DE1534599A1 - Process for the production of seamless formwork concrete in galleries and tunnels - Google Patents
Process for the production of seamless formwork concrete in galleries and tunnelsInfo
- Publication number
- DE1534599A1 DE1534599A1 DE19661534599 DE1534599A DE1534599A1 DE 1534599 A1 DE1534599 A1 DE 1534599A1 DE 19661534599 DE19661534599 DE 19661534599 DE 1534599 A DE1534599 A DE 1534599A DE 1534599 A1 DE1534599 A1 DE 1534599A1
- Authority
- DE
- Germany
- Prior art keywords
- formwork
- concrete
- tunnels
- galleries
- production
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000009415 formwork Methods 0.000 title claims description 27
- 238000000034 method Methods 0.000 title claims description 14
- 238000004519 manufacturing process Methods 0.000 title claims description 4
- 230000033001 locomotion Effects 0.000 claims description 8
- 238000003825 pressing Methods 0.000 description 2
- 238000010276 construction Methods 0.000 description 1
- 238000007654 immersion Methods 0.000 description 1
- 239000011435 rock Substances 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 238000009987 spinning Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/10—Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/10—Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
- E21D11/102—Removable shuttering; Bearing or supporting devices therefor
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Structural Engineering (AREA)
- Mining & Mineral Resources (AREA)
- Civil Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Lining And Supports For Tunnels (AREA)
Description
Verfahren zur Herstellung eines , » ' Process for the production of a ''
fugenlosen Schalbetons in Stol- . seamless formwork concrete in Stol- .
Xm allgemeinen verwendet man für die Herstellung eines Auskleidungsbetons im Stollen- und Tunnelbau eine ortsfeste Schalung. Sie wird in Einzelteilen aufgebaut und ausgerichtet. Danach wird der Beton durch irgend ein Transport-Verfahren eingebracht. Die Schalung muß so lange stehen bleiben, bis der Beton abgebunden hat. Danach wird sie demontiert und weiter nach vorne gebracht und wieder aufgestellt. Es handelt sich hierbei um ein Takt-Verfahren, das sehr viel Zeit in Anspruch nimmt. Damit ist auch die Fortschrittsleistung gering»It is generally used for the production of a lining concrete Fixed formwork in gallery and tunnel construction. It is built up and aligned in individual parts. Then the concrete is brought in by any transport method. The formwork must remain in place for so long until the concrete has set. Then it is dismantled and brought forward and then set up again. This is a clock process that takes a lot of time. This is also the achievement of progress small amount"
Man hat versucht, günstigere Ergebnisse zu erzielen, indem man sogenannte Teleskop-Schalungen angewandt hat. Diese können fahrbar auf einem Gleis angeordnet werden. Sie werden an Ort und Stelle eingefahren. Danach wird die Schalung mittels Teleskopvorrichtung zum Stollenprofil ausgeschwenkt und der Beton eingebracht. Die Schalung muß wieder so lange stehenbleiben, bis der Beton abgebunden hat. Darauf wird sie wieder zusammengeklappt und in diesem Zustand weiter nach vorne gefahren und wieder zum verlangten Profil ausgeklappt. Durch eine solche Schalung erhält man etwas bessere Fortschrittsgeschwindigkeiten; jedoch das Taktverfahren wird nicht beseitigt. Attempts have been made to get better results by so-called telescopic formwork has been used. these can be arranged mobile on a track. They are retracted on the spot. Then the formwork is made using Telescopic device swiveled out to the tunnel profile and the Placed concrete. The formwork must remain in place for so long until the concrete has set. It is then folded up again and, in this state, further forward driven and unfolded again to the required profile. Such a formwork gives somewhat better speeds of progress; however, the clocking method is not eliminated.
Im Gegensatz hierzu erreicht man nach dem Verfahren des Anmeldungsgegenstands ein kontinuierliches Betonieren, wobei die Auskleidung fugenlos hergestellt werden kann. Nur an solchen Stellen entstehen Fugen, an denen bewußt die Arbeit unterbrochen werden soll, Dies geschieht in der Regel am ¥ochenende. Der Beton wird hierbei - ähnlich wie bei den bekannten Verfahren - hinter die Schalung eingepreßt und durch Rüttelbewegung verdichtet. Im Gegensatz zu den bekanntenIn contrast to this, the process of the subject of the application is achieved continuous concreting, whereby the lining can be produced without joints. Only on those There are joints where work should be deliberately interrupted. This is usually done at the end of the week. The concrete is here - pressed in behind the formwork - similar to the known method - and through Compacted shaking movement. In contrast to the known
90983 1/067190983 1/0671
Flachrüttlern, die auf der Schalung aufgesetzt sind, und zu den Tauchriittlern erfolgt der Rüttelvorgang hier aber anders, so daß eine wesentliche Verbesserung gegenüber dem bekannten Schalbeton erzielt wird«Flat vibrators, which are placed on the formwork, and the vibrating process for the immersion belts, however, is different here, so that a significant improvement over the well-known formwork concrete is achieved «
Das Bild 1 stellt einen Querschnitt eines Stollens dar. Derselbe kann kreisrund oder beliebig anders geformt sein· Das Bild_2 stellt den hierzu gehörigen Längenschnitt fcfc dar. Nachdem der Fels 1 ausgebrochen ist und eine unrunde oder glatte Oberfläche 2 aufweist, wird die Schalung 4 kontinuierlich eingefahren. Hierbei wird der Beton 3 fortlaufend durch die üffnungen 8 eingepreßt. Er besitzt eine solche Konsistenz, daß der Preßvorgang durchgeführt werden kann. Die Schalung 4 wird gesteuert durch die Arme 10, welche teleskopartig an einem Gerät 9 sich kontinuierlich nach vorne bewegt* Hierzu können Raupenbänder 12 verwendet werden. Das Gerät 9 muß hierbei die Reibung überwinden, welche zwischen dem Beton 3 und der Schalung 4 entsteht. Durch das Einpressen des Betons durch die Öffnungen 8 entsteht an der Stirnwand 6, welche einen vorderen Abschluß darstellt - damit der Beton nicht nach vorne ausfließen kann - ein Druck P. Dieser Druck P hilft mit, die Reibung zu überwinden. U.U. ist er so groß, daß eine zusätzliche Kraft im Gerät 9 nicht mehr aufgewandt werden muß. Damit der Beton 3 nicht zwischen der Stirnwand 6 und der Außenfläche 2 herausfließen kann, ist eine Dichtung 7 vorgesehen. Während des Einbringens des Betons 3 wird der Rüttler 5t welcher fest mit der Schalung 4 verbunden ist» in Bewegung gesetzt. Dies geschieht aber nicht in der herkömmlichen ¥eise» sondern der Rüttler 5 besitzt eine Unwucht, so daß .die gesamte Schalung 4 in eine exzentrische Kreisbewegung versetzt wird. Der Beton 3 wird also sozusagen durch diese exzentrische Bewegung um ein geringes Maß ausgeschlagen, so daß der Durchmesser der fertigen Auskleidung größer ist, als ihn die Außenkante der Schalung aufweist. Dadurch daß die Tourenzahl des Rüttlers 5 sehrThe picture 1 shows a cross-section of a tunnel. The same can be circular or any other shape · The Bild_2 shows the corresponding longitudinal section fcfc. After the rock 1 has broken out and has a non-circular or smooth surface 2, the formwork 4 is continuously retracted. Here, the concrete 3 is continuously pressed in through the openings 8. It has such a consistency that the pressing process can be carried out. The formwork 4 is controlled by the arms 10, which telescopically on a Device 9 moves forward continuously * Crawler belts 12 can be used for this. The device 9 must this Overcome friction that arises between the concrete 3 and the formwork 4. By pressing the concrete through the openings 8 is created on the end wall 6, which is a front closure - so that the concrete does not flow out to the front can - a pressure P. This pressure P helps to overcome the friction. It may be so big that an additional Force in the device 9 no longer has to be applied. So that the concrete 3 does not get between the end wall 6 and the outer surface 2 can flow out, a seal 7 is provided. While the concrete 3 is being poured in, the vibrator 5t becomes solid is connected to the formwork 4 »set in motion. This does not happen in the conventional way, but in the Vibrator 5 has an imbalance, so that .the entire formwork 4 is set in an eccentric circular motion. The concrete 3 is so to speak by this eccentric movement around a knocked out small measure so that the diameter of the finished The lining is larger than the outer edge of the formwork. Because the number of revolutions of the vibrator 5 very
-3--3-
9 0 9 8 31/06719 0 9 8 31/0671
noch. 1st, entsteht eine im Kreis aicfa herumdrehende hämmernde Bewegung auf den Beton 3. Der Beton 3 wird hierdurch stark gerüttelt, verdichtet und,was besonders wichtig ist, geglät-still. 1st, a pounding hammering spinning around in aicfa arises Movement on the concrete 3. The concrete 3 is thereby strongly vibrated, compacted and, what is particularly important, smoothed.
^ Durch^ By
tet. die geringe Vergrößerung des Durchmessers des Betons gegenüber der Außenkante der Schalung wird in erwünschter Weise die Reibung zwischen Schalung h und Beton 3 verringert. Die Fortschrittsgeschwindigkeit der Schalung nach vorne rich«- tet sich nach der Länge der Schalung und nach der Abbindezeit des Betone 3. Er muß jedenfalls am Ende der Schalung so fest sein, daß er sich gerade selbst tragen kannj gegebenenfalls mit die Abbindung fördernden Beigaben gesteuert wirdj, . mß tet. the slight increase in the diameter of the concrete compared to the outer edge of the formwork, the friction between formwork h and concrete 3 is reduced in a desired manner. The forward speed of the formwork depends on the length of the formwork and the setting time of the concrete ,. must
U.U. ist es erwünscht, daß der letzte Teil der Schalung nicht in Rüttelbewegung versetzt wird und lediglich als abstützender Teil nach vorne bewegt wird. Dies kann erreicht werden, wenn die Schalung durch eine elastische Dichtung 1 1 unterbrochen wird.Under certain circumstances it is desirable that the last part of the formwork does not is set in shaking motion and is only moved forward as a supporting part. This can be achieved when the formwork is interrupted by an elastic seal 11.
Claims (5)
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| DEB0085983 | 1966-02-26 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| DE1534599A1 true DE1534599A1 (en) | 1969-07-31 |
Family
ID=6983166
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| DE19661534599 Pending DE1534599A1 (en) | 1966-02-26 | 1966-02-26 | Process for the production of seamless formwork concrete in galleries and tunnels |
Country Status (1)
| Country | Link |
|---|---|
| DE (1) | DE1534599A1 (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE2240091A1 (en) * | 1971-09-27 | 1973-04-05 | Gewerk Eisenhuette Westfalia | CONCRETE PROCEDURE FOR TUNNELING AND EQUIPMENT FOR CARRYING OUT THE PROCEDURE |
| FR2335650A1 (en) * | 1975-12-17 | 1977-07-15 | Domesle Benno | Shuttering for inside surfaces of channels - consists of shuttering sections supported in cantilevered position by two part carriage |
| DE3043312A1 (en) * | 1980-11-17 | 1982-07-08 | Heinz-Theo Dipl.-Ing. 5300 Bonn Walbröhl | METHOD AND DEVICE FOR DRIVING A SLIDE SHUTTER |
-
1966
- 1966-02-26 DE DE19661534599 patent/DE1534599A1/en active Pending
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE2240091A1 (en) * | 1971-09-27 | 1973-04-05 | Gewerk Eisenhuette Westfalia | CONCRETE PROCEDURE FOR TUNNELING AND EQUIPMENT FOR CARRYING OUT THE PROCEDURE |
| FR2335650A1 (en) * | 1975-12-17 | 1977-07-15 | Domesle Benno | Shuttering for inside surfaces of channels - consists of shuttering sections supported in cantilevered position by two part carriage |
| DE3043312A1 (en) * | 1980-11-17 | 1982-07-08 | Heinz-Theo Dipl.-Ing. 5300 Bonn Walbröhl | METHOD AND DEVICE FOR DRIVING A SLIDE SHUTTER |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| DE2318842A1 (en) | DEVICE AND METHOD FOR THE FORMATION OF PILLARS IN THE SOIL | |
| DE1534599A1 (en) | Process for the production of seamless formwork concrete in galleries and tunnels | |
| DE4304816A1 (en) | Implement and method for stabilising and exploring soft subsoil | |
| DE2260473C3 (en) | Process for producing material columns in the ground, such as drains, tamping compaction or unreinforced concrete piles and apparatus for carrying out the process | |
| DE1206938B (en) | Controllable propulsion shield for driving tunnels, routes or the like, and method for producing an in-situ concrete lining with such a propulsion shield | |
| DE4125576A1 (en) | Pumping dry powder into soil for strengthening - using rigid or flexible hose to introduce chalk-based powder into soil as hose is withdrawn to both stiffen and dewater soil | |
| DE825162C (en) | Anchoring device for the reinforcement of prestressed concrete | |
| EP0205853A2 (en) | Method for producing a pipelike underground cavity, e.g. a tunnel, gallery or the like, by means of shield driving, and device for carrying out the method | |
| DE927977C (en) | Method and device for the production of concrete parts of great length in tubular form | |
| DE699762C (en) | Method and device for creating trench-like construction pits | |
| DE3520092C2 (en) | ||
| DE2028820A1 (en) | Procedure and kit for upgrading tunnels and galleries | |
| DE3218995A1 (en) | Tool for making boreholes in loose compressible soils and method of making boreholes using such a tool | |
| EP0049846B1 (en) | Method of forming the bottom of a trench and for laying pipes on said bottom | |
| DE2109384C3 (en) | Method and apparatus for producing tubular tunnels, galleries or the like. in shield driving with a lining made of in-situ concrete | |
| DE1952707C3 (en) | VerpreBanker | |
| DE3435724C2 (en) | ||
| DE2948879A1 (en) | METHOD FOR PRODUCING IN-PLACE CONCRETE PUMPS | |
| DE1110575B (en) | Process and under terrain device for the production of earth graves od | |
| DE1484457C (en) | Device for making place piles | |
| DE2619431A1 (en) | On site concrete pile prodn. - has casing with releasable ram foot rammed into soil and pipe filled with setting concrete | |
| DE859878C (en) | Method and device for the production of foundation piles from in-situ concrete | |
| DE2510912A1 (en) | Procedure for lining underground bunker - prefab concrete panels are positioned and mortar pressed in joints between adjoining panels | |
| DE3133709A1 (en) | Method and apparatus for producing a concrete foundation body in the ground | |
| DE2521712A1 (en) | Corner stakes with widened lower ends - are compacted inside jacket column which is raised from ground |