[go: up one dir, main page]

EP3756254B1 - Reactive power control in power systems - Google Patents

Reactive power control in power systems Download PDF

Info

Publication number
EP3756254B1
EP3756254B1 EP18708499.1A EP18708499A EP3756254B1 EP 3756254 B1 EP3756254 B1 EP 3756254B1 EP 18708499 A EP18708499 A EP 18708499A EP 3756254 B1 EP3756254 B1 EP 3756254B1
Authority
EP
European Patent Office
Prior art keywords
power
time
super capacitor
processing arrangement
controller
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
EP18708499.1A
Other languages
German (de)
French (fr)
Other versions
EP3756254A1 (en
Inventor
Lackis ELEFTHERIADIS
Athanasios KARAPANTELAKIS
Konstantinos Vandikas
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Telefonaktiebolaget LM Ericsson AB
Original Assignee
Telefonaktiebolaget LM Ericsson AB
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Telefonaktiebolaget LM Ericsson AB filed Critical Telefonaktiebolaget LM Ericsson AB
Publication of EP3756254A1 publication Critical patent/EP3756254A1/en
Application granted granted Critical
Publication of EP3756254B1 publication Critical patent/EP3756254B1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for AC mains or AC distribution networks
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/04Programme control other than numerical control, i.e. in sequence controllers or logic controllers
    • G05B19/042Programme control other than numerical control, i.e. in sequence controllers or logic controllers using digital processors
    • GPHYSICS
    • G06COMPUTING OR CALCULATING; COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F1/00Details not covered by groups G06F3/00 - G06F13/00 and G06F21/00
    • G06F1/26Power supply means, e.g. regulation thereof
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00006Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment
    • H02J13/00022Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment using wireless data transmission
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for AC mains or AC distribution networks
    • H02J3/003Load forecast, e.g. methods or systems for forecasting future load demand
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for AC mains or AC distribution networks
    • H02J3/18Arrangements for adjusting, eliminating or compensating reactive power in networks
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for AC mains or AC distribution networks
    • H02J3/28Arrangements for balancing of the load in a network by storage of energy
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • H02J7/34Parallel operation in networks using both storage and other DC sources, e.g. providing buffering
    • H02J7/345Parallel operation in networks using both storage and other DC sources, e.g. providing buffering using capacitors as storage or buffering devices
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/20Pc systems
    • G05B2219/26Pc applications
    • G05B2219/2639Energy management, use maximum of cheap power, keep peak load low
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2203/00Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
    • H02J2203/20Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2207/00Indexing scheme relating to details of circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • H02J2207/50Charging of capacitors, supercapacitors, ultra-capacitors or double layer capacitors

Definitions

  • This disclosure relates to power control in power systems. More particularly, it relates to a method and a controller for controlling reactive power control in power systems.
  • 5G radio/NR units Due to radio resource allocation for mobile data transport and different power saving features, 5G radio/NR units typically have a transient behavior that affects the power system bus voltage.
  • Transients on the power system bus voltage create a need for reactive power, for which reason a power loss is generated.
  • the need for reactive power is generated at an input of the power system, which input is connected to a power grid, typically an alternating current (AC) grid.
  • AC alternating current
  • This increase in reactive power need generates an increased bill in kilo-Watt-hours (kWh) addressed to a network operator.
  • a cloud orchestrator can dedicate and allocate compute and store resources at the infrastructure.
  • Transients are here generated on power system infrastructure, when, for instance, elastic random access networks (ERAN) distribute data to allocate resources in a distributed cloud to another location. By moving data to other locations, transients are typically also generated on distributed cloud infrastructure equipment.
  • ERAN elastic random access networks
  • Radio systems at 5G and NR sites operating at relatively high radio frequency bands apply different power saving and data control functions, can apply discontinuous transmission (DTX) in the range of 100 ms and lower. Such DTX typically generate transients on the system bus voltage of their power systems.
  • DTX discontinuous transmission
  • radio access network increasingly requires efficient wireless channel access in further radio frequency bands for mobile data transmission.
  • This channel access and frequency allocation generates transients on the infrastructure, especially on system bus voltage, which transients are currently not handled in current power system for 5G radio/NR.
  • PSUs power supply units
  • the reactive demand of the PSU will increase the electrical bill accordingly for the operator using the power system of the 5G radio/NR site.
  • the power factor (PF) of the PSU will hence also be affected by the transient behavior of the power system voltage.
  • data allocation behavior similar to the one of 5G radio/NR can be identified, when compute and store resources are allocated for incoming data.
  • FIG. 1 schematically presents a power system architecture according to prior art.
  • the architecture comprises a power system 18, a digital unit (DU)/Baseband (BB) and a remote radio unit (RRU).
  • the power system 18 comprises one or more power system units (PSUs) 12 and a power distribution unit (PDU) 13. From a power grid 11 alternating current (AC) power is provided to said one or more power system units (PSU) 12 of the power system. From said one or more PSUs 12 power is delivered on a system bus voltage to the PDU 13. From the PDU13 power is further delivered to the RRU 16. Feedback signaling is provided between the DU/BB 15 and the RRU 16, as well as between the DU/BB 15 and the PDU 13.
  • AC alternating current
  • feedback signaling is also provided between the DU/BB 15 and said one or more PSUs 12.
  • a standard capacitor may be used to feed reactive power to the system bus voltage between said one or more PSUs 12 and the PDU 13. Power may be delivered by a capacitor within this architecture.
  • WO2011013187 A1 discloses a self-excited reactive power compensation device is provided with a capacitor (C) for smoothing alternating-current voltage, a self-excited converter that is coupled to a power system having multiple phases and includes a switching element in order to output reactive power to the power system on the basis of electric power smoothed by the capacitor, and a control unit for controlling the reactive power outputted from the self-excited converter to the power system by switching the switching element on the basis of the voltage of the power system detected by a first voltage detector and an electric current flowing between the power system and the self-excited converter, which is detected by a current detector.
  • the control unit controls a charger to thereby perform charge control for charging the capacitor (C) in such a manner that the voltage between both ends of the capacitor detected by a second voltage detector is a first predetermined value or more.
  • WO2010045726 A1 discloses a single phase grid correction system for correcting the power factor of an electrical power grid.
  • the grid has a generator, transmission lines connecting the generator to distribution nodes, feeder lines radiating from each node, and groups of consumers connected to each feeder line.
  • a capacitor bank is located at a number of consumer's premises, indoors, either beside or forming part of the consumer's normal single phase electric panel.
  • a set of remotely controlled switches at the consumer's premises permits the capacitor banks to be switched in and out of grid connection and also allows non-essential high energy consuming loads, not necessarily inductive, to be switched on and off the grid.
  • the grid correction systems are widely distributed at consumer's premises throughout the grid. By remotely controlling the switches, the utility operator can switch capacitor banks at selected consumer premises in or out of the grid to provide or remove reactive power as needed, and can also selectively remove load from the grid to reduce the likelihood of sudden uncontrollable load shedding.
  • US2016149413 A1 discloses a system including a distributed power source, a storage battery, a bidirectional inverter having a smoothing capacitor on its DC side, and a control section for controlling the entire system, and supplies AC power to a load while being interconnected with a power system.
  • the control section controls a power factor of inverter output current outputted from the bidirectional inverter so as to coincide with a power factor of load current flowing to the load.
  • a drawback with such a technique is the lack of information about when transients occur, and hence when there is a need to deliver power to the system bus voltage.
  • the power system comprises a power supply unit with a power input that is connected to a power grid, where the power supply unit has a power output connected to a power input of a power distribution unit that distributes power to a processing arrangement, whereby the power system serves the processing arrangement with power via the power distribution.
  • the processing arrangement has a data traffic workload.
  • the power system further comprises a super capacitor unit that is connected to the power output of the power supply unit. The method is performed in a controller that is connected to the processing arrangement, the power distribution unit and the super capacitor unit.
  • the controller is configured to schedule the data traffic workload of the processing arrangement, whereby the controller is configured to have information at time t(n) about the data traffic workload of the processing arrangement at a subsequent time t(n+1), where the time t(n+1) is one time interval from, and next to, the time t(n).
  • the method comprises obtaining at time t(n), information about data traffic workload to be processed by the processing arrangement at time t(n+1).
  • the method also comprises estimating a power required by the processing arrangement for processing the data traffic workload scheduled at time t(n+1), based on the obtained information about the data traffic load at time t(n).
  • said method Upon determining that the required power is higher than a power threshold, within the method, said method also comprises retrieving super capacitor data from a memory, where said super capacitor data corresponds to the required power.
  • the method comprises triggering discharge of the super capacitor unit based on the super capacitor data at time t(n+1), causing power from the super capacitor unit to be fed to the power input of the power distribution unit at time t(n+1), whereby transients in a voltage at the power input of the power distribution unit are, at least in part, smoothed out at time t(n+1). This reduces the reactive power of the power system, where said transients are related to the data traffic workload of the processing arrangement.
  • a controller that is operative of controlling reactive power of a power system
  • the power system comprises a power supply unit with a power input connected to a power grid.
  • the power supply unit has a power output connected to a power input of a power distribution unit that distributes power to a processing arrangement, whereby the power system serves the processing arrangement with power via the PDU.
  • the processing arrangement has a data traffic workload.
  • the power system further comprises a super capacitor unit that is connected to the power output of the PSU.
  • the controller is adapted to be connected to the processing arrangement, the power distribution unit, and the super capacitor unit.
  • the controller is configured to schedule the data traffic workload of the processing arrangement.
  • the controller is further configured to have information at time t(n) about the data traffic workload of the processing arrangement at a subsequent time t(n+1), where the time t(n+1) is one time interval from, and next to, the time t(n).
  • the controller comprises a processing circuitry and a memory.
  • the memory has instructions executable by the processing circuitry, wherein said processing circuitry when executing said instructions is configured to obtain at time t(n), information about data traffic workload to be processed by the processing arrangement at time t(n+1).
  • Said processing circuitry is, when executing said instructions also configured to estimate a power required by the processing arrangement for processing the data traffic workload scheduled at time t(n+1), based on the obtained information about the data traffic load at time t(n).
  • Said processing circuitry is, when executing said instructions also configured to determine whether the required power is higher than a power threshold, or not. Having determined that the required power is higher than a power threshold, said processing circuitry is, when executing said instructions further configured to retrieve super capacitor data from a memory, where said super capacitor data corresponds to the required power. In addition, said processing circuitry is, when executing said instructions further configured to trigger discharge of the super capacitor unit, based on the super capacitor data at time t(n+1), by which power from the super capacitor unit can be fed to the power input of the power distribution unit at the subsequent time t(n+1).
  • Transients in a voltage at the power input of the power distribution unit are hereby, at least in part, smoothed out at time t(n+1), which reduces the reactive power of the power system, where said transients are related to the data traffic workload of the processing arrangement.
  • the present disclosure also comprises a computer program for controlling reactive power of a power system.
  • This computer program comprises instructions which, when executed on at least one processor, cause the at least one processor to carry out the method according to claims 1 to 8.
  • the present disclosure also comprises a computer-readable storage medium that has thereon said computer program.
  • the present disclosure comprises the following advantages.
  • This disclosure improves the transient behavior of power systems for 5G radio/NR and distributed cloud infrastructure, which improves the power efficiency. By reducing the need for reactive power from AC grids at the input of power systems, the power efficiency of the power systems is reduced. By saving power, electricity costs are reduced.
  • a super capacitor unit mounted inside a power system and by controlling activation of said super capacitor unit based on traffic data from a controller, such as a digital unit(DU)/Baseband (BB) or orchestrator, the transient behavior of the system bus voltage, as experienced by the power system, is reduced.
  • a controller such as a digital unit(DU)/Baseband (BB) or orchestrator
  • transients on the system bus voltage are affected, which improves the transient behavior.
  • An improved transient behavior, as experienced by the power system unit reduces the need for input reactive power to the power system, from an AC grid connected to the power system.
  • the power factor may be defined as the ratio of the real power flowing to, for instance, a power system, to the apparent power of the power system, where the apparent power depends to the reactive power of the power system.
  • Super capacitors or super capacitor units have properties that enable rapid energy delivery, in comparison with valve regulated lead acid (VRLA) batteries or other type of energy storage, for that matter.
  • the fast reaction delivery of energy from the super capacitor unit is here utilized to smooth out, or even eliminate, transients or dips on the system voltage bus based on information from a controller, when applying this disclosure in a distributed cloud environment.
  • the super capacitor By activating a super capacitor unit based on information from the controller, power is momentarily added to the system bus voltage to smooth out said transients or dips, which reduces the transient behavior of the system bus voltage as experienced by the power system unit, for which reason the need for reactive power need from the AC grid is reduced. Subsequent to activation, the super capacitor is advantageously charged at times when the information from controller or orchestrator indicates less than peak, data or, traffic levels for the power demand of 5G radio/NR systems or distributed cloud environment.
  • a DU/BB or an orchestrator being examples of the controller, has at a time t(n) information about traffic data and hence also the power needed for subsequent transmission at a time t(n+1), i.e. information about traffic data is available at a point in time, which point is adjacent to the point in time at which the power is needed..
  • This data traffic information and basing the activation of the super capacitor unit on this information, energy from an activated super capacitor unit can meet the transient or dip at a time at which they occur, which can result in smoothening of system bus voltage, as experienced from the power system unit.
  • the controller may thus activate the super capacitor unit while sending data traffic to a processing arrangement.
  • a super capacitor can be installed in the cloud infrastructure on a distributed cloud, and be orchestrated by an orchestrator to activate the super capacitor unit such that a system bus voltage is smoothed out and the need for reactive power of the power system used, is reduced.
  • the present disclosure has a number of advantageous properties. Activation of a super capacitor mounted in the power system stabilizes the system bus voltage, and reduces the transient behavior on the system bus voltage, as experienced by the power system unit. A reduction in the transient behavior of the system bus voltage, as experienced by the power system unit, minimizes the demand for reactive power and hence power losses internally.
  • activation and control of the super capacitor mounted in the power system can be activated and controlled such that a transient behavior on system bus voltage is improved.
  • the accomplished improved transient behavior of system bus voltage reduces the demand for reactive power of the power system input from an AC grid.
  • the 5G radio/NR systems have radio requirements with higher demands regarding power saving functionality with respect to fast reaction and fast turn on/off of data traffic. It is noted that the same requirements of higher demand are requested in cloud infrastructure, in which also low latency is a requirement.
  • PRBs physical resource blocks
  • PSU power system unit
  • the power losses may be due to voltage variations as created on the distribution system having a high inductance on the copper wire. Voltage variations on a high inductance wire create a demand for reactive power. This demand of reactive power causes the active power as delivered from the PSU to dip on the system bus voltage. This in turn activates the PSU to immediate deliver power to respond to the dip.
  • the PSU thus demands both a reactive power as well as an active power, from an alternating current (AC) grid that is feeding the PSU with power.
  • AC alternating current
  • the power taken from the grid comprises active power as well as reactive power.
  • active and reactive power is taken from grid, a corresponding electricity bill in kWh, increases, due to increased consumption by 5G radio/NR radio or a distributed cloud environment. This kWh consumption of electricity is to be paid by the operator.
  • PF power factor
  • PF power factor
  • the power factor may be defined as cosine ⁇ .
  • the measure cosine ⁇ represents the mismatch in AC voltage and AC current, which the power factor (PF) circuit inside the PSU attempts to compensate for.
  • the present disclosure diminishes the reactive AC power component as demanded by the PSU from the AC grid. This in turn reduces the electrical bill for the operator and increases the efficiency of the power system, when the transient behavior of the system bus voltage is improved.
  • Data traffic information is provided from a controller, such as a scheduler, or an orchestrator.
  • the present disclosure utilizes the fact that it is known when, i.e. at what time, transients due to data traffic will occur.
  • this information is available at a point in time, one (1) transmission time interval (TTI) before the corresponding actual power is needed.
  • TTI transmission time interval
  • the PF circuit inside the PSU will not have to perform a compensation for reactive power via the AC grid.
  • the transients will likely be high within the power system, e.g. on the system bus voltage.
  • Substantial transients on power system voltage are especially generated when radio features and other RAN-related features, temporarily scheduling reduced amounts of allocation data in time and frequency, are applied.
  • a super capacitor unit is utilized, for the reason that super capacitors have suitable reaction time characteristics to rapidly deliver energy upon activation.
  • the super capacitor, or super capacitor unit can thus rapidly, i.e. timely respond to a request from a controller or orchestrator, scheduling data traffic.
  • a high cosine ⁇ value is an indicator of a reactive power need from the AC grid. This indicator may also be used as feedback to the controller or orchestrator.
  • FIG. 2 schematically presents a power system architecture, related to the present disclosure.
  • the power system architecture comprises a power system 28, a controller 25 and a processing arrangement 26.
  • the power system 28 comprises one or more PSUs 22, which is/are fed with power from a power grid 21, and a PDU 23, between which a system bus voltage delivers power from the output of said one or more PSUs 22 to said PDU 23.
  • the power system 28 also comprises a super capacitor unit 29 that is connected to the system bus voltage.
  • the super capacitor unit 29 is controlled by the controller 25.
  • the PDU 23 delivers power to the processing arrangement 26.
  • the processing arrangement 26 is controlled by the controller 25 being adapted to schedule data allocation.
  • the controller has information about data traffic load of the processing arrangement 26 at a point in time one (1) time interval in advance, relative to the timing of the data traffic load. This enables the controller to activate the super capacitor unit 29 at a subsequent time interval, to timely deliver power to the system bus voltage such that a variation or dip in the system bus voltage is, at least partly, smoothed out.
  • FIG 3 schematically presents an embodiment of the power system architecture of the power system architecture as presented in Figure 2 .
  • the power system architecture as presented in Figure 3 comprises a power system 38, comprising one or more PSUs 32, which is/are fed with power from a power grid 31, and a PDU 33, between which a system bus voltage delivers power from the output of said one or more PSUs 32 to said PDU 33.
  • the power system architecture as presented in Figure 3 comprises a digital unit (DU)/Baseband (BB) 35, which may be considered to be a specification of the generalized controller 25 of Figure 2 .
  • this power system architecture of Figure 3 also comprises a 5G radio/new radio (NR) unit 36, which can be considered to be a specification of the generalized processing arrangement 26 of Figure 2 .
  • DU digital unit
  • BB Baseband
  • NR new radio
  • the power system 38 comprises a super capacitor unit 39 that is connected to the system bus voltage, between the output of said one or more PSUs and the PDU 33.
  • the super capacitor unit 39 is controlled by the DU/BB 35.
  • the PDU 33 delivers power to the 5G radio/NR unit 36, corresponding to the processing arrangement 26 of Figure 2 .
  • the 5G radio/NR unit 36 is controlled by the DU/BB 35 being adapted to schedule data allocation.
  • the DU/BB 35 has information about data traffic load of the 5G radio/NR unit 36 at a time one (1) transmission time interval (TTI) in advance, relative to scheduling of the data traffic load. This enables the DU/BB 35 to activate the super capacitor unit 39 at a point in time when the data traffic is scheduled, to timely deliver power to the system bus voltage such that a variation or dip in the system bus voltage is, at least partly, smoothed out.
  • TTI transmission time interval
  • controller allocation such as scheduler allocation, of data traffic and power saving functions or radio features, data amount corresponding to a certain predetermined power rating, may generate variations or transients on the system bus voltage. Such variations or transients will thus give rise to the need for reactive power from said one or more PSUs.
  • the present disclosure can be implemented in a power system in a distributed cloud infrastructure.
  • a distributed cloud infrastructure the need to perform compute and storage operations, based on incoming data may generate power system variations or transients. Such variations or transients create power losses in the distributed infrastructure.
  • Figure 4 schematically presents a further embodiment of the power system architecture of the power system architecture as presented in Figure 2 .
  • Figure 4 comprises a power system 48 having one or more PSUs 42, a PDU 43 and a super capacitor unit 49. Similar to the case in Figure 3 , said one or more PSUs 42 provides a system bus voltage to the PDU 43.
  • the distributed cloud infrastructure further comprises hardware components 46A-C, which are fed by power from the PDU 43.
  • the hardware components may comprise a computing hardware 46A, storage component 46B and/or a network component 46C.
  • the power system architecture in a distributed cloud infrastructure also comprises a virtual infrastructure management 45, such as an orchestrator, which corresponds to the controller 25 of Figure 2 , and which controls said one or more PSUs 42, the super capacitor unit 49, the PDU 43, as well as the hardware components 46A-C, by signaling.
  • a virtual infrastructure management 45 such as an orchestrator, which corresponds to the controller 25 of Figure 2 , and which controls said one or more PSUs 42, the super capacitor unit 49, the PDU 43, as well as the hardware components 46A-C, by signaling.
  • Utilizing the super capacitor unit 49 can improve transient behavior on system bus of the power system 48, and at the same time save power.
  • the orchestrator or the virtual infrastructure management 45 can in a distributed cloud environment control the super capacitor unit 49 to smooth out or even eliminate variations or transients of the voltage on the system bus.
  • the virtual infrastructure management of for that matter the orchestrator, has advance information about compute and store requirements needed for a neighboring subsequent time interval. These compute and store requirements may thus be the requirements of the computing hardware 46A, storage hardware 46B and the network hardware 46C.
  • time interval As opposed to transmission time interval (TTI) as used in the embodiment when implementing a power system in a 5G radio/NR environment, the time interval as used in the current embodiment when implementing the present disclosure in a distributed cloud infrastructure, the meaning of the time interval typically depends on a current application. For instance, the time interval may be shorter for real-time, dynamic applications, for example fleet management, crowd control, etc., or longer for applications showing more predictable patterns of behavior, for instance monitoring-type of applications, such as temperature in forests, traffic monitoring, etc..
  • the time interval may vary, discretely. For instance, consecutive time intervals may be 100 milliseconds (ms), 10 ms, 20 ms, etc..
  • metrics such as floating point operations per second (FLOPS) or millions of instructions per second (MIPS)/billions of instructions per second (BIPS) may be used as a metric for correlating power consumption of the infrastructure with demands of applications running in the infrastructure.
  • FLOPS floating point operations per second
  • MIPS instructions per second
  • BIPS illions of instructions per second
  • FLOPS or MIPS of an application can be measured.
  • the orchestrator can know in advance which function will be executed on incoming data. Also, these metrics can be correlated to power consumption based on processor type and processor frequency, being used.
  • requirements for read/seek/write operations can also be correlated with power consumption in watts.
  • reference tables exit on average power requirement for read or write operations can be used for volatile, for instance, random access memory (RAM) of nonvolatile storage, for instance, hard disc drive (HDD) / solid state disc (SSD).
  • RAM random access memory
  • HDD hard disc drive
  • SSD solid state disc
  • the power system architecture in a distributed cloud infrastructure may be similar to the one of a 5G radio/NR site infrastructure.
  • a cloud power system infrastructure such as a data center has however typically a higher power demand; power demands being up to 50 kW, 100 kW or even 200 kW.
  • a controller such as a DU/BB or a virtual infrastructure management, has information about a data traffic load at a point in time one (1) time interval before said data traffic load is processed or transmitted.
  • the meaning, and duration, of one (1) such the time interval typically depends on the application in question, as mentioned above.
  • an autoregressive moving average model (ARIMA) that assumes that an evolving variable, which here corresponds to energy consumption, can be forecasted based on past values thereof.
  • ARIMA autoregressive moving average model
  • a historical data set would thus be needed and used as input. If deploying such an approach in a cloud environment, a relatively large data set would be needed as input.
  • the ARIMA approach uses as input time series data [x1,x2,..., xn], where smaller indices denote earlier in time, as opposed to higher indices denoting later in time.
  • This approach uses moving average windows in order to smooth out a function and to make said function as predictable as possible.
  • predictability can be portioned on an hourly, daily, weekly basis, etc..
  • Various tests can be applied such as the Dickery-Fuller test in order to determine whether input dataset is stationary or not, where stationary implies that mean, variance, auto-covariance values are time-invariant.
  • FIG. 5 illustrates a flow chart of method actions for controlling reactive power of a power system.
  • the power system comprises a power supply unit (PSU) that has a power input connected to a power grid, and has a power output connected to a power input of a power distribution unit (PDU) distributing power to a processing arrangement.
  • the power system serves the processing arrangement with power via the PDU, where the processing arrangement has a data traffic workload.
  • the power system further comprises a super capacitor unit that is connected to the power output of the PSU. The method is performed by a controller connected to the processing arrangement, the PDU and the super capacitor unit.
  • the controller is configured to schedule the data traffic workload of the processing arrangement, whereby the controller is configured to have information at time t(n) about the data traffic workload of the processing arrangement at a subsequent time t(n+1), where the time t(n+1) is one time interval from, and next to, the time t(n).
  • the flowchart comprises the following actions: Action 502: Obtaining at time t(n), information about data traffic workload to be processed by the processing arrangement at time t(n+1).
  • Action 504 Estimating a power required by the processing arrangement for processing the data traffic workload scheduled at time t(n+1), based on the obtained information about the data traffic load at time t(n).
  • Action 506 Upon determining that the required power is higher than a power threshold:
  • Action 510 of triggering discharge of the super capacitor unit may cause discharging of the super capacitor unit, whereby transients in the voltage at the power input of the power distribution unit are diminished.
  • the processing arrangement may comprise a remote radio unit (RRU), or communication hardware.
  • RRU remote radio unit
  • the controller may comprise a scheduler of a radio communication system or an orchestrator of a distributed network system.
  • FIG 6 illustrates, similar to Figure 5 , a flow chart of method actions for controlling reactive power of a power system.
  • the power system comprises a power supply unit (PSU) that has a power input connected to a power grid, and has a power output connected to a power input of a power distribution unit (PDU) distributing power to a processing arrangement.
  • the power system serves the processing arrangement with power via the PDU, where the processing arrangement has a data traffic workload.
  • the power system further comprises a super capacitor unit that is connected to the power output of the PSU. The method is performed by a controller connected to the processing arrangement, the PDU and the super capacitor unit.
  • the controller is configured to schedule the data traffic workload of the processing arrangement, whereby the controller is configured to have information at time t(n) about the data traffic workload of the processing arrangement at a subsequent time t(n+1), where the time t(n+1) is one time interval from, and next to, the time t(n).
  • Action 602 Obtaining at time t(n), information about data traffic workload to be processed by the processing arrangement at time t(n+1).
  • Action 604 Estimating a power required by the processing arrangement for processing the data traffic workload scheduled at time t(n+1), based on the obtained information about the data traffic load at time t(n).
  • Action 606 Determining whether the required power is higher than a power threshold. If the query in action 606 is answered with a "Yes", action 608 follows.
  • Action 608 Retrieving super capacitor data from a memory, where said super capacitor data corresponds to the required power.
  • Action 610 Triggering discharge of the super capacitor unit based on the super capacitor data at time t(n+1). This causes power from the super capacitor unit to be fed to the power input of the power distribution unit at time t(n+1), whereby transients in a voltage at the power input of the power distribution unit are, at least in part, smoothed out at time t(n+1), reducing the reactive power of the power system, where said transients are related to the data traffic workload of the processing arrangement.
  • This action may be followed by action 602, as above.
  • action 612 of confirming that there is no need to trigger the super capacitor unit. This action is optional.
  • Action 614 Obtaining information about residual strength of the super capacitor unit at time t(n+1) after thee discharge at time t(n+1).
  • Action 616 Obtaining information from power supply unit about power factor at time t(n+1).
  • Action 618 Storing super capacitor data about the required power, the residual strength, and the power factor, in the memory. Action 618 may be followed by action 602, as above.
  • action 604 of estimating the power required by the processing arrangement may be based on super capacity data as retrieved from the memory.
  • Action 610 of triggering discharge of the super capacitor unit may cause discharging of the super capacitor unit, whereby transients in the voltage at the power input of the power distribution unit are diminished.
  • the processing arrangement may comprise a remote radio unit (RRU), or communication hardware.
  • RRU remote radio unit
  • the controller may comprise a scheduler of a radio communication system or an orchestrator of a distributed network system.
  • the super capacitor unit may comprise one or more super capacitors. These one or more super capacitors may be activated separately. Alternatively, a plurality of these super capacitors may be activated at the same time, to achieve and deliver a higher power to the system bus voltage.
  • super capacity data as comprised in the memory, from action 608, may be based on historical activations, power needs and power factor values.
  • the super capacity data may hence also comprise information on what amount of the super capacitor unit is to be activated. Whether one, two or more parts, or whether even the entire super capacitor is to be activated, or triggered.
  • the present disclosure also comprises a computer program adapted to control reactive power of a power system, where the computer program comprises instructions which, when executed on at least one processor, cause the at least one processor to carry out the method of the flowcharts as presented in Figure 5 or 6 .
  • the present disclosure also comprises a computer-readable storage medium that has thereon said computer program.
  • FIG. 7 schematically presents a controller 25, 70 that is operative of controlling reactive power of a power system 28, 38, 48), where the power system comprises a power supply unit (PSU) 22, 32, 42 with a power input connected to a power grid 21, 31, 41.
  • the PSU has a power output connected to a power input of a power distribution unit (PDU) 23, 33, 43 that distributes power to a processing arrangement 26, whereby the power system serves the processing arrangement via the PDU with power, where the processing arrangement has a data traffic workload.
  • the power system further comprises a super capacitor unit 29, 39, 49 that is connected to the power output of the PSU.
  • the controller 25, 70 is adapted to be connected to the processing arrangement 26, the PDU 23, 33, 43 and the super capacitor unit 29, 39, 49.
  • the controller 25, 70 is configured to schedule the data traffic workload of the processing arrangement, whereby the controller 25, 70 is further configured to have information at time t(n) about the data traffic workload of the processing arrangement 26 at a subsequent time t(n+1), where the time t(n+1) is one time interval from, and next to, the time t(n).
  • the controller 25, 70 comprises a processing circuitry 72 and a memory 74.
  • the memory 74 has instructions executable by the processing circuitry 72, wherein said processing circuitry 72 when executing said instructions is configured to obtain at time t(n), information about data traffic workload to be processed by the processing arrangement 26 at time t(n+1).
  • Said processing circuitry 72 when executing said instructions is also configured to estimate a power required by the processing arrangement 26 for processing the data traffic workload scheduled at time t(n+1), based on the obtained information about the data traffic load at time t(n).
  • Said processing circuitry 72 when executing said instructions is also configured to determine whether the required power is higher than a power threshold, or not. Having determined that the required power is higher than a power threshold, said processing circuitry 72 when executing said instructions is further configured to retrieve super capacitor data from a memory, where said super capacitor data corresponds to the required power.
  • said processing circuitry 72 when executing said instructions is further configured to trigger discharge of the super capacitor unit 29, 39, 49 based on the super capacitor data at time t(n+1), by which power from the super capacitor unit can be fed to the power input of the power distribution unit at time t(n+1).
  • Transients in a voltage at the power input of the power distribution unit are hereby, at least in part, smoothed out at time t(n+1), which reduces the reactive power of the power system 28, 38, 48, where said transients are related to the data traffic workload of the processing arrangement.
  • the time t(n) denotes a point in time, which may be considered to be positioned along a time line, at an incremental index value n.
  • the time t(n+1) similarly denotes a point in time, which may be considered to be positioned along the time line, at an incremental index value of n+1. Since the increment indices differ by one (1) time interval, the time points t(n) and t(n+1) are next to each other in time.
  • the time interval or granularity in time which is used in the application, is applied by the controller and may depend on the application.
  • the granularity or resolution in time may be the transmission time interval (TTI).
  • TTI transmission time interval
  • the resolution in time may be a time interval that further may depend on the actual application.
  • Said processing circuitry 72 may further, when executing said instructions, be configured to obtain information about a residual strength of the super capacitor unit 29, 39, 49 at time t(n+1) following the discharge at time t(n+1). Said processing circuitry 72 may further, when executing said instructions, be configured to obtain information from the power supply unit 22, 32, 42 about a power factor at time t(n+1). Also, the processing circuitry 72 may also, when executing said instructions, be configured to store super capacitor data about the required power, the residual strength and the power factor in the memory. Said processing circuitry 72 may also, when executing said instructions, be configured to estimate the power required by the processing arrangement 26 based on super capacity data as retrieved from the memory. In addition, when executing said instructions, said processing circuitry 72 may also be configured to cause discharging of the super capacitor unit 29, 39, 49, whereby transients in the voltage at the power input of the PDU 23, 33, 43 will be diminished.
  • controller 25, 70 may comprise a scheduler that is adapted to schedule the data traffic workload of a radio communication system.
  • the processing arrangement 26 of the controller 25, 70 comprises a remote radio unit (RRU) of a radio communication system.
  • RRU remote radio unit
  • the controller 25, 70 may comprise virtual infrastructure management 45 or an orchestrator being adapted to orchestrate the data traffic workload in a distributed network system.
  • the processing arrangement 26 of the controller 25, 70 comprises communication hardware 46A-46C in a virtual infrastructure.
  • This communication hardware may comprise computing hardware 46A, storage hardware 46B and/or network hardware 46C.
  • the present disclosure also teaches a controller 25 that is operative to control reactive power of a power system 28, 38, 48, where the power system comprises a power supply unit (PSU) 22, 32, 42 with a power input connected to a power grid 21, 31, 41.
  • the PSU has a power output connected to a power input of a power distribution unit (PDU) 23, 33, 43 that distributes power to a processing arrangement 26, whereby the power system serves the processing arrangement via the PDU with power, where the processing arrangement has a data traffic workload.
  • the power system further comprises a super capacitor unit 29, 39, 49 that is connected to the power output of the PSU.
  • the controller 25 is adapted to be connected to the processing arrangement 26, the PDU 23, 33, 43 and the super capacitor unit 29, 39, 49.
  • the controller 25 is configured to schedule the data traffic workload of the processing arrangement, whereby the controller 25 is further configured to have information at time t(n) about the data traffic workload of the processing arrangement 26 at a subsequent time t(n+1), where the time t(n+1) is one time interval from, and next to, the time t(n).
  • the controller 25 is further adapted to obtain at time t(n), information about data traffic workload to be processed by the processing arrangement 26 at time t(n+1).
  • the controller 25 is also adapted to estimate a power required by the processing arrangement 26 for processing the data traffic workload scheduled at time t(n+1), based on the obtained information about the data traffic load at time t(n).
  • the controller 25 is also adapted to determine whether the required power is higher than a power threshold, or not. Having determined that the required power is higher than a power threshold, the controller 25 is adapted to retrieve super capacitor data from a memory, where said super capacitor data corresponds to the required power. In addition, the controller 25 is adapted to trigger discharge of the super capacitor unit 29, 39, 49 based on the super capacitor data at time t(n+1), by which power from the super capacitor unit can be fed to the power input of the power distribution unit at time t(n+1).
  • Transients in a voltage at the power input of the power distribution unit are hereby, at least in part, smoothed out at time t(n+1), which reduces the reactive power of the power system 28, 38, 48, where said transients are related to the data traffic workload of the processing arrangement.
  • the controller 25 may further be adapted to obtain information about a residual strength of the super capacitor unit 29, 39, 49 at time t(n+1) subsequent to the discharge at time t(n+1).
  • the controller 25 may further be adapted to obtain information from the power supply unit 22, 32, 42 about a power factor at time t(n+1).
  • the controller 25 may further be adapted to store super capacitor data about the required power, the residual strength and the power factor in the memory.
  • the controller 25 may further also be adapted to estimate the power required by the processing arrangement 26 based on super capacity data as retrieved from the memory.
  • controller 25 may be adapted to cause discharging of the super capacitor unit 29, 39, 49, whereby transients in the voltage at the power input of the PDU 23, 33, 43 will be diminished.
  • the controller 25 may comprise a scheduler that is adapted to schedule the data traffic workload of a radio communication system.
  • Examples and embodiments as described herein, comprise the following advantages and preferable features: Activation of a super capacitor unit mounted in the power system stabilizes the system bus voltage, and reduces the transient behavior on the system bus voltage, as experienced by the power system unit. A reduction in the transient behavior of the system bus voltage, as experienced by the power system unit, minimizes the demand for reactive power and hence power losses internally.
  • a super capacitor unit being mounted in the power system can be activated and controlled such that a transient behavior on system bus voltage is improved.
  • the accomplished improved transient behavior of system bus voltage reduces the demand for reactive power of the power system input from an AC grid.
  • power efficiency of the power system can be improved by 3-4 % by the reduction of the need for reactive power to the power system, or any similar energy feed arrangement. Accordingly, the electrical bill of an operator is reduced, which clearly is advantageous.

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Automation & Control Theory (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • General Engineering & Computer Science (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Control Of Electrical Variables (AREA)

Description

    TECHNICAL FIELD
  • This disclosure relates to power control in power systems. More particularly, it relates to a method and a controller for controlling reactive power control in power systems.
  • BACKGROUND
  • Current technology in power systems used for 5th generation wireless systems (5G) radio/new radio (NR) and distributed cloud infrastructure fails to consider the power system behavior on the system bus voltage of said power systems. Also, in similar energy feed arrangements the behavior on the system bus voltage is not considered.
  • Due to radio resource allocation for mobile data transport and different power saving features, 5G radio/NR units typically have a transient behavior that affects the power system bus voltage.
  • Transients on the power system bus voltage create a need for reactive power, for which reason a power loss is generated. The need for reactive power is generated at an input of the power system, which input is connected to a power grid, typically an alternating current (AC) grid. This increase in reactive power need generates an increased bill in kilo-Watt-hours (kWh) addressed to a network operator.
  • In a cloud infrastructure, a cloud orchestrator can dedicate and allocate compute and store resources at the infrastructure. Transients are here generated on power system infrastructure, when, for instance, elastic random access networks (ERAN) distribute data to allocate resources in a distributed cloud to another location. By moving data to other locations, transients are typically also generated on distributed cloud infrastructure equipment.
  • Radio systems at 5G and NR sites operating at relatively high radio frequency bands apply different power saving and data control functions, can apply discontinuous transmission (DTX) in the range of 100 ms and lower. Such DTX typically generate transients on the system bus voltage of their power systems.
  • Moreover, data traffic in the radio access network (RAN) increasingly requires efficient wireless channel access in further radio frequency bands for mobile data transmission. This channel access and frequency allocation generates transients on the infrastructure, especially on system bus voltage, which transients are currently not handled in current power system for 5G radio/NR.
  • Hence, transients on the system bus voltage impact power supply units (PSUs), such that reactive power behavior of the PSU input from the power grid is affected. This affected reactive power behavior gives rise to power losses on the power systems.
  • When the need of reactive power increases from the power grid (AC grid), such as when using a PSU for 5G radio/NR applications, the reactive demand of the PSU will increase the electrical bill accordingly for the operator using the power system of the 5G radio/NR site. The power factor (PF) of the PSU will hence also be affected by the transient behavior of the power system voltage.
  • Thus, in a cloud environment, data allocation behavior similar to the one of 5G radio/NR, can be identified, when compute and store resources are allocated for incoming data.
  • Figure 1 schematically presents a power system architecture according to prior art. The architecture comprises a power system 18, a digital unit (DU)/Baseband (BB) and a remote radio unit (RRU). The power system 18 comprises one or more power system units (PSUs) 12 and a power distribution unit (PDU) 13. From a power grid 11 alternating current (AC) power is provided to said one or more power system units (PSU) 12 of the power system. From said one or more PSUs 12 power is delivered on a system bus voltage to the PDU 13. From the PDU13 power is further delivered to the RRU 16. Feedback signaling is provided between the DU/BB 15 and the RRU 16, as well as between the DU/BB 15 and the PDU 13. Also, feedback signaling is also provided between the DU/BB 15 and said one or more PSUs 12. In Figure 1, even a standard capacitor may be used to feed reactive power to the system bus voltage between said one or more PSUs 12 and the PDU 13. Power may be delivered by a capacitor within this architecture.
  • Such solutions are known from the prior art.
  • WO2011013187 A1 discloses a self-excited reactive power compensation device is provided with a capacitor (C) for smoothing alternating-current voltage, a self-excited converter that is coupled to a power system having multiple phases and includes a switching element in order to output reactive power to the power system on the basis of electric power smoothed by the capacitor, and a control unit for controlling the reactive power outputted from the self-excited converter to the power system by switching the switching element on the basis of the voltage of the power system detected by a first voltage detector and an electric current flowing between the power system and the self-excited converter, which is detected by a current detector. The control unit controls a charger to thereby perform charge control for charging the capacitor (C) in such a manner that the voltage between both ends of the capacitor detected by a second voltage detector is a first predetermined value or more.
  • WO2010045726 A1 discloses a single phase grid correction system for correcting the power factor of an electrical power grid. The grid has a generator, transmission lines connecting the generator to distribution nodes, feeder lines radiating from each node, and groups of consumers connected to each feeder line. A capacitor bank is located at a number of consumer's premises, indoors, either beside or forming part of the consumer's normal single phase electric panel. A set of remotely controlled switches at the consumer's premises permits the capacitor banks to be switched in and out of grid connection and also allows non-essential high energy consuming loads, not necessarily inductive, to be switched on and off the grid. The grid correction systems are widely distributed at consumer's premises throughout the grid. By remotely controlling the switches, the utility operator can switch capacitor banks at selected consumer premises in or out of the grid to provide or remove reactive power as needed, and can also selectively remove load from the grid to reduce the likelihood of sudden uncontrollable load shedding.
  • US2016149413 A1 discloses a system including a distributed power source, a storage battery, a bidirectional inverter having a smoothing capacitor on its DC side, and a control section for controlling the entire system, and supplies AC power to a load while being interconnected with a power system. When active power supplied from the distributed power source and/or the storage battery to the smoothing capacitor is equal to or greater than active power of load power, the control section controls a power factor of inverter output current outputted from the bidirectional inverter so as to coincide with a power factor of load current flowing to the load.
  • A drawback with such a technique is the lack of information about when transients occur, and hence when there is a need to deliver power to the system bus voltage.
  • There is hence a need for an improved power control in current power systems.
  • SUMMARY
  • It is an object of exemplary embodiments herein to address at least some of the issues outlined above and to consider the power system behavior on the system bus voltage of said power systems, according to the appended independent claims, and by the exemplary embodiments according to the dependent claims.
  • According to one aspect, this object and others are achieved by a method of controlling reactive power of a power system. The power system comprises a power supply unit with a power input that is connected to a power grid, where the power supply unit has a power output connected to a power input of a power distribution unit that distributes power to a processing arrangement, whereby the power system serves the processing arrangement with power via the power distribution. The processing arrangement has a data traffic workload. The power system further comprises a super capacitor unit that is connected to the power output of the power supply unit. The method is performed in a controller that is connected to the processing arrangement, the power distribution unit and the super capacitor unit. The controller is configured to schedule the data traffic workload of the processing arrangement, whereby the controller is configured to have information at time t(n) about the data traffic workload of the processing arrangement at a subsequent time t(n+1), where the time t(n+1) is one time interval from, and next to, the time t(n). The method comprises obtaining at time t(n), information about data traffic workload to be processed by the processing arrangement at time t(n+1). The method also comprises estimating a power required by the processing arrangement for processing the data traffic workload scheduled at time t(n+1), based on the obtained information about the data traffic load at time t(n). Upon determining that the required power is higher than a power threshold, within the method, said method also comprises retrieving super capacitor data from a memory, where said super capacitor data corresponds to the required power. In addition, the method comprises triggering discharge of the super capacitor unit based on the super capacitor data at time t(n+1), causing power from the super capacitor unit to be fed to the power input of the power distribution unit at time t(n+1), whereby transients in a voltage at the power input of the power distribution unit are, at least in part, smoothed out at time t(n+1). This reduces the reactive power of the power system, where said transients are related to the data traffic workload of the processing arrangement.
  • According to a further aspect, this object and others are achieved by a controller that is operative of controlling reactive power of a power system, where the power system comprises a power supply unit with a power input connected to a power grid. The power supply unit has a power output connected to a power input of a power distribution unit that distributes power to a processing arrangement, whereby the power system serves the processing arrangement with power via the PDU. The processing arrangement has a data traffic workload. The power system further comprises a super capacitor unit that is connected to the power output of the PSU. The controller is adapted to be connected to the processing arrangement, the power distribution unit, and the super capacitor unit. The controller is configured to schedule the data traffic workload of the processing arrangement. The controller is further configured to have information at time t(n) about the data traffic workload of the processing arrangement at a subsequent time t(n+1), where the time t(n+1) is one time interval from, and next to, the time t(n). The controller comprises a processing circuitry and a memory. The memory has instructions executable by the processing circuitry, wherein said processing circuitry when executing said instructions is configured to obtain at time t(n), information about data traffic workload to be processed by the processing arrangement at time t(n+1). Said processing circuitry is, when executing said instructions also configured to estimate a power required by the processing arrangement for processing the data traffic workload scheduled at time t(n+1), based on the obtained information about the data traffic load at time t(n). Said processing circuitry is, when executing said instructions also configured to determine whether the required power is higher than a power threshold, or not. Having determined that the required power is higher than a power threshold, said processing circuitry is, when executing said instructions further configured to retrieve super capacitor data from a memory, where said super capacitor data corresponds to the required power. In addition, said processing circuitry is, when executing said instructions further configured to trigger discharge of the super capacitor unit, based on the super capacitor data at time t(n+1), by which power from the super capacitor unit can be fed to the power input of the power distribution unit at the subsequent time t(n+1). Transients in a voltage at the power input of the power distribution unit are hereby, at least in part, smoothed out at time t(n+1), which reduces the reactive power of the power system, where said transients are related to the data traffic workload of the processing arrangement.
  • The present disclosure also comprises a computer program for controlling reactive power of a power system. This computer program comprises instructions which, when executed on at least one processor, cause the at least one processor to carry out the method according to claims 1 to 8.
  • The present disclosure also comprises a computer-readable storage medium that has thereon said computer program.
  • The present disclosure comprises the following advantages.
  • It is an advantage that activation of a super capacitor unit mounted in the power system stabilizes the system bus voltage, and reduces the transient behavior on the system bus voltage, as experienced by the power system unit. A reduction in the transient behavior of the system bus voltage, as experienced by the power system unit, minimizes the demand for reactive power and hence power losses internally, which is also advantageous.
  • By using traffic information from a controller, activation and control of the super capacitor mounted in the power system, can be achieved such that a transient behavior on system bus voltage is improved. The accomplished improved transient behavior of system bus voltage reduces the demand for reactive power of the power system input from an AC grid.
  • Hereby, power efficiency of the power system can be improved by 3-4 % by reducing the incoming reactive power need to the power system. Accordingly, the electrical bill of an operator is reduced, which clearly also is an advantage.
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • Embodiments will now be described in more detail, and with reference to the accompanying drawings, in which:
    • Figure 1 schematically illustrates an architecture of a power system, according to the prior art;
    • Figures 2 to 4 schematically illustrate architectures of power systems, according to embodiments of the present disclosure;
    • Figures 5 and 6 illustrate flow charts of actions in method performed in controller, according to embodiments of the present disclosure; and
    • Figure 7 schematically illustrates a controller, according to embodiments of the present disclosure.
    DETAILED DESCRIPTION
  • In the following description, exemplary embodiments will be described in more detail, with reference to accompanying drawings. For the purpose of explanation and not limitation, specific details are set forth, such as particular examples and techniques in order to provide a thorough understanding.
  • Hence, there is a demand for an improved power control circumventing or at least diminishing issues, associated with transients on system bus voltage, in current power systems for 5G radio/NR and distributed cloud infrastructure.
  • This disclosure improves the transient behavior of power systems for 5G radio/NR and distributed cloud infrastructure, which improves the power efficiency. By reducing the need for reactive power from AC grids at the input of power systems, the power efficiency of the power systems is reduced. By saving power, electricity costs are reduced.
  • In short, by mounting a super capacitor unit inside a power system and by controlling activation of said super capacitor unit based on traffic data from a controller, such as a digital unit(DU)/Baseband (BB) or orchestrator, the transient behavior of the system bus voltage, as experienced by the power system, is reduced.
  • By applying the super capacitor unit and controlling the activation thereof, transients on the system bus voltage are affected, which improves the transient behavior. An improved transient behavior, as experienced by the power system unit, reduces the need for input reactive power to the power system, from an AC grid connected to the power system.
  • Transient behavior on system bus voltage hence affects the need for reactive power of the power system, also impacts the behavior of the power factor (PF) of the power system unit (PSU) on the power system. The power factor may be defined as the ratio of the real power flowing to, for instance, a power system, to the apparent power of the power system, where the apparent power depends to the reactive power of the power system.
  • Super capacitors or super capacitor units have properties that enable rapid energy delivery, in comparison with valve regulated lead acid (VRLA) batteries or other type of energy storage, for that matter. The fast reaction delivery of energy from the super capacitor unit is here utilized to smooth out, or even eliminate, transients or dips on the system voltage bus based on information from a controller, when applying this disclosure in a distributed cloud environment.
  • By activating a super capacitor unit based on information from the controller, power is momentarily added to the system bus voltage to smooth out said transients or dips, which reduces the transient behavior of the system bus voltage as experienced by the power system unit, for which reason the need for reactive power need from the AC grid is reduced. Subsequent to activation, the super capacitor is advantageously charged at times when the information from controller or orchestrator indicates less than peak, data or, traffic levels for the power demand of 5G radio/NR systems or distributed cloud environment.
  • A DU/BB or an orchestrator, being examples of the controller, has at a time t(n) information about traffic data and hence also the power needed for subsequent transmission at a time t(n+1), i.e. information about traffic data is available at a point in time, which point is adjacent to the point in time at which the power is needed.. By using this data traffic information, and basing the activation of the super capacitor unit on this information, energy from an activated super capacitor unit can meet the transient or dip at a time at which they occur, which can result in smoothening of system bus voltage, as experienced from the power system unit. The controller may thus activate the super capacitor unit while sending data traffic to a processing arrangement.
  • In the case of a distributed cloud infrastructure, a super capacitor can be installed in the cloud infrastructure on a distributed cloud, and be orchestrated by an orchestrator to activate the super capacitor unit such that a system bus voltage is smoothed out and the need for reactive power of the power system used, is reduced.
  • It is thus herein proposed to take into account the power system behavior on the system bus voltage of said power system. As described above, power systems used for 5G radio/NR or distributed cloud infrastructure applications may have a transient behavior. Since transients on the system bus voltage causes a need for reactive power from an AC grid feeding the power system, transients give rise to power losses and accordingly an electricity bill increase for an operator using the power system.
  • The present disclosure has a number of advantageous properties. Activation of a super capacitor mounted in the power system stabilizes the system bus voltage, and reduces the transient behavior on the system bus voltage, as experienced by the power system unit. A reduction in the transient behavior of the system bus voltage, as experienced by the power system unit, minimizes the demand for reactive power and hence power losses internally.
  • By using traffic information from a controller or orchestrator, activation and control of the super capacitor mounted in the power system, can be activated and controlled such that a transient behavior on system bus voltage is improved. The accomplished improved transient behavior of system bus voltage reduces the demand for reactive power of the power system input from an AC grid.
  • Hereby, power efficiency of the power system can be improved by 3-4 % by reducing the incoming reactive power need to the power system. Accordingly, the electrical bill of an operator is reduced.
  • The 5G radio/NR systems, have radio requirements with higher demands regarding power saving functionality with respect to fast reaction and fast turn on/off of data traffic. It is noted that the same requirements of higher demand are requested in cloud infrastructure, in which also low latency is a requirement.
  • In 5G radio/NR, various physical resource blocks (PRBs) are allocated within a corresponding frame structure. When features configured to save radio power are activated generate disturbances on the system bus voltage. These disturbances or transients generate power losses on the power system unit (PSU) and on a distribution system connected to it, for instance a 40 m long cable.
  • The power losses may be due to voltage variations as created on the distribution system having a high inductance on the copper wire. Voltage variations on a high inductance wire create a demand for reactive power. This demand of reactive power causes the active power as delivered from the PSU to dip on the system bus voltage. This in turn activates the PSU to immediate deliver power to respond to the dip. The PSU thus demands both a reactive power as well as an active power, from an alternating current (AC) grid that is feeding the PSU with power.
  • Accordingly, the power taken from the grid comprises active power as well as reactive power. When active and reactive power is taken from grid, a corresponding electricity bill in kWh, increases, due to increased consumption by 5G radio/NR radio or a distributed cloud environment. This kWh consumption of electricity is to be paid by the operator.
  • Moreover, a circuitry present inside a power system unit (PSU), which is called power factor (PF), has the task to try to keep the voltage and current of the AC grid at the PSU input in balance and in-line/in-phase between input AC voltage and input AC current. Whenever there is a mismatch between AC voltage and AC current, which mismatch can depend on transients on a cable having an inductance, an angle (ϕ) is created between voltage and current. The power factor may be defined as cosine ϕ. The measure cosine ϕ represents the mismatch in AC voltage and AC current, which the power factor (PF) circuit inside the PSU attempts to compensate for.
  • The generation of reactive power thus generates losses, with the result of an increased electrical bill for the operator, because more reactive power is need when transients or variations exist on the system bus voltage on the radio unit in question.
  • The present disclosure diminishes the reactive AC power component as demanded by the PSU from the AC grid. This in turn reduces the electrical bill for the operator and increases the efficiency of the power system, when the transient behavior of the system bus voltage is improved.
  • The introducing a super capacitor unit, and activating the super capacitor unit based on data traffic both in 5G radio/NR, as well as in distributed cloud environments, reactive power is directly added on the power system voltage bus, at a time when it is needed. Data traffic information is provided from a controller, such as a scheduler, or an orchestrator.
  • The present disclosure utilizes the fact that it is known when, i.e. at what time, transients due to data traffic will occur. In addition, in the case of 5G radio/NR, this information is available at a point in time, one (1) transmission time interval (TTI) before the corresponding actual power is needed. By activating a super capacitor, within the PSU, the PF circuit inside the PSU will not have to perform a compensation for reactive power via the AC grid. In the case transients depending on radio unit output power are substantial, the transients will likely be high within the power system, e.g. on the system bus voltage.
  • Substantial transients on power system voltage are especially generated when radio features and other RAN-related features, temporarily scheduling reduced amounts of allocation data in time and frequency, are applied.
  • Within the present disclosure a super capacitor unit is utilized, for the reason that super capacitors have suitable reaction time characteristics to rapidly deliver energy upon activation. The super capacitor, or super capacitor unit, can thus rapidly, i.e. timely respond to a request from a controller or orchestrator, scheduling data traffic.
  • It is noted that a high cosine ϕ value, or the PF-value, is an indicator of a reactive power need from the AC grid. This indicator may also be used as feedback to the controller or orchestrator.
  • Figure 2 schematically presents a power system architecture, related to the present disclosure. The power system architecture comprises a power system 28, a controller 25 and a processing arrangement 26. The power system 28 comprises one or more PSUs 22, which is/are fed with power from a power grid 21, and a PDU 23, between which a system bus voltage delivers power from the output of said one or more PSUs 22 to said PDU 23. The power system 28 also comprises a super capacitor unit 29 that is connected to the system bus voltage. In addition, the super capacitor unit 29 is controlled by the controller 25. The PDU 23 delivers power to the processing arrangement 26. Also, the processing arrangement 26 is controlled by the controller 25 being adapted to schedule data allocation. The controller has information about data traffic load of the processing arrangement 26 at a point in time one (1) time interval in advance, relative to the timing of the data traffic load. This enables the controller to activate the super capacitor unit 29 at a subsequent time interval, to timely deliver power to the system bus voltage such that a variation or dip in the system bus voltage is, at least partly, smoothed out.
  • Figure 3 schematically presents an embodiment of the power system architecture of the power system architecture as presented in Figure 2. The power system architecture as presented in Figure 3 comprises a power system 38, comprising one or more PSUs 32, which is/are fed with power from a power grid 31, and a PDU 33, between which a system bus voltage delivers power from the output of said one or more PSUs 32 to said PDU 33. The power system architecture as presented in Figure 3 comprises a digital unit (DU)/Baseband (BB) 35, which may be considered to be a specification of the generalized controller 25 of Figure 2. Similarly, this power system architecture of Figure 3 also comprises a 5G radio/new radio (NR) unit 36, which can be considered to be a specification of the generalized processing arrangement 26 of Figure 2.
  • In addition, the power system 38 comprises a super capacitor unit 39 that is connected to the system bus voltage, between the output of said one or more PSUs and the PDU 33. Within this embodiment as presented in Figure 3, the super capacitor unit 39 is controlled by the DU/BB 35. The PDU 33 delivers power to the 5G radio/NR unit 36, corresponding to the processing arrangement 26 of Figure 2. Also, the 5G radio/NR unit 36 is controlled by the DU/BB 35 being adapted to schedule data allocation. The DU/BB 35 has information about data traffic load of the 5G radio/NR unit 36 at a time one (1) transmission time interval (TTI) in advance, relative to scheduling of the data traffic load. This enables the DU/BB 35 to activate the super capacitor unit 39 at a point in time when the data traffic is scheduled, to timely deliver power to the system bus voltage such that a variation or dip in the system bus voltage is, at least partly, smoothed out.
  • It is noted that the energy demand from a power system architecture, when utilized in connection with 5G radio/NR, is relatively high. Due to controller allocation, such as scheduler allocation, of data traffic and power saving functions or radio features, data amount corresponding to a certain predetermined power rating, may generate variations or transients on the system bus voltage. Such variations or transients will thus give rise to the need for reactive power from said one or more PSUs.
  • It has been noted that by using a super capacitor unit, and by controlling the activation of said super capacitor unit, power can be saved on said one or more PSUs, eliminating the need for reactive power from the power grid 31, i.e. an AC grid. Such power savings may be up 3-4 % for a relatively high quality grid, and 4 - 6 % for a relatively low quality grid.
  • As mentioned above, the present disclosure can be implemented in a power system in a distributed cloud infrastructure. In a distributed cloud infrastructure, the need to perform compute and storage operations, based on incoming data may generate power system variations or transients. Such variations or transients create power losses in the distributed infrastructure.
  • Figure 4 schematically presents a further embodiment of the power system architecture of the power system architecture as presented in Figure 2. Figure 4 comprises a power system 48 having one or more PSUs 42, a PDU 43 and a super capacitor unit 49. Similar to the case in Figure 3, said one or more PSUs 42 provides a system bus voltage to the PDU 43. The distributed cloud infrastructure further comprises hardware components 46A-C, which are fed by power from the PDU 43. The hardware components may comprise a computing hardware 46A, storage component 46B and/or a network component 46C. The power system architecture in a distributed cloud infrastructure also comprises a virtual infrastructure management 45, such as an orchestrator, which corresponds to the controller 25 of Figure 2, and which controls said one or more PSUs 42, the super capacitor unit 49, the PDU 43, as well as the hardware components 46A-C, by signaling.
  • Utilizing the super capacitor unit 49 can improve transient behavior on system bus of the power system 48, and at the same time save power. The orchestrator or the virtual infrastructure management 45 can in a distributed cloud environment control the super capacitor unit 49 to smooth out or even eliminate variations or transients of the voltage on the system bus. In the case of a distributed cloud infrastructure, the virtual infrastructure management, of for that matter the orchestrator, has advance information about compute and store requirements needed for a neighboring subsequent time interval. These compute and store requirements may thus be the requirements of the computing hardware 46A, storage hardware 46B and the network hardware 46C.
  • As opposed to transmission time interval (TTI) as used in the embodiment when implementing a power system in a 5G radio/NR environment, the time interval as used in the current embodiment when implementing the present disclosure in a distributed cloud infrastructure, the meaning of the time interval typically depends on a current application. For instance, the time interval may be shorter for real-time, dynamic applications, for example fleet management, crowd control, etc., or longer for applications showing more predictable patterns of behavior, for instance monitoring-type of applications, such as temperature in forests, traffic monitoring, etc..
  • The time interval may vary, discretely. For instance, consecutive time intervals may be 100 milliseconds (ms), 10 ms, 20 ms, etc..
  • Technically, for compute resources, for instance the computing hardware 46A, metrics such as floating point operations per second (FLOPS) or millions of instructions per second (MIPS)/billions of instructions per second (BIPS) may be used as a metric for correlating power consumption of the infrastructure with demands of applications running in the infrastructure.
  • It is known that FLOPS or MIPS of an application can be measured. For a certain function granularity, the orchestrator can know in advance which function will be executed on incoming data. Also, these metrics can be correlated to power consumption based on processor type and processor frequency, being used.
  • For storage resources, for instance the storage hardware 46B, requirements for read/seek/write operations can also be correlated with power consumption in watts. For example, reference tables exit on average power requirement for read or write operations can be used for volatile, for instance, random access memory (RAM) of nonvolatile storage, for instance, hard disc drive (HDD) / solid state disc (SSD).
  • It is pointed out that the power system architecture in a distributed cloud infrastructure may be similar to the one of a 5G radio/NR site infrastructure. A cloud power system infrastructure such as a data center has however typically a higher power demand; power demands being up to 50 kW, 100 kW or even 200 kW.
  • Within the embodiments of the disclosure as described above, a controller, such as a DU/BB or a virtual infrastructure management, has information about a data traffic load at a point in time one (1) time interval before said data traffic load is processed or transmitted. The meaning, and duration, of one (1) such the time interval typically depends on the application in question, as mentioned above.
  • However, by slightly modifying an embodiment of the ones described, it would be possible to take into consideration a more predictive approach when it comes to deciding when to activate, i.e. trigger the use of, a super capacitor unit. This more predictive approach may be implemented and executed within the 5G radio/NR unit or in the cloud in which case a different radio technology is targeted.
  • It is envisaged that there are different possibilities to implement such a predictive approach. According to one example, an autoregressive moving average model (ARIMA) that assumes that an evolving variable, which here corresponds to energy consumption, can be forecasted based on past values thereof. In order to have ARIMA working, a historical data set would thus be needed and used as input. If deploying such an approach in a cloud environment, a relatively large data set would be needed as input.
  • The ARIMA approach uses as input time series data [x1,x2,..., xn], where smaller indices denote earlier in time, as opposed to higher indices denoting later in time. This approach uses moving average windows in order to smooth out a function and to make said function as predictable as possible. Dependent on the dataset to which the approach is applied, predictability can be portioned on an hourly, daily, weekly basis, etc..
  • Various tests can be applied such as the Dickery-Fuller test in order to determine whether input dataset is stationary or not, where stationary implies that mean, variance, auto-covariance values are time-invariant. In the case the data set is time-invariant; the ARIMA model can be applied to the dataset, by which predictions are made. Predicting calculations may be expressed as a function f(x) = arima(input, ahead=8), where the ahead-parameter specifies how many time units, such as hours, the model shall predict the function f(x).
  • Figure 5 illustrates a flow chart of method actions for controlling reactive power of a power system. The power system comprises a power supply unit (PSU) that has a power input connected to a power grid, and has a power output connected to a power input of a power distribution unit (PDU) distributing power to a processing arrangement. The power system serves the processing arrangement with power via the PDU, where the processing arrangement has a data traffic workload. The power system further comprises a super capacitor unit that is connected to the power output of the PSU. The method is performed by a controller connected to the processing arrangement, the PDU and the super capacitor unit. The controller is configured to schedule the data traffic workload of the processing arrangement, whereby the controller is configured to have information at time t(n) about the data traffic workload of the processing arrangement at a subsequent time t(n+1), where the time t(n+1) is one time interval from, and next to, the time t(n). The flowchart comprises the following actions:
    Action 502: Obtaining at time t(n), information about data traffic workload to be processed by the processing arrangement at time t(n+1).
  • Action 504: Estimating a power required by the processing arrangement for processing the data traffic workload scheduled at time t(n+1), based on the obtained information about the data traffic load at time t(n).
  • Action 506: Upon determining that the required power is higher than a power threshold:
    • Action 508: Retrieving super capacitor data from a memory, where said super capacitor data corresponds to the required power.
    • Action 510: Triggering discharge of the super capacitor unit based on the super capacitor data at time t(n+1). This causes power from the super capacitor unit to be fed to the power input of the power distribution unit at time t(n+1), whereby transients in a voltage at the power input of the power distribution unit are, at least in part, smoothed out at time t(n+1), reducing the reactive power of the power system, where said transients are related to the data traffic workload of the processing arrangement.
  • Action 510 of triggering discharge of the super capacitor unit, may cause discharging of the super capacitor unit, whereby transients in the voltage at the power input of the power distribution unit are diminished.
  • Within the method as presented in the flowchart of Figure 5, the processing arrangement may comprise a remote radio unit (RRU), or communication hardware.
  • Within the method as presented in flowchart of Figure 5, the controller may comprise a scheduler of a radio communication system or an orchestrator of a distributed network system.
  • Figure 6 illustrates, similar to Figure 5, a flow chart of method actions for controlling reactive power of a power system. The power system comprises a power supply unit (PSU) that has a power input connected to a power grid, and has a power output connected to a power input of a power distribution unit (PDU) distributing power to a processing arrangement. The power system serves the processing arrangement with power via the PDU, where the processing arrangement has a data traffic workload. The power system further comprises a super capacitor unit that is connected to the power output of the PSU. The method is performed by a controller connected to the processing arrangement, the PDU and the super capacitor unit. The controller is configured to schedule the data traffic workload of the processing arrangement, whereby the controller is configured to have information at time t(n) about the data traffic workload of the processing arrangement at a subsequent time t(n+1), where the time t(n+1) is one time interval from, and next to, the time t(n). This flowchart comprises the following actions:
  • Action 602: Obtaining at time t(n), information about data traffic workload to be processed by the processing arrangement at time t(n+1).
  • Action 604: Estimating a power required by the processing arrangement for processing the data traffic workload scheduled at time t(n+1), based on the obtained information about the data traffic load at time t(n).
  • Action 606: Determining whether the required power is higher than a power threshold. If the query in action 606 is answered with a "Yes", action 608 follows.
  • Action 608: Retrieving super capacitor data from a memory, where said super capacitor data corresponds to the required power.
  • Action 610: Triggering discharge of the super capacitor unit based on the super capacitor data at time t(n+1). This causes power from the super capacitor unit to be fed to the power input of the power distribution unit at time t(n+1), whereby transients in a voltage at the power input of the power distribution unit are, at least in part, smoothed out at time t(n+1), reducing the reactive power of the power system, where said transients are related to the data traffic workload of the processing arrangement. This action may be followed by action 602, as above.
  • If the query in action 606 is answered with a "No", action 612 of confirming that there is no need to trigger the super capacitor unit. This action is optional.
  • Subsequent to action 610 the following may occur.
  • Action 614: Obtaining information about residual strength of the super capacitor unit at time t(n+1) after thee discharge at time t(n+1).
  • Action 616: Obtaining information from power supply unit about power factor at time t(n+1).
  • Action 618: Storing super capacitor data about the required power, the residual strength, and the power factor, in the memory. Action 618 may be followed by action 602, as above.
  • It is noted that action 604 of estimating the power required by the processing arrangement may be based on super capacity data as retrieved from the memory.
  • Action 610 of triggering discharge of the super capacitor unit, may cause discharging of the super capacitor unit, whereby transients in the voltage at the power input of the power distribution unit are diminished.
  • Within the method as described in the flowchart of Figure 6, the processing arrangement may comprise a remote radio unit (RRU), or communication hardware.
  • Within the method of Figure 6, the controller may comprise a scheduler of a radio communication system or an orchestrator of a distributed network system.
  • It is noted that the super capacitor unit may comprise one or more super capacitors. These one or more super capacitors may be activated separately. Alternatively, a plurality of these super capacitors may be activated at the same time, to achieve and deliver a higher power to the system bus voltage.
  • It is noted that super capacity data as comprised in the memory, from action 608, may be based on historical activations, power needs and power factor values. The super capacity data may hence also comprise information on what amount of the super capacitor unit is to be activated. Whether one, two or more parts, or whether even the entire super capacitor is to be activated, or triggered.
  • The present disclosure also comprises a computer program adapted to control reactive power of a power system, where the computer program comprises instructions which, when executed on at least one processor, cause the at least one processor to carry out the method of the flowcharts as presented in Figure 5 or 6.
  • The present disclosure also comprises a computer-readable storage medium that has thereon said computer program.
  • Figure 7 schematically presents a controller 25, 70 that is operative of controlling reactive power of a power system 28, 38, 48), where the power system comprises a power supply unit (PSU) 22, 32, 42 with a power input connected to a power grid 21, 31, 41. The PSU has a power output connected to a power input of a power distribution unit (PDU) 23, 33, 43 that distributes power to a processing arrangement 26, whereby the power system serves the processing arrangement via the PDU with power, where the processing arrangement has a data traffic workload. The power system further comprises a super capacitor unit 29, 39, 49 that is connected to the power output of the PSU. The controller 25, 70 is adapted to be connected to the processing arrangement 26, the PDU 23, 33, 43 and the super capacitor unit 29, 39, 49. The controller 25, 70 is configured to schedule the data traffic workload of the processing arrangement, whereby the controller 25, 70 is further configured to have information at time t(n) about the data traffic workload of the processing arrangement 26 at a subsequent time t(n+1), where the time t(n+1) is one time interval from, and next to, the time t(n). The controller 25, 70 comprises a processing circuitry 72 and a memory 74. The memory 74 has instructions executable by the processing circuitry 72, wherein said processing circuitry 72 when executing said instructions is configured to obtain at time t(n), information about data traffic workload to be processed by the processing arrangement 26 at time t(n+1). Said processing circuitry 72 when executing said instructions is also configured to estimate a power required by the processing arrangement 26 for processing the data traffic workload scheduled at time t(n+1), based on the obtained information about the data traffic load at time t(n). Said processing circuitry 72 when executing said instructions is also configured to determine whether the required power is higher than a power threshold, or not. Having determined that the required power is higher than a power threshold, said processing circuitry 72 when executing said instructions is further configured to retrieve super capacitor data from a memory, where said super capacitor data corresponds to the required power. In addition, said processing circuitry 72 when executing said instructions is further configured to trigger discharge of the super capacitor unit 29, 39, 49 based on the super capacitor data at time t(n+1), by which power from the super capacitor unit can be fed to the power input of the power distribution unit at time t(n+1). Transients in a voltage at the power input of the power distribution unit are hereby, at least in part, smoothed out at time t(n+1), which reduces the reactive power of the power system 28, 38, 48, where said transients are related to the data traffic workload of the processing arrangement.
  • The time t(n) denotes a point in time, which may be considered to be positioned along a time line, at an incremental index value n. The time t(n+1) similarly denotes a point in time, which may be considered to be positioned along the time line, at an incremental index value of n+1. Since the increment indices differ by one (1) time interval, the time points t(n) and t(n+1) are next to each other in time.
  • The time interval or granularity in time, which is used in the application, is applied by the controller and may depend on the application. In the 5G radio/NR case, the granularity or resolution in time may be the transmission time interval (TTI). In the case of distributed virtual environment, the resolution in time may be a time interval that further may depend on the actual application.
  • Said processing circuitry 72 may further, when executing said instructions, be configured to obtain information about a residual strength of the super capacitor unit 29, 39, 49 at time t(n+1) following the discharge at time t(n+1). Said processing circuitry 72 may further, when executing said instructions, be configured to obtain information from the power supply unit 22, 32, 42 about a power factor at time t(n+1). Also, the processing circuitry 72 may also, when executing said instructions, be configured to store super capacitor data about the required power, the residual strength and the power factor in the memory. Said processing circuitry 72 may also, when executing said instructions, be configured to estimate the power required by the processing arrangement 26 based on super capacity data as retrieved from the memory. In addition, when executing said instructions, said processing circuitry 72 may also be configured to cause discharging of the super capacitor unit 29, 39, 49, whereby transients in the voltage at the power input of the PDU 23, 33, 43 will be diminished.
  • Moreover, the controller 25, 70 may comprise a scheduler that is adapted to schedule the data traffic workload of a radio communication system.
  • According to some embodiments of the present disclosure, the processing arrangement 26 of the controller 25, 70, comprises a remote radio unit (RRU) of a radio communication system.
  • The controller 25, 70 may comprise virtual infrastructure management 45 or an orchestrator being adapted to orchestrate the data traffic workload in a distributed network system.
  • According to some further embodiments of the present disclosure, the processing arrangement 26 of the controller 25, 70 comprises communication hardware 46A-46C in a virtual infrastructure. This communication hardware may comprise computing hardware 46A, storage hardware 46B and/or network hardware 46C.
  • The present disclosure also teaches a controller 25 that is operative to control reactive power of a power system 28, 38, 48, where the power system comprises a power supply unit (PSU) 22, 32, 42 with a power input connected to a power grid 21, 31, 41. The PSU has a power output connected to a power input of a power distribution unit (PDU) 23, 33, 43 that distributes power to a processing arrangement 26, whereby the power system serves the processing arrangement via the PDU with power, where the processing arrangement has a data traffic workload. The power system further comprises a super capacitor unit 29, 39, 49 that is connected to the power output of the PSU. The controller 25 is adapted to be connected to the processing arrangement 26, the PDU 23, 33, 43 and the super capacitor unit 29, 39, 49. The controller 25 is configured to schedule the data traffic workload of the processing arrangement, whereby the controller 25 is further configured to have information at time t(n) about the data traffic workload of the processing arrangement 26 at a subsequent time t(n+1), where the time t(n+1) is one time interval from, and next to, the time t(n). The controller 25 is further adapted to obtain at time t(n), information about data traffic workload to be processed by the processing arrangement 26 at time t(n+1). The controller 25 is also adapted to estimate a power required by the processing arrangement 26 for processing the data traffic workload scheduled at time t(n+1), based on the obtained information about the data traffic load at time t(n). The controller 25 is also adapted to determine whether the required power is higher than a power threshold, or not. Having determined that the required power is higher than a power threshold, the controller 25 is adapted to retrieve super capacitor data from a memory, where said super capacitor data corresponds to the required power. In addition, the controller 25 is adapted to trigger discharge of the super capacitor unit 29, 39, 49 based on the super capacitor data at time t(n+1), by which power from the super capacitor unit can be fed to the power input of the power distribution unit at time t(n+1). Transients in a voltage at the power input of the power distribution unit are hereby, at least in part, smoothed out at time t(n+1), which reduces the reactive power of the power system 28, 38, 48, where said transients are related to the data traffic workload of the processing arrangement.
  • The controller 25 may further be adapted to obtain information about a residual strength of the super capacitor unit 29, 39, 49 at time t(n+1) subsequent to the discharge at time t(n+1).
  • The controller 25 may further be adapted to obtain information from the power supply unit 22, 32, 42 about a power factor at time t(n+1).
  • The controller 25 may further be adapted to store super capacitor data about the required power, the residual strength and the power factor in the memory.
  • The controller 25 may further also be adapted to estimate the power required by the processing arrangement 26 based on super capacity data as retrieved from the memory.
  • Moreover, the controller 25 may be adapted to cause discharging of the super capacitor unit 29, 39, 49, whereby transients in the voltage at the power input of the PDU 23, 33, 43 will be diminished.
  • The controller 25 may comprise a scheduler that is adapted to schedule the data traffic workload of a radio communication system.
  • It is noted that energy feed arrangements, other than the power grid 21, 31, 41, may also be envisaged.
  • Examples and embodiments as described herein, comprise the following advantages and preferable features:
    Activation of a super capacitor unit mounted in the power system stabilizes the system bus voltage, and reduces the transient behavior on the system bus voltage, as experienced by the power system unit. A reduction in the transient behavior of the system bus voltage, as experienced by the power system unit, minimizes the demand for reactive power and hence power losses internally.
  • By using traffic information from a controller or orchestrator, a super capacitor unit being mounted in the power system, can be activated and controlled such that a transient behavior on system bus voltage is improved. The accomplished improved transient behavior of system bus voltage reduces the demand for reactive power of the power system input from an AC grid.
  • Hereby, power efficiency of the power system can be improved by 3-4 % by the reduction of the need for reactive power to the power system, or any similar energy feed arrangement. Accordingly, the electrical bill of an operator is reduced, which clearly is advantageous.
  • It may be further noted that the above described embodiments are only given as examples and should not be limiting to the present exemplary embodiments, since other solutions, uses, objectives, and functions are apparent within the scope of the embodiments as claimed in the accompanying patent claims.
  • ABBREVIATIONS
  • 5G
    5th generation wireless systems
    AC
    alternating current
    ARIMA
    autoregressive moving average model
    BB
    base band
    BFU
    battery fuse unit
    BIPS
    billions of instructions per second
    DTX
    discontinuous transmission
    DU
    digital unit
    ERAN
    elastic RAN
    FLOPS
    floating point operations per second
    HDD
    hard disc drive
    kW
    kilo Watt
    kWh
    kW hours
    m
    meter
    ms
    milli second
    MIPS
    millions of instructions per second
    NR
    new radio
    PDU
    power distribution unit
    PF
    power factor
    PRB
    physical resource block
    PSU
    power supply unit
    RAM
    random access memory
    RAN
    radio access network
    RF
    radio frequency
    SSD
    solid state disc
    TTI
    transmission time interval
    VRLA
    valve regulated lead acid

Claims (17)

  1. A method of controlling reactive power of a power system, the power system comprising a power supply unit, PSU, with a power input connected to a power grid, the PSU having a power output connected to a power input of a power distribution unit, PDU, that distributes power to a processing arrangement, whereby the power system serves the processing arrangement with power via the PDU, the processing arrangement having a data traffic workload, the power system further comprising a super capacitor unit being connected to the power output of the PSU, the method being performed by a controller connected to the processing arrangement, the PDU and the super capacitor unit, the controller being configured to schedule the data traffic workload of the processing arrangement, whereby the controller is configured to have information at time t(n) about the data traffic workload of the processing arrangement at a subsequent time t(n+1), where the time t(n+1) is one time interval from, and next to, the time t(n), the method comprising:
    - obtaining (502, 602) at time t(n), information about data traffic workload to be processed by the processing arrangement at time t(n+1);
    - estimating (504, 604) a power required by the processing arrangement for processing the data traffic workload scheduled at time t(n+1), based on the obtained information about the data traffic load at time t(n); and
    - upon determining (506) that the required power is higher than a power threshold,
    - retrieving (508, 608) super capacitor data from a memory, where said super capacitor data corresponds to the required power; and
    - triggering (510, 610) discharge of the super capacitor unit based on the super capacitor data at time t(n+1),
    causing power from the super capacitor unit to be fed to the power input of the power distribution unit at time t(n+1), whereby transients in a voltage at the power input of the power distribution unit are, at least in part, smoothed out at time t(n+1), which reduces the reactive power of the power system, where said transients are related to the data traffic workload of the processing arrangement.
  2. The method according to claim 1, further comprising obtaining (614) information about a residual strength of the super capacitor unit at time t(n+1) following the discharge at time t(n+1).
  3. The method according to claim 1 or 2, further comprising obtaining (616) information from the power supply unit about a power factor at time t(n+1).
  4. The method according to claim 3, further comprising storing (618) super capacitor data about the required power, the residual strength and the power factor in the memory.
  5. The method according to claim 4, wherein estimating (504, 604) the power required by the processing arrangement is based on super capacity data as retrieved from the memory.
  6. The method according to any one of claims 1 to 5, wherein triggering (510, 610) discharge of the super capacitor unit, causes discharging of the super capacitor unit, whereby transients in the voltage at the power input of the power distribution unit are diminished.
  7. The method according to any one of claims 1 to 6, wherein the processing arrangement comprises a remote radio unit, RRU, or communication hardware.
  8. The method according to any one of claims 1 to 7, wherein the controller comprises a scheduler of a radio communication system or an orchestrator of a distributed network system.
  9. A controller (25, 70) operative to control reactive power of a power system, the power system comprising a power supply unit, PSU, with a power input connected to a power grid, the PSU having a power output connected to a power input of a power distribution unit, PDU, that distributes power to a processing arrangement, whereby the power system serves the processing arrangement with power via the PDU, the processing arrangement having a data traffic workload, the power system further comprising a super capacitor unit being connected to the power output of the PSU, the controller being adapted to be connected to the processing arrangement, the PDU and the super capacitor unit, the controller is configured to schedule the data traffic workload of the processing arrangement, whereby the controller is configured to have information at time t(n) about the data traffic workload of the processing arrangement at a subsequent time t(n+1), where the time t(n+1) is one time interval from, and next to, the time t(n), the controller (25, 70) further comprising:
    - a processing circuitry (72); and
    - a memory (74) having instructions executable by the processing circuitry (72), wherein said processing circuitry (72) when executing said instructions is configured to:
    - obtain at time t(n), information about data traffic workload to be processed by the processing arrangement at time t(n+1);
    - estimate a power required by the processing arrangement for processing the data traffic workload scheduled at time t(n+1), based on the obtained information about the data traffic load at time t(n); and
    - upon determining that the required power is higher than a power threshold,
    - retrieve super capacitor data from a memory, where said super capacitor data corresponds to the required power; and
    - trigger discharge of the super capacitor unit based on the super capacitor data at time t(n+1),
    by which power from the super capacitor unit can be fed to the power input of the power distribution unit at time t(n+1), whereby transients in a voltage at the power input of the power distribution unit are, at least in part, smoothed out at time t(n+1), which reduces the reactive power of the power system, where said transients are related to the data traffic workload of the processing arrangement.
  10. The controller (25, 70) according to claim 9, wherein said processing circuitry (72) when executing said instructions is configured to obtain information about a residual strength of the super capacitor unit (29, 39, 49) at time t(n+1) following the discharge at time t(n+1).
  11. The controller (25, 70) according to claim 9 or 10, wherein said processing circuitry (72) when executing said instructions is configured to obtain information from the power supply unit (22, 32, 42) about a power factor at time t(n+1).
  12. The controller (25, 70) according to claim 11, wherein said processing circuitry (72) when executing said instructions is further configured to store super capacitor data about the required power, the residual strength and the power factor in the memory.
  13. The controller (25, 70) according to claim 12, wherein said processing circuitry (72) when executing said instructions is configured to estimate the power required by the processing arrangement (26) is based on super capacity data as retrieved from the memory.
  14. The controller (25, 70) according to any one of claims 9 to 13, wherein said processing circuitry (72) when executing said instructions is configured to cause discharging of the super capacitor unit (29, 39, 49), whereby transients in the voltage at the power input of the PDU (23, 33, 43) will be diminished.
  15. The controller (25, 70) according to any one of claims 9 to 14, comprises a scheduler that is adapted to schedule the data traffic workload of a radio communication system.
  16. A computer program for controlling reactive power of a power system, the computer program comprising instructions which, when executed on at least one processor, cause the at least one processor to carry out the method according to claims 1 to 8.
  17. A computer-readable storage medium having thereon a computer program according to claim 16.
EP18708499.1A 2018-02-21 2018-02-21 Reactive power control in power systems Active EP3756254B1 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/SE2018/050165 WO2019164425A1 (en) 2018-02-21 2018-02-21 Reactive power control in power systems

Publications (2)

Publication Number Publication Date
EP3756254A1 EP3756254A1 (en) 2020-12-30
EP3756254B1 true EP3756254B1 (en) 2022-06-29

Family

ID=61557319

Family Applications (1)

Application Number Title Priority Date Filing Date
EP18708499.1A Active EP3756254B1 (en) 2018-02-21 2018-02-21 Reactive power control in power systems

Country Status (3)

Country Link
US (1) US10985562B2 (en)
EP (1) EP3756254B1 (en)
WO (1) WO2019164425A1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111092436A (en) * 2019-11-08 2020-05-01 国网浙江余姚市供电有限公司 Wisdom thing allies oneself with type reactive compensation system

Family Cites Families (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
ATE35489T1 (en) * 1983-10-12 1988-07-15 Bbc Brown Boveri & Cie REACTIVE POWER COMPENSATOR FOR COMPENSATION OF A REACTIVE CURRENT COMPONENT IN AN AC VOLTAGE NETWORK.
US4645997A (en) 1985-03-13 1987-02-24 Kollmorgen Technologies Corporation Transient free solid state automatic power factor correction
US5329222A (en) 1992-11-30 1994-07-12 Westinghouse Electric Corporation Apparatus and method for dynamic voltage restoration of utility distribution networks
CA2740896C (en) 2008-10-20 2021-09-14 Mischa Warren Beuthling Single phase power factor correction system and method
US8401595B2 (en) * 2008-12-08 2013-03-19 Samsung Electronics Co., Ltd. Method and system for integrated wireless power and data communication
JP5490801B2 (en) 2009-07-27 2014-05-14 東芝三菱電機産業システム株式会社 Self-excited reactive power compensator
US8712596B2 (en) * 2010-05-20 2014-04-29 Accenture Global Services Limited Malicious attack detection and analysis
US8816531B2 (en) 2011-01-27 2014-08-26 General Electric Company Systems, methods, and apparatus for integrated volt/VAR control in power distribution networks
US10135247B2 (en) * 2013-10-17 2018-11-20 General Electric Company Methods and systems for integrated Volt/VAr control in electric network
WO2015094807A1 (en) * 2013-12-16 2015-06-25 Contour Hardening, Inc. System and method for control of an electric vehicle
CN106660461B (en) 2014-06-20 2019-08-02 通用电气公司 The system and method for power control for energy stores charging station
UA109619C2 (en) 2014-10-13 2015-09-10 REACTIVE POWER CONTROL DEVICE (OPTIONS)
JP6475002B2 (en) * 2014-11-21 2019-02-27 田淵電機株式会社 Distributed power supply system with storage battery
US20180018118A1 (en) * 2016-07-15 2018-01-18 Qualcomm Incorporated Power management in scenarios that handle asynchronous stimulus
US11420641B2 (en) * 2017-12-21 2022-08-23 Spark EV Technology, Ltd. System and method for determining the energy requirement of a vehicle for a journey

Also Published As

Publication number Publication date
WO2019164425A8 (en) 2020-09-24
US20210013718A1 (en) 2021-01-14
US10985562B2 (en) 2021-04-20
EP3756254A1 (en) 2020-12-30
WO2019164425A1 (en) 2019-08-29

Similar Documents

Publication Publication Date Title
US12002893B2 (en) Clustered power generator architecture
JP7002041B2 (en) Power controller and power system
EP2721706B1 (en) Method and apparatus for controlling energy services based on market data
CN111164853A (en) Power supply control system and method utilizing energy storage device and solar energy for power generation
US11891272B2 (en) Energy storage management system
WO2016136260A1 (en) Power management device, power management system, and power management method
CN116826815B (en) Charging management method based on battery module, energy manager and related medium
CN117293878A (en) Micro-grid-based energy scheduling method and device, electronic equipment and storage medium
WO2021086240A1 (en) Frequency balancing by power supply units in radio base station
KR20200005862A (en) Energy management system and energy storage system having the energy management system
EP3756254B1 (en) Reactive power control in power systems
US9450417B2 (en) Method for efficiency-driven operation of dispatchable sources and storage units in energy systems
CN112751340A (en) Power grid power supply scheduling method and device based on big data analysis
KR20170119863A (en) Method for calculating energy storage system capacity and power management system using the same
KR101744576B1 (en) Power dissipation operation system using small and medium distributed ess
CN116826814B (en) Electric energy management method based on battery cluster, energy manager and related medium
KR20190048246A (en) Scheduling Method and System for Load Tracking by Flexible Time Scaling and Multi Leveling in Micro Grid for Small/Medium Buildings
WO2019211826A1 (en) System and method for managing a hierarchic power distribution grid
Carpinelli et al. Demand response and energy storage systems: An industrial application for reducing electricity costs. Part I: Theoretical aspects
KR20200104543A (en) Apparatus and method for operating energy storage system
US20190288510A1 (en) Apparatus and method for managing peak power of zero-energy town
KR102597278B1 (en) Energy storage system for performing multi functions and design method of the same
Zhang et al. Energy management for smart base stations with heterogeneous energy harvesting devices
HK40008344A (en) Energy storage management system
US20220043414A1 (en) Apparatus and method for operating energy storage system

Legal Events

Date Code Title Description
STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: UNKNOWN

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE INTERNATIONAL PUBLICATION HAS BEEN MADE

PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE

17P Request for examination filed

Effective date: 20200603

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

DAV Request for validation of the european patent (deleted)
DAX Request for extension of the european patent (deleted)
REG Reference to a national code

Ref country code: DE

Ref legal event code: R079

Ref document number: 602018037280

Country of ref document: DE

Free format text: PREVIOUS MAIN CLASS: H02J0003000000

Ipc: G05B0019042000

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: GRANT OF PATENT IS INTENDED

RIC1 Information provided on ipc code assigned before grant

Ipc: H02J 3/00 20060101ALI20220211BHEP

Ipc: H02J 7/34 20060101ALI20220211BHEP

Ipc: H02J 3/28 20060101ALI20220211BHEP

Ipc: H02J 3/18 20060101ALI20220211BHEP

Ipc: G06F 1/26 20060101ALI20220211BHEP

Ipc: G05B 19/042 20060101AFI20220211BHEP

INTG Intention to grant announced

Effective date: 20220309

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE PATENT HAS BEEN GRANTED

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: AT

Ref legal event code: REF

Ref document number: 1501750

Country of ref document: AT

Kind code of ref document: T

Effective date: 20220715

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602018037280

Country of ref document: DE

REG Reference to a national code

Ref country code: NL

Ref legal event code: FP

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG9D

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220629

Ref country code: NO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220929

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220629

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220629

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220930

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220629

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220929

REG Reference to a national code

Ref country code: AT

Ref legal event code: MK05

Ref document number: 1501750

Country of ref document: AT

Kind code of ref document: T

Effective date: 20220629

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220629

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220629

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220629

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220629

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220629

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20221031

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220629

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220629

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220629

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220629

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20221029

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602018037280

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220629

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220629

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220629

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed

Effective date: 20230330

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220629

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220629

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

REG Reference to a national code

Ref country code: BE

Ref legal event code: MM

Effective date: 20230228

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20230221

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20230228

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20230228

REG Reference to a national code

Ref country code: IE

Ref legal event code: MM4A

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220629

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20230221

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20230228

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20230228

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220629

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220629

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: NL

Payment date: 20250227

Year of fee payment: 8

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20250227

Year of fee payment: 8

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 20250227

Year of fee payment: 8

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO

Effective date: 20180221

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO

Effective date: 20180221