contrucción con ladrillos rerámicos, que constituye, a la vez, vigueta armada, bovedilla y enconfrado para suelos o pisos de cemento armado