[go: up one dir, main page]

DE202011050814U1 - work dock - Google Patents

work dock Download PDF

Info

Publication number
DE202011050814U1
DE202011050814U1 DE202011050814U DE202011050814U DE202011050814U1 DE 202011050814 U1 DE202011050814 U1 DE 202011050814U1 DE 202011050814 U DE202011050814 U DE 202011050814U DE 202011050814 U DE202011050814 U DE 202011050814U DE 202011050814 U1 DE202011050814 U1 DE 202011050814U1
Authority
DE
Germany
Prior art keywords
work
workbridge
hook
working
bridge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
DE202011050814U
Other languages
German (de)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to DE202011050814U priority Critical patent/DE202011050814U1/en
Publication of DE202011050814U1 publication Critical patent/DE202011050814U1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65DCONTAINERS FOR STORAGE OR TRANSPORT OF ARTICLES OR MATERIALS, e.g. BAGS, BARRELS, BOTTLES, BOXES, CANS, CARTONS, CRATES, DRUMS, JARS, TANKS, HOPPERS, FORWARDING CONTAINERS; ACCESSORIES, CLOSURES, OR FITTINGS THEREFOR; PACKAGING ELEMENTS; PACKAGES
    • B65D19/00Pallets or like platforms, with or without side walls, for supporting loads to be lifted or lowered
    • B65D19/0004Rigid pallets without side walls
    • B65D19/0006Rigid pallets without side walls the load supporting surface being made of a single element
    • B65D19/0008Rigid pallets without side walls the load supporting surface being made of a single element forming a continuous plane contact surface
    • B65D19/002Rigid pallets without side walls the load supporting surface being made of a single element forming a continuous plane contact surface the base surface being made of more than one element
    • B65D19/0024Rigid pallets without side walls the load supporting surface being made of a single element forming a continuous plane contact surface the base surface being made of more than one element forming discontinuous or non-planar contact surfaces
    • B65D19/0026Rigid pallets without side walls the load supporting surface being made of a single element forming a continuous plane contact surface the base surface being made of more than one element forming discontinuous or non-planar contact surfaces and each contact surface having a stringer-like shape
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/15Scaffolds primarily resting on the ground essentially comprising special means for supporting or forming platforms; Platforms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/15Scaffolds primarily resting on the ground essentially comprising special means for supporting or forming platforms; Platforms
    • E04G1/154Non-detachably fixed and secured connections between platform and scaffold
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/08Scaffold boards or planks
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G7/00Connections between parts of the scaffold
    • E04G7/02Connections between parts of the scaffold with separate coupling elements
    • E04G7/28Clips or connections for securing boards
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F41WEAPONS
    • F41HARMOUR; ARMOURED TURRETS; ARMOURED OR ARMED VEHICLES; MEANS OF ATTACK OR DEFENCE, e.g. CAMOUFLAGE, IN GENERAL
    • F41H9/00Equipment for attack or defence by spreading flame, gas or smoke or leurres; Chemical warfare equipment
    • F41H9/10Hand-held or body-worn self-defence devices using repellant gases or chemicals
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65DCONTAINERS FOR STORAGE OR TRANSPORT OF ARTICLES OR MATERIALS, e.g. BAGS, BARRELS, BOTTLES, BOXES, CANS, CARTONS, CRATES, DRUMS, JARS, TANKS, HOPPERS, FORWARDING CONTAINERS; ACCESSORIES, CLOSURES, OR FITTINGS THEREFOR; PACKAGING ELEMENTS; PACKAGES
    • B65D2519/00Pallets or like platforms, with or without side walls, for supporting loads to be lifted or lowered
    • B65D2519/00004Details relating to pallets
    • B65D2519/00009Materials
    • B65D2519/00014Materials for the load supporting surface
    • B65D2519/00019Paper
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65DCONTAINERS FOR STORAGE OR TRANSPORT OF ARTICLES OR MATERIALS, e.g. BAGS, BARRELS, BOTTLES, BOXES, CANS, CARTONS, CRATES, DRUMS, JARS, TANKS, HOPPERS, FORWARDING CONTAINERS; ACCESSORIES, CLOSURES, OR FITTINGS THEREFOR; PACKAGING ELEMENTS; PACKAGES
    • B65D2519/00Pallets or like platforms, with or without side walls, for supporting loads to be lifted or lowered
    • B65D2519/00004Details relating to pallets
    • B65D2519/00009Materials
    • B65D2519/00049Materials for the base surface
    • B65D2519/00054Paper

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

Arbeitssteg (1, 2) zum Verbinden mit einem Grundgerüstträger (3) eines Grundgerüsts (14) mit einem Haken (4, 5), welcher an dem Arbeitssteg (1, 2) umfasst ist gekennzeichnet durch ein Befestigungsmittel (6, 7), geeignet den Grundgerüstträger (3) zu umgreifen, um an dem Arbeitssteg (1, 2) festgelegt zu werden.Work platform (1, 2) for connecting to a basic framework support (3) of a basic framework (14) with a hook (4, 5), which is attached to the work platform (1, 2), is characterized by a fastening means (6, 7) to grasp the basic scaffold support (3) in order to be fixed on the work platform (1, 2).

Description

Die Erfindung betrifft einen Arbeitssteg nach dem Oberbegriff des Anspruchs 1.The invention relates to a work bridge according to the preamble of claim 1.

Stand der TechnikState of the art

Aus dem Stand der Technik sind eine Vielzahl verschiedenartiger Arbeitsstege bekannt. Diese Arbeitsstege weisen in der Regel einen Haken auf, welche in einem rechten Winkel von einer Belagoberfläche eines Arbeitsstegs abragen und entsprechende Schlaufen eines Baugerüsts eingreifen. Weitergehende Befestigungen sind nicht vorgesehen. Nachteilig hierbei ist nicht nur eine oft nicht ausreichende Befestigung, sondern auch zwischen den Arbeitsstegen entstehende Freiräume.From the prior art, a variety of different working bars are known. These working webs generally have a hook, which protrude at a right angle from a lining surface of a work web and engage corresponding loops of a scaffolding. Further attachments are not provided. The disadvantage here is not only an often insufficient attachment, but also between the work bridges resulting free space.

Aufgabe der ErfindungObject of the invention

Aufgabe der Erfindung ist es ein Arbeitssteg zu schaffen, welcher eine sichere und stabile Verbindung mit einem anderem Arbeitssteg bzw. einem Baugrundgerüst zur Verfügung stellt.The object of the invention is to provide a work bridge, which provides a secure and stable connection with another work bridge or a foundation scaffolding available.

Lösung der AufgabeSolution of the task

Zur Lösung der Aufgabe führt der kennzeichnende Teil des Anspruchs 1.To achieve the object of the characterizing part of claim 1.

Ein erfindungsgemäßer Arbeitssteg soll aus verschiedenenartigen Materialien wie Kunststoff, Metall oder eine Mischung aus Kunststoff und Metall hergestellt werden. Er weist in seiner Mitte eine Regenrinne auf. Ausserdem kann er aufgrund seiner Form besser übereinander gestapelt und gelagert werden. Als bevorzugte Länge eines Arbeitssteges kommen Längen zwischen 50 cm und 2,50 m bevorzugt 50 cm und 1,25 m in Betracht. Hierdurch ist eine hohe Flexibilität vorteilhaft gewährleistet.An inventive work bridge is to be made of various materials such as plastic, metal or a mixture of plastic and metal. He has a gutter in his middle. In addition, it can be better stacked and stored because of its shape. Lengths between 50 cm and 2.50 m, preferably 50 cm and 1.25 m, are considered as the preferred length of a work bridge. As a result, a high flexibility is advantageously ensured.

Ein bevorzugtes erfindungsgemäßes Ausführungsbeispiel weist ausserdem einen Haken auf. Dieser Haken ist in der Regel aus dem gleichen Material gefertigt wie der Arbeitssteg. Die Ausbildung des Hakens ist insoweit frei wählbar, solange der Haken mit einem Grundgerüstträger korrespondieren kann. Dies bedeutet, dass der Haken in den Grundgerüstträger hineingelegt oder geführt werden kann. Die Ausführung des Hakens ist an den Bedürfnissen des Nutzers und der Ausformung des Grundgerüstträgers orientiert. Der Haken ist in der Regel an einer Schräge des Arbeitsstegs derart angeformt, dass er sich mit einem Schenkel an die Schräge anformt und mit dem zweiten Schenkel in den Grundgerüstträger hineinragt. Die Breite des Hakens ist variierbar. Er kann entweder die gesamte Länge des Grundgerüstträgers oder nur 5% bis 85% einnehmen. Es ist auch denkbar, mehrere Haken nebeneinander anzuordnen. Der Schenkel, welcher an die Schräge des Arbeitssteges angeformt ist, ist so lang, als dass eine sichere Verbindung zwischen Arbeitssteg und Haken gewährleistet ist. Es ist auch denkbar, dass der Arbeitssteg und der Haken einteilig aus ein und demselben Material besteht oder hergestellt ist. Dies kann beispielsweise im Kunststoffspritzverfahren hergestellt sein. Es ist aber auch möglich, den Haken mit der Schräge, welche die Frontpartie des Arbeitsstegs darstellt durch Schweißen oder Fügen zu verbinden. Vorteilhaft hierbeit ist eine einfache und schnelle Verbindung des Arbeitsstegs mit dem Grundgerüstträger.A preferred embodiment according to the invention also has a hook. This hook is usually made of the same material as the work bridge. The formation of the hook is insofar freely selectable, as long as the hook can correspond to a backbone carrier. This means that the hook can be inserted or guided into the backbone carrier. The execution of the hook is based on the needs of the user and the shape of the backbone carrier. The hook is usually formed on a slope of the work web so that it forms with a leg of the slope and protrudes with the second leg into the skeleton support. The width of the hook is variable. It can occupy either the entire length of the backbone support or only 5% to 85%. It is also conceivable to arrange several hooks next to each other. The leg, which is formed on the slope of the work bridge, is so long as to ensure a secure connection between the work bridge and hook. It is also conceivable that the working web and the hook consists of one piece of one and the same material or is made. This can be produced for example by plastic injection molding. But it is also possible to connect the hook with the slope, which represents the front part of the work bridge by welding or joining. Advantageous here is a simple and fast connection of the work bridge with the skeleton support.

In einem bevorzugten Ausführungsbeispiel ist ein Befestigungsmittel eingesetzt, um eine zusätzliche Sicherung und Befestigung des Arbeitsstegs entweder mit einem anderen Arbeitssteg oder mit dem Grundgerüstträger zu erreichen. Dies liegt im Ermessen des Nutzers. In einer Reihe von nebeneinander angebrachten Arbeitsstegen kann es auch derart gestaltet sein, dass der letzte Arbeitssteg in der Reihe nur mit einem Grundgerüstträger verbunden wird und die anderen in der Reihe verlegten Arbeitsstege jeweils mit den anschließenden Arbeitsstegen verbunden werden. Das Materials des Befestigungsmittels kann aus Kunststoff oder Metall sein. Letztendliche kommen alle Materialien in Frage, welche eine sichere und flexible Lösung bieten. Hier ist insbesondere darauf abzustellen, dass das Material des Befestigungsmittels derart gestaltet ist, dass eine Festlegevorrichtung einerseits und eine Verbindung über ein Drehwinkelgelenk andererseits möglich ist. Das Befestigungsmittel muss ausserdem der Art flexibel sein, dass es um einen anderen Arbeitssteg oder ein Grundgerüst gelegt werden kann. Zuletzt muss das Befestigungsmittel derart reissfest sein, als dass bei einem Bruch der Haken eine Sicherheitsverbindung zwischen den Arbeitsstegen bestehen bleibt und der Nutzer nicht vom Baugerüst fällt. Vorteilhaft ist hierbei insbesondere der Sicherheitsgewinn für die Nutzer.In a preferred embodiment, a fastener is used to achieve additional securing and attachment of the work bridge to either another workbridge or to the backbone support. This is at the discretion of the user. In a series of side-mounted work bars, it may also be designed so that the last work bridge in the series is connected only to a backbone carrier and the other laid in the series work bars are each connected to the subsequent work bars. The material of the fastener may be made of plastic or metal. Ultimately, all materials come into question that offer a secure and flexible solution. Here it is particularly important to make sure that the material of the fastening means is designed such that a fixing device on the one hand and a connection via a rotary joint joint on the other hand is possible. The fastener must also be flexible enough to be placed around another work bridge or scaffold. Finally, the fastener must be so tear-resistant that when a breakage of the hook a safety connection between the working webs remains and the user does not fall from the scaffolding. In this case, in particular, the security gain for the users is advantageous.

In einem bevorzugten Ausführungsbeispiel ist die Festlegevorrichtung in der Weise gestaltet, als dass sie in Durchführlage durch Öffnungen der Arbeitsstege im Wesentlichen den Umfang des Befestgigungsmittels einnimmt und nach der Durchführung des Befestigungsmittels durch die Öffnungen der Arbeitsstege einen über den Umfang des Befestigungsmittels hinausragenden Umfang einnimmt. Die Festlegevorrichtung kann beispielsweise ein abklappbarer Metallstab sein, welcher beim Durchführen abgeklappt und anschließend wieder aufgeklappt wird.In a preferred embodiment, the fixing device is designed in such a way that it occupies in Durchführlage through openings of the working webs substantially the periphery of the fastening means and occupies a beyond the circumference of the fastener extending periphery after the passage of the fastener through the openings of the working webs. The fixing device may be, for example, a hinged metal rod, which is folded down when performing and then unfolded again.

In einem anderen bevorzugten Ausführungsbeispiel ist ein Zusatzwinkel beschrieben. An diesem Zusatzwinkel sind dann wiederum die Haken angebracht. Der Zusatzwinkel dient dazu, eine bessere Kraftübertragung zu erreichen. Vorteilhaft ist hierbei ein zusätzliches Element, welches zur Beeinflussung der Stabilität des Arbeitssteges angepasst werden kann.In another preferred embodiment, an additional angle is described. At this additional angle turn the hooks are then attached. The additional angle serves to achieve a better power transmission. Advantageous in this case is an additional element which is to influence the stability of the workbridge can be adjusted.

In einem anderen bevorzugten Ausführungsbeispiel ist ein Brückenelement zwischen zwei miteinander verbundenen Arbeitsstegen angebracht. Dieses Brückenelement dient dazu, dass ein Nutzer beim Überqueren der Verbindungsstelle zwischen zwei Arbeitsstegen nicht versehentlich hängen bleibt oder ins Rutschen kommt.In another preferred embodiment, a bridge element is mounted between two interconnected work bars. This bridge element serves to ensure that a user does not accidentally get caught or slip when crossing the connection point between two working webs.

Zu den Arbeitsstegen sei noch erwähnt, dass sie der Art gestaltet sein können, dass sie entweder an ihren länglichen Rändern oder mittig eine Regenrinne ausbilden können. Dazu müsste dann entweder im ersten Fall der Arbeitssteg eine Wölbung aufweisen, damit Flüssigkeit wie Regen oder verschüttetes Wasser oder Farbe über die Wölbung in die längs an den Rändern angebrachten Rinnen abfließen kann. In gleicher Weise ist dies auch bei einer Rinne zu gewährleisten, welche mittig in den Arbeitssteg eingeformt ist. In einem solchen Fall müssen die Längskanten abschüssig zur mittig angeordneten Regenrinne gestaltet sein. Dadurch wird erreicht, dass entsprechende Flüssigkeit über die Mitte abfließen kann.As far as the working bridges are concerned, they may be designed in such a way that they can form a gutter either at their long edges or in the middle. For this purpose, either in the first case, the work bar would have a curvature, so that liquid such as rain or spilled water or paint can flow over the curvature in the longitudinally attached to the edges gutters. In the same way, this is to be ensured even with a channel, which is formed centrally in the work bridge. In such a case, the longitudinal edges must be designed sloping to the centrally arranged gutter. This ensures that appropriate liquid can flow through the middle.

FIGURENBESCHREIBUNGDESCRIPTION OF THE FIGURES

Weitere Vorteile, Merkmale und Einzelheiten der Erfindung ergeben sich aus den nachfolgenden Beschreibungen bevorzugter Ausführungsbeispiele sowie anhand der Zeichnung, diese zeigt inFurther advantages, features and details of the invention will become apparent from the following descriptions of preferred embodiments and from the drawing, which shows in

1 eine Seitenansicht zweier erfindungsgemäßen Arbeitsstege; 1 a side view of two working webs according to the invention;

2 eine Seitenansicht eines anderen erfindungsgemäßen Ausführungsbeispiels zweier verbundener Arbeitsstege; 2 a side view of another embodiment according to the invention of two connected working webs;

3 eine schematische Draufsicht auf einen Teil der 1; 3 a schematic plan view of a part of 1 ;

4 eine schematische Draufsicht auf einen Teil der 2. 4 a schematic plan view of a part of 2 ,

In 1 ist zunächst ein abgeschnitten dargestellter Arbeitssteg 1 und ein verkürzt dargestellter Arbeitssteg 2 zu sehen. Die bevorzugte Länge der Arbeitsstege 1, 2 variiert zwischen 50 cm und 4,50 m. Der Arbeitssteg 1 hat an seiner Frontseite eine Abschrägung, an welcher ein Haken 4 angebracht ist. Der Arbeitssteg 2 hat an seiner stirnseitigen Abschrägung einen Haken 5 angebracht. Ausserdem ist zu erkennen, wie am Ende der oben beschriebenen Schräge des Arbeitsstegs ein Drehgelenk 12 vorhanden ist. Von diesem Drehgelenk 12 geht ein Befestigungsmittel 6 ab.In 1 is initially a truncated workbridge 1 and a shortened workbridge 2 to see. The preferred length of the working bars 1 . 2 varies between 50 cm and 4.50 m. The workbridge 1 has on its front side a bevel on which a hook 4 is appropriate. The workbridge 2 has a hook on its front slope 5 appropriate. In addition, it can be seen as at the end of the above-described slope of the workbridge a swivel joint 12 is available. From this hinge 12 goes a fastener 6 from.

Es wird durch eine nicht gezeigte Öffnung 16 des Arbeitsstegs 1 durchgeführt und durch eine andere Öffnung 17 des Arbeitsstegs 2 geleitet. Während der Durchführung durch die Öffnungen 16 und 17 ist eine Festlegevorrichtung 9 in der Weise abklappbar, als dass das Befestigungsmittel 6 durch die Öffnung 17 gleiten kann. Anschließend wird die Festlegevorrichtung 9 aufgeklappt, so dass sie nicht durch die Öffnungen 16, 17 zurückgleiten kann. In erster Linie dient die Festlegevorrichtung 9 der Sicherung der festen Verbindung des Arbeitsstegs 2 mit dem Arbeitssteg 1.It is through an opening, not shown 16 of the workbridge 1 performed and through another opening 17 of the workbridge 2 directed. While passing through the openings 16 and 17 is a fixing device 9 Foldable in the way that the fastener 6 through the opening 17 can slide. Subsequently, the fixing device 9 unfolded so they did not pass through the openings 16 . 17 can slide back. First and foremost is the fixing device 9 securing the fixed connection of the working bridge 2 with the workbridge 1 ,

In gleicher Weise ist an dem Arbeitssteg 1 endseitig an der Schräge, an der auch der Haken 4 angebracht ist, ein Drehgelenk 13 zu erkennen. Von diesem Drehgelenk 13 wiederum wird ein Befestigungsmittel 7 durch eine andere Öffnung 19 des Arbeitsstegs 2 und eine Öffnung 20 des Arbeitsstegs 1 geleitet. Endseitig verfügt das Befestigungsmittel 7 über eine Festlegevorrichtung 8, welche wie die Festlegevorrichtung 9 während des Durchführens durch die Öffnungen 19, 20 der Arbeitsstege 1, 2 abklapppar geschaltet ist. Anschließend wird die Festlegevorrichtung 8 aufgeklappt, so dass sie nicht zurück durch die Öffnung 20 gleiten kann. Die Haken 4, 5 sind einerseits an einer Schräge der Arbeitsstege 1, 2 fest angebracht, andererseits ragt je ein Schenkel 21, 22 des Hakens 4, 5 in einen Aufnahmebereich eines Grundgerüstträgers 3. Zunächst werden die Arbeitsstege 1, 2 mit den Haken 4, 5 in den Aufnahmebereich des Grundgerüstgerüstträgers 3 gelegt. Anschließend werden die Befestigungsmittel 6, 7 durch die entsprechenden Öffnungen 17 bis 20 der Arbeitsstege 1, 2 geführt und anschließend mit Hilfe der Festlegevorrichtungen 8, 9 gesichert. Zuletzt wird eine Brücke 10 auf den Verbindungsbereich der beiden Arbeitsstege 1, 2 gelegt, so dass beim Überqueren durch die Arbeiter kein ungewolltes Hängenbleiben an den Befestgigungsmitteln 8, 9 erfolgen kann.In the same way is at the workbridge 1 end on the slope, at the hook 4 attached is a swivel joint 13 to recognize. From this hinge 13 in turn becomes a fastener 7 through another opening 19 of the workbridge 2 and an opening 20 of the workbridge 1 directed. End has the fastener 7 about a fixing device 8th which like the fixing device 9 while passing through the openings 19 . 20 the working bridges 1 . 2 Abklapppar is switched. Subsequently, the fixing device 8th unfolded so they did not go back through the opening 20 can slide. The hooks 4 . 5 are on the one hand on a slope of the working bridges 1 . 2 firmly attached, on the other hand protrudes a leg 21 . 22 of the hook 4 . 5 in a receiving area of a backbone carrier 3 , First, the working bridges 1 . 2 with the hooks 4 . 5 in the receiving area of the skeleton scaffold carrier 3 placed. Subsequently, the fasteners 6 . 7 through the corresponding openings 17 to 20 the working bridges 1 . 2 guided and then with the help of the fixing devices 8th . 9 secured. Last will be a bridge 10 on the connection area of the two working bridges 1 . 2 so that when crossing through the workers no unintentional snagging on the fasteners 8th . 9 can be done.

Die Arbeitsstege 1, 2 weisen verschiedenartig aufgerauhte Oberflächen auf. Hier kann es beispielsweise von Vorteil sein, dass die Oberflächen ein Lochmuster, Quermuster, gerade Linien, Rutschsterne oder eine sandige Oberfläche aufweisen. Die bevorzugte Breite eines Arbeitstegs 1, 2 sind 60 cm. Allerdings können die Arbeitsstege 1, 2 auch eine Breite zwischen 30 cm und 80 cm aufweisen. Dies liegt im Ermessen des Nutzers.The working bridges 1 . 2 have variously roughened surfaces. For example, it may be advantageous here for the surfaces to have a hole pattern, transverse patterns, straight lines, slide stars or a sandy surface. The preferred width of a workbridge 1 . 2 are 60 cm. However, the working bridges can 1 . 2 also have a width between 30 cm and 80 cm. This is at the discretion of the user.

In 3 ist gezeigt, wie die beiden Arbeitsstege 1, 2 in dem Grundgerüstträger 3 angeordnet sind. Ausserdem ist auch gezeigt, wie die beiden Befestigungsmittel 6, 7 jeweils durch die beiden Arbeitsstege 1, 2 greifen und die Arbeitsstege 1, 2 miteinander verbinden. Ausserdem ist von oben betrachtet ein Grundgerüst 14, 15 gezeigt, an denen der Grundgerüstträger 3 befestigt ist. Beim Grundgerüst 14, 15 handelt es sich um Längsstreben eines Grundaufbaus eines Baugerüsts. Die Arbeitsstege 1, 2 bilden die waagerechten Verbindungen.In 3 is shown as the two working bridges 1 . 2 in the backbone support 3 are arranged. In addition, it is also shown how the two fasteners 6 . 7 in each case through the two working bridges 1 . 2 grab and the work bars 1 . 2 connect with each other. In addition, viewed from above is a skeleton 14 . 15 shown on which the backbone carrier 3 is attached. At the skeleton 14 . 15 it concerns longitudinal struts of a basic structure of a scaffolding. The working bridges 1 . 2 form the horizontal connections.

In 2 ist neben den in 1 angesprochenen Merkmalen ein Zusatzwinkel 11 zu erkennen. Dieser Zusatzwinkel 11 ist an den Arbeitssteg 1, 2 angeformt. Der Zusatzwinkel 11 kann auch nachträglich an bestehende Arbeitsstege 1, 2 angebaut werden. An dem Zusatzwinkel 11 wiederum ist der jeweilige Haken 4, 5 befestigt, sowie das Drehwinkelgelenk 12, 13. Bei gleich benannten Merkmalen, welche in der 1 bereits besprochen wurden, wird auf eine Wiederholung der Einzelheiten verzichtet. Trotzdem wird darauf hingewiesen, dass gleichlautende und gleichbezifferte Merkmale in gleicher Weise auch in 2 gegeben sind.In 2 is next to the in 1 addressed features an additional angle 11 to recognize. This additional angle 11 is at the workbridge 1 . 2 formed. The additional angle 11 Can also be retrofitted to existing work bars 1 . 2 be grown. At the additional angle 11 again, the respective hook 4 . 5 attached, as well as the rotation angle joint 12 . 13 , For the same named features, which in the 1 have already been discussed, a repetition of the details is omitted. Nevertheless, it is pointed out that identically and identically numbered features are equally valid in 2 given are.

4 zeigt eine Draufsicht auf die Ausführung nach 2. Dort fehlt allerdings die Brücke 10. Dadurch ist ein Blick in den Befestigungsbereich der Arbeitsstege 1, 2 zu erkennen. Dort sind insbesondere die Zusatzwinkel 11 offenbart. Bezugszeichenliste 1 Arbeitssteg 2 Arbeitssteg 3 Grundgerüstträger 4 Haken 5 Haken 6 Befestigungsmittel 7 Befestigungsmittel 8 Festlegevorrichtung 9 Festlegevorrichtung 10 Brücke 11 Zusatzwinkel 12 Drehgelenk 13 Drehgelenk 14 Grundgerüst 15 Grundgerüst 16 Öffnung 17 Öffnung 18 Öffnung 19 Öffnung 20 Öffnung 21 Schenkel 22 Schenkel 4 shows a plan view of the embodiment according to 2 , There, however, the bridge is missing 10 , This is a look into the attachment area of the working bridges 1 . 2 to recognize. There are in particular the additional angle 11 disclosed. LIST OF REFERENCE NUMBERS 1 work dock 2 work dock 3 Backbone carrier 4 hook 5 hook 6 fastener 7 fastener 8th The restraint 9 The restraint 10 bridge 11 additional angle 12 swivel 13 swivel 14 backbone 15 backbone 16 opening 17 opening 18 opening 19 opening 20 opening 21 leg 22 leg

Claims (9)

Arbeitssteg (1, 2) zum Verbinden mit einem Grundgerüstträger (3) eines Grundgerüsts (14) mit einem Haken (4, 5), welcher an dem Arbeitssteg (1, 2) umfasst ist gekennzeichnet durch ein Befestigungsmittel (6, 7), geeignet den Grundgerüstträger (3) zu umgreifen, um an dem Arbeitssteg (1, 2) festgelegt zu werden.Workbridge ( 1 . 2 ) for connection to a backbone carrier ( 3 ) of a backbone ( 14 ) with a hook ( 4 . 5 ), which at the workbridge ( 1 . 2 ) is characterized by a fastening means ( 6 . 7 ), suitable the backbone carrier ( 3 ) around to the workbridge ( 1 . 2 ). Arbeitssteg nach Anspruch 1, dadurch gekennzeichnet, dass das Befestigungsmittel (6, 7) flexibel ist.Work bridge according to claim 1, characterized in that the fastening means ( 6 . 7 ) is flexible. Arbeitssteg nach Anspruch 1 oder 2, dadurch gekennzeichnet, dass das Befestigungsmittel (6, 7) über ein Drehgelenk (12, 13) mit dem Arbeitssteg (1, 2) verbunden ist.Work bridge according to claim 1 or 2, characterized in that the fastening means ( 6 . 7 ) via a rotary joint ( 12 . 13 ) with the workbridge ( 1 . 2 ) connected is. Arbeitssteg nach Anspruch 3, dadurch gekennzeichnet, dass das Befestigungsmittel (6, 7) an dem dem Drehgelenk (12, 13) abgewandten Ende eine Festlegevorrichtung (8, 9) umfasst.Work bridge according to claim 3, characterized in that the fastening means ( 6 . 7 ) at the swivel joint ( 12 . 13 ) facing away from a fixing device ( 8th . 9 ). Arbeitssteg nach einem der Ansprüche 1 bis 4, dadurch gekennzeichnet, dass der Arbeitssteg (1, 2) einen Zusatzwinkel (11) aufweist, an dem der Haken (4, 5) angebracht ist.Work bridge according to one of claims 1 to 4, characterized in that the working bridge ( 1 . 2 ) an additional angle ( 11 ), on which the hook ( 4 . 5 ) is attached. Arbeitssteg nach einem der vorigen Ansprüche 4 oder 5, dadurch gekennzeichnet, dass der Arbeitssteg (1, 2) eine Ausnehmung aufweist, welche mit der Festlegevorrichtung (8, 9) zusammenwirkt.Work bridge according to one of the preceding claims 4 or 5, characterized in that the working bridge ( 1 . 2 ) has a recess which with the fixing device ( 8th . 9 ) cooperates. Arbeitssteg nach einem der Ansprüche 1 bis 6, dadurch gekennzeichnet, dass ein Brückenelement (10) zwischen zwei Arbeitsstegen (1, 2) angeordnet ist.Work bridge according to one of claims 1 to 6, characterized in that a bridge element ( 10 ) between two working bridges ( 1 . 2 ) is arranged. Arbeitssteg nach einem der vorigen Ansprüche 1 bis 7, dadurch gekennzeichnet, dass der Haken (4, 5) an einer schrägen Stirnseite des Arbeitssteges (1, 2) umfasst ist, wobei die Stirnseite, die dem Grundgerüstträger (3) zugewandte Seite ist.Work bridge according to one of the preceding claims 1 to 7, characterized in that the hook ( 4 . 5 ) on an oblique front side of the work bridge ( 1 . 2 ), wherein the end face facing the skeleton support ( 3 ) facing side. Arbeitssteg nach Anspruch 8, dadurch gekennzeichnet, dass das Befestigungsmittel (6, 7) des einen Arbeitssteges (1, 2) den anderen Arbeitssteg (1, 2) durchgreift, geeignet die beiden Arbeitsstege (1, 2) miteinander zu verbinden.Work bridge according to claim 8, characterized in that the fastening means ( 6 . 7 ) of a workbridge ( 1 . 2 ) the other workbridge ( 1 . 2 ), suitably the two working bridges ( 1 . 2 ) to connect with each other.
DE202011050814U 2011-04-20 2011-04-20 work dock Expired - Lifetime DE202011050814U1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE202011050814U DE202011050814U1 (en) 2011-04-20 2011-04-20 work dock

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
DE102011002202A DE102011002202A1 (en) 2011-04-20 2011-04-20 Work platform for use during construction of scaffolding of building, has hooks, and flexible securing elements arranged around the backbone support and connected to another work platform via rotary joints
DE202011050814U DE202011050814U1 (en) 2011-04-20 2011-04-20 work dock

Publications (1)

Publication Number Publication Date
DE202011050814U1 true DE202011050814U1 (en) 2012-01-17

Family

ID=69143958

Family Applications (2)

Application Number Title Priority Date Filing Date
DE202011050814U Expired - Lifetime DE202011050814U1 (en) 2011-04-20 2011-04-20 work dock
DE102011002202A Withdrawn DE102011002202A1 (en) 2011-04-20 2011-04-20 Work platform for use during construction of scaffolding of building, has hooks, and flexible securing elements arranged around the backbone support and connected to another work platform via rotary joints

Family Applications After (1)

Application Number Title Priority Date Filing Date
DE102011002202A Withdrawn DE102011002202A1 (en) 2011-04-20 2011-04-20 Work platform for use during construction of scaffolding of building, has hooks, and flexible securing elements arranged around the backbone support and connected to another work platform via rotary joints

Country Status (1)

Country Link
DE (2) DE202011050814U1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20130192927A1 (en) * 2012-01-30 2013-08-01 F-Board Limited Scaffolding System
US20230139449A1 (en) * 2021-10-28 2023-05-04 Werner Co. Work Platform and Method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20130192927A1 (en) * 2012-01-30 2013-08-01 F-Board Limited Scaffolding System
US20230139449A1 (en) * 2021-10-28 2023-05-04 Werner Co. Work Platform and Method

Also Published As

Publication number Publication date
DE102011002202A1 (en) 2012-10-25

Similar Documents

Publication Publication Date Title
EP2848737B1 (en) protection shield
DE102010030577A1 (en) Planter holding device
DE2948230A1 (en) CARRYING DEVICE FOR A SCHNURGERUEST OR THE LIKE.
DE202011050814U1 (en) work dock
DE102012009960A1 (en) Verkehrsleitwand
DE843829C (en) Collapsible storage wall, consisting of a length of fabric with a support device
DE2025266C3 (en) Device for connecting axially butted support parts of a metal structure
DE202020102278U1 (en) Corner console
EP3712354A1 (en) Formwork stage
DE102009002854A1 (en) Scaffolding element, scaffolding system with a scaffolding element and method for setting up a scaffolding system
DE1534568A1 (en) Signaling device on streets, building sites and the like.
DE9201737U1 (en) Set of building elements for the construction of floors, walls, ceilings or the like and the profile element provided for this purpose
DE2556970C2 (en) Shoring unit for stiffening the walls of construction trenches, pipe trenches or the like
DE202014106017U1 (en) Mounting bracket for gabions
EP2980333B1 (en) Scaffold with a frame element
DE3514559A1 (en) UNIVERSAL CONNECTION POINT FOR CONNECTING SEPARATE RACKS IN A CONVEYOR WITH MOVING CABLES
DE3607348C1 (en) Walk plank
DE3624011A1 (en) Means for fitting a protective apparatus at a point located high up on a building
DE2119363C3 (en) Device for supporting and connecting formwork panels
DE202008011904U1 (en) Board set for scaffolding
DE2203893C3 (en) Console for attaching a work platform or the like. on a formwork
DE2945601C2 (en) Support bar as an additional support for the planks of a work platform of a tubular steel frame
DE2953830C2 (en) Batter board support with support strut
DE1534949A1 (en) Protection wall for roof work
DE1935740U (en) CLAMP COUPLING FOR STEEL PIPE SCAFFOLDING.

Legal Events

Date Code Title Description
R207 Utility model specification

Effective date: 20120308

R156 Lapse of ip right after 3 years
R156 Lapse of ip right after 3 years

Effective date: 20141101