Flooding method for use in a tandem shipbuilding process Download PDFInfo
- Publication number
- DE112007000108B4 DE112007000108B4 DE112007000108T DE112007000108T DE112007000108B4 DE 112007000108 B4 DE112007000108 B4 DE 112007000108B4 DE 112007000108 T DE112007000108 T DE 112007000108T DE 112007000108 T DE112007000108 T DE 112007000108T DE 112007000108 B4 DE112007000108 B4 DE 112007000108B4
- Authority
- DE
- Germany
- Prior art keywords
- ship
- dock
- tandem
- lashing
- block
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B73/00—Building or assembling vessels or marine structures, e.g. hulls or offshore platforms
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Structural Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- Ocean & Marine Engineering (AREA)
- Revetment (AREA)
- Ship Loading And Unloading (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
Absenkungsverfahren zur Verwendung in einem Tandem-Schiffsbauprozess, bei dem eine Vielzahl von Schiffen der Reihe nach in einem einzigen Dock durch Montage-Schritte und Schritte des Zum-Schwimmen-Bringens aufgebaut wird, wobei das Verfahren folgende Schritte umfasst:
Aufbau von Schiffs-Blöcken gemäß einem allgemeinen Tandem-Schiffsbauprozess in einem Dock (S100);
Montage mindestens eines der Haupt-Montageteile auf einem Tandem-Schiff, das abgesenkt werden soll, bevor ein Schiff, dessen Stapellauf durchgeführt werden soll, im Dock zum Schwimmen gebracht wird (S200);
Absenken des Tandem-Schiffs an derselben Position, indem Meerwasser natürlich in einen Fracht-/Ballast-Tank und einen Tank mit teilweise doppeltem Boden des Tandem-Schiffs fließen darf, wenn das Schiff, dessen Stapellauf durchgeführt werden soll, zum Schwimmen gebracht wird, indem Meerwasser in das Dock gelassen wird (S400a); und
Fortsetzen der Aufbauarbeiten für das Tandem-Schiff an derselben Position, nachdem das zum Schwimmen gebrachte Schiff, dessen Stapellauf durchgeführt werden soll, durch einen Schlepper aus dem Dock geschleppt wurde und das Tor...Lowering method for use in a tandem shipbuilding process, wherein a plurality of ships are sequentially assembled in a single dock by means of assembly steps and swim-to-float steps, the method comprising the steps of:
Constructing ship blocks according to a general tandem shipbuilding process in a dock (S100);
Mounting at least one of the main mounting parts on a tandem ship to be lowered before a ship whose launching is to be performed is made to float in the dock (S200);
Lowering the tandem vessel at the same position by allowing seawater to naturally flow into a cargo / ballast tank and a partially double-tandem tank of the tandem vessel when the ship whose launch is to be performed is made to float by Sea water is left in the dock (S400a); and
Continuing the construction work for the tandem ship at the same position after the vessel to be floated, whose launching is to be carried out, was towed out of the dock by a tugboat and the gate was ...
Description
Technisches GebietTechnical area
Die vorliegende Erfindung betrifft ein Absenkungsverfahren, das in einem Tandem-Schiffsbauprozess verwendet wird, und spezieller einen Tandem-Schiffsbauprozess, bei dem ein Verfahren eingesetzt wird, in dem der Rumpf eines Tandem-Schiffs abgesenkt wird, in dem mindestens ein Montageteil auf dem Tandem-Schiff montiert wird, oder ein Verfahren, in dem zusätzlich zum kompletten Absenken oder zum teilweisen Absenken eines Tandem-Schiffs ein Verzurren eingesetzt wird, um die Kraft zum Halten des Tandem-Schiffs zu erhöhen, so dass Schiffsbauaufgaben an einer ursprünglichen Position beendet werden können, ohne den Rumpf des Tandem-Schiffs zu bewegen.The The present invention relates to a lowering method which is disclosed in Tandem shipbuilding process is used, and more specifically, a tandem shipbuilding process a method is used in which lowered the hull of a tandem ship in which at least one assembly part is mounted on the tandem ship is, or a method in addition to the complete lowering or for lulling a tandem ship partially down a lashing is used, to increase the power to hold the tandem ship, so that shipbuilding tasks are finished at an original position can, without moving the hull of the tandem ship.
Technischer HintergrundTechnical background
Die
Die
Die
Wie allgemein in der Technik bekannt ist, werden in einer herkömmlichen Werft Schienen auf einer geneigten Oberfläche verlegt, und ein Schiff wird auf den Schienen aufgebaut, so dass wenn der Aufbau des Schiffs beendet ist, das Schiff auf den Schienen die geneigte Oberfläche herab in das Meerwasser gleiten kann. Dieser Typ des Stapellauf-Systems wird geneigte Stapellauf-Plattform genannt. Die geneigte Stapellauf-Plattform wird noch auf kleinen und mittelgroßen Werften und auf einigen großen Werften eingesetzt. Neuerdings ist jedoch der allgemeine Trend, um Sicherheit zu gewährleisten und die Effizienz beim Aufbau großer Schiffe zu erhöhen, ein Schiff in einem Schiffsbau-Dock aufzubauen. In diesem Fall wird ein Schiff in einem Dock aufgebaut und beim Stapellauf des Schiffs wird das Dock mit Meerwasser gefüllt und das Tor des Docks wird geöffnet, so dass das aufgebaute Schiff aus dem Dock heraus geschleppt werden kann, und restliche Schiffsbau-Arbeiten können außerhalb des Docks durchgeführt werden. Im Detail wird dieses Verfahren auf eine Weise angewendet, dass ein Schiff, das kürzer ist als das Dock, aufgebaut und durch Einlassen von Meerwasser in das Dock ins Schwimmen gebracht wird, das Tor des Docks geöffnet wird, das schwimmende Schiff mit einem Schlepper aus dem Dock herausgeschleppt wird und die restlichen Schiffsbauarbeiten außerhalb des Docks durchgeführt werden. Trotzdem hat dieses Verfahren das Problem, das die Platzausnutzung im Dock schlecht ist, und daher ist dieses Verfahren ineffizient für die Massenproduktion von Schiffen.As Generally known in the art are used in a conventional Shipyard tracks laid on a sloped surface, and a ship becomes built on the rails, so if the construction of the ship finished, the ship on rails the inclined surface down can slide into the sea water. This type of launching system is tilted Called launching platform. The inclined launching platform will still be on small and medium-sized shipyards and on some big shipyards used. Recently, however, the general trend is to safety to ensure and to increase the efficiency of building large ships, a ship to build in a shipbuilding dock. In this case, a ship built in a dock and the launch of the ship is the Dock filled with seawater and the gate of the dock will open, so that the constructed ship be towed out of the dock can, and remaining shipbuilding works can outside of the dock become. In detail, this method is applied in a way that a ship that shorter is constructed as the dock, and by taking in seawater in the dock is floated, the gate of the dock is opened, dragged the floating ship out of the dock with a tugboat will be carried out and the remaining shipbuilding work outside the dock. Nevertheless, this method has the problem that the space utilization in the dock is bad and therefore this procedure is inefficient for the Mass production of ships.
Um dieses Problem zu lösen, wurde in der Technik ein Tandem-Schiffsbauprozess vorgeschlagen. Mit diesem Prozess können durch Verbesserung der Platzausnutzungs-Effizienz in einem Dock zwei bis vier Schiffe gleichzeitig in einem Dock aufgebaut werden. Beim Tandem-Schiffsbauprozess wird, wenn ein aufgebautes Schiff zum Schwimmen gebracht und aus dem Dock geschleppt wird, ein teilweise aufgebautes Schiff, bei dem einige Aufbauarbeiten durchgeführt wurden, notwendigerweise zusammen mit dem aufgebauten Schiff, dessen Stapellauf durchgeführt werden soll, zum Schwimmen gebracht. Dann wird, nachdem das aufgebaute Schiff, dessen Stapellauf durchgeführt werden soll, aus dem Dock geschleppt wurde, ein Tor des Docks geschlossen, um das teilweise aufgebaute Schiff zu positionieren, und Meerwasser wird aus dem Dock abgelassen. Danach werden andere Aufbauarbeiten in einer verschobenen Position oder in einer ursprünglichen Position durchgeführt.To solve this problem, a tandem shipbuilding process has been proposed in the art. With this process, by improving space efficiency in a dock, two to four ships can be built simultaneously in one dock. In the tandem shipbuilding process, When a built-up ship is brought to swim and towed out of the dock, a partially constructed ship, in which some construction work has been performed, necessarily brought together with the built-up vessel, whose launching is to be performed, for swimming. Then, after the constructed ship whose launching is to be performed has been towed out of the dock, a gate of the dock is closed to position the partially constructed ship and seawater is drained from the dock. Thereafter, other construction work is performed in a shifted position or in an original position.
Offenlegungdisclosure
Technisches ProblemTechnical problem
Der herkömmliche Tandem-Schiffsbauprozess hat die unten beschriebenen Nachteile. In dem Fall, dass eine Tandem-Zone eine Länge hat, die nicht größer als 55% der LOA (Länge über alles) eines Schiffs ist, wird durch die Begrenzungen der Spezifikation eines Docks, da das Fluten auf eine Weise durchgeführt wird, dass die Anzahl von Montageteilen, die auf einem Tandem-Schiff zu montieren ist, begrenzt ist, um einen Tiefgang (von maximal 7,1 m) beim Schwimmen des Schiffs sicherzustellen, die Zeit zur Durchführung der Arbeiten im Dock verringert, was den Tandem-Schiffsbauprozess behindert und es erforderlich macht, die Aufbauarbeiten zu beschleunigen, wodurch Probleme der gleichzeitigen Realisierung einer größeren Anzahl von Arbeitsschritten auftreten. Beim herkömmlichen Tandem-Schiffsbauprozess umfassen die Montageteile, die nicht auf dem Tandem-Schiff montiert werden, bevor das Schiff zum Schwimmen gebracht wird, den Hauptantriebsmotor, Heck- und Zwischenwellen, einen Achter-Block, eine Zurrbrücke, eine Lukenabdeckung und so weiter.Of the conventional Tandem shipbuilding process has the disadvantages described below. In the case that a tandem zone has a length that is not greater than 55% of LOA (overall length) of a ship is governed by the limitations of the specification of a dock, since the flooding is done in a way that the number of mounting parts on a tandem ship too mount is limited to a draft (of a maximum of 7.1 m) while swimming the ship to ensure the time to carry out the Working in the dock reduces what hinders the tandem shipbuilding process and makes it necessary to accelerate the construction work, which Problems of simultaneous realization of a larger number of work steps occur. In the conventional tandem shipbuilding process include the mounting hardware not mounted on the tandem ship before the ship is brought to swim, the main propulsion engine, Rear and intermediate shafts, a figure-eight block, a lashing bridge, a hatch cover and so on.
Durch die Begrenzung der Anzahl der Montageteile, die auf einem Tandem-Schiff montiert werden können, bevor es zum Schwimmen gebracht wird, werden, wenn Aufbauarbeiten auf dem Tandem-Schiff im Dock durchgeführt werden, nachdem es zum Schwimmen gebracht wurde, die unten beschriebenen Probleme verursacht. Da die Montage eines Deck-Hauses durch die Montage der Heck- und Zwischenwellen und des Hauptantriebsmotors nach dem Zum-Schwimmen-Bringen verzögert wird, ist die Versorgung mit Energie vom Ufer (durch Einrichtungen am Ufer) voraussichtlich schwierig. Da die Aufgabe des endgültigen Ausrichtens als Operation zur Überprüfung der Vertikalität eines Ruders durch die Montage des Achter-Blocks nach dem Zum-Schwimmen-Bringen verzögert wird, steht auch weniger Zeit zur Montage der Schiffsschraube und des Ruders zur Verfügung.By Limiting the number of mounting parts on a tandem ship can be mounted before being brought to swimming will be when construction works to be performed on the tandem ship in the dock after being sent to Swimming was brought, causing the problems described below. Since the assembly of a deck house by the assembly of the tail and Intermediate shafts and the main drive motor after the swim-bring delayed is the supply of energy from the shore (through facilities on the shore) is expected to be difficult. Because the task of final alignment as an operation to review the verticality a rudder by mounting the figure eight block after swim-bringing delayed is less time to mount the propeller and the Oars available.
Ferner werden die schwimmenden Schiffsblöcke nicht sicher gehalten, sondern bewegen sich, so dass es möglich ist, dass sie miteinander oder mit der Wand des Docks kollidieren, wodurch die im Aufbau befindlichen Schiffsblöcke brechen oder beschädigt werden können. Darüber hinaus ist es schwierig, die Schiffsblöcke zum Schwimmen zu bringen und dabei den Gleichgewichtszustand der Schiffsblöcke beizubehalten. Zusätzlich dazu muss, nachdem die Schiffsblöcke zum Schwimmen gebracht wurden, wenn das vom Stapel zu lassende Schiff aus dem Dock geschleppt wird, aus dem Dock Meerwasser abgelassen werden, so dass die zum Schwimmen gebrachten Schiffsblöcke in einer Position zur Durchführung der Aufbauarbeiten angeordnet werden können. Diesbezüglich ist eine Menge Zeit und Arbeit erforderlich, um die Schiffsblöcke in einer ursprünglichen Position oder einer verschobenen Position zu platzieren.Further the floating ship blocks are not kept safe, but move so that it is possible for them to be together or collide with the wall of the dock, causing the under construction ship blocks break or damaged can be. About that In addition, it is difficult to bring the ship blocks to swim while maintaining the state of balance of the ship's blocks. Additionally must, after the ship blocks were brought to swim when the ship to be launched from the stack is towed out of the dock, drained from the dock seawater so that the floating blocks in one Position to carry the construction work can be arranged. In this regard is a lot of time and work required to get the ship blocks in one original Position or a shifted position.
Folglich wurde die vorliegende Erfindung in dem Bestreben gemacht, die beim Stand der Technik auftretenden Probleme zu beseitigen, und es ist eine Aufgabe der vorliegenden Erfindung, einen Tandem-Schiffsbauprozess bereitzustellen, bei dem ein Absenkungsverfahren benutzt wird, bei dem mindestens eines von Hauptantriebsmotor, Heck- und Zwischenwellen, Achter-Block, Zurrbrücke, Lukenabdeckung an einem Tandem-Schiff montiert wird, so dass wenn das Schiff, dessen Stapellauf durchgeführt werden soll, in einem Dock zum Schwimmen gebracht wird, das Tandem-Schiff nicht zum Schwimmen gebracht wird, sondern auf den Boden des Docks abgesenkt wird und so dass, nachdem das Schiff, dessen Stapellauf durchgeführt werden soll, aus dem Dock geschleppt wurde, die Aufbauarbeiten am selben Ort durchgeführt werden können, so dass der Aufbau des Tandem-Schiffs im Dock innerhalb kurzer Zeit beendet werden kann.consequently For example, the present invention has been made in the effort of the Prior art problems are eliminated and it is An object of the present invention is a tandem shipbuilding process to be provided using a descending method the at least one of main propulsion engine, stern and intermediate shafts, Eighth block, lashing bridge, Hatch cover is mounted on a tandem ship, so if the ship, whose launching is to be carried out, in a dock swim, the tandem boat is not for swimming but is lowered to the floor of the dock and so that after the ship, its launch will be carried out is towed out of the dock, the construction work on the same Place performed can be so that the construction of the tandem ship can be finished in the dock within a short time.
Eine weitere Aufgabe der vorliegenden Erfindung ist die Bereitstellung eines Tandem-Schiffsbauprozesses, bei dem ein Absenkungsverfahren benutzt wird, bei dem mindestens eines von Hauptantriebsmotor, Heck- und Zwischenwellen, Achter-Block, Zurrbrücke, Lukenabdeckung so an einem Tandem-Schiff montiert wird, dass wenn das Schiff, dessen Stapellauf durchgeführt werden soll, in einem Dock zum Schwimmen gebracht wird, das Tandem-Schiff auf den Boden des Docks abgesenkt wird, oder nicht vollständig zum Schwimmen gebracht wird, indem das Tandem-Schiff auf eine vorher festgelegte Tiefe abgesenkt wird, wobei die Position des Tandem-Schiffs durch Verzurren befestigt wird, und so dass, nachdem das Schiff, dessen Stapellauf durchgeführt werden soll, aus dem Dock geschleppt wurde, die Aufbauarbeiten am selben Ort durchgeführt werden können, so dass der Aufbau des Tandem-Schiffs im Dock innerhalb kurzer Zeit beendet werden kann.A Another object of the present invention is the provision a tandem shipbuilding process, in which a lowering method is used in which at least one of main propulsion engine, stern and intermediate shafts, aft block, lashing bridge, Hatch cover is mounted on a tandem ship that if the ship, whose launching is to be carried out, in a dock is brought to swim, the tandem ship to the bottom of the Docks is lowered, or not completely brought to swimming is set by the tandem ship to a predetermined depth is lowered, the position of the tandem ship by lashing is fastened, and so that after the ship, its launching be carried out is towed out of the dock, the construction work on the same Place performed can be so that the construction of the tandem ship in the dock within a short time can be stopped.
Technische LösungTechnical solution
Um
das erste Ziel zu erreichen, wird gemäß einem Aspekt der vorliegenden
Erfindung ein Absenkungsverfahren bereitgestellt, das in einem Tandem-Schiffsbauprozess
verwendet wird, bei dem eine Vielzahl von Schiffen der Reihe nach
in einem einzigen Dock durch Montage-Schritte und Schritte des Zum-Schwimmen-Bringen
aufgebaut wird, wobei das Verfahren folgende Schritte umfasst:
Aufbau
von Schiffsblöcken
gemäß einem
allgemeinen Tandem-Schiffsbauprozess in einem Dock;
Montage
mindestens eines der Haupt-Montageteile auf einem Tandem-Schiff,
das abgesenkt werden soll, bevor ein Schiff, dessen Stapellauf durchgeführt werden
soll, im Dock zum Schwimmen gebracht wird;
Absenken des Tandem-Schiffs
an derselben Position, indem Meerwasser natürlich in einen Fracht-/Ballasttank
und einen Tank mit teilweise doppeltem Boden des Tandem-Schiffs
fließen
darf, wenn das Schiff, dessen Stapellauf durchgeführt werden
soll, zum Schwimmen gebracht wird, indem Meerwasser in das Dock
gelassen wird; und
Fortsetzen der Aufbauarbeiten für das Tandem-Schiff an
derselben Position, nachdem das zum Schwimmen gebrachte Schiff,
dessen Stapellauf durchgeführt
werden soll, durch einen Schlepper aus dem Dock geschleppt wurde
und das Tor des Docks geschlossen wurde.In order to achieve the first object, according to one aspect of the present invention, there is provided a lowering method used in a tandem shipbuilding process in which a plurality of ships are sequentially stored in a single dock by means of mounting steps and steps of swimming The method comprises the following steps:
Construction of ship blocks according to a general tandem shipbuilding process in a dock;
Mounting at least one of the main assembly parts on a tandem ship to be lowered before a ship whose launching is to be performed is made to float in the dock;
Lowering the tandem vessel at the same position by allowing seawater to naturally flow into a cargo / ballast tank and a partially double-tandem tank of the tandem vessel when the vessel whose launch is to be performed is made to float by sending seawater into it the dock is left; and
Continuing the construction work for the tandem ship at the same position, after the boat brought to float, whose launching is to be carried out, was towed by a tractor from the dock and the gate of the dock was closed.
Um
das zweite Ziel zu erreichen, wird gemäß einem anderen Aspekt der
vorliegenden Erfindung ein Absenkungsverfahren bereitgestellt, das
in einem Tandem-Schiffsbauprozess verwendet wird, bei dem eine Vielzahl
von Schiffen der Reihe nach in einem einzigen Dock durch Montageschritte
und Schritte des Zum-Schwimmen-Bringens aufgebaut wird, wobei das
Verfahren folgende Schritte umfasst:
Aufbau von Schiffs-Blöcken gemäß einem
allgemeinen Tandem-Schiffsbauprozess in einem Dock;
Montage
mindestens eines der Haupt-Montageteile auf einem Tandem-Schiff,
das ganz oder teilweise abgesenkt werden soll, bevor ein Schiff,
dessen Stapellauf durchgeführt
werden soll, im Dock zum Schwimmen gebracht wird;
Verzurren
von Teilen an beiden Seiten des Tandem-Schiffs, das ganz oder teilweise
abgesenkt werden soll, am Boden des Docks;
Absenken oder teilweises
Absenken des Tandem-Schiffs an derselben Position, indem Meerwasser
natürlich
in einen Fracht-/Ballasttank und einen Tank mit teilweise doppeltem Boden
des Tandem-Schiffs fließen
darf, wenn das Schiff, dessen Stapellauf durchgeführt werden
soll, zum Schwimmen gebracht wird, indem Meerwasser in das Dock gelassen
wird;
Lösen
der Verzurrung zwischen den Teilen an beiden Seiten des Tandem-Schiffs,
das ganz oder teilweise auf den Boden des Docks abgesenkt ist, nachdem das
zum Schwimmen gebrachte Schiff aus dem Dock geschleppt wurde und
ein Tor des Docks geschlossen wurde; und
Fortsetzen der Aufbauarbeiten
für das
Tandem-Schiff an derselben Position.
In order to achieve the second object, according to another aspect of the present invention, there is provided a lowering method used in a tandem shipbuilding process in which a plurality of ships are sequentially stored in a single dock through assembly steps and steps of swimming-pooling. Bringens is built, the method comprising the following steps:
Construction of ship blocks according to a general tandem shipbuilding process in a dock;
Mounting at least one of the main assembly parts on a tandem vessel to be lowered in whole or in part before a ship whose launching is to be performed is made to float in the dock;
Lashing parts on both sides of the tandem ship to be lowered in whole or in part at the bottom of the dock;
Lowering or partially lowering the tandem vessel at the same position by allowing seawater to naturally flow into a cargo / ballast tank and a partially double-bottomed tank of the tandem vessel when the vessel whose launch is to be performed is made to float; by leaving seawater in the dock;
Releasing the lashing between the parts on both sides of the tandem ship that is lowered in whole or in part to the floor of the dock after the floated ship has been towed out of the dock and a gate of the dock has been closed; and
Continue the construction work for the tandem ship at the same position.
Gemäß einem weiteren Aspekt der vorliegenden Erfindung umfassen in dem Schritt der Montage mindestens eines der Haupt-Montageteile auf einem Tandem-Schiff, das ganz oder teilweise abgesenkt werden soll, die Haupt-Montageteile einen Hauptantriebsmotor, Heck- und Zwischenwellen, einen Achter-Block, eine Zurrbrücke und eine Lukenabdeckung.According to one Another aspect of the present invention includes in the step the assembly of at least one of the main assembly parts on a tandem ship, which is to be lowered in whole or in part, the main assembly parts a main propulsion engine, stern and intermediate shafts, a figure-eight block, a lashing bridge and a hatch cover.
Gemäß noch einem
weiteren Aspekt der vorliegenden Erfindung ist der Schritt des Verzurrens
ein Schritt, in dem Teile auf beiden Seiten mindestens eines aus
einem Bug-Block,
einem Achter-Block und einem Zwischenblock des Tandem-Schiffs, das
ganz oder teilweise abgesenkt werden soll, ausgewählten Teils
mit dem Boden des Docks verzurrt werden; und
der Schritt des
Lösens
ist ein Schritt, in dem die Verzurrung zwischen den Teilen auf beiden
Seiten mindestens eines aus einem Bug-Block, einem Achter-Block
und einem Zwischenblock des Tandem-Schiffs, das ganz oder teilweise
abgesenkt wurde, ausgewählten
Teils und dem Boden des Docks gelöst wird.According to yet another aspect of the present invention, the tying step is a step in which parts on both sides of at least one of a bow block, a figure eight block and an intermediate block of the tandem ship to be lowered in whole or in part, lashed down to the floor of the dock; and
the releasing step is a step in which the lashing between the parts on both sides of at least one part selected from a bow block, a figure eight block and an intermediate block of the tandem ship, which has been lowered in whole or in part, and the ground of the dock is solved.
Gemäß noch einem
weiteren Aspekt der vorliegenden Erfindung ist der Schritt des Verzurrens
ein Schritt, in dem Verzurrungslaschen auf Teilen auf beiden Seiten
mindestens eines aus einem Bug-Block, einem Achter-Block und einem
Zwischenblock des Tandem-Schiffs,
das ganz oder teilweise abgesenkt werden soll, ausgewählten Teils
ausgebildet werden, Verzurrungshalterungen, die den Verzurrungslaschen
entsprechen, werden auf dem Boden des Docks ausgebildet, und die
Verzurrungslaschen und die Verzurrungshalterungen werden durch Verzurrungsketten
miteinander verbunden; und
der Schritt des Lösens ist
ein Schritt, in dem die Verbindung der Verzurrungsketten zwischen
den Verzurrungslaschen, die auf Teilen auf beiden Seiten mindestens
eines aus einem Bug-Block, einem Achter-Block und einem Zwischenblock
des Tandem-Schiffs, das ganz oder teilweise abgesenkt werden soll,
ausgewählten
Teils ausgebildet sind, und den entsprechenden Verzurrungshalterungen,
die auf dem Boden des Docks ausgebildet sind, gelöst werden.According to still another aspect of the present invention, the lashing step is a step in which lashing tabs on parts on both sides of at least one of a bow block, a figure eight block and an intermediate block of the tandem ship are lowered in whole or in part lashings, corresponding to the lashing tabs, are formed on the floor of the dock, and the lashing tabs and lashing mounts are interconnected by lashing chains; and
the loosening step is a step in which the connection of the lashing chains between the lashing tabs, which are on parts on both sides of at least one of a bow block, a figure eight block and an intermediate block of the tandem ship, which are lowered in whole or in part should be, selected part are formed, and the corresponding lashing mounts, which are formed on the floor of the dock to be solved.
Dank der Eigenschaften der vorliegenden Erfindung werden die unten beschriebenen Vorteile realisiert. In einem Tandem-Schiffsbauprozess kann, da ein Deck-Haus in einem frühen Stadium an einem Tandem-Schiff montiert werden kann, weil Wellen und der Hauptantriebsmotor montiert wurden, bevor das Schiff, dessen Stapellauf durchzuführen ist, zum Schwimmen gebracht wird, die Zeit für die Versorgung mit Energie vom Ufer (geliefert durch Einrichtungen an Land) sichergestellt werden.Thanks to the characteristics of the present invention, the advantages described below are realized. In a tandem shipbuilding process, since a deckhouse can be mounted on a tandem ship at an early stage, because shafts and the main propulsion engine have been assembled before the ship whose launching is to be performed is used Swimming will be ensured, the time for the supply of energy from shore (supplied by facilities on land).
Auch kann in dem Tandem-Schiffsbauprozess, da das endgültige Ausrichten auf dem Tandem-Schiff möglich ist, da der Achter-Block montiert wurde, bevor das Schiff, dessen Stapellauf durchzuführen ist, zum Schwimmen gebracht wird, die Zeit für die Montage einer Schiffsschraube und eines Ruders sichergestellt werden.Also can in the tandem shipbuilding process, since the final alignment possible on the tandem ship is because the aft block was mounted before the ship, whose Launching run The time to mount a ship's propeller is made to swim and a rudder.
Ferner kann in dem Tandem-Schiffsbauprozess, wegen der Tatsache, dass Haupt-Montageteile montiert werden, bevor das Schiff, dessen Stapellauf durchzuführen ist, zum Schwimmen gebracht wird, die Montagelast eines Goliath-Kranes, nachdem das Schiff, dessen Stapellauf durchzuführen ist, zum Schwimmen gebracht wurde, beträchtlich verringert werden.Further can be mounted in the tandem shipbuilding process, due to the fact that main assembly parts before the ship whose launching is to be carried out, is brought to swim, the mounting load of a Goliath crane, after the ship whose launch is to be performed, brought to swim was, considerably be reduced.
Außerdem kann sogar in dem Fall, dass die gesamten Schiffs-Blöcke nicht auf den Boden eines Docks abgesenkt werden können, da ein bestimmter Schiffs-Block einen Teil hat, der nicht abgesenkt werden darf oder es strukturell unmöglich ist, den Schiffs-Block komplett abzusenken, so dass ein bestimmter Grad an Auftrieb in dem Schiffs-Block erzeugt wird, der Schiffs-Block durch Verzurren sicher an Ort und Stelle im Dock fixiert werden.In addition, can even in the event that the entire ship blocks are not on the floor of a dock can be lowered because a certain ship block has a part that is not lowered or structurally impossible, the ship's block completely lower so that a certain degree of buoyancy in the ship's block is generated by lashing the ship's block securely fixed in place in the dock.
Zusätzlich dazu können, sogar in dem Fall, in dem die Menge des Meerwassers, das in das Dock fließt, viel größer ist als die Menge Meerwasser, die zum Absenken der Schiffs-Blöcke benötigt wird, so dass ein bestimmter Grad an Auftrieb in den Schiffs-Blöcken erzeugt wird, während die Schiffs-Blöcke abgesenkt werden, die Positionen der Schiffs-Blöcke durch Verzurren sicher im Dock fixiert werden.Additionally can, even in the case where the amount of seawater that enters the Dock flows, is much bigger as the amount of seawater needed to lower the ship's blocks, so that generates a certain degree of buoyancy in the ship blocks will, while the ship blocks be lowered, the positions of the ship's blocks by lashing safely to be fixed in the dock.
Außerdem können, sogar in dem Fall, in dem die Bewegung des Schiffs-Blocks, der auf den Boden des Docks abgesenkt wurde, durch das Einfließen von Meerwasser oder den Fluss von Meerwasser im Dock erfolgt, weil das Schiff, dessen Stapellauf durchgeführt werden soll, gezogen wird, die Positionen der Schiffs-Blöcke durch Verzurren sicher im Dock fixiert werden, wobei die Zeiten zum Aufbau oder zur Montage von Hauptteilen im Tandem-Schiffsbauprozess beträchtlich verkürzt werden können. Als Folge davon kann die industrielle Anwendbarkeit der vorliegenden Erfindung erwartet werden.Besides, even in the case where the movement of the ship's block, which is on the Bottom of the dock was lowered, by the inflow of Sea water or the flow of sea water takes place in the dock because of the Ship, whose launching is to be carried out, is pulled, the positions of the ship blocks to be fixed securely in the dock by lashing, taking the times for the assembly or assembly of main parts in the tandem shipbuilding process considerably shortened can be. As a result, the industrial applicability of the present Invention can be expected.
Beschreibung der ZeichnungenDescription of the drawings
- 11
- Verzurrungs-LascheVerzurrungs tab
- 22
- Verzurrungs-HalterungVerzurrungs holder
- 33
- Verzurrungs-KetteVerzurrungs chain
Art der ErfindungType of invention
Im Folgenden wird detaillierter auf eine bevorzugte Ausführung der Erfindung Bezug genommen, von der ein Beispiel in den begleitenden Zeichnungen veranschaulicht wird.in the The following will describe in more detail a preferred embodiment of the Invention, an example of which is in the accompanying Drawings is illustrated.
Aufbau
von Schiffs-Blöcken
gemäß einem
allgemeinen Tandem-Schiffsbauprozess in einem Dock (S100);
Montage
mindestens eines der Haupt-Montageteile auf einem Tandem-Schiff,
das abgesenkt werden soll, bevor ein Schiff, dessen Stapellauf durchgeführt werden
soll, im Dock zum Schwimmen gebracht wird (S200);
Absenken
des Tandem-Schiffs an derselben Position, indem Meerwasser natürlich in
einen Fracht-Ballasttank und einen Tank mit teilweise doppeltem
Boden des Tandem-Schiffs fließen
darf, wenn das Schiff, dessen Stapellauf durchgeführt werden
soll, zum Schwimmen gebracht wird, indem Meerwasser in das Dock
gelassen wird (S400a); und
Fortsetzen der Aufbauarbeiten für das Tandem-Schiff an
derselben Position, nachdem das zum Schwimmen gebrachte Schiff,
dessen Stapellauf durchgeführt
werden soll, durch einen Schlepper aus dem Dock geschleppt wurde
und das Tor des Docks geschlossen wurde (S600).
Constructing ship blocks according to a general tandem shipbuilding process in a dock (S100);
Assemble at least one of the main assembly parts on a tandem ship, which should be lowered before a ship is launched to be docked in the dock for swimming (S200);
Lowering the tandem vessel at the same position by allowing seawater to naturally flow into a cargo ballast tank and a partially double tandem tank of the tandem vessel when the ship whose launch is to be performed is made to float by sending seawater into the tandem vessel Dock is left (S400a); and
Continuing the construction work for the tandem ship at the same position after the vessel to be floated to be launched is towed out of the dock by a tugboat and the dock gate is closed (S600).
In dem Schritt der Montage mindestens eines der Haupt-Montageteile auf einem abzusenkenden Tandem-Schiff umfassen die Haupt-Montageteile einen Hauptantriebsmotor, Heck- und Zwischenwellen, einen Achter-Block, eine Zurrbrücke und eine Lukenabdeckung.In the step of assembling at least one of the main mounting parts on a tandem ship to be lowered include the main mounting hardware a main propulsion engine, stern and intermediate shafts, a figure-eight block, a lashing bridge and a hatch cover.
Aufbau von
Schiffs-Blöcken
gemäß einem
allgemeinen Tandem-Schiffsbauprozess in einem Dock (S100);
Montage
mindestens eines der Haupt-Montageteile auf einem Tandem-Schiff,
das ganz oder teilweise abgesenkt werden soll, bevor ein Schiff,
dessen Stapellauf durchgeführt
werden soll, im Dock zum Schwimmen gebracht wird (S200);
Verzurren
von Teilen an beiden Seiten des Tandem-Schiffs, das ganz oder teilweise
abgesenkt werden soll, am Boden des Docks (S300);
Absenken
oder teilweises Absenken des Tandem-Schiffs an derselben Position,
indem Meerwasser natürlich
in einen Fracht-Ballasttank und einen Tank mit teilweise doppeltem
Boden des Tandem-Schiffs fließen
darf, wenn das Schiff, dessen Stapellauf durchgeführt werden
soll, zum Schwimmen gebracht wird, indem Meerwasser in das Dock gelassen
wird (S400b);
Lösen
der Verzurrung zwischen den Teilen an beiden Seiten des Tandem-Schiffs,
das ganz oder teilweise auf den Boden des Docks abgesenkt ist, nachdem das
zum Schwimmen gebrachte Schiff durch einen Schlepper aus dem Dock
geschleppt wurde und ein Tor des Docks geschlossen wurde (S500);
und
Fortsetzen der Aufbauarbeiten für das Tandem-Schiff an derselben
Position (S600).
Constructing ship blocks according to a general tandem shipbuilding process in a dock (S100);
Mounting at least one of the main assembly parts on a tandem ship to be lowered in whole or in part before a ship whose launching is to be performed is made to float in the dock (S200);
Lashing parts on both sides of the tandem ship to be lowered in whole or in part at the bottom of the dock (S300);
Lowering or partially lowering the tandem vessel at the same position by allowing seawater to naturally flow into a cargo ballast tank and a partially double-tandem tank of the tandem vessel when the vessel whose launch is to be performed is made to float Seawater is left in the dock (S400b);
Release the tie-down between the parts on both sides of the tandem ship that are lowered in whole or in part to the bottom of the dock after the vessel floated by a tugboat is towed out of the dock and a dock gate closed (S500) ; and
Continue the construction work for the tandem ship at the same position (S600).
In dem Schritt der Montage mindestens eines der Haupt-Montageteile auf einem Tandem-Schiff, das ganz oder teilweise abgesenkt werden soll, umfassen die Haupt-Montageteile einen Hauptantriebsmotor, Heck- und Zwischenwellen, einen Achter-Block, eine Zurr-brücke und eine Lukenabdeckung.In the step of assembling at least one of the main mounting parts on a tandem ship, which are lowered in whole or in part should include the main assembly parts a main propulsion engine, stern and intermediate shafts, a figure-eight block, a lashing bridge and a hatch cover.
Der
Schritt des Verzurren ist ein Schritt, in dem Teile auf beiden Seiten
mindestens eines aus einem Bug-Block, einem Achter-Block und einem
Zwischenblock des Tandem-Schiffs,
das ganz oder teilweise abgesenkt werden soll, ausgewählten Teils
mit dem Boden des Docks verzurrt werden; und
der Schritt des
Lösens
ist ein Schritt, in dem die Verzurrung zwischen den Teilen auf beiden
Seiten mindestens eines aus einem Bug-Block, einem Achter-Block
und einem Zwischenblock des Tandem-Schiffs, das ganz oder teilweise
abgesenkt wurde, ausgewählten
Teils und dem Boden des Docks gelöst wird.The lashing step is a step in which parts on both sides of at least one of a bow block, a figure eight block, and an intermediate block of the tandem ship to be lowered in whole or in part are lashed to the floor of the dock become; and
the releasing step is a step in which the lashing between the parts on both sides of at least one part selected from a bow block, a figure eight block and an intermediate block of the tandem ship, which has been lowered in whole or in part, and the ground of the dock is solved.
Konkret
ausgedrückt
ist der Schritt des Verzurrens ein Schritt, in dem Verzurrungslaschen
auf Teilen auf beiden Seiten mindestens eines aus einem Bug-Block,
einem Achter-Block und einem Zwischenblock des Tandem-Schiffs, das
ganz oder teilweise abgesenkt werden soll, ausgewählten Teils
ausgebildet werden, Verzurrungshalterungen, die den Verzurrungslaschen
entsprechen, werden auf dem Boden des Docks ausgebildet, und die
Verzurrungslaschen und die Verzurrungshalterungen werden durch Verzurrungsketten
miteinander verbunden; und
der Schritt des Lösens ist
ein Schritt, in dem die Verbindung der Verzurrungsketten zwischen
den Verzurrungslaschen, die auf Teilen auf beiden Seiten mindestens
eines aus einem Bug-Block, einem Achter-Block und einem Zwischenblock
des Tandem-Schiffs, das ganz oder teilweise abgesenkt werden soll,
ausgewählten
Teils ausgebildet sind, und den entsprechenden Verzurrungshalterungen,
die auf dem Boden des Docks ausgebildet sind, gelöst wird.Concretely, the step of lashing is a step in which lashing tabs are formed on parts on both sides of at least one part selected from a bow block, a figure eight block, and an intermediate block of the tandem ship to be lowered in whole or in part Lashing brackets corresponding to the lashing tabs are formed on the floor of the dock, and the lashing tabs and lashing brackets are connected by lashing chains; and
the loosening step is a step in which the connection of the lashing chains between the lashing tabs, which are on parts on both sides of at least one of a bow block, a figure eight block and an intermediate block of the tandem ship, which are lowered in whole or in part should, selected part are formed, and the corresponding lashing mounts, which are formed on the floor of the dock is released.
Es muss verstanden werden, dass das Schiff an einer ursprünglichen Position aufgebaut wird, sogar nachdem das Schiff abgesenkt wurde, und daher wird die Position des Schiffs nicht geändert.It must be understood that the ship is at an original Position is built even after the ship has been lowered, and therefore the position of the ship is not changed.
Im Gegensatz dazu muss verstanden werden, dass beim vorliegenden Tandem-Schiffsbauprozess, in dem das Absenkungsverfahren eingesetzt wird, als Haupt-Installationsteile ein Hauptantriebsmotor in einem Maschinenraum montiert wird, Heck- und Zwischenwellen im unteren Teil eines Schiffs montiert werden, ein Achter-Block über dem Ruder montiert wird, und eine Zurrbrücke und ein Lukendeckel im oberen Teil des Schiffs montiert werden. Daher ist beim vorliegenden Tandem-Schiffsbauprozess darauf hinzuweisen, dass die Haupt-Installations-Teile an ihre entsprechenden Schiffs-Blöcke montiert sind.in the By contrast, it must be understood that in the present tandem shipbuilding process, in which the lowering method is used as the main installation parts a main propulsion engine is mounted in a machine room, stern and Intermediate shafts are mounted in the lower part of a ship Eight block over the rudder is mounted, and a lashing bridge and a hatch cover in the be mounted on the upper part of the ship. Therefore, the present Tandem shipbuilding process to point out that the main installation parts are mounted on their respective ship blocks.
Beschreibt man den Schiffsbauprozess gemäß der vorliegenden Erfindung im Detail, werden, wenn der Aufbau eines Schiffs, das zuerst in ein Dock gesetzt wird, im Wesentlichen beendet ist, und das Schiff entsprechend dem First-in-First-out-Prinzip des Tandem-Schiffsbauprozesses fertig zum Stapellauf ist, bevor das Schiff, dessen Stapellauf durchzuführen ist, zum Schwimmen gebracht wird, alle Haupt-Installationsteile auf die restlichen Schiffe oder Schiffs-Blöcke montiert, die sich im Dock im Aufbau befinden, und ein Fracht-/Ballast-Tank und ein Tank mit teilweise doppeltem Boden wird auf natürliche Weise auf den Boden des Docks abgesenkt, wenn das Schiff, dessen Stapellauf durchgeführt werden soll, zum Schwimmen gebracht wird, so dass die restlichen Schiffe oder Schiffs-Blöcke nicht zum Schwimmen gebracht werden. Als Folge davon kann bei dem vorliegenden Schiffsbauprozess, weil die Anzahl der Montageteile, die auf die restlichen Schiffe oder Schiffs-Blöcke nach dem Zum-Schwimmen-Bringen zu montieren sind, verringert wird, eine zusätzliche Zeit von ungefähr 8 Tagen für den Aufbau des Tandem-Schiffs im Dock sichergestellt werden, nachdem das Schiff, dessen Stapellauf durchgeführt werden soll, zum Schwimmen gebracht wurde.Describes one the shipbuilding process according to the present Invention in detail, when the construction of a ship, the is first placed in a dock, essentially finished, and the ship according to the first-in-first-out principle of the tandem shipbuilding process ready for launching before the ship whose launching is to be performed, is brought to swimming, all the main installation parts on the remaining ships or ship blocks mounted in the dock are under construction, and a cargo / ballast tank and a tank with Partially double ground becomes naturally on the ground lowered when the ship whose launch is to be performed, is brought to swim, so that the remaining ships or Ship blocks not to be brought to swim. As a result, in the present Shipbuilding process because the number of mounting parts on the remaining ships or ship blocks after swim-bringing to be mounted, an additional time of about 8 days for the Construction of the tandem ship to be ensured in the dock after the ship, whose launching is to be performed, for swimming was brought.
Zu
diesem Zeitpunkt kann die Spannung der Verzurrungsketten
Die Gründe, warum die Verzurrung durchgeführt wird, werden unten beschrieben. Das heißt, dass sogar in dem Fall, in dem das gesamte Tandem-Schiff nicht abgesenkt werden kann, die gesamten Schiffs-Blöcke nicht auf den Boden eines Docks abgesenkt werden können, da ein bestimmter Schiffs-Block einen Teil hat, der nicht abgesenkt werden darf, oder es strukturell unmöglich ist, einen Schiffs-Block komplett abzusenken, was bedeutet, dass ein bestimmter Grad an Auftrieb in dem Schiffs-Block erzeugt wird, das Tandem-Schiff oder die Schiffs-Blöcke durch Verzurren sicher an Ort und Stelle im Dock fixiert werden können.The Reasons, why the lashing done will be described below. That means that even in the case in which the entire tandem ship can not be lowered, the entire ship blocks can not be lowered to the bottom of a dock because a certain ship block has a part that is not lowered or structurally impossible, a ship's block completely lower, which means that a certain degree of buoyancy generated in the ship block, the tandem ship or the ship blocks Lashing securely on the spot in the dock can be fixed.
Darüber hinaus kann, sogar in dem Fall, in dem die Menge des Meerwassers, das in das Dock fließt, viel größer ist als die Menge Meerwasser, die zum Absenken des Tandem-Schiffs benötigt wird, so dass ein bestimmter Grad an Auftrieb in einem Schiffs-Block erzeugt werden muss, während das Tandem-Schiff abgesenkt wird, die Position des Tandem-Schiffs durch Verzurren sicher im Dock fixiert werden.Furthermore can, even in the case where the amount of seawater that is in the dock is flowing, is much bigger as the amount of seawater needed to lower the tandem ship, so that generates a certain degree of buoyancy in a ship's block must be while the tandem ship is lowered, the position of the tandem ship by lashing securely fixed in the dock.
Außerdem können, sogar in dem Fall, in dem die Bewegung des Schiffs-Blocks, der auf den Boden des Docks abgesenkt wurde, durch das Einfließen von Meerwasser oder den Fluss von Meerwasser im Dock erfolgt, weil das Schiff, dessen Stapellauf durchgeführt werden soll, gezogen wird, die Positionen der Schiffs-Blöcke durch Verzurren sicher im Dock fixiert werden.In addition, even in the case where the movement of the ship block that has been lowered to the floor of the dock is due to the inflow of seawater or the flow of seawater in the dock, because the ship whose launch is carried out, the positions of the ship's blocks are securely fixed by lashing in the dock.
Obwohl bevorzugte Ausführungen der vorliegenden Erfindung zum Zweck der Erläuterung beschrieben wurden, wird ein Fachmann erkennen, dass verschiedene Änderungen, Hinzufügungen und Ersetzungen möglich sind, ohne vom Umfang und Geist der Erfindung abzuweichen, wie in den begleitenden Ansprüchen offen gelegt.Even though preferred embodiments of the present invention have been described for the purpose of explanation, One skilled in the art will recognize that various changes, additions and substitutions possible are without departing from the scope and spirit of the invention, as in the accompanying claims disclosed.
Claims (5)
Applications Claiming Priority (5)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| KR1020060137604A KR100796410B1 (en) | 2006-12-29 | 2006-12-29 | Immersion method applied to tandem drying method |
| KR10-2006-0137604 | 2006-12-29 | ||
| KR10-2007-0096679 | 2007-09-21 | ||
| KR1020070096679A KR100953487B1 (en) | 2007-09-21 | 2007-09-21 | Immersion method using gourd applied to tandem drying method |
| PCT/KR2007/005765 WO2008082076A1 (en) | 2006-12-29 | 2007-11-16 | Inundation method used in tandem shipbuilding process |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| DE112007000108T5 DE112007000108T5 (en) | 2009-11-12 |
| DE112007000108B4 true DE112007000108B4 (en) | 2010-10-07 |
Family
ID=39588717
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| DE112007000108T Active DE112007000108B4 (en) | 2006-12-29 | 2007-11-16 | Flooding method for use in a tandem shipbuilding process |
Country Status (3)
| Country | Link |
|---|---|
| JP (1) | JP4759620B2 (en) |
| DE (1) | DE112007000108B4 (en) |
| WO (1) | WO2008082076A1 (en) |
Families Citing this family (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN101823546B (en) * | 2010-04-29 | 2015-02-11 | 浙江金港船业股份有限公司 | Tandem shipbuilding method for chemical tanker |
| CN103910038A (en) * | 2014-04-15 | 2014-07-09 | 南通长航船舶配件有限公司 | Method for constructing tail area of self-propelled drag suction dredger |
| CN110027674B (en) * | 2019-05-16 | 2020-05-15 | 上海外高桥造船有限公司 | Method for building hull block by shifting |
| KR102157346B1 (en) * | 2019-12-26 | 2020-09-18 | 대우조선해양 주식회사 | Method for shipbuilding by adapting non-floating tandem in dry dock |
| CN114162280B (en) * | 2021-12-15 | 2023-08-29 | 上海振华重工启东海洋工程股份有限公司 | No-allowance folding installation process for stern ring section |
Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US4018180A (en) * | 1975-04-01 | 1977-04-19 | Kawasaki Jukogyo Kabushiki Kaisha | System for building and launching ships |
| DE2528144B2 (en) * | 1974-07-09 | 1977-06-23 | SHIP HULL CONSTRUCTION | |
| DE2854472C2 (en) * | 1978-12-16 | 1982-11-18 | Jurij Petrovič Leningrad Ivanov | Dry dock for building new ships and method for building ships in this dry dock |
Family Cites Families (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR800000463B1 (en) * | 1975-03-10 | 1980-05-29 | 마기다 히사오 | Consecutive method of hull construction |
| JPH0524577A (en) * | 1991-07-23 | 1993-02-02 | Mitsui Eng & Shipbuild Co Ltd | Ship building dock |
| JP2001180573A (en) * | 1999-12-21 | 2001-07-03 | Mitsubishi Heavy Ind Ltd | Buoyancy device for vessel structure, and buoyancy regulating method |
| JP5153076B2 (en) * | 2005-06-27 | 2013-02-27 | 大宇造船海洋株式会社 | Additional buoyancy launching method for ships |
| KR100681556B1 (en) * | 2005-06-27 | 2007-02-09 | 대우조선해양 주식회사 | Additional buoyancy launching method of ship and its suitable device |
-
2007
- 2007-11-16 JP JP2008552247A patent/JP4759620B2/en active Active
- 2007-11-16 DE DE112007000108T patent/DE112007000108B4/en active Active
- 2007-11-16 WO PCT/KR2007/005765 patent/WO2008082076A1/en not_active Ceased
Patent Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE2528144B2 (en) * | 1974-07-09 | 1977-06-23 | SHIP HULL CONSTRUCTION | |
| US4018180A (en) * | 1975-04-01 | 1977-04-19 | Kawasaki Jukogyo Kabushiki Kaisha | System for building and launching ships |
| DE2854472C2 (en) * | 1978-12-16 | 1982-11-18 | Jurij Petrovič Leningrad Ivanov | Dry dock for building new ships and method for building ships in this dry dock |
Also Published As
| Publication number | Publication date |
|---|---|
| JP4759620B2 (en) | 2011-08-31 |
| JP2009517290A (en) | 2009-04-30 |
| WO2008082076A1 (en) | 2008-07-10 |
| DE112007000108T5 (en) | 2009-11-12 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| DE2357131A1 (en) | TRANSPORT SHIP FOR TRANSPORTING LIGHTS | |
| DE60217784T2 (en) | Big cargo ship | |
| DE2451406A1 (en) | SHIP FOR TRANSPORTING VARIOUS CARGOES INCLUDING FLOATING CONTAINERS | |
| DE60208229T2 (en) | METHOD AND DEVICE FOR RAISING OFFSHORE PLANT STRUCTURE CONSTRUCTIONS | |
| DE2339305A1 (en) | HALF-DISPLACEMENT HYBRID BOAT | |
| DE112007000108B4 (en) | Flooding method for use in a tandem shipbuilding process | |
| DE3150066A1 (en) | STOPPING DEVICE ON A WATER VEHICLE FOR SECURING A BUOYLINE | |
| DE3204177A1 (en) | FLOATING DEVICE FOR HANDLING CARGO | |
| DE602004005961T2 (en) | RESCUE SHIP FOR MANEUVERABLE SHIPS, SHIP SAFEGUARD PROCEDURE AND USE OF A RESCUE SHIP | |
| DE2133356A1 (en) | Ship mooring in the form of a stable swimming platform | |
| DE2120019A1 (en) | Partly submersible carrier ship | |
| DE69304062T2 (en) | METHOD FOR OFFSHORE LOADING A TANKER AND DESIGN OF SUCH A TANKER | |
| DE3143457C2 (en) | Dock ship for the transport of barges | |
| DE2042850A1 (en) | Floating dock | |
| DE1781292A1 (en) | SEMI-SUBMERSIBLE DOUBLE HULL SHIP WITH ONE OR MORE LOADING ARMS | |
| DE2303381C2 (en) | ship | |
| DE102019117268B4 (en) | Installation arrangement with jack-up platform and a barge and a method for setting up the installation arrangement | |
| DE2042868A1 (en) | ||
| WO2008151712A1 (en) | Barge transport vessel | |
| DE1781202A1 (en) | Semi-submersible double-hulled watercraft | |
| DE2212116C3 (en) | Method and device for connecting a push ship to a cargo ship to form a push unit | |
| DE3790273C1 (en) | Ship association with properties capable of ice rides | |
| EP1336558A1 (en) | Pilot boat in SWATH configuration | |
| DE2514955C3 (en) | Transport ship for long timber | |
| DE2758353A1 (en) | FLOATING SYSTEM AND PROCEDURES FOR SHIPPING (LOADING AND UNLOADING) FLOATING CARRIERS ON A BARRIER |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| OP8 | Request for examination as to paragraph 44 patent law | ||
| 8364 | No opposition during term of opposition | ||
| R079 | Amendment of ipc main class |
Free format text: PREVIOUS MAIN CLASS: B63B0009060000 Ipc: B63B0073000000 |