DE7116160U - Apprenticeship for follow-up work in reinforced concrete structures - Google Patents
Apprenticeship for follow-up work in reinforced concrete structuresInfo
- Publication number
- DE7116160U DE7116160U DE7116160U DE7116160DU DE7116160U DE 7116160 U DE7116160 U DE 7116160U DE 7116160 U DE7116160 U DE 7116160U DE 7116160D U DE7116160D U DE 7116160DU DE 7116160 U DE7116160 U DE 7116160U
- Authority
- DE
- Germany
- Prior art keywords
- teaching according
- skirting board
- profile
- metal profile
- work
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
- 239000011150 reinforced concrete Substances 0.000 title claims description 3
- 239000004567 concrete Substances 0.000 claims description 12
- 239000002184 metal Substances 0.000 claims description 11
- 229910052751 metal Inorganic materials 0.000 claims description 11
- 125000006850 spacer group Chemical group 0.000 claims description 10
- 230000002787 reinforcement Effects 0.000 claims description 7
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 claims description 6
- 238000003466 welding Methods 0.000 claims description 3
- 229910052742 iron Inorganic materials 0.000 claims 2
- 238000010276 construction Methods 0.000 description 3
- 238000009434 installation Methods 0.000 description 3
- 238000005253 cladding Methods 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- ZOKIJEBQDZFGMW-PSXMRANNSA-N [(2R)-2-[12-(4-azido-2-nitroanilino)dodecanoyloxy]-3-tetradecanoyloxypropyl] 2-(trimethylazaniumyl)ethyl phosphate Chemical compound CCCCCCCCCCCCCC(=O)OC[C@H](COP([O-])(=O)OCC[N+](C)(C)C)OC(=O)CCCCCCCCCCCNc1ccc(cc1[N+]([O-])=O)N=[N+]=[N-] ZOKIJEBQDZFGMW-PSXMRANNSA-N 0.000 description 1
- 238000009415 formwork Methods 0.000 description 1
- 235000000396 iron Nutrition 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Description
TELEFON: (0421) »1»·77 TELEQRAMME: FERROPATTELEPHONE: (0421) »1» · 77 TELEQRAMS: FERROPAT
BREMER BANK 100 9072 POSTSCHECK HAMBURG 255767 UNS. ZEICHEN: Z 10BREMER BANK 100 9072 POST CHECK HAMBURG 255767 US. CHARACTER: Z 10
datum: 19. April 1971Date: April 19, 1971
Helmuth Zwanziger, 282 Bremen 70, Fröbelstraße 26 Lehre für Folgearbeiten bei Stahlbeton-BauwerkenHelmuth Zwanziger, 282 Bremen 70, Fröbelstraße 26 Apprenticeship for follow-up work on reinforced concrete structures
Die Erfindung betrifft eine Lehre für Folgearbeiten bei Stahlbeton-Bauwerken. -The invention relates to a teaching for follow-up work in reinforced concrete structures. -
Aufgabe der Erfindung ist es, eine Bezugslehre für verschiedene Folgearbeiten bei der Erstellung von Stahlbeton-Bauwerken zu schaffen, die einwandfreie Ausrichtungsmöglichkeiten in mehreren Ebenen oder Bezug auf das Gesamtgebäude erlaubt.The object of the invention is to provide a reference gauge for various follow-up work in the creation of reinforced concrete structures to create the flawless alignment options in multiple planes or in relation to the entire building allows.
Erfindungsgemäß wird die Aufgabe dadurch gelöst, daß ein durch mindestens eine gerade Längskante begrenztes Metallprofil unter Zwischenschaltung von mindestens einem ebenfalls aus Metall bestehenden Abstandshalter mit den Moniereisen durch Schweißen o. dgl. verbunden ist und mit einer den Moniereisen abgekehrten Vertikalfläche fluchtend in der Außenfläche einer Beton-, insbesondere einer Sichtbetonwand liegt.According to the invention, the object is achieved in that a metal profile bounded by at least one straight longitudinal edge with the interposition of at least one spacer also made of metal is connected to the reinforcement bars by welding or the like and is aligned with a vertical surface facing away from the reinforcement bars in the outer surface of a concrete -, in particular an exposed concrete wall.
Dieser Metallstreifen kann alle gegossenen Betonwände undThis metal strip can be used on all cast concrete walls and
oder Betonpfeiler in vorgege? jner Höhe durchziehen und läßt sich äußerst vorteilhaft als sicheres Bezugsniveau für alle nachfolgenden Baumaßnahmen und/oder Insta1Iaticrisarbsitsn, als Vcrsehaiungslenre, and außerdem als Sockelleiste für jegliche Innenräume verwenden.or concrete pillars in pre? pull through at that height and can be used extremely advantageously as a safe reference level for all subsequent construction work and / or installation risks, as a conception lernre, and also as Use skirting boards for any interior.
Der Metallstreifen kann auch als Sockelleiste mit U-förmigem Querschnitt ausgebildet sein, bei der zumindest die eine freie Kante eines Profilschenkels als Vertikalfläche dient. Das U-föimige Profil bietet den zusätzlichen Vorteil, daß die obere Kante des unteren abgewinkelten Schenkels als Estrichlehre benutzt werden kann.The metal strip can also be used as a U-shaped skirting board Be formed cross-section in which at least one free edge of a profile leg as a vertical surface serves. The U-shaped profile offers the additional Advantage that the upper edge of the lower angled leg can be used as a screed gauge.
Die Abstandshalter können zu beiden Seiten von den Moniereisen abstehen, so daß an jeder seiner beiden entgegengesetzten stirnkanten je eine Sockelleiste für die beiden gegenüberliegenden Außenflächen einer Betonwand befestigt ist. Außerdem können die Stirnkanten des Abstandshalters mit erhabenen Abschnitten versehen sein, an denen die Sockelleiste anliegt. Daraus ergibt sich der Vorteil, daß die Sockelleisten nur an diesem erhobenen Abschnitt angeschweißt zu werden brauchen.The spacers can be on either side of the reinforcement bars stand out, so that at each of its two opposite end edges a skirting board for the two opposite outer surfaces of a concrete wall is attached. In addition, the front edges of the spacer be provided with raised sections on which the skirting board rests. This has the advantage that the skirting boards only need to be welded to this raised section.
Nachfolgend wird die Erfindung anhand eines bevorzugten Ausführungsbeispieles unter Bezugnahme auf die Zeichnung näher erläutert.The invention is described below using a preferred exemplary embodiment with reference to the drawing explained in more detail.
In der Zeichnung ist eine um Moniereisen 1 herum gegossene sogenannte Sichtbetonwand 2 dargestellt, an deren beiden Seiten oberhalb eines Estrichs 3 je eine Sockelleiste 4 angeordnet ist. Die Sockelleiste 4 des vorliegenden Ausführungsbeispiels besitzt U-förmigen Querschnitt, verläuft mit ihrem Mittelteil vertikal und parallel zur Wandfläche, ist jedoch, wie die Zeichnung erkennen läßt, um die Tiefe ihrer Flansche 4a in die Wand 2 hineingerückt. Die den oberen und unteren Abschluß der Sockelleiste 4 bil-In the drawings a molded around reinforcing rods 1 around so-called concrete wall 2 is shown, is arranged on both sides thereof above a screed 3 each have a baseboard. 4 The skirting board 4 of the present embodiment has a U-shaped cross-section, its middle part runs vertically and parallel to the wall surface, but, as the drawing shows, it is pushed into the wall 2 by the depth of its flanges 4a. The upper and lower ends of the skirting board 4 form
711616Ü16.9.71711616Ü16.9.71
denden Plansche 4a Fluchten in vertikaler Ebene mit der Außenfläche der Sichtbetonwand 2 und in horizontaler Ebene mit ihrem unteren Flansch 4a mit der Oberfläche des Estrichs 3.The end of the pool 4a is aligned in a vertical plane with the Outer surface of the exposed concrete wall 2 and in a horizontal plane with its lower flange 4a with the surface of the screed 3.
Da die Sockelleiste 4 erfindungsgemäß in noch zu beschreibender Weise vor dem Gießen der Sichtbetonwand 2 oder beispielsweise eines Pfeilers und vor dem Gießen des Estrichs 3 angebracht wird, läßt sie sich in äußerst vorteilhafter Weise als Lehre sowohl für die Verschalung der Wand 2 oder eines Pfeilers als auch für alle nachfolgenden Baumaßnahmen, also bespielsweise fUr das Gießen des Estrichs 3 oder für Installationsarbeiten und dergleichen, einsetzen. Von großer Bedeutung ist, daß die Sockelleiste darüberhinaus als Lehre f'-< die Verschalung der nächsten Decke verwendbar ist.Since the baseboard 4 is attached according to the invention in a manner to be described before the pouring of the exposed concrete wall 2 or, for example, a pillar and before the pouring of the screed 3, it can be used in an extremely advantageous manner as a teaching both for the cladding of the wall 2 or a pillar can also be used for all subsequent construction work, for example for pouring the screed 3 or for installation work and the like. It is of great importance that the skirting board can also be used as a gauge for the cladding of the next ceiling.
Zum Fixieren der Sockeileisten 4 dienen die Moniereisen 1, welche vor dem Hochziehen jedes einzelnen Stockwerkes des Gebäudes in dem jeweils da.:·. ■" *.er liegenden Roh-Boden 5 verankert worden sind. An diesen normalerweise senkrecht stehenden Moniereisen 1 werden Abstandshalter 6 vorzugsweise durch Schweißen so befestigt, daß mindestens eine freie Stirnkante des Abstandshalters 6 bis kurz vor die Oberfläche der herzustellenden Wand 2 ragt. Darauf wird eine Sockelleiste 4 ausgerichtet, gegen die freien Stirnkanten von vorzugsweise mehreren Abstandshaltern 6 gelegt und mit diesen verschweißt bzw. verbunden. Das Ausrichten erfolgt nach bauseitig angegebenen Meterriß sowie nach eventuell vorhandenen Schalkränzen o. dgl. Zm Ausführungsbeispiel sind diese Abstandshalter 6 aufrechtstehende Flacheisen, welche bis in den Bereich der Wand 2 ragen und an beiden Stirnkanten zur Befestigung je einer Sockelleiste 4 mit erhabenen Abschnitten versehen sein können, in deren Bereich die Teile miteinander verschweißt sind.The reinforcement bars serve to fix the skirting boards 4 1, which before each individual floor of the building is pulled up in the respective da.:·. ■ "* .er lying raw soil 5 have been anchored. Spacers 6 preferably fastened by welding so that at least one free end edge of the spacer 6 to just before the surface of the wall 2 to be produced protrudes. A skirting board 4 is aligned thereon, against the free ones Front edges of preferably several spacers 6 laid and welded or connected to these. The alignment is carried out according to the on-site specified meter plan and according to any formwork wreaths or the like that may be present. In the exemplary embodiment, these spacers 6 are upright flat irons which extend into the area of the wall 2 protrude and be provided on both front edges for fastening a skirting board 4 with raised sections can, in the area of which the parts are welded together.
711616C 16.9.71711616C 9/16/71
Zum Gießen der Sichtbetonwand 2 wird deren Verschalung von außen gegen die beiden Längskanten der Flansche 4a der Sockelleisten 4 angelegt, so daß der durch das U-förmige Profil der Sockelleiste 4 gebildete Hohlraum nicht voll Schüttbeton laufen kann. Nach dem Gießen der Sichtbe· .»rfand 2 werden auf den Ron-Boden 5 in üblicher Weise Dämmschichten 6 und 9 aufgelegt und anschließend der Estrich 3 bis zum oberen Rand des unteren Flansches 4a der Sockelleiste 4 eingegossen und dann auf dem Flansch abgezogen. Damit bildet der untere Flansch 4a mit dem Estrich 3 eine durchlaufende Fläche, auf die ein Fußbodenbelag 10 aufgelegt werden kann. Bedarfsweise kann die Sockelleiste 4 oberhalb des Fußbodenbelags 10 auch noch mit einer Füllung 11 ausgelegt werden, die Vorzugs- , weise aus dem Material des Fußbodenbelages besteht.For pouring the exposed concrete wall 2, its casing is applied from the outside against the two longitudinal edges of the flanges 4a of the skirting boards 4 so that the cavity formed by the U-shaped profile of the skirting board 4 cannot run full of poured concrete. After the visible area 2 has been poured, insulating layers 6 and 9 are placed on the Ron floor 5 in the usual way and then the screed 3 is poured in up to the upper edge of the lower flange 4a of the skirting board 4 and then pulled off the flange. The lower flange 4a with the screed 3 thus forms a continuous surface on which a floor covering 10 can be placed. If necessary, the skirting board 4 above the floor covering 10 can also be laid out with a filling 11, which preferably consists of the material of the floor covering.
Wie aus der Beschreibung zu entnehmen ist, dient die durch die erfindungsgemäße Halterung befestigte Sockelleiste als Bezugslehre zumindest für die zu gießende Wand 2, den Estrich 3 und die Decke. Darüberhinaus bietet die erfindungsgemäß angebrachte Sockelleiste 4 auch die Voraus- I setzung für eine genaue, problemlose und nacharbeitfreie Ausführung von weiteren Bau- und Installationsarbeiten. Zusätzlich zu der erreichten Genauigkeit ermöglicht die Erfindung erhebliche Einsparungen durch Fortfall der sonst notwendigen wiederholten Vermessungsarbeiten.As can be seen from the description, is used by the bracket according to the invention attached skirting board as a reference gauge at least for the wall to be poured 2, the Screed 3 and the ceiling. In addition, the skirting board 4 attached according to the invention also offers the front I setting for an exact, problem-free and rework-free execution of further construction and installation work. In addition to the achieved accuracy, the invention enables considerable savings by eliminating the otherwise necessary repeated surveying work.
Obwohl die Lehre in dem bevorzugten Ausführungsbeispiel von einer U-fönnigen Sockelleiste gebildet ist, können auch andere Metftllprofile verwendet werden, beispiels weise ein ausrechend dickes Flachmaterial oder L- bzw. J-Profile. Although the teaching in the preferred embodiment is formed by a U-shaped skirting board, other metal profiles can also be used, for example a sufficiently thick flat material or L or J profiles.
7i"i6'i6f7i "i6'i6f
Claims (7)
Publications (1)
| Publication Number | Publication Date |
|---|---|
| DE7116160U true DE7116160U (en) | 1971-09-16 |
Family
ID=1267318
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| DE7116160U Expired DE7116160U (en) | Apprenticeship for follow-up work in reinforced concrete structures |
Country Status (1)
| Country | Link |
|---|---|
| DE (1) | DE7116160U (en) |
-
0
- DE DE7116160U patent/DE7116160U/en not_active Expired
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| DE2166992A1 (en) | STEEL BEAM CEILING CONSTRUCTION | |
| DE1559585A1 (en) | Formwork element for the production of concrete walls and method for erecting buildings using such formwork elements | |
| DE2319190A1 (en) | DEVICE FOR PRODUCING RECESSES IN CAST CONCRETE | |
| DE7116160U (en) | Apprenticeship for follow-up work in reinforced concrete structures | |
| DE912465C (en) | Cable duct | |
| DE2120484C (en) | Wall-mounted gauge for follow-up work | |
| DE807015C (en) | Reinforced concrete ceiling | |
| DE820068C (en) | Process for the production of monolithic masonry between removable formwork and formwork supports for this purpose | |
| DE2246441A1 (en) | BUILDING CONSTRUCTION | |
| DE1434776A1 (en) | Swimming pool or the like. | |
| DE2120484B (en) | Wall-mounted jig for follow-up work | |
| DE545450C (en) | Process for the production of rammed and cast concrete walls between formwork and with a continuous internal insulation made of plasterboard or other insulating panels | |
| DE2548298C2 (en) | Method and cavity formwork wall for building a cavity wall | |
| DE710572C (en) | Strip foundation made of concrete or reinforced concrete with permanent formwork made of concrete slabs | |
| DE929029C (en) | Formwork for sliding construction | |
| DE2553732C2 (en) | Prefabricated anchoring element, especially for prefabricated house construction | |
| AT222307B (en) | Procedure for erecting structures in bulk construction and formwork for this | |
| DE816748C (en) | Attachment for roof panels, especially large panels made of reinforced concrete | |
| DE808780C (en) | Process for assembling a formwork for the construction of one or more walls and formwork produced according to this process | |
| DE341982C (en) | Concrete support | |
| DE457744C (en) | Cantilever ceiling | |
| DE536873C (en) | Process for the production of trough-shaped reinforced concrete beams for reinforced concrete hollow ceilings | |
| DE533158C (en) | Reinforced concrete ribbed ceiling with suspended hollow stone ceiling and with insulating filling between the load-bearing and suspended ceiling | |
| DE2317071C3 (en) | Method for producing a pile-like reinforced concrete foundation for an overhead line mast | |
| AT216742B (en) | Formwork system with lost formwork for concrete walls |