DE1995693U - FORMWORK BRACKET. - Google Patents
FORMWORK BRACKET.Info
- Publication number
- DE1995693U DE1995693U DE19681995693 DE1995693U DE1995693U DE 1995693 U DE1995693 U DE 1995693U DE 19681995693 DE19681995693 DE 19681995693 DE 1995693 U DE1995693 U DE 1995693U DE 1995693 U DE1995693 U DE 1995693U
- Authority
- DE
- Germany
- Prior art keywords
- formwork
- cladding
- holder
- bent
- panels
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
- 238000009415 formwork Methods 0.000 title claims description 33
- 238000005253 cladding Methods 0.000 claims description 10
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 claims description 6
- 229910052742 iron Inorganic materials 0.000 claims description 3
- 238000009416 shuttering Methods 0.000 description 4
- 230000002787 reinforcement Effects 0.000 description 2
- TWQHGBJNKVFWIU-UHFFFAOYSA-N 8-[4-(4-quinolin-2-ylpiperazin-1-yl)butyl]-8-azaspiro[4.5]decane-7,9-dione Chemical compound C1C(=O)N(CCCCN2CCN(CC2)C=2N=C3C=CC=CC3=CC=2)C(=O)CC21CCCC2 TWQHGBJNKVFWIU-UHFFFAOYSA-N 0.000 description 1
- 241000283984 Rodentia Species 0.000 description 1
- 235000008429 bread Nutrition 0.000 description 1
- 230000037431 insertion Effects 0.000 description 1
- 238000003780 insertion Methods 0.000 description 1
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Description
Gebrauchsmus teranmeldung sUtility model registration s
Kaspar BECKER, 5^54 Heimbach-Veis/gfr., Netnjxed Kaspar BECKER, 5 ^ 54 Heimbach-Veis / gfr., Netnjxed
5555
Schalungshalter,Formwork holder,
Schaltang und Verkleidung der Betonsichtflächen werden bisher vor dem Betonieren mit Nägeln an den Kanthölzern bzw« den Schalbrettern befestigt. Nach dem Betonieren wird die Schalung entfernt, während die Verkleidung am Jb«ton haften bleibt. Beim Aussch«J.en werden durch das Herausreißen der Nägel die Schalungsplatten sehr leicht beschädigt, zumal die Nilgel durch die Feuchtigkeit und Einwirkung des Betons teilweise sehr i'est in den Schalungsbrottera sitzen. Zudem macht das Einschalen sehr viel Arbeit, weil die Nägel von den verhältnismäßig mit geringem Abstand verlegten Scha— luugsbrettern der Gegenwand aus eingeschlagen weiden müssen.Schaltang and cladding of the concrete surfaces are previously attached to the squared timber or the shuttering boards with nails before concreting. After concreting the formwork removed while the cladding was on the junction sticks. When pulling out, by tearing out the nails damage the formwork panels very easily, especially since the nile gel due to the moisture and the action of the Concrete partially very i'est sit in the formwork bread. In addition, the shuttering is a lot of work, because the nails of the relatively small spacing laid sheets. Luugsboards of the opposite wall have to be smashed in.
Gemäß der Neuerung wird die Aufgabe gelöst, einen Schalungshalter zu schaffen, der beim Einschalen leicht zuAccording to the innovation, the object is achieved to create a formwork holder that easily closes when shuttering
handhaben bzw. festzunageln let und beim Entfernen der Schalung weder an den Schalbrottorn noch an den Verkleidungen irgendwelche Schädon vorursacht.handle or nail down let and when removing the Formwork neither on the formwork mandrel nor on the cladding causing any damage.
Die Neuerung böstoht darin» daß an dem einen Ende eines um $0 verdrehten Bandeisens eine Befestigungsöffnung für das Einschlagen eines Nagola und das andoro um 90° verdrehte Ende mit tig geschlitzt ist un4 44s Endes» Jeveile entgegengesetzt nach oben und unten um PO abgebogen sind, wobei diese abgebogenen Endon die olngoloßto Schalung an der Oberkante festhalten und zugleich das Einlegen der darüber befindlichen Schalung ermöglichen*The novelty is that "at one end of a band iron twisted by $ 0 a fastening opening for hammering in a Nagola and the andoro end twisted by 90 ° is slit with a tig and at the end" Jeveile are bent up and down in opposite directions around PO, with this bent endon hold the olngolossto formwork at the upper edge and at the same time enable the formwork above it to be inserted *
Um ein leichtes Einlegen der Schalung zu gestatten, sind die abgebogenen Enden an den Endkanten leicht aufgebogen. To allow easy insertion of the formwork, the bent ends are slightly bent up at the end edges.
Weiterhin £.uid in dem zwischen den Schalbrettern liegenden Teil des Schalungshalters Aussparungen ausgestanzt, welche an der Fuge zwischen Verkleidungs- und Schalplatte eine Sollbruchstelle schaffen, so daß beim Drehen des überstehenden Teils des Schalungshalters nach dem Ausschalen dieser an der Sollbruchstelle abbricht und keine überstehenden Teile mehr verbleiben.Furthermore £ .uid in the one between the shuttering boards lying part of the formwork holder cutouts, which at the joint between the cladding and Formwork panel create a predetermined breaking point so that when turning the protruding part of the formwork holder after When stripping, it breaks off at the predetermined breaking point and no protruding parts remain.
Der Vorteil dieser Neuerung besteht einmal darin, daß das Befestigen der Schaltmgs- und Verkleidungsplatten wesentlich erleichtert wird, -weil die Nägel gut zugänglich und daher leicht einzuschlagen sind und ztun anderen darin, daß die Nägel beim Ausschalen leicht entfernt werden könneno The advantage of this innovation is one that attaching the Schaltmgs- and cladding panels is much easier-because the nails are well pursue accessible and therefore easy and ztun other is that the nails during stripping can be easily removed o
Ein weiterer Vorteil ist derf daß duroh Verdrehen des überstehenden Endes des Schalungshalters dieser abbricht und damit die verbleibende Fläche keine herausstehenden Spitzen mehr aufweist, die immer wieder sau Unfällen geführt haben.Another advantage is that the f duroh twisting of the projecting end of the formwork holder of these stops and thus the remaining area has no protruding tips more, the sow have repeatedly accidents.
Die Neuerung ist in der Zeichnung in olnera AusfUhrungs· beispiel dargestellt. Es zeigtSThe innovation is in the drawing in olnera execution. example shown. It shows S.
Fig. 1 einen senkrechten Schnitt durch eine Schalunga-V seite mit durch Schalungshalter gehaltenenFig. 1 is a vertical section through a formwork a-V side with held by formwork holder
Schalungs— und Verkleidungsplatii&s aaob Eiin±a I-I,Formwork and cladding plates & s aaob egg in ± a II,
Fig. 2 einen waagerechten Schnitt durch die Schalungsseite nach Fig. 1 entsprechend Linie H-H der Fig. 1,FIG. 2 shows a horizontal section through the formwork side according to FIG. 1 according to line H-H of Fig. 1,
Fig» 3 einen Schnitt durch die Anordnung nach Fig. 2, jedoch nach dem Ausschalen undFIG. 3 shows a section through the arrangement according to FIG. 2, but after stripping and
Fig. k einen Schnitt entsprechend Fig. 1 durch eine vollständige Einscbalung.FIG. K shows a section corresponding to FIG. 1 through a complete enclosure.
^•f- Das Befestigungsende 1 des Schalungshalters mit der ^ • f- The fastening end 1 of the formwork holder with the
\r * ''"- mit Doppelkopf . \ r * ''"- with double head.
- Bohrung 2 ist mittels eines Nagerls/3 am Xantholz 4 befestigt. Das andere um 90° verdrehte Ende 5 des Schalungs— halters ist am Ende geschlitzt, wobei die Enden 6 und 7 entgegengesetzt um 90 nach oben und unten gebogen und an den Enden leicht aufgebogen sind* Zwecks Befestigung wird der Schalungshalter auf die bereits eingelegten Schalungsund Verkleidungsplatten 8 und 9 aufgelegt und dann mittels- Hole 2 is attached to the xantwood 4 by means of a rodent / 3. The other end 5 of the formwork rotated by 90 ° holder is slotted at the end, with the ends 6 and 7 bent opposite to 90 up and down and on the ends are slightly bent up * The formwork holder is attached to the already inserted formwork and Cladding panels 8 and 9 placed and then by means of
~ 4 —~ 4 -
eines Nagels 3 am Kantholz k befestigt land anschließend die darauf sitzenden Schalungs- und Verkleidungsplatten 81 und 91 eingelegt. An der Fuge zwischen Schalungs- und Verkleidungsplatte 8 und 9 bzw. 81 und 9' sind Aussparungen ausgestanzt, wodurch eine Sollbruchstelle 11 entsteht, an welcher nach dem Ausschalen durch Drehen des Überstehendan 1 dar· Snhalmigfllial -fert-n abbricht ΐ»»** SJLELS *"Ί&*ΐίϊ Fläche a nail 3 attached to the timber k land then the formwork and cladding panels 8 1 and 9 1 sitting thereon inserted. At the joint between the formwork and paneling plate 8, and 9 and 8 1 and 9 'recesses are punched out, whereby a predetermined breaking point 11 is formed, at which after stripping by turning the Überstehendan 1 represents · Sn ha l mig fl lia l -fert- n cancels ΐ »» ** SJLELS * "Ί & * ΐίϊ area
hinterbleibt. Zum besseren Verständnis sind in den Abbildungen die Armierungseisen 12, der Beton 13 in Fig. 3 "ind ein die Armierungseisen 12 verbindendes Eisen Xk mit eingezeichnet. remains behind. For a better understanding, the reinforcement bars 12, the concrete 13 in FIG. 3 ″ and an iron Xk connecting the reinforcement bars 12 are also shown in the figures.
Das- Befestigungsende 1 des Schalungshalters mit der Bohrun" 2 ist mit einem Nagel mit Doppelkopf 3 am Kantholz 4 zu befestigen. Der Schalungshalter kann auch aus Kunststoff hergestellt werden.The fastening end 1 of the formwork holder with the Bohrun "2 is with a nail with double head 3 on the square timber 4 to attach. The formwork holder can also be made of plastic.
Schutzansprüche 8 Protection claims 8
Claims (2)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| DE19681995693 DE1995693U (en) | 1968-08-02 | 1968-08-02 | FORMWORK BRACKET. |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| DE19681995693 DE1995693U (en) | 1968-08-02 | 1968-08-02 | FORMWORK BRACKET. |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| DE1995693U true DE1995693U (en) | 1968-10-31 |
Family
ID=5757884
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| DE19681995693 Expired DE1995693U (en) | 1968-08-02 | 1968-08-02 | FORMWORK BRACKET. |
Country Status (1)
| Country | Link |
|---|---|
| DE (1) | DE1995693U (en) |
-
1968
- 1968-08-02 DE DE19681995693 patent/DE1995693U/en not_active Expired
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| DE1995693U (en) | FORMWORK BRACKET. | |
| DE572537C (en) | Vorpfaendeeisen | |
| DE470080C (en) | Detachable iron shuttering board holder frame | |
| DE2706802C3 (en) | Crib for stables | |
| DE829146C (en) | Method and device for lining up caps | |
| DE1917945A1 (en) | Formwork nail | |
| DE674214C (en) | On the frame of a support grate for upholstered furniture attached, for hanging and unhooking the grate bar ends serving sheet metal tab | |
| DE856504C (en) | Method for tensioning formwork in concrete structures | |
| DE710572C (en) | Strip foundation made of concrete or reinforced concrete with permanent formwork made of concrete slabs | |
| DE2508461C3 (en) | Crib for stables | |
| DE189444C (en) | ||
| DE827111C (en) | Height-adjustable formwork support | |
| DE470968C (en) | Fixing device for artificial nest holes | |
| DE1434525C (en) | Anchoring for a formwork for the production of a tunnel wall in concrete or reinforced concrete | |
| DE1878582U (en) | DEVICE FOR HOLDING THE PARTS OF FORMWORK TOGETHER FOR THE PRODUCTION OF CONCRETE WALLS. | |
| DE2428599B2 (en) | TEACHING TO APPLY PLASTER | |
| DE1256288B (en) | Device, in particular for holding electrical cables or pipes in concrete walls | |
| DE1779180U (en) | CONSTRUCTION CLAMPS FOR FASTENING THE HORIZONTAL EDGE WOODS AND PLUMB RIGHT EDGE WOODS DURING CONCRETE FORMWORKS. | |
| DE6750154U (en) | ARRANGEMENT FOR FASTENING SUSPENSION DEVICES FOR CLADDING PANELS AND THE LIKE. ON CASSETTE FORMWORK IN CONCRETE CONSTRUCTION | |
| DE6908375U (en) | ARRANGEMENT FOR FASTENING HANGING DEVICES FOR CLADDING PANELS AND THE LIKE. ON CASSETTE FORMWORK IN CONCRETE CONSTRUCTION | |
| DE1827173U (en) | DEVICE FOR STRUCTURING CONCRETE SURFACES. | |
| DE1939328U (en) | ANCHORS FOR FASTENING CLADDING PANELS TO FACADES OF BUILDINGS OD. DGL. | |
| DE1980873U (en) | HANGING OR FASTENING DEVICE. | |
| DE1039007B (en) | End piece for wire distortion tips | |
| DE7310759U (en) | Device for covering and securing the end loops in concrete formwork |