[go: up one dir, main page]

DE29811865U1 - Mortar application slide for applying mortar to one side of stones - Google Patents

Mortar application slide for applying mortar to one side of stones

Info

Publication number
DE29811865U1
DE29811865U1 DE29811865U DE29811865U DE29811865U1 DE 29811865 U1 DE29811865 U1 DE 29811865U1 DE 29811865 U DE29811865 U DE 29811865U DE 29811865 U DE29811865 U DE 29811865U DE 29811865 U1 DE29811865 U1 DE 29811865U1
Authority
DE
Germany
Prior art keywords
mortar
application carriage
stones
mortar application
slide
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
DE29811865U
Other languages
German (de)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tubag Trass Zement und Steinwerke GmbH
Original Assignee
Tubag Trass Zement und Steinwerke GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tubag Trass Zement und Steinwerke GmbH filed Critical Tubag Trass Zement und Steinwerke GmbH
Priority to DE29811865U priority Critical patent/DE29811865U1/en
Publication of DE29811865U1 publication Critical patent/DE29811865U1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/20Tools or apparatus for applying mortar
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/20Tools or apparatus for applying mortar
    • E04G21/204Mortar sledges
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/20Tools or apparatus for applying mortar
    • E04G21/204Mortar sledges
    • E04G21/205Mortar sledges with closable mortar opening

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Devices For Post-Treatments, Processing, Supply, Discharge, And Other Processes (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Description

PATENTANWALT DR. HANS GÜNTHER EGGERTPATENT ATTORNEY DR. HANS GÜNTHER EGGERT

RÄDERSCHEIDTSTRASSE I1 50935 KÖLNRÄDERSCHEIDTSTRASSE I 1 50935 COLOGNE

29- Juni 1998 83/9829- June 1998 83/98

Tubag Trass-, Zement- und Steinwerke GmbH D-56638 KraftTubag Trass, Cement and Stone Works GmbH D-56638 Kraft

Mörtelauftragsschlitten zum Aufbringen von Mörtel auf eine Seite von Steinen Mortar application sledge for applying mortar to one side of stones

BeschreibungDescription

Die Erfindung betrifft einen Mörtelauftragschlitten zum Aufbringen von Mörtel auf eine Seite von mehreren, nebeneinander angeordneten Steinen, der zwecks Aufbringung des Mörtels über die Steine in einer Verfahrrichtung bewegt wird, mitThe invention relates to a mortar application carriage for applying mortar to one side of several stones arranged next to one another, which is moved over the stones in a direction of travel for the purpose of applying the mortar, with

- einer unteren Austragsöffnung für Mörtel und
- einer oberen Einfüllöffnung für Mörtel,
- a lower discharge opening for mortar and
- an upper filling opening for mortar,

wobei im Bodenbereich des Mörtelauftragschlittens ein Verschlußschieber angeordnet ist, mit dem der Ausfluß von Mörtel freigegeben oder unterbrochen werden kann.A shut-off valve is arranged in the bottom area of the mortar application carriage with which the flow of mortar can be released or stopped.

Mörtelauftragschlitten dieser Art sind bekannt. Bei solchen Schlitten wird ein Mörtelvorratsraum über eine Einfüllöffnung mit Mörtel gefüllt. Der Mörtel wird dann dem unteren Bereich des Auftragschlittens zugeführt, von wo aus er über eine Austragsöffnung auf die Oberfläche der zu beschichtenden Steine gelangt.Mortar application sledges of this type are well known. In such sledges, a mortar storage chamber is filled with mortar via a filling opening. The mortar is then fed to the lower area of the application sledge, from where it is applied via a discharge opening to the surface of the stones to be coated.

In der DE 196 12 900 Al ist ein Mörtelauftragschlitten zum Aufbringen von Dünnbettmörtel von gesteuert erhöhter Konsistenz zur Erstellung von Mauerwerken aus Steinen mit großem Lochanteil beschrieben, wobei der modifizierte Dünnbettmörtel mittels eines Durchlaufmischers angemischt und mittels einer Pumpe unter Druck über eine Schlauchleitung in eine Aufbringvorrichtung gefördert wird. Um die Aufbringung des Dünnbettmörtels auf den Mauerwerken von Hand zu ermöglichen, ist dort vorgesehen, daß die Aufbringvorrichtung eine breitgefächerte Düse ist, die über eine Kupplung eingangsseitig mit der Schlauchleitung der Pumpe verbunden ist und deren Breite im wesentlichen der Mauersteinbreite entspricht. Ferner ist vorgesehen, daß die Düse mit Einrichtungen zur seitlichen Führung auf den Steinen und zur Einstellung einer zum Austrittsende der Düse hin geneigten Arbeitsposition versehen ist.DE 196 12 900 A1 describes a mortar application carriage for applying thin-bed mortar of a controlled increased consistency for the construction of masonry from stones with a large proportion of holes, whereby the modified thin-bed mortar is mixed using a continuous mixer and is pumped under pressure via a hose line into an application device using a pump. In order to enable the application of the thin-bed mortar to the masonry by hand, it is provided that the application device is a wide nozzle, which is connected to the hose line of the pump via a coupling on the inlet side and the width of which essentially corresponds to the width of the brick. It is also provided that the nozzle is provided with devices for lateral guidance on the stones and for setting a working position inclined towards the outlet end of the nozzle.

In der DE 44 43 907 C2 ist hingegen eine vergleichsweise einfache Verfahrensweise beschrieben, um Mörtel auf eine Seite von Steinen aufzubringen. In dieser Schrift wird ein Verfahren zum Erstellen eines Mauerwerkes aus Planziegeln offenbart.In contrast, DE 44 43 907 C2 describes a comparatively simple procedure for applying mortar to one side of bricks. This document discloses a method for creating a masonry from flat bricks.

Planziegel sind solche Steine, die nach dem Brennen noch Toleranzen von 1 bis 1,5 mm aufweisen und deshalb nachbearbeitet werden: sie werden plangeschliffen, so daß es anschließend möglich ist, sie mit speziellen Dünnbettmörteln zu verkleben.Flat bricks are bricks that still have tolerances of 1 to 1.5 mm after firing and are therefore reworked: they are ground flat so that it is then possible to glue them together with special thin-bed mortars.

In der genannten Schrift wird also Mörtel auf der Oberfläche der Planziegel aufgetragen. Bei der Lösung gemäß diesem Dokument ist vorgesehen, daß ein Mörtel mit Leichtzuschlagstoffen verwendet wird, die eine zerbrechliche oder zusammendrückbare räumliche Struktur aufweisen, und daß beim Aufeinandersetzen der Planziegel zunächst ein Teil des Mörtels ausgedrückt und in der verbleibenden Mörtelmenge die räumliche Struktur von den Stegen zwischen den Hohlräumen der Planziegel zerbrochen oder zusammengedrückt wird, hingegen im Bereich der Hohlräume erhalten bleibt. Daher reicht es hier auch aus, den Mörtel nach dem Aufbringen auf die Steinoberfläche mit einer Handzahnspachtel zu verteilen.In the document mentioned, mortar is applied to the surface of the bricks. The solution according to this document provides for the use of mortar with lightweight aggregates that have a fragile or compressible spatial structure, and that when the bricks are placed on top of each other, part of the mortar is first squeezed out and in the remaining amount of mortar the spatial structure of the webs between the cavities of the bricks is broken or compressed, while remaining in the area of the cavities. Therefore, it is sufficient here to spread the mortar with a hand-notched spatula after it has been applied to the stone surface.

Weiterhin ist aus der DE 297 18 544 Ul ein Mörtelauftragschlitten bekannt, der eine Einfüllöffnung aufweist, die weitgehend der Länge des Schlittens entspricht. Um eine verbesserte Verbindung des Mörtels mit der Oberfläche der Steine zu erreichen, ist dort vorgesehen, daß die Länge der Kontaktfläche zwischen Steinen und Mörtel im Bodenbereich des Schlittens im wesentlichen der Länge der Einfüllöffnung entspricht.Furthermore, DE 297 18 544 Ul discloses a mortar application carriage which has a filling opening which largely corresponds to the length of the carriage. In order to achieve an improved bond between the mortar and the surface of the stones, it is provided that the length of the contact surface between stones and mortar in the bottom area of the carriage essentially corresponds to the length of the filling opening.

Mit den bekannten Mörtelauftragschlitten wird der Mörtel nur über die größten Oberflächenbereiche der zu beschichtenden Steine geführt, in den Endbereichen wird der Mörtel dann jedoch von Hand aufgebracht, da die Beschichtung der Steine an den Endbereichen problematisch ist, insbesondere, wenn die Beschichtung über eine Steinoberfläche erfolgen soll, die „über Eck" führt.With the known mortar application sledges, the mortar is only applied over the largest surface areas of the stones to be coated, but in the end areas the mortar is then applied by hand, since coating the stones at the end areas is problematic, especially if the coating is to be applied over a stone surface that runs "around a corner".

Dadurch sind Effizienzeinbußen beim Mauern bedingt, denn der mit dem Mörtelauftragschlitten erzielbare Rationalisierungseffekt ist in den End- und Eckbereichen der Steinreihe nicht nutzbar. Vielmehr muß rechtzeitig vor dem Ende der Steinreihe der im Bodenbereich des Mörtelauftragschlittens angeordnete Verschlußschieber betätigt werden, um übermäßiges Ausfließen von Mörtel aus dem Schlitten zu verhindern.This results in a loss of efficiency when laying bricks, because the rationalization effect that can be achieved with the mortar application carriage cannot be used in the end and corner areas of the row of bricks. Instead, the locking slide located in the base area of the mortar application carriage must be activated in good time before the end of the row of bricks in order to prevent excessive mortar from flowing out of the carriage.

Der Erfindung liegt die Aufgabe zugrunde, einen Mörtelauftragschlitten der eingangs genannten Art so fortzubilden, daß ein größtmöglicher Bereich der mit Mörtel zu versehenen Steinoberfläche möglichst einfach mittels des Schlittens versehen werden kann. Es soll insbesondere möglich sein, mit dem Mörtelauftragschütten auch „über Eck" verlaufende Steinpartien mit Mörtel zu beschichten.The invention is based on the task of developing a mortar application sledge of the type mentioned at the beginning in such a way that the largest possible area of the stone surface to be covered with mortar can be covered as easily as possible using the sledge. In particular, it should be possible to use the mortar application sledge to coat stone sections that run "around corners" with mortar.

Die Lösung der Aufgabe durch die Erfindung ist dadurch gekennzeichnet, daß der Verschlußschieber (7) so angeordnet und geführt ist, daß zwecks Freigabe bzw. Unterbrechung des Ausflusses von Mörtel (2) der Verschlußschieber (7) in der Oberflächenebene (O) der Steine (3) im wesentlichen senkrecht zur Verfahrrichtung (s) des Mörtelauftragsschlittens (1) bewegt werden kann.The solution to the problem by the invention is characterized in that the closure slide (7) is arranged and guided in such a way that, in order to release or interrupt the outflow of mortar (2), the closure slide (7) can be moved in the surface plane (O) of the stones (3) essentially perpendicular to the direction of travel (s) of the mortar application carriage (1).

Mit dieser Ausgestaltung ergibt sich der besondere Effekt, daß der Mörtelauftragschlitten bis zum Ende einer Steinreihe, d. h. bis in den Eckbereich hinein, gefahren werden kann, so daß eine Mörtelbeschichtung bis dorthin erfolgen kann. Dies wird durch die seitliche Betätigung des Schiebers möglich. Weiterhin kann dann - nach Umsetzen des Auftragschlittens - exakt an der Stelle die Beschichtung fortgesetzt werden, wo sie zuvor unterbrochen wurde.This design has the special effect that the mortar application carriage can be moved to the end of a row of bricks, i.e. into the corner area, so that mortar can be coated up to that point. This is made possible by operating the slide from the side. Furthermore, after moving the application carriage, the coating can be continued exactly at the point where it was previously interrupted.

Der Verschlußschieber (7) ist dabei vorzugsweise in einer Schieberlagerung (8) gelagert. Zwecks Profilierung der Oberfläche der Mörtelschicht ist weiterhin vorgesehen, daß im Bereich der Austragsöffnung (4) für Mörtel (2) eine auswärts gebogene Zahnleiste (9) angeordnet ist. Diese kann höhenverstellbar sein; sie kann auch auswechselbar sein, so daß unterschiedliche Zahnprofile zum Einsatz kommen können.The closing slide (7) is preferably mounted in a slide bearing (8). In order to profile the surface of the mortar layer, it is also provided that an outwardly curved tooth strip (9) is arranged in the area of the discharge opening (4) for mortar (2). This can be height-adjustable; it can also be replaceable so that different tooth profiles can be used.

Gemäß einer Weiterbildung ist vorgesehen, daß zur Führung des Mörtelauftragschlittens (1) auf den Steinen (3) mindestens eine seitlich angeordnete Führungsschiene (10) angeordnet ist. Die Führungsschienen (10) können in Verfahrrichtung (s) des Mörtelauftragschlittens (1) nach außen gebogen sein, um ein Verhaken der Schienen (10) beim Bewegen des Mörtelauftragschlittens (1) zu verhindern.According to a further development, at least one laterally arranged guide rail (10) is arranged on the stones (3) to guide the mortar application carriage (1). The guide rails (10) can be bent outwards in the direction of travel (s) of the mortar application carriage (1) in order to prevent the rails (10) from snagging when the mortar application carriage (1) is moved.

Weiterhin kann vorgesehen werden, daß im Bodenbereich (6) des Mörtelauftragschlittens (1) ein Abdeckeinsatz angeordnet ist, der über ausgewählte Breitenbereiche des Mörtelauftragsschlittens (1) den Kontakt von Mörtel (2) mit den SteinenFurthermore, it can be provided that a cover insert is arranged in the bottom area (6) of the mortar application carriage (1), which prevents the contact of mortar (2) with the stones over selected width areas of the mortar application carriage (1).

-A--A-

(3) verhindert. Dies ist beispielsweise dann hilfreich, wenn die Steine in der Mitte einen großen, nicht zu beschichtenden Lochanteil aufweisen.(3) is prevented. This is helpful, for example, if the stones in the middle have a large number of holes that cannot be coated.

Der Mörtelauftragschlitten kann vorteilhafterweise aus nichtrostendem Blech oder aus Kunststoff bestehen. Schließlich kann zwecks einfacher Handhabung vorgesehen sein, daß er Handgriffe (11) aufweist.The mortar application carriage can advantageously be made of stainless steel or plastic. Finally, it can be provided with handles (11) for easier handling.

In der Zeichnung ist ein Ausführungsbeispiel der Erfindung dargestellt:The drawing shows an embodiment of the invention:

Fig. 1 zeigt in perspektivischer Ansicht den erfindungsgemäßenFig. 1 shows a perspective view of the inventive

Mörtelauftragschlitten,
Fig. 2 stellt schematisch den Querschnitt durch den Schlitten dar.
Mortar application carriage,
Fig. 2 shows a schematic cross-section through the carriage.

In Fig. 1 ist perspektivisch eine über Eck verlaufende Steinreihe zu sehen, die insgesamt sechs Steine 3 aufweist. Die Oberflächenebene O der Steine 3 soll mittels des Mörtelauftragschlittens 1 mit Mörtel 2 beschichtet werden, bevor eine weitere Lage Steine 3 aufgelegt wird.In Fig. 1, a perspective view of a row of stones running around the corner can be seen, which has a total of six stones 3. The surface plane O of the stones 3 is to be coated with mortar 2 using the mortar application carriage 1 before another layer of stones 3 is placed on top.

Der Mörtelauftragschlitten 1 hat eine im wesentlichen quaderförmige Gestalt und ist in bezug auf seine Breite der Breite B der Steine 3 angepaßt, so daß die Steine 3 im wesentlichen über ihre gesamte Breite B mit Mörtel beschichtet werden. Der Schlitten 1 hat in seinem oberen Bereich eine Einfüllöffnung 5 für Mörtel 2. In seinem Bodenbereich 6 (s. Fig. 2) hat er eine Austragsöffnung 4 für Mörtel.The mortar application carriage 1 has a substantially cuboid shape and is adapted in terms of its width to the width B of the stones 3, so that the stones 3 are coated with mortar essentially over their entire width B. The carriage 1 has a filling opening 5 for mortar 2 in its upper area. In its bottom area 6 (see Fig. 2) it has a discharge opening 4 for mortar.

Zwecks Beschichtung der Oberfläche O der Steine 3 wird der Schieber mittels der Handgriffe 11 (von denen zwecks Übersichtlichkeit nur einer dargestellt ist) in Verfahrrichtung s geschoben. Der dabei aus der Austragsöffnung 4 ausströmende Mörtel 2 wird mit einer Zahnleiste 9 abgestrichen und profiliert.In order to coat the surface O of the stones 3, the slider is pushed in the direction of travel s using the handles 11 (only one of which is shown for the sake of clarity). The mortar 2 flowing out of the discharge opening 4 is scraped off and profiled using a toothed strip 9.

Erfindungsgemäß ist am Mörtelauftragschlitten 1 ein Verschlußschieber 7 angeordnet, der zwecks Freigabe und Verschluß des Mörtelflusses senkrecht zur Verfahrrichtung s heraus- bzw. hineingeschoben wird. Der Verschlußschieber ist in einer Schieberlagerung 8 geführt.According to the invention, a closure slide 7 is arranged on the mortar application carriage 1, which is pushed out or in perpendicular to the direction of travel s in order to release and close the mortar flow. The closure slide is guided in a slide bearing 8.

-5--5-

Mit dieser Ausgestaltung besteht die Möglichkeit, den Schlitten 1 am Anfang einer Steinreihe (z. B. bündig mit dem linken Stein 3 der vorderen dreisteinigen Reihe) anzusetzen, dann die Schieber 7 zu öffnen und die vordere Steinreihe durch Verfahren des Schlittens 1 mit Mörtel zu beschichten; die Fig. 1 zeigt diesen Status. Wenn das Ende der vorderen Steinreihe erreicht ist, wird der Schieber 7 wieder hineingeschoben und der Mörtelfluß damit gestoppt.With this design, it is possible to position the slide 1 at the beginning of a row of stones (e.g. flush with the left stone 3 of the front row of three stones), then open the slides 7 and coat the front row of stones with mortar by moving the slide 1; Fig. 1 shows this status. When the end of the front row of stones is reached, the slide 7 is pushed in again and the flow of mortar is stopped.

Vorteilhafterweise kann dann eine vollständige Beschichtung des über Eck verlaufenden Steinverlaufs wie folgt erreicht werden:Advantageously, a complete coating of the stone course running around the corner can then be achieved as follows:

Der Schlitten 1 wird - nachdem die vordere Steinreihe beschichtet ist - in der gestrichelten Position erneut angesetzt. Da der Verschlußschieber 7 seitlich herausschiebbar ist, kann bündig mit der bereits aufgebrachten Mörtelschicht die Beschichtung fortgesetzt werden, indem der Schlitten, nach Öffnen des Schiebers 7, über die drei nach hinten verlaufenden Steine 3 geführt wird. Im Ergebnis ergibt sich eine vollständige Beschichtung der über Eck verlaufenden Steinoberfläche O.The slide 1 is - after the front row of stones has been coated - repositioned in the dashed position. Since the locking slide 7 can be pushed out to the side, the coating can be continued flush with the mortar layer already applied by guiding the slide over the three stones 3 running to the rear after opening the slide 7. The result is a complete coating of the stone surface O running around the corner.

In Fig. 2 ist der Mörtelschlitten im Querschnitt zu sehen. Auch hier ist deutlich zu erkennen, daß die Verschieberichtung des Verschlußschiebers 7 senkrecht zur Verfahrrichtung s des Schlittens 1 erfolgt (letztere steht in Fig. 2 senkrecht auf der Zeichenebene). Die Führung des Schlittens 1 entlang der Steinreihe 3 wird durch eine seitliche Führungsschiene 10 erleichtert. Diese ist nur auf einer Seite des Schlittens (nämlich rechts) dargestellt, kann sich aber genauso auch zusätzlich links befinden - ggf. mit Ausnehmungen für den Schieber 7.In Fig. 2, the mortar slide can be seen in cross-section. Here, too, it can be clearly seen that the sliding direction of the locking slide 7 is perpendicular to the direction of travel s of the slide 1 (the latter is perpendicular to the plane of the drawing in Fig. 2). The guidance of the slide 1 along the row of stones 3 is facilitated by a lateral guide rail 10. This is only shown on one side of the slide (namely on the right), but can also be located on the left - if necessary with recesses for the slide 7.

-6-Bezugszeichenlistei-6-List of reference symbols

11 MörtelauftragschlittenMortar application carriage 22 Mörtelmortar 33 SteinStone 44 AustragsöffnungDischarge opening 55 EinfüllöffnungFilling opening 66 Bodenbereich des SchlittensBottom area of the sled 77 VerschlußschieberLocking slide 88th SchieberlagerungSlide bearing 99 gebogene Zahnleistecurved tooth strip 1010 seitliche Führungsschieneside guide rail 1111 HandgriffHandle SS Verfahrrichtung des Schlittens 1Travel direction of carriage 1 BB Breite der Steine 3Width of stones 3 OO Oberflächenebene der Steine 3Surface level of stones 3

Claims (11)

• ·· Schutzansprüche• ·· Protection claims 1. Mörtelauftragschlitten (1) zum Aufbringen von Mörtel (2) auf eine Seite von mehreren, nebeneinander angeordneten Steinen (3), der zwecks Aufbringung des Mörtels (2) über die Steine (3) in einer Verfahrrichtung (s) bewegt wird, mit1. Mortar application carriage (1) for applying mortar (2) to one side of several stones (3) arranged next to one another, which is moved over the stones (3) in a travel direction (s) for the purpose of applying the mortar (2), with - einer unteren Austragsöffnung (4) für Mörtel (2) und- a lower discharge opening (4) for mortar (2) and - einer oberen Einfüllöffnung (5) für Mörtel (2),- an upper filling opening (5) for mortar (2), wobei im Bodenbereich (6) des Mörtelauftragschlittens (1) ein Verschlußschieber (7) angeordnet ist, mit dem der Ausfluß von Mörtel (2) freigegeben oder unterbrochen werden kann,
dadurch gekennzeichnet, daß
wherein a closing slide (7) is arranged in the bottom area (6) of the mortar application carriage (1), with which the outflow of mortar (2) can be released or interrupted,
characterized in that
der Verschlußschieber (7) so angeordnet und geführt ist, daß zwecks Freigabe bzw. Unterbrechung des Ausflusses von Mörtel (2) der Verschlußschieber (7) in der Oberflächenebene (O) der Steine (3) im wesentlichen senkrecht zur Verfahrrichtung (s) des Mörtelauftragsschlittens (1) bewegt werden kann.the closure slide (7) is arranged and guided in such a way that, in order to release or interrupt the outflow of mortar (2), the closure slide (7) can be moved in the surface plane (O) of the stones (3) essentially perpendicular to the direction of travel (s) of the mortar application carriage (1).
2. Mörtelauftragschlitten nach Anspruch 1, dadurch gekennzeichnet, daß der Verschlußschieber (7) in einer Schieberlagerung (8) gelagert ist.2. Mortar application carriage according to claim 1, characterized in that the closing slide (7) is mounted in a slide bearing (8). 3. Mörtelauftragschlitten nach Anspruch 1 oder 2, dadurch gekennzeichnet, daß im Bereich der Austragsöffnung (4) für Mörtel (2) eine auswärts gebogene Zahnleiste (9) angeordnet ist.3. Mortar application carriage according to claim 1 or 2, characterized in that an outwardly bent toothed strip (9) is arranged in the region of the discharge opening (4) for mortar (2). 4. Mörtelauftragschlitten nach Anspruch 3, dadurch gekennzeichnet, daß die Zahnleiste (9) höhenverstellbar ist.4. Mortar application carriage according to claim 3, characterized in that the toothed strip (9) is height-adjustable. 5- Mörtelauftragschlitten nach Anspruch 3 oder 4, dadurch gekennzeichnet, daß die Zahnleiste (9) auswechselbar ist.5- Mortar application carriage according to claim 3 or 4, characterized in that the toothed strip (9) is replaceable. 6. Mörtelauftragschlitten nach einem der Ansprüche 1 bis 5, dadurch gekennzeichnet, daß zur Führung des Mörtelauftragschlittens (1) auf den Steinen (3) mindestens eine seitlich angeordnete Führungsschiene (10) angeordnet ist.6. Mortar application carriage according to one of claims 1 to 5, characterized in that at least one laterally arranged guide rail (10) is arranged to guide the mortar application carriage (1) on the stones (3). -2--2- 7. Mörtelauftragschlitten nach Anspruch 6, dadurch gekennzeichnet, daß die Führungsschienen (10) in Verfahrrichtung (s) des Mörtelauftragschlittens (1) nach außen gebogen sind, um ein Verhaken der Führungsschienen (10) beim Bewegen des Mörtelauftragschlittens (1) zu verhindern.7. Mortar application carriage according to claim 6, characterized in that the guide rails (10) are bent outwards in the direction of travel (s) of the mortar application carriage (1) in order to prevent the guide rails (10) from getting caught when the mortar application carriage (1) is moved. 8. Mörtelauftragschlitten nach einem der Ansprüche 1 bis 7, dadurch gekennzeichnet, daß im Bodenbereich (6) des Mörtelauftragschlittens (1) ein Abdeckeinsatz angeordnet ist, der über ausgewählte Breitenbereiche des Mörtelauftragschlittens (1) den Kontakt von Mörtel (2) mit den Steinen (3) verhindert.8. Mortar application carriage according to one of claims 1 to 7, characterized in that a cover insert is arranged in the bottom area (6) of the mortar application carriage (1), which prevents contact between mortar (2) and the stones (3) over selected width areas of the mortar application carriage (1). 9. Mörtelauftragschlitten nach einem der Ansprüche 1 bis 8, dadurch gekennzeichnet, daß er aus nichtrostendem Blech besteht.9. Mortar application carriage according to one of claims 1 to 8, characterized in that it consists of stainless sheet metal. 10. Mörtelauftragschlitten nach einem der Ansprüche 1 bis 8, dadurch gekennzeichnet, daß er aus Kunststoff besteht.10. Mortar application carriage according to one of claims 1 to 8, characterized in that it is made of plastic. 11. Mörtelauftragschlitten nach einem der Ansprüche 1 bis 10, dadurch gekennzeichnet, daß er Handgriffe (11) aufweist.11. Mortar application carriage according to one of claims 1 to 10, characterized in that it has handles (11).
DE29811865U 1998-07-03 1998-07-03 Mortar application slide for applying mortar to one side of stones Expired - Lifetime DE29811865U1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE29811865U DE29811865U1 (en) 1998-07-03 1998-07-03 Mortar application slide for applying mortar to one side of stones

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE29811865U DE29811865U1 (en) 1998-07-03 1998-07-03 Mortar application slide for applying mortar to one side of stones

Publications (1)

Publication Number Publication Date
DE29811865U1 true DE29811865U1 (en) 1999-05-12

Family

ID=8059384

Family Applications (1)

Application Number Title Priority Date Filing Date
DE29811865U Expired - Lifetime DE29811865U1 (en) 1998-07-03 1998-07-03 Mortar application slide for applying mortar to one side of stones

Country Status (1)

Country Link
DE (1) DE29811865U1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0985646A1 (en) 1998-09-09 2000-03-15 Tubag Trass-, Zement- und Steinwerke Gmbh Thin bed mortar

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0985646A1 (en) 1998-09-09 2000-03-15 Tubag Trass-, Zement- und Steinwerke Gmbh Thin bed mortar

Similar Documents

Publication Publication Date Title
DE2426322A1 (en) SPATULA
DE10054900B4 (en) Method and device for applying thin bed mortar
DE2947755A1 (en) SPRAY CAB
DE4440111C2 (en) Device for coating surfaces on buildings using curable thick materials
DE4329321C2 (en) Device for applying an adhesive or thin-bed mortar
DE19646352A1 (en) Tool for handling adhesive or sealing materials, e.g. silicon
EP2942109B1 (en) Device for creating joints between angled components
DE19829715A1 (en) Mortar applicator for plastering one side of several bricks has top filler opening and movable slider which is opened and closed to release and hold back plaster
DE19746181C2 (en) Device for applying mortar to one side of stones
DE29811865U1 (en) Mortar application slide for applying mortar to one side of stones
EP2699742B1 (en) Arrangement and method for manufacturing of concrete components
DE29608631U1 (en) Device for applying thin bed mortar
DE29718544U1 (en) Device for applying mortar to one side of stones
DE4032577A1 (en) Cement mortar spreading tool - has rear wall with opening controlled by adjustable blade to form even layer
DE10260661A1 (en) Concrete bucket with quickly replaceable bulk material guide
DE3643019C2 (en)
DE19500777C2 (en) Device for grouting covering or clothing panels, in particular tiles
EP1233121A2 (en) Hand-held device for distributing pasty products on floors
DE9410470U1 (en) Roller-shaped tool for distributing liquids on surfaces
DE9108560U1 (en) Tool for inserting backfill material into a joint
DE1996254U (en) DEVICE FOR APPLYING MOER TAPE
DE202007011250U1 (en) Machine for spraying plaster
DE965640C (en) Moving supporting arch for a closed protective hood made of single profile boards that moves with the tunnel or tunnel drive
DE3438148A1 (en) Device for applying a marking medium
DE1975186U (en) TROUGH FOR AN INCLINED CONVEYOR AUGER.

Legal Events

Date Code Title Description
R207 Utility model specification

Effective date: 19990624

R150 Utility model maintained after payment of first maintenance fee after three years

Effective date: 20011210

R151 Utility model maintained after payment of second maintenance fee after six years

Effective date: 20041124

R152 Utility model maintained after payment of third maintenance fee after eight years

Effective date: 20061019

R071 Expiry of right