DE886685C - Procedure and pipeline to compensate for pipe lengths - Google Patents
Procedure and pipeline to compensate for pipe lengthsInfo
- Publication number
- DE886685C DE886685C DEM6513D DEM0006513D DE886685C DE 886685 C DE886685 C DE 886685C DE M6513 D DEM6513 D DE M6513D DE M0006513 D DEM0006513 D DE M0006513D DE 886685 C DE886685 C DE 886685C
- Authority
- DE
- Germany
- Prior art keywords
- heated
- pipeline
- compensate
- pipes
- procedure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L51/00—Expansion-compensation arrangements for pipe-lines
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Pipe Accessories (AREA)
- Thermal Insulation (AREA)
Description
Die Erfindung betrifft ein Verfahren, um die bei. Erwärmung auftretenden Längenänderungen an Rohrleitungen auszugleichen.The invention relates to a method to the. Warming occurring Compensate for changes in length on pipelines.
Bei Rohrleitungen für Heißwasser, Dampf od. dgl., insbesondere von größerer Länge, treten beim Erwärmenderselben Dehnungen auf; ,die infolge Überbeanspruchung des Rohrwerkstoffs zu Spannungen in der Leitung; undichten Flanschen, übergroßen Festpunktkräften usw. Anlaß geben können.In pipelines for hot water, steam or the like, in particular from greater length, stretching occurs when heated; caused by overuse the pipe material to stresses in the line; leaky flanges, oversized Fixed point forces, etc. can give rise to.
Zum Ausgleichen dieser Längenänderungen ist vorgeschlagen worden, an Stelle von Stopfbuchsen' federnde Rohrbogen, Faltenrohre und Metallschlauchkompensatoren zu verwenden.To compensate for these changes in length it has been proposed that Instead of stuffing boxes, there are resilient elbows, corrugated tubes and metal hose expansion joints to use.
Nach dem erfindungsgemäßen Verfahren wird ein Ausgleich der sich bei Erwärmen ausdehnenden Bauteile dadurch herbeigeführt, daß zwischen diesen Teilen Zwischenstücke oder Zwischenrohre aus Stoffen angeordnet werden, die sich beim Erwärmen zusammenziehen. An Stoffen dieser Art sind unter anderem gewisse nicht geschichtete Kunstharzpreßstoffe, eine Legierung von Chrom, Eisen und Kobalt u. dgl. bekannt. Eine erfindungsgemäß ausgebildete Rohrleitung besteht demnach entweder aus einer Anzahl sich längenden und einem oder mehreren sich verkürzenden Rohren oder nur aus, sich längenden Rohren mit zwischen. deren Flanschen angeordneten, sich beim Erwärmen zusammenziehenden Zwischenlagen. Die Zwischenlagen oder Rohre sind in ihrer Stärke bzw. Länge derart bemessen, daß die beim Erwärmen eintretende Verkürzung .der sich in den Rohrleitungen ergebenden Längung entspricht.According to the method according to the invention, a compensation of the Heating expanding components brought about by being between these parts Intermediate pieces or intermediate pipes made of substances are arranged, which are when heated pull together. Some of the fabrics of this type include some that are not layered Synthetic resin molded materials, an alloy of chromium, iron and cobalt and the like are known. A pipeline designed according to the invention accordingly consists of either one Number of elongated and one or more shortened pipes or only from, elongated pipes with between. whose flanges are arranged at Warming astringent liners. The liners or tubes are in theirs Dimension the thickness or length in such a way that the shortening that occurs during heating . corresponds to the elongation resulting in the pipelines.
Gegenüber den erwähnten bekannten Dehnungsausgleichen ergibt sich durch die erfindungsgemäße Anordnung der Vorteil größerer Einfachheit beim Einbau und im Betrieb, insbesondere durch den Fortfall jeglicher Wartung. Beachtlich ist ferner, daß Festpunktkräfte bei -richtiger Bemessung der Zwischenstücke nicht auftreten können.Compared to the known expansion compensations mentioned, this results the arrangement according to the invention has the advantage of greater ease of installation and in operation, especially due to the omission of any maintenance. It is remarkable also that fixed point forces do not occur if the spacers are correctly dimensioned can.
Das erfindungsgemäße Verfahren -ist aber nicht auf Rohrleitungen beschränkt, sondern kann für alle sich beim Erwärmen längenden BauteileAnwendung finden.The method according to the invention is not limited to pipelines, but can be used for all components that elongate when heated.
Eine nach dem neuen Verfahren aufgebaute Rohrleitung ist in der Zeichnung in zwei Ausführungsbeispielen dargestellt. Abb. i zeigt einen. Teil einer Rohrleitung, die aus einer Anzahl miteinander verflanschter Rohre a, b, c aus sich beim Erwärmen -dehnendem Baustoff gebildet sind. Zwischen den Rohren b, c ist ein Rohrstück d angeordnet, das aus einem sich beim Erwärmen zusammenziehenden Baustoff der erwähnten Art besteht. Die Länge des Rohrstückes d ist hierbei derart bemessen, daß die sich beim Erwärmen ergebende Verkürzung der Längung der Rohrleitung @bzw. der Rohre a, b entspricht.A pipeline constructed according to the new process is shown in the drawing in two exemplary embodiments. Fig. I shows one. Part of a pipeline that consists of a number of flanged pipes a, b, c made of building material that expands when heated. A pipe section d is arranged between the pipes b, c and consists of a building material of the type mentioned which contracts when heated. The length of the pipe section d is dimensioned in such a way that the shortening of the elongation of the pipeline resulting from heating @bzw. corresponds to the tubes a, b.
Nach Abb. 2 kann der Längenausgleich auch dadurch bewirkt werden, daß zwischen den Flanschen der Rohre a, b, c Zwischenlagen e aus sich beim Erwärmen zusammenziehendem Baustoff angeordnet werden. Die Zwischenlagen e sind so bemessen, daß ihre Verkürzung der Längung eines Rohres a, b oder c entspricht, so daß der Längenausgleich innerhalb eines Rohrabschnitts erfolgt.According to Fig. 2, the length compensation can also be effected by that between the flanges of the tubes a, b, c intermediate layers e out when heated astringent building material. The intermediate layers e are dimensioned so that that their shortening corresponds to the elongation of a pipe a, b or c, so that the Length compensation takes place within a pipe section.
In gleicher Weise kann natürlich ein Längenausgleich auch bei anderen sich beim Erwärmen längenden Bauteilen herbeigeführt werden. Die dargestellte und beschriebene Rohrleitung stellt hierfür nur ein Beispiel dar.In the same way, length compensation can of course also be applied to others when heating elongated components are brought about. The shown and The pipeline described here is only one example.
Claims (3)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| DEM6513D DE886685C (en) | 1939-11-10 | 1939-11-10 | Procedure and pipeline to compensate for pipe lengths |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| DEM6513D DE886685C (en) | 1939-11-10 | 1939-11-10 | Procedure and pipeline to compensate for pipe lengths |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| DE886685C true DE886685C (en) | 1953-08-17 |
Family
ID=7293523
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| DEM6513D Expired DE886685C (en) | 1939-11-10 | 1939-11-10 | Procedure and pipeline to compensate for pipe lengths |
Country Status (1)
| Country | Link |
|---|---|
| DE (1) | DE886685C (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE1019874B (en) * | 1954-12-01 | 1957-11-21 | Messerschmitt Ag | Belt straps or cord chains, especially for sewing machines |
| DE1101879B (en) * | 1956-07-12 | 1961-03-09 | Kraftanlagen Ag | Relieved axial expansion compensator for pipelines |
-
1939
- 1939-11-10 DE DEM6513D patent/DE886685C/en not_active Expired
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE1019874B (en) * | 1954-12-01 | 1957-11-21 | Messerschmitt Ag | Belt straps or cord chains, especially for sewing machines |
| DE1101879B (en) * | 1956-07-12 | 1961-03-09 | Kraftanlagen Ag | Relieved axial expansion compensator for pipelines |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| DE3035671A1 (en) | GASKET FOR VACUUM FLANGE CONNECTIONS | |
| DE2429370A1 (en) | PROCESS FOR MANUFACTURING EXCHANGERS WITH TUBE BULBS, AND EXCHANGERS MANUFACTURED BY THIS PROCESS | |
| DE2648877C3 (en) | Process for making pipes | |
| DE1133877B (en) | Process for the production of bent hose pieces from polytetrafluoroethylene with a sleeve made of wire mesh | |
| DE886685C (en) | Procedure and pipeline to compensate for pipe lengths | |
| DE548576C (en) | Process for the production of iron high pressure pipes | |
| DE698851C (en) | High pressure vessel | |
| DE2629422A1 (en) | PROCESS FOR APPLYING A PROTECTIVE COVER TO PIPE BENDING PROVIDED WITH A THERMAL INSULATION | |
| EP0178477B1 (en) | Method for producing seamless steel tubes with a great diameter | |
| DE711617C (en) | Tube with reinforced end parts | |
| DE858915C (en) | Flange profiled from sheet metal | |
| DE589298C (en) | Process for the production of iron strips plated with copper, nickel or their alloys | |
| DE881199C (en) | Manufacturing process for internally leaded liquid preheaters | |
| AT201373B (en) | Process for producing a connection between thermoplastic plastic pipes | |
| DE734465C (en) | Process for the manufacture of iron pipes reinforced with sproedem plastic | |
| DE671557C (en) | Process for the production of pipes or rods from hardened synthetic resin and metal | |
| CH276503A (en) | Process for the production of a connection, which forms a hollow ring body and acts as a compensator, between coaxial hollow bodies which are mutually subject to displacements and angular changes. | |
| DE348439C (en) | Compensation device | |
| DE1056905B (en) | Method of bending pipes | |
| DE741370C (en) | Expansion insert for pipes | |
| AT220574B (en) | Process for the production of steel bars or profiles made of iron or steel alloys by rolling | |
| AT104682B (en) | A bent folded tube made from a seamlessly drawn, welded or soldered tube and process for its manufacture. | |
| DE1018826B (en) | Displacement pipe or the like. | |
| DE326768C (en) | Process for the manufacture of finned tubes | |
| DE478944C (en) | Process for the production of welded heat exchangers |