[go: up one dir, main page]

DE3005484A1 - STONE BOLT ASSEMBLY - Google Patents

STONE BOLT ASSEMBLY

Info

Publication number
DE3005484A1
DE3005484A1 DE19803005484 DE3005484A DE3005484A1 DE 3005484 A1 DE3005484 A1 DE 3005484A1 DE 19803005484 DE19803005484 DE 19803005484 DE 3005484 A DE3005484 A DE 3005484A DE 3005484 A1 DE3005484 A1 DE 3005484A1
Authority
DE
Germany
Prior art keywords
resin
bolt
injection
borehole
rock
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
DE19803005484
Other languages
German (de)
Inventor
Torgny Thorsell
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Linden Alimak AB
Original Assignee
Linden Alimak AB
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Linden Alimak AB filed Critical Linden Alimak AB
Publication of DE3005484A1 publication Critical patent/DE3005484A1/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • E21D20/003Machines for drilling anchor holes and setting anchor bolts
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • E21D20/003Machines for drilling anchor holes and setting anchor bolts
    • E21D20/006Machines for drilling anchor holes and setting anchor bolts having magazines for storing and feeding anchoring-bolts

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
  • Earth Drilling (AREA)
  • Drilling And Exploitation, And Mining Machines And Methods (AREA)
  • Rock Bolts (AREA)
  • Dowels (AREA)

Description

Dipl. Phy&. Dr. rer. nat. Woltgar.g Kempe q η η c L ο /Phy &. Dr. rer. nat. Woltgar.g Kempe q η η c L ο /

PATCNTAMW^ I.TPATCNTAMW ^ I.T

Postfach 1273 O e, IOP.O. Box 1273 O e, IO

D-68OO Mannheim 1D-68OO Mannheim 1

Fernsprecher CO621) 381-4744Telephone CO621) 381-4744

13- Februar 1980 Be 2February 13, 1980 Be 2

Linden-Alimak AB 931 03 Skellefteä (Schweden)Linden-Alimak AB 931 03 Skellefteä (Sweden)

Gesteinsbolzen-MontagevorrierhtungRock bolt assembly equipment

Die- Erfindung betrifft eine Vorrichtung zurr Befestigung von von Bolzen in Gestein mit einer Gesteinsbohrmaschine., einer." Harz-Einspritzvorrichtung zur Einspritzung von Harz in ein von der Bohrmaschine gebohrtes. Loch, sowie einer Bolzen-Einführungsvorrichtung zur Einführung eines Ankerbolzens in das= Bohrloch, wobei nach Härtung des. im Bohrloch befindlichen Harzes der Bolzen im Bohrloch festgehalten ist. Insbesondere betrifft die Erfindung die Harz-Einspritzvorrichtung.The invention relates to a device for fastening of bolts in rock with a rock drill., a. "Resin injection device for injecting resin into one of the drill. Hole, as well as a bolt insertion device for the introduction of an anchor bolt into the = borehole, the bolt after hardening of the resin in the borehole is held in the borehole. In particular, the invention relates the resin injector.

Für diesen Einspritzvorgang sind bislang Harzpatronen im Gebrauch, die zwei Kammern haben, von denen die eine für die Aufnahme von Harz und die andere Kammer für die Aufnahme eines HärtungsmittelsResin cartridges have so far been used for this injection process, which have two chambers, one for containing resin and the other for containing a curing agent

in das.in the.

Prlvatanachrlft: 894O Weinheim · HolbelnstraBe 8 - Fernsprecher CO 62 OD 7 3212Prlvatanachrlft: 894O Weinheim · Holbelnstrasse 8 - Telephone CO 62 OD 7 3212

O30Ö35/07S3O30Ö35 / 07S3

Bohrloch wird der Bolzen in dieses- Bohrloch eingeführt, wobei die. Patrone aufgesprengt wird und das Harz und das Härtungsmittel aus dieseir austreten und durch Drehung des Bolzens sich miteinander vermischen können.The bolt is inserted into this borehole, whereby the. The cartridge is blown open and the resin and the hardening agent escape from this and by turning the bolt itself can mix with each other.

Die- weitgehende Mechanisierung der Arbeitsgänge- des. Bohrens, der. Einführung der vorgenannten Patronen und der. Bolzen ist mit relativ schnell arbeitenden Gesteinsbolzen-Montagevorrichtungen möglich geworden, wie sie im Bergwerks-Streckenausbau eingesetzt werden und in den französischen Patenten 1.362.691 und 77.10169 beschrieben sind.The - extensive mechanization of the work processes - the drilling, the. Introduction of the aforementioned cartridges and the. Bolt has become possible with a relatively fast operating rock bolt-mounting devices, such as those used in the mine-tunnel support and in French patents 1,362,691 and 77 .10169 are described.

Die: Verwendung von Patronen hat jedoch den Nachteil, dass, die eine spezielle Fertigung erfordernde Herstellung dieser Patronen nur mit relativ hohen Kosten möglich ist. Der..· Mechanisierung und Automatisierung der mit einer solchen Vorrichtung auszuführenden Ärbeitsschritte sind indes. Grenzen gesetzt durch die für die Handhabung und den Transport der· Patronen erforderlichen Bewegungsorgane.The: However, the use of cartridges has the disadvantage that the a special production requiring manufacture of these cartridges is only possible at relatively high costs. The .. · Mechanization and automation of those to be performed with such a device Work steps are meanwhile. Limits are set by the cartridges required for handling and transporting the cartridges Locomotor organs.

Die. vorgenannten, bekannten Vorrichtungen weisen ausserdem die Schwierigkeit auf, die Harz-Zuführungsvorrichtung und die Bolzen in einer Arbeitsachse zu zentrieren, die mit der Achse des Bohrlochs übereinstimmt. Die Ursache für diese Schwierigkeit sind die. relativ grossen Toleranzen.in den Bewegungen der verschiedenen Teile der Vorrichtung, die man in Kauf nehmen muss, um die Kosten der Vorrichtung durch unrealistisch enge Eertigungstoleranzen nicht zu erhöhen.The. aforementioned, known devices also have the Difficulty centering the resin feeder and bolts on a working axis that coincides with the axis of the Borehole matches. The cause of this difficulty is that. relatively large tolerances in the movements of the various Parts of the device that have to be accepted in order to reduce the costs of the device due to unrealistically tight manufacturing tolerances not to increase.

©30035/0763© 30035/0763

Der Erfindung liegt die Aufgabe zugrunde, eine Harz-Einspritz-Vorrichtung für eine Gesteinsbolzen-Montagevorrichtung zu schaffen, mittels welcher die Harzkosten im Vergleich zu einer.· Harz-Patronen verwendenden Vorrichtung gesenkt werden können.The invention is based on the object of a resin injection device for a rock bolt jig which reduces the cost of resin compared to a. · Resin cartridges using device can be lowered.

Eine weitere Aufgabe der. Erfindung besteht darin, diesa Harz-Einspritzvorrichtung für die vollautomatisierte Durchführung der von einer; Gesteinsbolzen-Montagevorrichtung zur Montage von einer Reihe von Ankerbolzen im Gestein nacheinander auszuführenden Arbeitsschritte zu verv/enden.Another task of the. Invention consists in this resin injection device for the fully automated implementation of one; Rock bolt assembly device for assembling a series of anchor bolts in the rock to be carried out one after the other.

Eine andere Aufgabe der Erfindung ist, Führungsorgane vorzusehen, mittels welcher die Harz-Zuführvorrichtung entlang einer von der Bohrachse des, Bohrlochs bestimmten Arbeitslinie genau geführt werden kann.Another object of the invention is to provide guide organs, by means of which the resin feed device is precisely guided along a working line determined by the drilling axis of the borehole can be.

Erfindung sgemäss. weist die Harz-Einspritzvorrichtung zwei Rohrleitungen auf für die getrennte, jedoch gleichzeitige Einspritzung eines Harzes und eines Härtungsmittels in das Bohrloch, wobei die Rohrleitungen über, jeweils eine Pumpe mit einem Harzbehälter und einem Härtemittel-Behälter verbunden sind.Invention according to. the resin injection device has two pipes for the separate but simultaneous injection of a resin and a curing agent into the borehole, with the pipelines over, each with a pump with a resin tank and a hardener container are connected.

Nachfolgend ist ein Ausführungsbeispiel des Erfindungsgegenstandes anhand der beizulegenden Zeichnung näher beschrieben. Es zeigen:
Eig. 1 eine schematische Seitenansicht eines Fahrzeugs mit einer darauf befestigten Gesteinsbolzen-Montagevorrichtung,
An exemplary embodiment of the subject matter of the invention is described in more detail below with reference to the accompanying drawing. Show it:
Prop. 1 is a schematic side view of a vehicle with a rock bolt mounting device mounted thereon;

!ig. 2, 5 und 4- teilweise, schematische Ansichten von der Seite, von oben und von der Stirnseite einer Bolzen-Bohreinheit,! ig. 2, 5 and 4- partial, schematic views from the side, from above and from the face of a bolt drilling unit,

030035/0763030035/0763

-X--X-

Fig. 5 eine Seitenansicht der Harz-Einspritzvorrichtung, die in die Vorrichtung gemäss Fig. 2-4 eingebaut ist, . ■Fig. 5 is a side view of the resin injection apparatus showing is built into the device according to FIGS. 2-4,. ■

Fig. 6 den Anschlussplan der Harz-Einspritzvorrichtung nach Fig. 5 und6 shows the connection diagram of the resin injection device Fig. 5 and

Fig. 7 die Harz-Pumpe, für die Harz-Einspritzvorrichtung in einer teilweisen Schnitt-Seitenansicht.Fig. 7 shows the resin pump, for the resin injection device in a partial sectional side view.

Das. Verbundfahrzeug nach Fig. 1 weist eine. Zugmachine 2 mit Anhänger 4- auf, auf welchem ein senkrechter Aufbau 6 mit einem hydraulischen Ausleger 8 befestigt ist. Am Ende des Auslegers ist eine Gesteinsbolzen-Montagevorrichtung 10 befestigt. Die Vorrichtung IO kann vom Ausleger 8 seitlich und vertikal bewegt werden. Die Bolzenvorrichtung IO kann ausserdem um die Längsachse- des Auslegers 8 gedreht werden.That. The composite vehicle according to FIG. 1 has a. Tractor 2 with Trailer 4- on which a vertical structure 6 with a hydraulic boom 8 is attached. At the end of the boom a rock bolt mounting device 10 is attached. The device IO can be moved laterally and vertically by the boom 8 will. The bolt device IO can also be around the longitudinal axis of the boom 8 can be rotated.

Die Bolzenvorrichtung wird von einem Längsrahmen 12 gehalten, der seinerseits um eine Querwelle 14- drehbar von dem Ausleger 8 gehalten ist. Diese Drehbewegung wird bewirkt von einem hydraulischen Zylinder 16, der zwischen dem Rahmen 12 und einem Antriebskopf 18 des Auslegers 8 wirksam ist. Der Antriebskopf 18 weist einen Antriebsmotor für die Drehbewegung des Auslegers 8 um seine Längsachse auf, der mittels eines Flansches 20 am Ende des hydraulischen Auslegers befestigt ist.The bolt device is held by a longitudinal frame 12, which in turn is rotatable about a transverse shaft 14 of the boom 8 is held. This rotary movement is caused by a hydraulic cylinder 16, which is between the frame 12 and a Drive head 18 of the boom 8 is effective. The drive head 18 has a drive motor for the rotary movement of the boom 8 about its longitudinal axis, which is fastened by means of a flange 20 at the end of the hydraulic boom.

Der Rahmen 12 weist zwei Wellenlager 22 auf, zwischen welchen ein nicht gezeigter Wellenzapfen angeordnet ist. An disem Wellenzapfen ist eine Zylinderwelle 24 drehbar befestigt. Auf der Welle 24 ist eine Befestigungsplatte 26 mittels. Flanschen 28 befestigt. Zu beiden Seiten der Welle 24 ist die Platte 26 mitThe frame 12 has two shaft bearings 22, between which a shaft journal, not shown, is arranged. On this shaft journal a cylinder shaft 24 is rotatably mounted. On the shaft 24 is a mounting plate 26 by means. Flanges 28 attached. On both sides of the shaft 24, the plate 26 is with

$30035/0753$ 30035/0753

einem Bolzenanschlusstuck 30 versehen, das mit dem Ende einer Kolbenstange 32 verbunden ist, wobei die Kolbenstange 32 zu zwei gegenläufig arbeitenden, hintereinander angeordneten Zylindern 34·, 36 führt. Eine Kolbenstange 38 des Zylinders "36 ist mit ihrem Ende an das untere Ende einer Halterung 40 befestigt, die ihrerseits am Rahmen 12 befestigt ist. a bolt connection piece 30 provided with the end of a Piston rod 32 is connected, the piston rod 32 to two oppositely working, arranged one behind the other Cylinders 34 ·, 36 leads. A piston rod 38 of the cylinder "36 is attached at its end to the lower end of a bracket 40, which in turn is attached to the frame 12.

Mittels der Zylinder 34-> 36 zu beiden Seiten des- Rahmens 12 kann die. Welle 24 um ihre. Achse gedreht v/erden, wodurch die Befestigungsplatte 26 seitlich verschwenkt werden kann.By means of the cylinder 34-> 36 on both sides of the frame 12 can. Wave 24 about hers. Axis rotated v / earth, whereby the Mounting plate 26 can be pivoted laterally.

An der Platte 26 sind Zuführungss.chienen 42 und 44 für die. Bohrvorrichtung 46 und die Bolzen-Eindrehvorrichtung 48 parallel zur Welle 24 liegend befestigt. Zwischen der Bohrvorrichtung und der Bolzen-Eindrehvorrichtung 42, 46 und 44, 48 ist eine Harz-Zuführungs-und Einspritzvorrichtung 50 angeordnet, die mit Einspritzöffnungen 52 versehen ist.On the plate 26 are feed rails 42 and 44 for the. The drilling device 46 and the bolt screwing device 48 are fastened lying parallel to the shaft 24. Between the drilling device and the bolt screwing device 42, 46 and 44, 48 has a resin feed and injection device 50 arranged therein is provided with injection openings 52.

Dia Wirkungsweise- der beschriebenen Vorrichtung ist folgende: Mittels der Bohrvorrichtung 46 wird zuerst ein Loch in die Wand eines Schachtes o.drgl. gebohrt, dessen umgebendes Gestein befestigt werden soll. Mittels der Vorrichtung 50 wird diesea Bohrloch mit einem schnell härtenden Harz gefüllt, worauf schlauch ein Sicherungsbolzen in das mit Harz gefüllte Loch mit den· Vorrichtung 48 eingedreht wird. Am vorderen Ende des Rahmens 12 ist eine Zentriervorrichtung angeordnet, mittels welcher, alle drei vorgenannten Arbeitsgänge auf eine. Arbeitsachse 54 ausgerichtet werden können. Die Grobeinstellung auf diese Achse, von der Bohrstange, von der Harz-Zuführeinrichtung undThe mode of operation of the device described is as follows: By means of the drilling device 46, a hole is first made in the wall of a shaft or the like. drilled its surrounding rock should be attached. By means of the device 50 this is a The borehole is filled with a fast-setting resin, followed by a hose a safety bolt is screwed into the resin-filled hole with the device 48. At the front end of the frame 12 a centering device is arranged, by means of which, all three of the aforementioned operations on one. Working axis 54 can be aligned. The coarse adjustment on this axis, of the boring bar, of the resin feeder and

fi30Q36/Q7*3fi30Q36 / Q7 * 3

von dem Bolzen wird bewirkt durch seitliches Verschwenken der Halteplatte. 26 mittels der. beiden Zylinder-Paare 34, 36. Die Bohrmaschine 26, die Bolzen-Einführvorrichtung 48 und die Harz-Zuführeinrichtung 50 sind mittels jeweils einer nichtige ze igten Antriebskette auf ihren jeweiligen Führungsschienen nach vorn und mit Hilfe- der Zentriervorrichtung auf der Arbeitsachse 54 entlang bewegbar, in einer Weise, die im Zusammenhang mit Ge. Steinsbohrmaschinen bereits bekannt ist.of the bolt is effected by pivoting the sideways Retaining plate. 26 using the. two cylinder pairs 34, 36. The Drill 26, the bolt inserter 48 and the resin feeder 50 are shown by means of a void each Drive chain on their respective guide rails forwards and with the aid of the centering device on the working axis 54 movable along, in a manner related to Ge. Stone drilling machines is already known.

Die Zentriervorrichtung besteht aus einem am Rahmen 12 befestigten Bookman welchem ein Anschlag 56, z.B. aus Hartgummi, und eine. Zentrierbüchse 57 befestigt sind. Die Achse der Zentrier> büchse 57 und die Arbeitsachte. 54 fluchten miteinander, wobei die Zentrierbüchse 57 axial geschlitzt ist in einer·Ebene,auf auf der im wesentlichen die Achsa 5^ und die Längsachse des Rahmens 12 liegen.The centering device consists of a device attached to the frame 12 Bookman which a stop 56, e.g. made of hard rubber, and one. Centering sleeve 57 are attached. The axis of the centering> rifle 57 and the labor eight. 54 are aligned with each other, with the centering sleeve 57 is axially slotted in a plane on which essentially the axis 5 ^ and the longitudinal axis of the Frame 12 lie.

Die Zentrierbüchse weist an ihrer einen Stirnseite eine axial geschlitzte, trichterförmige Erweiterung 57' auf, deren beide Hälften jeweils an dem entsprechenden Büchsenbereich befestigt sind. Am anderen Ende ist die Zentrierbüchae mit einem ebenfalls axial geschlitzten Schutztrichter· 58 versehen, dessen beide Hälften ebenfalls mit dem entsprechenden Büchsenbereich verbunden sind. Die. Hälften der. Zentrierbüchse 57 mit den trichterförmigen Bereichen 58 und 57" sind am Rahmen 55 schwenkbar· befestigt und von einem Hydraulik-Zylinder 59auseinander wegschwenkbar.The centering bushing has an axial face on one of its faces slotted, funnel-shaped extension 57 ', both of which Halves are each attached to the corresponding sleeve area. At the other end there is also the centering bush with one axially slotted protective funnel 58, both of which Halves are also connected to the corresponding sleeve area. The. Halves of the. Centering sleeve 57 with the funnel-shaped Areas 58 and 57 ″ are pivotably attached to the frame 55 and pivotable away from one another by a hydraulic cylinder 59.

Die vorgenannten Arbeitschritte zur Befestigung eines Bolzens in die Gesteinswand erfolgen, nachdem die Vorrichtung in StellungThe aforementioned work steps for fastening a bolt into the rock wall are carried out after the device is in position

©30035/0753© 30035/0753

gebracht ist, wobei der Anschlag 56 in feste Anlage an die Wand gebracht wird und zwar so, dass die Arbeitsachse 54 auf die Aahse des. zu bohrenden Loches ausgerichtet wird. Die Zentrierbüchse 57 mit ihren trichterförmigen Enden 57' und 58 ist normalerweise geschlossen und dient dazu, mit ihrem nach hinten gerichteten Führungstrichter 57- die Bohrstange, die Harz-Zuführvorrichtung und die Bolzen zu führen, wenn die- entsprechenden Arbeitsg-änge anlaufen. Den Eührungstrichter 57' ist gross- genug, um die zusätzlichen Grob-Toleranzen der V.orrichtung, die durch das Verschwenken der drei vorgenannten Einheiten um die. Wellenachse 24 in ihre nur grob ausgerichtetenis brought, the stop 56 in firm contact with the wall is brought in such a way that the working axis 54 on the Aahse of the hole to be drilled is aligned. The centering sleeve 57 with its funnel-shaped ends 57 'and 58 is normally closed and serves with its rearwardly directed guide funnel 57- the drill rod, the resin feeder and to guide the bolts when the corresponding work steps start. The feed hopper 57 'is large enough to meet the additional rough tolerances of the device, by pivoting the three aforementioned units around the. Shaft axis 24 in their only roughly aligned

entstehen,
Arbeitsstellungen/auszugleichen.
develop,
Work positions / to compensate.

Manchmal kann es erforderlich sein, Bolzen zu verwenden, die an ihrem äusseren Ende, eine Ankerplatte aufweisen, um die Gesteinswand in der herkömmlichen Weise zu befestigen. In solchen Fällen wird der Bolzen mit der an seinem rückwärtigen Ende, befestigten Ankerplatte durch die Zentrierbüchse 57 in das. Bohrloch eingeführt, wobei der Durchgang der Ankerplatte durch die Zentrier-büchse dadurch ermöglicht wird, dass die beiden Büchsenhälften von dem Hydraulikzylinder.- 59 auseinandergeklappt werden.Sometimes it may be necessary to use bolts that have an anchor plate at their outer end in order to secure the To fix the rock wall in the traditional way. In such cases, the bolt with the one on its rear End, attached anchor plate through the centering sleeve 57 Introduced into the borehole, the passage of the anchor plate through the centering sleeve being made possible in that the two sleeve halves of the hydraulic cylinder.- 59 unfolded will.

Während des. Betriebes ist das. Innere des- Schutztrichters 58 an eine Saugleitung angeschlossen zwecks Absaugung des herausgebohrten Materials.The interior of the protective funnel 58 is during operation connected to a suction line for the purpose of suctioning off the drilled out Materials.

Mit der Zuführungsschiene 44-, auf gleicher Seite ist auch ein Bolzenmagazin 60 angeordnet.With the feed rail 44-, there is also a on the same side Bolt magazine 60 arranged.

Ö30Ö36/0763Ö30Ö36 / 0763

In der schwedischen Patentanmeldung 7901617-6, eingereicht am 22. Februar 1979, ist das Bolzenmagazin und seine Funktion genauer beschrieben.In Swedish patent application 7901617-6, filed on February 22nd, 1979, the bolt magazine and its function are described in more detail.

Die Harz-Einspritzvorrichtung 50 weist eine Zuführschiene 62 auf, die u.a. mittels einer Halteplatte 64 mit den Führungsschienen 42 und 44· verbunden ist. In der Nähe der Platte 64 ist das Gehäuse 66 eines hydraulischen Rotäionsmotors an der Schiene 62 befestigt. Der Hydraulik-Motor treibt ein KettenradThe resin injection device 50 has a feed rail 62 on, inter alia by means of a retaining plate 64 with the guide rails 42 and 44 · is connected. In the vicinity of the plate 64 is the housing 66 of a hydraulic rotary motor on the Rail 62 attached. The hydraulic motor drives a sprocket

7272

68 und dieses eine über ein weiteres Kettenrad/laufende Antriebs-Kette 70 an, an welcher ein in der Schiene 62 laufender Schlitten 74 befestigt ist.68 and this one over another sprocket / running drive chain 70 on which a carriage running in the rail 62 74 is attached.

Am Schlitten 74 ist das eine Ende eines Doppelrohres befestigt, das im wesentlichen die gleiche Länge wie die Eührungsscniene 62 hat. Dieses Doppelrohr besteht aus einem Aussenrohr 76, in dem ein inneres Rohr 78 koaxial angeordnet ist. An den am Schlitten 74 befestigten Ende weisen die Rohre 76, 78 nach oben gebogene Bereiche mit Verbindungselementen 80, 82 auf, an welchen flexible Zuführungsleitungen 84, 86 anschliessbar sind. Am Auslassende des Doppelrohres ragt das Innenrohr 78 ein kurzes Stück aus dem Aussenrohr 76 heraus und ist von Streben 88 koaxial zum Aussenrohr gehalten. Das Aussenrohr 76 ist in einem zylinderförmigen Gehäuse 90 geführt, das an der Schiene 62 befestigt ist. Im Gehäuse 90 sind über die ganze Länge elektrische Heizwicklungen angeordnet.One end of a double tube is attached to the slide 74, which is substantially the same length as the guide rail 62. This double tube consists of an outer tube 76, in which an inner tube 78 is arranged coaxially. To the on Slide 74 attached end, the tubes 76, 78 face up curved areas with connecting elements 80, 82, to which flexible supply lines 84, 86 can be connected. At the outlet end of the double tube, the inner tube 78 protrudes a short one Piece out of the outer tube 76 and is held by struts 88 coaxially to the outer tube. The outer tube 76 is in a cylindrical shape Housing 90 out, which is attached to the rail 62. In the housing 90 there are electrical heating coils over the entire length arranged.

Von einer Kolbenpumpe 9^ wird" aus einem Behälter 92 über eineFrom a piston pump 9 ^ is "from a container 92 via a

Leitung 84 Harz in die Leitung 76 gefördert. Die Leitung 78 erhält ein ausLine 84 promoted resin into line 76. The line 78 gets an out

030036/07^3030036/07 ^ 3

ß ' ß ' 3 O O F 4 8 43 O O F 4 8 4

einem Behälter 9° von einer Schraubenpumpe 97 durch eine Leitung 86 gefördertes Härtungsmittel für das-Harz. Das Härtemittel und das Harz sind so beschaffen, dass sie nach ihrer Vermischung rasch aushärten. Das Harz ist beispielsweise ein niedrig viskoser, tixotroper Polyester, der durch das Härtemittel rasch aushärtet.a container 9 ° from a screw pump 97 through a conduit 86 promoted hardener for the resin. The hardener and the resins are made in such a way that they harden quickly after they have been mixed. The resin is, for example, a low viscosity, thixotropic polyester, which hardens quickly due to the hardening agent.

Die Pumpe 94 wird von einem hydraulischen Motor 98 und die Pumpe 97 von einem hydraulischen Motor 99 angetrieben, i'igur zeigt ein Hydraulik-Diagramm für die beiden hydraulischen Motoren. In Fig 1 sind die Anordnungen des Behälters 92 und der Pumpe auf dem Anhänger 4 dargestellt.The pump 94 is driven by a hydraulic motor 98 and the Pump 97 driven by a hydraulic motor 99, i'igur shows a hydraulic diagram for the two hydraulic motors. In Fig. 1, the arrangements of the container 92 and the pump are shown on the trailer 4.

Die Pumpe 94 ist mit einer Einlassleitung 100 verbunden, die vom Boden des Behälters 92 über ein federbelastetes, gegen die Einlassrichtung schliessendes Ventil 104 in die Kammer eines Zylinders 103 führt.The pump 94 is connected to an inlet line 100, from the bottom of the container 92 via a spring-loaded, against the inlet direction closing valve 104 leads into the chamber of a cylinder 103.

Am Ende des Zylinders 103 ist koaxial dazu ein hydraulischer Zylinder 106 befestigt. Der Zylinder 106 weist an seinem Ende Einlasse 108, 110 für die Hydraulikflüssigkeit sowie Einlass-Anschlüsse 112, 114 hierfür auf. Die Zylinder 103, 106 weisen jeweils einen Kolben 116, 118 auf, die durch eine gemeinsame Kolbenstange 120 miteinander verbunden sind, wobei die Kolbenstange durch einen Dichtungsring 122 hindurchgeführt ist. Aus dem freien Ende des Zylinders 106 ragt eine durch eine Dichtung geführte, axial verstellbare Btange 124 heraus, die mittels einer Einstellmutter 128 und einer Kontermutter 130 relativ zum Zylinder 106 einstellbar ist.A hydraulic cylinder 106 is fastened coaxially to the end of the cylinder 103. The cylinder 106 points at its end Inlets 108, 110 for the hydraulic fluid and inlet connections 112, 114 for this. The cylinders 103, 106 each have a piston 116, 118, which by a common Piston rod 120 are connected to one another, the piston rod being passed through a sealing ring 122. the end the free end of the cylinder 106 protrudes an axially adjustable rod 124 guided through a seal, which by means of an adjusting nut 128 and a lock nut 130 relative to the Cylinder 106 is adjustable.

Ö3003E70753Ö3003E70753

Am Einlassende des Zylinders 103 befindet sich ein radial angeordneter Auslasstutzen 132, in welchem ein gegen die Auslassrichtung schliessendes und federbelastetes Ventil. 134 angeordnet ist.At the inlet end of the cylinder 103 is a radially arranged one Outlet nozzle 132, in which a spring-loaded valve that closes against the outlet direction. 134 arranged is.

Wenn im Betriebszustand ein Bohrloch mit Harz ausgegossen werden soll, wird das Doppelrohr 76, 78 durch die Zentrierbüchse hindurch nach vorne gebracht und bis zum Ende des Bohrlochs in: dieses eingeführt, worauf die Eumpen 94,97 i-n Funktion gesetzt werden, wobei gleichzeitig und sukzessiv das Doppelrohr 76, 78 aus dem Bohrloch herausgezogen wird. Im Betriebszustand der Pumpe 94 wird mittels des Kolbens 118 des hydraulischen Motors 98 der Kolben 116 nach rechts in Eig. 7 bewegt, wobei eiiB Saugwirkung entsteht, die das Ventil 104 von seinem Sitz abhebt und das Ventil 134 gegen seinen Sitz andrückt. Hierdurch wird eine Charge- von Harz aus dem Behälter 92 durch das Einlassventil in die Zylinderkammer 102 gefördert. Die Liefermenge wird bestimmt durch die Länge des Hubes des hydraulischen Kolbens 118, wobei der Hub seinerseits durch die beiden als Anschlag dienenden Muttern 128, 130 der Einstellstange 126 bestimmt wird. Der Ausstoss der in den Zylinder 102 gesaugten Charge ungehärteten Harzes geschieht dadurch, dass der Kolben 116 mittels des hydraulischen Motors 98 nach links in Fig. 7 bewegt wird, wodurch dasWhen a borehole is to be filled with resin in the operating state, the double pipe 76, 78 brought by the centering pass to the front and to the end of the borehole is: whereupon the Eumpen be set in function of this introduced 94,97, while simultaneously and successively the double pipe 76, 78 is withdrawn from the borehole. In the operating state of the pump 94, the piston 116 is moved to the right by means of the piston 118 of the hydraulic motor 98 in FIG. 7 moves, wherein eiiB suction occurs, which lifts the valve 104 from its seat and presses the valve 134 against its seat. As a result, a batch of resin is conveyed from the container 92 through the inlet valve into the cylinder chamber 102. The delivery quantity is determined by the length of the stroke of the hydraulic piston 118, the stroke in turn being determined by the two nuts 128, 130 of the adjusting rod 126, which serve as stops. The charge of uncured resin sucked into the cylinder 102 is ejected in that the piston 116 is moved to the left in FIG. 7 by means of the hydraulic motor 98, whereby the

gedrückt
Ventil 104 gegen seinen Sitz/und das Ventil 134 von seinem Sitz
pressed
Valve 104 against its seat / and valve 134 from its seat

abgehoben wird.is lifted.

Die Bewegung der hydraulischen Motoren 98, 99 der beiden Pumpen 94, 98 ist synchronisiert, sodass das. Harz und das Härtemittel gleichzeitig aus dem Doppelrohr austritt. Ausserdem erfolgt mitThe movement of the hydraulic motors 98, 99 of the two pumps 94, 98 is synchronized, so that the resin and the curing agent emerges from the double pipe at the same time. Also takes place with

Ü30Ö3S/0753Ü30Ö3S / 0753

und in dieser Synchronisation auch der Antrieb des Schlittens Die Rohre 76, 78 werden fortlaufend mit dem Har^z und dem Härtemittel beaufschlagt, und zwar auch zwischen den einzelnen Ein-and in this synchronization also the drive of the carriage. The tubes 76, 78 are continuously filled with the resin and the hardening agent applied, even between the individual

der Eüllmaterialien spritzvorgängen, wobei eine Vorwärmung/von der im Zylinder befindlichen Heizwindung erfolgt,bevor der nächste Einspritzvorgang beginnt, nämlich während ein Bolzen in ein mit Harz und Härter bereits gefülltes Bohrloch eingeführt und ein nächstes Loch gebohrt wird. Bei Bedarf ist es deshalb möglich, die Aushärtungszeit eines Teils des das Bohrloch ausfüllenden Harzes, nämlich das sich am Grund des Bohrlochs befindliche Harz, zu reduzieren, mit der Eolge, dass der Bolzen sofort nach seiner Einführung in das Bohrloch festklebt. Während der Einführung des Bolzens wird dieser gleichzeitig gedreht, sodasa sich da.^: Harz und der Härter miteinander vermischen können. Möglicherweise kann der Bolzen auch nachträglich noch für eine kurze Zeit verdreht werden, wobei diese Zeit dann von einem Zelt-Relais geregelt werden muss.of the enveloping materials injection processes, with a preheating / of the in the cylinder located heating coil takes place before the next injection process begins, namely while a bolt is inserted into a drill hole already filled with resin and hardener, and another Hole is drilled. If necessary, it is therefore possible to reduce the hardening time of part of the resin filling the borehole, namely to reduce the resin at the bottom of the borehole, with the consequence that the bolt immediately after its Introduction to the borehole stuck. During the introduction of the bolt, it is turned at the same time, so that it is there. ^: Resin and hardener can mix together. Possibly the bolt can also be used for a short time afterwards Time can be turned, whereby this time must then be controlled by a tent relay.

Die hydraulischen Kreisläufe der drei Hydraulik-Motoren 66, 98, 99 für· die Harz-Einspritzvorrichtung können, wie vorerwähnt, bei Bedarf so zusammengeschlossen werden, dass ihre Arbeitsgänge miteinander synchronisiert und/oder koordiniert sind. Auch lassen sich diese drei Hydraulik-Kreisläufe ihrerseits in ein grösseres Hydraulik-System einbeziehen, das alle Hydraulik-Kreislaufe der Gesteinsbolzen-Montagevorrichtung enthält, womit die Koordination und/oder Synchronisation der Operationen der Bohrmaschine, der Harz-Einspritzvorrichtung und der Bolzen-Einsetzvorrichtung hergestellt werden kann. Dieses ,'wiederum geregelt werden mit kontaktlosen, induktiven Sensoren beispielsweise, welche - angebracht an den verschiedeiHibeweglichen Teilen -The hydraulic circuits of the three hydraulic motors 66, 98, 99 for the resin injection device, as mentioned above, If necessary, they can be combined in such a way that their operations are synchronized and / or coordinated with one another. Even these three hydraulic circuits can in turn be included in a larger hydraulic system that includes all hydraulic circuits the rock bolt assembly device, thereby coordinating and / or synchronizing the operations of the Drilling machine, the resin injection device and the bolt inserting device can be manufactured. This, 'in turn are controlled with contactless, inductive sensors, for example, which - attached to the various moving parts -

030035/0753030035/0753

-xT--xT-

die Ventile des Hydraulik-Systems betätigen. Mit Hilfe eines Arbeitsprogramms kann eine vollständige Automatisierung der nacheinander erfolgenden Einführung der im Magazin 60 befindlichen Bolzen (sechs Stück im gezeigten Beispiel) erreicht werden, auch unter Berücksichtigung der vorerwähnten schwedischen Patentanmeldung. Bei einer solchen automatisierten Arbeitsweise kann das Bedienungspersonal entfernt von der Arbeitsstelle geschützt
/ in der Fahrzeugkabine des Fahrzeugs 2 bleiben.
operate the valves of the hydraulic system. With the aid of a work program, complete automation of the successive introduction of the bolts located in the magazine 60 (six in the example shown) can be achieved, also taking into account the aforementioned Swedish patent application. With such an automated mode of operation, the operating personnel can be protected remotely from the work site
/ Remain in the vehicle cabin of vehicle 2.

Die Verwirklichung des oben kurz erwähnten Hydraulik-Regelungssystem mit Fositions-Sensoren und Arbeitsprogramm kann von einem Fachmann auf diesem Gebiet erfolgen.The realization of the hydraulic control system briefly mentioned above with position sensors and work program can be done by a person skilled in the art.

©30035/O7S3© 30035 / O7S3

Claims (1)

Patentansprüche:Patent claims: 1. Vorrichtung zur Befestigung von Bolzen in Gestein, mit einer Gesteins-Bohrmaschine, einer Harz-Einspritzvorrichtung zur Einspritzung von Harz in ein von der Bohrmaschine gebohrtes Loch, sowie einer Bolzen-Einführvorrichtung zur Einführung eines Ankerbolzens in das Bohrloch, dadurch gekennzeichnet, dass die Harz-Einspritzvorrichtung zwei Rohrleitungen (76»78) aufweist für die separate jedoch gleichzeitige Einspritzung eines Harzes und eines Härtungsmittels in das Bohrloch, wobei die Rohrleitungen über jeweils eine Pumpe (9^-,89) an einen Harz-Behälter (92) und einen Härtemittel-Behälter (96) entsprechend angeschlossen sind.1. Device for fastening bolts in rock, with a rock drill, a resin injection device for Injection of resin into a hole drilled by the drill and a bolt inserter for insertion an anchor bolt into the borehole, characterized in that the resin injection device has two pipes (76 »78) has for the separate but simultaneous injection a resin and a curing agent into the borehole, the pipelines each having a pump (9 ^ -, 89) are connected to a resin container (92) and a hardener container (96), respectively. 2. Vorrichtung nach Anspruch 2, dadurch gekannzeichnet, dass die Leitungen (76,78) auf einer Zuführungsschiene(62) in ihrer Längsrichtung nach vorn bewegbar sind.2. Apparatus according to claim 2, characterized in that the lines (76,78) on a feed rail (62) in can be moved forward in their longitudinal direction. 3. Vorrichtung nach Anspruch 1 oder 2, dadurch gekennzeichnet,3. Device according to claim 1 or 2, characterized in that (90)(90) dass eine Heizvorrichtung/vorgesehen ist zum Vorheizen der Rohre (76,78) und ihres Inhalts vor dessen Einspritzung in das Bohrloch.that a heating device / is provided for preheating the tubes (76,78) and their contents prior to their injection into the borehole. . Vorrichtung nach den Ansprüchen 2 und 3, dadurch gekennzeichnet, dass am vorderen Ende der Zuführungsschiene die Heizvorrichtung befestigt ist, die als Führungsrohr (90) ausgebildet und mit einem Heizorgan versehen ist.. Device according to Claims 2 and 3, characterized in that that the heating device is attached to the front end of the feed rail, which acts as a guide tube (90) is formed and provided with a heating element. 030035/07S3030035 / 07S3 5. Vorrichtung nach mindestens einem der Ansprüche 1 bis 4, dadurch gekennzeichnet, dass die Leitungsrohre (76,78) koaxial ineinander angeordnet sind, wobei das innere Rohr5. Device according to at least one of claims 1 to 4, characterized in that the line pipes (76,78) are arranged coaxially one inside the other, the inner tube (78) mit seinem vorderen Ende ein kurz.es Stück aus dem äusseren Rohr (76) herausragt, und dass das innere Rohr an einem Härtemittel-Behälter (96) und der Zwischenraum zwischen beiden Rohren an einem Harz-Behälter (92) angeschlossen sind.(78) protrudes a short distance from the outer tube (76) with its front end, and that the inner tube on a Hardener container (96) and the space between the two tubes are connected to a resin container (92). 6. Vorrichtung nach mindestens einem der Ansprüche 1 bis 5» dadurch gekennzeichnet, dass die Harz-Einspritzpumpe (9*0 eine Kolbenpumpe ist mit einem Kolben (116) und einer Kolbenstange (100), welch letztere mit einem in einem Hydraulik-Zylinder (106) laufenden Kolben (118) zum Antrieb des Kolbens der Harz-Pumpe verbunden ist.6. Device according to at least one of claims 1 to 5 » characterized in that the resin injection pump (9 * 0 a piston pump is with a piston (116) and a piston rod (100), the latter with a piston (118) running in a hydraulic cylinder (106) connected to drive the piston of the resin pump. 7. Vorrichtung nach Anspruch 2, dadurch gekennzeichnet, dass, der Hydraulik-Motor (66) zur Vorwärtsbewegung der Rohrleitungen (76,78) und die beiden Hydraulik-Motoren (98,99) für: die Harz - und Härtemittel - Einspritz-Pumpen (94,97) in einem gemeinsamen Hydraulik-Regelkreis für die Koordination7. The device according to claim 2, characterized in that, the hydraulic motor (66) for moving the pipes (76,78) forward and the two hydraulic motors (98,99) for: the resin and hardener injection pumps (94.97) in a common hydraulic control circuit for coordination und SynchroniStion der Operationen der drei Motoren zusammengeschlossen sind.and synchronization of the operations of the three engines are. 8. Vorrichtung naah Anspruch 7> dadurch gekennzeichnet, dass die Hydraulik-Motoren zum Antrieb der Gesteinsbohrmaschine (46) und der Bolzen-Einführvorrichtung (60) ebenfalls in dem gemeinsamen Hydraulik-Regelkreis mit eingeschlossen sind, wobei kantaktlose Sensoren zur Ermittlung der Position der beweglichen Teile der Vorrichtung für die Betätigung der8. Device near claim 7> characterized in that the hydraulic motors drive the rock drilling machine (46) and the bolt insertion device (60) are also included in the common hydraulic control circuit, wherein contactless sensors for determining the position of the moving parts of the device for the actuation of the $30035/0753$ 30035/0753 Ventile und ihre Regelung im gemeinsamen Hydraulikkreis vorgesehen sind.Valves and their regulation in the common hydraulic circuit are provided. 9. Vorrichtung nach Anspruch 1, bei welcher die Gesteins-Bohrmaschine (46), die Rohrleitungen (76,78) und die Eolzen-9. The apparatus of claim 1, wherein the rock drilling machine (46), the pipelines (76,78) and the Eolzen- (12) fiinführvorrlchtung auf einen Rahmen/befestigt sind,nahe einer Arbeitslinie,entlang welcher die Arbeitsschritte stattfinden sollen, wobei ein Anschlag (56) vorgesehen ist, der in Anlage an die Gesteinswand, in die ein Bohrloch anzubringen ist, bringbar ist, wodurch der Rahmen (12) in seiner Stellung relativ zur Gesteinswand genau eingestellt ist, dadurch gekennzeichnet, dass eine Zentriervorrichtung (57-59) vorgesehen ist, die zur genauen Führung der Bohrstange, der Rohrleitungen (76,78) und der Bolzen auf einer Arbeitslinie (5^0 dient, welche Zentriervorrichtung mindestens beim Beginn der Arbeitsschritte relativ zum Anschlag (56) fest eingestellt ist.(12) infeed devices are attached to a frame / close to a Work line along which the work steps take place should, a stop (56) is provided, which is in contact with the rock wall in which a borehole is to be made, can be brought, whereby the frame (12) is precisely adjusted in its position relative to the rock wall, thereby characterized in that a centering device (57-59) is provided for the precise guidance of the drill rod, the pipelines (76,78) and the bolt on a working line (5 ^ 0 serves, which centering device is fixedly set relative to the stop (56) at least at the beginning of the work steps is. 10. Vorrichtung nach Anspruch 9, dadurch gekennzeichnet, dass die Zentriervorrichtung von Eührungstrichtern (57»57') gebildet ist, die am Rahmen (12) koaxial zu den· gemeinsamen Arbeitslinei C54) befestigt sind.10. The device according to claim 9, characterized in that the centering device of guide funnels (57 »57 ') is formed on the frame (12) coaxially to the · common Working lines C54) are attached. 11. Vorrichtung nach Anspruch 10, dadurch gekennzeichnet, dass die Trichter (57»57') durch einen Längsschlitz zweigeteilt sind, wobei die beiden Hälften den· Trichter nach aussen voneinander wegklappbar sind.11. The device according to claim 10, characterized in that the funnel (57 »57 ') divided into two by a longitudinal slot The two halves of the funnel can be folded away from one another outwards. 03003B/075303003B / 0753
DE19803005484 1979-02-22 1980-02-14 STONE BOLT ASSEMBLY Withdrawn DE3005484A1 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SE7901616A SE417742B (en) 1979-02-22 1979-02-22 DEVICE FOR BULT DRILLING DEVICE

Publications (1)

Publication Number Publication Date
DE3005484A1 true DE3005484A1 (en) 1980-08-28

Family

ID=20337373

Family Applications (1)

Application Number Title Priority Date Filing Date
DE19803005484 Withdrawn DE3005484A1 (en) 1979-02-22 1980-02-14 STONE BOLT ASSEMBLY

Country Status (8)

Country Link
JP (1) JPS55117000A (en)
AU (1) AU5577980A (en)
DE (1) DE3005484A1 (en)
FI (1) FI800508A7 (en)
FR (1) FR2449778A1 (en)
GB (1) GB2043748B (en)
NO (1) NO800480L (en)
SE (1) SE417742B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0126046A1 (en) * 1983-04-12 1984-11-21 Atlas Copco Aktiebolag A method of rock bolting, and a device, and a roof bolting apparatus
DE3421389A1 (en) * 1983-06-13 1984-12-13 Osakeyhtiö Tampella AB, Tampere METHOD AND DEVICE FOR SUPPLYING CEMENTING AGENT INTO A HOLE WHILE ANCHORING A ROCK BY CEMENTING
AT384860B (en) * 1983-06-30 1988-01-25 Ver Edelstahlwerke Ag ANCHOR DRILLING AND SETTING DEVICE
US4732509A (en) * 1985-11-07 1988-03-22 Oy Tampella Ab Method and a device for feeding concrete into a drill hole in the concrete boiling of a rock
AT393537B (en) * 1989-10-25 1991-11-11 E & Pk Ingbuero Drill
CN102536117A (en) * 2012-01-31 2012-07-04 中国水利水电第七工程局有限公司 Machine-mounted type multipurpose anchor rod drilling machine
CN104912484A (en) * 2015-04-21 2015-09-16 王发秀 Fully automatic anchor rod drill carriage for coal mine

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CH636703A5 (en) * 1980-10-01 1983-06-15 Sapal Plieuses Automatiques DOSING MACHINE FOR PRODUCTS OF LIQUID CONSISTENCY WITH PASTE.
SE466067B (en) * 1990-12-03 1991-12-09 Atlas Copco Constr & Mining Rock bolting DEVICE
FR2739134B1 (en) * 1995-09-25 1997-12-05 Montabert Ets DRILLING AND BOLTING APPARATUS FOR DIGGING AND SUPPORTING GALLERIES
CN103397894B (en) * 2013-07-29 2015-05-13 三一重型装备有限公司 Anchor mechanism and engineering machinery with same
SE539411C2 (en) 2014-07-03 2017-09-19 Skanska Sverige Ab Method and arrangement for mounting bolts in a tunnel wall
PE20231876A1 (en) * 2016-09-02 2023-11-24 J Lok Co PUMPABLE RESIN SYSTEM
US11156217B2 (en) 2017-11-10 2021-10-26 J-Lok Co. Hydraulic and control system for resin injection
CN113859983A (en) * 2021-09-27 2021-12-31 张家口宣化华泰矿冶机械有限公司 Resin cartridge conveying device
CN115258810B (en) * 2022-07-20 2024-02-09 中煤科工集团西安研究院有限公司 Reciprocating type tubular part conveying device for coal mine and control method
CN115263389B (en) * 2022-07-20 2025-04-08 中煤科工集团西安研究院有限公司 A resin anchor hose delivery system and method for coal mines
CN119754824B (en) * 2024-12-20 2025-11-21 中煤科工(天津)岩层智控科技有限公司 Drilling and anchoring integrated construction method

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR1362691A (en) * 1963-04-26 1964-06-05 Gardner Denver Co Machine for installing mine tunnel roof support bolts
US3302410A (en) * 1965-10-20 1967-02-07 American Cyanamid Co Rock bolting package usage
US3861155A (en) * 1972-12-05 1975-01-21 Atomic Energy Commission Pumpable rockbolt method
FR2385894A1 (en) * 1977-03-30 1978-10-27 Secoma Mine gallery bolt setting machine - has magazine with feed mechanism using twin chains with links shaped to advance bolts

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0126046A1 (en) * 1983-04-12 1984-11-21 Atlas Copco Aktiebolag A method of rock bolting, and a device, and a roof bolting apparatus
DE3421389A1 (en) * 1983-06-13 1984-12-13 Osakeyhtiö Tampella AB, Tampere METHOD AND DEVICE FOR SUPPLYING CEMENTING AGENT INTO A HOLE WHILE ANCHORING A ROCK BY CEMENTING
AT384860B (en) * 1983-06-30 1988-01-25 Ver Edelstahlwerke Ag ANCHOR DRILLING AND SETTING DEVICE
US4732509A (en) * 1985-11-07 1988-03-22 Oy Tampella Ab Method and a device for feeding concrete into a drill hole in the concrete boiling of a rock
AT393537B (en) * 1989-10-25 1991-11-11 E & Pk Ingbuero Drill
CN102536117A (en) * 2012-01-31 2012-07-04 中国水利水电第七工程局有限公司 Machine-mounted type multipurpose anchor rod drilling machine
CN102536117B (en) * 2012-01-31 2015-08-19 中国水利水电第七工程局有限公司 Machine-mounted type multipurpose anchor rod drilling machine
CN104912484A (en) * 2015-04-21 2015-09-16 王发秀 Fully automatic anchor rod drill carriage for coal mine

Also Published As

Publication number Publication date
SE417742B (en) 1981-04-06
GB2043748B (en) 1983-01-12
JPS55117000A (en) 1980-09-08
GB2043748A (en) 1980-10-08
FI800508A7 (en) 1981-01-01
SE7901616L (en) 1980-08-23
AU5577980A (en) 1980-08-28
FR2449778A1 (en) 1980-09-19
NO800480L (en) 1980-08-25

Similar Documents

Publication Publication Date Title
DE3005484A1 (en) STONE BOLT ASSEMBLY
EP0396696B1 (en) Process for repairing an inaccessible domestic pipe using a remote-controlled device operating in the main
DE3882953T2 (en) Ram drilling machine with control valve.
DE2935126C2 (en) Injection and drill rod
DE2952877C2 (en)
DE69406156T2 (en) Process for driving pipes into the ground
DE2832517A1 (en) COUPLING FOR UNDERWATER DRAIN PIPES
DE2514909C3 (en) Method and apparatus for connecting a submarine central station to wellheads and production lines
DE2811212A1 (en) METHOD AND DEVICE FOR ALIGNING AND CONNECTING PIPELINES TO A PRODUCTION HEAD OF UNDERWATER DEEP DRILLING
DE2461112B2 (en) Rotary drill head
DE1634626B1 (en) Method and device for producing an anchorage in the ground or rock
DE3421389C2 (en)
DE3048939C2 (en) Device for extracting and conveying coal
EP0257287B1 (en) Pressure-sealed pipe joint for a driving pipe made of steel
DE3708434C2 (en)
DE3222880C2 (en) Method and device for the construction of a pipeline in underground jacking
DE3125082A1 (en) Method and tunnel-driving machine for producing tunnels of varying cross-section
DE2554844A1 (en) MECHANICAL-HYDRAULIC COMBINES FOR THE EXTRACTION OF COAL
EP0305834A2 (en) Process and apparatus for making a duct in an underground borehole
DE3326350A1 (en) EARTH DRILLING DEVICE AND DRILLING METHOD
DE3722622C1 (en) Process for repairing a buried sewer pipe
DE1425717A1 (en) Valve assembly and method and apparatus for inserting such valves in pipelines
EP1672125A1 (en) Apparatus and method for producing a foundation element
EP0611912A1 (en) Method for making a joint between a main pipe and branch pipe and apparatus for use in the method
DE2720039C2 (en) Intermediate socket for pre-pressing underground pipelines

Legal Events

Date Code Title Description
8139 Disposal/non-payment of the annual fee