DE1608301A1 - Method and top hatch for loading shaft ovens, in particular high pressure blast furnaces - Google Patents

Method and top hatch for loading shaft ovens, in particular high pressure blast furnaces

Info

Publication number
DE1608301A1
DE1608301A1 DE19681608301 DE1608301A DE1608301A1 DE 1608301 A1 DE1608301 A1 DE 1608301A1 DE 19681608301 DE19681608301 DE 19681608301 DE 1608301 A DE1608301 A DE 1608301A DE 1608301 A1 DE1608301 A1 DE 1608301A1
Authority
DE
Germany
Prior art keywords
closure
bell
gout
furnace
chamber
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
DE19681608301
Other languages
German (de)
Other versions
DE1608301C3 (en
DE1608301B2 (en
Inventor
Manfred Euteneuer
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mannesmann Demag AG
Original Assignee
Demag AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Demag AG filed Critical Demag AG
Publication of DE1608301A1 publication Critical patent/DE1608301A1/en
Publication of DE1608301B2 publication Critical patent/DE1608301B2/en
Application granted granted Critical
Publication of DE1608301C3 publication Critical patent/DE1608301C3/en
Expired legal-status Critical Current

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21BMANUFACTURE OF IRON OR STEEL
    • C21B7/00Blast furnaces
    • C21B7/18Bell-and-hopper arrangements

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Manufacturing & Machinery (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Vertical, Hearth, Or Arc Furnaces (AREA)

Description

DEMAG Aktiengesellschaft 4.3.1968DEMAG Aktiengesellschaft March 4th, 1968

kl Duisburg -5351/HH- kl Duisburg -5351 / HH-

Wolfgang-Reuter-Platz Pl./Tp.Wolfgang-Reuter-Platz Pl./Tp.

Verfahren und GichtVerschluß zum Beschicken von· Schachtöfen, insbesondere von im Hochdruck betriebenen HochöfenProcedure and top seal for loading Shaft furnaces, especially those operated at high pressure Blast furnaces

Die Erfindung betrifft ein Verfahren zum Beschicken von Schachtöfen und bei solchen insbesondere von im Hochdruck betriebenen Hochöfen, bei denen das Beschikkungsgut aus einer den Ofen gegen die Atmosphäre abdic-htenden Schleusenkammer in den Ofenraum geführt wird.The invention relates to a method for charging shaft furnaces and, in the case of such, in particular from im High-pressure blast furnaces in which the material to be loaded is sealed off from the atmosphere from the furnace Lock chamber is led into the furnace chamber.

Die Vergrößerung der Gestelldurchmesser von Hochöfen bis zu 10 m und mehr bringt Probleme der Durchgasung und damit der Beschickung mit sich. An und für sich ist es bekannt, nach dem Aufstauverfahren aus der Deutschen Patentschrift 1 229 566 Klasse 18 a - 7/20 zu arbeiten. Im Betrieb befindlich Groß-HochÖfen-lassen sich,, wenn auch mit einigen Unzulänglichkeiten, nach dem Schuttverfahren begichten. Die Schwierigkeiten der Durchgasung einer ziemlich ungleichmäßig verteilten Beschickungsgutmenge können durch höhere Drücke an der Gicht in etwa ausgeglichen werden. Dazu muß der Hochofen mittels besonderer Maßnahmen abgedichtet sein, um den Druck von etwa 2,3 atü zu halten. Nach der bezeichneten Ofengattung dienen hierzu Schleusenkammern. Das beispielsweise von einer Skip-Begichtung angelieferte Gut füllt man in die Schleusenkammer, so langeThe enlargement of the frame diameter of blast furnaces up to 10 m and more creates problems with gas penetration and thus the loading with itself. In and of itself it is known after the damming process from the German patent specification 1 229 566 class 18 a - 7/20 to work. Groß-Hochofen-Lassen is in operation himself, albeit with a few shortcomings report to the rubble procedure. Difficulties the gassing of a rather unevenly distributed amount of material to be charged can be prevented by higher pressures on the Gout can be roughly compensated for. For this purpose, the blast furnace must be sealed using special measures, to keep the pressure at about 2.3 atmospheres. According to the designated furnace type, lock chambers are used for this purpose. The goods delivered, for example, from a skip charge, are filled into the lock chamber for that long

00 9 885/0417 - 2 -00 9 885/0417 - 2 -

- 2 - 4.3.1968- 2 - 4.3.1968

-5351/HH-Pl .VTp.-5351 / HH-Pl .VTp.

die Ausgänge dieser Vorratsbunker geschlossen sind. Naturgemäß besitzen die Vorratsbunker einige Kapazität, woraus sich eine höhere Bauweise der öfen ergibt. Anschließend an die Ausgänge der Schleusenkammern befindet sich nunmehr erst die Verteilvorrichtung vor dem Ofenraum.the exits of these storage bunkers are closed. Naturally, the storage bunkers have some capacity, which results in a higher construction of the ovens. Then located at the exits of the lock chambers Now only the distribution device is in front of the furnace chamber.

Gemäß einer Veröffentlichung in "Journal of Metals" Febr. 1966, Seite 235 sind zwei Begichtungsglocken bisheriger Bauweise hinter den erläuterten Schleusenkammern angeordnet. Das Gut gelangt in konischen Zuführungskanälen aus der Schleusenkammer gegen die Mitte des Gichtschachtes. Es erfolgt zunächst eine Aufstauung zwischen erster Gichtglocke und einem Gichttrichter. Nach Freigabe stürzt das Gut auf die darunter .befindliche Gichtglocke und in die eigentliche Gichtschüssel. Erst danach scheint eine geeignete Ringverteilung des Gutes in der Gichtschüssel bewirkt zu sein.According to a publication in "Journal of Metals" Febr. 1966, page 235 are two bell bells of the previous design behind the lock chambers explained arranged. The material arrives in conical feed channels from the lock chamber towards the center of the gout shaft. First there is an impoundment between the first bell jar and a bell jar. After approval, the goods fall onto the bell jar underneath and into the actual gout bowl. Only then does a suitable ring distribution of the goods in the topping bowl appear to have been effected.

Bei nicht im Hochdruckverfahren arbeitenden Hochöfen ist es bekannt, für eine Skip-Begichtung, d.h. für am Umfang an einer oder mehreren Stellen der Gicht angeliefertes Gut, einen Verteiler vorzusehen, der meist aus einem Drehwerk besteht. Dieser Verteiler liegt außerhalb der von zwei Gichtglocken und Gichttrichterft bzw. Gichtschussein gebildeten Schleusenkammer, so daß für ihn keine Probleme der Gichtgasverschmutzung bzw. des Antriebs bestehen. Anders liegen die Verhältnisse bei im Hochdruckverfahren betriebenen Hochöfen, bei denen das Gut hinter der Schleusenkammer verteilt werden muß. -For blast furnaces that do not use the high pressure process it is known for a skip gout, i.e. for something delivered around the circumference at one or more points of the gout It is good to provide a distributor, which usually consists of a rotating mechanism. This distributor lies outside of the two bell bells and bell funnel or gout shot in a lock chamber formed so that for him there are no problems of furnace gas pollution or the drive. The situation is different in the case of blast furnaces operated in the high pressure process where the goods must be distributed behind the lock chamber. -

- 3 009885/0417 - 3 009 885/0417

- 3 - ή.3.1968- 3 - ή.3.1968

-5351/ΗΗ-Fl./Tp. -5351 / ΗΗ-bottle / Tp.

Die Erfindung geht von der Aufgabe aue, für eine relativ geringe Fallhöhe des Gutes ein Verfahren aufzuzeigen, das Gut auf kürzerem Wege zu verteilen, ohne in eine Zwangslage bei der Ausbildung der Verteilvorrichtung zu gelangen, die die Dichtwirkung und damit das Arbeltsergebnis in Frage stellen könnte.The invention is based on the task of showing a method for a relatively low height of fall of the goods to distribute the goods over a shorter distance without in to get a predicament in the formation of the distribution device, which the sealing effect and thus the Work result could call into question.

Gemäß der Erfindung erfolgt das Beschicken des Ofens derart, daß das Gut vor dem Ofenraum aufgestaut, zunächst durch Vergrößern der Schüttbreite und gleichzeitigem Verringern der Schütthöhe auf einer Ringfläche verteilt und erst dann zum Auflegen auf die Beschickungsoberfläche freigegeben wird. Der Grundgedanke besteht also darin, das Gut bei mäßiger Geschwindigkeit, sei es in horizontaler oder vertikaler Richtung, zu bewegen, d .h. zu verteilen. Die bekannten Schuttverfahren arbeiten dagegen mit Aufprall aus größerer Höhe und entsprechender Stufenzahl der Begichtungsglocken. So 1st aus "Journal of Metals" Febr. 1966, Seite 231 sogar ein dreistufiges Schütten auf Gichtglocken verschiedenen Durchmessers zu entnehmen. Das vorliegende Verfahren weist demnach nicht die Nachtelle einer hohen mechanischen Beanspruchung des Möllergutes auf.According to the invention, the furnace is charged in such a way that the material is dammed up in front of the furnace chamber, first distributed on an annular surface by increasing the bulk width and at the same time reducing the bulk height, and only then is placed on the Loading surface is released. The basic idea is to move the goods at a moderate speed, be it in the horizontal or vertical direction, i. to distribute. The known Rubble processes, on the other hand, work out with impact greater height and the corresponding number of steps of the bell bells. So 1st from "Journal of Metals" Febr. 1966, page 231 even a three-stage pouring on bell bells of different diameters can be seen. The present proceedings therefore do not the disadvantage of high mechanical stress of the Möllergut.

Die Eigenheit des aus dem Schleusenkammer-Ausgang strömenden Gutes, eine gerichtete Strömung vorauszusetzen bringt naturgemäß eine gewisse Schwierigkeit der Verteilung des Gutes auf der eigentlichen Verteilvorrichtung rait sich. Nach dem weiteren Verfahren lit deshalb vorgesehen, daß zum Aufstauen das Gut wechselweise in sich gegenüberliegenden Teilschüttungen zugeführt wird.The peculiarity of the material flowing out of the lock chamber exit to presuppose a directed flow naturally brings a certain difficulty in distributing the goods on the actual distribution device. Therefore lit after the further procedure provided that for damming the material is alternately fed in opposing partial beds.

- l» 009885/0417 - l » 009885/0417

4.3.1968March 4th, 1968

-5351/HH--5351 / HH-

Fl./Tp.Fl./Tp.

Es läßt sich deshalb ein gewisser Ausgleichen mehreren Umfangsstelleny zugleich Gut zuzuführen, bewirken, so daß das Verteilen noch mehr erleichtert werden kann.It is therefore possible to compensate a certain number of times Circumferential places at the same time supply good, effect, so that the distribution can be made even easier.

Um die Dichtheit des Ofenkopfes zu gewährleisten, bewährt sich eine möglichst einfache Verteilvorrichtung. Der GichtVerschluß zur Durchführung des Verfahrens genügt dieser Forderung durchaus. Erfindungsgemäß besitzt er einen innerhalb des Beschickungsgut-Weges aus einer Ausgangs- in die Freigabestellung bewegbaren Verschlußkörper, der zwischen diesen Positionen mit der Gichtschachtwandung Ringquerschnitte bildet, deren Größe und/oder Form sich stetig ändern. Im Gegensatz zu den bekannten Verteilvorrichtungen ergibt sich ein Zusammenspiel zwischen nur einem Körper und der feststehenden Gichtschachtwandung. Die Störanfälligkeit eines derartigen Gichtverschlusses ist bei weitem geringer als bei den bekannten. Der GichtVerschluß ist mit weitaus weniger beweglichen Teilen ausgestattet und diese können einem Verschleiß unterworfen werden, der die Funktionssicherheit an keiner Stelle beeinträchtigt. Der GichtVerschluß erhält eine zweckmäßig niedrigere Ausbildung, so daß der Weg des Beschickungsgutes vom Schleusenkammer-Ausgang bis zur Verteilvorrichtung verkürzt ist. Eine Vereinfachung des Ilochdruck-Gichtverschlusses erweist sich außerdem deshalb als vorteilhaft, weil bei höheren Drücken gesteigerte Temperaturen auftreten, wodurch die Teile innerhalb des Ofenraumes noch stärker beansprucht sind als sie das ohnehin früher schon waren.In order to ensure the tightness of the furnace head, the simplest possible distribution device has proven itself. The gout seal is sufficient to carry out the procedure of this requirement. According to the invention, it has a path from within the charging material a closure body that can be moved into the release position, which forms ring cross-sections with the gout shaft wall between these positions, whose Size and / or shape are constantly changing. In contrast to the known distribution devices, there is a Interplay between just one body and the fixed gout shaft wall. The susceptibility to failure such a gout seal is far less than that of the known ones. The gout occlusion is equipped with far fewer moving parts and these can be subjected to wear, which does not affect the functional reliability at any point. The gout seal receives an expedient lower training, so that the path of the load from the lock chamber exit to the distribution device is shortened. A simplification of the orthotic gout seal therefore also proves to be advantageous because increased temperatures occur at higher pressures, leaving the parts inside of the furnace chamber are even more heavily used than they were before.

Die praktische Ausführung des erfindungsgemäßen Gichtverschlusses gestattet eine beanspruchungsfähige Ausführung, die nach der weiteren Erfindung darin besteht,The practical design of the gout closure according to the invention allows a heavy-duty design, which according to the further invention consists in

009885/0417009885/0417

-H--H-

- 5 - ' 4*3.1968- 5 - '4 * 3.1968

-5351/HH-Fl./Tp. -5351 / HH- Fl./Tp.

daß eine unterhalb eines zentralen Einfüllrohres angeordnete Verschlußglocke mit dem oberen Teil des Ofenkopfes einen Ringspalt bildet, an den sich ein mit lichter Weite an den größten Verschlußglockendurchmesser angepaßter, in den Ofenraum gerichteter Zylinderteil anschließt, in dem die Verschlußglocke auf- und abwärts bewegbar ist. Die Abwärtsbewegung bewirkt ein Ordnen, bzw. Verteilen des Beschickungsgutes auf der Verschlußglocke und im weiteren Verlauf die Freigabe. Da beide Bewegungen in derselben Richtung verlaufen, ist die Zuführung, von großen Mengen Beschickungsgut möglich. that a closing bell arranged below a central filling pipe with the upper part of the furnace head forms an annular gap, to which a clear width at the largest locking bell diameter adapted cylinder part, directed into the furnace chamber, in which the locking bell opens. and is movable downwards. The downward movement effects an order or distribution of the load the locking bell and in the further course of the release. Since both movements are in the same direction, it is possible to feed in large quantities of items to be loaded.

An und für sich kann der notwendige Ringspalt zwischen Verschlußglocke und Qichtschachtwandung durch einen ausreichenden Abstand erhalten werden, jedoch ist für eine möglichst hohe Anfangs3teilung und eine verbesserte Verteilwirkung nach der weiteren Erfindung möglich, daß die Kegelschräge der Verschlußglocke flacher verläuft als die Schräge des oberen Teils des Ofenkopfes.In and of itself, the necessary annular gap between Closing bell and Qichtschachtwandung through one sufficient spacing can be obtained, but is for the highest possible initial pitch and an improved Distribution effect according to the further invention possible that the conical slope of the locking bell is flatter than the slope of the upper part of the furnace head.

Die wesentliche Schwierigkeit beim Hochdruckbetrieb liegt in der dauerhaften Abdichtung der Durchdringungsstellen für einzelne funktionswichtige Organe der Verteilvorrichtung» Nach einem zusätzlichen Merkmal der Erfindung ist deshalb vorgesehen, daß der Verschlußkörper bzw. die Verschlußglocke an einer zentralen Zugstange befestigt ist, die die Gichtverschlußdecke zwischen zwei Schleusenkammern durchdringt und deren Hubantrieb außerhalb des Ofendruckraumes liegt. Die Verwendung einer einzigen Hubstange beschränkt deshalb die Bewegung auf den Durchmesser der Stange, der sehr gering gehalten werden kann. Demnach bestehen geringere Schwierigkeiten der Abdichtung der Durchtrittstelle der Stange.The main difficulty with high pressure operation lies in the permanent sealing of the penetration points for individual functionally important organs of the distribution device »According to an additional feature the invention is therefore provided that the locking body or the locking bell on a central pull rod is attached, which is the gout occlusion cover penetrates between two lock chambers and whose lifting drive is outside the furnace pressure chamber. the Using a single lift rod therefore limits movement to the diameter of the rod, which is very much can be kept low. Accordingly, there are fewer Difficulties in sealing the passage point of the rod.

0098 85/04 170098 85/04 17

6 - li.3.19686 - left 3.1968

-5351/HH-Pl./Tp. -5351 / HH-Pl. / Tp.

Schuttechnlsch betrachtet, ist es günstig, auch noch die zentrale Zugstange zu umgehen, um die Strömung des Beschickungsgutes so wenig wie möglich zu beeinträchtigen. Nach der weiteren Erfindung ist der Verschlußkörper bzw. die Verschlußglocke an einer Traverse befestigt, deren außermittiges Zugstangenpaar jeweils in ofenraumdruckbeaufschlagten Rohren geführt ist, dessen Enden mittels einer weiteren Traverse überhalb der Schleusenkammer-Ausgänge an eine einzige, durch die Gichtverschlußdecke abgedichtet geführte Zugstange angelenkt sind. Da keine Druckverluste im Ofenraum entstehen und keine zusätzlichen Dichtungsstellen auftreten, ist jeder Strömungswiderstand im Inneren des zentralen Einfüllrohres beseitigt.From a technical point of view, it is cheap, too to bypass the central pull rod in order to impair the flow of the load as little as possible. According to the further invention, the closure body or the closure bell is attached to a cross member, whose eccentric pair of tie rods is guided in tubes that are pressurized in the furnace, the ends of which by means of a further traverse above the lock chamber exits to a single one the gout closure cover sealed guided pull rod are articulated. Since there are no pressure losses in the furnace chamber and no additional sealing points occur, all flow resistance is inside the central filler pipe eliminated.

Eine gezielte Aufgabe des Gutes auf der Beschickungsoberfläche läßt sich für größere Umfangsbereiche ebenfalls durchführen. Dazu tragen der Verschlußkörper bzw. die Verschlußglocke senkrechte, radial verlaufende Führungswände.A targeted task of the goods on the loading surface can also be used for larger circumferential areas carry out. For this purpose, the closure body or the closure bell wear vertical, radially extending Guide walls.

Die Erfindung ermöglicht Im weiteren auch die Erleichterung des Vefteilens dadurch, daß der Verschlußkörper bzw. die Verschlußglocke rotierbar sind. Die Ablaßbewegung der Verschlußglocke kann also zusanmen mit einer Drehbewegung stattfinden, wodurch auch bei großem Glockendurchmesser eine ausreichend genaue Verteilung vor der Freigabe des Gutes zum Auflegen auf die Be-8chickungsoberfläche stattfindet.The invention also enables the facilitation the distribution in that the closure body or the closure bell are rotatable. The drainage movement the locking bell can therefore together with a Rotary movement take place, whereby a sufficiently precise distribution even with a large bell diameter before the goods are released for placing on the loading surface takes place.

In der Zeichnung ist ein Ausführungsbeispiel des erfindungagemäßen GichtVerschlusses dargestellt, an dem sich auch das erfindungsgemäße Verfahren erläutern läßt.In the drawing is an embodiment of the inventive Gout closure shown, which also explains the method according to the invention leaves.

009885/0417009885/0417

- 7 - *U3.1968- 7 - * U3.1968

-5351ΉΗ-Pl./Tp. -5351ΉΗ-Pl. / Tp.

Die einzige Figur der Zeichnung stellt einen senkrechten Schnitt durch den Gichtverschluß dar, wobei die Schnittebene mit der Ofenraittelachse zusammenfällt.The only figure in the drawing represents a vertical section through the gout occlusion where the cutting plane coincides with the furnace center axis.

Das Beschickungsgut gelangt über einen nicht weiter gezeigten Schrägaufzug wie beispielsweise eine Skip-Begichtung in die Vorratsbunker 1 und 2 und von dort aus durch Schleusenkammernöffnungen 3 und 4 in die Schleusenkammern 5 und 6. Das Füllen der Schleusenkammern 5 und 6 geschieht bei geschlossenen Schleusenkammer-Dichtklappen 7 und 8. Bevor die Schleusenkammer-Dicht klappen 7 und 8 geöffnet werden können gegen den dort herrschenden Ofenrauradruck, wird ein Druckausgleich in den Schleusenkammern 5 und 6 durchgeführt. Der Druck steigt demnach über weiter nicht gezeigte Preßgasanschlüsse für gereinigtes Gichtgas oder ähnlichem bis auf den Ofendruck, wonach sich mittels der Hydraulikzylinder 9 und IO die Schleusenkammer-tllehtklappen 7 und 8 öffnen lassen in die in der Zeichnung gestrichelt eingetragene» Stellung.The load arrives via an inclined elevator, not shown in detail, such as a skip feed into the storage bunkers 1 and 2 and from there through lock chamber openings 3 and 4 into the Lock chambers 5 and 6. The lock chambers 5 and 6 are filled with the lock chamber sealing flaps closed 7 and 8. Before the lock chamber sealing flaps 7 and 8 can be opened against the The furnace pressure prevailing there, pressure equalization is carried out in the lock chambers 5 and 6. The pressure therefore rises via compressed gas connections, not shown, for purified furnace gas or the like except for the furnace pressure, after which the lock chamber flaps open by means of the hydraulic cylinders 9 and IO 7 and 8 can be opened into the position shown in dashed lines in the drawing.

Das Beschiclcungsgut fließt aus den Schleusenkammern 5 und 6 wechselweise oder gleichzeitig in die Schütttrichter 11, von dort in das anschließende Zentral- The load flows out of the lock chambers 5 and 6 alternately or simultaneously in the hopper 11, from there to the adjoining central

rohr 12 und schließlich in den Ringspalt 13, der von · der konusförmigen Gichtschachtwandung 1*1 und der Verteilglocke 15 gebildet wird. Die Gichtglocke 15 hängt über ein Gelenkstück 16 an der zentralen Zugstange 17, welche bei 18 abgedichtet durch die Decke 19 des Gichtverschlusses geführt ist. Als Abdichtung ist eine mit Gegendruclcgas gefüllte Rohrlcammer 20 angeordnet, die gleichzeitig als Führung für die Zugstange mit ihren Eingängen 2^1 und 22 dient. Zur senkrechten Verstellungtube 12 and finally into the annular gap 13, that of · the conical top shaft wall 1 * 1 and the distributor bell 15 is formed. The bell bell 15 hangs via a joint 16 on the central pull rod 17, which is sealed at 18 through the ceiling 19 of the top seal. As a seal is one with Back pressure gas filled Rohrlcammer 20 arranged, the at the same time serves as a guide for the pull rod with its inputs 2 ^ 1 and 22. For vertical adjustment

009885/0417009885/0417

— O — i- O - i

-5351/HH-Fl./Tp. -5351 / HH-Fl. / Tp.

der Verteilerglocke 15 befindet sich zwischen den beiden Schleusenkammern 5 und 6 an Teilen der Gichtbühne 23 ein Kolbentriebwerk 24, an dessen Kolbenstange die Zugstange 17 angelenkt ist.the distributor bell 15 is located between the two lock chambers 5 and 6 on parts of the furnace platform 23 a piston engine 24, on the piston rod of which the pull rod 17 is articulated.

Aus dem Ringspalt 13 entsteht beim Absinken der Zugstange 17 mit der Verteilerglocke 15 ein größerer Raum zwischen der Verteilglocke und der Gichtschachtwandung 14. Das bedeutet, daß das Beschickungsgut sich ordnet und sich gleichmäßig auf der Ringfläche verteilt. Diese Wirkung wird !zusätzlich durch den Zylinderteil 26 hervorgerufen, wobei letzterer zwischen Ofenkopf 27 und Gichtschacht 14 gehaltert ist. Die freie Schüttung des Beschickungsgutes erfolgt erst nachdem die Verteilerglocke 15 die unterste, strichpunktiert gezeichnete Stellung einnimmt.The pull rod emerges from the annular gap 13 when it drops 17 with the distributor bell 15, a larger space between the distributor bell and the top wall 14. This means that the load is arranged and distributed evenly on the ring surface. This effect is additionally caused by the cylinder part 26, the latter between Furnace head 27 and gout shaft 14 is supported. The free pouring of the load takes place first after the distributor bell 15 is the lowest, dash-dotted lines position drawn.

Aus dem Ringspalt 13 entsteht auf diese Weise des Absenkens der Verteilerglocke 15 die größere Ringfläche 28, der insbesondere eine Verbreitung nach Innen eigen 1st. Es ist unerheblich, ob die anfänglich vorhandene Beschickungsoberfläche bfe 30 schräg verläuft, stets stellt sich beim Absenken der Verteilerglocke 15 eine ebene Niveauhöhe 31,ein, so daß es zu einer am Umfang ablaufenden Bewegung des Beschickungsgutes kommt. Ehe die Stellung 32 der Verteilerglocke erreicht ist, wobei das Beschickungsgut etwa in Pfeilrichtung 33 von der Kegelschräge der Verteiler glocke strömt, kann also durch eine einfache Bewegung der Verteilerglocke 15 das Ordnen und Verteilen des Beschickungsgutes erfolgen.In this way, the lowering of the distributor bell 15 creates the larger annular surface from the annular gap 13 28, which is particularly characteristic of internal dissemination. It does not matter whether that is initially existing charging surface bfe 30 runs obliquely, always arises when lowering the distributor bell 15 a level level height 31, so that there is a movement of the load running on the circumference. Before the position 32 of the distributor bell is reached, the load approximately in the direction of arrow 33 from the conical slope of the distributor bell flows, so by a simple movement of the distributor bell 15, the order and distribution of the load take place.

Die Ausführung der Verteilerglocke 15 ist nicht auf das Ausführungsbeispiel beschränkt, sondern unterliegt der grundsätzlichen Ausbildung als Verschluß-The design of the distributor bell 15 is not limited to the exemplary embodiment, but is subject to it the basic training as a closure

009885/0417009885/0417

r 9 - 4.3.1968r 9 - 4 March 1968

-5351/ΗΗ-Fl./Tp. -5351 / ΗΗ-bottle / Tp.

körper, der auf mannigfache Art mit -etttf der Gichtschachtwandung l4 veränderbare Querschnitte bildet, so daß das Beschickungsgut beim Absenken und/oder Drehen auf der Verteilvorrichtung so verteilt wird, daß es später allseitig in gleichmäßig großen Strömen auf die Beschickungsoberfläche fällt.body, which in many ways with -etttf the gout shaft wall 14 variable cross-sections, so that the load when lowering and / or Turning on the distribution device is distributed so that it is later on all sides in evenly large flows falls on the loading surface.

009885/041 7009885/041 7

Claims (1)

4.3.1968March 4th, 1968 -5351/HH--5351 / HH- Pl./Tp.Pl./Tp. PatentansprücheClaims 1. Verfahren zum Beschicken, von Schachtöfen, insbesondere von im Hochdruck betriebene Hochöfen, bei denen das Beschickungsgut aus einer den Ofen gegen die Atmosphäre abdichtenden Schleusenkammer in den Ofenraum geführt wird,
dadurch gekennzeichnet,
1. Method for charging shaft furnaces, in particular high-pressure blast furnaces in which the material to be charged is fed into the furnace chamber from a lock chamber that seals the furnace from the atmosphere,
characterized,
daß das Gut vor dem Ofenraum aufgestaut, zunächst durch Vergrößern der Schüttbreite und gleichzeitigem Verringern der Schütthöhe auf einer Ringfläche verteilt und erst dann zum Auflegen auf die Beschickungsoberfläche freigegeben wird.that the material is dammed up in front of the furnace chamber, initially by increasing the bulk width and at the same time Reduction of the dumping height distributed on an annular surface and only then to be placed on the loading surface is released. 2. Verfahren nach Anspruch 1
dadurch gekennzeichnet,
2. The method of claim 1
characterized,
daß zum Aufstauen das Gut wechselweise in sich gegenüberliegenden Teilschüttungen zugeführt wird.that for damming the material is alternately fed in opposing partial beds. GichtVerschluß zur Durchführung des Verfahrens nach den Ansprüchen 1 und 2
gekennzeichnet
Gout closure for carrying out the method according to claims 1 and 2
marked
durch einen innerhalb des Beschickungsgutweges (1,5*11,12,13,33) aus einer Ausgangs-in die Freigabestellung bewegbaren Verschlußkörper (15), der zwischen diesen Positionen mit der Gichtschachtwandung (I1I) Ringquerschnitte (13,28) bildet, deren Größe und/oder Form sich stetig ändern.by a closure body (15) which can be moved from an initial to the release position within the charging material path (1,5 * 11,12,13,33) and which forms ring cross-sections (13,28) with the gout shaft wall (I 1 I) between these positions whose size and / or shape are constantly changing. 009885/0417009885/0417 -5351/HH-Fl./Tp.-5351 / HH-Fl. / Tp. 4. GichtVerschluß nach Anspruch 3 dadurch gekennzeichnet,4. Gout closure according to claim 3 characterized, daß eine unterhalb eines zentralen Einfüllrohres (11,12) angeordnete Verschlußglocke (15) mit dem oberen Teil des Ofenkopfes (27) einen Ringspalt (13) bildet, an den sich ein mit lichter Weite an den größten Verschlußglockendurchmesser angepaßter, in den Ofenraum gerichteter Zylinderteil (26) anschließt, in dem die Verschlußglocke (15) auf- und abwärts bewegbar 1st.that a below a central filler tube (11,12) arranged locking bell (15) with the upper part of the furnace head (27) forms an annular gap (13) to which a clear width is attached to the The cylinder part (26), which is adapted to the largest closure bell diameter and is directed into the furnace chamber, is connected, in which the closure bell (15) opens and movable downwards 1st. 5. GichtVerschluß nach Anspruch 4 dadurch gekennzeichnet,5. Gout closure according to claim 4, characterized in that daß die Kegelschräge der Verschlußglocke (15) .flacher verläuft als die Schräge des oberen Teils (14) des Ofenkopfes (27)·that the conical slope of the locking bell (15). is flatter than the slope of the upper part (14) of the furnace head (27) 6. GichtVerschluß nach den Ansprüchen 3 bis 5 dadurch gekennzeichnet,6. Gout closure according to claims 3 to 5 characterized, daß der Verschlußkörper bzw. die Verschlußglocke (15) an einer zentralen Zugstange (17) befestigt ist, die die Gichtverschlußdecke (19) zwischen zwei Schleusenkammern (5,6) durchdringt und deren Hubantrieb (24) außerhalb des Ofendruckraumes liegt·that the closure body or the closure bell (15) is attached to a central pull rod (17) which penetrates the top (19) between two lock chambers (5, 6) and whose lifting drive (24) is outside the furnace pressure chamber Gichtverschluß nach den Ansprüchen 3 bis 5 dadurch gekennzeichnet,Gout closure according to Claims 3 to 5, characterized in that daß der Verschlußkörper bzw. die Verschlußglocke (15) an einer Traverse befestigt ist,deren außermittiges Zugstangenpaar jeweils In ofenraumdruckbeaufschlagten Rohren geführt ist, dessen Enden mittels einer weiteren Traverse überhalb der Schleusenkammer-Ausgänge (7,8) an eine einzige, durch die Gicht verschlußdecke (19) atigedichtet geführte Zugstange (17) angelenkt sind.that the closure body or the closure bell (15) is attached to a cross member, the eccentric pair of tie rods is guided in each tube pressurized in the furnace, the ends of which by means of a further traverse above the lock chamber exits (7, 8) to a single one through which Gout closure cover (19) atigedicht guided pull rod (17) are articulated. - 3 - ■- 3 - ■ --fr=~" 4.3.1968--fr = ~ "4.3.1968 -5351/HH--5351 / HH- Pl./Tp.Pl./Tp. JtJt 8. GichtVerschluß nach den Ansprüchen 3 bis 5 dadurch gekennzeichnet,8. Gout closure according to Claims 3 to 5, characterized in that daß der Verschlußkorper bezw. die Verschlußglocke (15) senkrechte, radial verlaufende Führungsiiände tragen.that the closure body respectively. the locking bell (15) vertical, radially extending guide lines wear. 9. GichtVerschluß nach den Ansprüchen 3 bis„6 dadurch gekennzeichnet,9. Gout closure according to claims 3 to "6 characterized, daß der Verschlußkorper bzw. die Verschlußglocke (15) rotierbar sind.that the closure body or the closure bell (15) are rotatable. 009865/0417009865/0417
DE19681608301 1968-03-06 1968-03-06 Method and top seal for loading shaft furnaces, especially high-pressure blast furnaces Expired DE1608301C3 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DED0055498 1968-03-06

Publications (3)

Publication Number Publication Date
DE1608301A1 true DE1608301A1 (en) 1971-01-28
DE1608301B2 DE1608301B2 (en) 1973-06-07
DE1608301C3 DE1608301C3 (en) 1974-01-03

Family

ID=7056578

Family Applications (1)

Application Number Title Priority Date Filing Date
DE19681608301 Expired DE1608301C3 (en) 1968-03-06 1968-03-06 Method and top seal for loading shaft furnaces, especially high-pressure blast furnaces

Country Status (1)

Country Link
DE (1) DE1608301C3 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3834969A1 (en) * 1988-10-13 1990-04-19 Kortec Ag FEEDING DEVICE FOR SHAFT OVENS, IN PARTICULAR STOVE OVENS

Also Published As

Publication number Publication date
DE1608301C3 (en) 1974-01-03
DE1608301B2 (en) 1973-06-07

Similar Documents

Publication Publication Date Title
DE2065460C3 (en) Loading device for a shaft furnace
DE1781411B1 (en) Container for bulk goods with a discharge opening that can be closed by means of a slide plate
DE1285825B (en) Gate valve for hot gases
DE2824305A1 (en) DEVICE FOR BLOCKING GAS PIPES OF LARGE SECTIONS
DE102008006558A1 (en) Inert gas lock for filling a container with bulk material
DE2708249A1 (en) PRESSURE COMPENSATING VALVE FOR MANHOLE FURNACES
DE826098C (en) Slider
DE1608301A1 (en) Method and top hatch for loading shaft ovens, in particular high pressure blast furnaces
DE3331483A1 (en) DEVICE FOR FIRE-RESISTANT PANELS FROM SLIDING CLOSURES
DE3226236A1 (en) DEVICE FOR QUARCHING TUBES IN A MULTIPLE ARRANGEMENT
DE589090C (en) Feeding device for gas generators
EP1528013B1 (en) Air cannon with upper inner valve unit
DE1758636B1 (en) Device for filling shaft ovens
DE1945132C3 (en) Suspension device for distributor bells of shaft furnaces, in particular of blast furnaces
DE2022909A1 (en) Furnace loading device
DE1671354C3 (en)
DE958556C (en) Closure for gas generators, in particular compressed gas generators, or other pressure vessels with openings that can be closed gas-tight
DE1946900B2 (en) Glchtverschluß for shaft furnaces that can be operated in the high pressure process, especially for pressure furnaces
DE184902C (en)
DE875025C (en) Device for unloading container trolleys into a chain conveyor
DE929690C (en) Closure device for loading and unloading bulk goods into or out of gas-filled spaces
DE2029089B2 (en) DEVICE FOR FILLING AND DISTRIBUTING BATCHES FOR A CHAMBER
DE2022909C3 (en) Furnace loading device
DE329790C (en) Automatically switching on and off locking device for periodically moving, rotatably mounted discs, drums, cellular wheels or the like, especially for charging devices for furnaces
AT412786B (en) METHOD FOR CHARGING FLUIDABLE MATERIAL AND DEVICE FOR CARRYING OUT THE METHOD

Legal Events

Date Code Title Description
C3 Grant after two publication steps (3rd publication)
E77 Valid patent as to the heymanns-index 1977
EHJ Ceased/non-payment of the annual fee