Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ricardo Garcia S L
Original Assignee
Ricardo Garcia S L
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ricardo Garcia S LfiledCriticalRicardo Garcia S L
Priority to ES1972182846UpriorityCriticalpatent/ES182846Y/en
Publication of ES182846UpublicationCriticalpatent/ES182846U/en
Application grantedgrantedCritical
Publication of ES182846YpublicationCriticalpatent/ES182846Y/en
Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes
(AREA)
Abstract
Improved slope, essentially characterized in that it is constituted by two bodies that constitute the slope itself and an independent pendant, both bodies of anchoring means being to be coupled together with uncoupling, so that said slope can be used interchangeably alone or with the pendant incorporated. (Machine-translation by Google Translate, not legally binding)