DE29715214U1 - Dike fastening from sheet piles to reinforce existing and new dikes - Google Patents

Dike fastening from sheet piles to reinforce existing and new dikes

Info

Publication number
DE29715214U1
DE29715214U1 DE29715214U DE29715214U DE29715214U1 DE 29715214 U1 DE29715214 U1 DE 29715214U1 DE 29715214 U DE29715214 U DE 29715214U DE 29715214 U DE29715214 U DE 29715214U DE 29715214 U1 DE29715214 U1 DE 29715214U1
Authority
DE
Germany
Prior art keywords
sheet piles
dyke
dike
reinforcement according
new
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
DE29715214U
Other languages
German (de)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HUNGERHOFF JOHANNES DR
Original Assignee
HUNGERHOFF JOHANNES DR
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HUNGERHOFF JOHANNES DR filed Critical HUNGERHOFF JOHANNES DR
Priority to DE29715214U priority Critical patent/DE29715214U1/en
Publication of DE29715214U1 publication Critical patent/DE29715214U1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/10Dams; Dykes; Sluice ways or other structures for dykes, dams, or the like

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Soil Working Implements (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Description

BeschreibungDescription

Deichbefestigung aus Spundbohlen zur Verstärkung von vorhandenen und neuen DeichenDyke reinforcement using sheet piles to reinforce existing and new dykes

An Küsten, Seen und Flüssen werden zur Zurückhaltung des Wassers Deiche errichtet, um bei erhöhten Wasserständen eine Überflutung des angrenzenden Landes zu verhindern. Die Form der Deiche ist in der Regel so gewählt, daß sie den Seitenkräften des steigenden Hochwassers standhalten können.Dikes are built on coasts, lakes and rivers to hold back water and prevent flooding of the adjacent land when water levels rise. The shape of the dikes is usually chosen so that they can withstand the lateral forces of the rising flood water.

Infolge von Verschwächungen des Deichkörpers, hervorgerufenAs a result of weakening of the dyke body, caused

a) durch mechanische Einwirkungen an den Deichoberflächen oder innerhalb des Deiches durch Aktivitäten von Tieren (Kaninchen, Maulwürfe, usw.),a) through mechanical impacts on the dike surfaces or within the dike through activities of animals (rabbits, moles, etc.),

b) durch Erosion infolge des Angriffs starker Strömungen des Wassers, oderb) by erosion resulting from the attack of strong water currents, or

c) durch die Wirkung von Auftriebskräften auf das Deichmaterial bei zunehmender Durchweichung mit eindringendem Wasserc) due to the effect of buoyancy forces on the dyke material as it becomes increasingly soggy with penetrating water

kommt es bei extremen Hochwasserpegeln zu Durchbrüchen, da die vorhandene Deichmasse den Horizontalkräften des Wassers nicht mehr ausreichend entgegenwirkt.Extreme flood levels can lead to breaches because the existing dike mass no longer adequately counteracts the horizontal forces of the water.

Der im Schutzanspruch 1 angegebenen Erfindung liegt das Problem zugrunde, die vorhandenen, nach Durchbrüchen auszubessernden oder gänzlich neu zu errichtenden Deiche so zu verstärken, daß der bei Hochwasser auftretende Wasserdruck und das in den Deich eindringende Wasser den Deich nicht mehr so erheblich schwächen können, daß es zu einem Bruch kommt.The invention specified in claim 1 is based on the problem of strengthening the existing dikes that are to be repaired after breaches or completely rebuilt in such a way that the water pressure that occurs during flooding and the water penetrating the dike can no longer weaken the dike so significantly that it breaks.

Dieses Problem wird mit dem in Schutzanspruch 1 beschriebenen Merkmalen, das vertikale Einsetzen von ineinandergreifenden Spundbohlen, gelöst.This problem is solved with the features described in claim 1, the vertical insertion of interlocking sheet piles.

Mit der Erfindung wird erreicht, daß infolge der Abdichtung durch die ineinandergreifenden Spundbohlen das weitere Eindringen von Wasser verhindert und insbesondere durch den Kraftschluß der eingebrachten Spundbohlen eine horizontale Verschiebung des Deichkörpers aufgehalten wird. Damit werden entscheidende Verschwächungen des Deiches vermieden.The invention ensures that the sealing by the interlocking sheet piles prevents further water penetration and, in particular, the frictional connection of the sheet piles prevents horizontal displacement of the dyke body. This prevents significant weakening of the dyke.

Eine weitere vorteilhafte Ausgestaltung ist im Schutzanspruch 2 angegeben.A further advantageous embodiment is specified in claim 2.

Dadurch daß die Spundbohlen jeweils unabhängig voneinander bis in den festen, gewachsenen Untergrund eingesetzt werden können, werden die vom Wasserdruck der ansteigenden Flut stammenden Horizontalkräfte und das dadurch eingebrachte Biegemoment durch die feste Einspannung in den Boden weitgehend aufgenommen und nicht mehr in vollem Umfange in den sich landwärts anschließenden Teil des Deiches eingeleitet.Because the sheet piles can be inserted independently of one another into the solid, natural subsoil, the horizontal forces resulting from the water pressure of the rising tide and the bending moment introduced as a result are largely absorbed by the firm clamping into the ground and are no longer fully introduced into the part of the dike adjoining the landward side.

Die in Schutzanspruch 3 angegebenen mit einer Perforation versehenen Spundbohlen geben dem Deich die im Schutzanspruch 2 genannte höhere Festigkeit gegenüber dem Hochwasser und erlauben gleichzeitig den Austausch des Grundwassers im Bereich der Perforation, sofern dies gefordert ist.The sheet piles provided with a perforation specified in claim 3 give the dyke the higher resistance to flooding specified in claim 2 and at the same time allow the exchange of groundwater in the area of the perforation, if this is required.

Infolge der in Schutzanspruch 4 beschriebenen Lösung, daß die Spundbohlen unsichtbar unterhalb der Deichkrone abschließen, bleibt das Bild der Küsten-, Fluß- oder sonstigen Deichlandschaft erhalten und wird nicht durch herausragende Enden von Spundbohlen beeinträchtigt.As a result of the solution described in claim 4, whereby the sheet piles end invisibly below the top of the dike, the image of the coastal, river or other dike landscape is preserved and is not impaired by protruding ends of sheet piles.

Die in Schutzanspruch 5 angegebene Nachrüstung weiterer Bohlen erlaubt es, bei drohendem Wasseranstieg über die Deichkrone hinaus sehr schnell und zu geringen Kosten einen zusätzlichen Schutz vor dem Übertritt des Wassers zu erhalten. Beim Absinken des Pegels können die nachgerüsteten Spundbohlen wieder entfernt werden.The retrofitting of additional sheet piles specified in claim 5 makes it possible to obtain additional protection against water overflow very quickly and at low cost if the water level is threatening to rise above the crest of the dyke. If the water level drops, the retrofitted sheet piles can be removed again.

Durch die in Schutzanspruch 6 angegebene versetzte Anordnung der Spundbohlen können bei der gewünschten Deicherhöhung die aufzusetzende Bohlen sehr leicht in die vorhandenen freien Lücken eingesetzt werden. Danach können die noch offenen Zwischenräume durch das Einschieben weitere Bohlen geschlossen werden.Due to the staggered arrangement of the sheet piles specified in claim 6, the piles to be added can be very easily inserted into the existing free gaps when the dyke is raised to the desired level. The gaps that are still open can then be closed by inserting further piles.

Ein Ausfuhrungsbeispiel der Erfindung wird anhand der Fig. 1 bis 5 erläutert.An embodiment of the invention is explained with reference to Figs. 1 to 5.

In Fig. 1 ist im Querschnitt eines Deichkörpers 2 eine Reihe von Spundbohlen 1 einsetzt, die mit Schlössern ineinandergreifen und in den festen Boden abgesenkt sind.In Fig. 1, a row of sheet piles 1 is inserted in the cross-section of a dyke body 2, which interlock with locks and are sunk into the solid ground.

In Fig. 2 ist beispielhaft bei 5 die Anordnung der Spundbohlen 1 bei unterschiedlicher Tiefe des festen Untergrundes 6 gezeigt.In Fig. 2, the arrangement of the sheet piles 1 at different depths of the solid subsoil 6 is shown as an example at 5.

Die Perforierung 7 der Spundbohlen 1 in dem Bereich des festen Bodens 6 ist in Fig. 3 gezeigt.The perforation 7 of the sheet piles 1 in the area of the solid ground 6 is shown in Fig. 3.

Das Ineinandergreifen der Profile der Spundbohlen 1 mittels Schlössern 8 ist im Querschnitt in Fig. 4 dargestellt.The interlocking of the profiles of the sheet piles 1 by means of locks 8 is shown in cross section in Fig. 4.

In Fig. 5 ist die versetzte Anordnung im oberen Bereich 9 der in einen Deich eingesetzten Spundbohlen 1 zu erkennen. Weitere Spundbohlen 1 können zur Erhöhung des Deiches aufgrund der versetzten Anordnung leicht aufgesetzt werden.In Fig. 5, the staggered arrangement in the upper area 9 of the sheet piles 1 inserted into a dyke can be seen. Additional sheet piles 1 can easily be added to raise the dyke due to the staggered arrangement.

Claims (6)

SchutzansprücheProtection claims 1. Deichbefestigung aus Spundbohlen zur Verstärkung von vorhandenen und neuen Deichen1. Dyke reinforcement using sheet piles to reinforce existing and new dykes dadurch gekennzeichnet, daß mittels Schlössern (8) seitlich ineinandergreifende Spundbohlen (1) vertikal in den Deichkörper (2) eingesetzt sind.characterized in that sheet piles (1) which laterally engage with one another by means of locks (8) are inserted vertically into the dyke body (2). 2. Deichbefestigung nach Anspruch2. Dyke reinforcement according to claim dadurch gekennzeichnet, daß die Spundbohlen (1) zur Erhöhung der Seitenstandfestigkeit in den festen, gewachsenen Boden (6) eingesetzt sind und je nach Tiefe des Untergrundes unterschiedlich tief abgesenktcharacterized in that the sheet piles (1) are inserted into the solid, natural soil (6) to increase the lateral stability and are lowered to different depths depending on the depth of the subsoil 3. Deichbefestigung nach Anspruch 1 oder3. Dyke reinforcement according to claim 1 or dadurch gekennzeichnet, daß die Spundbohlen (1) teilweise mit einer Perforation (7) ausgestattet sind.characterized in that the sheet piles (1) are partially provided with a perforation (7). 4. Deichbefestigung nach einem oder mehreren der Ansprüche 1 bis4. Dyke reinforcement according to one or more of claims 1 to dadurch gekennzeichnet, daß die Spundbohlen (1) nach oben in Höhe des maximalen Wasserpegels (4) enden, jedoch unsichtbar unterhalb der Deichkrone (3) abschließen.characterized in that the sheet piles (1) end at the height of the maximum water level (4), but end invisibly below the dyke crest (3). 5. Deichbefestigung nach einem oder mehreren der Ansprüche 1 bis5. Dyke reinforcement according to one or more of claims 1 to dadurch gekennzeichnet, daß weitere Spundbohlen (1) auch in bereits mit Spundbohlen (1) ausgerüsteten Deichanlagen im Bedarfsfalle entsprechend einem höheren Wasserpegel nachträglich auf die vorhandenen (1) aufgesetzt sind.characterized in that additional sheet piles (1) are also subsequently placed on the existing ones (1) in dykes already equipped with sheet piles (1) if necessary, in accordance with a higher water level. 6. Deichbefestigung nach Anspruch 5,6. Dyke reinforcement according to claim 5, dadurch gekennzeichnet, daß die in den Deich eingesetzten Spundbohlen am oberen Abschluß (9) vertikal gegeneinander versetzt sind.characterized in that the sheet piles inserted into the dyke are vertically offset from one another at the upper end (9).
DE29715214U 1997-08-26 1997-08-26 Dike fastening from sheet piles to reinforce existing and new dikes Expired - Lifetime DE29715214U1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE29715214U DE29715214U1 (en) 1997-08-26 1997-08-26 Dike fastening from sheet piles to reinforce existing and new dikes

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE29715214U DE29715214U1 (en) 1997-08-26 1997-08-26 Dike fastening from sheet piles to reinforce existing and new dikes

Publications (1)

Publication Number Publication Date
DE29715214U1 true DE29715214U1 (en) 1997-12-18

Family

ID=8045058

Family Applications (1)

Application Number Title Priority Date Filing Date
DE29715214U Expired - Lifetime DE29715214U1 (en) 1997-08-26 1997-08-26 Dike fastening from sheet piles to reinforce existing and new dikes

Country Status (1)

Country Link
DE (1) DE29715214U1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19827092C1 (en) * 1998-06-18 2000-02-10 Andreas Loebnitz Method for improving earth dam has a vertical concrete wall inserted from the top of the dam and with a drainage duct at the bottom of the wall to prevent water seeping into the land side of the dam
GB2463079B (en) * 2008-09-02 2013-02-20 Balfour Beatty Plc Retaining wall

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1917749A1 (en) * 1968-04-09 1969-10-30 Wendel & Cie S A De Device for the protection of embankments and slopes
DE3442559A1 (en) * 1984-11-22 1986-05-28 Hochtief Ag Vorm. Gebr. Helfmann, 4300 Essen Method of producing a flexible subsoil seal
DE3808269A1 (en) * 1988-03-12 1989-09-21 Saarlaend Grubenausbau Method of constructing a retaining dam and prefabricated steel member, in particular for a retaining dam constructed according to this method
DE9211306U1 (en) * 1992-08-22 1992-11-12 Preussag Stahl AG, 3150 Peine Sheet pile and sheet pile made with it

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1917749A1 (en) * 1968-04-09 1969-10-30 Wendel & Cie S A De Device for the protection of embankments and slopes
DE3442559A1 (en) * 1984-11-22 1986-05-28 Hochtief Ag Vorm. Gebr. Helfmann, 4300 Essen Method of producing a flexible subsoil seal
DE3808269A1 (en) * 1988-03-12 1989-09-21 Saarlaend Grubenausbau Method of constructing a retaining dam and prefabricated steel member, in particular for a retaining dam constructed according to this method
DE9211306U1 (en) * 1992-08-22 1992-11-12 Preussag Stahl AG, 3150 Peine Sheet pile and sheet pile made with it

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19827092C1 (en) * 1998-06-18 2000-02-10 Andreas Loebnitz Method for improving earth dam has a vertical concrete wall inserted from the top of the dam and with a drainage duct at the bottom of the wall to prevent water seeping into the land side of the dam
GB2463079B (en) * 2008-09-02 2013-02-20 Balfour Beatty Plc Retaining wall

Similar Documents

Publication Publication Date Title
DE102008020261A1 (en) Flood water and coastal protection device, has fastening unit fixing set of elastic plates in position to be protected, where plates with thickness of specified range consist of rubber and inserts that are made up of textile fabrics
DE102006041049A1 (en) Barrier for e.g. military purpose, has bulkhead components e.g. Z-sheet pile and connection units, supported on surface of ground and connected with one another, such that barrier stands freely
EP2374942B1 (en) Device and method for generating heat from the environment
CH672933A5 (en)
EP0802285A2 (en) High water protection system
DE212024000090U1 (en) Dirt protection curtain
DE29715214U1 (en) Dike fastening from sheet piles to reinforce existing and new dikes
EP3486378A1 (en) Sheet pile for extracting energy from soil
DE19522614A1 (en) High-water barrier to protect land or other used areas against rising river etc level
DE19631275C1 (en) Flood wall for building protection
EP1937898A1 (en) Protective wall, dyke and method of producing a dyke
DE2425780C2 (en) Trench sheeting device
DE202012006100U1 (en) Flood protection device for protection against flooding
DE102004010020B4 (en) Flood protection wall
DE2758739C2 (en) Breaking structure
DE102009055621A1 (en) Earthwork e.g. embankment, has dam crown and water-side and land side counter bearings that are placed on sides of core, where earthwork is made of natural earthwork material that is homogenized by uniformly adding source material
WO2004044334A1 (en) Floodwater protection system
DE2706665A1 (en) Flood defence wall - has concrete panels supported by composite steel sheet piles with cut=off membrane driven into ground
DE102006035593B4 (en) Flood barrier by wall hat
DE102017108979B3 (en) Breakwater device for coastal and shore protection
DE679557C (en) Installation on steel sheet piles with drainage openings to eliminate the hydrostatic overpressure in the backfill floor of pile piles
CH672339A5 (en)
DE202024001978U1 (en) Plastic panels - water weirs - seepage water
DE102004013879A1 (en) Device for sealing and stabilizing an embankment, especially a river embankment, comprises a sealing layer consisting of a water-proof bitumen or plastic layer that extends from the top of the embankment into the embankment
EP0115553A1 (en) Arrangement for the reduction of the erosive influence of rough waters on the marginal surfaces between water and land and/or for the reclamation of land

Legal Events

Date Code Title Description
R207 Utility model specification

Effective date: 19980205

R021 Search request validly filed

Effective date: 19971208

R163 Identified publications notified

Effective date: 19980624

R156 Lapse of ip right after 3 years

Effective date: 20010501