[go: up one dir, main page]

DE2732868A1 - EXTRACTION DEVICE FOR MINING EXTRACTIONS - Google Patents

EXTRACTION DEVICE FOR MINING EXTRACTIONS

Info

Publication number
DE2732868A1
DE2732868A1 DE19772732868 DE2732868A DE2732868A1 DE 2732868 A1 DE2732868 A1 DE 2732868A1 DE 19772732868 DE19772732868 DE 19772732868 DE 2732868 A DE2732868 A DE 2732868A DE 2732868 A1 DE2732868 A1 DE 2732868A1
Authority
DE
Germany
Prior art keywords
rail
extraction
mining
machine
water supply
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
DE19772732868
Other languages
German (de)
Other versions
DE2732868C2 (en
Inventor
Klaus Prof Dipl Ing D Beckmann
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gewerkschaft Eisenhutte Westfalia GmbH
Original Assignee
Gewerkschaft Eisenhutte Westfalia GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gewerkschaft Eisenhutte Westfalia GmbH filed Critical Gewerkschaft Eisenhutte Westfalia GmbH
Priority to DE19772732868 priority Critical patent/DE2732868C2/en
Priority to SU782634853A priority patent/SU1269742A3/en
Priority to PL20854678A priority patent/PL117040B1/en
Priority to GB7830731A priority patent/GB2001683B/en
Publication of DE2732868A1 publication Critical patent/DE2732868A1/en
Application granted granted Critical
Publication of DE2732868C2 publication Critical patent/DE2732868C2/en
Expired legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C29/00Propulsion of machines for slitting or completely freeing the mineral from the seam
    • E21C29/02Propulsion of machines for slitting or completely freeing the mineral from the seam by means on the machine exerting a thrust against fixed supports
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C35/00Details of, or accessories for, machines for slitting or completely freeing the mineral from the seam, not provided for in groups E21C25/00 - E21C33/00, E21C37/00 or E21C39/00
    • E21C35/22Equipment for preventing the formation of, or for removal of, dust
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F17/00Methods or devices for use in mines or tunnels, not covered elsewhere
    • E21F17/04Distributing means for power supply in mines
    • E21F17/06Distributing electric power; Cable networks; Conduits for cables

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Mechanical Engineering (AREA)
  • Power Engineering (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)
  • Machines For Laying And Maintaining Railways (AREA)
  • Cleaning In General (AREA)
  • Drilling And Exploitation, And Mining Machines And Methods (AREA)

Description

PATENTANWÄLTEPATENT LAWYERS

DlPL.-ING. HENNICKE DlPL.-lNG. VOLLBACH _DlPL.-ING. HENNICKE DlPL.-lNG. VOLLBACH _

5 KOLN/RH.5 KOLN / RH.

KAISER-WILHELM-RING 24KAISER WILHELM RING 24

R«g.-Nr.R «g.-No.

1 ftw 77?fi I Köln, d*n 20.6.1977 1 ftw 77? Fi I Cologne, d * n June 20, 1977

Akt.ni.: biH.one«b«i VO/WO Akt.ni .: biH.one «b« i VO / WHERE

Anm.: Gewerkschaft Eisenhütte Westfalia 4670 LünenNote: Union Eisenhütte Westfalia 4670 Lünen

Gewinnungseinrichtung für Bergbau-GewinnungebetriebeExtraction facility for mining companies

Die Erfindung betrifft eine Gewinnungaeinrichtung für Bergbau-Gewinnungsbetriebe, bestehend aus einer Fahrschiene für eine selbstfahrende Gewinnungsmaschine und einer Strom- und WasserversorgungBvorriohtung, wobei die Stromversorgungsvorrichtung eine in einem Schutzgehäuse angeordnete Stromschiene für einen an der Gewinnungsmaschine angeordneten, in das Schutzgehäuse einfassenden Stromabnehmer aufweist, während die Wasserveraorgungsvorrichtung aus einer Druckwasserleitung besteht, aus welcher das Wasser vorzugsweise mittels «in·· an dar Gewinnungsmaschine angeordneten, in die Druckwaaserleitung einfassenden und längs durch diese Leitung hindurchbewegbaren Wasserabnehmers entnehmbar ist.The invention relates to an extraction device for Mining extraction operations, consisting of a rail for a self-propelled extraction machine and a Power and water supply device, the power supply device having a power rail arranged in a protective housing for one on the mining machine arranged, in the protective housing enclosing current collector, while the water supply device consists of a pressurized water line, from which the water preferably by means of "in ·· on the extraction machine, enclosing in the pressure water line and movable longitudinally through this line Water collector is removable.

FUr die maschinelle Gewinnung von Kohle oder sonstigen Mineralien in Strebbetrieben u.dgl. werden Hobelanlagen sowie Schrämmaschinen eingesetzt, bei denen der al· Kettenkratzförderer ausgebildete rückbar· StrebfOrderer surFor the mechanical extraction of coal or other Minerals in longwall operations and the like, planing systems and cutting machines are used, in which the al · chain scraper conveyor is designed to be reversible · StrebfOrderer sur

809885/0338809885/0338

Gewerkschaft Elsenhütte Westfalia nnn^oeo Union Elsenhütte Westfalia nnn ^ oeo

FUhrung der Gewinnungsmaschine verwendet wird. An den Strebförderer werden zu diesem Zweck die erforderlichen MaschinenfUhrungen angebaut. Außerdem ist der Förderer Trttger des Versorgungssystems. Er wird z.B. mit einem Kabelkanal für ein von der Schrämmaschine nachgeschlepptes elektrisches Schleppkabel sowie mit Anbauteilen für eine der Staubniederschlagung dienende Druckwasserversorgungsleitung ausgerüstet. Bei Hobelanlagen erfolgt der Fahrantrieb des Hobels mit Hilfe einer endlosen Hobelantriebskette, die in am Förderer angebauten Kettenkanälen geführt wird.Guiding the extraction machine is used. To the For this purpose, face conveyors are attached to the necessary machine guides. Also is the sponsor Owner of the supply system. He is e.g. with a Cable duct for an electrical towing cable that is towed by the cutting machine and with attachments for equipped with a pressurized water supply line for dust deposition. In the case of planing systems the travel drive of the planer with the help of an endless planer drive chain, which is guided in chain channels attached to the conveyor.

Ss ist auch schon bekannt, bei Walzenschrämmaschinen mit einem kettenlosen Vorschub zu arbeiten. In diesem Fall wird z.B. eine triebstockverzahnte Fahrschiene am Förderer angebaut, an der die mit einem eigenen Fahrantrieb ausgerüstete Schrämmaschine entlangläuft. Es ist ferner bekannt, für die Stromversorgung elektrisch angetriebener Gewinnungsmaschinen anstelle von Kabeln eine Stromschiene zu verwenden, die in einem Schutzgehäuse angeordnet ist, in welches ein an der Stromschiene entlanggleitender Stromabnehmer der Gewinnungsmaschine einfaßt (DT-OS 1 515 340). Ein ähnliches Versorgungssystem ist auch für die Druckwasserzuführung bekannt. Die Wasserzuführung zu der Gewinnungsmaschine erfolgt in diesem Fall mit Hilfe eines an der Gewinnungsmaschine angeordneten, in die Druckwasserleitung einfassenden und bei der Fahrbewegung der Gewinnungsmaschine längs durch die Druckwasserleitung hindurohlaufenden Wasserabnehmers od.dgl.Ss is also already known to use with roller shearers to work with a chainless feed. In this case, e.g. a rack-toothed rail is attached to the conveyor, on which the rail with its own drive equipped cutting machine runs along. It is also known to be electrically powered for power supply Extraction machines to use a busbar instead of cables, which is arranged in a protective housing, in which a pantograph of the mining machine, sliding along the busbar, encloses (DT-OS 1 515 340). A similar supply system is also known for the pressurized water supply. The water supply to the extraction machine takes place in this case with the help of a arranged on the extraction machine, bordering in the pressurized water line and during the movement of the extraction machine along through the pressurized water line hindurohlaufenden water collector or the like.

Di· bekannten Gewinnungs- und Versorgungssysteme für Strebbetrieb· sind verhältnismäßig starre Systeme, die sich im Betrieb zumindest nicht ohne erhebliche Umrüstarbeiten von der Hobelgewinnung auf die SchrämmaschinengewinnungThe known extraction and supply systems for longwall mining are relatively rigid systems that are located in the Operation at least not without considerable conversion work from planer extraction to cutting machine extraction

809885/0339809885/0339

Gewerkschaft Eisenhütte Westfalia
Gw 7726
Westfalia Ironworks Union
GW 7726

oder umgekehrt umstellen lassen und die auch nicht ohne weiteres für den gleichzeitigen Einsatz unterschiedlicher Gewinnungsmaschinen, wie Kohlenhobel und Schrämmaschinen, verwendbar sind.or vice versa, and not without further ado for the simultaneous use of different ones Extraction machines such as coal planers and cutting machines are useful.

Der Erfindung liegt vornehmlich die Aufgabe zugrunde, eine Gewinnungseinrichtung, insbesondere ein Antriebs-, Führungs- und Versorgungssystem zu schaffen, welche bzw. welches die Möglichkeit bietet, im Bedarfsfall auch verschiedene Gewinnungsmaschinen, wie Hobel und Schrämmaschinen, gleichzeitig unter möglichst günstiger Maschinenausnutzung einzusetzen. Dabei soll vor allem das Antriebsund Versorgungssystem universell für unterschiedliche Gewinnungsmaschinen verwendbar und außerdem vom Förderer weitgehend unabhängig sein.The invention is primarily based on the object of creating an extraction device, in particular a drive, guidance and supply system, which, if necessary , offers the possibility of using different extraction machines, such as planers and cutting machines, at the same time with the most favorable machine utilization possible. Above all, the drive and supply system should be universally usable for different mining machines and also be largely independent of the conveyor.

Die Erfindung besteht in ihrem Grundgedanken darin, daß die Fahrschiene und die Strom- und Wasserversorgungsvorrichtung zu einer fördererunabhängigen, als Schlitten ausgebildeten und sowohl für eine schälend arbeitende Gewinnungsmaschine als auch für eine schneidend arbeitende Gewinnungsmaschine verwendbare Gewinnungsschiene vereinigt sind. The invention consists in its basic concept is that the running rail and the power and water supply device to a conveyor independent, formed as a slide and combined both for a peeling operating mining machine as usable also for a cutting working extraction machine extracting rail.

Der Ausdruck nf order erunabhängig11 besagt, daß die Fahrschiene und das Strom- und Wasserversorgungssystem nicht, wie üblich, Anbauteile des Förderers darstellen, sondern ihrerseits zu einer selbständigen Baueinheit in Gestalt einer selbsttragenden, stabilen und schußweise zusammensetzbaren Gewinnungssohlene vereinigt sind, die gegebenenfalls als Träger für den Strebförderer dienen kann, ohne daß jedoch die sich aus dem Fahrantrieb und der Gewinnungsarbeit ergebenden Maschinenkräfte voll auf den För derer abgesetzt werden. Von Bedeutung ist, daß die er- The expression n for erindependent 11 means that the running rail and the power and water supply system are not, as usual, add-on parts of the conveyor, but are in turn combined into an independent structural unit in the form of a self-supporting, stable extraction level that can be assembled in sections, which may be used as a Can serve carrier for the face conveyor, however, without the machine forces resulting from the drive and the extraction work are fully deposited on the conveyor. What is important is that sufficient

809885/0339809885/0339

Gewerkschaft Eisenhütte WestfaliaWestfalia Ironworks Union Gewerkschaft Eisenhütte Westfalia ^TOOOCOWestfalia Ironworks Union ^ TOOOCO

Gw 7726 * tQcQQQ Gw 7726 * tQcQQQ

- k- - k-

flndungsgemäße Gewinnungsschiene als Einheitsschiene für unterschiedliche Gewinnungsmaschinen gleichermaßen geeignet ist und daher universell verwendbar ist. Die Gewinnungsschiene bildet demgemäß innerhalb des gesamten Gewinnungssystems ein die Fahrschiene, das Energieversorgungssystem und das Druckwasserversorgungssystem umfassendes selbständiges Grundelement, an dem man je nach Bedarf auch mehrere oder unterschiedliche Gewinnungsmaschinen optimal einsetzen kann. Dies bietet die Möglichkeit, in verschiedenen Bereichen eines Gewinnungsbetriebes unterschiedliche Gewinnungsmaschinen einzusetzen und damit insgesamt eine Steigerung der Gewinnungsleistung zu erzielen.according to the recovery rail as a standard rail for different extraction machines is equally suitable and can therefore be used universally. The extraction rail accordingly forms within the entire extraction system an independent basic element comprising the running rail, the energy supply system and the pressurized water supply system, on which several or different extraction machines can be optimally used as required. This offers the possibility to use different extraction machines in different areas of an extraction operation and thus to achieve an overall increase in extraction performance.

Die erfindungsgemäße Gewinnungsschiene ermöglicht einen kettenlosen Vorschub der Gewinnungsmaschinen, die also in diesem Fall mit einem eigenen Fahrantrieb ausgerüstet sind, dessen Energieversorgung über die in die Gewinnungsschiene integrierte Stromschiene erfolgt. Es versteht sich, daß über die gemeinsame Stromschiene mehrere gleichzeitig arbeitende Gewinnungsmaschinen versorgt werden können. Dabei kann auch der Hobel mit einem eigenen elektrischen Fahrantrieb ausgerüstet werden, so daß der bisher übliche Kettenantrieb entfällt.The extraction rail according to the invention enables one chainless feed of the mining machines, which in this case are equipped with their own drive whose energy supply takes place via the busbar integrated in the extraction rail. It goes without saying that several mining machines working at the same time can be supplied via the common busbar. The planer can also have its own electric Travel drive are equipped, so that the chain drive that has been customary up to now is no longer necessary.

Die in die Gewinnungsschiene integrierte Fahrschiene kann, wie bekannt, «in· Triebstockverzahnung aufweisen, mit welcher mindestens ein Antriebsritzel der Gewinnungsmaschine im Zahneingriff steht. Die Gewinnungsmaschine weist zweckmäßig zusätzlich zu der Fahrschiene nooh mindestens eine Führungsschiene für die Gewinnungsmaschine auf. Dabei können dl· unterschiedlichen Gewinnungsmaschinen an ein und derselben Führungsschiene geführt werden. Es besteht die Möglichkeit, dl· Strom- und/oder die Waeeervereorgungeleitung und/oder die genannt· Fahr«chien· selbst als «in·As is known, the running rail integrated in the mining rail can have rack teeth with which at least one drive pinion of the mining machine is in mesh. The mining machine expediently has at least one in addition to the running rail nooh Guide rail for the mining machine. Here, dl · different extraction machines can be connected to one and the same guide rail. There is the possibility to use the electricity and / or the water supply line and / or the named drivers themselves as “in”

809885/0339809885/0339

Gewerkschaft Eisenhütte WestfaliaWestfalia Ironworks Union

die Gewinnungsmaschine führende Führungsschiene auszubilden oder aber im Inneren dieser Führungsschiene anzuordnen. Beispielsweise kann hierbei die Triebstockverzahnung an einer der Zwangsführung der Gewinnungsmaschine dienenden Führungsschiene angebracht werden. Statt dessen ist es aber auch möglich, die triebstockverzahnte Fahrschiene oder die genannten Versorgungsleitungen im Inneren einer stabilen Führungsschiene unterzubringen.to train the mining machine leading guide rail or to be arranged inside this guide rail. For example, the rack toothing can be used here be attached to a guide rail used to guide the mining machine. Instead is But it is also possible to use the rack-toothed rail or to accommodate said supply lines inside a stable guide rail.

In weiterer Ausgestaltung der Erfindung weist die Gewinnungsschiene eine, vorzugsweise trogförmige, Aufnahme für einen Förderer (Kettenkratzförderer) auf. Dabei läßt sich die Anordnung z.B. so treffen, daß auf der Abbaustoßseite der Fördereraufnähme die triebstockverzahnte Fahrschiene und auf der Versatzseite der Fördereraufnahme die Strom- und Wasserversorgungsleitungen angeordnet sind. Ee besteht ferner die Möglichkeit, die Gewinnungsmaschine mit mindestens einem Längskanal für besondere Funktionen zu versehen. Beispielsweise kann der Längskanal zur Verlegung der Hydraulikleitungen für die Versorgung des hydraulischen Ausbausystems oder aber als Luftkanal für die Zuführung von Frischwettern, als Saugkanal für das Absaugen von Grubengas u.dgl. Verwendung finden. Der Kanal kann zugleich zur Aussteifung der Gewinnungsschiene dienen und gegebenenfalls mit Kupplungsorganen für den Anschluß von Rückvorrichtungen, Abspannvorrichtungen u.dgl. versehen sein.In a further embodiment of the invention, the extraction rail has a, preferably trough-shaped, receptacle for a conveyor (chain scraper conveyor). The arrangement can be made, for example, so that on the working face side the Fördereraufnähme the rack toothed rail and the power and water supply lines are arranged on the offset side of the conveyor receptacle. Ee there is also the possibility of using the extraction machine to provide at least one longitudinal channel for special functions. For example, the longitudinal channel can be used for laying the hydraulic lines for the supply of the hydraulic expansion system or as an air duct for the supply from fresh weather, as a suction channel for extracting mine gas and the like. The channel can at the same time serve to stiffen the extraction rail and, if necessary, be provided with coupling elements for the connection of rear devices, bracing devices and the like.

Die gesamte Gewinnungsmaschine kann auoh an den Ausbaukappen eines schreitenden Ausbausysteas hängend angeordnet werden. In diesem Fall bildet sie eine Oberführung für die Gewinnungemaschine. Die «rfindungsgmäß· Gewinnungsschiene bildet das Rückgrat der gesamten Gewinnungseinrichtung, die eich mit unterschiedlichen Ausbausystemen kombinieren IKBt. Dabei können für die verschiedenen Strebbereiohe auch v#r-The entire extraction machine can also be arranged hanging on the extension caps of a striding extension system will. In this case it forms an overpass for the Extraction machine. The extraction rail according to the invention forms the backbone of the entire extraction facility that Combine eich with different expansion systems IKBt. For the various longwall areas, you can also

809885/0339809885/0339

Gewerkschaft Eisenhütte Westfalia
Gw 7726
Westfalia Ironworks Union
GW 7726

schiedene Ausbausysteme eingesetzt werden. Mit besonderem Vorteil läßt sich die Gewinnungsschiene mit einem Ausbausystem kombinieren, welches aus Ausbaueinheiten besteht, die jeweils einen höhenveränderlichen, vorzugsweise winkelsteifen, Stützrahmen aufweisen, dessen Kappe und/oder Liegendschwelle von mehreren parallel nebeneinanderliegen den, einzeln oder gruppenweise vorschiebbaren schmalen First- bzw. Sohlmessern gebildet ist. Bei einem solchen Ausbausystem, welches eine vollflächige Hangendunterstützung und einen Vorschub der Firstmesser unter Last ermöglicht, läßt sich der Anschluß der Gewinnungsschiene so durchführen, daß die Schiene nur mit einem Teil der zu derselben Ausbaueinheit gehörenden First- oder Sohlmesser gekoppelt wird, während die übrigen Messer unabhängig von der Gewinnungsschiene vorschiebbar sind. Für die Ausgestaltung eines solchen, im nachfolgenden noch näher erläuterten Ausbaus wird selbständiger Schutz beansprucht.different expansion systems can be used. The extraction rail can be particularly advantageously equipped with an expansion system combine, which consists of expansion units, each with a height-adjustable, preferably angularly rigid, Have support frame, the cap and / or sleeper of several are parallel to each other the narrow ridge or sole knives that can be pushed forward individually or in groups. With such a Extension system, which provides a full-surface slope support and a feed of the ridge knife under load allows the connection of the extraction rail Carry out such that the rail is only connected to a part of the ridge or sole knife belonging to the same extension unit is coupled, while the other knives can be advanced independently of the extraction rail. For the design independent protection is claimed for such an expansion, which will be explained in more detail below.

Weitere Merkmale der Erfindung ergeben sich aus der nachfolgenden Beschreibung der in der Zeichnung dargestellten Ausführungsbeispiele. In der Zeichnung zeigt:Further features of the invention emerge from the following Description of the embodiments shown in the drawing. In the drawing shows:

Fig. 1 im Querschnitt durch einen Gewinnungsstreb eine Gewinnungseinrichtung mit einer erfindungsgemäß en Gewinnungs s chi ene;Fig. 1 in cross section through an extraction strut an extraction device with an inventive mining chi ene;

Fig. 2 einen Schnitt nach Linie II-II der Fig. 1; Fig. 3 in der Schnittdarstellung der Fig. 1 ein dieser gegenüber hinsichtlich der Ausgestaltung des Schreitausbaus geändertes Ausfuhrungsbeispiel; FIG. 2 shows a section along line II-II of FIG. 1; 3 in the sectional view of FIG. 1, one opposite with regard to the configuration of the step extension modified exemplary embodiment;

Fig. 4 eine Teilansicht zu Fig. 3, wobei anstelle einer Schrämmaschine ein Hobel vorgesehen ist;Fig. 4 is a partial view of FIG. 3, with instead a cutter is provided with a planer;

Fig. 5 in der Schnittdarstellung der Fig. 1 ein weiteres Ausführungsbeispiel;FIG. 5 shows a further exemplary embodiment in the sectional view of FIG. 1; FIG.

809885/0339809885/0339

Gewerkschaft Eisenhütte Westfalia η τ-> ο ο ο βWestfalia Ironworks Union η τ-> ο ο ο β

Gw 7726 2 7 3 2 0 0GW 7726 2 7 3 2 0 0

Fig. 6 einen Schnitt nach Linie VI-VI der Fig. 5.FIG. 6 shows a section along line VI-VI in FIG. 5.

Bei dem Ausführungsbeispiel nach den Fig. 1 und 2 ist als Strebausbau ein Schildausbau vorgesehen, bestehend aus Kappe 10, Bruchschild 11, Liegendschwelle 12, hydraulischen Stempeln 13, die zwischen Kappe 10 und Liegendschwelle 12 gelenkig eingeschaltet sind, und Lenkern 14, welche den Bruchschild mit der Liegendschwelle gelenkig verbinden. Zwischen Kappe 10 und Bruchschild 11 ist ein hydraulischer Zylinder 15 eingeschaltet.In the embodiment according to FIGS. 1 and 2, a shield support is provided as a longwall construction, consisting of Cap 10, breakage shield 11, lying threshold 12, hydraulic rams 13 between the cap 10 and lying threshold 12 are articulated, and links 14, which articulate the breakage shield with the sleeper associate. A hydraulic cylinder 15 is connected between the cap 10 and the fracture shield 11.

Zwischen den Schildausbaueinheiten und dem Abbaustoß 16 liegt der als Kettenkratzförderer ausgebildete Strebförderer 17, welcher mittels an den Liegendschwellen 12 abgestützter Rückzylinder 13 gegen den Abbaustoi3 rückbar ist. Die Hereingewinnung des Flözes erfolgt bei dem Ausführungsbeispiel mit Hilfe einer Walzenschrämmaschine 19, die sich seitlich an dem Strebförderer 17 bzw. einer hieran angeordneten Führungsschiene 20 führt.The face conveyor designed as a chain scraper conveyor is located between the shield support units and the working face 16 17, which can be moved against the dismantling oi3 by means of rear cylinders 13 supported on the lying sleepers 12. In the exemplary embodiment, the seam is extracted with the aid of a roller cutting machine 19, which laterally on the face conveyor 17 or a guide rail 20 arranged thereon.

Die Schrämmaschine 19 ist als selbstfahrende Maschine ausgebildet und mit einem elektrischen Fahrantrieb versehen. Das Antriebs- und Versorgungssystem wird von einer schlittenartigen Gewinnungsschiene 21 gebildet, die nach Art einer Hängeschiene an den vorkragenden Kappen 10 der Schildausbaueinheiten verschiebbar aufgehängt ist. Der Vorschub der Gewinnungsschiene 21 in Richtung auf den Abbaustoß 16 erfolgt mittels hydraulischer Vorschubzylinder 22, welche zwischen Gewinnungsschiene und Kappe gelenkig eingeschaltet sind.The cutting machine 19 is designed as a self-propelled machine and is provided with an electric drive. The drive and supply system is formed by a slide-like extraction rail 21, which according to Art a hanging rail on the protruding caps 10 of the shield support units is slidably suspended. Of the The extraction rail 21 is advanced in the direction of the working face 16 by means of hydraulic advance cylinders 22, which is articulated between the extraction rail and cap are switched on.

Die Gewinnungsschiene 21 umfaßt in einer Baueinheit eine triebstockverzahnte Fahrschiene 23, ferner eine Stromversorgungsvorrichtung 24 und schließlich eine Druckwasser-The extraction rail 21 comprises in a structural unit a rack-toothed running rail 23, furthermore a power supply device 24 and finally a pressurized water

B098S5/0339B098S5 / 0339

Gewerkschaft Eisenhütte Westfalia Λ- ....αWestfalia Ironworks Union Λ - .... α

Gw 7726 273ZOOOGW 7726 273ZOOO

Zuführungsvorrichtung 25. Die Vorrichtung 24 besteht in bekannter Weise aus einer elektrischen Stromschiene 26, die im Inneren eines Schutzgehäuses 27 angeordnet ist, welches mit einem unter geringem Überdruck stehenden Gas (Luft) gefüllt sein kann, um das Eindringen von Methangasen in das Schutzgehäuse zu verhindern. Das Schutzgehäuse ist an seiner Unterseite in Längsrichtung bei 28 geschlitzt, wobei sich der Schlitz für den Durchgriff eines Stromabnehmers 29 elastisch aufweiten läßt. Der Stromabnehmer 29 der Gewinnungsmaschine 19 durchgreift den Schlitz und steht in Gleitkontakt mit der Stromschiene 26. Über die Stromschiene 26 und den Stromabnehmer wird somit der Fahrantrieb der Schrämmaschine sowie der Drehantrieb der Schrämwalzen 30 gespeist.Feed device 25. The device 24 consists in a known manner of an electric busbar 26, which is arranged in the interior of a protective housing 27, which with a slightly overpressure gas (Air) can be filled to prevent methane gases from entering the protective housing. The protective housing is slotted on its underside in the longitudinal direction at 28, the slot being for the penetration a pantograph 29 can expand elastically. The pantograph 29 of the mining machine 19 reaches through the slot and is in sliding contact with the busbar 26. Via the busbar 26 and the current collector the drive of the cutting machine and the rotary drive of the cutting rollers 30 are thus fed.

Die Druckwasserzuleitung für die Staubniederschlagung besteht, wie ebenfalls an sich bekannt ist, aus einer Druckwasserleitung 31, in die ein nach Art eines Rüssels od.dgl. ausgebildeter Wasserabnehmer 32 der Schrämmaschine 19 einfaßt. Das der Druckwasserleitung 31 über den Wasserabnehmer 32 entnommene Druckwasser fließt den verschiedenen Sprühdüsen der Schrämmaschine zu, wie dies bekannt ist.As is also known per se, the pressurized water supply line for the dust precipitation consists of a pressurized water line 31, in which a trunk or the like. trained water collector 32 of the cutting machine 19 borders. The pressurized water taken from the pressurized water line 31 via the water collector 32 flows to the various Spray nozzles of the cutting machine, as is known.

Der Fahrantrieb der Schrämmaschine 19 weist mindestens ein angetriebenes Zahnrad 33 auf, welches mit der triebetockverzahnten Fahrschiene 23 im Eingriff steht und dadurch den Maschinenvorschub bewirkt. Die gesamte Gewinnungssohiene 21 ist ebenso wie der Strebförderer 17 nach jedem Gewinnungsschnitt der Schrämmaschine 19 um die Schnittiefe zum Abbaustoß 16 hin vorschiebbar. Die Aufhängung der Gewinnungsschisne 21 an den benachbarten Kappen 10 der Ausbaueinheiten kann, wie in Fig. 2 dargestellt, mittels einer T-Nutführung 34 erfolgen. Die Schrämmaschine ist im übrigen, wie bekannt, als DoppelwalzenschrämmaschineThe travel drive of the cutting machine 19 has at least one driven gear 33, which is toothed with the drive unit Rail 23 is in engagement and thereby causes the machine advance. The entire extraction line 21 is just like the face conveyor 17 after each extraction cut of the cutting machine 19 to the Depth of cut to the working face 16 can be advanced. The suspension of the extraction chisne 21 on the adjacent caps 10 of the expansion units can, as shown in FIG. 2, take place by means of a T-slot guide 34. The cutting machine is moreover, as is known, as a double drum shearer

809885/0339809885/0339

Gewerkschaft Eisenhütte Westfalia (lTi-iefiflUnion of Eisenhütte Westfalia (lTi-iefifl

mit zwei höhenverschwenkbaren Schrämwalzen 30 und 30' ausgebildet. Die Ausbildung der triebstockverzahnten Fahrschiene 23 kann unterschiedlich sein. Sie kann aus einer Lochstange, einer Zahnstange, einer Bolzenstange od.dgl. bestehen. Bei dem dargestellten AusfUhrungsbeispiel wird die Schrämmaschine im Liegendbereich an dem Strebförderer 17 geführt. Die Schrämmaschine kann, wie Fig. 2 zeigt, auch mit Gleitkufen 35 versehen sein, mit welchen sie auf dem Liegenden oder auf dem Strebförderer 17 läuft. Anstelle der Walzenschrämmaschine kann aber auch eine andere Gewinnungsmaschine, z.B. ein Hobel, vorgesehen sein, der in diesem Fall ebenfalls mit einem elektrischen Fahrantrieb ausgerüstet ist.formed with two vertically pivotable cutting rollers 30 and 30 '. The formation of the rack-toothed rail 23 can be different. It can consist of a perforated bar, a rack, a bolt rod or the like. exist. In the exemplary embodiment shown, the cutting machine is guided on the face conveyor 17 in the lying area. The cutting machine can, as Fig. 2 shows, also be provided with skids 35, with which it runs on the lying or on the face conveyor 17. Instead of However, another mining machine, e.g. a planer, can also be provided for the roller shearer, which is used in in this case is also equipped with an electric drive.

Die Anordnung nach Fig. 3 unterscheidet sich von derjenigen nach den Fig. 1 und 2 im wesentlichen dadurch, daß hier ein anderes Ausbausystem verwendet wird, welches eich in Verbindung mit der erfindungsgemäßen Gewinnungaeohiene mit besonderem Vorteil einsetzen läßt. Dieses Ausbausystem besteht aus einem winkelsteifen, offenen Stützrahmen 40, an dessen Rahmenecken jeweils ein hydraulischer Stempel 41 angeordnet ist. Die Stempel 41 tragen eine mehrteilige Kappe, welche aus z.B. drei bis zehn schmalen, dicht nebeneinanderliegenden parallelen Firstmessern 42 besteht, die von Gleitführungen 43 des Stützrahmens geführt und abgestützt sind. Jedem Firstmesser 42 ist ein eigener Vorechubzylinder 44 zugeordnet, der zwischen dem betreffenden Firstmesser und dem gemeinsamen Stützrahmen 40 eingeschaltet ist. Die Firstmesser 42 können daher einzeln oder gruppenweise zum Abbaustoß hin vorgeschoben werden, ohne die Stempel 41 voll entlasten zu müssen. Die Liegendschwell· des Ausbaus ist entsprechend der Kappe ausgebildet. Sie besteht ebenfalls aus mehreren, parallel dicht nebeneinanderliegenden Sohlmessern 45» weloh· von Führungen 46The arrangement according to FIG. 3 differs from that according to FIGS. 1 and 2 essentially in that a different expansion system is used here, which is calibrated in connection with the extraction process according to the invention Can be used with particular advantage. This expansion system consists of an angularly rigid, open support frame 40, a hydraulic ram 41 is arranged at each of the frame corners. The stamp 41 carry a multi-part Cap, which consists of, for example, three to ten narrow, closely spaced parallel ridge knives 42, which are guided and supported by sliding guides 43 of the support frame. Each ridge knife 42 has its own feed cylinder 44 assigned, switched between the respective ridge knife and the common support frame 40 is. The ridge knife 42 can therefore be advanced individually or in groups to the working face without the To have to fully relieve stamp 41. The horizontal sill of the extension is designed to match the cap. she also consists of a plurality of sole knives 45 lying close to one another in parallel, with guides 46

809885/0339809885/0339

Gewerkschaft Eisenhütte Westfalia .......Westfalia Ironworks Union .......

des Stützrahmens 40 geführt werden und mittels hydraulischer Vorschubzylinder 47 einzeln oder gruppenweise vorschiebbar sind. Die Anordnung ist so getroffen, daß sowohl die Firstmesser 42 als auch die Sohlmesser 45 unter Last vorgeschoben werden können. Sobald sämtliche Messer 42 und 45 um den Hub ihrer Vorschubzylinder 44, 47 vorgeschoben sind, läßt sich der Stützrahmen 40 in einem Schritt nachholen. Dies erfolgt ebenfalls mit Hilfe der Zylinder 44 und 47, die sich in diesem Fall an den im Reibkontakt mit dem Hangenden bzw. Liegenden stehenden Messern 42, 45 abstützen. Auch beim Nachholen des Stützrahmens 40 brauchen die Stempel 41 nicht vollständig entlastet zu werden.of the support frame 40 and by means of hydraulic feed cylinders 47 individually or in groups are advanced. The arrangement is such that both the ridge knife 42 and the bottom knife 45 can be advanced under load. As soon as all knives 42 and 45 by the stroke of their feed cylinders 44, 47 are advanced, the support frame 40 can be made up in one step. This is also done with the help of the Cylinders 44 and 47, which in this case are in frictional contact with the hanging wall or lying person Support knives 42, 45. Even when the support frame 40 is made up for, the punches 41 do not need to be completely relieved to become.

Der Strebförderer 17 ruht auf den vorderen Enden der Sohlmesser 45· Er ist mit einem der zu jeder Ausbaueinheit gehörenden Sohlmesser verbunden, so daß er beim Vorpressen dieses Sohlmessers mitgenommen und damit zum Abbaustoß hin gerückt wird. Entsprechend ist die Gewinnungsschiene 21 mit einem der Firstmesser 42 einer jeden Ausbaueinheit gekoppelt, so daß sie ebenfalls beim Vorschub dieses Messers mitgenommen wird. Die Gewinnungsschiene 21 entspricht im übrigen derjenigen nach Fig. 1.The face conveyor 17 rests on the front ends of the bottom knife 45 · It is with one of the belonging to each extension unit Sole knife connected, so that he is taken along when pre-pressing this sole knife and thus to the mining joint is moved towards. The extraction rail 21 is correspondingly with one of the ridge knives 42 of each expansion unit coupled so that it is also taken along when this knife is advanced. The extraction rail 21 corresponds otherwise that of FIG. 1.

Fig. 4 läßt erkennen, daß anstelle der Schrämmaschine 19 auch ein Kohlenhobel 48 eingesetzt werden kann, der ebenfalls über die Gewinnungsschiene 21 versorgt wird. Der Hobel weist, wie erwähnt, einen eigenen elektrischen Fahrantrieb auf. Der kettenlose Vorschub des Hobels erfolgt in gleicher Weise über die triebstockverzahnte Fahrschiene 23 der Gewinnungsschiene. Der Hobel ist im Liegendbereich an dem Strebförderer 17 bzw. einer hieran angebauten Führungsschiene 20 geführt.Fig. 4 shows that instead of the cutting machine 19, a coal plow 48 can be used, which also is supplied via the extraction rail 21. Of the As mentioned, the planer has its own electric drive. The chainless feed of the planer takes place in in the same way via the rack rail 23 with teeth the extraction rail. The plane is in the lying area on the face conveyor 17 or on a guide rail attached to it 20 led.

609885/0339609885/0339

Gewerkschaft Eisenhütte Westfalia Gw 7726Westfalia Ironworks Union GW 7726

In den Fig. 5 und 6 ist ein AusfUhrungsbeispiel dargestellt, bei welchem die Gewinnungsschiene 50 ebenfalls aus einem Schlitten besteht, der eine triebstockverzahnte Fahrschiene 23, eine Stromversorgungsvorrichtung 24 mit Stromschiene 26 und eine Druckwasserversorgungsvorrichtung 25 umfaßt. Die Vorrichtungen 24 und 25 entsprechen denjenigen nach den vorstehend beschriebenen Ausführungsbeispielen. Die Vorrichtungen 24 und 25 sind an einem Kastenaufbau 51 der Gewinnungsschiene angeordnet, welcher einen Längskanal bildet, der bestimmte Funktionen übernehmen kann. Beispielsweise können in dem Längskanal die hydraulischen Versorgungs- und Steuerleitungen für den Strebausbau verlegt werden. Zwischen dem Längskanal und der abbaustoßseitigen Fahrschiene 23 befindet sich ein Aufnahmetrog 52 für den Strebförderer 17.In Figs. 5 and 6, an exemplary embodiment is shown, in which the extraction rail 50 also consists of a slide which has a rack toothed Running rail 23, a power supply device 24 with busbar 26 and a pressurized water supply device 25 includes. The devices 24 and 25 correspond to those according to the exemplary embodiments described above. The devices 24 and 25 are arranged on a box structure 51 of the extraction rail, which forms a longitudinal channel that can take on certain functions. For example, in the longitudinal channel the hydraulic supply and control lines for the longwall mining will be relocated. Between the longitudinal channel and the running rail 23 on the working face side is located a receiving trough 52 for the face conveyor 17.

Die aus einer Schrämmaschine 19 bestehende Gewinnungsmaschine ist hier mit ihren Gleitkufen 35 auf dem Strebförderer 17 geführt.The mining machine consisting of a cutting machine 19 is here with its skids 35 on the face conveyor 17 led.

Bei dem Ausführungsbeispiel nach den Fig. 5 und 6 entspricht der Ausbau demjenigen nach Fig. 3. Der einzige Unterschied besteht darin, daß die Vorschubzylinder 44 und 47 zwischen den Stempeln 41 des kastenförmigen Stützrahmens 40 liegen. Die Gewinnungsschiene 50 ist hier außerdem mit einem der Sohlmesser 45 gekoppelt, so daß sie beim Vorschub dieses Sohlmessers mitgenommen wird. Auch bei dem Ausführungsbeispiel nach den Fig. 5 und 6 kann die Schrämmaschine 19 durch eine andere Gewinnungsmaschine, z.B. einen selbstfahrenden Hobel, ersetzt werden. Es ist auch ohne weiteres möglich, an der Gewinnungsschiene mehrere, gegebenenfalls unterschiedliche Gewinnungsmaschinen gleichzeitig zu führen. Es empfiehlt sichIn the embodiment of FIGS. 5 and 6, the expansion corresponds to that of FIG. 3. The only one The difference is that the feed cylinders 44 and 47 between the punches 41 of the box-shaped support frame 40 lie. The extraction rail 50 is here also coupled to one of the sole knife 45 so that it is carried along when this sole knife is advanced. Also in the embodiment according to FIGS. 5 and 6, the cutting machine 19 can be replaced by another mining machine, e.g. a self-propelled planer. It is also easily possible to have several, possibly different, mining machines on the mining rail to lead at the same time. It is advisable

809885/0339809885/0339

Gewerkschaft Eisenhütte V/estfalia Gw 7726Union of ironworks V / estfalia GW 7726

- Vt- - Vt-

im übrigen, die Gewinnungsschienen mit besonderen Maschinenführungen für die Seiten- und Höhenführung der jeweiligen Gewinnungsmaschine zu versehen. In diesem Fall braucht der Strebförderer 17 keine Führungsfunktion zu übernehmen. Die erflndungsgemäße Gewinnungsschiene besteht aus einzelnen Schienenschüssen, die enri seitig zugfest, jedoch begrenzt gelenkbeweglich miteinander verbunden werden.Incidentally, the extraction rails with special machine guides to be provided for the lateral and height guidance of the respective mining machine. In this In this case, the face conveyor 17 does not need to assume any management function. The extraction rail according to the invention consists of individual rail sections that enri be connected to each other with tensile strength, but limited articulation.

809885/0339809885/0339

- K- - K-

LeerseiteBlank page

Claims (10)

PATENTANWÄLTE .,,,.-,. DlPL-ING. BUSCHHOFF 2732399 DIPL..ING. HENNICKE DIPL.-ING. VOLLBACH KOLN/RH. KAlSEl-WIlHElMiING 24 Reg.-Nr. 1 aw 7796 I <OLN, den 2o06.1977 AM««.. bift.ang.ben V/ Anm.ι Gewerkschaft Eisenhütte Westfalia 4670 Lünen Titel: Gewinnungseinrichtung für Bergbau-Gewinnungsbetriebe Ansprüche :PATENT LAWYERS. ,,, .- ,. DlPL-ING. BUSCHHOFF 2732399 DIPL..ING. HENNICKE DIPL.-ING. VOLLBACH KOLN / RH. KALSEl-WIlHElMiING 24 Reg.No. 1 aw 7796 I <OLN, the 2o06.1977 AM «« .. bift.ang.ben V / Anm.ι Union Eisenhütte Westfalia 4670 Lünen Title: Extraction facility for mining companies Claims: 1. Gewinnungseinrichtung für Bergbau-Gewinnungsbetriebe, bestehend aus einer Fahrschiene für eine selbstfahrende Gewinnungsmaschine und einer Strom- und Wasserversorgungsvorrichtung, wobei die Stromversorgungsvorrichtung eine in einem Schutzgehäuse angeordnete Stromschiene für einen an der Gewinnungsmaschine angeordneten» in das Schutzgehäuse einfassenden Stromabnehmer aufweist, während die Wasserversorgungsvorrichtung aus einer Druckwasserleitung besteht, aus welcher das Wasser vorzugsweise mittels eines an der Gewinnungsmaschine angeordneten, in die Druckwasserleitung einfassenden und längs durch diese Leitung hindurchbewegbaren Vaeserabnehmers entnehmbar ist, dadurch gekennzeichnet, daß die Fahrschiene (23) und die Strom- und Wasserversorgungsvorrichtung (24, 25) zu einer fördererunabhängigen, als Schlitten ausgebildeten und sowohl für eine schälend arbeitende Gewinnungsmaschine als auch für eine schneidend arbeitende Gewinnungsmaschine verwendbare Gewinnungsschiene (21, 50) vereinigt sind. *1. Extraction facility for mining operations, consisting of a running rail for a self-propelled mining machine and a power and water supply device, the power supply device being a power rail arranged in a protective housing for a current collector arranged on the mining machine »in the protective housing comprises, while the water supply device consists of a pressurized water line, from which the water is preferably arranged by means of a located on the extraction machine, enclosing in the pressurized water line and moved longitudinally through this line Vaeserabnahmers is removable, characterized in that the rail (23) and the electricity and water supply device (24, 25) to a conveyor-independent, designed as a slide and both for a peeling extraction machine and for a cutting machine Mining machine usable mining rail (21, 50) are united. * 2. Einrichtung nach Anspruch 1, dadurch g e -kennzeichnet, daß die Fahrschiene (23), wie bekannt, eine Triebstockverzahnung od.dgl. aufweist.2. Device according to claim 1, characterized in that the running rail (23), as known, a rack toothing or the like. having. 809885/0330809885/0330 Gewerkschaft Eisenhütte Westfalia
Gw 7726
Westfalia Ironworks Union
GW 7726
3. Einrichtung nach Anspruch 1 oder 2, dadurch gekennzeichnet, daß die Gewinnungsschiene (50) eine, vorzugsweise trogförmige, Aufnahme (52) für einen Förderer (17) aufweist.3. Device according to claim 1 or 2, characterized in that the extraction rail (50) has a, preferably trough-shaped, receptacle (52) for a conveyor (17). 4. Einrichtung nach einem der Ansprüche 1 bis 3> dadurch gekennzeichnet, daß die Gewinnungsschiene (21, 50) zusätzlich zu der Fahrschiene (23) noch mindestens eine Führungsschiene für die Gewinnungsmaschine aufweist.4. Device according to one of claims 1 to 3> characterized in that the extraction rail (21, 50) in addition to the running rail (23) also has at least one guide rail for the mining machine. 5. Einrichtung nach Anspruch 3 oder 4, dadurch gekennzeichnet, daß auf der Abbaustoßseite der Fördereraufnahme (52) die triebstockverzahnte Fahrschiene (23) und auf der Versatzseite der Fördereraufnahme die Strom- und Wasserversorgungsleitungen (24, 25) angeordnet sind.5. Device according to claim 3 or 4, characterized in that on the working face side the conveyor mount (52) the rack toothed Runway (23) and on the offset side of the conveyor mount, the power and water supply lines (24, 25) are arranged. 6. Einrichtung nach einem der Ansprüche 1 bis 5f dadurch gekennzeichnet, daß die Strom- und/oder die Wasserversorgungsleitungen (24, 25) und/oder die Fahrschiene (23) selbst als eine die Gewinnungsmaschine in Seiten- und/oder Höhenrichtung führende Führungsschiene ausgebildet oder in dieser angeordnet ist bzw. sind.6. Device according to one of claims 1 to 5 f, characterized in that the power and / or the water supply lines (24, 25) and / or the running rail (23) itself as a guide rail leading to the mining machine in the lateral and / or vertical direction is formed or arranged in this or are. 7. Einrichtung nach einem der Ansprüche 1 bis 6, dadurch gekennzeichnet, daß die Gewinnungsschiene (50) mindestens einen Längskanal (51) aufweist.7. Device according to one of claims 1 to 6, characterized in that the extraction rail (50) has at least one longitudinal channel (51) having. 8. Einrichtung nach einem der Ansprüche 1 bis 7, dadurch gekennzeichnet, daß die Gewinnungsschiene (21) als eine an Ausbaukapp«n hängend angeordnete Hängeschiene ausgebildet 1st.8. Device according to one of claims 1 to 7, characterized in that the extraction rail (21) as a hanging on expansion caps arranged hanging rail 1st. 809885/033S809885 / 033S Gewerkschaft Eisenhütte Westfalia
Gw 7726
Westfalia Ironworks Union
GW 7726
9. Einrichtung nach einem der Ansprüche 1 bis 8, dadurch gekennzeichnet, daß zumindest im Strebendbereich die Gewinnungsschiene (21, 50) verankernde Ausbaueinheiten angeordnet sind, die jeweils einen höhenveränderlichen, vorzugsweise winkelsteifen Stützrahmen (40) aufweisen, dessen Kappe und/oder Liegendschwelle von mehreren parallel nebeneinanderliegenden, einzeln oder gruppenweise vorscliiebbaren First- bzw. Sohlmessern (42, 45) gebildet ist.9. Device according to one of claims 1 to 8, characterized in that at least in the strut area the extraction rail (21, 50) anchoring expansion units are arranged, each of which have a height-adjustable, preferably angularly rigid support frame (40), the cap and / or Lying threshold of several parallel juxtaposed, individually or in groups First or sole knives (42, 45) is formed. 10. Einrichtung nach Anspruch 9, dadurch gekennzeichnet, daß die Gewinnungsschiene (21) nur mit einem Teil der zu derselben Ausbaueinheit gehörenden First- und/oder Sohlmesser (42, 45) gekoppelt ist.10. Device according to claim 9, characterized in that the extraction rail (21) coupled only to a part of the ridge and / or sole knives (42, 45) belonging to the same expansion unit is. 809885/0339809885/0339
DE19772732868 1977-07-21 1977-07-21 Runway and supply rail for a mining machine Expired DE2732868C2 (en)

Priority Applications (4)

Application Number Priority Date Filing Date Title
DE19772732868 DE2732868C2 (en) 1977-07-21 1977-07-21 Runway and supply rail for a mining machine
SU782634853A SU1269742A3 (en) 1977-07-21 1978-07-12 Winning arrangement for mining enterprises
PL20854678A PL117040B1 (en) 1977-07-21 1978-07-20 Winning apparatus for mine excavations
GB7830731A GB2001683B (en) 1977-07-21 1978-07-21 Mineral mining installations

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE19772732868 DE2732868C2 (en) 1977-07-21 1977-07-21 Runway and supply rail for a mining machine

Publications (2)

Publication Number Publication Date
DE2732868A1 true DE2732868A1 (en) 1979-02-01
DE2732868C2 DE2732868C2 (en) 1986-07-31

Family

ID=6014449

Family Applications (1)

Application Number Title Priority Date Filing Date
DE19772732868 Expired DE2732868C2 (en) 1977-07-21 1977-07-21 Runway and supply rail for a mining machine

Country Status (4)

Country Link
DE (1) DE2732868C2 (en)
GB (1) GB2001683B (en)
PL (1) PL117040B1 (en)
SU (1) SU1269742A3 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2923227A1 (en) * 1978-11-28 1980-06-12 Gewerk Eisenhuette Westfalia Hydraulic mining machine water supply system - has water and electricity supply rails along face conveyor for high pressure pump

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3245792C1 (en) * 1982-12-10 1984-03-22 M.A.N. Maschinenfabrik Augsburg-Nürnberg AG, 4200 Oberhausen Supply of the liquid media for a hydraulic-mechanical mining extraction machine provided with a sword
DE202004000516U1 (en) * 2004-01-14 2004-04-01 Dbt Gmbh Planer for underground mining
DE102006027955B4 (en) * 2006-06-14 2016-06-02 Caterpillar Global Mining Europe Gmbh Traction sled for extraction planer and extraction planer hereby
RU2470154C2 (en) * 2007-11-06 2012-12-20 Буцирус Ойропе Гмбх Towing trolley for mining drawknife
CN113622919B (en) * 2021-08-26 2023-06-16 宁夏天地西北煤机有限公司 Anti-slip device and displacement type belt conveyor

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1103866B (en) * 1957-09-26 1961-04-06 Gewerk Eisenhuette Westfalia Device for supplying a pressure medium from an elastic pressure line to a moving point of consumption
DE1515340A1 (en) * 1966-02-08 1969-07-31 Th Steinfurth Gmbh Dipl Ing Contact line for firedamp-endangered mine rooms
DE2456442A1 (en) * 1974-11-29 1976-08-12 Eickhoff Geb SIDE BRACKET TO TAKE UP A SCREW CABLE OR A CABLE CHAIN ENCLOSING THE SCREW CABLE
DE2633173A1 (en) * 1975-07-26 1977-02-17 Summit Mining ARRANGEMENT ON A COAL PRODUCTION DEVICE

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1103866B (en) * 1957-09-26 1961-04-06 Gewerk Eisenhuette Westfalia Device for supplying a pressure medium from an elastic pressure line to a moving point of consumption
DE1515340A1 (en) * 1966-02-08 1969-07-31 Th Steinfurth Gmbh Dipl Ing Contact line for firedamp-endangered mine rooms
DE2456442A1 (en) * 1974-11-29 1976-08-12 Eickhoff Geb SIDE BRACKET TO TAKE UP A SCREW CABLE OR A CABLE CHAIN ENCLOSING THE SCREW CABLE
DE2633173A1 (en) * 1975-07-26 1977-02-17 Summit Mining ARRANGEMENT ON A COAL PRODUCTION DEVICE

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2923227A1 (en) * 1978-11-28 1980-06-12 Gewerk Eisenhuette Westfalia Hydraulic mining machine water supply system - has water and electricity supply rails along face conveyor for high pressure pump

Also Published As

Publication number Publication date
PL208546A1 (en) 1979-03-26
PL117040B1 (en) 1981-07-31
SU1269742A3 (en) 1986-11-07
GB2001683A (en) 1979-02-07
GB2001683B (en) 1982-01-13
DE2732868C2 (en) 1986-07-31

Similar Documents

Publication Publication Date Title
DE2509810A1 (en) PROGRESSIVE EXPANSION FOR USE IN MIGHTY FLOEZEN
DE2732339C2 (en) Longwall mining, especially longwall mining
DE2732868A1 (en) EXTRACTION DEVICE FOR MINING EXTRACTIONS
DE2806767C2 (en) Mining equipment for long or short front mining
DE2709392A1 (en) COAL PLANER
DE2646563C3 (en) Expansion for the hem area of a longwall
DE2928150A1 (en) SHIELD EXTENSION RACK
DE19721201B4 (en) Extraction facility for underground ore mining operations
DE2754381A1 (en) EXTRACTION DEVICE, ESPECIALLY FOR THE EXTRACTION OF COAL, UNDERGROUND
DE2752650C2 (en) Height-adjustable driving area shielding for underground mining operations, especially in inclined and steep storage
DE2850175C2 (en) Planing system
DE3009923A1 (en) METHOD AND DEVICE FOR DISASSEMBLING THE PILLARS IN CHAMBER PILLAR CONSTRUCTION
DE1002715B (en) Extraction machine movable along the coal face with a group of drill bits arranged on the face
DE19750484B4 (en) Extraction device, in particular for the coal production in unterertätigen extraction struts
DE2254129C3 (en) Removable longwall equipment for the extraction and removal of coal
DE2622201C2 (en) Knife shield
DE977137C (en) Guide and conveyor device for peeling extraction devices
DE1248588B (en) Equipment for the mechanical extraction of coal
DE2751199A1 (en) PLANING DEVICE FOR HYDRAULIC HIGH PRESSURE EXTRACTION
DE2929153A1 (en) Mine face working cap mounted hydraulic cutter head - rotates about axis in mineral working line
DE3031113A1 (en) Opening up mine face working area - involves retaining initially guided support units to secure long face entry zone
DE2312557C3 (en) Procedure for operating longwall equipment for underground mining
DE3144382A1 (en) Cutter shield for the driving of development roadways in underground mining operations
DE20305436U1 (en) Roof support system for mouth of tunnel or roadway in coal mine adjacent to coal face has support members resting on floor and holding actuators and movement control linkage for roof support
DE2846790C2 (en) Continuous crusher for mining operations, especially with hydraulic extraction

Legal Events

Date Code Title Description
8110 Request for examination paragraph 44
D2 Grant after examination
8327 Change in the person/name/address of the patent owner

Owner name: GEWERKSCHAFT EISENHUETTE WESTFALIA GMBH, 4670 LUEN

8364 No opposition during term of opposition
8339 Ceased/non-payment of the annual fee