Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by IndividualfiledCriticalIndividual
Priority to DE1950H0003083priorityCriticalpatent/DE1622974U/en
Publication of DE1622974UpublicationCriticalpatent/DE1622974U/en
v u n nBie z -chStsenenTeil desFMisterveschlüsses sollen 4den 7-weck vc-Wfolgeneein Penster auf 4en ilarkt zu bringen-idaasich weder esiMkein Wassgrp einclNgej 1 ilaßTb und zugdihtbleibt-tDie esenderen Merkmale sjsc. darinzu. erblicken, dadieBe'3chlaeile S59-. Stab-nsd BoMMverschlnß ein-gearbeitet sinäfDies<=T-Vrselilß : aim an allen'olin-und eschäftshauefenstest.angebrach-c werden.Besondere'Verbesserung : Kein Rosipfleecenuttd ein Abblätternder ; wie bei a. er frankfurter Dockschienet vunn In the z -thest part of the FMister lock, 4 to bring the 7-wake-up vc-sequence a penster to 4en ilarkt-idaa Neither do they agree with any water group remains-tThe other characteristics sjsc. to it. behold, dadie Be'3chlaeile S59-. Stab-nsd BoMMverschlnß a worked sinäf This <= T-Vrselilß: aim at all'olin and business house tests. be attached-c. Special improvement: No rosipfleecenuttd a flaking the ; as with a. he frankfurter Dockschienet
Claims (1)
S C h u J nf a n f, ; E f ? r
L.) YnBterverschlvß, daililrh geke ; zeic~hne, daßSchloß und Stase im rechten Tersch&üßck ein-gebaut sisd<2, FeEEter'9reshLuB sa=c. h Anspruch l &a durch ekeBneichsieie crsciü. ußs'üuk ein SchlieBbleoa mer b ? g $ mn *3.,) fenserv$rsch3uß nach Ansprucli l dadch ge3ms@ichnet,daß ie ijre chlaleiste und das SchluBfrles ans L-"nem stüc sine un eine inDer ? Sctigsiste Beschlag"indFuge verdeckte
SC hu J nf anf,; E f? r
L.) YnBterverschlvß, daililrh geke; show that Lock and stasis in the right Tersch & üßck built sisd < 2, FeEEter'9reshLuB sa = c. h claim l & a by ekeBneichsi eie crsciü. ußs'üuk a SchlieBbleoa mer b? g $ mn * 3.,) window serv $ rsch3uß according to claims dadch ge3ms @ ichnet, that your key bar and the key to the L- " a piece sine an indId? Sctigsiste fitting "ind Concealed joint
Delayed fracture of high strength steel as stochastic process in terms of nucleation theory and delayed fracture toughness(Delayed fracture of high strength steel as stochastic process in terms of nucleation theory and delayed fracture toughness)
Study of the influence of cold working in the region of stress concentration on the fatigue strength of a notched dural structure(Fatigue strength of notched thin sheet dural structure, noting effect of strain hardening by cold working in region of stress concentration)