DE1271968B - Multi-storey building made of prefabricated parts - Google Patents
Multi-storey building made of prefabricated partsInfo
- Publication number
- DE1271968B DE1271968B DEP1271A DE1271968A DE1271968B DE 1271968 B DE1271968 B DE 1271968B DE P1271 A DEP1271 A DE P1271A DE 1271968 A DE1271968 A DE 1271968A DE 1271968 B DE1271968 B DE 1271968B
- Authority
- DE
- Germany
- Prior art keywords
- core piece
- building according
- floor
- parts
- building
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000005192 partition Methods 0.000 claims description 8
- 239000002184 metal Substances 0.000 claims description 5
- 239000004020 conductor Substances 0.000 claims 1
- 238000010276 construction Methods 0.000 description 8
- 238000009413 insulation Methods 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 230000001427 coherent effect Effects 0.000 description 1
- 238000010438 heat treatment Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000009417 prefabrication Methods 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 238000009423 ventilation Methods 0.000 description 1
- 239000002023 wood Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/34—Extraordinary structures, e.g. with suspended or cantilever parts supported by masts or tower-like structures enclosing elevators or stairs; Features relating to the elastic stability
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/343—Structures characterised by movable, separable, or collapsible parts, e.g. for transport
- E04B1/344—Structures characterised by movable, separable, or collapsible parts, e.g. for transport with hinged parts
- E04B1/3442—Structures characterised by movable, separable, or collapsible parts, e.g. for transport with hinged parts folding out from a core cell
- E04B1/3444—Structures characterised by movable, separable, or collapsible parts, e.g. for transport with hinged parts folding out from a core cell with only lateral unfolding
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/343—Structures characterised by movable, separable, or collapsible parts, e.g. for transport
- E04B1/344—Structures characterised by movable, separable, or collapsible parts, e.g. for transport with hinged parts
- E04B1/3445—Structures characterised by movable, separable, or collapsible parts, e.g. for transport with hinged parts foldable in a flat stack of parallel panels
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/348—Structures composed of units comprising at least considerable parts of two sides of a room, e.g. box-like or cell-like units closed or in skeleton form
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/348—Structures composed of units comprising at least considerable parts of two sides of a room, e.g. box-like or cell-like units closed or in skeleton form
- E04B1/34807—Elements integrated in a skeleton
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/35—Extraordinary methods of construction, e.g. lift-slab, jack-block
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Building Environments (AREA)
- Load-Bearing And Curtain Walls (AREA)
Description
DEUTSCHESGERMAN
PATENTAMTPATENT OFFICE
AUSLEGESCHRIFTEDITORIAL
Int. Cl.:Int. Cl .:
E04hE04h
Deutsche Kl.: 37 f-15/02German class: 37 f-15/02
Nummer: 1271 968Number: 1271 968
Aktenzeichen: P 12 71 968.5-25 (R 44285)File number: P 12 71 968.5-25 (R 44285)
Anmeldetag: 5. Oktober 1966 Filing date: October 5, 1966
Auslegetag: 4. Juli 1968Open date: 4th July 1968
Die Erfindung bezieht sich auf ein Gebäude mit mehreren Stockwerken aus vorgefertigten Teilen mit einem aus mehreren lotrechten Pfosten gebildeten Gerippe.The invention relates to a multi-storey building made of prefabricated parts a framework formed from several vertical posts.
Ein solches bekanntes Gebäude ist als Stahlskelettbau ausgebildet, in dessen Skelett vorgefertigte Deckenplatten und ein vorgefertigtes Dach eingehängt sind. Erst anschließend ist dieser Skelettbau durch ein aufeinanderfolgendes Zubringen der Innenausstattung mit Zwischenwänden, Außenwänden usw. fertigzustellen. Nachteilig ist dabei nicht nur die Heranschaffung und Montage der großflächigen Deckenplatten und des Daches, sondern auch die umständliche und zeitraubende Fertigstellung des Gebäudes durch das einzelne Heranschaffen und Einbringen der Zwischen- und Außenwände und der sonstigen Ausstattung in die einzelnen Stockwerke.Such a well-known building is designed as a steel frame construction, prefabricated in its skeleton Ceiling panels and a prefabricated roof are attached. Only then is this skeleton structure by successively adding the interior fittings with partition walls, external walls etc. to complete. The disadvantage here is not only the acquisition and assembly of the large-area Ceiling panels and the roof, but also the cumbersome and time-consuming completion of the building by individually bringing in and installing the partition and outer walls and the other equipment in the individual floors.
Der Erfindung liegt die Aufgabe zugrunde, das eingangs genannte Gebäude schon auf Grund seiner Planung so auszugestalten, daß es in allen seinen Stockwerken in leicht transportablen Einheiten vollständig ausgestattet herangeschafft und stockwerkweise ohne die Notwendigkeit der nachträglichen Heranschaffung von Bauteilen erstellt werden kann.The invention is based on the object of the aforementioned building already due to its Planning to design so that it is completely in all its floors in easily transportable units equipped and brought up by floor without the need for subsequent Procurement of components can be created.
Die gestellte Aufgabe ist erfindungsgemäß dadurch gelöst, daß das eingangs genannte Gebäude je Stockwerk wenigstens eine vorgefertigte, zusammenhängende Baugruppe mit einem zentralen Kernstück aufweist, an dem zu Transportzwecken heranfaltbar die Außenwände, der Boden, die Decke und gegebenenfalls Zwischenwände angeordnet sind.The object set is achieved according to the invention in that the above-mentioned building per floor at least one prefabricated, coherent assembly with a central core has, on which the outer walls, the floor, the ceiling and, if necessary, can be folded up for transport purposes Partitions are arranged.
Die stockwerkweise zusammenhängenden, vorgefertigten Baugruppen ergeben in der mit den weiteren Bauteilen an ihr zentrales Kernstück herangefalteten kompakten Transportstellung gerade noch mit Straßenfahrzeugen günstig transportierbare Einheiten, die somit eine außerordentlich schnelle Erstellung größerer mehrstöckiger Gebäude ermöglichen. The prefabricated subassemblies that are connected on a floor-by-floor basis result in the with the other Components folded up to their central core in the compact transport position Road vehicles inexpensively transportable units, which are therefore extremely quick to create enable larger multi-storey buildings.
Gemäß bevorzugten Ausgestaltungen der Erfindung weist das Gerippe jeweils ein Stockwerk hohe Pfosten aus Metall auf, während das Kernstück und die faltbaren Teile bevorzugt aus Kunststoff bestehen.According to preferred refinements of the invention, the framework is each one story high Post made of metal, while the core piece and the foldable parts are preferably made of plastic.
Nach anderen ebenfalls bevorzugten Ausgestaltungen der Erfindung nimmt das Kernstück Leitungen in einem oben und unten offenen Schacht auf, der durch eine darin angeordnete Leiter stets zugänglich ist, während in die faltbaren Teile zugeordnete Leitungen, insbesondere Stromversorgungs- und Telefonkabel, und gegebenenfalls Türen und Fenster eingebaut sind.According to other, likewise preferred embodiments of the invention, the core piece takes lines in a shaft open at the top and bottom, which is always accessible through a ladder arranged in it is, while in the foldable parts associated lines, in particular power supply and Telephone cables and, if applicable, doors and windows are installed.
Gebäude mit mehreren Stockwerken aus
vorgefertigten TeilenBuildings with several floors
prefabricated parts
Anmelder:Applicant:
Marc Pierre Rainaut, ParisMarc Pierre Rainaut, Paris
Vertreter:Representative:
Dipl.-Ing. H. Strohschänk, Patentanwalt,Dipl.-Ing. H. Strohschänk, patent attorney,
8000 München 60, Musäusstr. 58000 Munich 60, Musäusstr. 5
Als Erfinder benannt:
Marc Pierre Rainaut, ParisNamed as inventor:
Marc Pierre Rainaut, Paris
Beanspruchte Priorität:Claimed priority:
Frankreich vom 7. Oktober 1965 (34 063)France 7 October 1965 (34 063)
Eine derart vollständige Vorfertigung des Gebäudes macht es möglich, daß an der Baustelle der zentrale Kern bereits mit allen Bestandteilen ausgerüstet ankommt, die zur Bildung eines Stockwerkes erforderlich sind. Insbesondere sind in allen auseinanderfaltbaren Teilen (Decke, Boden, Außenwände und gegebenenfalls Zwischenwände) alle üblichen Leitungssysteme vorgesehen, so daß man nach beendetem Auseinanderfalten der Teile lediglich zugeordnete Verbindungsanschlüsse zwischen den Leitungen herstellen muß, woraufhin das Stockwerk unmittelbar anschließend bewohnt werden kann. Schließlich liegt es auf der Hand, daß man einerseits durch die Vorfertigung des zentralen Kernstücks und aller von diesem getragenen auseinanderfaltbaren Teile und andererseits durch die schnelle Erstellung des Gebäudes einen niedrigen Gesamtpreis für das fertige Gebäude erhält. Im übrigen kann dem so erhaltenen Gebäude ein unterschiedliches inneres und äußeres Aussehen verliehen werden.Such a complete prefabrication of the building makes it possible that at the construction site of the central core arrives already equipped with all the components necessary for the formation of a floor required are. In particular, in all parts that can be folded out (ceiling, floor, outer walls and, if necessary, partition walls) all the usual piping systems are provided so that after completed unfolding of the parts only associated connection connections between the Must produce lines, after which the floor can be inhabited immediately afterwards. After all, it is obvious that, on the one hand, by prefabricating the central core and of all foldable parts carried by this and, on the other hand, by the quick creation of the building receives a low total price for the finished building. Incidentally, the so obtained Buildings can be given a different internal and external appearance.
Es sind zwar schon Bauwerke bekannt, bei denen ein zentrales Kernstück die heranfaltbaren Wände und Böden trägt. Dabei handelt es sich jedoch ausschließlich um eingeschossige Bauwerke, bei denen das zentrale Kernstück entweder von einem in konventioneller Bauweise erstellten und im Erdreich fundamentierten Sockel getragen wird oder nach Art von Wohnwagen mit einem Fahrgestell versehen ist. Das erfindungsgemäße Aufeinandersetzen mehrerer solcher Kernstücke unter Heranziehung eines ausThere are already buildings known in which a central core is the foldable walls and floors. However, these are exclusively single-storey buildings where the central core either of a conventional construction and in the ground A foundation base is supported or is provided with a chassis in the manner of a caravan. The stacking of several such core pieces according to the invention using one from
809 568/40809 568/40
mehreren lotrechten Pfosten gebildeten Gerippes konnte durch diesen Stand der Technik nicht nahegelegt werden.several vertical posts formed framework could not be suggested by this prior art will.
In der Zeichnung ist die Erfindung beispielsweise veranschaulicht; es zeigtIn the drawing, the invention is illustrated by way of example; it shows
F i g. 1 einen Horizontalschnitt durch ein erfindungsgemäß ausgebildetes Gebäude, wobei die zentrale Baugruppe in der linken Hälfte so dargestellt ist, wie sie vom Transport her auf der Baustelle ankommt, während in der rechten Hälfte bereits die seitlichen Außenwände herausgefaltet sind,F i g. 1 shows a horizontal section through an inventive trained building, with the central assembly shown in the left half is how it arrives at the construction site from the transport, while in the right half already the lateral outer walls are folded out,
F i g. 2 einen lotrechten Teilschnitt nach der Linie II-IIderFig. 1,F i g. 2 is a vertical partial section along the line II-IIofFig. 1,
F i g. 3 einen Horizontalschnitt wie in F i g. 1 in einem späteren Montagestadium,F i g. 3 shows a horizontal section as in FIG. 1 at a later assembly stage,
F i g. 4 einen lotrechten Teilschnitt nach der Linie IV-IV der Fig. 3,F i g. 4 shows a vertical partial section along the line IV-IV of FIG. 3,
Fig. 5 einen Horizontalschnitt wie in Fig. 3, jedoch im Endzustand der Montage,FIG. 5 shows a horizontal section as in FIG. 3, however in the final state of assembly,
F i g. 6 einen vergrößert dargestellten lotrechten Teilschnitt, aus dem die Festlegung der auseinandergefalteten Teile an den Pfosten des Gerippes ersichtlich ist,F i g. 6 is an enlarged vertical partial section, from which the definition of the unfolded Parts can be seen on the posts of the framework,
F i g. 7 einen weiteren lotrechten Teilschnitt, aus dem der Zusammenbau zweier übereinanderfolgender zentraler Kernstücke ersichtlich ist.F i g. 7 a further vertical partial section, from which the assembly of two successive central core pieces can be seen.
In Fig. 1 sind ein Gerippe 1 und ein zentrales Kernstück 2 dargestellt. Das Gerippe 1 wird durch eine Anzahl vorzugsweise metallischer, jeweils ein Stockwerk hoher Pfosten gebildet, und zwar aus vier Pfosten 3, die das zentrale Kernstück 2 tragen, aus vier Eckpfosten 4 und Zwischenpfosten 5. Die Pfosten sind auf herkömmlichen Fundamenten aus Beton, Mauerwerk od. dgl. montiert.In Fig. 1 are a framework 1 and a central Core 2 shown. The frame 1 is preferably metallic, each one by a number Floor-high posts formed, namely from four posts 3, which carry the central core piece 2 from four corner posts 4 and intermediate posts 5. The posts are made on conventional foundations Concrete, masonry or the like mounted.
In der Höhe jedes Stockwerks ist das zentrale Kernstück 2 festgelegt, das vorzugsweise aus Kunststoff besteht. Das Kernstück 2 ist fabrikmäßig vorgefertigt und, wie in der Zeichnung dargestellt, einstückig; es kann aber auch erst auf der Baustelle aus mehreren Teilen zusammengesetzt sein.At the level of each floor, the central core piece 2 is fixed, which is preferably made of plastic consists. The core 2 is prefabricated in the factory and, as shown in the drawing, in one piece; but it can also be assembled from several parts on the construction site.
Das die Umrißform eines Parallelepipeds aufweisende Kernstück 2 weist Seitenwände 2 α, Stirnwände 2 b, einen Boden 2 c und eine Decke 2 d (F i g. 2) auf, die an der Außenfläche des Kernstückes zwischen sich Ausnehmungen 6 bilden. In diesen Ausnehmungen befinden sich beim Transport die zusammengefalteten Außenwände, der Boden, die Decke und gegebenenfalls die Zwischenwände jedes Stockwerkes, die wie das Kernstück 2 vorzugsweise aus Kunststoff hergestellt sind. Insbesondere aus der linken Hälfte der Fig. 1 ist ersichtlich, daß die äußeren Ausnehmungen eine seitliche Außenwand 7 aus jeweils zwei Wandteilen 7 α und 7 b aufnehmen, die zwischen sich über ein lotrechtes Scharnier 8 und mit dem Kernstück 2 über ein weiteres lotrechtes Scharnier 9 verbunden sind, ferner eine parallel zum Kernstück 2 verlaufende Außenwand 11, die über ein waagerechtes Scharnier 12 an einem Boden 13 angelenkt ist, der aus zwei Teilen 13 α und 13 b besteht, die über ein waagerechtes Scharnier 14 miteinander verbunden und ihrerseits am Kernstück 2 über ein waagerechtes Scharnier 10 angelenkt sind, und schließlich eine Zwischenwand 15, die aus einem oder mehreren zusammenfaltbaren Teilen besteht und am Kernstück 2 entlang einem Scharnier 20 angelenkt ist.The core piece 2, which has the outline of a parallelepiped, has side walls 2 α, end walls 2 b, a bottom 2 c and a ceiling 2 d (FIG. 2), which form recesses 6 on the outer surface of the core piece between them. In these recesses are the folded outer walls, the floor, the ceiling and, if necessary, the partition walls of each storey during transport, which, like the core piece 2, are preferably made of plastic. In particular, from the left half of FIG. 1 it can be seen that the outer recesses accommodate a lateral outer wall 7 each consisting of two wall parts 7 α and 7 b , which are connected between them via a perpendicular hinge 8 and with the core piece 2 via a further perpendicular hinge 9 are connected, furthermore an outer wall 11 running parallel to the core piece 2, which is articulated via a horizontal hinge 12 to a base 13, which consists of two parts 13 α and 13 b , which are connected to one another via a horizontal hinge 14 and in turn on the core piece 2 are articulated via a horizontal hinge 10, and finally an intermediate wall 15, which consists of one or more foldable parts and is articulated on the core piece 2 along a hinge 20.
Das Kernstück 2 trägt oben noch die Decke 16, die ebenfalls aus zusammenfaltbaren Teilen besteht.The core 2 still carries the top 16, which also consists of collapsible parts.
Gemäß dem dargestellten Ausführungsbeispiel besteht jede Decke 16 aus vier gelenkig miteinander
verbundenen Teilen und ist über ein waagerechtes Scharnier am Kernstück 2 angelenkt.
In allen auseinanderfaltbaren Teilen sind die zugeordneten Leitungen der Stromversorgung, für das
Telefon usw. sowie auch die Fenster und Türen vorgesehen. Alle auseinanderfaltbaren Teile sind schon
bei der Vorfertigung der Baugruppe fabrikmäßigAccording to the illustrated embodiment, each cover 16 consists of four parts that are articulated to one another and is hinged to the core piece 2 via a horizontal hinge.
The associated lines for the power supply, for the telephone, etc. as well as the windows and doors are provided in all parts that can be folded out. All parts that can be unfolded are factory-made when the assembly is prefabricated
ίο fertig hergestellt.ίο finished.
Nachstehend wird die Erstellung eines erfindungsgemäß ausgebildeten Gebäudes beschrieben:The construction of a building designed according to the invention is described below:
Das durch einen Lastwagen zur Baustelle angelieferte zentrale Kernstück 2 nebst allen herangefalteten Teilen wird mittels eines Hubgerätes in dem jeweils zugeordneten Stockwerk an den als Auflager dienenden Pfosten 3 des Gerippes 1 und zugleich auf dem Kernstück 2 des darunter befindlichen Stockwerks festgelegt, wie es in F i g. 7 dargestellt ist. ZuThe central core 2, which was delivered to the construction site by a truck, along with all of the folded parts Sharing is carried out by means of a lifting device on the floor assigned to each as a support serving post 3 of the framework 1 and at the same time on the core piece 2 of the floor below set as it is in F i g. 7 is shown. to
ao diesem Zweck weist jedes Kernstück 2 an seiner Oberseite eine Längsrinne 17 auf, in die eine Längsrippe 18 an der Unterseite des nach oben anschließenden Kernstückes 2 eingreift. Die Längsrinne 17 und die Längsrippe 18 könnten auch umgekehrt angeordnet und gegenüber der Darstellung der F i g. 7 mit unterschiedlichen Querschnitten versehen sein. In die unteren und oberen Randteile der Kernstücke 2 sind Löcher gebohrt, durch die Verbindungsbolzen 19 gesteckt sind, die die aufeinandergesetzten Kernstücke 2 fest miteinander verbinden.For this purpose, each core piece 2 has a longitudinal groove 17 on its upper side, into which a longitudinal rib 18 engages on the underside of the core piece 2 adjoining the top. The longitudinal channel 17 and the longitudinal rib 18 could also be arranged the other way around and compared to the illustration of FIG F i g. 7 be provided with different cross-sections. In the lower and upper edge parts of the core pieces 2 holes are drilled through which connecting bolts 19 are inserted, which are placed on top of one another Connect core pieces 2 firmly together.
Aus F i g. 7 geht weiterhin hervor, daß die waagerechte Decke 2d jedes Kernstückes 2 auf einem Winkelansatz 21 der Pfosten 3 aufruht, wodurch die Verbindung zwischen dem Kernstück 2 und dem metallischen Gerippe 1 hergestellt ist.From Fig. 7 also shows that the horizontal ceiling 2d of each core piece 2 rests on an angled shoulder 21 of the posts 3, whereby the connection between the core piece 2 and the metallic framework 1 is established.
Nachdem das Kernstück 2 am Gerippe 1 und auf dem darunter befindlichen Kernstück festgelegt ist, folgt der nächste Montageschritt, bei dem die seitlichen Außenwände 7 herausgefaltet werden, die mit (in der Zeichnung nicht dargestellten) Fenstern und gegebenenfalls Balkontüren versehen sind. Wie aus dem rechten Teil der F i g. 1 hervorgeht, werden die Wandteile 7 α und 7 b jeder seitlichen Außenwand 7 vom Kernstück 2 aus um ein Scharnier 9 herausgeklappt, wonach der eine gegenüber dem anderen Wandteil um das Scharnier 8 weiter herausgeklappt wird, bis die Außenwand 7 in in den Zwischenpfosten 5 und den Eckpfosten 4 vorgesehene Ausnehmungen eingreift und einrastet. Die Außenwände sind schon bei der Vorfertigung der zentralen Baugruppe vollständig fertig bearbeitet.After the core 2 has been fixed to the framework 1 and the core below it, the next assembly step follows, in which the lateral outer walls 7 are folded out, which are provided with windows (not shown in the drawing) and, if necessary, balcony doors. As shown in the right part of FIG. 1, the wall parts 7 α and 7 b of each lateral outer wall 7 are folded out from the core piece 2 around a hinge 9, after which the one opposite the other wall part around the hinge 8 is further folded out until the outer wall 7 in the intermediate post 5 and the corner post 4 engages provided recesses and engages. The outer walls are completely finished when the central assembly is prefabricated.
Im nun folgenden Montageabschnitt werden der Boden 13 und die parallel zum Kernstück 2 verlaufende Außenwand 11 auseinandergefaltet. Die Teile 13 α und 13 b des Bodens 13 legen sich dabei flach auf den Zwischenboden 22 (Fig. 4) auf, der vorher auf die Decke 16 des darunter befindlichen Stockwerkes montiert wurde, wie es nachstehend noch näher beschrieben ist. Der Boden 13 rastet ebenfalls ein und ist damit starr festgelegt. Nun wird die parallel zum Kernstück 2 verlaufende Außenwand 11 aufgerichtet und klinkt in zugeordnete Ausnehmungen der Eckpfosten 4 und der Zwischenpfosten 5 ein. Auch die Außenwand 11 ist bereits mit den erforderlichen Fenstern oder Balkontüren versehen. Der Boden 13 kann, wie auch alle anderen beweglichen Teile des Kernstückes 2, aus Kunststoff bestehen, könnte aber selbstverständlich auch ausIn the assembly section that now follows, the base 13 and the outer wall 11, which runs parallel to the core piece 2, are unfolded. The parts 13 α and 13 b of the floor 13 lie flat on the intermediate floor 22 (Fig. 4), which was previously mounted on the ceiling 16 of the floor below, as will be described in more detail below. The bottom 13 also engages and is thus rigidly fixed. The outer wall 11, which runs parallel to the core piece 2, is now erected and latches into associated recesses in the corner posts 4 and the intermediate posts 5. The outer wall 11 is also already provided with the necessary windows or balcony doors. The bottom 13, like all other moving parts of the core piece 2, can be made of plastic, but could of course also be made of
Holz oder irgendeinem anderen geeigneten Material hergestellt sein.Wood or any other suitable material.
Nach dem Auseinanderfalten des Bodens 13 und dem Errichten der Außenwand 11 wird die Decke 16 ausgebreitet. Die gemäß dem Ausführungsbeispiel 5 vier Teile aufweisende Decke wird in gleicher Weise wie die anderen beweglichen Teile um außerordentlich widerstandsfähige Scharniere auseinandergeklappt. Die ausgebreitete Decke 16 rastet in zugeordnete Ausnehmungen der Eck- und Zwischenpfosten 4 und 5 des Gerippes 1 ein und bewirkt zugleich die endgültige Verriegelung der vorher erstellten Außenwände 7 und 11.After unfolding the floor 13 and erecting the outer wall 11, the ceiling 16 spread out. The four-part ceiling according to the embodiment 5 is made in the same way like the other moving parts, unfolded around extremely robust hinges. The spread-out ceiling 16 snaps into associated recesses in the corner and intermediate posts 4 and 5 of the framework 1 and at the same time causes the final locking of the previously created outer walls 7 and 11.
Die Beendigung der beiden ersten Montageabschnitte macht es möglich, nunmehr auch die Zwischenwände 15 auseinanderzufalten, die sich am Grunde der Ausnehmungen 6 des zentralen Kernstückes 2 befinden. Die Zwischenwände 15 werden bis in vorbestimmte Stellen des Bodens 13 und der Decke 16 herausgefaltet und weisen ebenfalls bereits ao alle erforderlichen Öffnungen, wie Türen, Wandschranktüren u. dgl., auf. Das gleiche gilt für die Wandschränke selbst.The completion of the first two assembly sections makes it possible, now also the Unfold partition walls 15, which are located at the bottom of the recesses 6 of the central core piece 2 are located. The partition walls 15 are up in predetermined locations of the bottom 13 and the Ceiling 16 folded out and also already have all the necessary openings, such as doors, closet doors and the like. The same goes for the closets themselves.
Das so vollkommen entfaltete und fertiggestellte Stockwerk ist aus F i g. 5 ersichtlich.The floor so completely unfolded and completed is shown in FIG. 5 can be seen.
Der zwischen Seitenwänden 2 α und den Stirnwänden 2 b jedes zentralen Kernstückes 2 eingeschlossene prismatische Schacht 25 ist oben und unten offen und enthält die Versorgungsleitungen 26 für die Wasserversorgung, den Wasserablauf, die Stromversorgung, die Heizung, die Lüftung, das Telefon, die Fernsehantennen usw., wobei es eine im Schacht angeordnete Leiter 27 und Gitterroste 28 erlauben, diese Versorgungsleitungen ständig zu erreichen und in jedem Stockwerk zu überwachen und zu warten.The prismatic shaft 25 enclosed between the side walls 2 α and the end walls 2 b of each central core piece 2 is open at the top and bottom and contains the supply lines 26 for the water supply, the water drainage, the power supply, the heating, the ventilation, the telephone, the television antennas, etc. ., A ladder 27 and gratings 28 arranged in the shaft allow these supply lines to be reached at all times and to be monitored and maintained on each floor.
Aus den Fig. 1, 3 und 5 ist im linken Teil des Stockwerkes ein zusätzliches Nebenkernstück 32 ersichtlich, das ebenfalls die Form eines Parallelepipeds aufweist und vorzugsweise aus Kunststoff hergestellt ist. Auch alle Nebenkernstücke 32 der verschiedenen Stockwerke sind in gleicher Weise wie die zentralen Kernstücke 2 aufeinandergesetzt und miteinander verbunden.1, 3 and 5, an additional secondary core piece 32 can be seen in the left part of the floor, which also has the shape of a parallelepiped and preferably made of plastic is made. Also all secondary core pieces 32 of the various floors are in the same way as the central core pieces 2 placed on top of one another and connected to one another.
Das Nebenkernstück 32 trägt auseinanderfaltbare Wandteile 33, die verschiedene Räume unterteilen, einen Bodenteil 34 (vgl. F i g. 1 und 3) sowie einen parallel zum Kern verlaufenden Außenwandteil 35. Auch das Nebenkernstück 32 ist hohl und kann in seinem Hohlprofilraum Leitungen 36 und eine Leiter 37 aufweisen, damit auch dieser Raum jederzeit begehbar ist.The secondary core piece 32 carries foldable wall parts 33 which subdivide different rooms, a bottom part 34 (see FIGS. 1 and 3) and an outer wall part 35 running parallel to the core. The secondary core piece 32 is also hollow and can have lines 36 and a ladder in its hollow profile space 37, so that this room can also be accessed at any time.
Wenn die verschiedenen Montagearbeiten des Auseinanderfaltens und Errichtens eines Stockwerkes beendet sind, werden die Küchenmöbel und sanitären Einrichtungen aufgestellt, die in dem zur Baustelle angelieferten zentralen Kernstück 2 untergebracht waren. Diese Einrichtungsgegenstände brauchen nach ihrer Aufstellung lediglich noch an die verschiedenen Versorgungs- und Abflußleitungen angeschlossen zu werden.When the various assembly work of unfolding and building a floor are finished, the kitchen furniture and sanitary facilities are set up in the for Central core 2 delivered to the construction site. These furnishings After they have been set up, they only need to connect to the various supply and drainage lines to be connected.
Wenn auch diese Arbeiten und der Anschluß der in den herausgefalteten Teilen befindlichen Leitungen an die im Hohlraum des zentralen Kernstückes und des Nebenkernstückes befindlichen Leitungen beendet sind, kann die Wohnung bezogen werden. Insbesondere aus F i g. 7 ist ersichtlich, daß zwischen einer Decke 16 und dem Boden 13 des nach oben anschließenden Stockwerkes ein metallischer Zwischenboden 22 angeordnet ist, der aus Metallträgern 23 und Kunststoffteilen 24 besteht, die die Zwischenräume zwischen den Metallträgern 23 ausfüllen und sowohl eine gute Schallisolation als auch eine gute Wärmeisolation gewährleisten.Even if this work and the connection of the lines located in the unfolded parts to the lines located in the cavity of the central core piece and the secondary core piece are finished, the apartment can be moved into. In particular from FIG. 7 it can be seen that between a ceiling 16 and the floor 13 of the floor adjoining the top, a metallic one Intermediate bottom 22 is arranged, which consists of metal supports 23 and plastic parts 24, which the Fill gaps between the metal supports 23 and have good sound insulation as well ensure good thermal insulation.
Sowie der metallische Zwischenboden 22 verlegt ist, kann das nach oben anschließende Stockwerk montiert werden.As soon as the metallic intermediate floor 22 has been laid, the upper floor can be to be assembled.
Zu beachten ist, daß die Zwischenboden 22 an den Stellen vorgesehener Balkone bis vor die unverputzten Außenwände ragen. Die Balkone werden dann ganz zuletzt an diesen Metallträgern 23 angeschraubt. It should be noted that the intermediate floor 22 at the points of provided balconies up to the unplastered Outside walls protrude. The balconies are then screwed to these metal supports 23 at the very end.
Die Verbindungsstellen der Decke 16 und die Verbindungsstellen des Bodens 13 an den Scharnieren sind kaum sichtbar und können verputzt werden. Die Verbindungsstellen zwischen den Außenwänden 7 und 11 und dem Boden 12 bzw. der Decke 16 sind durch angeklebte Sockelleisten verdeckt.The connection points of the ceiling 16 and the connection points of the floor 13 on the hinges are barely visible and can be plastered. The connection points between the Outer walls 7 and 11 and the floor 12 and the ceiling 16 are glued on by skirting boards covered.
Abweichend von dem beschriebenen Ausführungsbeispiel könnten in jedem Stockwerk mehrere Nebenkernstücke vorgesehen sein, und die auseinanderfaltbaren Teile könnten in einer vom Ausführungsbeispiel unterschiedlichen Weise (z. B. der Boden 13 und die Außenwand 11 zuerst) an das Kernstück herangefaltet sein.In a departure from the exemplary embodiment described, there could be several on each floor Secondary core pieces may be provided, and the parts which can be folded out could be in one of the exemplary embodiments different ways (z. B. the bottom 13 and the outer wall 11 first) be folded against the core piece.
In einem Gebäude, das auch eine kreuzförmige, gekrümmte oder runde Form usw. aufweisen könnte, könnten Stockwerke unterschiedlicher Höhe vorgesehen sein, in welchem Falle lediglich die Höhe der zentralen Kernstücke und der Nebenkernstücke entsprechend geändert ist. Für den Fall, daß ein Gebäude eine gekrümmte Form aufweist, können die zentralen Kernstücke und die Nebenkernstücke die Querschnittsform eines Trapezes aufweisen.In a building that could also have a cruciform, curved or round shape, etc., floors of different heights could be provided, in which case only the height the central core pieces and the secondary core pieces is changed accordingly. In the event that a Building has a curved shape, the central core pieces and the secondary core pieces can die Have cross-sectional shape of a trapezoid.
Claims (13)
»Der Stahlbau«, 1961, H. 7, S. 217.British Patent Nos. 699 753, 833 289;
"Der Stahlbau", 1961, no. 7, p. 217.
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| FR34063A FR1460742A (en) | 1965-10-07 | 1965-10-07 | Prefabricated building and method of construction |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| DE1271968B true DE1271968B (en) | 1968-07-04 |
Family
ID=8589911
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| DEP1271A Pending DE1271968B (en) | 1965-10-07 | 1966-10-05 | Multi-storey building made of prefabricated parts |
Country Status (6)
| Country | Link |
|---|---|
| US (1) | US3402515A (en) |
| BE (1) | BE687572A (en) |
| DE (1) | DE1271968B (en) |
| FR (1) | FR1460742A (en) |
| GB (1) | GB1113746A (en) |
| NL (1) | NL6614169A (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| EP0097475A1 (en) * | 1982-06-18 | 1984-01-04 | Giovanna Maria Fagnoni | Transportable pre-fabricated building structure |
Families Citing this family (16)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US3835600A (en) * | 1972-06-22 | 1974-09-17 | American Nat Housing Corp | Housing package designed to be conveyed by one vehicle |
| US4074475A (en) * | 1977-01-28 | 1978-02-21 | Building Components Research, Inc. | Collapsible room module construction and method of assembly |
| US4932172A (en) * | 1989-04-11 | 1990-06-12 | Maas John C | Portable room divider |
| US5214885A (en) * | 1989-04-11 | 1993-06-01 | Maas John C | Portable room divider |
| USD323944S (en) | 1989-10-31 | 1992-02-18 | Paul Maas | Combined foldable room divider and storage cabinet |
| USD330646S (en) | 1990-10-15 | 1992-11-03 | Paul Maas | Folding room divider |
| USD345018S (en) | 1991-05-29 | 1994-03-08 | Paul Maas | Folding room divider |
| US5272848A (en) * | 1992-02-20 | 1993-12-28 | Paul Maas | Portable room divider |
| US6009930A (en) * | 1998-06-05 | 2000-01-04 | Versare Solutions, Inc. | Portable wall partition with full panel end members |
| US7213632B1 (en) | 2004-03-17 | 2007-05-08 | Advanced Office Concepts Inc | Portable folding room dividing partition |
| US20090056253A1 (en) * | 2007-08-27 | 2009-03-05 | Hanson Pipe & Precast, Inc. | Low elevated slab system |
| ES1078082Y (en) * | 2012-08-01 | 2013-02-18 | Martin Pedro Martin | STRUCTURAL AND FACILITIES MODULE FOR BUILDING CONSTRUCTION |
| CN106193316B (en) * | 2016-07-14 | 2018-09-04 | 中国建筑第八工程局有限公司 | Integral jacking platform box beam assembled protection system |
| US20240141639A1 (en) * | 2021-03-03 | 2024-05-02 | Rohe Homes Ltd. | Systems and methods for manufacturing anddeploying modular buildings |
| CN114775840B (en) * | 2022-05-09 | 2023-11-03 | 金松果新材料科技有限公司 | Multi-layer modularized wall body and assembling method thereof |
| US20240183148A1 (en) * | 2022-12-01 | 2024-06-06 | A&C Future, Inc. | Two-direction expandable mobile house |
Citations (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| GB699753A (en) * | 1951-01-22 | 1953-11-18 | Faville Clement Poulton | Improvements in and relating to caravans and transportable buildings |
| GB833289A (en) * | 1956-07-05 | 1960-04-21 | Gaston Desagnat | Prefabricated house |
Family Cites Families (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US1995573A (en) * | 1932-02-06 | 1935-03-26 | George A Matthews | Portable building unit |
| US2058543A (en) * | 1933-07-31 | 1936-10-27 | Charles L Wooldridge | Prefabricated dwelling |
| GB674946A (en) * | 1949-03-09 | 1952-07-02 | Terrapin Dwellings Ltd | Improvements in or relating to transportable habitable constructions |
| FR75926E (en) * | 1959-06-20 | 1961-08-25 | Industrial building construction process | |
| FR1269080A (en) * | 1959-10-14 | 1961-08-11 | Method of constructing buildings of the cellular type, for various uses, residential elements for the implementation and buildings thus obtained | |
| GB991752A (en) * | 1960-05-30 | 1965-05-12 | Lely Nv C Van Der | Improvements in or relating to building structures |
| FR1269321A (en) * | 1960-07-01 | 1961-08-11 | Housing of the individual or collective type and cells for the realization of these dwellings | |
| FR1303708A (en) * | 1961-09-13 | 1962-09-14 | Patent Concern Nv | Building with at least one residential plan |
| FR1334474A (en) * | 1962-06-27 | 1963-08-09 | prefabricated house element |
-
1965
- 1965-10-07 FR FR34063A patent/FR1460742A/en not_active Expired
-
1966
- 1966-09-29 BE BE687572D patent/BE687572A/xx unknown
- 1966-10-03 GB GB44105/66A patent/GB1113746A/en not_active Expired
- 1966-10-04 US US584248A patent/US3402515A/en not_active Expired - Lifetime
- 1966-10-05 DE DEP1271A patent/DE1271968B/en active Pending
- 1966-10-07 NL NL6614169A patent/NL6614169A/xx unknown
Patent Citations (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| GB699753A (en) * | 1951-01-22 | 1953-11-18 | Faville Clement Poulton | Improvements in and relating to caravans and transportable buildings |
| GB833289A (en) * | 1956-07-05 | 1960-04-21 | Gaston Desagnat | Prefabricated house |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| EP0097475A1 (en) * | 1982-06-18 | 1984-01-04 | Giovanna Maria Fagnoni | Transportable pre-fabricated building structure |
Also Published As
| Publication number | Publication date |
|---|---|
| US3402515A (en) | 1968-09-24 |
| BE687572A (en) | 1967-03-01 |
| GB1113746A (en) | 1968-05-15 |
| NL6614169A (en) | 1967-04-10 |
| FR1460742A (en) | 1966-03-04 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| DE1271968B (en) | Multi-storey building made of prefabricated parts | |
| DE2929197C2 (en) | Open skeleton frame element made of reinforced concrete | |
| DE2301931A1 (en) | COMPLETE HOUSE | |
| DE582465C (en) | Building that can be assembled from individual factory-made cells | |
| DE7027429U (en) | PREFABRICATED ROOM ELEMENT FOR ERECTING BUILDINGS. | |
| DE3306456A1 (en) | COMPONENT | |
| DE29618522U1 (en) | Kit for a prefabricated house | |
| DE4039651A1 (en) | Timber frame building structure - incorporates sandwich sections using check core timber between outer layers | |
| DE817517C (en) | Method for erecting a framework for at least two-story houses | |
| DE1459901C3 (en) | Building that has a front with loggias | |
| DE959761C (en) | Construction with standardized, prefabricated and floor-to-ceiling wall parts | |
| DE2342046A1 (en) | MULTI-STORY PRE-FABRICATED BUILDING | |
| EP0128294A2 (en) | Wall element | |
| DE19516751A1 (en) | Method to manufacture and build living module with multiple units | |
| DE19739402C2 (en) | Building corner for a house made of wood | |
| DE856214C (en) | Method and method of construction for the factory-made production of in particular skeleton-free structures, for example residential houses | |
| DE19731377C2 (en) | Process for the construction of a system prefabricated cellar and system prefabricated cellar | |
| EP3067483B1 (en) | Wall structure for a building system, in particular residential dwelling | |
| DE7337568U (en) | Pre-fabricated part made from cast mineral building materials, in particular from concrete | |
| DE1559237C (en) | Terraced house arrangement with prefabricated houses elimination from 1434760 | |
| DE2151314A1 (en) | PROCESS FOR ERECTING BUILDINGS FROM PRE-FABRICATED UNITS | |
| DE2028575A1 (en) | Buildings, in particular for residential purposes | |
| DE102015118975A1 (en) | Kit of building construction elements and method of manufacturing a building | |
| AT216742B (en) | Formwork system with lost formwork for concrete walls | |
| AT17244U1 (en) | Modular kit for a building |