EP4335721B1 - Système de communication des données, procédé mis en oeuvre par ordinateur destiné à la communication des données dans un réseau ferroviaire, programme informatique et support de données non volatiles - Google Patents
Système de communication des données, procédé mis en oeuvre par ordinateur destiné à la communication des données dans un réseau ferroviaire, programme informatique et support de données non volatiles Download PDFInfo
- Publication number
- EP4335721B1 EP4335721B1 EP22194669.2A EP22194669A EP4335721B1 EP 4335721 B1 EP4335721 B1 EP 4335721B1 EP 22194669 A EP22194669 A EP 22194669A EP 4335721 B1 EP4335721 B1 EP 4335721B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- friction coefficient
- friction
- value
- validated
- data
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L15/00—Indicators provided on the vehicle or train for signalling purposes
- B61L15/0081—On-board diagnosis or maintenance
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61C—LOCOMOTIVES; MOTOR RAILCARS
- B61C15/00—Maintaining or augmenting the starting or braking power by auxiliary devices and measures; Preventing wheel slippage; Controlling distribution of tractive effort between driving wheels
- B61C15/08—Preventing wheel slippage
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61K—AUXILIARY EQUIPMENT SPECIALLY ADAPTED FOR RAILWAYS, NOT OTHERWISE PROVIDED FOR
- B61K9/00—Railway vehicle profile gauges; Detecting or indicating overheating of components; Apparatus on locomotives or cars to indicate bad track sections; General design of track recording vehicles
- B61K9/08—Measuring installations for surveying permanent way
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L15/00—Indicators provided on the vehicle or train for signalling purposes
- B61L15/0018—Communication with or on the vehicle or train
- B61L15/0027—Radio-based, e.g. using GSM-R
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L23/00—Control, warning or like safety means along the route or between vehicles or trains
- B61L23/04—Control, warning or like safety means along the route or between vehicles or trains for monitoring the mechanical state of the route
- B61L23/042—Track changes detection
Definitions
- the present invention relates generally to drive arrangements for rail vehicles. Especially, the invention relates to a data communication system for a railway network according to the preamble of claim 1 and a corresponding computer-implemented method. The invention also relates to a computer program and a non-volatile data carrier storing such a computer program.
- US 2007/0219682 shows a system for providing at least one of train information and track characterization information for use in train performance, including a first element to determine a location of a train on a track segment and/or a time from a beginning of the trip.
- a track characterization element to provide track segment information, and a sensor for measuring an operating condition of at least one of the locomotives in the train are also included.
- a database is provided for storing track segment information and/or the operating condition of at least one of the locomotives.
- a processor is also included to correlate information from the first element, the track characterization element, the sensor, and/or the database, so that the database may be used for creating a trip plan that optimizes train performance in accordance with one or more operational criteria for the train.
- WO 2022/006614 describes a method for improving braking performance of a rail vehicle, the method comprising the steps of: a) Associating one or more sensors with one or more components of the rail vehicle, at least one of the one or more sensors comprising an acoustic sensor configured to detect acoustic signals emitted from a wheel-rail interface; b) Acquiring measurements of one or more operating parameters of the rail vehicle using the one or more sensors; c) Transmitting the measurements of the one or more operating parameters to an operating parameter monitoring device; d) Converting, using a computing circuit of the operating parameter monitoring device, the measurements into an output signal message including information relating to the one or more components of the rail vehicle and/or to adhesion conditions at the wheel-rail interface; and e) Transmitting the output signal message electronically to one or more recipients.
- US 2010/0023190 discloses a system for controlling a railroad train over a segment of track.
- the system comprises a first element for determining a location of the train on the segment of track; a second element for providing track characterization information for the segment of track; the track characterization information related to physical conditions of the segment of track; and a processor for controlling applied tractive forces and braking forces of the train responsive to the location of the train and the track characterization information to reduce at least one of wheel wear and/or track wear during operation of the train over the segment of track.
- EP3483029A1 defines a system and method to determine the friction coefficient by taking into account the speed difference between a target wheelset and another wheelset.
- the object of the present invention is to mitigate the above problems and offer a solution that enables rail vehicles to obtain up-to-date high-quality information about applicable adhesion conditions at the wheel-rail interface in various parts of a railway network.
- the object is achieved by a data communication system for a railway network, which system contains at least one measurement controller, at least one transmitter apparatus and a set of receiver apparatuses.
- the at least one measurement controller is configured to be comprised in a respective one of at least one rail vehicle of a data-supplier type.
- the at least one measurement controller is configured to obtain a basic parameter reflecting an initial value of a friction coefficient relating to a rail segment, e.g. via an incoming message or as a default value.
- the at least one measurement controller is further configured to produce a validated value of the basic parameter, which validated value reflects an updated friction coefficient between the rail of the rail segment and the wheels of the respective one of the at least one rail vehicle of the data-supplier type.
- the validated value is produced through a procedure involving: measuring individual rotational speeds of the axels to which the wheels of the at least one first rail vehicle are connected while applying a gradually increasing traction force to a specific one of said axles; determining, while applying the gradually increasing traction force, an absolute difference between the rotational speed of the specific one of said axles and an average rotational speed of said axles except the specific one of said axles, and in response to the absolute difference exceeding a threshold value deriving a parameter reflecting measured value of the friction coefficient, checking whether the measured value of the friction coefficient lies within an acceptance interval from the basic parameter, and if so assigning the validated value equal to the measured value of the friction coefficient.
- the at least one transmitter apparatus is configured to be comprised in a respective one of at least one rail vehicle of the data-supplier type and emit a friction data message containing the validated value of the friction coefficient.
- Each receiver apparatus in the set of receiver apparatuses is configured to be comprised in a respective one of at least one rail vehicle in the railway network and receive the friction data message.
- the above data communication system is advantageous because it allows sharing of verified friction measures, i.e. information based upon which a rail vehicle carrying the receiver apparatus can rely when for example determining an appropriate distance to a rail vehicle in front. This, in turn, enables an improved overall throughput in the railway network.
- each receiver apparatus in the set of receiver apparatuses is configured to receive the friction data message over a wireless interface
- each of the at least one transmitter apparatus is configured to emit the friction data message over the wireless interface.
- each of the at least one measurement controller is configured to produce a friction data message containing: the validated value of the friction coefficient, an identification of the rail segment to which the validated value of the friction coefficient relates, and a point in time when the validated value of the friction coefficient was derived.
- any rail vehicle carrying the receiver apparatus may conveniently determine the relevant rail segment to which the friction coefficient relates as well as a reliability of the received information.
- each receiver apparatus in the set of receiver apparatuses is configured to receive at least two friction data messages relating to the rail segment, and derive an updated value of the friction coefficient for the rail segment based on the at least two received friction data messages.
- the updated value of the friction coefficient is based on a balancing of the validated values of the friction coefficient included in the at least two friction data messages.
- the balancing of the validated values of the friction coefficient may involve comparing the validated value of the friction coefficient of each of the at least two received friction data messages to a threshold level for the friction coefficient, and assigning the updated value of the friction coefficient equal to the validated value of the friction coefficient of a latest received message of the at least two received friction data messages, if the validated value of the friction coefficient of the latest received message is lower than or equal to the threshold level. If, however, the latest received message indicates a friction coefficient above the threshold level, the updated value of the friction coefficient is assigned a friction coefficient equal to the threshold level. As a result, it can be guaranteed that the friction coefficient is not assigned an excessively high value.
- the balancing of the validated values of the friction coefficient may involve assigning the updated value of the friction coefficient equal to the validated value of the friction coefficient of a latest received message of the at least two received friction data messages without considering any threshold level.
- maximum advantage can be taken of the validated value of the friction coefficient.
- the system further contains at least one dispatchment node configured to receive the friction data message from one of the at least one transmitter apparatus via the wireless interface and relay the received friction data message to at least one of the receiver apparatuses in the set of receiver apparatuses via the wireless interface.
- a communication infrastructure in the form of such dispatchment nodes is beneficial because it bridges distance gaps between different rail vehicles and thus ensures that the friction data message are distributed properly to the intended receiver apparatuses.
- the at least one dispatchment node is configured to receive at least two friction data messages relating to the particular rail segment, derive an updated value of the friction coefficient for the rail segment based on the at least two received friction data messages, and relay the updated value of the friction coefficient for the rail segment to at least one of the receiver apparatuses.
- the updated value of the friction coefficient is based on a balancing of the validated values of the friction coefficient contained in the at least two friction data messages.
- friction data may be aggregated and enhanced in the at least one dispatchment node before being distributed to the rail vehicles in the railway network.
- the balancing of the validated values of the friction coefficient may involve assigning the updated value of the friction coefficient equal to the validated value of the friction coefficient of a latest received message of the at least two received friction data messages.
- the validated value of the friction coefficient of each of the at least two received friction data messages may be compared to a threshold level for the friction coefficient, and only if the latest received message contains a validated value of the friction coefficient lower than or equal to the threshold level, the updated value of the friction coefficient is assigned equal to the validated value of the friction coefficient of the latest received message. Otherwise, the updated value of the friction coefficient is assigned a friction coefficient equal to the threshold level. This advantageous for the same reasons as stated above.
- the object is achieved by a computer-implemented method for data communication in a railway network, which method is implemented in at least one processing circuitry and involves: obtaining, in a measurement controller comprised in a rail vehicle of a data-supplier type, a basic parameter reflecting an initial value of a friction coefficient relating to a rail segment in the railway network, and producing, in the measurement controller, a validated value of the basic parameter.
- the validated value reflects an updated friction coefficient between the rail of the rail segment and the wheels of the respective one of the at least one rail vehicle of the data-supplier type.
- the validated value is produced through a procedure involving: receiving data representing measurements of individual rotational speeds of the axels to which the wheels of the at least one first rail vehicle are connected while applying a gradually increasing traction force to a specific one of said axles, determining, while applying the gradually increasing traction force, an absolute difference between the rotational speed of the specific one of said axles and an average rotational speed of said axles except the specific one of said axles, and in response to the absolute difference exceeding a threshold value deriving a parameter reflecting a measured value of the friction coefficient, checking whether the measured value of the friction coefficient lies within an acceptance interval from the basic parameter, and if so, assigning the validated value equal to the measured value of the friction coefficient.
- a friction data message is emitted from a transmitter apparatus comprised in the rail vehicle of the data-supplier type, which friction data message contains the validated value of the friction coefficient.
- the method involves receiving the friction data message in a receiver apparatus comprised in a rail vehicle in the railway network.
- the object is achieved by a computer program loadable into a non-volatile data carrier communicatively connected to a processing unit.
- the computer program includes software for executing the above method when the program is run on the processing unit.
- the object is achieved by a non-volatile data carrier containing the above computer program.
- Figure 1 we see a schematic illustration of a rail vehicle 100 containing equipment that form part of a data communication system according to one embodiment of the invention.
- Figure 3 shows a schematic railway network 300 in which the proposed data communication system may be implemented.
- the data communication system includes a set of receiver apparatuses.
- Figure 1 shows an example of such a receiver apparatus 110 that is comprised in the rail vehicle 100 and which receiver apparatus 110 is configured to receive a friction data message M( ⁇ ) from at least one other rail vehicle in the railway network 300.
- the friction data message M( ⁇ ) relates to a particular rail segment of the railway network 300, for example as illustrated by 310 in Figure 3 .
- the data communication system also includes at least one measurement controller.
- Figure 1 shows an example of such a measurement controller 130 that is comprised in the rail vehicle 100.
- the rail vehicle 100 is a rail vehicle of a data-supplier type, i.e. a source for producing validated friction information as will be described below.
- the measurement controller 130 is configured to obtain a basic parameter ⁇ reflecting an initial value of a friction coefficient ⁇ e relating to the rail segment 310.
- the basic parameter ⁇ may be received in the receiver apparatus 110 via a friction data message M( ⁇ ) from another rail vehicle in the railway network 300. Then, the receiver apparatus 110 may forward the basic parameter ⁇ to the measurement controller 130.
- the measurement controller 130 may produce the basic parameter ⁇ , for instance based on a default assumption, or an historic entry stored in the rail vehicle 100. Consequently, the basic parameter ⁇ may originate from another rail vehicle in the railway network 300, dedicated friction test equipment performing measurements on the rail segment 310, or the rail vehicle 100 itself, for example through deduction based on neighboring measuring points.
- the measurement controller 130 is configured to produce a validated value of the basic parameter ⁇ .
- the validated value reflects an updated friction coefficient ⁇ e between the rail 140 of the rail segment 310 and the wheels 151, 152, 153 and 154 of the rail vehicle 100 of the data-supplier type.
- the validated value is produced through a procedure involving the following steps.
- individual rotational speeds ⁇ 1 , ⁇ 2 , ⁇ 3 and ⁇ 4 are measured of the respective axels to which the wheels 151, 152, 153 and 154 respectively of the rail vehicle 100 are connected while applying a gradually increasing traction force AF to a specific one of the axles, say 152.
- an absolute difference is determined between the rotational speed ⁇ 2 of the specific one of the axles and an average rotational speed of the other axles, i.e. all the axles except the specific one of the axles.
- a parameter ⁇ m is derived that reflects a measured value of the friction coefficient ⁇ e .
- the measurement controller 130 is further configured to check whether the measured value of the friction coefficient ⁇ e lies within an acceptance interval from the basic parameter ⁇ , say ⁇ 10 %, from the initial value of the friction coefficient ⁇ e . If the measured value of the friction coefficient ⁇ e lies within the acceptance interval, the measurement controller 130 is configured to assign the validated value equal to the measured value of the friction coefficient ⁇ e .
- the acceptance interval need not be ⁇ 10 %. On the contrary, any wider or narrower extension of this interval is likewise conceivable.
- the measurement controller 130 is preferably configured to repeat the above steps to derive a new measured value of the friction coefficient ⁇ e .
- FIG. 2 shows a graph illustrating an example of how the kinetic friction coefficient ⁇ k is expressed as a function of the wheel slippage s, which here is understood to designate a common term for a spinning or sliding motion of the wheel relative to the rail resulting from an applied traction or braking force respectively.
- the wheel slippage s is applicable to retardation as well as acceleration.
- the kinetic friction coefficient ⁇ k increases relatively proportionally with increasing wheel slippage s.
- the kinetic friction coefficient ⁇ k levels out somewhat.
- the friction coefficient peak value ⁇ e is associated with an optimal wheel slippage s e after which a further increase of wheel slippage s results in a gradually reduced kinetic friction coefficient ⁇ k .
- a parameter ⁇ m is determined that reflects the friction coefficient between the rail vehicle's 100 wheels and the rails upon which the rail vehicle 100 travels.
- the peak value ⁇ e should be derived.
- the peak value ⁇ e may be derived as follows. When the absolute difference
- the peak value ⁇ e of the kinetic friction coefficient ⁇ k may be estimated relatively accurately.
- the data communication system includes at least one transmitter apparatus, which in Figure 1 is exemplified by the unit 120 comprised in the rail vehicle 100 of the data-supplier type.
- the transmitter apparatus is configured to emit the friction data message M( ⁇ e ) containing the validated value of the friction coefficient ⁇ e , such that at least one other rail vehicle in the railway network 300 may obtain information about said validated value by receiving the friction data message M( ⁇ e ).
- each of the at least one rail vehicle 100, 312, 313 and 314 in the railway network 300 that is equipped with a receiver apparatuses 110 can make use of the validated value of the friction coefficient ⁇ e , for example when keeping a particular distance to a rail vehicle in front, accelerating and/or when braking.
- the measurement controller 130 is configured to produce the friction data message M( ⁇ e ) such that it contains not only the validated value of the friction coefficient ⁇ e , however also an identification of the rail segment to which the validated value of the friction coefficient ⁇ e relates and a timestamp designating a point in time when the validated value of the friction coefficient ⁇ e was derived.
- Figure 3 exemplifies this by showing a friction data message M( ⁇ e , ID 310 , t 1 ) including an identification ID 310 of the rail segment 310 to which the validated value of the friction coefficient ⁇ e relates, and a point in time t 1 when the validated value of the friction coefficient ⁇ e was derived.
- each receiver apparatus 110 is configured to receive the validated value of the friction coefficient ⁇ e over a wireless interface via the friction data messages M( ⁇ e ), and each transmitter apparatus 120 is configured to emit the validated value of the friction coefficient ⁇ e over the wireless interface via the friction data messages M( ⁇ e ).
- this allows for convenient sharing of high-quality friction information between the different rail vehicles 100, 312, 313 and 314 in the railway network 300.
- each receiver apparatus 110 is configured to receive at least two friction data messages M( ⁇ e ) relating to the same rail segment, say 310, and derive an updated value of the friction coefficient for the rail segment 310 based on the at least two received friction data messages M( ⁇ e ).
- the updated value of the friction coefficient is based on a balancing of the validated values of the friction coefficient ⁇ e included in the at least two friction data messages M( ⁇ e ).
- the balancing may involve any kind of weighing together of the validated values of the friction coefficient ⁇ e , such as calculating average or median value.
- the balancing of the validated values of the friction coefficient ⁇ e involves comparing the validated value of the friction coefficient ⁇ e of each of the at least two received friction data messages M( ⁇ e ) to a threshold level for the friction coefficient. If the validated value of the friction coefficient ⁇ e of a latest received message is lower than or equal to the threshold level, the updated value of the friction coefficient is assigned equal to the validated value of the friction coefficient ⁇ e of the latest received message of the at least two received friction data messages M( ⁇ e ). Otherwise, the updated value of the friction coefficient is assigned a friction coefficient equal to the threshold level. Thus, the friction coefficient will never be assigned a better/higher value than the threshold level. This facilitates complying with regulatory requirements that may prescribe maximum values for the friction coefficient.
- the balancing of the validated values of the friction coefficient ⁇ e involves assigning the updated value of the friction coefficient equal to the validated value of the friction coefficient ⁇ e of a latest received message of the at least two received friction data messages M( ⁇ e ), i.e. without considering any maximum value for the friction coefficient.
- the data communication system contains at least one dispatchment node 320.
- Each dispatchment node 320 is configured to receive the friction data message M( ⁇ e , ID 310 , t 1 ) from at least one transmitter apparatus 120 via the wireless interface.
- a rail vehicle 100 comprises a transmitter apparatus 120 that emits the friction data message M( ⁇ e , ID 310 , t 1 ).
- each dispatchment node 320 is configured to relay the received friction data message M to at least one of the receiver apparatuses 110 in the set of receiver apparatuses via the wireless interface.
- a respective receiver apparatus in each of the rail vehicles 312, 313 and 314 respectively receives the friction data message M( ⁇ e , ID 310 , t 1 ) from the dispatchment node 320. Consequently, it is sufficient for the rail vehicles 100, 312, 313 and 314 to be communicatively connected to at least one dispatchment node 320 in order to exchange friction information with other rail vehicles in the railroad network 300.
- the dispatchment node 320 is configured to receive at least two friction data messages M( ⁇ e , ID 310 , t 1 ) relating to a particular rail segment, say 310.
- the dispatchment node 320 is further configured to derive an updated value of the friction coefficient for the rail segment 310 based on the at least two received friction data messages M( ⁇ e , ID 310 , t 1 ).
- the updated value of the friction coefficient is based on a balancing of the validated values of the friction coefficient ⁇ e comprised in the at least two friction data messages M( ⁇ e , ID 310 , t 1 ).
- the dispatchment node 320 is configured to relay the updated value of the friction coefficient for the rail segment 310 to at least one of the receiver apparatuses 110 by emitting a friction data message M over the wireless interface.
- the balancing of the validated values of the friction coefficient ⁇ e involves comparing the validated value of the friction coefficient ⁇ e of each of the at least two received friction data messages M( ⁇ e , ID 310 , t 1 ) to a threshold level for the friction coefficient, assigning the updated value of the friction coefficient equal to the validated value of the friction coefficient ⁇ e of a latest received message of the at least two received friction data messages M( ⁇ e , ID 310 , t 1 ), if the validated value of the friction coefficient ⁇ e of the latest received message is lower than or equal to the threshold level. Otherwise, the dispatchment node 320 is configured to assign the updated value of the friction coefficient to a friction coefficient equal to the threshold level.
- the balancing of the validated values of the friction coefficient ⁇ e effected by the dispatchment node 320 simply involves assigning the updated value of the friction coefficient equal to the validated value of the friction coefficient ⁇ e of the latest received message of the at least two received friction data messages M( ⁇ e , ID 310 , t 1 ).
- Figure 4 shows a block diagram of the measurement controller 130 according to one embodiment of the invention.
- the measurement controller 130 is configured to receive the wheel speed signals ⁇ 1 , ⁇ 2 , ⁇ 3 and ⁇ 4 , and ⁇ a and output a signal defining the traction force AF to be applied as well as a value of the updated friction coefficient ⁇ e .
- the measurement controller 130 includes processing circuitry in the form of at least one processor 430 and a memory unit 420, i.e. non-volatile data carrier, storing a computer program 425, which, in turn, contains software for making the at least one processor 430 execute the actions mentioned in this disclosure when the computer program 425 is run on the at least one processor 430.
- a first step 510 it is checked whether a basic parameter ⁇ has been obtained, which basic parameter ⁇ reflects an initial value of a friction coefficient ⁇ e relating to a particular rail segment 310 in the railway network 300. If the basic parameter ⁇ has been obtained, for example via a received friction data message M( ⁇ ), steps 520 and 530 follow; and otherwise, the procedure loops back and stays in step 510.
- a validated value of the basic parameter ⁇ is produced by executing steps 520 to 570.
- the validated value reflects an updated friction coefficient ⁇ e between the rail 140 of the rail segment 310 and the wheels the rail vehicle 100 of the data-supplier type, i.e. in which the procedure is executed.
- step 520 a rotational speed of a specific one of the wheel axles of the rail vehicle 100 of the data-supplier type is obtained, and in step 530, preferably parallel to step 520, an average rotational speed of the axles except the specific one of the axles is obtained.
- a traction force AF is applied to the specific one of the axles, and in a step 550 subsequent to steps 540 and 530, it is checked if an absolute difference between the rotational speed of the specific one of the axles and the average rotational speed of the axles except the specific one of the axles exceeds a threshold value. If so, a step 560 follows; and otherwise, the procedure loops back to steps 520 and 530.
- the traction force AF is applied at a somewhat larger magnitude than last time, such that for each run through the loop the traction force AF is gradually increased.
- a parameter ⁇ m is derived, which reflects a measured value of the friction coefficient ⁇ e .
- the measured value of the friction coefficient ⁇ e is derived as described above referring to Figure 2 .
- a step 570 checks if the measured value of the friction coefficient ⁇ e lies within an acceptance interval from the friction coefficient ⁇ e reflected by the basic parameter ⁇ obtained in step 510. If the measured value of the friction coefficient ⁇ e is found to lie within the acceptance interval, the validated value of the basic parameter ⁇ is assigned equal to the measured value of the friction coefficient ⁇ e , and a step 580 follows. Otherwise, the procedure loops back to steps 520 and 530 for deriving a new measured value of the friction coefficient ⁇ e .
- step 580 a message M( ⁇ e ) containing the validated value of the basic parameter ⁇ is emitted, for example over a wireless interface, so that it may be received by other rail vehicles in the railway network 300. After that, the procedure loops back to step 510.
- All of the process steps, as well as any sub-sequence of steps, described with reference to Figure 5 may be controlled by means of a programmed processor.
- the embodiments of the invention described above with reference to the drawings comprise processor and processes performed in at least one processor, the invention thus also extends to computer programs, particularly computer programs on or in a carrier, adapted for putting the invention into practice.
- the program may be in the form of source code, object code, a code intermediate source and object code such as in partially compiled form, or in any other form suitable for use in the implementation of the process according to the invention.
- the program may either be a part of an operating system, or be a separate application.
- the carrier may be any entity or device capable of carrying the program.
- the carrier may comprise a storage medium, such as a Flash memory, a ROM (Read Only Memory), for example a DVD (Digital Video/Versatile Disk), a CD (Compact Disc) or a semiconductor ROM, an EPROM (Erasable Programmable Read-Only Memory), an EEPROM (Electrically Erasable Programmable Read-Only Memory), or a magnetic recording medium, for example a floppy disc or hard disc.
- the carrier may be a transmissible carrier such as an electrical or optical signal which may be conveyed via electrical or optical cable or by radio or by other means.
- the carrier When the program is embodied in a signal, which may be conveyed, directly by a cable or other device or means, the carrier may be constituted by such cable or device or means.
- the carrier may be an integrated circuit in which the program is embedded, the integrated circuit being adapted for performing, or for use in the performance of, the relevant processes.
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Health & Medical Sciences (AREA)
- Biomedical Technology (AREA)
- General Health & Medical Sciences (AREA)
- Transportation (AREA)
- Electric Propulsion And Braking For Vehicles (AREA)
- Train Traffic Observation, Control, And Security (AREA)
Claims (22)
- Système de communication de données pour un réseau ferroviaire (300), lequel système comprend :au moins un contrôleur de mesure (130) configuré pour :être compris dans un véhicule ferroviaire respectif parmi au moins un véhicule ferroviaire (100) d'un type fournisseur de données,obtenir un paramètre de base (µ) reflétant une valeur initiale d'un coefficient de frottement (µe) relatif à un segment de rail (310) dans le réseau ferroviaire (300), etproduire une valeur validée du paramètre de base (µ), laquelle valeur validée reflète un coefficient de frottement mis à jour (µe) entre le rail (140) du segment de rail (310) et les roues (151, 152, 153, 154) du véhicule ferroviaire respectif parmi les au moins un véhicule ferroviaire (100) du type fournisseur de données, et laquelle valeur validée est produite par une procédure impliquant :la mesure de vitesses de rotation individuelles (ω1, ω2, ω3, ω4) des essieux auxquels les roues (151, 152, 153, 154) de l'au moins un premier véhicule ferroviaire sont connectées tout en appliquant une force de traction progressivement croissante (AF) à un essieu spécifique parmi lesdits essieux,la détermination, tout en appliquant la force de traction progressivement croissante (AF), d'une différence absolue entre la vitesse de rotation (ω2) de l'essieu spécifique parmi lesdits essieux et une vitesse de rotation moyenne desdits essieux à l'exception de l'essieu spécifique parmi lesdits essieux, et, en réponse au dépassement d'une valeur seuil par la différence absoluela dérivation d'un paramètre (µm) reflétant une valeur mesurée du coefficient de frottement (µe) ;la vérification de si la valeur mesurée du coefficient de frottement (µe) se situe dans un intervalle d'acceptation par rapport au paramètre de base (µ), et, si tel est le cas,l'attribution de la valeur validée égale à la valeur mesurée du coefficient de frottement (µe), etau moins un appareil émetteur (120) configuré pour :être compris dans un véhicule ferroviaire respectif parmi au moins un véhicule ferroviaire (100) du type fournisseur de données, etémettre un message de données de frottement (M(µe)) contenant la valeur validée du coefficient de frottement (µe) ; etun ensemble d'appareils récepteur (110) dont chacun est configuré pour :être compris dans au moins un véhicule ferroviaire (100, 312, 313, 314) dans le réseau ferroviaire (300) etrecevoir le message de données de frottement (M(µe)).
- Système selon la revendication 1, dans lequel :chaque appareil récepteur (110) dans l'ensemble d'appareils récepteur est configuré pour recevoir le message de données de frottement (M(µe)) sur une interface sans fil, etchacun des au moins un appareil émetteur (120) est configuré pour émettre le message de données de frottement (M(µe)) sur l'interface sans fil.
- Système selon la revendication 2, dans lequel chacun des au moins un contrôleur de mesure (130) est configuré pour produire le message de données de frottement (M(µe), M(µe, ID310, t1)) comprenant :la valeur validée du coefficient de frottement (µe),une identification (ID310) du segment de rail (310) auquel se rapporte la valeur validée du coefficient de frottement (µe), etun instant (ti) auquel la valeur validée du coefficient de frottement (µe) a été dérivée.
- Système selon la revendication 3, dans lequel chaque appareil récepteur (110) dans l'ensemble d'appareils récepteur est configuré pour :recevoir au moins deux messages de données de frottement (M(µe)) relatifs au segment de rail (310), etdériver une valeur mise à jour du coefficient de frottement pour le segment de rail (310) sur la base des au moins deux messages de données de frottement reçus (M(µe)), laquelle valeur mise à jour du coefficient de frottement est basée sur un équilibrage des valeurs validées du coefficient de frottement (µe) comprises dans les au moins deux messages de données de frottement (M(µe)).
- Système selon la revendication 4, dans lequel l'équilibrage des valeurs validées du coefficient de frottement (µe) comprend :la comparaison de la valeur validée du coefficient de frottement (µe) de chacun des au moins deux messages de données de frottement reçus (M(µe)) à un niveau seuil pour le coefficient de frottement, etl'attribution de la valeur mise à jour du coefficient de frottement égale à la valeur validée du coefficient de frottement (µe) d'un message reçu en dernier parmi les au moins deux messages de données de frottement reçus (M(µe)) si la valeur validée du coefficient de frottement (µe) du message reçu en dernier est inférieure ou égale au niveau seuil, et sinonl'attribution à la valeur mise à jour du coefficient de frottement d'un coefficient de frottement égal au niveau seuil.
- Système selon la revendication 4, dans lequel l'équilibrage des valeurs validées du coefficient de frottement (µe) comprend :
l'attribution de la valeur mise à jour du coefficient de frottement égale à la valeur validée du coefficient de frottement (µe) d'un message de données de frottement reçu en dernier parmi les au moins deux messages de données de frottement reçus (M (µe) ) . - Système selon l'une quelconque des revendications 3 à 6, comprenant en outre :
au moins un noeud de répartition (320) configuré pour recevoir le message de données de frottement (M(µe, ID310, t1)) provenant d'un desdits au moins un appareil émetteur (120) par l'intermédiaire de l'interface sans fil et relayer le message de données de frottement reçu (M) à au moins un des appareils récepteur (110) dans l'ensemble d'appareils récepteur par l'intermédiaire de l'interface sans fil. - Système selon la revendication 7, dans lequel l'au moins un noeud de répartition (320) sont configurés pour :recevoir au moins deux messages de données de frottement (M(µe, ID310, t1)) relatifs au segment de rail particulier (310),dériver une valeur mise à jour du coefficient de frottement pour le segment de rail (310) sur la base des au moins deux messages de données de frottement reçus (M(µe, ID310, t1)), laquelle valeur mise à jour du coefficient de frottement est basée sur un équilibrage des valeurs validées du coefficient de frottement (µe) comprises dans les au moins deux messages de données de frottement (M(µe, ID310, t1)), etrelayer la valeur mise à jour du coefficient de frottement pour le segment de rail (310) à au moins un des appareils récepteur (110) dans l'ensemble d'appareils récepteur au moyen d'un message de données de frottement (M) émis sur l'interface sans fil.
- Système selon la revendication 8, dans lequel l'équilibrage des valeurs validées du coefficient de frottement (µe) comprend :la comparaison de la valeur validée du coefficient de frottement (µe) de chacun des au moins deux messages de données de frottement reçus (M(µe, ID310, t1)) à un niveau seuil pour le coefficient de frottement, etl'attribution de la valeur mise à jour du coefficient de frottement égale à la valeur validée du coefficient de frottement (µe) d'un message reçu en dernier parmi les au moins deux messages de données de frottement reçus (M(µe, ID310, t1)) si la valeur validée du coefficient de frottement (µe) du message reçu en dernier est inférieure ou égale au niveau seuil, et sinonl'attribution à la valeur mise à jour du coefficient de frottement d'un coefficient de frottement égal au niveau seuil.
- Système selon la revendication 8, dans lequel l'équilibrage des valeurs validées du coefficient de frottement (µe) comprend :
l'attribution de la valeur mise à jour du coefficient de frottement égale à la valeur validée du coefficient de frottement (µe) d'un message reçu en dernier parmi les au moins deux messages de données de frottement reçus (M(µe, ID310, t1)). - Procédé mis en œuvre par ordinateur pour la communication de données dans un réseau ferroviaire (300), lequel procédé est mis en œuvre dans au moins un circuit de traitement (430) et comprend :l'obtention, dans un contrôleur de mesure (130) compris dans un véhicule ferroviaire (100) d'un type fournisseur de données, d'un paramètre de base (µ) reflétant une valeur initiale d'un coefficient de frottement (µe) relatif à un segment de rail (310) dans le réseau ferroviaire (300),la production, dans le contrôleur de mesure (130), d'une valeur validée du paramètre de base (µ), laquelle valeur validée reflète un coefficient de frottement mis à jour (µe) entre le rail (140) du segment de rail (310) et les roues (151, 152, 153, 154) du véhicule ferroviaire respectif parmi les au moins un véhicule ferroviaire (100) du type fournisseur de données, et laquelle valeur validée est produite par une procédure impliquant :la réception de données représentant des mesures de vitesses de rotation individuelles (ω1, ω2, ω3, ω4) des essieux auxquels les roues (151, 152, 153, 154) de l'au moins un premier véhicule ferroviaire sont connectées tout en appliquant une force de traction progressivement croissante (AF) à un essieu spécifique parmi lesdits essieux,la détermination, tout en appliquant la force de traction progressivement croissante (AF), d'une différence absolue entre la vitesse de rotation (ω2) de l'essieu spécifique parmi lesdits essieux et une vitesse de rotation moyenne desdits essieux à l'exception de l'essieu spécifique parmi lesdits essieux, et, en réponse au dépassement d'une valeur seuil par la différence absolue,la dérivation d'un paramètre (µm) reflétant une valeur mesurée du coefficient de frottement (µe) ;la vérification de si la valeur mesurée du coefficient de frottement (µe) se situe dans un intervalle d'acceptation par rapport au paramètre de base (µ), et, si tel est le cas,l'attribution de la valeur validée égale à la valeur mesurée du coefficient de frottement (µe), etl'émission, par un appareil émetteur (120) compris dans le véhicule ferroviaire (100) du type fournisseur de données, un message de données de frottement (M(µe)) contenant la valeur validée du coefficient de frottement (µe) ; etla réception, dans un appareil récepteur (110) compris dans au moins un véhicule ferroviaire (100, 312, 313, 314) dans le réseau ferroviaire (300), du message de données de frottement (M(µe)).
- Procédé selon la revendication 11, comprenant :la réception, dans chaque appareil récepteur (110) dans l'ensemble d'appareils récepteur, du message de données de frottement (M(µe)) sur une interface sans fil, etl'émission, par chacun des au moins un appareil émetteur (120), du message de données de frottement (M(µe)) sur l'interface sans fil.
- Procédé selon la revendication 12, comprenant :
la production, dans chacun des au moins un contrôleur de mesure (130), du message de données de frottement (M(µe), M(µe, ID310, t1)) pour comprendre la valeur validée du coefficient de frottement (µe), une identification (ID310) du segment de rail (310) auquel se rapporte la valeur validée du coefficient de frottement (µe), et un instant (ti) auquel la valeur validée du coefficient de frottement (µe) a été dérivée. - Procédé selon la revendication 13, comprenant, dans chaque appareil récepteur (110) de l'ensemble d'appareils récepteur :la réception d'au moins deux messages de données de frottement (M(µe)) relatifs au segment de rail (310), etla dérivation d'une valeur mise à jour du coefficient de frottement pour le segment de rail (310) sur la base des au moins deux messages de données de frottement reçus (M(µe)), laquelle valeur mise à jour du coefficient de frottement est basée sur un équilibrage des valeurs validées du coefficient de frottement (µe) comprises dans les au moins deux messages de données de frottement (M(µe)).
- Procédé selon la revendication 14, dans lequel l'équilibrage des valeurs validées du coefficient de frottement (µe) comprend :la comparaison de la valeur validée du coefficient de frottement (µe) de chacun des au moins deux messages de données de frottement reçus (M(µe)) à un niveau seuil pour le coefficient de frottement, etl'attribution de la valeur mise à jour du coefficient de frottement égale à la valeur validée du coefficient de frottement (µe) d'un message reçu en dernier parmi les au moins deux messages de données de frottement reçus (M(µe)) si la valeur validée du coefficient de frottement (µe) d'un message reçu en dernier est inférieure ou égale au niveau seuil, et sinonl'attribution à la valeur mise à jour du coefficient de frottement d'un coefficient de frottement égal au niveau seuil.
- Procédé selon la revendication 14, dans lequel l'équilibrage des valeurs validées du coefficient de frottement (µe) comprend :
l'attribution de la valeur mise à jour du coefficient de frottement égale à la valeur validée du coefficient de frottement (µe) d'un message de données de frottement reçu en dernier parmi les au moins deux messages de données de frottement reçus (M(µe)). - Procédé selon l'une quelconque des revendications 13 à 16, comprenant en outre :la réception, dans au moins un noeud de répartition (320), du message de données de frottement (M(µe, ID310, t1)) provenant d'un des au moins un appareil émetteur (120) par l'intermédiaire de l'interface sans fil, etle relais du message de données de frottement reçu (M) à au moins un des appareils récepteur (110) dans l'ensemble d'appareils récepteur par l'intermédiaire de l'interface sans fil.
- Procédé selon la revendication 17, comprenant en outre, dans le noeud de répartition,la réception d'au moins deux messages de données de frottement (M (µe, ID310, t1)) relatifs au segment de rail particulier (310),la dérivation d'une valeur mise à jour du coefficient de frottement pour le segment de rail (310) sur la base des au moins deux messages de données de frottement reçus (M(µe, ID310, t1)), laquelle valeur mise à jour du coefficient de frottement est basée sur un équilibrage des valeurs validées du coefficient de frottement (µe) comprises dans les au moins deux messages de données de frottement (M(µe, ID310, t1)), etle relais de la valeur mise à jour du coefficient de frottement pour le segment de rail (310) à au moins un des appareils récepteur (110) dans l'ensemble d'appareils récepteur au moyen d'un message de données de frottement (M) émis sur l'interface sans fil.
- Procédé selon la revendication 18, dans lequel l'équilibrage des valeurs validées du coefficient de frottement (µe) comprend :la comparaison de la valeur validée du coefficient de frottement (µe) de chacun des au moins deux messages de données de frottement reçus (M(µe, ID310, t1)) à un niveau seuil pour le coefficient de frottement, etl'attribution de la valeur mise à jour du coefficient de frottement égale à la valeur validée du coefficient de frottement (µe) d'un message reçu en dernier parmi les au moins deux messages de données de frottement reçus (M(µe, ID310, t1)) si la valeur validée du coefficient de frottement (µe) du message reçu en dernier est inférieure ou égale au niveau seuil, et sinonl'attribution à la valeur mise à jour du coefficient de frottement d'un coefficient de frottement égal au niveau seuil.
- Procédé selon la revendication 18, dans lequel l'équilibrage des valeurs validées du coefficient de frottement (µe) comprend :
l'attribution de la valeur mise à jour du coefficient de frottement égale à la valeur validée du coefficient de frottement (µe) d'un message reçu en dernier parmi les au moins deux messages de données de frottement reçus (M (µe, ID310, t1)) . - Programme informatique (425) chargeable dans un support de données non volatil (420) connecté en communication à au moins un processeur (430), le programme informatique (425) comprenant un logiciel pour exécuter le procédé selon l'une quelconque des revendications 11 à 20 lorsque le programme informatique (425) est exécuté sur l'au moins un processeur (430) .
- Support de données non volatil (420) contenant le programme informatique (425) selon la revendication 21.
Priority Applications (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| EP22194669.2A EP4335721B1 (fr) | 2022-09-08 | 2022-09-08 | Système de communication des données, procédé mis en oeuvre par ordinateur destiné à la communication des données dans un réseau ferroviaire, programme informatique et support de données non volatiles |
| PCT/EP2023/069927 WO2024051992A1 (fr) | 2022-09-08 | 2023-07-18 | Système de communication de données, procédé mis en œuvre par ordinateur pour la communication de données dans un réseau ferroviaire, programme informatique et support de données non volatil |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| EP22194669.2A EP4335721B1 (fr) | 2022-09-08 | 2022-09-08 | Système de communication des données, procédé mis en oeuvre par ordinateur destiné à la communication des données dans un réseau ferroviaire, programme informatique et support de données non volatiles |
Publications (3)
| Publication Number | Publication Date |
|---|---|
| EP4335721A1 EP4335721A1 (fr) | 2024-03-13 |
| EP4335721C0 EP4335721C0 (fr) | 2024-11-20 |
| EP4335721B1 true EP4335721B1 (fr) | 2024-11-20 |
Family
ID=83271561
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| EP22194669.2A Active EP4335721B1 (fr) | 2022-09-08 | 2022-09-08 | Système de communication des données, procédé mis en oeuvre par ordinateur destiné à la communication des données dans un réseau ferroviaire, programme informatique et support de données non volatiles |
Country Status (2)
| Country | Link |
|---|---|
| EP (1) | EP4335721B1 (fr) |
| WO (1) | WO2024051992A1 (fr) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE102024205803A1 (de) * | 2024-06-21 | 2025-12-24 | Siemens Mobility GmbH | Antriebssteuerung |
Family Cites Families (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US9233696B2 (en) | 2006-03-20 | 2016-01-12 | General Electric Company | Trip optimizer method, system and computer software code for operating a railroad train to minimize wheel and track wear |
| US8768543B2 (en) | 2006-03-20 | 2014-07-01 | General Electric Company | Method, system and computer software code for trip optimization with train/track database augmentation |
| EP3483029A1 (fr) * | 2017-11-10 | 2019-05-15 | Siemens Aktiengesellschaft | Système et procédé pour tester des conditions d'adhérence sur une piste |
| DE102018111984A1 (de) * | 2018-05-18 | 2019-11-21 | Knorr-Bremse Systeme für Schienenfahrzeuge GmbH | Kollisionsvermeidung für ein Fahrzeug und Verfahren hierzu |
| DE102018111982A1 (de) * | 2018-05-18 | 2019-11-21 | Knorr-Bremse Systeme für Schienenfahrzeuge GmbH | Kollisionsvermeidungssystem für ein Fahrzeug und Verfahren hierzu |
| WO2022006614A1 (fr) | 2020-07-09 | 2022-01-13 | Central Queensland University | Procédé et système permettant d'améliorer les performances de freinage d'un véhicule ferroviaire |
-
2022
- 2022-09-08 EP EP22194669.2A patent/EP4335721B1/fr active Active
-
2023
- 2023-07-18 WO PCT/EP2023/069927 patent/WO2024051992A1/fr not_active Ceased
Also Published As
| Publication number | Publication date |
|---|---|
| EP4335721C0 (fr) | 2024-11-20 |
| WO2024051992A1 (fr) | 2024-03-14 |
| EP4335721A1 (fr) | 2024-03-13 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN109311498B (zh) | 用于运行定位设备的方法以及定位设备 | |
| US7548032B2 (en) | Locomotive speed determination | |
| BR112017025245B1 (pt) | Sistema e método para gerenciar uma composição de trem | |
| JP6814658B2 (ja) | 車両制御装置、車両制御方法、プログラム | |
| CN118991870B (zh) | 一种铁路货物运输状态预警方法及系统 | |
| EP4335721B1 (fr) | Système de communication des données, procédé mis en oeuvre par ordinateur destiné à la communication des données dans un réseau ferroviaire, programme informatique et support de données non volatiles | |
| RU2741459C1 (ru) | Способ эксплуатации сортировочной горки при ранжировке и устройство управления сортировочной горкой | |
| CN116215600B (zh) | 轨道车辆对标停车控制方法、装置及计算机存储介质 | |
| CN108290589A (zh) | 用于轨道车辆的具有粘着图的控制系统 | |
| CN102574536B (zh) | 用于在轨道车辆中监测部件状态的方法和电子装置 | |
| US12397833B2 (en) | Prevention of collision between trains | |
| CN103868516A (zh) | 用于确定道路基础设施的位置和/或类型的方法和装置 | |
| EP4306384B1 (fr) | Système de communication des données, procédé mis en oeuvre par ordinateur destiné à la communication des données dans un réseau ferroviaire, programme informatique et support de données non volatiles | |
| KR102732488B1 (ko) | 군집 주행차량에 대한 교통 정보 운용 시스템 및 방법 | |
| RU2722513C1 (ru) | Способ выявления схода с рельс на основе сигналов о числе оборотов колеса | |
| US10829097B2 (en) | Speed control device | |
| CN111071303B (zh) | 列车控制方法、装置、系统和计算机联锁设备 | |
| KR101945971B1 (ko) | 열차 위치 판단 방법 및 장치 | |
| RU2560211C1 (ru) | Способ и устройство управления для определения длины по меньшей мере одного участка пути | |
| WO2021220447A1 (fr) | Dispositif de diagnostic de détérioration, dispositif embarqué, système de diagnostic de détérioration et procédé de diagnostic de détérioration | |
| US20250276723A1 (en) | Friction testing system, computer-implemented friction-testing method for a rail vehicle, computer program and non-volatile data carrier | |
| EP4204265B1 (fr) | Système de freinage pour au moins un véhicule ferroviaire et architecture de signalisation ferroviaire | |
| JP2023084401A (ja) | 列車制御装置および列車制御方法 | |
| JP2000013903A (ja) | 電気ブレーキの制御方法及びその装置 | |
| KR20210044380A (ko) | 제동 작용 장치의 점검상태 예측 방법 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE APPLICATION HAS BEEN PUBLISHED |
|
| AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE |
|
| 17P | Request for examination filed |
Effective date: 20240405 |
|
| RBV | Designated contracting states (corrected) |
Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
| GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: GRANT OF PATENT IS INTENDED |
|
| RIC1 | Information provided on ipc code assigned before grant |
Ipc: B61C 15/08 20060101ALI20240820BHEP Ipc: B61K 9/08 20060101ALI20240820BHEP Ipc: B61L 23/04 20060101ALI20240820BHEP Ipc: B61L 15/00 20060101AFI20240820BHEP |
|
| INTG | Intention to grant announced |
Effective date: 20240830 |
|
| GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
| GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE PATENT HAS BEEN GRANTED |
|
| AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
| REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D |
|
| REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP |
|
| REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 602022007876 Country of ref document: DE |
|
| REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D |
|
| U01 | Request for unitary effect filed |
Effective date: 20241120 |
|
| U07 | Unitary effect registered |
Designated state(s): AT BE BG DE DK EE FI FR IT LT LU LV MT NL PT RO SE SI Effective date: 20241126 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20241120 Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20250320 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20241120 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20250220 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20250221 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20241120 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: RS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20250220 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SM Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20241120 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20241120 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20241120 |
|
| PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
| 26N | No opposition filed |
Effective date: 20250821 |