[go: up one dir, main page]

DE10324326A1 - Process for the use of natural and for the production of artificial water pathways in a tectonically stressed mountain range for water transport and water extraction - Google Patents

Process for the use of natural and for the production of artificial water pathways in a tectonically stressed mountain range for water transport and water extraction Download PDF

Info

Publication number
DE10324326A1
DE10324326A1 DE2003124326 DE10324326A DE10324326A1 DE 10324326 A1 DE10324326 A1 DE 10324326A1 DE 2003124326 DE2003124326 DE 2003124326 DE 10324326 A DE10324326 A DE 10324326A DE 10324326 A1 DE10324326 A1 DE 10324326A1
Authority
DE
Germany
Prior art keywords
circulation
water
loosening
zones
holes
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
DE2003124326
Other languages
German (de)
Inventor
Joachim Loos
Wilhelm Ehrhardt
Udo Adam
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to DE2003124326 priority Critical patent/DE10324326A1/en
Priority to PCT/EP2004/005615 priority patent/WO2004106648A1/en
Publication of DE10324326A1 publication Critical patent/DE10324326A1/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03BINSTALLATIONS OR METHODS FOR OBTAINING, COLLECTING, OR DISTRIBUTING WATER
    • E03B1/00Methods or layout of installations for water supply

Landscapes

  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Drilling And Exploitation, And Mining Machines And Methods (AREA)

Abstract

Die Erfindung betrifft ein Verfahren zur Nutzung natürlicher und zur Herstellung künstlicher Wasserwegsamkeiten für den Wassertransport zur Nutzung von Wasservorkommen sowie zur Ermittlung von neuen Wasservorkommen in einem nicht quellfähigen Gebirge, in dem tektonische Energie in Bewegungsvorgänge umgewandelt wurde, wobei aus der vorhandenen Geometrie der Gebirgsstrukturen Zirkulationswege und Zirkulationssperren und deren Verhalten ermittelt und danach unter Berücksichtigung der Tektonik in als vorteilhaft ermittelten Zonen nicht ausreichender Wasserzirkulation oder Zirkulationssperren Bohrungen, Auflockerungsmaßnahmen, Rohrleitungen und/oder Kanäle zur Überwindung von Zirkulationssperren und/oder Zirkulationsbehinderungen sowie in Zonen guter Wasserwegsamkeit Ansatzpunkte von der Wassergewinnung oder der Wassereingabe dienenden Bohrungen oder Brunnen festgelegt werden.The invention relates to a method for the use of natural and for the production of artificial waterways for water transport for the use of water resources as well as for the determination of new water resources in a non-swellable mountain range, in which tectonic energy has been converted into movement processes, with circulation paths and from the existing geometry of the mountain structures Circulation barriers and their behavior are determined and then, taking into account the tectonics in areas of insufficient circulation or circulation barriers identified as advantageous, drilling, loosening measures, pipelines and / or channels to overcome circulation barriers and / or circulation restrictions as well as in zones of good water mobility, starting points from water extraction or water input serving boreholes or wells.

Description

Die Erfindung betrifft ein Verfahren zur Nutzung natürlicher Wasserwegsamkeiten für die Nutzung bzw. Ausbeutung von Wasservorkommen und zur Ermittlung von neuen Wasservorkommen in einem nichtquellfähigen und/oder nicht salz- oder solelöslichem Gebirge oder auch in salz- oder solelöslichem Gebirge und zur Nutzung derselben für die Gewinnung und den Transport von Wasser in wasserarmen Regionen und zur Durchführung von technischen Maßnahmen zur Überwindung von Wasserwegsamkeitssperren durch Herstellung von künstlichen Wasserwegsamkeiten, wobei die Wasserwegsamkeiten örtlich, regional und überregional auftreten, sowie den Einsatz von örtlichen und regionalen Entsalzungsanlagen.The The invention relates to a method for using natural water pathways for the Use or exploitation of water resources and to determine new water resources in a non-swellable and / or non-salt or brine soluble Mountains or in salt or brine-soluble mountains and for use the same for the extraction and transport of water in arid regions and to carry out of technical measures to overcome of waterway barriers by making artificial ones Waterways, where the waterways are local, regional and national occur, as well as the use of local and regional desalination plants.

Sinn der Erfindung ist, dem Wassermangel in Trockengebieten der Erde zu begegnen, indem geologische Gegebenheiten der Erdkruste erfindungsgemäß genutzt werden, um über- und untertägige Wasservorkommen wirtschaftlich über natürliche und/oder technisch zu schaffende Zirkulationswege in Trockengebiete zu leiten. Ein Ziel ist dabei, aufwendige Investitionen für den Bau von Versorgungsleitungen und sonstigen Infrastrukturmaßnahmen zu minimieren und die Verteilung des Wassers über ein System natürlicher und/oder technisch geschaffener Zirkulationswege bzw. Transportwege vorzunehmen.sense The invention is the lack of water in dry areas of the world to counteract by using geological features of the earth's crust according to the invention in order to and intraday Water resources economically natural and / or To guide technically created circulation routes in dry areas. One goal is to make expensive investments for the construction of supply lines and other infrastructure measures to minimize and distribute water through a more natural system and / or technically created circulation routes or transport routes make.

Insofern liegt der Erfindung die Aufgabe zugrunde, die Wasserversorgung insbesondere in Trockengebieten der Erde zu möglichst geringen Kosten zu verbessern.insofar is the object of the invention, the water supply in particular in dry areas of the world if possible to improve low cost.

Die Lösung dieser Aufgabe ergibt sich einschließlich vorteilhafter Ausgestaltungen und Weiterbildungen der Erfindung aus dem Inhalt der Patentansprüche, welche dieser Beschreibung nachgestellt sind.The solution this task arises including advantageous refinements and developments of the invention from the content of the claims, which follow this description.

Im Zuge der Gewinnung von Wasser und des Transportes desselben zu den Gewinnungs- und/oder Nutzungsstellen ist es dabei vorrangiges Ziel, die erforderliche Wassermenge so bereitzustellen, dass dafür geringe Kosten anfallen. Insofern gilt es, die günstigsten Wasserwegsamkeiten mit geringen Wasserwegsamkeitssperren festzulegen und dazu die Zirkulationswege im Gebirge, die insbesondere durch die Umwandlung tektonischer Energie in Bewegungsvorgänge des Gebirges entstanden sind, zu nutzen, indem die räumliche Lage der Zirkulationswege und ihre Kapazitäten für den Wassertransport zum Abnehmer ermittelt und die technischen Maßnahmen wie Bohrungen und/oder technische und/oder artifizielle Auflockerungen im Bereich von Wasserwegsamkeitssperren oder Zirkulationsbehinderungen festgelegt werden sowie örtlich und regional Entsalzungsanlagen vorgesehen werden, wenn und soweit dies erforderlich ist.in the In the process of extracting water and transporting it to the Extraction and / or usage points, the primary goal is to provide the required amount of water so that it is low Costs are incurred. In this respect, it is the cheapest water ways with low waterway barriers and the circulation routes in the mountains, particularly through the conversion of tectonic energy in movements of the mountains have arisen, by using the spatial Location of the circulation routes and their capacities for water transport to the customer determined and the technical measures such as drilling and / or technical and / or artificial loosening in the area of waterway barriers or circulation restrictions as well as locally and Regional desalination plants are provided if and insofar as this is concerned is required.

Von besonderer Beachtung ist erfindungsgemäß nicht nur das Ermitteln der Zirkulationswege, sondern auch das Ermitteln der Zirkulationssperren, mit deren Hilfe ein unkontrolliertes Abfließen des Wassers insbesondere zur Teufe, aber auch zur Seite hin verhindert wird.Of According to the invention, particular attention is not only given to determining the Circulation routes, but also the determination of the circulation blocks, with whose help is an uncontrolled drainage of the water in particular to the depth, but also to the side is prevented.

Die Zirkulationswege, deren räumliche Lage und Kapazitäten für Wassertransport und Gewinnung, sind insbesondere ein Ergebnis der Umwandlung tektonischer Energie in Massenbewegungen, die das Gebirge aufgenommen hat. Diese Umwandlung in Bewegungen hat die Strukturen, die die Zirkulationswege bestimmen, in örtlichen und überörtlichen Gesamtzusammenhängen geschaffen. Die gleiche Entstehungsursache gilt für die Zirkulationssperren, so dass erfindungsgemäß von einer einheitlichen Ursache ausgegangen wird.The Circulation routes, their spatial Location and capacities for water transport and extraction, are particularly a result of tectonic conversion Energy in mass movements that the mountains have absorbed. This Conversion into movements has the structures that make up the circulation paths determine in local and local Total contexts created. The same cause of origin applies to the circulation blocks, so that according to the invention from a uniform cause is assumed.

So sind zusammen mit den Zirkulationswegen und Zirkulationssperren für Wasser die tektonischen Strukturen wie Verschiebungen bzw. Blätter, Abschiebungen bzw. Sprünge, Überschiebungen bzw. Wechsel und Sättel, Mulden und Umbiegungsachsen der Falten entstanden.So are together with the circulation routes and circulation barriers for water the tectonic structures such as displacements or leaves, displacements or jumps, thrusts or Bills and saddles, Troughs and bending axes of the folds arose.

Maßgebend sind dabei die Wechselbeziehungen der Bewegungsabläufe sowie die Bewegungsabläufe im Gebirge im Einzelnen gewesen, durch die die Zirkulationswege und – sperren entstanden und zu unterschiedlich großen räumlich angeordneten Systemen zusammengefasst sind. Die Geometrie der Gebirgsstrukturen dient dafür als zusammenfassender Begriff. Als Anwendungsbeispiel der Erfindung werden Wasserwegsamkeitssperren und ungenügende Wasserwegsamkeiten durch Bohrungen und Sprengungen beseitigt oder durch Rohrleitungen und/oder Kanäle überbrückt. Hierzu ist vorgesehen, die Wässer in Rohrleitungen und/oder über Kanäle an Stellen zu leiten, von denen vorteilhaft die Wässer über Bohrungen, Brunnen oder andere technische Einrichtungen in die unterirdischen Wasserwegsamkeiten eingebracht werden. Dabei werden die Rohrleitungen und/oder Kanäle bis zu diesen Stellen geführt.authoritative are the interrelations of the movement sequences as well the movements in the mountains in detail, through which the circulation routes and - lock emerged and to different sized systems are summarized. The geometry of the mountain structures serves for that as summary term. As an application example of the invention are due to waterway barriers and insufficient waterway Holes and explosions removed or by pipelines and / or Bridged channels. For this is provided the waters in pipelines and / or via ducts in places to conduct, of which the waters are advantageous through boreholes, wells or other technical facilities in the underground waterways be introduced. The pipes and / or ducts are up to these places.

Als Erweiterung des Anwendungsbeispieles werden erfindungsgemäß die Rohrleitungs- und Kanalsysteme zu zwei, drei oder mehreren hintereinander und/oder nebeneinander liegenden vorteilhaften Stellen für die Wassereingabe ins Gebirge mit entsprechender Dimensionierung erstellt, das Wasser zu diesen als vorteilhaft erkannten Stellen geleitet und in bzw. auf den Boden eingebracht.As According to the invention, the pipeline and duct systems for two, three or more in a row and / or adjacent advantageous locations for water input into the mountains with appropriate dimensioning, the water to these recognized as beneficial directed and in or on the floor brought in.

Im einzelnen ist erfindungsgemäß vorgesehen, dass aus der vorhandenen Geometrie der Gebirgsstrukturen Zirkulationswege und deren Kapazität ermittelt und danach unter Berücksichtigung der Tektonik in als vorteilhaft ermittelten Zonen ausreichender Wasserzirkulation die Bohrungen und/oder die technischen und/oder artifiziellen Auflockerungsmaßnahmen zur Überwindung von Zirkulationssperren oder Zirkulationsbehinderungen und/oder Überbrücken der Zirkulationssperren durch Rohrleitungen und/oder Kanäle angeordnet werden, wobei neben dem Einfallen, dem Streichen und dem Verwurfsmaß der Störungen die durch die Umwandlung der tektonischen Energie in Bewegungsvorgänge bewirkten Auflockerungen, Quetschungen und Pressungen sowie die dadurch beeinflussten tektonischen Massentransporte herangezogen werden.In detail, it is provided according to the invention that circulation paths and their capacities are available from the existing geometry of the mountain structures activity determined and then, taking into account the tectonics, in sufficiently determined zones of sufficient water circulation, the wells and / or the technical and / or artificial loosening measures for overcoming circulation blocks or circulation restrictions and / or bridging the circulation blocks through pipes and / or channels are arranged, whereby next to the incidence, the deletion and the degree of rejection of the disturbances, the loosening, crushing and pressing caused by the conversion of the tectonic energy into movement processes as well as the tectonic mass transports influenced thereby are used.

Für das Orientieren der Rohrleitungen und/oder Kanäle und/oder für das Ansetzen der Bohrungen und/oder die technischen und/oder die artifiziellen Auflockerungsmaßnahmen zur Überwindung von Zirkulationssperren oder Zirkulationsbehinderungen erfolgt die Ermittlung der Zirkulationswege erfindungsge mäß durch das Berücksichtigen der realen Bewegungsabläufe, die durch die Geometrie der Gebirgsstrukturen geschaffen sind. Zugleich mit den Bewegungsabläufen und den tektonischen Störungen und bei der Ausbildung der Falten entstanden im Gebirge Auflockerungen, Quetschungen und Pressungen. Es sind Materialbilanzen, die das Entstehen von Zirkulationswegen und Zirkulationssperren grundlegend bestimmen. Dabei wirken Auflockerungen für das Entstehen von Zirkulationswegen konstruktiv, während Pressungen und Quetschungen örtlich Tendenzen zur Errichtung von Zirkulationssperren unterstützen, was die optimale Lage von Bohrungen, Sprengungen, Rohrleitungen und/oder Kanäle für die Überwindung von Zirkulationssperren oder Zirkulationsbehinderungen entscheidend bestimmt. Die Bewegungsabläufe, die das Gebirge durchgeführt hat, haben Energie benötigt, die als tektonische Energie bezeichnet und in Bewegung umgesetzt wird, woraus die Geometrie der Gebirgsstrukturen entstanden ist.For orientation the pipes and / or ducts and / or for the drilling of the holes and / or the technical and / or the artificial loosening measures to overcome Circulation blocks or circulation restrictions are determined the circulation paths according to the invention by taking into account the real movements, created by the geometry of the mountain structures. at the same time with the movements and tectonic disturbances and When the folds were formed, loosening occurred in the mountains, Bruises and pressings. There are material balances that arise of circulation routes and circulation blocks fundamentally. Loosening works for the Circulation paths develop constructively, while presses and bruises local tendencies to establish circulation barriers support what the optimal location of drilling, blasting, piping and / or channels for overcoming of circulation blockages or circulation restrictions certainly. The movements, who carried out the mountains needed energy which is called tectonic energy and put into motion is what gave rise to the geometry of the mountain structures.

Unterschiede in den Materialbilanzen sind dabei Folgen von unterschiedlich großen Bewegungsabläufen- und richtungen im Gebirge, die mit entsprechenden Umwandlungen der tektonischen Energie in Bewegungen von Gesteinsmassen verbunden sind. Somit gibt es unterschiedliche Voraussetzungen für die Umsetzung der Energie mit Folgen für die Zuführung und Weiterleitung der tektonischen Energie. Auch dadurch befinden sich unterschiedlich zugeführte, weitergeleitete und auch abgelenkte tektonische Energien nebeneinander. So entstanden nebeneinander befindliche Differenzen beim Massentransport und bei Aufscherungen im Gebirge über Kilometer hinweg, die sich als Zirkulationswege für Wasser anbieten. Auflockerungen im Gebirge fördern das Zirkulieren. Pressungen und insbesondere Quetschungen wirken behindernd. Dies erlaubt bei der optimalen Festlegung von Bohrungen, Sprengungen, Rohrleitungen und/oder Kanälen zur Überwindung von Zirkulationssperren oder Zirkulationsbehinderungen im Gebirge eine Berücksichtigung der Zirkula tionsgegebenheiten durch Zurückführung der bestehenden Geometrie der Gebirgsstrukturen auf ihre Entstehung durch die Umwandlung von tektonischer Energie in Massenbewegungen im Gebirge.differences in the material balances there are consequences of movements and movements of different sizes directions in the mountains with corresponding transformations of tectonic energy are connected in movements of rock masses. So there are different ones Requirements for the implementation of energy with consequences for the supply and forwarding of the tectonic energy. This also means that there are differently supplied, forwarded and also distracted tectonic energies side by side. This is how they were created side by side differences in mass transport and in the case of suspensions in the mountains over kilometers away, which offer themselves as circulation paths for water. dispersals in the mountains promote that Circulate. Pressing and especially bruising have an adverse effect. This allows for the optimal determination of bores, blasting, piping and / or channels to overcome Circulation barriers or circulation restrictions in the mountains consideration the circulation conditions by reducing the existing geometry of the mountain structures on their formation by the conversion of tectonic energy in mass movements in the mountains.

Das Verfahren zur Festlegung von Bohrungen und/oder von Auflockerungsmaßnahmen und/oder von Rohrleitungen und/oder von Kanälen mit und ohne Pumpanlagen zur Überwindung von Zirkulationssperren oder Zirkulationsbehinderungen und zur Ablenkungen der Bohrungen im Gebirge auf der Grundlage von Zirkulationsermittlungen, die das Entstehen der Geometrie der Gebirgsstrukturen beachtet, geht vom Autoritätsprinzip aus, nach dem größere Gebirgsbewegungen und größere Unterschiede an Ort und Stelle nach Umfang und Richtung eine größere Auswirkung auf das Zirkulationsverhalten haben. Das setzt eine Ermittlung der bestehenden Geometrie der Gebirgsstrukturen voraus, um auf dieser Grundlage der Bewegungsabläufe Rückschlüsse auf Zirkulationswege zu ziehen. Die Ermittlung der vorhandenen Geometrie der Gebirgsstrukturen, um Rückschlüsse auf das Zirkulationsverhalten und dessen Wirksamkeit für den Wassertransport zu ziehen, erfolgt nach bekannten Methoden.The Procedures for defining holes and / or loosening measures and / or of pipelines and / or channels with and without pumping systems to overcome of circulation blocks or circulation restrictions and for distractions drilling in the mountains based on circulation calculations, which takes into account the emergence of the geometry of the mountain structures, goes from the principle of authority out after major mountain movements and bigger differences Location and location have a greater impact on circulation behavior in terms of scope and direction. This entails determining the existing geometry of the mountain structures advance in order to draw conclusions about circulation paths based on the movement sequences pull. The determination of the existing geometry of the mountain structures, to draw conclusions on the circulation behavior and its effectiveness for water transport pulling is done according to known methods.

Es ist vorgesehen, dass die Bohrungen, Sprengungen, Rohrleitungen und/oder Kanäle zur Überwindung von Zirkulationssperren oder Zirkulationsbehinderungen und ggf. die Ablenkung von Bohrungen im Gebirge unter Berücksichtigung ausreichender Kapazität für die Wasserzirkulation angeordnet werden, indem die tektonischen Massentransporte, die durch die tektonische Energie ausgelöst werden, zur Grundlage der Ermittlung der örtlichen Zirkulationsgegebenheiten herangezogen werden. Dabei wird der Massentransport hinsichtlich Größe und Richtung vom Einfallen, dem Streichen und den Verwurfs-, Überschiebungs- und Verschiebungsmaßen sowie Abständen und Kreuzungen der entstehenden oder bereits entstandenen tektonischen Störun gen sowie von Intensität und Abstände der entstehenden oder bereits entstandenen Faltungselemente bestimmt, woraus dann unter Beachtung entstehender und/oder bereits entstandener Auflockerungen, Quetschungen und Pressungen zusammen mit den Aufscherungen Angaben über das Zirkulationsverhalten des Gebirges abgeleitet werden.It it is provided that the holes, blasting, piping and / or channels to overcome of circulation blocks or circulation restrictions and possibly the diversion of drilling in the mountains taking into account sufficient capacity for the Water circulation can be arranged by the tectonic mass transport, which are triggered by the tectonic energy, to the basis of the Determination of the local Circulation conditions can be used. This is mass transportation in terms of size and direction of collapse, deletion and the dimensions of discard, thrust and displacement as well as intervals and crossings of the emerging or already emerging tectonic Malfunctions as well of intensity and distances determines the resulting or already created folding elements, from which then taking into account emerging and / or already created Loosening, crushing and pressing together with the cutting Information about the circulation behavior of the mountains can be derived.

Im Rahmen dieser Vorgehensweise werden die tektonische Energie, die Umsetzung der tektonischen Energie in Massenbewegungen (Übergang der tektonischen Energie in eine andere) und die Energieflussrichtung herangezogen. Mit der Erfindung ist demzufolge der Vorteil verbunden, dass das Entstehen der Geometrie der Gebirgsstrukturen als Grundlage der Zirkulationsermittlungen und über diesen Weg als Grundlage zur Festlegung von Bohrungen und deren Ablenkungen und/oder von Auflockerungsmaßnahmen für eine ausreichende Wasserzirkulation gemacht werden, wobei die Nutzung des Standes der Technik bei der Ermittlung der bestehenden Geometrie des Gebirgskörpers die Ermittlungen präzisiert. So werden innerhalb der Geometrie eines nicht quellfähigen und nicht salz- oder solelöslichen und/oder auch eines salz- und solelöslichen Gebirgskörpers die Großtektonik, die Groß- und Kleintektonik und die Zusammenhänge zwischen Initialstörungen und deren Folgen für das Ermitteln des Zirkulationsverhaltens und damit für optimale Bohrungen und/oder Auflockerungsmaßnahmen zur Überwindung oder Beseitigung von Zirkulationssperren oder Zirkulationsbehinderungen in einem Gebirgskörper nutzbar gemacht.In the course of this procedure, the tectonic energy, the conversion of the tectonic energy into mass movements (transition of the tectonic energy into another) and the energy flow direction are used. The invention is therefore associated with the advantage that the formation of the geometry of the mountain structures forms the basis of the circulation determinations and via the sen way as a basis for defining holes and their deflections and / or loosening measures for sufficient water circulation are made, the use of the prior art in determining the existing geometry of the rock body clarifies the investigations. So within the geometry of a non-swellable and not salt or brine-soluble and / or also a salt and brine-soluble rock body the large-scale electronics, the large-scale and small-scale electronics and the connections between initial disturbances and their consequences for determining the circulation behavior and thus for optimal drilling and / or loosening measures to overcome or eliminate circulation barriers or circulation restrictions in a mountain range.

Nach einem Ausführungsbeispiel der Erfindung werden nun in einem nicht quellfähigem und nicht salz- oder solelöslichen sowie auch in einem salz- und solelöslichen Gebirgsbereich das Umsetzen von tektonischer Energie in Massenbewegungen des Gebirges und darauf aufbauend die Zirkulationsgegebenheiten ermittelt und daran die Bohrungen und Auflockerungsmaßnahmen sowie die Rohrleitungen und/oder Kanäle zum Überwinden von Zirkulationssperren und Zirkulationsbehinderungen orientiert.To an embodiment the invention are now in a non-swellable and not salt or sole soluble as well as in a salt and brine-soluble mountain area Converting tectonic energy into mass movements in the mountains and based on this, the circulation conditions are determined and the drilling and loosening measures as well as the pipelines and / or channels to overcome of circulation barriers and circulation restrictions.

Allgemein steht in einem Gebirgskörper der tektonischen Energie ein Gegendruck gegenüber, der von der Masse des Gebirges bereitgestellt wird; die tektonische Energie überwindet diesen Gegendruck und leistet dabei Arbeit durch das Entstehen und Ausgestalten der Elemente der Gebirgsgeometrie, wobei aus dem erkannten Verlauf der tektonischen Energie die dadurch hervorgerufene Ausgestaltung der Geometrie erkennbar ist. So hängt die Zirkulationskapazität im Einzelfall ganz wesentlich davon ab, ob die tektonische Energie durch das Gebirge geleitet worden ist, ohne daß neue Strukturen der Gebirgsgeometrie entstanden sind oder neue Strukturen entstehen oder schon bestehende Strukturen noch verändert worden sind, also eine Umwandlung der tektonischen Energie erfolgt ist.Generally stands in a mountain range the tectonic energy against a back pressure, which depends on the mass of the Mountain is provided; overcomes the tectonic energy this counter pressure and does work by creating and Designing the elements of the mountain geometry, taking from the recognized Course of the tectonic energy the resulting configuration the geometry is recognizable. So the circulation capacity depends on the individual case very much depends on whether the tectonic energy through the mountains has been directed without new ones Structures of the mountain geometry have emerged or new structures arise or already existing structures have been changed are, so a conversion of the tectonic energy has occurred.

So werden nach einem Ausführungsbeispiel der Erfindung der Verlauf der tektonischen Energie an Bewegungssperren und Bewegungsfreizonen bestimmt und das Zirkulationsverhalten und die Kapazität des Wassertransportes in den betreffenden Bereichen ermittelt. Dies beruht auf der Erkenntnis, dass die tektonische Energie örtlich nur dann in Bewegungen und Aufscherungen umgesetzt wird, solange ein Freiraum, wie zum Beispiel die Tagesoberfläche, für das Entstehen von Strukturen der Gebirgsgeometrie vorhanden ist; so hängt die Kapazität der Wasserzirkulation von dem Vorhandensein von Bewegungsfreizonen ab, denen Bewegungssperrzonen gegenüberstehen. Dabei ist in Bewegungsfreizonen die Wasserzirkulation für den Wassertransport generell günstiger zu beurteilen als in Bewegungssperrzonen. In Bewegungsfreizonen sind die Zirkulationsverhältnisse generell günstiger, was für die Wassergewinnung in jedem Falle vorteilhafter ist, so dass nach einem Ausführungsbeispiel der Erfindung die Rohrleitungen und/oder Kanäle so orientiert werden, dass der Wassertransport im Bereich von Bewegungssperren mit Rohrleitungen und im Bereich von Bewegungsfreizonen auf den Zirkulationswegen im Gebirge durchgeführt wird.So are according to an embodiment of the Invention of the course of tectonic energy at movement locks and movement free zones determined and the circulation behavior and the capacity of water transport in the areas concerned. This is based on the knowledge that the tectonic energy is local only then converted into movements and shearings as long as there is free space, like the daily surface, for the Emergence of structures of mountain geometry is present; so hangs the capacity the water circulation from the presence of free movement zones from which movement restricted zones are opposed. It is in free movement zones the water circulation for water transport generally cheaper to be assessed as in restricted movement zones. In motion free zones are the circulation conditions generally cheaper, what kind of water extraction is more advantageous in any case, so after an embodiment the invention, the pipes and / or channels are oriented so that the Water transport in the area of movement barriers with pipelines and in the area of free movement zones on the circulation routes performed in the mountains becomes.

Die Bewegungsvorgänge im Gebirge als Folge der Zuführung von tektonischer Energie haben Pressungszonen, Quetschungszonen und Auflockerungszonen zur Folge. Da Pressungszonen entstehen, wenn tektonische Energie und Gebirgsmaterial verstärkt aufeinander zugeführt werden, sind in solchen Zonen die Bewegungsmöglichkeiten im Gebirge eingeschränkt, so dass hier die Zirkulationsverhältnisse für den Wassertransport und die Wassergewinnung ungünstiger sind, da Zirkulationswege meist nur im beschränkten Umfange vorhanden sind.The motions in the mountains as a result of the feeding of tectonic energy have squeeze zones, squeeze zones and loosening zones. Because pressure zones arise when tectonic energy and rock material are increasingly brought together, the movement possibilities in the mountains are restricted in such zones, so that here the circulation conditions for the Water transport and water extraction are less favorable because of circulation routes usually only to a limited extent Extent are available.

Quetschungszonen sind dadurch geprägt, dass tektonische Energie und Gebirgsmaterial ineinander streben, so dass nur wenige oder kaum Zirkulationswege vorhanden sind, so dass Zirkulationssperren oder Zirkulationsbehinderungen vorhanden sind. Nach einem Anwendungsbeispiel der Erfindung wird die Anzahl der Bohrungen und Sprengungen vergrößert, um in diesen Bereichen eine brauchbare Wasserzirkulation und eine Wassergewinnung einzustellen und/oder es werden Rohrleitungen und/oder Kanäle orientiert, mit denen die Zirkulationssperren und –behinderungen überwunden werden.pinch zones are characterized in that tectonic energy and rock material strive so that there are few or hardly any circulation paths, so that circulation blocks or circulation problems. After an application example the invention, the number of holes and blasts is increased to Adequate water circulation and water extraction in these areas set and / or pipes and / or channels are oriented, with which the circulation blocks and obstructions are overcome become.

Dagegen ergeben sich Auflockerungszonen bei dem Auseinanderstreben von tektonischer Energie und Gebirgsmaterial. Die damit verbundene Auflockerung bietet Freiräume für Zirkulationswege, die das Fließen von Wasser begünstigen. Diese Bereiche sind für einen Wassertransport und eine Wassergewinnung generell vorteilhaft. Liegen Auflockerungen in Bereichen von bis nach über Tage durchgehenden Zirkulationswegen oder tektonischen Störungen, wird man nach einem Ausführungsbeispiel der Erfindung im Bereich von Zirkulationssperren, die die Zirkulationswege begrenzen, bevorzugt Bohrungen oder andere Maßnahmen zur Überwindung der Zirkulationssperren oder Zirkulationsbehinderungen ansetzen.On the other hand there are loosening zones when tectonic striving apart Energy and mountain material. The associated loosening offers Free rooms for circulation routes, the flowing favor by water. These areas are for water transport and water extraction generally advantageous. There are loosenings in areas with circulation paths that last up to several days or tectonic disturbances one according to an embodiment of the invention in the area of circulation barriers, the circulation routes limit, preferably drilling or other measures to overcome of circulation restrictions or circulation restrictions.

Die Existenz von Pressungs-, Quetschungs- und Auflockerungszonen bedingt dazwischen liegende Bereiche, in denen ein dadurch bedingter tektomechanischer Massentransport vorliegt. Der Massentransport hat erhebliche Auswirkungen im Hinblick auf die zu erwartende Kleintektonik und damit auf mögliche Zirkulationen für Wasser. Daher schlägt die Erfindung in einem Ausführungsbeispiel vor, insbesondere in Bereichen eines Massentransportes in Richtung des gewünschten Wasserflusses befindliche Zirkulationssperren oder Zirkulationsbehinderungen für die bevorzugte Festlegung von Ansatzpunkten von Bohrungen und Sprengungen und zur Orientierung von Rohrleitungen und/oder Kanälen zur Überwindung der Zirkulationssperren auszuwählen.The existence of pressure, squeezing and loosening zones necessitates areas in between, in which a tectomechanical mass transport is present. Mass transport has a significant impact on the expected small electronics and thus on possible circulations for water. Therefore beats the invention in an exemplary embodiment, in particular in areas of mass transport in the direction of the desired water flow, to select circulation barriers or circulation restrictions for the preferred determination of starting points for bores and explosions and for the orientation of pipelines and / or channels for overcoming the circulation barriers.

Bei Verwurfsänderungen an Sprüngen entstehen Auflockerungen in Bereichen mit geringeren Verwürfen und Pressungen in Bereichen mit größeren Verwürfen. Der Ausgleich zwischen Auflockerungen und Pressungen erfolgt durch Massentransporte einschließlich des Entstehens von Zirkulationswegen für Wasser. Das bedeutet, daß im Auslaufbereich von vorrangig schollenbegrenzenden oder größeren Sprüngen Auflockerungen vorhanden sind. Dort sind Zirkulationswege für Wasser gegeben, so dass nach einem Anwendungsbeispiel der Erfindung in Richtung des gewünschten Wasserflusses befindliche Zirkulationssperren oder Zirkulationsbehinderungen durch Bohrungen und/oder Auflockerungsmaßnahmen und/oder durch die Orientierung von Rohrleitung und/oder Kanälen überwunden werden.at Verwurfsänderungen on jumps there will be loosening in areas with fewer discards and Pressings in areas with larger warps. The Compensation between loosening and pressing takes place through mass transports including the Creation of circulation routes for water. That means that in the outlet area There is loosening of primarily clod-limiting or larger jumps are. There are circulation routes for water, so that after a Application example of the invention in the direction of the desired Circulation barriers or circulation restrictions Drilling and / or loosening measures and / or through the Orientation of the pipeline and / or ducts can be overcome.

Setzen im Gebirge zur Teufe hin Überschiebungen an, entsteht im Auslaufbereich der Überschiebungen eine schichtparallele Gleitung, welche die Zirkulationswege für Wasser verschmiert und die Wasserwegsamkeit unterbricht. Das gilt für die Zirkulation nach oben und unten, so dass dort eine Fläche vorhanden ist, über der das Wasser fließt. In diesem Fall eignen sich Bereiche oberhalb davon nach einem Ausführungsbeispiel der Erfindung für das Ansetzen von Bohrungen und/oder Auflockerungsmaßnahmen zum Überwinden von Zirkulationssperren und/oder Zirkulationsbehinderungen in Richtung des gewünschten Wasserflusses.Put thrusts in the mountains to depth on, a stratified parallel arises in the discharge area of the thrusts Glide that smears the circulation paths for water and water mobility interrupts. That applies to the circulation up and down so that there is an area there is about who flows the water. In this case, areas above it are suitable according to one embodiment of the invention for drilling and / or loosening measures to overcome of circulation blocks and / or circulation restrictions in the direction of the desired one Water flow.

Streichrichtungsänderungen von Überschiebungen haben Schneepflug- und Trichtereffekte zur Folge, wobei Schneepflugeffekte mit Auflockerungen und Trichtereffekte mit Quetschungen verbunden sind. Sind nun Schneepflugeffekte und Schichtgleitung im gleichen Bereich vorhanden, dann sind Zirkulationswege gegeben, während im Bereich einer Quetschung Zirkulationssperren und/oder Zirkulationsbehinderungen entstanden sind und erfindungsgemäß Bohrungen und/oder Auflockerungsmaßnahmen dort orientiert werden, um die Sperren und Behinderungen in Richtung des gewünschten Wasserflusses zu überwinden.Strike changes of thrusts result in snow plow and funnel effects, with snow plow effects with loosening and funnel effects associated with bruises. Now snow plow effects and shift gliding are in the same area exist, then there are circulation routes, while in the area of a bruise Circulation barriers and / or circulation problems arose are and holes according to the invention and / or loosening measures be oriented there towards the locks and disabilities of the desired one Overcome water flow.

Schichtgleitungen entstehen auch bei Änderungen des Überschiebungsmaßes an Überschiebungen sowie in Auslaufbereichen von Überschiebungen nach unten, und dort sind Auflockerungsbereiche vorhanden, welche sich für die Zirkulation von Wasser anbieten, so dass auch hier für das Überwinden vorhandener Zirkulationssperren und/oder Zirkulationsbehinderungen Bohrungen und/oder Auflockerungsmaßnahmen nach einem Anwendungsbeispiel der Erfindung orientiert werden. Das gleiche gilt hier für das Orientieren von Rohrleitungen und Kanälen.Layer sliding EVENTS also arise with changes the degree of thrust of thrust as well as in discharge areas of thrust down, and there are loosening areas there, which for offer the circulation of water so that here too for overcoming existing circulation blocks and / or circulation restrictions Drilling and / or loosening measures according to an application example of Invention to be oriented. The same applies here for orientation of pipes and ducts.

Nicht nur Überschiebungen setzen zur Teufe hin an. Gleiches gilt auch für die Sattelstrukturen und konvexen Umbiegungsachsen. Während in den oberen Sattelbereichen und konvexen Umbiegungsachsen in der Regel ungestörte Verhältnisse vorherrschen, folgen darunter im Sattelbereich und konvexen Umbiegungsachsen Überschiebungen, darunter Verschiebungen; Überschiebungen sind mit Schichtgleitung und Verschmieren der Störungsflächen verbunden. Verschiebungen weisen in Sattelbereichen und konvexen Umbiegungsachsen auf Auflockerungen in einem Sattel hin, und dort sind Zirkulationswege für Wasser vorhanden, die nach einem Anwendungsbeispiel der Erfindung für den Wassertransport so genutzt werden, dass in Richtung des gewünschten Wasserflusses das Wasser eingeleitet und später durch Brunnen entnommen wird.Not only thrusts start at depth. The same applies to the saddle structures and convex Umbiegungsachsen. While in the upper saddle areas and convex bending axes in the Usually undisturbed conditions prevail, followed by thrusts in the saddle area and convex bending axes, including shifts; thrusts are associated with layer sliding and smearing of the fault surfaces. shifts indicate loosening in saddle areas and convex bending axes in a saddle and there are circulation routes for water available that according to an application example of the invention for water transport be used in the direction of the desired water flow initiated and later by Fountain is removed.

Das Gebirge ist in der Regel oder zumindest oft in bestimmten Abständen durch größere, etwa parallele Verschiebungszonen oder Verschiebungen in nebeneinander liegende Bahnen aufgeteilt. Dabei hat an den Verschiebungen ein mehr oder weniger horizontaler Massentransport stattgefunden. Der Massentransport stößt gegen die jeweiligen Nachbarschollen, wodurch dort Pressungen entstehen, die die Tendenz zu Zirkulationssperren haben, so dass dort verstärkt in Richtung des gewünschten Wasserflusses Bohrungen und/oder Auflockerungsmaßnahmen zur Überwindung von Wassersperren nach einem Anwendungsbeispiel der Erfindung orientiert werden.The Mountains are usually through or at least often at certain intervals bigger ones, about parallel displacement zones or displacements in side by side divided lanes. Doing so on the shifts more or less horizontal mass transport took place. Mass transportation bumps into the respective neighboring clods, which creates pressures there have a tendency to block circulation, so stepping up there the desired water flow Drilling and / or loosening measures to overcome oriented by water barriers according to an application example of the invention become.

Zugleich entsteht durch den Massentransport an den Verschiebungen rückwärtig ein Sog, der im Gebirge und dabei auch an schollenbegrenzenden oder größeren Sprüngen zu Auflockerungen führt. Es entstehen Zirkulationswege für Wasser. Ergänzend kommt hinzu, dass im Bereich der Verschiebungen der Verwurf an den Sprüngen oft Minimalwerte hat. Die beim Abrutschen des Gebirges auf den Sprungflächen entstehenden Auflockerungen haben Aufsche rungen im Gefolge, die ebenfalls als Zirkulationswege für Wasser dienen. Daher werden nach einem Ausführungsbeispiel der Erfindung im Umfeld dieser Auflockerungen Bohrungen oder Auflockerungsmaßnahmen dort angesetzt oder Rohrleitungen und/oder Kanäle dort orientiert, wo sich in Richtung des gewünschten Wasserflusses Zirkulationssperren und/oder Zirkulationsbehinderungen befinden.at the same time arises from the mass transport at the shifts backwards Suction that in the mountains and also on clod-limiting or bigger jumps too Loosening leads. Circulation paths for Water. additional In addition, in the area of postponements, the discard to the jumps often has minimum values. Those that arise on the jumping surfaces when the mountains slide down Loosening has followed in the wake, also as Circulation routes for Serve water. Therefore, according to an embodiment of the invention in the area of these loosening holes or loosening measures applied there or pipes and / or channels oriented wherever towards the desired one Water flow restriction and / or restricted circulation are located.

Ist es an Verschiebungen oder Verschiebungszonen zu gegenläufigen Bewegungen gekommen, ist das Gebirge mylonitisiert und verschmiert, und in diesen Fällen sind Zirkulationssperren entstanden, die mit abgelenkten Bohrungen durchbohrt oder aufgelockert werden oder durch die Orientierung von Rohrleitungen und/oder Kanälen überwunden werden. D.h. in einem solchen Falle werden nach einem weiteren Anwendungsbeispiel der Erfindung die Bohrungen und/oder Auflockerungsmaßnahmen für die Überwindung von Zirkulationssperren und/oder Zirkulationsbehinderungen in Richtung der Verschiebungszone orientiert und dies gilt auch im Bereich von Winkelhalbierenden zwischen den Streichrichtungen von Sprüngen und Überschiebungen, Sprüngen und Verschiebungen, Überschiebungen und Verschiebungen und Schollenhalbierenden. Hierzu zählen dann auch zu ermittelnde Bereiche der großen Verschiebungen.If shifts or displacement zones have opposite movements, the mountains are mylonitized and smeared, and in these cases circulation barriers have arisen which are drilled or loosened with deflected bores or overcome by the orientation of pipes and / or ducts. That is, in such a case, according to a further application example of the invention, the bores and / or loosening measures for overcoming circulation barriers and / or circulation restrictions are oriented in the direction of the displacement zone and this also applies in the area of bisectors of angles between the strike directions of jumps and thrusts, jumps and Shifts, thrusts and shifts, and plaice bisectors. This also includes areas of the large shifts to be determined.

Liegen zwei Auflockerungszonen in einem geringeren Abstand als 600 m voneinander entfernt und sind die Auflockerungen durch das Verhalten der Sprünge ausgelöst, kommt es zu gegenläufigen Bewegungen an Scherflächen mit Migrationssperren, was ein erfindungsgemäßes Überwinden dieser Sperren mit Bohrungen und/oder Auflockerungsmaßnahmen und/oder durch die Orientierung von Rohrleitungen und/oder Kanälen erforderlich macht.Lie two loosening zones less than 600 m apart removed and the loosening is triggered by the behavior of the jumps comes it going in opposite directions Movements on shear surfaces with migration barriers, what an inventive overcoming these locks with Drilling and / or loosening measures and / or through the Orientation of pipes and / or ducts is required.

Treffen dagegen Verschiebungen auf Überschiebungen, so sind insbesondere unterhalb der Überschiebungen in der Regel Zirkulationswege für das Wasser nicht oder kaum vorhanden. Aus diesem Grunde werden nach einem Ausführungsbeispiel der Erfindung die Bohrungen und/oder Auflockerungsmaßnahmen zur Wasserzirkulation in diesen Bereichen durchgeführt und/oder Rohrleitungen und/oder Kanäle hier orientiert.To meet on the other hand, shifts to thrusts, so are usually below the thrust in particular Circulation channels for that No or hardly any water. For this reason, after an embodiment the invention the holes and / or loosening measures carried out for water circulation in these areas and / or Pipelines and / or channels oriented here.

In Auslaufbereichen von Überschiebungen und Verschiebungen kreuzen sich die Scherflächen als potentielle Zirkulationswege, hervorgerufen durch Massentransporte im Gebirge. Scherflächen kreuzen sich auch, wenn Winkelhalbierende sich mit Scherflächen kreuzen, die durch das Auslaufen von Überschiebungen und Verschiebungen ausgelöst sind. Ferner kreuzen sich Aufscherungen, wenn sich größere Verschiebungen kreuzen. Mit dem Kreuzen der Aufscherungen kreuzen sich auch Zirkulationswege, so dass im Bereich von Kreuzungsstellen nach einem Anwendungsbeispiel der Erfindung Bohrungen zur Wassergewinnung und zur Wassereingabe orientiert werden.In Discharge areas of thrust and Shifts intersect the shear surfaces as potential circulation paths, caused by mass transports in the mountains. Shear areas intersect even if bisectors intersect with shear surfaces that are cut by the Leakage of thrust and shifts triggered are. Furthermore, shearings intersect when there are major shifts cross. Circulation paths also cross with the intersection of the shearings, so that in the area of crossing points according to an application example the invention holes for water extraction and water input be oriented.

Liegen Auflockerungen an Sprüngen in einem Abstand bis 2000 m in Richtung des Energieflusses bei auslaufenden Überschiebungen und in einem Abstand bis 1000 m ebenfalls in Richtung des Energieflusses bei auslaufenden Verschiebungen und 400 m davor, sind in die Kreuzungsbereiche ebenfalls bevorzugt Bohrungen zur Wassergewinnung und Wassereinleitung zu orientieren. Sind allerdings an den Kreuzungsstellen schichtparallele Gleitungen vorhanden, sind Zirkulationssperren entstanden, die nach einem weiteren Beispiel der Erfindung durchbohrt oder durch Auflockerungsmaßnahmen zirkulationsfähig gemacht oder durch Rohrleitungen und/oder Kanäle überwunden werden.Lie Loosening of jumps at a distance of up to 2000 m in the direction of the energy flow when the thrusting expires and at a distance of up to 1000 m also in the direction of the energy flow with expiring shifts and 400 m in front, are also in the intersection areas prefers holes for water extraction and water discharge orientate. However, they are parallel to the layers at the crossing points Slides exist, circulation blocks have arisen, which follow pierced another example of the invention or made capable of circulation by loosening measures or be overcome by pipelines and / or ducts.

Sind Schichtgleitungen in zwei Richtungen vorhanden, wie beispielsweise im Hangenden von Sprüngen, welche zur Teufe ihr Einfallen verändern, und lie gen an gleicher Stelle Überschiebungen vor, an denen sich das Überschiebungsmaß ändert, sind Zirkulationssperren mit großer Wirkung vorhanden. Somit sieht ein Ausführungsbeispiel der Erfindung vor, außerhalb dieser Bereiche die Bohrungen zur Wassergewinnung und/oder Wassereinleitung zu orientieren.are Layer slides exist in two directions, such as in the hanging of jumps, which change their ideas to the depth, and lie on the same Make thrusts in front of which the degree of thrust changes are circulation blocks with great Effect present. Thus, an embodiment of the invention provides outside of these areas, the holes for water extraction and / or water discharge to orient.

Schichtgleitungen in zwei Richtungen entstehen auch bei Einfallen von Mulden- und Sattellinien sowie Änderungen des Überschiebungsmaßes an Überschiebungen in einem bankrechten Abstand von den Überschiebungen von weniger als 400 m.Layer sliding EVENTS in two directions also occur when troughs and Saddle lines and changes the degree of thrust of thrust at a bank distance from the thrusts of less than 400 m.

Die Aufteilung des Gebirges in bestimmten Abständen durch größere, etwa parallele Verschiebungszonen oder Verschiebungen in nebeneinander liegende Bahnen gibt Hinweise auf Zirkulationsbereiche und Zirkulationssperren bzw. Zirkulationsbehinderungen und damit auf die Festlegung von günstig gelegenen Bohrungen zur Überwindung von Zirkulationssperren und günstig gelegenen Bohrungen zur Wassergewinnung in großräumigen und ausgedehnten Gebirgsräumen. Dadurch werden erfindungsgemäß die Provinzen oder Bereiche mit Zirkulationswegen großflächig ermittelt und die Zirkulationssperren großflächig durch die Orientierung von Bohrungen, Auflockerungsmaßnahmen, Rohrleitungen und/oder Kanälen überwunden, indem dafür die günstigsten Stellen ermittelt werden.The Division of the mountains at certain intervals by larger ones, for example parallel displacement zones or displacements in adjacent ones Lanes provide information on circulation areas and circulation barriers or circulation restrictions and thus on the determination of conveniently located Boreholes to overcome of circulation blocks and cheap located holes for water extraction in large and extensive mountain areas. Thereby the provinces according to the invention or areas with circulation paths are determined over a large area and the circulation blocks through overcome the orientation of boreholes, loosening measures, pipelines and / or channels, by for that the cheapest places be determined.

Verschiebungszonen oder Verschiebungen sind in Streichrichtung über größere Entfernungen nachzuweisen. Dabei sind in vielen Fällen die Verschiebungen über bestimmte Distanzen als solche nicht vorhanden, beziehungsweise als Klein- und Kleinsttektonik (Aufscherungen) ausgebildet. Stets ist damit zu rechnen, dass auch dort Zirkulationen und Zirkulationssperren vorhanden sind, wie bei größeren Verschiebungen.shift regions or displacements are to be demonstrated in the strike direction over longer distances. In many cases the shifts over certain distances as such do not exist, respectively trained as small and very small electronics (shearings). Always is to expect that there will also be circulation and circulation restrictions are present, as with larger shifts.

Die Aufteilung des Gebirges in bestimmten Abständen durch größere, etwa parallele Verschiebungszonen oder Verschiebungen nimmt Einfluss auf die tektonische Energie und den Gegendruck. Die tektonische Energie und der Gegendruck werden von den Verschiebungen abgelenkt. Da die tektonische Energie auf breiter Front dem Gebirge zugeführt wird, ist mit den nebeneinander liegenden Ablenkungen der Energie eine Addition der Energie und auch des Gegendruckes zu immer größer werdenden Werten verbunden. Dadurch wird die Ausgestaltung von anderen tektonischen Störungen gesetzmäßig in Abhängigkeit von den Kausalzusammenhängen beeinflusst. Dadurch haben Sprünge im Bereich der größeren Verschiebungszonen und Verschiebungen oft einen geringeren Verwurf oder laufen von beiden Seiten kommend im Nachbarbereich der Verschiebungen aus, bzw. setzen wieder an; auch ändert sich die Streichrichtung der Sprünge. Das gleiche gilt für Überschiebungen. Auf der Grundlage dieser Zusammenhänge bei der Umwandlung der tektonischen Energie in Bewegungsabläufe ist zwischen den Verschiebungszonen mit größeren Verwürfen an den Sprüngen zu rechnen. Dort wird Gebirgsmaterial verstärkt aufeinander zugeführt, so dass in solchen Zonen die Bewegungsmöglichkeiten im Gebirge eingeschränkt sind. Da die Zirkulationsfähigkeit ausgedünnt ist, sind nach einem weiteren Anwendungsbeispiel der Erfindung gegebenenfalls Bohrungen, Auflockerungen und/oder die Orientierung von Rohrleitungen und/oder Kanälen erforderlich bzw. es ist die Anzahl der Bohrungen zu erhöhen, um Zirkulationssperren und Zirkulationsbehinderungen zu beseitigen.The division of the mountains at certain intervals by larger, parallel displacement zones or displacements influences the tectonic energy and the counter pressure. The tectonic energy and back pressure are deflected by the shifts. Since the tectonic energy is supplied to the mountains on a broad front, the adjacent deflections of the energy are an addition of the energy and also of the Back pressure linked to ever increasing values. As a result, the design of other tectonic disorders is legally influenced depending on the causal relationships. As a result, jumps in the area of the larger displacement zones and displacements often have less rejection or run from both sides in the neighboring region of the displacements, or start again; the direction of the jumps also changes. The same applies to thrusts. On the basis of these relationships in the conversion of the tectonic energy into motion sequences, greater warping at the jumps is to be expected between the displacement zones. There, mountain material is increasingly fed to one another, so that the movement possibilities in the mountains are restricted in such zones. Since the ability to circulate is thinned out, according to a further example of application of the invention, holes, loosening and / or the orientation of pipelines and / or ducts may be necessary or the number of holes must be increased in order to eliminate circulation blocks and circulation obstructions.

Im Bereich größerer Verschiebungszonen, die als solche über bestimmte Distanzen nicht vorhanden sind, befinden sich dort, wo die Sprünge auslaufen Auflockerungen, die Freiräume für die Zirkulation von Wasser bieten; solche Bereiche, die in gerader Linie oder in großräumigen Bögen hintereinander liegen, sind für eine Wasserzirkulation zugänglich.in the Area of larger displacement zones, the as such about certain distances are not there, are where the jumps loosening up, the space for the circulation of water Offer; areas that lie in a straight line or in large arcs one behind the other, are for water circulation accessible.

Sind die Geometrie und dabei Sprünge punktförmig zwischen zwei benachbarten Verschiebungen bzw. Verschiebungszonen bekannt, lassen sich aus den Streichrichtungen der Verschiebungen bzw. Verschiebungszonen und der Sprünge die Lage von voraussichtlichen Auflockerungen und damit günstige Zirkulationsvoraussetzungen über größere Entfernungen hinweg bestimmen. Nach einem Ausführungsbeispiel der Erfindung werden Bohrungen zur Wasserzirkulation bevorzugt in der Nähe von den Auslaufstellen der Sprünge oder Schnittstellen der Sprünge mit den Verschiebungszonen angesetzt und senkrecht zu den Verschiebungszonen gerichtet und/oder abgelenkt, um vorhandene Zirkulationssperren zu beseitigen, wenn dadurch dem gewünschten Zirkulationsfluss gedient wird. Ergibt sich, dass die Streichrichtung von Sprüngen an Verschiebungen auf Grund der Umwandlung der tektonischen Energie in Gebirgsbewegungen abgelenkt ist, dann entstehen bis 600 m Abstand von den großräumigen Verschiebungen Quetschungen als Zirkulationssperren und als Folge der Gebirgsbewegungen an den Sprüngen Auflockerungszonen. Sind auch hier Sprünge zwischen zwei benachbarten Verschiebungszonen bekannt, lässt sich aus den Streichrichtungen der Verschiebungszonen und der Sprünge die Lage der Zonen mit guten Zirkulationsbedingungen über größere Entfernungen hinweg bestimmen.are the geometry and jumps punctually between two neighboring displacements or displacement zones are known, can be derived from the deletion directions of the displacements or displacement zones and the jumps the location of expected loosening and thus favorable circulation requirements over longer distances determine away. According to an embodiment of the invention holes for water circulation are preferred in the vicinity of the outlet points the jumps or interfaces of the jumps set with the displacement zones and perpendicular to the displacement zones directed and / or distracted to block existing circulation to be eliminated if this serves the desired circulation flow becomes. It turns out that the strike direction of jumps Shifts due to the conversion of tectonic energy is distracted in mountain movements, then arise up to 600 m distance from the large-scale shifts Crushes as a barrier to circulation and as a result of mountain movements on the jumps Loosening zones. Here, too, are cracks between two neighboring ones Known displacement zones, leaves from the deletion directions of the displacement zones and the jumps Location of zones with good circulation conditions over long distances determine away.

Nach einem Ausführungsbeispiel der Erfindung wird zweckmäßigerweise bestimmt, ob eine dieser Zonen zusätzlich durch den Massentransport an den Verschiebungen zusammengepresst ist, und es werden die Wassergewinnungsmöglichkeit und die Zirkulationssperren in allen betreffenden Bereichen ermittelt.To an embodiment the invention is expedient determines whether one of these zones is additionally due to mass transport the shifts are compressed, and there will be water extraction and determined the circulation blocks in all relevant areas.

Nach einem Ausführungsbeispiel der Erfindung werden in Auflockerungszonen, die durch den Massentransport an den Verschiebungen zusammengepresst sind, Ansatzpunkte von Bohrungen und/oder Auflockerungsmaßnahmen zum Überwinden von Zirkulationssperren ausgewählt und/oder Rohrleitungen und/oder Kanäle in Richtung der gewählten Zirkulationsflüsse orientiert. Trotz der Pressung sind Zirkulationswege für das Wasser vorhanden, so dass demzufolge nach einem Ausführungsbeispiel der Erfindung Zirkulationsmöglichkeiten für Wasser verbessert sind.To an embodiment the invention are in loosening zones caused by mass transport are pressed together at the displacements, starting points of bores and / or loosening measures to overcome selected by circulation blocks and / or pipes and / or channels oriented in the direction of the selected circulation flows. Despite the pressure, there are circulation paths for the water, so that accordingly according to one embodiment the invention circulation possibilities for water are improved.

Im Bereich von Überschiebungen ist die Ausgestaltung von großräumigen Verschiebungen behindert, trotzdem sind Aufscherungen mit Zirkulationswegen in Streichrichtung der großräumigen Verschiebungen zu erwarten. Auch haben Sprünge im Bereich der größeren Verschiebungszonen und Verschiebungen einen geringeren Verwurf oder laufen von beiden Seiten kommend aus beziehungsweise setzen wieder an. Zugleich nehmen die Verschiebungszonen Einfluss auf die Streichrichtungen von Überschiebungen; auch laufen Überschiebungen oft an Verschiebungszonen aus. Dadurch entstehen mit der Umwandlung tektonischer Energie in Bewegungsvorgänge Schneepflug- und Trichtereffekte mit Aufscherungen, Auflockerungen und Quetschungen, deren Folgen für die Wasserzirkulation vorstehend bereits erläutert sind.in the Range of thrusts is the design of large-scale shifts hindered, nevertheless, there are cuts in with circulation paths in Deletion of large-scale shifts expected. Also have cracks in the area of the larger displacement zones and shifts less discard or run from both Pages coming out or starting again. Take at the same time the shift zones influence the deletion directions of thrust; thrusts are also ongoing often out of displacement zones. This creates with the conversion tectonic energy in motion snowplough and funnel effects with cuts, loosening and bruises, their consequences for the Water circulation are already explained above.

Erfindungsgemäß lassen sich die Schnittpunkte von Verschiebungszonen und Überschiebungen über größere Entfernungen hinweg bestimmen, wenn punktförmige Aufschlüsse über die Geometrie der Gebirgsstrukturen vorliegen. Dadurch lassen sich präzisere Angaben über günstige Ansatzpunkte und günstige Ablenkungen für die Bohrungen und/oder Auflockerungsmaßnahmen und/oder für die Orientierung von Rohrleitungen und/oder Kanälen festlegen.Leave according to the invention the intersection of displacement zones and thrusts over larger distances determine if punctiform Information about the Geometry of the mountain structures are present. This allows more precise information about favorable starting points and cheap Distractions for the drilling and / or loosening measures and / or for orientation of pipes and / or ducts establish.

Die vorstehenden Kausalzusammenhänge sind für die Wassergewinnung im Gebirge insofern von Interesse, als auch in Bereichen, die durch Bohrungen und/oder Seismik weniger bekannt sind, Rückschlüsse auf die Zirkulation zu ziehen sind, so dass daraus auch dort die bestmögliche Anordnung der Ansatzpunkte von der Wasserzirkulation dienenden Bohrungen und Auflockerungsmaßnahmen folgt. Die Grundlagen für die Wassergewinnung sind deutlich verbessert.The above causal relationships are of interest for the water extraction in the mountains, as well as in areas that are less well-known due to drilling and / or seismic, conclusions can be drawn about the circulation, so that the best possible arrangement of the starting points from the water circulation can also be found there serving drilling and loosening measures follows. The basics for water extraction have been significantly improved.

Aus der Aufteilung des Gebirges in bestimmten Abständen durch größere, etwa parallele Verschiebungszonen oder Verschiebungen, die über größere Entfernungen streichen, in nebeneinander liegende Bahnen folgt die Möglichkeit einer Festlegung dieser Zonen als Bestandteil der Geometrie der Gebirgsstrukturen. Der Kausalzusammenhang zwischen tektonischer Energie und ihrer Umsetzung in Bewegungsvorgänge oder Umwandlung in andere Energien in Verbindung mit der Geometrie der Gebirgsstrukturen ergibt Hinweise auf Auflockerungen, Zerrungen, Pressungen, Materialtransporte im Gebirge, sowie auf Aufscherungen und sich kreuzende Aufscherungen, deren örtliche Folgen für die Zirkulation und für die technische Anordnung hinsichtlich Bohrungen und Auflockerungsmaßnahmen sowie Orientierung von Rohrleitungen und/oder Kanälen zum Überwinden von Zirkulationssperren und Zirkulationsbehinderungen vorstehend erläutert wurden.Out the division of the mountains at certain intervals by larger, approximately parallel displacement zones or displacements over longer distances delete, the possibility follows in adjacent lanes defining these zones as part of the geometry of the mountain structures. The causal relationship between tectonic energy and its implementation in movements or conversion to other energies in connection with geometry of the mountain structures gives indications of loosening, strains, Pressings, material transport in the mountains, as well as on shearings and intersecting cuts, their local consequences for the circulation and for the technical arrangement with regard to drilling and loosening measures and orientation of pipelines and / or channels to overcome of circulation barriers and circulation obstructions above explained were.

Die vorstehenden Ausführungen über Zirkulationswege und technische Maßnahmen zum Überwinden von Zirkulationssperren und Zirkulationsbehinderungen werden nach einem Ausführungsbeispiel der Erfindung in Verbindung mit natürlichen Wasserwegen oder Wasservorkommen und/oder künstlich geschaffenen Netzen und/oder untertägigen künstlich hergestellten Wassertransportsystemen und/oder Wassereintrittstellen gebracht und so eine weiträumige Wasserverteilung erreicht.The the above statements about circulation routes and technical measures to overcome of circulation blocks and circulatory obstructions are after an embodiment of the invention in connection with natural waterways or water resources and / or artificial created networks and / or underground artificially produced water transport systems and / or water entry points and thus a spacious water distribution reached.

Wasser, dass in salz- und solelöslichen Gebirge zirkuliert, lässt den Boden versalzen und ist als Ver- und Gebrauchswasser meist nicht geeignet. Erfindungsgemäß wird dieses Wasser in Bohrungen, Brunnen oder Quellen gewonnen und einer örtlichen Entsalzungsanlage, die mit und/oder ohne Solarenergie betrieben wird, zugeführt, bevor es verwendet wird.Water, that in salt and brine soluble Mountains circulate, leaves salinize the soil and is usually not used and used suitable. According to the invention Water from wells, wells or springs and a local desalination plant, which is operated with and / or without solar energy, before it is used.

Die in der vorstehenden Beschreibung und den Patentansprüchen offenbarten Merkmale des Gegenstandes dieser Unterlagen können einzeln als auch in beliebigen Kombinationen untereinander für die Verwirklichung der Erfindung in ihren verschiedenen Ausführungsformen wesentlich sein.The disclosed in the foregoing description and claims Features of the subject matter of these documents can be used individually as well as in any Combinations for each other Realization of the invention in its various embodiments be essential.

Claims (22)

Verfahren zur Nutzung natürlicher und zur Herstellung künstlicher Wasserwegsamkeiten für den Wassertransport zur Nutzung von Wasservorkommen sowie zur Ermittlung von neuen Wasservorkommen in einem nicht quellfähigen Gebirge, in dem tektonische Energie in Bewegungsvorgänge umgewandelt wurde, wobei aus der vorhandenen Geometrie der Gebirgsstrukturen Zirkulationswege und Zirkulationssperren und deren Verhalten ermittelt und danach unter Berücksichtigung der Tektonik in als vorteilhaft ermittelten Zonen nicht ausreichender Wasserzirkulation oder Zirkulationssperren Bohrungen, Auflockerungsmaßnahmen, Rohrleitungen und/oder Kanäle zur Überwindung von Zirkulationssperren und/oder Zirkulationsbehinderungen sowie in Zonen guter Wasserwegsamkeit Ansatzpunkte von der Wassergewinnung oder der Wassereingabe dienenden Bohrungen oder Brunnen festgelegt werden, wobei neben dem Einfallen, dem Streichen und dem Verwurfsmaß der Störungen die durch die tektonische Energie bewirkten Auflockerungen, Quetschungen und Pressungen sowie die dadurch beeinflußten tektonischen Massentransporte und deren Auswirkungen auf die Qualität und Quantität der Zerklüftung des Gebirges herangezogen werden.Methods of using natural and manufacturing artificial Waterways for water transport for the use of water resources and for the determination of new water resources in a non-swellable mountain, in the tectonic Energy in movement processes was converted, taking into account the existing geometry of the mountain structures Circulation paths and circulation blocks and their behavior determined and then considering tectonics in zones determined to be advantageous are insufficient Water circulation or circulation closures drilling, loosening measures, Pipelines and / or channels to overcome of circulation blocks and / or circulation restrictions as well in zones of good water mobility starting points from water extraction or boreholes or wells used for water input be, whereby in addition to the idea, the deletion and the degree of rejection of the disturbances loosening, bruising caused by the tectonic energy and pressings as well as the tectonic mass transport influenced thereby and their impact on the quality and quantity of the fracture of the Mountains can be used. Verfahren nach Anspruch 1, dadurch gekennzeichnet, dass der Verlauf der Faltungsenergie an Bewegungssperren und Bewegungsfreizonen bestimmt und die Zirkulationsfähigkeit des Gebirges ermittelt wird.A method according to claim 1, characterized in that the course of the folding energy at movement barriers and movement free zones determined and the ability to circulate of the mountains is determined. Verfahren nach Anspruch 1, dadurch gekennzeichnet, dass Auflockerungen ermittelt und die Bohrungen zur Wassergewinnung und Wassereingabe in Auflockerungszonen angeordnet werden.A method according to claim 1, characterized in that loosening is identified and the holes for water extraction and water input can be arranged in loosening zones. Verfahren nach Anspruch 1, dadurch gekennzeichnet, dass die Massentransporte ermittelt und die der Wassereingabe oder Wassergewinnung dienenden Bohrungen in Bereichen eines Massentransportes in Nähe einer Quetschung oder Pressung und ferner Bohrungen und Auflockerungsmaßnahmen und/oder Rohrleitungen und/oder Kanäle zum Überwinden von Zirkulationssperren und/oder Zirkulationsbehinderungen im Bereich der Quetschung oder Pressung angeordnet werden.A method according to claim 1, characterized in that the mass transports are determined and those of the water input or Wells serving water extraction in areas of mass transport close a squeeze or squeeze and further drilling and loosening measures and / or Pipelines and / or channels to overcome of circulation blocks and / or circulation restrictions in the area the pinch or squeeze. Verfahren nach Anspruch 4, dadurch gekennzeichnet, dass die Bohrungen, Auflockerungsmaßnahmen, Rohrleitungen und/oder Kanäle zum Überwinden von Zirkulationssperren in Nähe von Bereichen von an Sprüngen mit größerem Verwurfsmaß liegenden Pressungen angeordnet werden.A method according to claim 4, characterized in that the drilling, loosening measures, piping and / or channels to overcome of circulation blocks in the vicinity from areas of jumps with a larger amount of discard Pressings can be arranged. Verfahren nach einem der Ansprüche 1 bis 5, dadurch gekennzeichnet, dass die Bohrungen zur Wassergewinnung oder Wassereingabe im Auslaufbereich von Überschiebungen und Verschiebungen und auf der dem Energiefluss abgewandten Seite von Änderungen in der zur Richtung des Energieflusses quer oder diagonal streichenden Tektonik angeordnet und die Streichrichtung von Aufscherungen in Richtung des Energieflusses genutzt werden.Method according to one of claims 1 to 5, characterized in that that the holes for water extraction or water input in the outlet area of thrusts and shifts and on the side away from the energy flow of changes in the direction transverse or diagonal to the direction of energy flow Tectonics arranged and the streak direction of Aufscherschungen towards of the energy flow can be used. Verfahren nach Anspruch 1, dadurch gekennzeichnet, dass die Bohrungen zur Wassergewinnung oder Wassereingabe im Bereich von an Überschiebungen mit Streichrichtungsänderung gegebenen Auflockerungen angeordnet werden und das gegenseitige Durchdringen der Scherflächen genutzt wird.A method according to claim 1, characterized in that the holes for water extraction or water input in the range from overshoot Exercises with a change in the direction of the streak can be arranged and the mutual penetration of the shear surfaces is used. Verfahren nach Anspruch 7, dadurch gekennzeichnet, dass die Bohrungen zur Wassergewinnung oder Wassereingabe in der Nähe eines sich überlagernden Schneepflugeffektes durch Schichtgleitung bei Überschiebungen mit Änderung des Überschiebungsmaßes angeordnet und die Zirkulationswege der Schichtgleitung, das gegenseitige Durchdringen der Scherflächen und das in Richtung des Energieflusses angeordnete Streichen der Scherflächen genutzt und die Zirkulationssperren und/oder Zirkulationsbehinderungen der Schichtgleitung durch Bohrun gen, Auflockerungsmaßnahmen, Rohrleitungen und/oder Kanäle überwunden werden.A method according to claim 7, characterized in that the holes for water extraction or water input in the Close to one overlapping Snow plow effect due to shift sliding during thrusts with changes of the thrust dimension and the circulation paths of the layer sliding, the mutual penetration of the shears and the streaking in the direction of the energy flow Shear surfaces used and the circulation blocks and / or circulation restrictions of the Shift sliding through drilling, loosening measures, pipelines and / or Channels overcome become. Verfahren nach Anspruch 7 und 8, dadurch gekennzeichnet, dass die Bohrungen zur Wassergewinnung oder Wassereingabe in der Nähe von Quetschungen oder Pressungen in einem parallel zur Überschiebung gerichteten Verlauf und ferner Bohrungen, Auflockerungsmaßnahmen, Rohrleitungen und/der Kanäle zum Überwinden von Zirkulationssperren und/oder Zirkulationsbehinderungen im Bereich der Quetschungen und Pressungen angeordnet werden.A method according to claim 7 and 8, characterized in that the holes for water extraction or water input in the near Squeezes or squeezes in one parallel to the thrust directed course and further drilling, loosening measures, Pipelines and / the channels to overcome of circulation blocks and / or circulation restrictions in the area squeezing and squeezing. Verfahren nach Anspruch 9, dadurch gekennzeichnet, dass die Bohrungen zur Wassergewinnung oder Wassereingabe bei einem Abstand zwischen Schneepflug- und Trichtereffekten von weniger als 900 m parallel zur Überschiebung angeordnet und die dort befindlichen verstärkten Aufscherungen und deren Durchdringungen genutzt werden und ferner die Bohrungen, Auflockerungsmaßnahmen, Rohrleitungen und/oder Kanäle zum Überwinden von Zirkulationssperren und/oder -behinderungen in Bereichen mit Trichtereffekten angeordnet werden.A method according to claim 9, characterized in that the holes for water extraction or water input at a Distance between snow plow and funnel effects less than 900 m parallel to the thrust arranged and the intensified Aufscherer located there and their Penetrations are used and also the drilling, loosening measures, Pipelines and / or channels to overcome circulation restrictions and / or disabilities in areas with Funnel effects can be arranged. Verfahren nach Anspruch 1, dadurch gekennzeichnet, dass die Bohrungen zur Wassergewinnung oder Wassereingabe in Sattelbereichen mit konvexen Umbiegungsachsen und zwischen Überschiebungszonen und Verschiebungszonen angeordnet und die Durchdringungen der Scherflächen im Bereich der Verschiebungszonen und die Zirkulationssperre der Überschiebungszone zur Verhinderung des Abfließens von Wasser genutzt werden.A method according to claim 1, characterized in that the holes for water extraction or water input in saddle areas with convex bending axes and between thrust zones and displacement zones arranged and the penetrations of the shear surfaces in the area of the displacement zones and the circulation block of the thrust zone to prevent drainage be used by water. Verfahren nach Anspruch 1, dadurch gekennzeichnet, dass die Bohrungen zur Wassergewinnung oder Wassereingabe in Bereichen angeordnet werden, wo der Massentransport an Verschiebungen auf eine Nachbarscholle trifft und die Durchdringungen der Scherflächen genutzt werden.A method according to claim 1, characterized in that the holes for water extraction or water input in areas be arranged where the mass transport to shifts to one Neighboring clod hits and uses the penetrations of the shear surfaces become. Verfahren nach Anspruch 1, dadurch gekennzeichnet, dass die Bohrungen zur Wassergewinnung oder Wassereingabe in Bereichen eines Aufeinandertreffens von Verschiebungen und Überschiebungen angeordnet und die dort befindlichen verstärkten Aufscherungen genutzt werden.A method according to claim 1, characterized in that the holes for water extraction or water input in areas a meeting of shifts and thrusts arranged and the intensified Aufscherer located there used become. Verfahren nach Anspruch 1, dadurch gekennzeichnet, dass die Bohrungen zur Wassergewinnung oder Wassereingabe in Bereichen einer Kreuzung von auslaufenden Überschiebungen und auslaufenden Verschiebungen angeordnet werden.A method according to claim 1, characterized in that the holes for water extraction or water input in areas an intersection of expiring thrusts and expiring shifts are arranged. Verfahren nach einem der Ansprüche 1, dadurch gekennzeichnet, dass die Bohrungen, Auflockerungsmaßnahmen, Rohrleitungen und/oder Kanäle zum Überwinden von Zirkulationssperren und/oder Zirkulationsbehinderungen in der Nähe der Mitte zwischen zwei Verschiebungen in einem parallel zur Streichrichtung der Mitte angeordneten Verlauf angeordnet werden.Method according to one of claims 1, characterized in that the drilling, loosening measures, piping and / or channels to overcome of circulation blocks and / or circulation restrictions in the Near the center between two shifts in one parallel to the strike direction arranged in the middle of the course. Verfahren nach einem der Ansprüche 1 bis 4, dadurch gekennzeichnet, dass die Bohrungen zur Wassergewinnung oder Wassereingabe in Nähe der von den Schnittstellen der Sprünge mit den Verschiebungszonen angeordnet werden.Method according to one of claims 1 to 4, characterized in that that the holes for water extraction or water input close to the the interfaces of the jumps be arranged with the displacement zones. Verfahren nach einem der Ansprüche 1 bis 4, dadurch gekennzeichnet, dass die Bohrungen, Auflockerungsmaßnahmen, Rohrleitungen und/oder Kanäle zum Überwinden von Zirkulationssperren und/oder Zirkulationsbehinderungen in der Nähe von Zonen angeordnet werden, die durch den Massentransport an Verschiebungszonen zusammengepresst sind.Method according to one of claims 1 to 4, characterized in that that the drilling, loosening measures, piping and / or channels to overcome of circulation blocks and / or circulation restrictions in the Near zones are arranged by mass transport at displacement zones are pressed together. Verfahren nach einem der Ansprüche 1 bis 17, dadurch gekennzeichnet, dass festgestellte Wassergewinnungsergebnisse in die Ermittlung der Geometrie der Gebirgsstrukturen oder Lagerstättengeometrie und zur Verbesserung der Wassergewinnung einbezogen werden.Method according to one of claims 1 to 17, characterized in that that found water extraction results in the determination the geometry of the mountain structures or deposit geometry and for improvement of water extraction. Verfahren nach einem der Ansprüche 1 bis 16, dadurch gekennzeichnet, dass die Bohrungen zur Wassergewinnung oder Wassereingabe so orientiert werden, dass die Aufscherungen weitgehend senkrecht oder möglichst senkrecht oder diagonal durchbohrt werden.Method according to one of claims 1 to 16, characterized in that that the holes for water extraction or water input are oriented so be that the fractions are largely vertical or as possible be pierced vertically or diagonally. Verfahren nach einem der Ansprüche 1 bis 19, dadurch gekennzeichnet, dass eine Verbindung der untertägigen Zirkulationswege und/oder Zirkulationssysteme mit natürlichen Wasserwegen oder Wasservorkommen und/oder mit artifiziell geschaffenen übertägigen Wassersystemen und/oder untertägigen Wassertransportsystemen und/oder Wassereinleitstellen einzeln oder örtlich, regional und überregional in beliebiger Kombination hergestellt wird zur vorteilhaften Orientierung von Bohrungen und Brunnen, zur Wassergewinnung oder Wassereingabe, von Rohrleitungen und Kanälen zur Wasserverteilung und ferner von Bohrungen, Auflockerungen, Rohrleitungen und Kanälen zum Überwinden von Zirkulationssperren.Method according to one of claims 1 to 19, characterized in that a connection of the underground circulation routes and / or circulation systems with natural waterways or water resources and / or with artificially created surface water systems and / or underground water transport systems and / or water inlet points individually or locally, regionally and Any combination is produced nationally for the advantageous orientation of bores and wells, for water extraction or water input, of pipe Pipes and channels for water distribution and also of drilling, loosening, pipes and channels for overcoming circulation barriers. Verfahren nach einem der Ansprüche 1 bis 20, dadurch gekennzeichnet, dass die Bohrungen und/oder Auflockerungsmaßnahmen zum Überwinden von Zirkulationssperren und/oder Zirkulationsbehinderungen so angeordnet werden, dass die gewünschte oder geplante Fließrichtung erreicht wird.Method according to one of claims 1 to 20, characterized in that that the drilling and / or loosening measures to overcome of circulation blocks and / or circulation restrictions so arranged be that the one you want or planned flow direction is achieved. Verfahren nach einem der Ansprüche 1 bis 21, dadurch gekennzeichnet, dass bei Transport in oder Gewinnung aus einem salz- oder solelöslichen Gebirge der Wasserhebung Entsalzungsanlagen nachgeschaltet werden.Method according to one of claims 1 to 21, characterized in that that when transported in or extracted from a salt or brine-soluble mountain desalination plants are installed downstream of the water lift.
DE2003124326 2003-05-27 2003-05-27 Process for the use of natural and for the production of artificial water pathways in a tectonically stressed mountain range for water transport and water extraction Withdrawn DE10324326A1 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
DE2003124326 DE10324326A1 (en) 2003-05-27 2003-05-27 Process for the use of natural and for the production of artificial water pathways in a tectonically stressed mountain range for water transport and water extraction
PCT/EP2004/005615 WO2004106648A1 (en) 2003-05-27 2004-05-25 Method for the utilization of natural water migration pathways and for producing artificial water migration pathways in a tectonically active mountain range for the transport and procurement of water

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE2003124326 DE10324326A1 (en) 2003-05-27 2003-05-27 Process for the use of natural and for the production of artificial water pathways in a tectonically stressed mountain range for water transport and water extraction

Publications (1)

Publication Number Publication Date
DE10324326A1 true DE10324326A1 (en) 2004-12-16

Family

ID=33441449

Family Applications (1)

Application Number Title Priority Date Filing Date
DE2003124326 Withdrawn DE10324326A1 (en) 2003-05-27 2003-05-27 Process for the use of natural and for the production of artificial water pathways in a tectonically stressed mountain range for water transport and water extraction

Country Status (2)

Country Link
DE (1) DE10324326A1 (en)
WO (1) WO2004106648A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102009010751A1 (en) 2009-02-26 2010-09-02 Ehrhardt, Wilhelm, Prof. Dr.-Ing. Method for improved prediction and assessment of earthquakes and / or seismic shocks

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6000880A (en) * 1997-12-23 1999-12-14 Halus; William J. Sewage water purification/reuse/redistribution, flood control, and power generating system
US6575662B2 (en) * 2000-07-21 2003-06-10 Gannett Fleming, Inc. Water quality management system and method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102009010751A1 (en) 2009-02-26 2010-09-02 Ehrhardt, Wilhelm, Prof. Dr.-Ing. Method for improved prediction and assessment of earthquakes and / or seismic shocks

Also Published As

Publication number Publication date
WO2004106648A1 (en) 2004-12-09

Similar Documents

Publication Publication Date Title
DE3708081C2 (en)
DE102009010751A1 (en) Method for improved prediction and assessment of earthquakes and / or seismic shocks
DE4339418A1 (en) Process for the optimized orientation of mining operations, especially in a hard coal deposit
EP0471158B1 (en) Method and arrangement for preventing leakage of infiltration water from a waste dump
DE19628367A1 (en) Coal-cutting sequence employed in underground mining
DE2934072A1 (en) METHOD FOR INCREASING OIL EXTRACTION
DE10324326A1 (en) Process for the use of natural and for the production of artificial water pathways in a tectonically stressed mountain range for water transport and water extraction
EP0861365A1 (en) Process for ensuring optimal orientation of face working operations, in particular in a hard coal deposit
DE2854679A1 (en) METHOD AND DEVICE FOR RAW MATERIAL, ESPECIALLY URBAN RECOVERY FROM NATURAL WATERS, ESPECIALLY FROM THE SEA
BE1027748B1 (en) Device for going through an old incision for the coal mining work surface and its method of use
DE10324325A1 (en) Procedures for determining migration routes and using them for the extraction of natural gas and oil as well as for the discovery of new natural gas and oil deposits
DE2417223B2 (en) STRUCTURAL STRUCTURE WITH SHIELD STRUCTURES
DE102006022684A1 (en) Method for orientation of fracture in boreholes and mountains, involves identifying dip, strike and rejected measure of respective identified geological troubles for determining fractures
DE4026048C2 (en)
DE3011100A1 (en) PLANER
EP2812731A2 (en) Method for improving processing in reflection seismics
DE2318102C3 (en) Well for shifting groundwater from one groundwater horizon into a second groundwater horizon separated from it by an impermeable barrier layer
DE292753C (en)
EP2694225A1 (en) Method for demethanizing groundwater horizons
Bukowski Bemerkungen über die Binnenablagerungen in der Umgelbung des Buldur Giöll in Kleinasien
DE4446028C2 (en) Method and installation for stabilizing a soil using injections
DD224368A1 (en) KOMBINATIONSBOHRWERKZEUG
DE4418015A1 (en) Method of optimum gas recovery, esp. in hard coal deposits
Rottenburg Laudatio für Achille Mbembe zum Ernst-Bloch-Preis 2018.
DE19512661A1 (en) Method of optimised orientation of mining processes, esp in coal deposit

Legal Events

Date Code Title Description
8139 Disposal/non-payment of the annual fee