[go: up one dir, main page]

DE3701057A1 - SUPPLY AND / OR RESTORATION SYSTEM FOR TREE - Google Patents

SUPPLY AND / OR RESTORATION SYSTEM FOR TREE

Info

Publication number
DE3701057A1
DE3701057A1 DE19873701057 DE3701057A DE3701057A1 DE 3701057 A1 DE3701057 A1 DE 3701057A1 DE 19873701057 DE19873701057 DE 19873701057 DE 3701057 A DE3701057 A DE 3701057A DE 3701057 A1 DE3701057 A1 DE 3701057A1
Authority
DE
Germany
Prior art keywords
supply
tree
grate
irrigation
chambers
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
DE19873701057
Other languages
German (de)
Inventor
Hans-Claus Dr Menzel
Karlheinz Schumacher
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MENZEL HANS C
Original Assignee
MENZEL HANS C
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MENZEL HANS C filed Critical MENZEL HANS C
Priority to DE19873701057 priority Critical patent/DE3701057A1/en
Publication of DE3701057A1 publication Critical patent/DE3701057A1/en
Ceased legal-status Critical Current

Links

Classifications

    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G13/00Protection of plants
    • A01G13/30Ground coverings
    • A01G13/31Ground coverings for individual plants
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G13/00Protection of plants
    • A01G13/20Protective coverings for plants
    • A01G13/27Protective coverings for plants protecting specific parts of plants, e.g. roots, trunks or fruits

Landscapes

  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Toxicology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Environmental Sciences (AREA)
  • Cultivation Receptacles Or Flower-Pots, Or Pots For Seedlings (AREA)

Abstract

The invention relates to a tending and/or restoring installation for trees. The invention provides a reinforcing and/or tending annular structural body 1 which comprises at least two interconnected structural elements and exhibits tending cells 3 which are connected together by irrigation and tending chambers 2 in the form of channels. The invention provides a structural body which is easily producible and transportable, is simple to install and tends a tree in a reliable manner. <IMAGE>

Description

Die Erfindung betrifft eine Versorgungs- und/oder Sanie­ rungsanlage für Bäume nach dem Oberbegriff des Patentan­ spruchs 1.The invention relates to a supply and / or sanitation tree plant according to the generic term of the patent application saying 1.

Aus der FR-PS 3 76 167 ist eine Vorrichtung zum Schutz von Straßenbäumen bekannt. Diese Vorrichtung besteht aus mehreren voneinander getrennten Behältern, die unterhalb eines Gitterrostes um den Baum herum angeordnet sind. Das durch den Gitterrost in die einzelnen Behälter ein­ strömende Wasser wird in diesen gesammelt und langsam an den Boden abgegeben, wobei Schmutzteilchen ausgefiltert werden.From FR-PS 3 76 167 is a device for protection known from street trees. This device consists of several separate containers below a grate are arranged around the tree. This through the grating into the individual containers flowing water is collected in this and slowly on released the soil, filtering out dirt particles will.

Bei vielen Bäumen erstreckt sich eine geschlossene, asphaltierte oder gepflasterte Straßendecke bis fast an den Baumstamm heran. Aus der US-PS 37 55 966 ist es bekannt, in den asphaltierten oder gepflasterten Straßenbereich, der den Baum umgibt, Kunststoffzylinder einzusetzen, die einen Durchmesser von etwa 10 cm und eine Höhe von etwa 40 cm haben. Diese Kunststoffzylinder weisen einen oberen Rand auf, der sich über die Straßen­ decke erstreckt. In diesen Kunststoffzylinder können Filtereinsätze eingesetzt werden, die ein Düngemittel aufnehmen. Es ist erforderlich, um den Baum herum meh­ rere dieser Zylinder anzuordnen. Many trees have a closed, paved or paved road surface to almost the tree trunk. From US-PS 37 55 966 it is known in the asphalt or paved Road area surrounding the tree, plastic cylinder use a diameter of about 10 cm and have a height of about 40 cm. This plastic cylinder have an upper edge that extends across the streets blanket stretches. Can in this plastic cylinder Filter cartridges are used which are a fertilizer record, tape. It is necessary to meh around the tree rere to arrange these cylinders.  

Aus dem DE-GM 85 08 173 sind Bauelemente für ein Be­ lüftungs- und Bewässerungssystem für Bäume bekannt. Dieses Bauelement ist ein Filterkasten mit Rost, Steg­ kasten und einem herausnehmbaren Bodenrost, der wenig­ stens eine Filter- und/oder Granulatlage trägt.DE-GM 85 08 173 are components for a loading ventilation and irrigation system known for trees. This component is a filter box with grate, web box and a removable floor grid that is little least carries a filter and / or granulate layer.

Mit den beiden zuletzt genannten Einrichtungen können ein Gasaustausch, eine Wasserzufuhr und auch eine Flüssigkeitsdüngung in einem erweiterten Bereich außer­ halb des Baumkronendurchmessers durchgeführt werden. Die bekannten Einrichtungen erfordern jedoch umständliche und zeitraubende Einbaumaßnahmen.With the latter two facilities you can a gas exchange, a water supply and also one Liquid fertilization in an extended area except half of the tree top diameter. The known facilities, however, require cumbersome and time-consuming installation measures.

Schutzmaßnahmen für Bäume müssen aus öffentlichen Mit­ teln finanziert werden. Es ist deshalb notwendig, opti­ male Schutz- und Sanierungsmaßnahmen derart durchzufüh­ ren, daß die dafür aufzubringenden Mittel in einem Rah­ men liegen, der von der öffentlichen Hand noch ver­ antwortet werden kann.Protective measures for trees must come from public be financed. It is therefore necessary to opti to carry out protective and remedial measures in this way ren that the funds to be raised in a frame that are still available from the public sector can be answered.

Der Erfindung liegt die Aufgabe zugrunde, eine Ver­ sorgungs- und/oder Sanierungsanlage für Bäume zu schaf­ fen, die bei vertretbarem Aufwand eine optimale Sanie­ rung und einen zuverlässigen Schutz des Baumwurzel­ bereiches gewährleistet.The invention has for its object a Ver care and / or renovation plant for trees fen, the optimal sania with reasonable effort and reliable protection of the tree root area guaranteed.

Erfindungsgemäß wird diese Aufgabe durch die technische Lehre des Patentanspruchs 1 gelöst.According to the invention, this object is achieved by the technical Teaching of claim 1 solved.

Der um den Baum umlaufende Bewehrungs- und/oder Ver­ sorgungsringbaukörper kann aus glasfaserverstärktem Be­ ton hergestellt werden. Bauelemente aus glasfaserver­ stärktem Beton sind in der Herstellung billig und können mit einfachsten Mitteln eingebaut werden. Die Versor­ gungszellen können mit einem Granulat und einem Lang­ zeitdünger gefüllt werden. Auch können die Bewässerungs­ und Versorgungskammern zur Aufnahme eines Langzeitdün­ gers dienen. Die Decken der Versorgungszellen können mit Schlitzen versehen sein und die Innenwandung der Ver­ sorgungskammern mit Öffnungen. Es können ferner An­ schlußöffnungen für Drainagerohre vorgesehen sein. Für den Bewehrungs- und/oder Versorgungsringbaukörper können vorgefertigte Betonbauteile verwendet werden, wodurch sowohl die Herstellung als auch der Transport und der Einbau an Ort und Stelle erleichtert werden.The reinforcement and / or ver  supply ring structure can be made of glass fiber reinforced Be be made. Components made of glass fiber ver Reinforced concrete is cheap and can be manufactured be installed with the simplest of means. The Versor Delivery cells can with a granulate and a Lang be filled earlier. Also can irrigation and supply chambers for receiving a long-term fertilizer gers serve. The ceilings of the supply cells can with Slots are provided and the inner wall of the ver care chambers with openings. It can also be To closing openings may be provided for drainage pipes. For the reinforcement and / or supply ring structure can prefabricated concrete components are used, which both the manufacture as well as the transport and the Installation on site can be facilitated.

Mit besonderem Vorteil kann der Bewehrungs- und/oder Versorgungsringbaukörper in einen aus Betonplatten be­ stehenden Baumrost derart integriert werden, daß der Bewehrungs- und/oder Versorgungsringbaukörper im Randab­ schnitt des Baumrostes eingebaut ist. Dabei sind die Versorgungszellen in den Baumrost integriert, so daß eine zusätzliche Herstellung der Versorgungszellen ent­ fallen kann. Eine zusätzliche Verlegungsarbeit ist nicht mehr erforderlich. Durch die Anordnung der Versorgungs­ zellen in den Baumrostkanten wird deren optimale Anord­ nung, insbesondere im Bereich der Traufkanten der Baum­ krone sichergestellt. Die Verbindungsleitungen dieser Versorgungszellen sind ebenfalls in den Baumrost inte­ griert, so daß eine zusätzliche Leitungsverlegung nicht erforderlich ist. Die Bewässerungs- und Versorgungskam­ mern können am Baumrost anbetoniert sein. Bei einer anderen vorteilhaften Ausführungsform sind die Versor­ gungskammern als an den Baumrost eingeklebte Kunststoff- kammern ausgebildet. Hierdurch werden die Herstellungs­ kosten verringert und eine für den Transport günstige Gewichtseinsparung erzielt.The reinforcement and / or Supply ring structure in a be made of concrete slabs standing tree grate are integrated so that the Reinforcement and / or supply ring structure in the edge cut of the tree grate is installed. Here are the Supply cells integrated in the tree grate, so that an additional production of the supply cells ent can fall. Additional laying work is not more needed. By arranging the supply cells in the edges of the tree grate become their optimal arrangement tion, especially in the area of the eaves of the tree crown ensured. The connecting lines of this Supply cells are also integrated in the tree grate griert, so that no additional wiring is required. The irrigation and supply came  concrete can be concreted on the tree grate. At a another advantageous embodiment are the Versor chambers as plastic glued to the tree grate chambers trained. This will make the manufacturing reduced costs and a cheap for transport Weight saving achieved.

Erhaltenswerte Altbäume werden besonders durch ihren Standort in städtischen Verkehrsbereichen gefährdet. In diesen Bereichen stehen sich zwei Erfordernisse als scheinbar gleichzeitig nicht erfüllbar gegenüber. Das eine Erfordernis betrifft die Notwendigkeit, im Wurzel­ bereich um den Stamm eines Baumes herum einen weiträu­ migen, biologisch von Umwelteinflüssen freigehaltenen Raum zu schaffen. Das andere Erfordernis betrifft die Maßnahme, insbesondere für den Autoverkehr optimale Flächen auch für den ruhenden Verkehr, d. h. Parkplätze zur Verfügung zu stellen.Old trees are particularly worthy of preservation due to their Location in urban traffic areas endangered. In these areas face two needs as apparently not achievable at the same time. The One requirement concerns the need at the root area around the trunk of a tree biologically kept free from environmental influences To create space. The other requirement concerns the Measure, optimal especially for car traffic Areas also for stationary traffic, d. H. Parking spaces to provide.

Es ist bekannt, daß bei der Schaffung von Parkplätzen in besiedelten Wohnbereichen der vorhandene Baumbestand oft ein störendes Element bildet.It is known that when creating parking spaces in the existing trees often populated living areas forms a disruptive element.

Einerseits sollen sich die Verkehrswege und die Park­ flächen so nah wie möglich zum Baum hinerstrecken. Ande­ rerseits sollte um den Baum herum ein möglichst großer Bereich frei bleiben, der von einem Rost überdeckt oder für eine Begrünung frei gehalten ist. Mit Vorteil wird die Baumscheibe, der Baumrost oder der Bewehrungs- oder Versorgungsringbaukörper von einem aus freitragenden Rostplatten, die auf für Baumwurzeln durchlässige Funda­ mente verlegt sind, bestehenden Rostplattensteg umgeben. Dadurch wird ein den Baum weiträumig umspannender, sanierter Bereich geschaffen, wobei ein Randabschnitt hergestellt wird, unter den sich die Wurzeln des Baumes in einen sanierten und geschützten Boden hineiner­ strecken können. Die Oberfläche dieses Bereiches wird dann für den Verkehr zur Verfügung gestellt. Insbeson­ dere kann ein schwerbelastbarer Randbereich geschaffen werden.On the one hand, the traffic routes and the park stretch as close as possible to the tree. Ande on the other hand, a large one should be around the tree Stay clear of a area covered by rust or is kept free for greening. With advantage the tree slice, the tree grate or the reinforcement or Supply ring structure from a self-supporting Rust plates on funda that is permeable to tree roots  elements are laid, surrounding the existing grate slab. This makes a tree that spans the tree redeveloped area, with an edge section is produced under which the roots of the tree into a renovated and protected floor can stretch. The surface of this area will then made available for traffic. In particular This can create a heavy-duty edge area will.

Mit besonderem Vorteil können die die Rostplatten tragenden Fundamente Eckelemente aufweisen, die mit Anschlußstutzen für ein Belüftungs-, Bewässerungs- und Düngesystem ausgerüstet sind. Insbesondere können dabei die Rostplatten mit einem Belag der Verkehrsflächen, wie Platten, Pflaster und dergleichen, überzogen sein. Dabei kann es besonders vorteilhaft sein, daß die Rostplatten mit Sand oder Erdsubstrat abgedeckt sind und daß auf dem Sand ein Belag der Verkehrsflächen aufgebracht oder auf dem Erdsubstrat ein Rasengitter verlegt ist.The grate plates can be particularly advantageous load-bearing foundations have corner elements that with Connection piece for a ventilation, irrigation and Fertilizer system are equipped. In particular, you can the grate plates with a covering of the traffic areas, such as Plates, plasters and the like may be covered. Here it can be particularly advantageous that the grate plates are covered with sand or earth substrate and that on the Sand covering or covering the traffic areas a lawn grid is laid on the earth substrate.

Durch diese Ausführungsformen werden im wesentlichen zwei Baumelemente in Kombination zu einem System zusammengefaßt und zwar freitragende Elemente, nämlich die Rostplatten, die beispielsweise aus glasfaserver­ stärktem Beton hergestellt werden können und Stütz- oder Einfassungselemente, nämlich die Fundamente, die mit Versorgungsleitungen ausgerüstet sind. Dies ermöglicht einen ausreichend großen Lebensraum für die Baumscheibe, die dann in die Verkehrsflächen voll integriert werden kann. Diese Maßnahmen erlauben mit Vorteil, daß die Baumgruben gepflastert werden, ohne daß das Erdreich in störender Weise verdichtet wird. In Fällen, in denen Baumrostanlagen stören, kann deren Einbau umgangen werden, ohne daß Nachteile für den Baum auftreten.These embodiments are essentially two tree elements in combination to form a system summarized, namely cantilever elements, namely the grate plates, for example made of glasfaserver reinforced concrete can be made and supporting or Edging elements, namely the foundations that with Supply lines are equipped. this makes possible a sufficiently large habitat for the tree slice, which are then fully integrated into the traffic areas can. These measures advantageously allow the  Tree pits are paved without the soil in is compressed in a disruptive manner. In cases where Disturbing tree grate systems can avoid their installation without disadvantages for the tree.

Die freitragenden Rostplatten können auf der Oberseite Längs- und/oder Querrippen aufweisen. Diese dienen der Erhöhung der Verkehrssicherheit.The self-supporting grate plates can be on the top Have longitudinal and / or transverse ribs. These serve the Increase traffic safety.

Es liegt im Rahmen der Erfindung, einen Bewehrungsring­ baukörper vorzusehen, der aus Einfassungselementen be­ steht. Diese Einfassungselemente haben Eckelemente mit Anschlußstutzen für die Ringdrainageleitungen. Diese Eckelemente werden durch Verbindungselemente miteinander verbunden. Durch diesen Bewehrungsringbaukörper wird ein besonders geschützter Bereich um einen Baum herum ge­ schaffen.It is within the scope of the invention to have a reinforcement ring to provide building structure, which be made of edging elements stands. These edging elements have corner elements Connection piece for the ring drainage lines. These Corner elements are connected by connecting elements connected. Through this reinforcement ring structure is a specially protected area around a tree create.

Mit besonderem Vorteil können die Eck- und/oder Ver­ bindungselemente Stützschultern zur Abstützung von Rost­ platten aufweisen.The corner and / or ver binding elements Support shoulders to support rust have plates.

Ausführungsbeispiele der Erfindung sollen in der folgenden Beschreibung unter Bezugnahme auf die Fig. der Zeichnung erläutert werden.Embodiments of the invention will be explained in the following description with reference to the figures of the drawing.

Es zeigen:Show it:

Fig. 1 eine schematische, perspektivische An­ sicht eines Bewehrungs- und/oder Ver­ sorgungsringbaukörpers, Fig. 1 is a schematic, perspective view on a reinforcement and / or Ver sorgungsringbaukörpers,

Fig. 2 eine schematische, perspektivische An­ sicht eines Baumes mit einem als Baumrost ausgebildeten Bewehrungsringbaukörper, Fig. 2 is a schematic, perspective view on a tree with a tree grate constructed as reinforcement ring structure,

Fig. 3 eine Schnittansicht genommen längs der Linie II-II der Fig. 2, FIG taken. 3 is a sectional view taken along line II-II of Fig. 2,

Fig. 4a + 4b Schnittansichten genommen längs der Linie III-III der Fig. 3, FIG. 4a + 4b are sectional views taken along the line III-III of Fig. 3,

Fig. 5 eine Draufsicht auf einen Baumrost, der von einem Plattensteg umgeben ist, Fig. 5 is a plan view of a tree grate, which is surrounded by a plate web,

Fig. 6 eine schematische, auseinandergezogene, perspektivische Ansicht einer Baumschutz­ anlage, Fig. 6 is a schematic, exploded, perspective view of a tree protection system,

Fig. 7 eine schematische Schnittansicht einer verkehrsbündig integrierten Baumschutz­ anlage, Fig. 7 is a schematic sectional view of an integrated flush traffic tree protection system,

Fig. 8 eine perspektivische Teilansicht eines Bewehrungsringbaukörpers und Fig. 8 is a partial perspective view of a reinforcement ring structural body, and

Fig. 9-11 Einbaubeispiele des in Fig. 8 darge­ stellten Bewehrungsringbaukörpers. Fig. 9-11 installation examples of the reinforcement ring structure shown in Fig. 8 Darge.

In Fig. 1 ist ein Bewehrungs- und/oder Versorgungsring­ baukörper 1 dargestellt, welcher einen Baumrost oder eine Baumscheibe umgeben kann und in das Erdreich einge­ lassen ist. Dieser Bewehrungs- und/oder Versorgungsring­ baukörper 1 kann mehrteilig ausgebildet sein und einen runden oder polygonalen, insbesondere rechteckigen, Umriß haben. Das Stegfundament 1 kann insbesondere aus faserverstärktem Beton gefertigt sein.In Fig. 1, a reinforcement and / or supply ring structure 1 is shown, which can surround a tree grate or a tree slice and is left in the ground. This reinforcement and / or supply ring structure 1 can be formed in several parts and have a round or polygonal, in particular rectangular, outline. The web foundation 1 can be made in particular of fiber-reinforced concrete.

Beim dargestellten Ausführungsbeispiel sind in den Ecken eines polygonalen Bewehrungs- und/oder Versorgungsring­ baukörpers 1 Versorgungszellen 3 ausgebildet. Diese Versorgungszellen 3 weisen in den Deckenwandungen Schlitzöffnungen 6 auf, durch die Oberflächenwasser in diese Versorgungszellen 3 eintreten kann. Versorgungs­ zellen dieser Art sind mit einem Langzeitdünger und einem Granulat gefüllt. Von diesen Versorgungszellen 3 aus erstrecken sich kanalartige Bewässerungs- und Ver­ sorgungskammern 2, die beim dargestellten Ausführungs­ beispiel einen rechteckigen Querschnitt haben. Diese Bewässerungs- und Versorgungskammern 2 weisen zumindest an der Innenwandung Öffnungen 4 auf.In the illustrated embodiment, 1 supply cells 3 are formed in the corners of a polygonal reinforcement and / or supply ring structure. These supply cells 3 have slot openings 6 in the ceiling walls through which surface water can enter these supply cells 3 . Supply cells of this type are filled with slow release fertilizer and granules. From these supply cells 3 extend channel-like irrigation and supply chambers 2 , which have a rectangular cross section in the embodiment shown. These irrigation and supply chambers 2 have openings 4 at least on the inner wall.

Der Bewehrungs- und/oder Versorgungsringbaukörper 1 kann sowohl im Bereich der Versorgungszellen 3 als auch im Bereich der Bewässerungs- und Versorgungskammern 2 An­ schlüsse für Ringdrainageleitungen haben.The reinforcement and / or supply ring structure 1 can be used both in the supply cells 3 and in the field of irrigation and supply chambers 2 to connections for ring drainage pipes have.

In Fig. 2 ist ein Baum 30 dargestellt. Der Baum 30 ist von einem Baumrost 5 umgeben.A tree 30 is shown in FIG . The tree 30 is surrounded by a tree grate 5 .

Dieser Baumrost 5 hat beim dargestellten Ausführungs­ beispiel einen quadratischen Grundriß. Er weist Schlitz­ öffnungen 10 auf, durch die das Regenwasser absickern kann. Weiterhin sind im Baumrost 5 Anschlüsse 7 vorge­ sehen, die mit einer bei 11 dargestellten Drainage­ leitung verbunden sind.This tree grate 5 has, for example, a square plan in the illustrated embodiment. It has slot openings 10 through which the rainwater can seep away. Furthermore, 5 connections 7 are easily seen in the tree grate, which are connected to a drain line shown at 11 .

Die bei 11 dargestellte Drainageleitung ist eine Ring­ leitung, die den Bereich der Baumwurzeln umgibt. Der Baumrost 5 besteht aus zwei identischen Betonplatten 15 und 17, die an einem Plattenstoß 19 gegeneinander an­ liegen und auf eingebaute Fundamentstützen 9 verlegt sind. Im Bereich des Plattenstoßes 19 sind in den Beton­ platten 15 und 17 Aussparungen für den Stamm des Baumes 30 vorgesehen.The drainage line shown at 11 is a ring line that surrounds the area of the tree roots. The tree grate 5 consists of two identical concrete slabs 15 and 17 , which lie against each other at a plate joint 19 and are laid on built-in foundation supports 9 . In the area of the panel joint 19 plates 15 and 17 recesses for the trunk of the tree 30 are provided in the concrete.

Beim dargestellten Ausführungsbeispiel weist der quadra­ tische Baumrost 5 in den Ecken vier Versorgungszellen 3 auf.In the illustrated embodiment, the quadra diagram tree grate 5 in the corners of four cells supply. 3

Wie Fig. 3 zeigt, sind in der Deckenwandung einer jeden Versorgungszelle 3 Schlitzöffnungen 6 vorgesehen. In der Bodenwandung ist mindestens eine Anschlußöffnung für ein Drainagerohr 11 angeordnet. In diesen Versorgungs­ zellen 3 kann Trachyt-Granulat mit Langzeitdünger unter­ gebracht sein. Mit Mineralien angereichertes, gefilter­ tes Oberflächenwasser kann über die Drainageleitung 11 in die Ringleitung gelangen.As shown in FIG. 3, 3 slotted holes 6 are provided in the top wall of each power cell. At least one connection opening for a drainage pipe 11 is arranged in the bottom wall. In these supply cells 3 , trachyte granules with slow-release fertilizers can be accommodated. Mineral-enriched, filtered surface water can reach the ring line via the drain line 11 .

Wie die Fig. 3 und 4 zeigen, erstrecken sich längs der Baumrostkanten 12 Bewässerungs- und Versorgungskammern 13, die in Verbindung mit den Versorgungszellen 3 ste­ hen. Auch diese Bewässerungs- und Versorgungskammern 13 können gegebenenfalls mit Langzeitdünger gefüllt sein. Diese Versorgungs- und Bewässerungskammern 13 weisen Öffnungen 4 auf und können ebenfalls Anschlüsse für Drainageröhren haben. Insbesondere sind Öffnungen 4 in der Innenwand 18 vorgesehen.As shown in FIGS. 3 and 4, along the tree grate edges 12 extending irrigation and supply chambers 13, the ste in conjunction with the supply cells 3 hen. These irrigation and supply chambers 13 can also be filled with slow-release fertilizers if necessary. These supply and irrigation chambers 13 have openings 4 and can also have connections for drainage pipes. In particular, openings 4 are provided in the inner wall 18 .

Wie die Fig. 4a und 4b zeigen, weisen die Bewässerungs­ und Versorgungskammern 13 einen rechteckigen Querschnitt auf.As shown in FIGS. 4a and 4b show the irrigation and supply chambers 13 have a rectangular cross-section.

Bei der in Fig. 4a dargestellten Ausführungsform ist die Bewässerungs- und Versorgungskammer 13 anbetoniert.In the embodiment shown in Fig. 4a, the irrigation and supply chamber 13 is concreted.

In Fig. 4b ist eine Ausführungsform dargestellt, bei welcher die Bewässerungs- und Versorgungskammer 13 als angeklebte Kunststoffkammer ausgebildet ist.In Fig. 4b shows an embodiment in which the irrigation and supply chamber 13 is formed as a bonded plastic chamber.

Fig. 5 zeigt eine Draufsicht auf einen Baumrost 5. Dieser Baumrost 5 ist von einem Rostplattensteg um­ spannt, der aus einander anstoßenden Rostplatten 20 be­ steht. Diese Rostplatten 20 sind auf Stegplatten ver­ legt, die für Baumwurzeln durchlässig sind. Wie darge­ stellt, überdeckt dieser Rostplattensteg ein gestrichelt dargestelltes Ringdrainagesystem 22. In den Eckabschnit­ ten dieser Rostplattenstege können Versorgungskammern 21 vorgesehen sein, die mit dem Ringdrainagesystem 22 in Verbindung stehen. Die Rostplatten 20 können mit Längs­ und Querrippen 24 bzw. mit Vorsprüngen 23 ausgerüstet sein, die der Erhöhung der Verkehrssicherheit dienen. Fig. 5 shows a plan view of a tree grate 5. This tree grate 5 is spanned by a grate plate web, which consists of abutting grate plates 20 be. These grate plates 20 are ver on multi-wall sheets, which are permeable to tree roots. As Darge presents, this grate plate web covers a ring drainage system 22 shown in dashed lines. In the Eckabschnit th these grate plate webs supply chambers 21 can be provided, which are in communication with the ring drainage system 22 . The grate plates 20 can be equipped with longitudinal and transverse ribs 24 or with projections 23 , which serve to increase traffic safety.

Wie Fig. 6 zeigt, sind die Rostplatten 20 auf Fundament­ stützen 9 verlegt. In den Ecken oder Eckabschnitten sind Eckelemente 26 vorgesehen, die Anschlußstutzen 28 für eine Versorgungsanlage haben. Bei der in Fig. 6 dargestellten Baumschutzanlage handelt es sich um eine freitragende Überbrückung mit Rostplatten 20, die aus glasfaserverstärktem Beton hergestellt werden können. Es erfolgt auch eine Auflage auf Eckelementen 26, die Anschlußstutzen 28 für einen Anschluß an ein Rohrleitungssystem für die Belüftung, Bewässerung und Düngung der Baumscheiben haben. Wie die Fig. 6 zeigt, können die Rostplatten 20 mit dem Belag der Verkehrs­ flächen, wie beispielsweise Platten, Pflaster und der­ gleichen, überzogen werden. Es wird auf diese Weise ein genügend großer Lebensraum für die Baumscheibe geschaf­ fen, der voll in Verkehrsflächen integriert werden kann.As shown in Fig. 6, the grate plates 20 are supported on the foundation 9 . In the corners or corner sections, corner elements 26 are provided which have connecting pieces 28 for a supply system. The tree protection system shown in FIG. 6 is a self-supporting bridge with grate plates 20 , which can be made from glass fiber reinforced concrete. There is also a support on corner elements 26 , which have connecting pieces 28 for connection to a piping system for ventilation, irrigation and fertilization of the tree grates. As shown in FIG. 6, the grate plates 20 can be covered with the surface of the traffic surfaces, such as plates, plasters and the like. In this way, a sufficiently large living space for the tree disc is created, which can be fully integrated into traffic areas.

In Fig. 7 ist schematisch ein Schnitt durch einen Teil einer Baumgrube gezeigt. In diese Baumgrube werden nicht dargestellte Einzelfundamente eingesetzt und Mutterboden wird eingebracht. Die Baumgrube wird dann mit frei­ tragenden Rostplatten 20 abgedeckt. Die Rostschlitze in den Rostplatten 20 können mit Grobkron gefüllt werden. Im linken Teil der Fig. 7 ist dargestellt, daß eine Pflasterung 8 auf Sand 29 vorgesehen ist. Im rechten Abschnitt der Fig. 7 sind die Rostplatten 20 mit Erd­ substrat 31 abgedeckt. Auf dem Erdsubstrat 31 sind Rasengittersteine 14 verlegt.In Fig. 7 a section through part of a tree pit is shown schematically. Individual foundations (not shown) are inserted into this tree pit and topsoil is introduced. The tree pit is then covered with self-supporting grate plates 20 . The grate slots in the grate plates 20 can be filled with coarse crown. In the left part of FIG. 7 it is shown that paving 8 is provided on sand 29 . In the right section of FIG. 7, the grate plates 20 are covered with earth substrate 31 . Grass pavers 14 are laid on the earth substrate 31 .

In Fig. 8 ist eine Bauminsel für Straßenrückbaumaßnahmen dargestellt, wobei die Bauminsel für einen Baum mit offener Baumscheibe vorgesehen sein kann. Diese Baum­ insel weist Einfassungselemente 26 und 27 auf. Eck­ elemente 26 sind vorgesehen, die Anschlußstutzen 28 für eine Ringdrainageleitung 29 haben, die um den Baum herum verläuft und zur Belüftung und Bewässerung der Baum­ scheibe dient. Die Einfassungselemente 26 und 27 können aus Baustahl armiertem Schwerbeton hergestellt sein.In FIG. 8 is a tree island is shown for road renaturation, wherein the tree island may be provided for a tree with a tree open disc. This tree island has bordering elements 26 and 27 . Corner elements 26 are provided, the connection piece 28 for an annular drainage line 29 which runs around the tree and is used for ventilation and irrigation of the tree disc. The edging elements 26 and 27 can be made from reinforced concrete reinforced with structural steel.

In die Anschlußstutzen 28 wird kein Langzeitdünger ein­ gelagert. Diese Anschlußstutzen 28 dienen nur der Be­ lüftung und Bewässerung der Baumwurzeln. Es wird mit Flüssigkeitsdünger gearbeitet.In the connecting piece 28 no slow-release fertilizer is stored. These connecting pieces 28 are used only for ventilation and irrigation of the tree roots. Liquid fertilizers are used.

Bei der Schnittdarstellung in Fig. 9 ist eine Bauminsel gezeigt, die die Einfassungselemente aufweist, die in Fig. 8 dargestellt sind. Die Einfassung selbst ist mit Erde aufgefüllt. In Fig. 9 ist eine Einfassung darge­ stellt, bei der die nicht dargestellten Eckelemente bzw. die dargestellten Verbindungselemente 27 Stützschultern 32 aufweisen, auf denen Rostplatten 20 oder nicht darge­ stellte Baumroste aufliegen können.In the sectional view in FIG. 9, a tree island is shown which has the bordering elements which are shown in FIG. 8. The enclosure itself is filled with earth. In Fig. 9 is a border Darge provides, in which the corner elements or the connecting elements 27 not shown have support shoulders 32 on which grate plates 20 or tree grids not shown can rest.

Fig. 11 zeigt eine Ausführungsform, bei der das Baum­ schutzsystem in die Verkehrsfläche integriert ist. Die Verbindungselemente 27 und die nicht dargestellten Eck­ elemente sind so tief verlegt, daß die in Fig. 11 links dargestellte Straßenpflasterung bündig an den Belag 8 der Rostplatten 20 anschließen kann. Fig. 11 shows an embodiment in which the tree protection system is integrated into the traffic area. The connecting elements 27 and the corner elements, not shown, are laid so deep that the road paving shown on the left in FIG. 11 can connect flush to the covering 8 of the grate plates 20 .

Claims (18)

1. Versorgungs- und/oder Sanierungsanlage für Bäume mit in den Boden eingelassenen Filter- und Düngerzellen, gekennzeichnet durch einen um eine Baumscheibe oder einen Baumrost (5) umlaufenden, aus zumindest zwei miteinander verbun­ denen Bauelementen bestehenden Bewehrungs- und/oder Versorgungsringbaukörper (1, 5), der Versorgungs­ zellen (3, 13) aufweist, die durch kanalförmige Bewässerungs- und Versorgungskammern (2, 12,) mit­ einander verbunden sind.1. supply and / or remediation plant for trees with recessed in the floor filter and fertilizer cells, characterized by a a tree disc or a tree grate (5) encircling verbun of at least two to each other which components existing reinforcement and / or supply ring structure (1 , 5 ), the supply cells ( 3 , 13 ) which are connected to each other by channel-shaped irrigation and supply chambers ( 2 , 12, ). 2. Versorgungs- und/oder Sanierungsanlage nach Anspruch 1, dadurch gekennzeichnet, daß die Bewässerungs- und Versorgungskammern (2) einen Rechteckquerschnitt aufweisen.2. Supply and / or renovation system according to claim 1, characterized in that the irrigation and supply chambers ( 2 ) have a rectangular cross section. 3. Versorgungs- und/oder Sanierungsanlage nach Anspruch 1 oder 2, dadurch gekennzeichnet, daß die Bewässerungs- und Versorgungskammern (2) wenig­ stens an der Innenwandung Öffnungen (4) aufweisen.3. Supply and / or remediation system according to claim 1 or 2, characterized in that the irrigation and supply chambers ( 2 ) have little least on the inner wall openings ( 4 ). 4. Versorgungs- und/oder Sanierungsanlage nach einem der Ansprüche 1-3, dadurch gekennzeichnet, daß die Deckenwandung der Versorgungszellen (3) Schlitz­ öffnungen (6) aufweist. 4. Supply and / or renovation system according to one of claims 1-3, characterized in that the ceiling wall of the supply cells ( 3 ) has slot openings ( 6 ). 5. Versorgungs- und/oder Sanierungsanlage nach einem der Ansprüche 1-4, dadurch gekennzeichnet, daß die Versorgungszellen (3) und/oder die Bewässerungs­ und Versorgungskammern (2) Drainrohranschlüsse auf­ weisen.5. Supply and / or renovation system according to one of claims 1-4, characterized in that the supply cells ( 3 ) and / or the irrigation and supply chambers ( 2 ) have drain pipe connections. 6. Versorgungs- und/oder Sanierungsanlage nach einem der Ansprüche 1-5, dadurch gekennzeichnet, daß der Bewehrungs- und/oder Versorgungsringbaukörper (1) einen polygonalen, insbesondere rechteckigen Grundriß aufweist.6. Supply and / or renovation system according to one of claims 1-5, characterized in that the reinforcement and / or supply ring structure ( 1 ) has a polygonal, in particular rectangular plan. 7. Versorgungs- und/oder Sanierungsanlage nach Anspruch 6, dadurch gekennzeichnet, daß die Versorgungszellen (3) in den Ecken des Polygons oder Rechtecks angeordnet sind.7. Supply and / or renovation system according to claim 6, characterized in that the supply cells ( 3 ) are arranged in the corners of the polygon or rectangle. 8. Versorgungs- und/oder Sanierungsanlage nach einem der Ansprüche 1-7, dadurch gekennzeichnet, daß der Versorgungsringbaukörper einen aus mindestens zwei Betonplatten (15, 17) bestehenden Baumrost (5) bildet, an dessen Baumrostkanten (12) die Versor­ gungszellen (3) ausgebildet sind, und daß die Be­ wässerungs- und Versorgungskammern (13) sich längs der Baumrostkanten (12) erstrecken.8. Supply and / or renovation system according to one of claims 1-7, characterized in that the supply ring structure forms an at least two concrete slabs ( 15 , 17 ) existing tree grate ( 5 ), on the tree grate edges ( 12 ) of the supply cells ( 3 ) are formed, and that the Be watering and supply chambers ( 13 ) extend along the tree grating edges ( 12 ). 9. Versorgungs- und/oder Sanierungsanlage nach Anspruch 8, dadurch gekennzeichnet, daß die Bewässerungs- und Versorgungskammern (13) an den Baumrost (5) anbetoniert sind.9. Supply and / or renovation system according to claim 8, characterized in that the irrigation and supply chambers ( 13 ) on the tree grate ( 5 ) are concreted. 10. Versorgungs- und/oder Sanierungsanlage nach Anspruch 8, dadurch gekennzeichnet, daß die Bewässerungs- und Versorgungskammern (13) an den Baumrost (5) angeklebte Kunststoffkammern sind.10. Supply and / or renovation system according to claim 8, characterized in that the irrigation and supply chambers ( 13 ) on the tree grate ( 5 ) are glued plastic chambers. 11. Versorgungs- und/oder Sanierungsanlage nach einem der Ansprüche 1-10, dadurch gekennzeichnet, daß die Baumscheibe oder der Baumrost oder der Beweh­ rungs- und/oder Versorgungsringkörper (25) von einem aus freitragenden Rostplatten (20), die auf für Baumwurzeln durchlässige Fundamente (9) verlegt sind, bestehenden Rostplattensteg umgeben ist.11. Supply and / or refurbishment system according to one of claims 1-10, characterized in that the tree slice or the tree grate or the reinforcement and / or supply ring body ( 25 ) from a cantilevered grate plates ( 20 ) on for tree roots permeable foundations ( 9 ) are laid, existing rust plate web is surrounded. 12. Versorgungs- und/oder Sanierungsanlage nach Anspruch 11, dadurch gekennzeichnet, daß die freitragenden Rostplatten (20) auf der Oberseite Längs- und/oder Querrippen (24) aufweisen.12. Supply and / or refurbishment system according to claim 11, characterized in that the self-supporting grate plates ( 20 ) on the upper side have longitudinal and / or transverse ribs ( 24 ). 13. Versorgungs- und/oder Sanierungsanlage nach einem der Ansprüche 11 oder 12, dadurch gekennzeichnet, daß die freitragenden Rostplatten (20) einen L-förmigen Grundriß haben.13. Supply and / or renovation system according to one of claims 11 or 12, characterized in that the self-supporting grate plates ( 20 ) have an L-shaped plan. 14. Versorgungs- und/oder Sanierungsanlage nach einem der Ansprüche 11-13, dadurch gekennzeichnet, daß die die Rostplatten (20) tragenden Fundamente Eck­ elemente (26) aufweisen, die mit Anschlußstutzen (28) für ein Belüftungs-, Bewässerungs- und Dünge­ system ausgerüstet sind.14. Supply and / or refurbishment system according to one of claims 11-13, characterized in that the grate plates ( 20 ) supporting foundations have corner elements ( 26 ) with connection pieces ( 28 ) for aeration, irrigation and fertilization system are equipped. 15. Versorgungs- und/oder Sanierungsanlage nach einem der Ansprüche 11-14, dadurch gekennzeichnet, daß die Rostplatte (20) mit einem Belag (8) der Ver­ kehrsflächen wie Platten, Pflaster und dergleichen, überzogen ist.15. Supply and / or refurbishment system according to one of claims 11-14, characterized in that the grate plate ( 20 ) with a covering ( 8 ) of the traffic surfaces such as plates, plasters and the like, is coated. 16. Versorgungs- und/oder Sanierungsanlage nach einem der Ansprüche 11-15, dadurch gekennzeichnet, daß die Rostplatten (20) mit Sand (29) oder Erdsubstrat (31) abgedeckt sind und auf dem Sand (29) ein Belag (8) aufgebracht oder auf dem Erdsubstrat (31) ein Rasengitter (14) verlegt ist.16. Supply and / or refurbishment system according to one of claims 11-15, characterized in that the grate plates ( 20 ) are covered with sand ( 29 ) or earth substrate ( 31 ) and a covering ( 8 ) is applied to the sand ( 29 ) or a lawn grid ( 14 ) is laid on the earth substrate ( 31 ). 17. Versorgungs- und/oder Sanierungsanlage nach Anspruch 1, gekennzeichnet durch einen Bewehrungsringbaukörper, der aus Einfassungs­ elementen (26, 27) besteht, wobei die Eckelemente (26) und die diese verbindenden Verbindungselemente (27) Anschlußstutzen (28) für ein Versorgungssystem aufweisen.17. Supply and / or refurbishment system according to claim 1, characterized by a reinforcement ring structure consisting of edging elements ( 26 , 27 ), the corner elements ( 26 ) and the connecting elements ( 27 ) connecting them having connecting pieces ( 28 ) for a supply system . 18. Versorgungs- und/oder Sanierungsanlage nach Anspruch 17, dadurch gekennzeichnet, daß die Eck- und/oder Verbindungselemente (26, 27) Stützschultern (32) zur Abstützung von Rostplatten (20) aufweisen.18. Supply and / or renovation system according to claim 17, characterized in that the corner and / or connecting elements ( 26 , 27 ) have support shoulders ( 32 ) for supporting grate plates ( 20 ).
DE19873701057 1986-02-12 1987-01-13 SUPPLY AND / OR RESTORATION SYSTEM FOR TREE Ceased DE3701057A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE19873701057 DE3701057A1 (en) 1986-02-12 1987-01-13 SUPPLY AND / OR RESTORATION SYSTEM FOR TREE

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
DE3604776 1986-02-12
DE19873701057 DE3701057A1 (en) 1986-02-12 1987-01-13 SUPPLY AND / OR RESTORATION SYSTEM FOR TREE

Publications (1)

Publication Number Publication Date
DE3701057A1 true DE3701057A1 (en) 1987-08-13

Family

ID=25840982

Family Applications (1)

Application Number Title Priority Date Filing Date
DE19873701057 Ceased DE3701057A1 (en) 1986-02-12 1987-01-13 SUPPLY AND / OR RESTORATION SYSTEM FOR TREE

Country Status (1)

Country Link
DE (1) DE3701057A1 (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE8710209U1 (en) * 1987-07-25 1987-10-29 Breitsch, Rudolf, 6781 Schindhard Tree disc
US5243782A (en) * 1992-05-04 1993-09-14 Jones Shawnee L Christmas tree watering apparatus
DE19707355C2 (en) * 1996-03-14 2002-05-29 Schwenk Betontech Gmbh & Co Precast set for creating foundations for tree grates
EP1862064A3 (en) * 2006-06-02 2008-07-16 Kronimus Ag Tree section
DE202008015908U1 (en) 2008-12-02 2010-04-15 3A Beton Gmbh & Co. Kg tree quarters
DE102011002303A1 (en) * 2011-04-28 2012-10-31 Buderus Kanalguss Gmbh Tree grate with gutter and cleaning device for irrigation and infiltration
US20140283446A1 (en) * 2013-03-22 2014-09-25 Mao-Chiang Kuo Water supply device for planting
US20170188525A1 (en) * 2016-01-06 2017-07-06 Randall Lee Paige, Sr. Tree and shrub protector reservoir

Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE85478C (en) * 1895-05-11 1896-02-21
DE1185853B (en) * 1963-08-27 1965-01-21 Karl Weidl Edging for garden beds or the like.
DE1913883A1 (en) * 1969-03-19 1970-10-08 Siemens Ag Electromagnetic brake or clutch
DE2705988A1 (en) * 1977-02-12 1978-12-21 Theodor Kilian Tree root irrigation system - features distributor head for each tree with three connections and control valve
DE7931970U1 (en) * 1979-11-13 1980-05-14 Blume, Franz, 5880 Luedenscheid TREE PROTECTION DISC
DE8028501U1 (en) * 1980-10-25 1981-02-12 Gimmler, Helmut, 6618 Wadern-Bardenbach MULTIPURPOSE FORM STONE, MOSTLY FOR THE FORMATION OF LINEAR AND ANGLED LIMITS OF BEETS, FOR USE AS BASE, PIPE CHANNELS AND THE LIKE.
DE3133420A1 (en) * 1981-08-24 1983-03-03 Josef 6531 Gensingen Fischer LIMITING ELEMENT
DE3202684A1 (en) * 1982-01-28 1983-08-04 Dieter 8548 Heideck Opitz Cover for beds around trees
DE8332080U1 (en) * 1983-11-09 1984-06-20 Dunkel, Volker, 2800 Bremen TREE VENTILATION PLATE FOR THE RENOVATION OR REPLANTING OF TREES
DE8508173U1 (en) * 1985-03-15 1985-09-12 Menzel, Gabriele, 7000 Stuttgart Construction element for a ventilation and irrigation system for trees
FR2565063A1 (en) * 1984-06-01 1985-12-06 Boyer Jean Marie Border for green areas, landscaped terraces and shuttering for works made of concrete cast at ground level, with built-in ducts for water and various cables
DE3543861A1 (en) * 1985-12-12 1986-07-10 Gerhard 4150 Krefeld Fabritz Device for the care and watering of trees
DE3534437A1 (en) * 1985-09-27 1987-04-09 Betonsteinwerk Exter Gebr Schm Paving, in particular for tree-surrounds

Patent Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE85478C (en) * 1895-05-11 1896-02-21
DE1185853B (en) * 1963-08-27 1965-01-21 Karl Weidl Edging for garden beds or the like.
DE1913883A1 (en) * 1969-03-19 1970-10-08 Siemens Ag Electromagnetic brake or clutch
DE2705988A1 (en) * 1977-02-12 1978-12-21 Theodor Kilian Tree root irrigation system - features distributor head for each tree with three connections and control valve
DE7931970U1 (en) * 1979-11-13 1980-05-14 Blume, Franz, 5880 Luedenscheid TREE PROTECTION DISC
DE8028501U1 (en) * 1980-10-25 1981-02-12 Gimmler, Helmut, 6618 Wadern-Bardenbach MULTIPURPOSE FORM STONE, MOSTLY FOR THE FORMATION OF LINEAR AND ANGLED LIMITS OF BEETS, FOR USE AS BASE, PIPE CHANNELS AND THE LIKE.
DE3133420A1 (en) * 1981-08-24 1983-03-03 Josef 6531 Gensingen Fischer LIMITING ELEMENT
DE3202684A1 (en) * 1982-01-28 1983-08-04 Dieter 8548 Heideck Opitz Cover for beds around trees
DE8332080U1 (en) * 1983-11-09 1984-06-20 Dunkel, Volker, 2800 Bremen TREE VENTILATION PLATE FOR THE RENOVATION OR REPLANTING OF TREES
FR2565063A1 (en) * 1984-06-01 1985-12-06 Boyer Jean Marie Border for green areas, landscaped terraces and shuttering for works made of concrete cast at ground level, with built-in ducts for water and various cables
DE8508173U1 (en) * 1985-03-15 1985-09-12 Menzel, Gabriele, 7000 Stuttgart Construction element for a ventilation and irrigation system for trees
DE3534437A1 (en) * 1985-09-27 1987-04-09 Betonsteinwerk Exter Gebr Schm Paving, in particular for tree-surrounds
DE3543861A1 (en) * 1985-12-12 1986-07-10 Gerhard 4150 Krefeld Fabritz Device for the care and watering of trees

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE8710209U1 (en) * 1987-07-25 1987-10-29 Breitsch, Rudolf, 6781 Schindhard Tree disc
US5243782A (en) * 1992-05-04 1993-09-14 Jones Shawnee L Christmas tree watering apparatus
DE19707355C2 (en) * 1996-03-14 2002-05-29 Schwenk Betontech Gmbh & Co Precast set for creating foundations for tree grates
EP1862064A3 (en) * 2006-06-02 2008-07-16 Kronimus Ag Tree section
DE202008015908U1 (en) 2008-12-02 2010-04-15 3A Beton Gmbh & Co. Kg tree quarters
DE102011002303A1 (en) * 2011-04-28 2012-10-31 Buderus Kanalguss Gmbh Tree grate with gutter and cleaning device for irrigation and infiltration
EP2517551A3 (en) * 2011-04-28 2017-12-06 MeierGuss Limburg GmbH Tree grate with gutter and cleaning device for watering and seepage
US20140283446A1 (en) * 2013-03-22 2014-09-25 Mao-Chiang Kuo Water supply device for planting
US20170188525A1 (en) * 2016-01-06 2017-07-06 Randall Lee Paige, Sr. Tree and shrub protector reservoir
US10798882B2 (en) * 2016-01-06 2020-10-13 Randall Lee Paige, Sr. Tree and shrub protector reservoir

Similar Documents

Publication Publication Date Title
DE29710241U1 (en) Fastening outdoor traffic areas with paving stones or slabs
EP0576939B2 (en) Plastic multiple use building element
DE102015115968A1 (en) Elastic, water-permeable floor grid
WO1987002399A1 (en) Noise-absorbing greenary-carrying structure
EP0039372B1 (en) Shaped brick for a talus
DE2146520A1 (en) Monolithic component and systems for it
DE2920873A1 (en) DEVICE FOR PLANTING TREES AND THE LIKE, IN PARTICULAR IN TRAFFIC AREAS
DE2519232C3 (en) Plantable retaining wall
DE3701057A1 (en) SUPPLY AND / OR RESTORATION SYSTEM FOR TREE
DE202017103566U1 (en) Tree protection with rainwater management
DE202005015107U1 (en) Grid plate for fixing on e.g. roads has many filling chambers for plaster element e.g. stone, plastic whereby grid plates are combined with connector at its side panel and is formed by protruding ledges and recesses provided on grid plate
DE2317216A1 (en) TREE PROTECTION MADE OF CONCRETE
DE19608143C2 (en) Precast concrete for seepage of rainwater
DE10303640A1 (en) Metal wall structure for use in e.g. landscape gardening, horticulture, has metal wall angles serially joined together through butt joints, each angle comprising of baseplate with water draining recess
DE3633914A1 (en) Turf perforated brick for improved drainage of rainwater into the subsoil
EP0141772B1 (en) Ventilation plate for sanitizing or planting trees
DE8805949U1 (en) Kit for making a root protection bridge for trees
EP0682730B1 (en) House composed of fabricated elements
DE202009001982U1 (en) Tree protection with universal support structure
DE19808092A1 (en) Tree-planting equipment alongside roads etc
EP2948601B1 (en) Prefabricated element and method for erecting a structure
DE69700174T2 (en) Box and system for thermal insulation and floor drainage
DE29604750U1 (en) Precast set for the variable design of support and / or separating devices in the building industry
DE19700247C1 (en) Ground paving plate with reinforced concrete support component
DE8808104U1 (en) Plate-shaped concrete component

Legal Events

Date Code Title Description
8180 Miscellaneous part 1

Free format text: DIE HAUPTKLASSE IST WIE ANGEGEBEN ZU BERICHTIGEN A01G 13/00

8110 Request for examination paragraph 44
8131 Rejection