[go: up one dir, main page]

DE557176C - Belt system for mining operations - Google Patents

Belt system for mining operations

Info

Publication number
DE557176C
DE557176C DEH126813D DEH0126813D DE557176C DE 557176 C DE557176 C DE 557176C DE H126813 D DEH126813 D DE H126813D DE H0126813 D DEH0126813 D DE H0126813D DE 557176 C DE557176 C DE 557176C
Authority
DE
Germany
Prior art keywords
belt
drive
tape
station
drive station
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
DEH126813D
Other languages
German (de)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hinselmann E & Co GmbH
Hauhinco Maschinenfabrik G Hausherr Jochums GmbH and Co KG
Original Assignee
Hinselmann E & Co GmbH
Hauhinco Maschinenfabrik G Hausherr Jochums GmbH and Co KG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hinselmann E & Co GmbH, Hauhinco Maschinenfabrik G Hausherr Jochums GmbH and Co KG filed Critical Hinselmann E & Co GmbH
Priority to DEH126813D priority Critical patent/DE557176C/en
Application granted granted Critical
Publication of DE557176C publication Critical patent/DE557176C/en
Expired legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F13/00Transport specially adapted to underground conditions
    • E21F13/06Transport of mined material at or adjacent to the working face

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Mechanical Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Structure Of Belt Conveyors (AREA)

Description

Bandanlage für den Grubenbetrieb Gegenstand der Erfindung bildet eine Anlage zur Förderung verschiedener Materialien in beiden Richtungen mit Hilfe eines Gummibandes, dessen Abgabestelle in einer Richtung wandert. An sich ist es bekannt, mit Gummibändern in beiden Richtungen zu fördern. Bei solchen Bändern hat man auch schon an den beiden Enden Antriebsstationen vorgesehen, die abwechselnd zur Einschaltung gelangten, so daß der Antrieb stets an der Austragstelle erfolgte. Nach der Erfindung soll aber vor allem dem Umstand Rechnung getragen werden, daß es in der Grube sehr häufig vorkommt, daß die Aufgabe- und Abgabestellen der beiden verschiedenen Materialien, Kohle und Berge, wechseln. Es tritt sehr häufig der Fall ein, daß die Aufgabestelle der Kohle viel weiter ins Feld vorgezogen ist, als die Abgabestelle für die Berge. In diesem Falle mußte für die Abgabe der Berge bei gebräuchlichen Bandanlagen eine Abstreifvorrichtung vorgesehen werden. Durch solche Abstreifeinrichtungen wird aber der Zustand der Bänder erheblich beeinflußt, da die Berge sich häufig in das Band einarbeiten und dieses beschädigen. Die Lebensdauer der Bänder wird wesentlich vermindert. Ferner ist es auch nicht möglich, den Ort der beiden Stellen für die Aufgabe und die Abgabe in gleichbleibendem Abstand zu halten, so daß hieraus wiederum die Förderung ungünstig beeinflußt wird bzw. besondere Hilfseinrichtungen nötig werden. Man hat sich daher schon in der oben angedeuteten Weise geholfen, daß man die Abgabestelle für die Berge mit Abstreifern besetzte, ein Abwurfwagen ist in der Grube nicht überall anwendbar, und die Umlenkstelle des Bandes so weit ins Feld vorschob, daß ein Wechsel im Abstand der Aufgabe-und Abgabestellen möglich wurde. Wie schon gesagt, war aber bei diesen Anlagen, abgesehen von sonstigen Unzuträglichkeiten, stets mit einem raschen Verschleiß der Bänder zu rechnen.Belt system for mining operations The subject of the invention is a Plant for conveying different materials in both directions with the help of a Rubber band, the delivery point of which moves in one direction. In itself it is known to promote with elastic bands in both directions. With bands like this one also has already provided at both ends of the drive stations, which alternately switch on arrived so that the drive always took place at the discharge point. According to the invention but above all the fact that there is a lot in the pit should be taken into account it often happens that the loading and unloading points of the two different materials, Coal and mountains, switch. It very often happens that the task the coal is moved much further into the field than the delivery point for the mountains. In this case, a Stripping device are provided. However, by such stripping devices The condition of the ligaments is significantly affected, as the mountains often fit into the ligament work in and damage it. The lifespan of the belts is significantly reduced. Furthermore, it is also not possible to specify the location of the two positions for the task and to keep the delivery at a constant distance, so that from this in turn the promotion is adversely affected or special auxiliary equipment is necessary. One has therefore already helped in the manner indicated above that one the delivery point manned with scrapers for the mountains, a dump truck is not everywhere in the pit applicable, and the turning point of the tape advanced so far into the field that a change at the distance of the posting and delivery points was possible. As I said, it was in these systems, apart from other inconveniences, always with a rapid wear of the belts can be expected.

Nach der Erfindung soll nun in der Weise vorgegangen werden, daß ohne weiteres dem wechselnden Abstand der Aufgabe- und Abgabestellen entsprochen werden kann, jedoch ein vorzeitiges Ablegen des Bandes verhindert wird. Es wird der Austrag der Berge durch Endaustrag vorgenommen, der nicht am Ende des Bandes liegt. Grundsatz ist dabei, daß das Band an sich so weit zu Felde geführt wird, daß mit seiner Länge für einen größeren Zeitabschnitt die beiden Aufgabe- und Abgabestellen erfaßt werden können. Der Antrieb für das ins Feld vorgezogene Bandende bleibt aber gegenüber der Umlenkstelle des Bandes zurück, und zwar wandert er mit der Bergeabführstelle. Dadurch ist für die beiden Förderrichtungen zwar eine verschiedene Bandlänge gegeben, die aber nach der Erfindung auf einfache Weise ermöglicht wird. Die Abgabe und Aufgabe von Kohle und Bergen am Ouerschlag oder der entsprechenden Umschlagstelle wird nach der Erfindung dadurch erleichtert, daß auch hier die Antriebsstation vom Bandende zurüclcvveicht und der Raum bis zur Umlenkrolle durch einen heb- und senkbaren Ausleger, der die Umlenkrolle trägt, überbrückt wird. Der Ausleger wird gesenkt zur Aufgabe der Berge und gehoben für die Abgabe der Kohlen in das Weiterfördermittel.According to the invention should now be proceeded in such a way that without The changing distance between the drop-off and drop-off points must also be complied with can, however, a premature removal of the tape is prevented. It will be the discharge of the mountains made by final discharge, which is not at the end of the belt. principle is that the tape is so far led to the field that with its length the two delivery and delivery points are recorded for a larger period of time can. The drive for the end of the belt pulled into the field remains opposite the turning point of the belt back, and that it wanders with the recovery point. This means that there is a different belt length for the two conveying directions, but which is made possible in a simple manner according to the invention. The submission and abandonment of coal and mountains at the Ouerschlag or the corresponding transshipment point is facilitated according to the invention in that the drive station from here too The end of the belt is softened and the space up to the pulley is lifted and lowered Boom that carries the pulley is bridged. The boom is lowered for the abandonment of the mountains and raised for the delivery of the coals in the further conveying means.

An Hand der Zeichnung wird die Erfindung näher erläutert. In dieser ist in schematischer Form eine Bandanlage dargestellt, und zwar in Abb. i in Längsansicht und in Abb. z im Grundriß, wobei der Zustand der Anlage bei der Förderung von Bergen mit vollen Linien, der Zustand bei der Förderung von Kohle mit strichpunktierten Linien angedeutet ist.The invention is explained in more detail with reference to the drawing. In this a conveyor system is shown in schematic form, namely in Fig. i in a longitudinal view and in Fig. z in plan, showing the condition of the plant when pumping mountains with full lines, the condition in the mining of coal with dash-dotted lines Lines is indicated.

Die Anlage nach der Erfindung wird etwa in folgender Weise aufgebaut: In dem Querschlag A erfolge der Umschlag der Kohlen von dem Band in das Weiterfördermittel 18 und die Aufgabe der Berge in beliebiger Weise auf das in der Strecke B verlegte Band 13. Dann wird der für die Förderung der Kohle eingeschaltete Antrieb To so weit von dem Ouerschlag A zurückverlegt, daß durch Heben oder Senken des Auslegers 1i mit der Umlenkrolle 12 der Umschlag des Fördergutes in den beiden Richtungen bequem erreicht werden kann. Die beiden Trume des Bandes 13 werden in üblicher Weise in der Strecke B geführt und abgestützt. Bei dem Zustand des Bandes nach den ausgezogenen Linien der Zeichnung werden Berge gefördert. In diesem Falle ist der Antrieb To ausgeschaltet, der Antrieb 1d. dagegen eingeschaltet; die Berge werden dann in das Strebfördermitte117 ausgetragen. Das weiter ins Feld verlegte Bandende 13a ist hierbei von dem Band 13 abgetrennt und arbeitet nicht. Für die Förderung der Kohle wird das Bandende 13a mit dem Band 13 verbunden und der Antrieb To eingeschaltet. Die Trommeln der Antriebsstation 14 laufen, da diese ausgeschaltet ist, lose mit. Das Band läuft dann über den Umlenkbock 15 mit, und die Kohle wird aus dem Strebfördermitte116 auf das Band aufgegeben. Der Ausleger i i ist in die strichpunktierte Stellung gehoben, und die Kohle wird in das Weiterfördermittel 18 ausgetragen.The system according to the invention is constructed approximately in the following way: In cross passage A, the coal is transferred from the belt to the onward conveyor 18 and the abandonment of the mountains in any way to the one laid in route B. Volume 13. Then the drive To which is switched on for conveying the coal becomes so moved back far from Ouerschlag A, that by raising or lowering the boom 1i with the deflection roller 12 the handling of the conveyed goods in both directions can be easily reached. The two strands of the band 13 are made in the usual way guided and supported in route B. In the condition of the tape after it was pulled out Lines of drawing are promoted mountains. In this case the drive is To switched off, the drive 1d. on the other hand switched on; the mountains will then be in that Longwall conveyor center117 carried out. The tape end 13a that has been moved further into the field is here separated from the belt 13 and does not work. Used for the extraction of coal the tape end 13a is connected to the tape 13 and the drive To is switched on. the Drums of the drive station 14 run loosely with it because it is switched off. That The belt then runs along over the deflection block 15, and the coal is removed from the face conveyor 116 abandoned on the tape. The boom i i is raised to the dot-dash position, and the coal is discharged into the onward conveyor 18.

Aus der Zeichnung ist ersichtlich, daß im Bereiche des vorgezogenen Bandendes 1311 und des Bandes an sich die Kohle an beliebiger Stelle, vor und hinter dem Antrieb 1q., aufgegeben werden kann. Lediglich die Antriebsstation 1d. wandert mit dem veränderten Bergeaustrag gegen den Umlenkblock 15 voran. Die Antriebsstation 1¢ rückt also allmählich zu Felde und nähert sich dem Umlenkbock 15. Damit hierbei stets die nötige Verlängerung des Bandes 13 ohne Schwierigkeit erfolgen kann, ist das Bandende 13a in kurze Stücke unterteilt, deren Länge dem Vorrücken der Antriebsstation 1q. entspricht. Das bedeutet, daß mit dem Vorrücken der Antriebsstation 1q. das Bandende 13a um ein entsprechendes Stück verkürzt wird, das dann dem Band 13 während der Bergeförderung. angegliedert wird. Wenn das jeweilige Vorrücken der Antriebsstation 1.1 ein Meter beträgt, so braucht das Bandende 13a nicht nur aus a m langen Stücken bestehen, sondern kann entsprechend der Wanderung aus jeweils um die Vorrücklänge zunehmenden Stücken gebildet werden, so daß beim ersten Vorrücken ein 2 m langes Bandstück dem Band 13 zugefügt wird, dann ein 4. m, ein 6 m usw. langes Stück, während die kürzeren Stücke dann jeweils im toten Bandende 13" verbleiben. Die zur Abstützung des Bandendes 13a vorgesehenen Bandträger und -stützen werden natürlich mit dem Voranwandern der Antriebsstation 14 ebenfalls umgesetzt und können in den Verband des Bandes 13 eingereiht werden.From the drawing it can be seen that in the areas of the preferred Tape end 1311 and the tape itself the coal at any point, in front of and behind the drive 1q., can be abandoned. Only the drive station 1d. wanders with the changed Bergeaustrag against the deflection block 15 ahead. The drive station 1 ¢ gradually moves to the field and approaches the deflection block 15. With this here the necessary extension of the band 13 can always be carried out without difficulty the tape end 13a divided into short pieces, the length of which is the advance of the drive station 1q. is equivalent to. This means that with the advance of the drive station 1q. the Tape end 13a is shortened by a corresponding piece, which then the tape 13 during the mountain conveyance. is affiliated. When the respective advance of the drive station 1.1 is one meter, the tape end 13a does not only need a m long pieces consist, but can vary according to the hike by the length of the advance increasing pieces are formed, so that the first advance a 2 m long Tape piece is added to tape 13, then a 4th m, 6 m, etc. long piece while the shorter pieces then each remain in the dead belt end 13 ″. The support of the tape end 13a provided tape carriers and supports are of course with the Advancing the drive station 14 also implemented and can be in the association of the band 13 are classified.

Das Zurückverlegen des Bandantriebes vom Umlenkende ab und die Überbrückung des Zwischenraums zwischen Antrieb und Umlenktrommel durch einstellbare Ausleger ist an sich bekannt. Bei der Erfindung handelt es sich darüber hinaus aber um die Durchführung des Gedankens, in beiden Richtungen fördernde Bänder ohne Hilfseinrichtungen, wie Abstreifer usw., an dem Ort nach verschiedene Abgabe- und Aufgabestellen anzupassen. Es wird dazu der Antrieb des mit dem Ausleger ausgerüsteten Endes fest angeordnet; der Antrieb am anderen Ende des Bandes ist beweglich, aber auch vom Umlenkende zurückverlegt, so daß, je nach der Förderrichtung abwechselnd, einmal die Antriebstrommel, das andere Mal die vorgezogene Umlenktrommel als Endstelle des Bandes benutzt werden kann. Die Brücke bildet hierbei ein abtrennbares Bandstück. Dadurch werden die gerügten Mängel beseitigt.Moving the belt drive back from the deflecting end and bridging the space between the drive and the tail pulley by means of adjustable arms is known per se. The invention is also about the Implementation of the idea of conveying belts in both directions without auxiliary equipment, such as scrapers, etc., to be adapted at the location according to different delivery and delivery points. For this purpose, the drive of the end equipped with the boom is fixedly arranged; the drive at the other end of the belt is movable, but also moved back from the deflecting end, so that, depending on the direction of conveyance, the drive drum, the other times, the forward pulley can be used as the end of the belt can. The bridge forms a detachable piece of tape. This will result in the reprimanded Defects eliminated.

Claims (1)

PATENTANSPRÜCHE: i. Bandanlage für den Grubenbetrieb mit einer Antriebsstation an jedem Bandende für die Förderung in beiden Richtungen, dadurch gekennzeichnet, daß eine Antriebsstation (To) fest, die andere (14) beweglich angeordnet ist, aber beide vom Umlenkende in bekannter Weise zurückverlegt sind, und daß der Abstand von der festen Station zur vorderen Umlenkrolle (12) durch einen bekannten Heb- und senkbaren Ausleger (i i), dem Träger der Umlenkrolle (12), der Abstand der beweglichen Antriebsstation (14) zur hinteren Umlenkrolle (15) durch ein abtrennbares Bandende (13a) überbrückt wird. a. Anlage nach Anspruch i, dadurch gekennzeichnet, daß das abtrennbare Bandende (13a) in Stücke von solcher Länge unterteilt ist, daß dem Wandern der Antriebsstation (14) durch Herausnahme solcher Stücke und Ansetzen am Hauptband (13) ohne Veränderung des Standortes der Umlenkstation (15) entsprochen werden kann.PATENT CLAIMS: i. Belt system for mining operations with a drive station at each end of the belt for conveying in both directions, characterized in that one drive station (To) is fixed, the other (14) is movable, but both are moved back from the deflecting end in a known manner, and that the Distance from the fixed station to the front deflection roller (12) by a known lifting and lowering arm (ii), the carrier of the deflection roller (12), the distance between the movable drive station (14) and the rear deflection roller (15) by a separable end of the belt ( 13a) is bridged. a. System according to claim i, characterized in that the separable end of the belt (13a) is divided into pieces of such a length that the drive station (14) can move by removing such pieces and attaching them to the main belt (13) without changing the location of the deflection station (15 ) can be met.
DEH126813D 1931-05-07 1931-05-07 Belt system for mining operations Expired DE557176C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DEH126813D DE557176C (en) 1931-05-07 1931-05-07 Belt system for mining operations

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DEH126813D DE557176C (en) 1931-05-07 1931-05-07 Belt system for mining operations

Publications (1)

Publication Number Publication Date
DE557176C true DE557176C (en) 1932-08-19

Family

ID=7175219

Family Applications (1)

Application Number Title Priority Date Filing Date
DEH126813D Expired DE557176C (en) 1931-05-07 1931-05-07 Belt system for mining operations

Country Status (1)

Country Link
DE (1) DE557176C (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1019628B (en) * 1952-10-06 1957-11-21 Wilhelm Eckey Facing material

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1019628B (en) * 1952-10-06 1957-11-21 Wilhelm Eckey Facing material

Similar Documents

Publication Publication Date Title
DE2051995B2 (en) Inclined conveyor
DE557176C (en) Belt system for mining operations
DE1125409B (en) Device for taking samples, in particular ore samples, from a moving conveyor belt
DE621624C (en) Link conveyor belt for steep conveyors with variable capacity of the cup chambers
DE667084C (en) Endless conveyor belt carried by an overhead track intended for open-cast mining
DE1262164B (en) Debris pile removal device
DE2504696B2 (en) CHAIN TENSIONING DEVICE FOR CHAIN DRIVEN MACHINERY, ESPECIALLY IN MINING
DE538364C (en) Cross belt conveyor for introducing backlogs
DE888074C (en) Conveyor device, z. B. for mining operations
DE914478C (en) Apron conveyor
DE508161C (en) Process and system for the extraction of powerful or multilayered overburden by means of conveyor bridges
DE1556195A1 (en) Magnetic chip conveyor
DE560655C (en) Loading facility
DE894759C (en) Device for applying mortar to the joint surface of masonry or the like.
DE699654C (en) Unloading device for drag plate conveyor
DE474844C (en) Facility, especially for conveying the coal extracted on site in civil engineering
DE968419C (en) Method and device for the removal of dredged material in opencast mines
DE959986C (en) Discharge device for endless chain conveyors
DE1217278B (en) Bulky goods handling system in a storage area
DE3448028A1 (en) Belt conveying installation
DE964484C (en) Double chain conveyor, especially for mining
DE878925C (en) Unloading device for drag plate conveyor
DE3708219A1 (en) DEVICE FOR STACKING AND UNLOADING SCHUETTGUT IN SCHUETTGUTHALDEN
DE697451C (en) System for feeding the overburden to the dropping point in the opencast mine
DE915609C (en) Fuel feeder for mechanical grate firing