DE29509817U1 - Work basket for use on construction sites - Google Patents
Work basket for use on construction sitesInfo
- Publication number
- DE29509817U1 DE29509817U1 DE29509817U DE29509817U DE29509817U1 DE 29509817 U1 DE29509817 U1 DE 29509817U1 DE 29509817 U DE29509817 U DE 29509817U DE 29509817 U DE29509817 U DE 29509817U DE 29509817 U1 DE29509817 U1 DE 29509817U1
- Authority
- DE
- Germany
- Prior art keywords
- work basket
- grating
- work
- floor
- basket according
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 238000010276 construction Methods 0.000 title description 6
- 239000000725 suspension Substances 0.000 claims description 8
- 238000009966 trimming Methods 0.000 claims 1
- 238000009415 formwork Methods 0.000 description 4
- 244000309464 bull Species 0.000 description 2
- 238000009499 grossing Methods 0.000 description 2
- 239000000203 mixture Substances 0.000 description 2
- 238000009435 building construction Methods 0.000 description 1
- 230000008878 coupling Effects 0.000 description 1
- 238000010168 coupling process Methods 0.000 description 1
- 238000005859 coupling reaction Methods 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 238000010422 painting Methods 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 238000009418 renovation Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/28—Mobile scaffolds; Scaffolds with mobile platforms
- E04G3/30—Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G1/00—Scaffolds primarily resting on the ground
- E04G1/15—Scaffolds primarily resting on the ground essentially comprising special means for supporting or forming platforms; Platforms
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/02—Conveying or working-up concrete or similar masses able to be heaped or cast
- E04G21/04—Devices for both conveying and distributing
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Packages (AREA)
Description
Arbeitskorb für den Einsatz auf BaustellenWork basket for use on construction sites
Die Erfindung betrifft einen Arbeitskorb für den Einsatz auf Baustellen, insbesondere für Betonierarbeiten. Der Arbeitskorb weist einen Boden, ein umlaufendes Geländer, Eckpfosten und einer Aufhängung zum Festmachen des Arbeitskorbes an dem Lasthaken eines Hochbaukrans auf.The invention relates to a work basket for use on construction sites, in particular for concreting work. The work basket has a floor, a surrounding railing, corner posts and a suspension for securing the work basket to the load hook of a construction crane.
Bei der Errichtung von Bauwerken wie Wohnhäusern wird weitgehend Transport-Beton verwendet, der von dem Betonmischer über Schlauchmastenpumpen zu der Verwendungsstelle gefördert wird. An der Verwendungsstelle wird das Ende des Schlauches von zwei Hilfskräften gehalten. Da der Beton durch Kolbenpumpen gefördert wird, überträgt der Betonschlauch die Kolbenstöße, so daß am Ende des Betonschlauchs starke Schläge auftreten. Auch das anschließende Verdichten, Abziehen und Glätten des Frisch-Betons ist sehr mühsam und körperlich .->. anstrengend·.When building structures such as houses, ready-mixed concrete is widely used, which is pumped from the concrete mixer to the place of use via hose boom pumps. At the place of use, the end of the hose is held by two assistants. Since the concrete is pumped by piston pumps, the concrete hose transmits the piston impacts, so that strong blows occur at the end of the concrete hose. The subsequent compacting, screeding and smoothing of the fresh concrete is also very laborious and physically demanding.
Der Erfindung liegt die Aufgabe zugrunde, Betonierarbeiten zu vereinfachen.The invention is based on the object of simplifying concreting work.
2020
Mönchen - Bogenhausen Poschingerstraße 6Mönchen - Bogenhausen Poschingerstraße 6
Telefon: +49-89-99 89 04-0Phone: +49-89-99 89 04-0
5 23 992 (abitz d)5 23 992 (abitz d)
•Telefax*(ji &*m - automat,):
+49-89-98 40 37•Fax*(ji &*m - automat,):
+49-89-98 40 37
Telegramm·.Telegram·.
Chemindus MünchenChemindus Munich
Erfindungsgemäß wird diese Aufgabe durch einen Arbeitskorb der eingangs genannten Art gelöst, der eine Einrichtung zur Führung eines Betonpumpenschlauches aufweist.According to the invention, this object is achieved by a work basket of the type mentioned at the outset, which has a device for guiding a concrete pump hose.
Vorzugsweise ist die Führung für den Betonpumpenschlauch mit einem Spritzschutz versehen. Der Arbeitskorb kann ferner einen Innenrüttler aufnehmen und auf seiner Unterseite mit Verziehbrettern und einem Flügelglätter ausgestattet werden.Preferably, the guide for the concrete pump hose is provided with a splash guard. The work basket can also accommodate an internal vibrator and be equipped with smoothing boards and a power trowel on its underside.
&iacgr;&ogr; Vorzugsweise wird der Betonpumpenschlauch durch die Führung von oben vertikal in der Mitte des Arbeitskorbes geführt. Um zu verhindern, daß der Arbeitskorb dabei durch das Gewicht des Betonschlauchs zur Seite geschwenkt wird, ist vorzugsweise eine justierbare Aufhängung zum Einrichten des Arbeitskorbes in der Waagrechten vorgesehen.&iacgr;&ogr; Preferably, the concrete pump hose is guided vertically from above in the middle of the work basket. To prevent the work basket from being swung to the side by the weight of the concrete hose, an adjustable suspension is preferably provided for setting up the work basket in a horizontal position.
Der erfindungsgemäße Arbeitskorb eignet sich insbesondere für Betonierarbeiten, bei denen der Betonschlauch nicht über einen Masten geführt wird, sondern von dem an der Baustelle ohnehin im allgemeinen vorhandenen Hochbaukran gehalten wird.The work basket according to the invention is particularly suitable for concreting work in which the concrete hose is not guided over a mast, but is held by the construction crane that is generally present at the construction site anyway.
Ein Ausführungsbeispiel der Erfindung wird nachfolgend anhand der Zeichnung erläutert. Es zeigen:An embodiment of the invention is explained below with reference to the drawing.
Fig. 1 den Arbeitskorb in perspektivischer Darstellung, Fig. 2 den Arbeitskorb im Vertikalschnitt; Fig. 3 den Arbeitskorb im Horizontalschnitt undFig. 1 the work basket in perspective view, Fig. 2 the work basket in vertical section; Fig. 3 the work basket in horizontal section and
Fig. 4 den Schwingungsdämpfer für den BetonschlauchFig. 4 the vibration damper for the concrete hose
mit einer Führung für den Betonpumpenschlauch.with a guide for the concrete pump hose.
Fig. 1 zeigt einen Arbeitskorb 10, der einen Gitterrost 12 als Boden, vertikale Eckpfosten 14 und eine justierbare Aufhängung 16 aufweist. Die Gitterpfosten 12 sind bis zuFig. 1 shows a work basket 10, which has a grating 12 as a floor, vertical corner posts 14 and an adjustable suspension 16. The grating posts 12 are up to
• * 9* • * 9*
I · * 9* I · * 9*
einer Höhe von 90 cm durch ein Geländer 18 verbunden. In dem Geländer 18 befindet sich eine nicht dargestellte Türe, so daß der Arbeitskorb von einer Person betreten werden kann.a height of 90 cm by a railing 18. In the railing 18 there is a door (not shown) so that the work basket can be entered by one person.
Durch die justierbare Aufhängung 16 ist zentral ein Betonpumpenschlauch 20 geführt, der durch eine zentrale Öffnung im Gitterrost 12 nach unten aus dem Arbeitskorb 10 herausgeführt ist. Bis etwa zur Höhe des Geländers 18 über dem Gitterrost 12 ist der Betonpumpenschlauch 20 geführt, wobeiA concrete pump hose 20 is guided centrally through the adjustable suspension 16 and is led downwards out of the work basket 10 through a central opening in the grating 12. The concrete pump hose 20 is guided up to approximately the height of the railing 18 above the grating 12, whereby
&iacgr;&ogr; er innerhalb eines Schachtes 22 verläuft. An der Oberseite des Schachtes 22 ist der Betonpumpenschlauch 20 in einem Schwingungsdämpfer 24 gehalten, über dem Schwingungsdämpfer 24 befindet sich noch ein Spritzschutz 26. Zwischen dem Schacht 22 und dem Geländer 18 besteht ein ausreichender Abstand, so daß ein Laufgang für ein oder zwei Personen in dem Arbeitskorb 10 vorhanden ist.&iacgr;&ogr; it runs within a shaft 22. At the top of the shaft 22, the concrete pump hose 20 is held in a vibration damper 24, and above the vibration damper 24 there is a splash guard 26. There is sufficient clearance between the shaft 22 and the railing 18 so that there is a walkway for one or two people in the work basket 10.
In der justierbaren Aufhängung 16 ist ferner ein Innenrüttler 30 vorgesehen, dessen Rüttelrohr 32 ebenfalls durch den Schacht 22 und den Gitterrost 12 nach unten herausgeführt ist. Auf der Unterseite des Gitterrostes 12 sind Befestigungseinrichtungen für Verziehbretter 34 sowie einen Flügelglätter 3 6 vorgesehen.An internal vibrator 30 is also provided in the adjustable suspension 16, the vibrating tube 32 of which is also led downwards through the shaft 22 and the grating 12. Fastening devices for skidding boards 34 and a wing smoother 36 are provided on the underside of the grating 12.
Der Arbeitskorb 10 wird zum Betonieren in der Weise eingesetzt, daß er an dem Lasthaken eines Hochbaukrans über der zu betonierenden Fläche, z.B. Geschoßdecke, gehalten wird. Mittels der justierbaren Aufhängung 16 wird der Arbeitskorb 10 in der Waagrechten eingerichtet. Die justierbare Aufhängung 16 besteht dabei aus einer oben am Arbeitskorb 10 waagrecht angebrachten Lochschiene 38. Der Lasthaken des Hochbaukrans kann dadurch an unterschiedlichen Stellen längs der Schiene eingehängt werden, um eine waagrechte Einrichtung des Arbeitskorbes 10 zu erreichen. Zum Einrichten 5 des Arbeitskorbes in der Waagrechten sind etwa in Augenhöhe über dem Gitterrost 12 auf allen vier Seiten Wasserwaagen vorgesehen. Durch Verschwenken des Auslegers des Hochbau-The work basket 10 is used for concreting in such a way that it is held on the load hook of a building crane above the surface to be concreted, e.g. floor slab. The work basket 10 is set up horizontally using the adjustable suspension 16. The adjustable suspension 16 consists of a perforated rail 38 attached horizontally to the top of the work basket 10. The load hook of the building crane can thus be hooked in at different points along the rail in order to achieve a horizontal setting of the work basket 10. To set up the work basket 5 horizontally, spirit levels are provided at approximately eye level above the grating 12 on all four sides. By pivoting the boom of the building crane
krans mit dem daran hängenden Arbeitskorb 10 wird das über dem Betonpumpenschlauch 20 zugeführte Betongemisch in der Betonschalung verteilt. Im Arbeitskorb befinden sich dabei im allgemeinen zwei Personen, von denen die eine den Betonschlauch 2 0 führt und die andere über ein Funkgerät oder mittels Signalflagge den Kranführer anweist. Gleichzeitig wird mittels des Innenrüttlers 30 der Beton verdichtet. Der Innenrüttler 3 0 kann dazu verschoben werden, so daß das Ende des Rüttelrohrs 32 unterschiedlich weit in den Beton eintaucht. Der Innenrüttler 3 0 ist von üblicher Bauart und wird daher hier nicht näher beschrieben. Beim Betonieren einer Geschoßdecke sind dabei unter dem Gitterrost 12 Verziehbretter 34 angebracht. Beim Verschwenken des Auslegers des Hochbaukranes zum Bewegen des Arbeitskorbes 10 beim Verteilen des Betongemisches wird damit gleichzeitig die Oberfläche des Betons verzogen. Danach kann die Betonoberfläche noch mittels eines Flügelglätters 3 6 geglättet werden, der dazu an der Unterseite des Gitterrostes 10 befestigt wird. Der Flügelglätter 36 ist ebenfalls von üblieher Bauart.The concrete mixture supplied via the concrete pump hose 20 is distributed in the concrete formwork by means of the crane with the work basket 10 hanging from it. There are generally two people in the work basket, one of whom guides the concrete hose 20 and the other instructs the crane operator via a radio or signal flag. At the same time, the concrete is compacted using the internal vibrator 30. The internal vibrator 30 can be moved so that the end of the vibrating tube 32 dips into the concrete to different depths. The internal vibrator 30 is of a conventional design and is therefore not described in more detail here. When concreting a floor slab, deflection boards 34 are attached under the grating 12. When the boom of the high-rise crane is swiveled to move the work basket 10 when distributing the concrete mixture, the surface of the concrete is simultaneously distorted. The concrete surface can then be smoothed using a power trowel 36, which is attached to the underside of the grating 10. The power trowel 36 is also of a conventional design.
Beim Betonieren von Wänden werden die Verziehbretter 34 abmontiert und wird der Arbeitskorb 10 mittels Führungswinkeln 42 an der Unterseite des Gitterrostes 12 auf Schienen entlang der Oberkante der Schalungsplatten geführt. Zwei parallele Führungswinkel 42 sind dabei an der Unterseite des Gitterrostes 12 in einem Abstand angebracht, der mindestens gleich dem Außenabstand der Schalungsplatten auf beiden Seiten der zu betonierenden Wand entspricht.When concreting walls, the skid boards 34 are removed and the work basket 10 is guided on rails along the upper edge of the formwork panels using guide angles 42 on the underside of the grating 12. Two parallel guide angles 42 are attached to the underside of the grating 12 at a distance that is at least equal to the external distance of the formwork panels on both sides of the wall to be concreted.
In Fig. 4 ist in Draufsicht der Schwingungsdämpfer 24 dargestellt. Er weist eine Schlauchkupplung 43 auf, an der auf gegenüberliegenden Seiten über Schwingungsdämpfer 44 jeweils etwa rechteckförmige Handgriffe 45 mit Gummimanschetten 46 im Griffbereich befestigt sind. Die beiden Handgriffe 45 überspannen zusammen eine Fläche, die größer alsFig. 4 shows a top view of the vibration damper 24. It has a hose coupling 43, to which approximately rectangular handles 45 with rubber sleeves 46 in the grip area are attached on opposite sides via vibration dampers 44. The two handles 45 together span an area that is larger than
die Oberseite des Schachtes 22 ist, so daß sich die Gummimanschetten 4 6 außerhalb des Schachtes 22 befinden.the top of the shaft 22 so that the rubber sleeves 4 6 are outside the shaft 22.
Der erfindungsgemäße Arbeitskorb kann im Hochbau für vielerlei Arbeiten eingesetzt werden. Neben den Betonierarbeiten kann er auch für Betonsanierungsarbeiten, Schalungsmontage und -demontage, Armierungsarbeiten, Reparaturarbeiten, Gerüstmontage und -demontage und Fertigteilmontage eingesetzt werden. Auch zum Mauern, Verputzen, Streichen und &iacgr;&ogr; für Dachdeckerarbeiten, einschließlich Blechnerarbeiten, kann der erfindungsgemäße Arbeitskorb eingesetzt werden.The work basket according to the invention can be used for a wide range of work in building construction. In addition to concreting work, it can also be used for concrete renovation work, formwork assembly and disassembly, reinforcement work, repair work, scaffolding assembly and disassembly and prefabricated part assembly. The work basket according to the invention can also be used for bricklaying, plastering, painting and roofing work, including sheet metal work.
Daneben kann der Arbeitskorb auch als Förderkorb für Lasten aller Art, insbesondere für Heizkörper, Sanitärobjekte, Fliesen, Fenster und Bodenbeläge verwendet werden. Damit der Arbeitskorb 10 auch als Förderkorb einsetzbar ist, sind die Geländer 18 klappbar oder abnehmbar ausgebildet.In addition, the work basket can also be used as a conveyor basket for all types of loads, in particular for radiators, sanitary objects, tiles, windows and floor coverings. So that the work basket 10 can also be used as a conveyor basket, the railings 18 are designed to be foldable or removable.
Schließlich ist der erfindungsgemäße Arbeitskorb 10 auch als Rettungskorb bei Bränden oder sonstigen Notfällen einsetzbar. Finally, the work basket 10 according to the invention can also be used as a rescue basket in the event of fires or other emergencies.
Claims (7)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| DE29509817U DE29509817U1 (en) | 1995-06-16 | 1995-06-16 | Work basket for use on construction sites |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| DE29509817U DE29509817U1 (en) | 1995-06-16 | 1995-06-16 | Work basket for use on construction sites |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| DE29509817U1 true DE29509817U1 (en) | 1995-08-24 |
Family
ID=8009381
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| DE29509817U Expired - Lifetime DE29509817U1 (en) | 1995-06-16 | 1995-06-16 | Work basket for use on construction sites |
Country Status (1)
| Country | Link |
|---|---|
| DE (1) | DE29509817U1 (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN113265958A (en) * | 2021-04-27 | 2021-08-17 | 河南乾坤路桥工程有限公司 | Bottom die platform integral hanging and dismantling type hanging basket suspension arm and construction method |
Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE7215779U (en) * | 1972-04-25 | 1972-07-20 | Amundsen Odd | COLLAPSIBLE CARRIER PLATFORM FOR A HANGING FRAME |
| DE7335374U (en) * | 1973-09-29 | 1974-02-14 | WORKING AND ASSEMBLY BASKET | |
| DE3623631C1 (en) * | 1986-07-12 | 1987-08-13 | Karl Dipl-Ing Schlecht | Distributor mast |
| DE3801003A1 (en) * | 1988-01-15 | 1989-07-27 | Putzmeister Maschf | Arrangement for feeding tunnel formwork with concrete |
-
1995
- 1995-06-16 DE DE29509817U patent/DE29509817U1/en not_active Expired - Lifetime
Patent Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE7215779U (en) * | 1972-04-25 | 1972-07-20 | Amundsen Odd | COLLAPSIBLE CARRIER PLATFORM FOR A HANGING FRAME |
| DE7335374U (en) * | 1973-09-29 | 1974-02-14 | WORKING AND ASSEMBLY BASKET | |
| DE3623631C1 (en) * | 1986-07-12 | 1987-08-13 | Karl Dipl-Ing Schlecht | Distributor mast |
| DE3801003A1 (en) * | 1988-01-15 | 1989-07-27 | Putzmeister Maschf | Arrangement for feeding tunnel formwork with concrete |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN113265958A (en) * | 2021-04-27 | 2021-08-17 | 河南乾坤路桥工程有限公司 | Bottom die platform integral hanging and dismantling type hanging basket suspension arm and construction method |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| EP3926125B1 (en) | Fall prevention device | |
| DE1283484B (en) | Procedure for building high-rise buildings and formwork to carry out the procedure | |
| DE102004004883B4 (en) | Ceiling formwork panel and system ceiling formwork | |
| DE2213924A1 (en) | Method and device for the production of multi-storey buildings with a reinforced concrete skeleton | |
| DE29509817U1 (en) | Work basket for use on construction sites | |
| DE3036539A1 (en) | Prefabricated brick wall element for the full assembly of houses | |
| DE4102814C2 (en) | Soundproofing supports | |
| DE667655C (en) | Suspended framework, especially for roof work | |
| DE2064201A1 (en) | Method for assembling a roof made of precast reinforced concrete elements and a roof made of precast reinforced concrete elements | |
| DE935454C (en) | Building, room edging, bridging or the like. | |
| DE102004020345B4 (en) | Support system for a Konsolgerüst and Konsolgerüst having the carrier system | |
| CH444453A (en) | Console frame | |
| DE2402683A1 (en) | Varying-width reinforced-concrete tower structure climbing shuttering - with support-mounted panels swivelling about axis sloping according to wall slope | |
| DE29906036U1 (en) | Device for covering openings | |
| DE202019001499U1 (en) | Spacers for scaffold structures | |
| DE29612004U1 (en) | Tubular wall positioning profile | |
| DE29516293U1 (en) | Wooden beams, especially for slab formwork | |
| DE818112C (en) | Formwork for concrete structures of all kinds, especially concrete ceilings and hollow core ceilings | |
| DE2238565A1 (en) | DEVICE FOR SPREADING CONCRETE | |
| DE3807764C2 (en) | ||
| DE8332591U1 (en) | SCAFFOLDING CONSOLE FOR THE PRODUCTION OF SAVINGS, PETTES, LATCHES, ETC. FIXED HEIGHT AND WIDTH ADJUSTABLE CONSOLE FRAME | |
| DE1531102B2 (en) | Well equipment for an elevator | |
| DE3324306A1 (en) | Device for plastering, in particular on internal walls of buildings | |
| DE1434673B2 (en) | TRANSFORMER STATION MADE OF PRE-FABRICATED CONCRETE SLABS AND CORNER PARTS | |
| DE59750C (en) | Scaffolding for plastering and staining facades with adjustable scaffolding supports |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| R207 | Utility model specification |
Effective date: 19951005 |
|
| R163 | Identified publications notified |
Effective date: 19950927 |
|
| R150 | Utility model maintained after payment of first maintenance fee after three years |
Effective date: 19981030 |
|
| R151 | Utility model maintained after payment of second maintenance fee after six years |
Effective date: 20010801 |
|
| R158 | Lapse of ip right after 8 years |
Effective date: 20031231 |