[go: up one dir, main page]

DE1863363U - SUPPORT BRACKET FOR CONCRETE PULLER. - Google Patents

SUPPORT BRACKET FOR CONCRETE PULLER.

Info

Publication number
DE1863363U
DE1863363U DE1962H0041204 DEH0041204U DE1863363U DE 1863363 U DE1863363 U DE 1863363U DE 1962H0041204 DE1962H0041204 DE 1962H0041204 DE H0041204 U DEH0041204 U DE H0041204U DE 1863363 U DE1863363 U DE 1863363U
Authority
DE
Germany
Prior art keywords
support frame
support
tube
base
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
DE1962H0041204
Other languages
German (de)
Inventor
Kurt Huerlimann
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Publication of DE1863363U publication Critical patent/DE1863363U/en
Expired legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F21/00Implements for finishing work on buildings
    • E04F21/02Implements for finishing work on buildings for applying plasticised masses to surfaces, e.g. plastering walls
    • E04F21/04Patterns or templates; Jointing rulers
    • E04F21/05Supports for jointing rulers

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Description

ti 680 888*25.10.62 ti 680 888 * 25.10.62

Dlpl.-fo- H. MissiingDlpl.-fo- H. Missiing

MM/54«Sd/$2 Bi»..;arduff, 43 j-ie3 s er_, ά en :ί4.1C. 1 9 S 2MM / 54 «Sd / $ 2 Bi» ..; arduff, 43 j-ie3 s er_, ά en: ί4.1C. 1 9 S 2

iv'^S·· 7538iv '^ S 7538

Kurt Hürlimann, Maurerpolier, Scheibenstrasse 8Kurt Hürlimann, bricklayer foreman, Scheibenstrasse 8

Rüti ( Zürich, Schweiz )
Stützbock für Beton-Abziehvorrichtung.
Rüti (Zurich, Switzerland)
Support frame for concrete puller.

Die Neuerung betrifft einen Stützbock für Beton-Abziehvorrichtung mit einem höhenverstellbaren, zum Abstützen von Führungsschienen bestimmten Support. Uebliche Stützböcke dieser Art haben den Nachteil, dass man bei ihrer Verwendung keine glatte Betonoberfläche erzielt. Wie noch näher erläutert werden wird, hängt dies davon ab, dass bei diesen üblichen Stützböcken der Support unterhalb einer zu dessen Höhenverstellung dienenden Gewindebuchse angeordnet ist.The innovation relates to a support frame for concrete pulling device with a height-adjustable, for supporting support determined by guide rails. Usual support frames of this type have the disadvantage that you can use them no smooth concrete surface achieved. As will be explained in more detail, this depends on the fact that in these usual support frames the support is arranged below a threaded bushing used to adjust its height.

Zur Verminderung des erwähnten Nachteils zeichnet sich der Stützbock nach der Neuerung dadurch aus, dass sich der Support am oberen Ende des Stützbockes befindet, soTo reduce the disadvantage mentioned, the support frame according to the innovation is characterized in that the support is at the upper end of the support frame, so

dass Führungsschienen auf ihm abstützbar sind, deren Kante höher liegt als der höchste Punkt des Stütsbockes selbst.that guide rails can be supported on it, the edge of which is higher than the highest point of the support frame itself.

In der Zeichnung ist ein Ausführungsbeispiel der Neuerung dargestellt. Es ist :In the drawing, an embodiment of the innovation is shown. It is :

Fig. 1 eine Vorderansicht eines Stützbockes,Fig. 1 is a front view of a support frame,

Fig. 2 ein Vertikalschnitt durch denselben gemäss Linie II - II von Fig. 1, undFig. 2 is a vertical section through the same according to Line II - II of Fig. 1, and

Fig. 3 eine schematisehe Darstellung einer Beton-Abziehvorrichtung, in welcher der Stützbock nach Fig. 1 und 2 verwendet ist.Fig. 3 is a schematic representation of a concrete pulling device, in which the trestle according to FIGS. 1 and 2 is used.

Der in Fig. 1 dargestellte Stützbock weist einen Sockel 1 auf, der aus einem zentralen, vertikalen Rohr 2 und drei Füssen 3 besteht, die um 120° gegeneinander versetzt sind. Jeder Fuss 3 besteht aus einem in einer Vertikalebene liegenden Flacheisen, von dem eine SchmalseiteThe support frame shown in FIG. 1 has a base 1 which consists of a central, vertical tube 2 and three feet 3, which are offset from one another by 120 °. Each foot 3 consists of one in one Flat iron lying in the vertical plane, one narrow side of which

4 an das Rohr 2 angeschweisst ist und eine andere Schmalseite4 is welded to the tube 2 and another narrow side

5 als Standfläche dient. Das Rohr 2 ist mit Innengewinde5 serves as a stand. The pipe 2 is internally threaded

6 versehen und an seinem unteren Ende durch einen Boden 7 abgeschlossen.6 and closed at its lower end by a base 7.

Ein zweites, vertikales Rohr 8, das an seinem unteren Ende ein Äussengewinde 9 aufweist, ist von oben in das erste Rohr 2 eingeschraubt. Sine auf dem zweiten Rohr 8 gleitbare Ueberwurfmutter 10 ist auf ein am oberen iSnde des ersten Rohres 2 angebrachtes Aussengewinde 11 aufgeschraubt und hält eine ringförmige Dichtung 12 fest, dieA second, vertical tube 8, which has an external thread 9 at its lower end, is from above screwed into the first tube 2. Its union nut 10, which is slidable on the second tube 8, is on a top External thread 11 attached to the end of the first tube 2 is screwed on and holds an annular seal 12, the

auf einer Unterlagscheibe 12a liegt und z.B. aus Filz bestehen kann. In das obere Ende des Rohres 8 ragt ein Zapfen 13, der mit diesem Rohr 8 fest verbunden ist, z.B. durch Aufschrumpfen des Rohres 8 auf den Zapfen 13, Das obere Ende des Zapfens 13 ist mit einem Vierkant 14 versehen, der zum Ansetzen eines nicht dargestellten Steckschlüssels dient. Ss ist klar, dass durch Drehen am Tierkant 14 das Rohr 8 im Rohr 2 nach unten oder nach oben geschraubt werden kann.lies on a washer 12a and can be made of felt, for example. A pin protrudes into the upper end of the tube 8 13, which is firmly connected to this tube 8, e.g. by shrinking the tube 8 onto the pin 13, the upper one The end of the pin 13 is provided with a square 14 which is used to attach a socket wrench, not shown. It is clear that the tube 8 in the tube 2 can be screwed downwards or upwards by turning the animal edge 14.

Auf dem Zapfen 13 ist ein Support 15 drehbar angebracht, der aus einem U-Stück 16 und aus einer am horizontalen Joch 17 dieses U-Stückes 16 zentral befestigten, auf dem Zapfen 13 gelagerten Buchse 18 besteht. Die Schenkel 19 des U-Stückes 16 sind vertikal nach oben gerichtet. Das Joch 17 ruht auf dem oberen Ende des Rohres 8, in Bezug auf welches der ganze Support 15 um den Zapfen 13 drehbar ist. Sin an> oberen Ende des Zapfens 13 vorgesehener Splint 20 verhindert ein Abziehen des Supportes 15 von dem Zapfen 13.On the pin 13, a support 15 is rotatably mounted, which consists of a U-piece 16 and a horizontal Yoke 17 of this U-piece 16 is centrally fastened and mounted on the pin 13 socket 18. The legs 19 of the U-piece 16 are directed vertically upwards. The yoke 17 rests on the upper end of the tube 8, with respect to which the entire support 15 is rotatable about the pin 13. Sin an> The cotter pin 20 provided at the upper end of the pin 13 prevents the support 15 from being pulled off the pin 13.

Der beschriebene Stützbock dient zum Abstützen der Enden von zwei Schienen 21 von rechteckigem Querschnitt, wobei diese Schienen 21 etwa um den Aussendurchmesser der Buchse 18 gegeneinander versetzt sind, im übrigen aber nahezu miteinander in. Flucht liegen, wie in Fig. 3 schema tisch im Grundriss veranschaulicht ist. In der Fig. 3 sind zwei zueinander parallele Reihen von Stützböcken durch ihreThe support frame described is used to support the ends of two rails 21 of rectangular cross-section, these rails 21 about the outer diameter of the Socket 18 are offset from one another, but otherwise almost with one another in alignment, as in Fig. 3 schematically table is illustrated in the floor plan. In Fig. 3, two parallel rows of support frames are through their

Supporte 15 dargestellt. Die auf den Supporten 15 abgestützten Schienen 21 bilden zwei parallele Führungsbahnen für die abgesetzten Enden 22 einer Abziehplatte 23, die in Fig. 3 in die Grundrissebene umgeklappt dargestellt ist. Die Äbziehkante der Blatte 23 ist mit 24 bezeichnet.Supporte 15 shown. The supported on the supports 15 Rails 21 form two parallel guideways for the offset ends 22 of a peeling plate 23, which is shown folded down in Fig. 3 in the planar plane. The drawing edge of the sheet 23 is denoted by 24.

Die in Fig. 3 dargestellte Vorrichtung dient dazu, bei der Herstellung einer Betondecke, deren obere Fläche uabzuziehen" und dadurch zu glätten. Dabei geht man folgendermassen vor :The device shown in Fig. 3 is used in the production of a concrete ceiling, the upper surface u "deduct and thereby smooth. The procedure is as follows:

Man setzt die Stützböcke auf die horizontale Verschalung 25, auf welcher die Betondecke hergestellt werden soll, stellt die Höhe der Supporte 15 auf die gewünschte Dicke der Betondecke ein und stützt auf denselben die Schienen 21 ab. Nach Aufbringen des flüssigen Betons auf die horizontale Verschalung 25, die selbstverständlich an ihren Rändern mit einer vertikalen Verschalung von der gewünschten Bodendicke entsprechender Höhe versehen ist, fährt man mit der Abziehplatte 23 über die Oberfläche des Betons, wobei man die Lattenenden 22 auf den von den Schienen 21 gebildeten, parallelen Führungsbahnen gleiten lässt. Dabei kann man mit der Abziehplatte kontinuierlich, d.h. ohne jede Unterbrechung von dem einen zum anderen Ende der Führungsbahnen fahren, so dass man überall eine vollkommen glatte Oberfläche erhält.The trestles are placed on the horizontal formwork 25 on which the concrete ceiling is to be made is, adjusts the height of the supports 15 to the desired thickness of the concrete ceiling and supports the rails 21 on the same away. After applying the liquid concrete to the horizontal formwork 25, which of course at their edges with If a vertical cladding is provided with the desired floor thickness corresponding to the height, one moves with the peeling plate 23 over the surface of the concrete, the lath ends 22 on the rails 21 formed, slide in parallel guideways. The peeling plate can be used continuously, i.e. without any interruption Drive from one end of the guideway to the other so that you get a perfectly smooth surface everywhere.

Bei Anwendung von bisher zum Abstützen der Enden der Schienen 21 üblichen, höhenverstellbaren Stützböcken ist dies hingegen nicht der Fall, und zwar aus folgendem Grunde :When using previously to support the ends of the Rails 21 standard, height-adjustable support frames, however, this is not the case, for the following reason:

Bei den üblichen Stützböcken ist ein dem Support 15 ähnlicher Support am unteren Ende eines Bohres angebracht, das oben in eine Gewindebuchse eingeschraubt ist, die zentral auf einem mit Füssen versehenen Gestell angebracht ist. Durch Drehen des Rohres kann man die Höhe des Supportes somit ebenfalls der gewünschten Dicke des Betonbodens anpassen. Wenn man aber mit der Abziehplatte 23 zu einem Stützbock kommt, muss man deren Ende 22 über die Gewindebuchse hinüber heben. Um eine möglichst glatte Oberfläche zu erzielen, hebt man in der Praxis zuerst das eine Ende 22 der Abziehplatte 23 über die Gewindebuchse des betreffenden Stützbockes, fährt dann mit leicht schräg zu den Führungsbahnen stehender Abziehplatte etwas hin und her,hebt dann deren anderes Ende über die Gewindebuchse des gegenüberliegenden Stützbockes. Trotz dieser Massnahme, die übrigens einen erheblichen Zeitverlust bedingt, weist die Oberfläche der fertigen Betondecke bei den Verbindungslinien gegenüberliegender Stützböcke stets ünregelmässigkeiten, insbesondere leichte Wellen, auf. Dieser Nachteil ist bei Verwendung von Stützböcken nach Fig. 1 und 2 vollkommen vermieden, wobei selbstverständlich Schienen 21 zu verwendenIn the case of the usual support frames, a support similar to the support 15 is attached to the lower end of a drill bit, which is screwed into a threaded bushing, which is mounted centrally on a frame provided with feet. By turning the pipe, you can adjust the height of the support to the desired thickness of the concrete floor. But if you come to a support frame with the peeling plate 23, you have to put its end 22 over the threaded bushing lift over. In order to achieve the smoothest possible surface, in practice one first lifts one end 22 of the Extraction plate 23 over the threaded bushing of the relevant support frame, then moves back and forth with the extraction plate slightly inclined to the guideways, then lifts the other end over the threaded bushing of the opposite support frame. Despite this measure, by the way Due to a considerable loss of time, the surface of the finished concrete ceiling is opposite at the connecting lines Trestles always show irregularities, especially light waves. This disadvantage is with Use of trestles according to FIGS. 1 and 2 completely avoided, of course using rails 21

sind, deren Querschnitt hoch genug ist, damit die Schienenoberkante höher liegt als die oberen Enden der Schenkel 19 des U-Stückes 16 und als der Vierkant 14.whose cross-section is large enough to allow the upper edge of the rail lies higher than the upper ends of the legs 19 of the U-piece 16 and than the square 14.

Der Grund, warum man bisher das zur Verstellung des Supports dienende Gewinde oberhalb des Supports angeordnet hat, ist jedenfalls der, dass man beim Betonieren ein Eindringen des flüssigen Betons in die Gewinde vermeiden wollte, um einen raschen Verschleiss derselben au verhindern. Beim Stützbock nach Fig. 1 und 2 werden die Gewinde 6 und 9 durch die Dichtung 12 vor dem Eindringen des Betons geschützt. Der geringe Mehraufwand für das Anbringen dieser Dichtung 12 fällt praktisch gar nicht ins Gewicht gegenüber dem beschriebenen, grossen Vorteil, der sich bei der Benützung des Stützbockes nach Fig. 1 und 2 ergibt ; dies ganz abgesehen davon, dass zur Konstruktion des niedrigen Sockels 1 weniger Material erforderlich ist als zur Konstruktion des relativ hohen Gestells der üblichen Stützböcke.The reason why the thread used to adjust the support was previously arranged above the support is in any case the fact that one wanted to avoid penetration of the liquid concrete into the thread when concreting, to prevent rapid wear and tear of the same. In the support frame according to FIGS. 1 and 2, the threads 6 and 9 are through the seal 12 is protected from the penetration of the concrete. The small additional expense for attaching this seal 12 is eliminated practically negligible compared to the great advantage described when using the trestle according to Fig. 1 and 2 results; this quite apart from the fact that less material is required for the construction of the low base 1 is than for the construction of the relatively high frame of the usual support frames.

Nach dem Abziehen des Betonbodens werden natürlich die Schienen 21 weggenommen und die Stütztböcke aus dem noch nicht erhörteten Beton herausgezogen. Der Umstand, dass die Füsse 3 durch Flacheisen von geringer Dicke (z.B. 2 *· 4 mm) gebildet sind, erleichtert das Herausziehen der Stützböcke aus dem Beton. Selbstverständlich kann beim Abziehen desAfter the concrete floor has been peeled off, the rails 21 are of course removed and the trestles from the still unheard concrete pulled out. The fact that the feet 3 are made of flat iron of small thickness (e.g. 2 * 4 mm) are formed, facilitates the pulling out of the support frames from the concrete. Of course, when removing the

Betonbodens der Beton in üblicher Weise vibriert xverden, z.B. durch einen an der iJbziehplatte 23 angebrachten
Vibrator. In diesem Falle ist die Glätte der Oberfläche bei Verwendung der Stützböcke nach Fig. 1 und 2 ganz besonders gut, verglichen mit bei Verwendung bisher üblicher Stützböcke und Vibrierung ersielten Oberflächenglätten.
Concrete floor the concrete vibrates in the usual way, for example by means of one attached to the pulling plate 23
Vibrator. In this case, the smoothness of the surface when using the support frames according to FIGS. 1 and 2 is particularly good, compared with surface smoothing obtained when using the support frames and vibration that were customary up to now.

Claims (6)

SchutzansprücheProtection claims 1.) Stützbock für Beton-4bziehvorrichtung mit einem höhenverstellbaren, zum Abstützen von Führungsschienen bestimmten Support, dadurch gekennzeichnet, dass sich der Support (15) am oberen Ende des Stützbockes befindet, so dass Führungsschienen (21) auf ihm abstützbar sind, deren obere Kante höher liegt als der höchste Punkt des Stützbockes selbst.1.) Support frame for concrete pulling device with a height-adjustable, intended for supporting guide rails support, characterized in that the Support (15) is located at the upper end of the support frame, so that guide rails (21) can be supported on it, the upper Edge is higher than the highest point of the support frame itself. 2.) Stützbock nach Anspruch 1, dadurch gekennzeichnet, dass der Support (15) auf dem oberen Ende eines Organes (8, 13) drehbar angebracht ist, das unten in einen Sockel (l) eingeschraubt ist, wobei die Einschraubtiefe einstellbar ist und Mittel (10, 12) vorgesehen sind, um ein Sindringen von flüssigem Beton in die zusammenarbeitenden Gewinde (6, 9) des Sockels und des genannten Grganes zu verhindern.2.) Support frame according to claim 1, characterized in that the support (15) on the upper end of an organ (8, 13) is rotatably mounted, which is screwed into a base (l) at the bottom, the screw-in depth being adjustable and means (10, 12) are provided for penetration of liquid concrete into the cooperating threads (6, 9) of the base and the said Grganes. 3.) Stützbock nach Anspruch 2, dadurch gekennzeichnet, dass der Sockel (1) ein zentrales, mit Innengewinde (6) versehenes Rohr (2) aufweist, welches unten durch einen Boden (7) abgeschlossen ist und in welches ein am genannten Organ (8, 13) vorgesehenes Aussengewinde (9) von oben her eingeschraubt ist, xfobei auf das mit Aussengewinde (11) versehene Snde des Rohres eine das genannte Organ umgebende Ueberwurfmusster (10 geschraubt ist, die eine Dichtung (12) auf diesem Rohrende festhält.3.) Support frame according to claim 2, characterized in that the base (1) has a central, with internal thread (6) provided tube (2) which is closed at the bottom by a base (7) and in which an am mentioned organ (8, 13) provided external thread (9) is screwed in from above, xfobei on the end of the tube provided with the external thread (11) one of the named Organ surrounding Ueberwurfmusster (10 is screwed, which holds a seal (12) on this pipe end. 4.) Stütsbock nach Anspruch 3, dadurch gekennzeichnet, dass der Sockel (1) Füsse (3) aufweist, die durch in Yertikalebenen liegende Flacheisen gebildet sind, die längs einer Schmalseite (4) mit dem Rohr (2) verbunden sind und eine als Standfläche dienende Schmalseite (5) aufweisen.4.) support frame according to claim 3, characterized in that the base (1) has feet (3) which through Flat iron lying in vertical planes are formed which are connected to the tube (2) along a narrow side (4) and have a narrow side (5) serving as a standing surface. 5.) Stützbock nach Anspruch 2, dadurch gekennzeichnet, dass das genannte Organ (8, 13) ein unten mit Gewinde (9) versehenes Rohr (8) und einen oben aus diesem Rohr vorragenden, mit demselben fest verbundenen Zapfen (13) aufweist, auf welchem der Support (15) drehbar gelagert ist, und der oben mit einem zum Ansetzen eines Steckschlüssels bestimmten Element (14) versehen ist.5.) Support frame according to claim 2, characterized in that said organ (8, 13) with a down Thread (9) provided tube (8) and a pin (13) which protrudes from this tube and is firmly connected to the same. has, on which the support (15) is rotatably mounted, and the top with a for attaching a socket wrench certain element (14) is provided. 6.) Stützbock nach Anspruch 5, dadurch gekennzeichnet, dass der Support (15) ein U-Stück (16) mit horizontalem Joch (17) und vertikal nach oben gerichteten Schenkeln (19) aufweist, sowie eine am Joch befestigte, zentrale Buchse (18), die auf dem Zapfen (13) gelagert und gegen Abziehen von demselben gesichert ist.6.) Support frame according to claim 5, characterized in that the support (15) has a U-piece (16) with a horizontal Yoke (17) and legs (19) directed vertically upwards, as well as one attached to the yoke, central bushing (18) which is mounted on the pin (13) and secured against being pulled off the same.
DE1962H0041204 1962-02-12 1962-04-10 SUPPORT BRACKET FOR CONCRETE PULLER. Expired DE1863363U (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CH173562A CH389878A (en) 1962-02-12 1962-02-12 Support frame for concrete puller

Publications (1)

Publication Number Publication Date
DE1863363U true DE1863363U (en) 1962-12-06

Family

ID=4217358

Family Applications (1)

Application Number Title Priority Date Filing Date
DE1962H0041204 Expired DE1863363U (en) 1962-02-12 1962-04-10 SUPPORT BRACKET FOR CONCRETE PULLER.

Country Status (2)

Country Link
CH (1) CH389878A (en)
DE (1) DE1863363U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1278095B (en) * 1963-05-15 1968-09-19 Heinrich Franke Gauge stand for setting the height of leveling gauges for concrete ceiling surfaces

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3837127A (en) * 1972-10-10 1974-09-24 Michael B Mc Mobile home leveling and hold-down support
US4870789A (en) * 1988-01-04 1989-10-03 Clark Steven J Manufactured building adjustable leveling and support device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1278095B (en) * 1963-05-15 1968-09-19 Heinrich Franke Gauge stand for setting the height of leveling gauges for concrete ceiling surfaces

Also Published As

Publication number Publication date
CH389878A (en) 1965-03-31

Similar Documents

Publication Publication Date Title
DE1863363U (en) SUPPORT BRACKET FOR CONCRETE PULLER.
DE1602974A1 (en) Frame for machine tools with at least one stand
DE2353526A1 (en) MOUNTING DEVICE FOR BATHTUBS
DE3308528C2 (en) Clamping device for connecting formwork panels
DE8304713U1 (en) SCAFFOLDERS FOR ANCHORING SCAFFOLDINGS ON CURTAIN FACADES
DE824694C (en) Steel formwork device for ceilings
DE3106783A1 (en) Support frame for shower tubs
DE510080C (en) Method and device for lifting punches loosened by means of an adjacent earth bore, in particular pit punches
DE1659341C3 (en) Edging for flat roofs or the like
DE2032534C3 (en) Support and adjustment device for shower trays
DE3205785A1 (en) Trench sheeting arrangement
DE827111C (en) Height-adjustable formwork support
DE2251188A1 (en) RING SUPPORT FOR RISED, HEIGHT-ADJUSTABLE FLOOR, GENERALLY CALLED DOUBLE FLOOR
DE7832046U1 (en) SUPPORT AND ADJUSTMENT DEVICE FOR SHOWER TRAYS
DE2200965C3 (en) Suspension for cladding panels on buildings
DE3011181C2 (en) Edging for flat roofs or the like
DE636230C (en) Auxiliary device for carrying out a masonry process
DE757923C (en) Head for pit punch
AT404051B (en) Retaining arrangement for a shuttering panel of end shuttering for floors or ceilings
AT203172B (en) Shower or shower cubicle
DE1828826U (en) STAND FOR SCAFFOLDING.
DE8804830U1 (en) Device for holding parapet elements
DE6902865U (en) ADJUSTABLE SUPPORT FOR WALLPAPING CEILINGS
DE1751391U (en) SUPPORT-LIKE ASSISTANCE DEVICE FOR TEMPORARY LOAD ASSESSMENT IN BUILDINGS
CH400523A (en) console