DE102019103887A1 - Project file for lighting systems - Google Patents
Project file for lighting systems Download PDFInfo
- Publication number
- DE102019103887A1 DE102019103887A1 DE102019103887.1A DE102019103887A DE102019103887A1 DE 102019103887 A1 DE102019103887 A1 DE 102019103887A1 DE 102019103887 A DE102019103887 A DE 102019103887A DE 102019103887 A1 DE102019103887 A1 DE 102019103887A1
- Authority
- DE
- Germany
- Prior art keywords
- blockchain
- data
- building installation
- equipment
- installation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Images
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L12/00—Data switching networks
- H04L12/28—Data switching networks characterised by path configuration, e.g. LAN [Local Area Networks] or WAN [Wide Area Networks]
- H04L12/2803—Home automation networks
- H04L12/2807—Exchanging configuration information on appliance services in a home automation network
- H04L12/2809—Exchanging configuration information on appliance services in a home automation network indicating that an appliance service is present in a home automation network
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F21/00—Security arrangements for protecting computers, components thereof, programs or data against unauthorised activity
- G06F21/60—Protecting data
- G06F21/64—Protecting data integrity, e.g. using checksums, certificates or signatures
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for AC mains or AC distribution networks
- H02J3/38—Arrangements for parallely feeding a single network by two or more generators, converters or transformers
- H02J3/381—Dispersed generators
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L9/00—Cryptographic mechanisms or cryptographic arrangements for secret or secure communications; Network security protocols
- H04L9/32—Cryptographic mechanisms or cryptographic arrangements for secret or secure communications; Network security protocols including means for verifying the identity or authority of a user of the system or for message authentication, e.g. authorization, entity authentication, data integrity or data verification, non-repudiation, key authentication or verification of credentials
- H04L9/3236—Cryptographic mechanisms or cryptographic arrangements for secret or secure communications; Network security protocols including means for verifying the identity or authority of a user of the system or for message authentication, e.g. authorization, entity authentication, data integrity or data verification, non-repudiation, key authentication or verification of credentials using cryptographic hash functions
- H04L9/3239—Cryptographic mechanisms or cryptographic arrangements for secret or secure communications; Network security protocols including means for verifying the identity or authority of a user of the system or for message authentication, e.g. authorization, entity authentication, data integrity or data verification, non-repudiation, key authentication or verification of credentials using cryptographic hash functions involving non-keyed hash functions, e.g. modification detection codes [MDCs], MD5, SHA or RIPEMD
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L9/00—Cryptographic mechanisms or cryptographic arrangements for secret or secure communications; Network security protocols
- H04L9/50—Cryptographic mechanisms or cryptographic arrangements for secret or secure communications; Network security protocols using hash chains, e.g. blockchains or hash trees
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/10—Geometric CAD
- G06F30/13—Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J13/00—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2300/00—Systems for supplying or distributing electric power characterised by decentralized, dispersed, or local generation
- H02J2300/20—The dispersed energy generation being of renewable origin
- H02J2300/22—The renewable source being solar energy
- H02J2300/24—The renewable source being solar energy of photovoltaic origin
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2300/00—Systems for supplying or distributing electric power characterised by decentralized, dispersed, or local generation
- H02J2300/20—The dispersed energy generation being of renewable origin
- H02J2300/28—The renewable source being wind energy
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2310/00—The network for supplying or distributing electric power characterised by its spatial reach or by the load
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for AC mains or AC distribution networks
- H02J3/12—Circuit arrangements for AC mains or AC distribution networks for adjusting voltage in AC networks by changing a characteristic of the network load
- H02J3/14—Circuit arrangements for AC mains or AC distribution networks for adjusting voltage in AC networks by changing a characteristic of the network load by switching loads on to, or off from, network, e.g. progressively balanced loading
- H02J3/144—Demand-response operation of the power transmission or distribution network
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for AC mains or AC distribution networks
- H02J3/38—Arrangements for parallely feeding a single network by two or more generators, converters or transformers
- H02J3/46—Controlling of the sharing of output between the generators, converters, or transformers
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B20/00—Energy efficient lighting technologies, e.g. halogen lamps or gas discharge lamps
- Y02B20/40—Control techniques providing energy savings, e.g. smart controller or presence detection
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B70/00—Technologies for an efficient end-user side electric power management and consumption
- Y02B70/30—Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
- Y02B70/3225—Demand response systems, e.g. load shedding, peak shaving
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/50—Photovoltaic [PV] energy
- Y02E10/56—Power conversion systems, e.g. maximum power point trackers
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S20/00—Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
- Y04S20/20—End-user application control systems
- Y04S20/222—Demand response systems, e.g. load shedding, peak shaving
Landscapes
- Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Computer Security & Cryptography (AREA)
- Theoretical Computer Science (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- Health & Medical Sciences (AREA)
- Human Resources & Organizations (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- General Health & Medical Sciences (AREA)
- Automation & Control Theory (AREA)
- Signal Processing (AREA)
- Computer Networks & Wireless Communication (AREA)
- Marketing (AREA)
- General Business, Economics & Management (AREA)
- Tourism & Hospitality (AREA)
- Entrepreneurship & Innovation (AREA)
- Primary Health Care (AREA)
- Bioethics (AREA)
- Software Systems (AREA)
- Educational Administration (AREA)
- Development Economics (AREA)
- Operations Research (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- Quality & Reliability (AREA)
- Game Theory and Decision Science (AREA)
- General Engineering & Computer Science (AREA)
- Computer Hardware Design (AREA)
- Power Engineering (AREA)
- Circuit Arrangement For Electric Light Sources In General (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Non-Portable Lighting Devices Or Systems Thereof (AREA)
- Traffic Control Systems (AREA)
- Photometry And Measurement Of Optical Pulse Characteristics (AREA)
Abstract
Die Erfindung betrifft ein Verfahren zum computergestützten Planen, Einrichten und Überwachen eines Netzwerkes einer Gebäudeinstallation, insbesondere einer Beleuchtungsanlage, das folgende Schritte umfasst: Erfassen von Planungsdaten für die Einrichtung der Gebäudeinstallation eines Projekts und Speichern der Planungsdaten in einer projektbezogenen Blockchain; Analysieren der Planungsdaten aus der Blockchain und Ausgabe eines Installationsplans für ein Netzwerk aus einer Vielzahl von Komponenten der Gebäudeinstallation;nach Annahme des Installationsplans durch einen Benutzer, Ermitteln der zur Gebäudeinstallation benötigten Betriebsmittel und deren Einbauorte, Zuordnen von eindeutigen Betriebsmittelkennzeichnungen den Betriebesmitteln und Speichern der Betriebsmittelkennzeichnungen mit zugehörigen Einbauorten in der Blockchain; Erstellen einer Bestellliste der benötigten Betriebsmittel aus der Blockchain; nach erfolgter Einrichtung der Gebäudeinstallation, Speichern von Änderungen an den Betriebsmitteln der Gebäudeinstallation in der Blockchain um den jeweils aktuellen Konfigurationszustand der Betriebsmittel in der Blockchain zu erhalten.The invention relates to a method for computer-aided planning, setting up and monitoring a network of a building installation, in particular a lighting system, which comprises the following steps: acquiring planning data for setting up the building installation of a project and storing the planning data in a project-related blockchain; Analysis of the planning data from the blockchain and output of an installation plan for a network of a variety of components of the building installation; after acceptance of the installation plan by a user, determination of the equipment required for the building installation and its installation locations, assignment of unique equipment designations to the equipment and storage of the equipment designations associated installation locations in the blockchain; Creation of an order list of the required resources from the blockchain; After the building installation has been set up, changes to the building installation equipment are saved in the blockchain in order to maintain the current configuration status of the equipment in the blockchain.
Description
Die vorliegende Erfindung betrifft allgemein das Gebiet von Gebäudeinstallationsanlagen, worunter insbesondere Beleuchtungsanlagen in und am Gebäude sowie gegebenenfalls weitere zusätzliche Gebäudetechnik im Gebäude, im gebäudenahen Bereich sowie im Außenbereich verstanden wird. Insbesondere betrifft die Erfindung ein Verfahren welches dazu dient, die zur Planung, Einrichtung und Überwachung eines Netzwerkes einer Gebäudeinstallation benötigten Daten zu erfassen, zu speichern und auszugeben.The present invention relates generally to the field of building installation systems, which means in particular lighting systems in and on the building and, if appropriate, further additional building technology in the building, in the building-related area and in the outdoor area. In particular, the invention relates to a method which serves to record, store and output the data required for planning, setting up and monitoring a network of a building installation.
Gebäudeinstallationen, einschließlich der Beleuchtungstechnik, benötigen für größere Bauvorhaben eine umfangreiche Planung. Während des Lebenszyklus der Anlage sind laufende Wartungs- und Reparaturarbeiten die Regel. Schließlich stellt bei einem Rückbau der Gebäude sogar die Entsorgung ein kompliziertes Unterfangen dar, zu welchem die spezifischen Anlagenparameter bekannt sein müssen. Derzeit sind viele nicht miteinander vernetze Arbeitsschritte notwendig, um das unterschiedliche Wissen für die Planung der Gebäudetechnik, die Wartung und Entsorgung durchzuführen. Ein Problem besteht bereits darin, dass viel Wissen und Information zu einer Anlage über den laufenden Betrieb verloren geht und viel Klärungsbedarf zwischen den einzelnen Personen, welche die Anlage planen und betreiben, notwendig ist. Die Folge sind zeitaufwendige Notizen während der anfänglichen Planungsphase. Wenn die Anlage nicht so funktioniert, wie sie soll, sind häufig auch Streitigkeiten zwischen dem Hersteller der Anlage und dem Betreiber der Anlage zu erwarten.Building installations, including lighting technology, require extensive planning for larger construction projects. Ongoing maintenance and repair work are the norm throughout the life cycle of the system. After all, when the buildings are dismantled, even disposal is a complicated undertaking for which the specific system parameters must be known. At present, many steps that are not networked with each other are necessary to carry out the different knowledge for planning the building technology, maintenance and disposal. One problem is that a lot of knowledge and information about a system is lost about the ongoing operation and a lot of clarification is necessary between the individual people who plan and operate the system. The result is time-consuming notes during the initial planning phase. If the system does not work as it should, disputes between the manufacturer of the system and the operator of the system are often to be expected.
Aufgabe der vorliegenden Erfindung ist es, ein computergestütztes Verfahren bzw. ein Softwaretool bereitzustellen, welches die Planung, den Betrieb und ggf. den Rückbau einer Gebäudeinstallation vereinfacht.The object of the present invention is to provide a computer-aided method or a software tool which simplifies the planning, operation and possibly the dismantling of a building installation.
Gelöst wird die Aufgabe durch ein Verfahren nach Anspruch 1, sowie durch ein Computerprogramm nach Anspruch 15 und ein Netzwerk nach Anspruch 16.The object is achieved by a method according to
Ein besonderer Vorteil des computergestützten Verfahrens zum Planen, Einrichten und Überwachen eines Netzwerkes einer Gebäudeinstallation gemäß der vorliegenden Erfindung besteht darin, dass sämtliche relevanten Daten, welche in der Planungsphase und beim Einrichten der Gebäudeinstallation erhoben werden, in einer Blockchain gespeichert werden. Ferner wird in der Blockchain auch der aktuelle Zustand der Gebäudeinstallation, welcher sich durch Änderungen der Anlage ergeben kann, gespeichert. Dadurch ist eine lückenlose Dokumentation über den gesamten Lebenszyklus der Anlage vorhanden, auf die in jeder Projektphase zurückgegriffen werden kann. Insbesondere können aus diesen Daten beispielsweise alle notwendigen Bestelldaten noch vor Einrichten der Anlage automatisch erzeugt werden. Das Verfahren kann nach Bedarf mit einem Warenwirtschaftssystem des Herstellers der Anlage direkt verknüpft sein. Nach der Installation können alle Servicearbeiten an der Anlage aus den vorhandenen Daten geplant werden. Ferner bieten die Daten den Vorteil, dass auch streitige Fragen von Kundenreklamationen und Gewährleistungsansprüchen beim Auftreten von Defekten geklärt werden können. Technisch wird die Dokumentation der Daten dadurch realisiert, dass alle Daten für ein Projekt in einer Blockchain abgelegt werden. Die Blockchain ist manipulationssicher, weil aufgrund der Datenstruktur einer Blockchain eine nachträgliche Fälschung der Daten nahezu unmöglich ist. Jeder neu hinzugefügte Datenblock einer Blockchain enthält einen Hash des vorhergehenden Datenblocks. A particular advantage of the computer-aided method for planning, setting up and monitoring a network of a building installation according to the present invention is that all relevant data which are collected in the planning phase and when setting up the building installation are stored in a blockchain. The blockchain also stores the current state of the building installation, which can result from changes to the system. This means that there is complete documentation over the entire life cycle of the system, which can be used in every project phase. In particular, all necessary order data can be generated automatically from this data even before the system is set up. If necessary, the process can be directly linked to an ERP system of the manufacturer of the system. After installation, all service work on the system can be planned from the existing data. The data also offers the advantage that disputed questions about customer complaints and warranty claims can be resolved if defects occur. Technically, the data is documented by storing all data for a project in a blockchain. The blockchain is tamper-proof because the data structure of a blockchain makes it almost impossible to falsify it later. Each newly added block of data in a blockchain contains a hash of the previous block of data.
Dadurch ist eine nachträgliche Änderung der vorhergehenden Blöcke nicht möglich. Ferner eignet sich diese Art von Datenaufzeichnung insbesondere für Daten, welche in zeitlicher Abfolge hintereinander aufgezeichnet werden müssen. Erfindungsgemäß wurde erkannt, dass diese Art von Datenaufzeichnung für die Dokumentation einer Gebäudeinstallation von besonderem Vorteil ist.This means that the previous blocks cannot be changed later. Furthermore, this type of data recording is particularly suitable for data that must be recorded in chronological order. According to the invention, it was recognized that this type of data recording is of particular advantage for the documentation of a building installation.
Gemäß einer bevorzugten Ausführungsform umfasst das Verfahren ferner: Speichern von ausgewerteten Sensordaten aus Sensoren, die Teil der Gebäudeinstallation sind, in der Blockchain. Dadurch kann auch der Betriebszustand der Gebäudeinstallation zu jedem Zeitpunkt aus den Daten einer Blockchain ermittelt werden.According to a preferred embodiment, the method further comprises: storing evaluated sensor data from sensors that are part of the building installation in the blockchain. As a result, the operating status of the building installation can be determined from the data of a blockchain at any time.
Gemäß einer bevorzugten Ausführungsform umfasst das Verfahren ferner ein statistisches Analysieren der Sensordaten aus der Blockchain und Speichern der Analyseergebnisse in der Blockchain. Die Sensordaten werden wenigstens zum Teil für den Betrieb der Anlage ohnehin erhoben, z.B. um bewegungsabhängig Beleuchtungseinrichtungen zu schalten. Das Aufzeichnen der Daten bzw. der ausgewerteten Daten ermöglicht es, zu einem späteren Zeitpunkt nachzuvollziehen, in welchem Betriebszustand sich die Anlage befunden hat. Dies ist z.B. für eine mögliche nachfolgende Auswertung der Leistungsfähigkeit der Anlage sowie zur Fehlerdetektion hilfreich.According to a preferred embodiment, the method further comprises statistical analysis of the sensor data from the blockchain and storage of the analysis results in the blockchain. The sensor data are at least partially collected for the operation of the system anyway, e.g. to switch lighting devices depending on the movement. Recording the data or the evaluated data makes it possible to understand at a later point in time the operating state of the system. This is e.g. helpful for a possible subsequent evaluation of the performance of the system and for error detection.
Gemäß einer bevorzugten Ausführungsform umfasst das Verfahren ferner das Erzeugen von elektronischen Benachrichtigungen aus der Blockchain, wobei die Benachrichtigung den aktuellen Konfigurationszustand der Gebäudeinstallation anzeigen.According to a preferred embodiment, the method further comprises generating electronic notifications from the blockchain, the notifications indicating the current configuration status of the building installation.
Gemäß einer bevorzugten Ausführungsform umfasst das Verfahren ferner das Durchführen von Selbstfunktionstest von Betriebsmitteln in der Gebäudeinstallation und Speichern des Ergebnisses des Selbstfunktionstest in der Blockchain.According to a preferred embodiment, the method further comprises performing self-function testing of equipment in the Building installation and saving the result of the self-function test in the blockchain.
Gemäß einer bevorzugten Ausführungsform umfasst das Verfahren ferner das Versenden einer elektronischen Benachrichtigung, welche den aktuellen Funktionszustand von Betriebsmitteln in der Blockchain anzeigt. Die Nachrichten können beispielsweise an Servicetechniker übersandt werden. Auf diese Weise kann die laufende Wartung sowie notwendige Reparaturarbeiten an der Installation koordiniert werden.According to a preferred embodiment, the method further comprises sending an electronic notification which indicates the current functional state of the equipment in the blockchain. The messages can be sent to service technicians, for example. In this way, ongoing maintenance and necessary repair work on the installation can be coordinated.
Gemäß einer bevorzugten Ausführungsform umfasst das Verfahren ferner das Ermitteln eines Energieverbrauchs von Betriebsmitteln oder Gruppen von Betriebsmitteln der Gebäudeinstallation aus gespeicherten Sensordaten der Blockchain. Dadurch kann der Betreiber der Anlage nachvollziehen, ob die vom Hersteller angegebenen Angaben zum Energieverbrauch auch erzielt werden. Ferner lassen sich aus den einzelnen Energieverbräuchen der Betriebsmittel auch diejenigen Verbraucher auffinden, die zu einem zu hohen Energieverbrauch führen, um ggf. Änderungen an der Gebäudeinstallation vorzusehen.According to a preferred embodiment, the method further comprises determining an energy consumption of operating resources or groups of operating resources of the building installation from stored sensor data of the blockchain. This enables the operator of the system to understand whether the information on energy consumption specified by the manufacturer can also be achieved. Furthermore, from the individual energy consumption of the equipment, those consumers can be found that lead to excessive energy consumption in order to make changes to the building installation, if necessary.
Gemäß einer bevorzugten Ausführungsform umfasst das Verfahren ferner das Speichern einer Parametrierung von Betriebsmitteln der Gebäudeinstallation in der Blockchain.According to a preferred embodiment, the method further comprises storing a parameterization of resources of the building installation in the blockchain.
Gemäß einer bevorzugten Ausführungsform umfasst das Verfahren ferner das Kopieren der Parametrierung von einer Gruppe von Betriebsmitteln der Gebäudeinstallation auf eine andere Gruppe von Betriebsmitteln der Gebäudeinstallation, insbesondere nach Umzügen von Mitarbeitern in einem Gebäude der Gebäudeinstallation. Es entfällt die notwendige Neuparametrierung, wenn die Gebäudeinstallation in einem neuen Gebäudeteil genau in der gleichen Weise, beispielsweise nach Umzug eines Mitarbeiters, wie in einem alten Gebäudeteil funktionieren soll.According to a preferred embodiment, the method further comprises copying the parameterization from one group of building installation equipment to another group of building installation equipment, in particular after relocations of employees in a building installation building. There is no need to re-parameterize if the building installation in a new part of the building is to work in exactly the same way, for example after an employee has moved, as in an old part of the building.
Gemäß einer bevorzugten Ausführungsform umfasst das Verfahren ferner eine Fehleranalyse von der Gebäudeinstallation aus Daten der Blockchain, insbesondere eine Ermittlung von statistischen Auffälligkeiten aus gespeicherten Sensordaten von miteinander in Beziehung stehenden Sensordaten und Funktionszuständen benachbart angeordneten Sensoren und Betriebsmitteln der Gebäudeinstallation, sowie ggf. ein Erzeugen einer elektronischen Benachrichtigung für eine mögliche Fehlfunktion von Betriebsmittelkomponenten.According to a preferred embodiment, the method further comprises an error analysis of the building installation from blockchain data, in particular a determination of statistical anomalies from stored sensor data of mutually related sensor data and functional states of sensors and operating means of the building installation arranged adjacent to one another, and possibly generating an electronic one Notification for a possible malfunction of equipment components.
Gemäß einer bevorzugten Ausführungsform umfasst das Verfahren ferner das Erzeugen von Benachrichtigungen für Servicemitarbeiter zur Durchführung von regelmäßigen oder außerplanmäßigen Serviceintervallen aus den Daten der Blockchain.According to a preferred embodiment, the method further comprises generating notifications for service employees to carry out regular or unscheduled service intervals from the blockchain data.
Gemäß einer bevorzugten Ausführungsform umfasst das Verfahren ferner das Speichern von Daten in der Blockchain, wobei die Daten eines oder mehreres aus folgender Gruppe umfassen: Lichtmessung, Temperaturmessung insbesondere von Komponenten der Gebäudeinstallation, Bewegungserfassung, Bewegungssignalqualität, Kommunikationssignalqualität, Betriebszähler von Komponenten der Gebäudeinstallation, Störsignale auf einem Versorgungsnetz der Gebäudeinstallation, Umgebungsbedingungen, insbesondere Feuchtigkeit, flüchtige organisierte Verbindungen und Umgebungstemperatur, mechanische Erschütterungen, sowie Ergebnisse automatischer Funktionstest von Komponenten der Gebäudeinstallation.According to a preferred embodiment, the method further includes storing data in the blockchain, the data comprising one or more from the following group: light measurement, temperature measurement, in particular of components of the building installation, motion detection, motion signal quality, communication signal quality, operation counter of components of the building installation, interference signals a supply network for the building installation, ambient conditions, in particular moisture, volatile organized connections and ambient temperature, mechanical vibrations, as well as results of the automatic function test of components of the building installation.
Gemäß einer bevorzugten Ausführungsform umfasst das Verfahren ferner, dass die Blockchain in einer Datenbank einer Cloud und/oder an mehreren verteilten Orten in Kopien gespeichert wird. Das Speichern der Blockchain an verteilten Orten erhöht die Manipulationssicherheit der Daten, weil eine Blockchain nicht an einem einzelnen Speicherort manipuliert werden kann. Das Grundprinzip der verteilten Speicherorte ist zum Nutzen der vorliegenden Erfindung, weil die Daten in der Blockchain auch zum Nachweis von Gewährleistungsansprüchen oder zur Abwehr von solchen herangezogen werden können.According to a preferred embodiment, the method further comprises that the blockchain is stored in copies in a database of a cloud and / or at several distributed locations. Storing the blockchain in distributed locations increases the security against manipulation of the data because a blockchain cannot be manipulated in a single location. The basic principle of the distributed storage locations is for the benefit of the present invention, because the data in the blockchain can also be used to prove warranty claims or to ward off such claims.
Gemäß einer bevorzugten Ausführungsform umfasst das Verfahren ferner, dass die Daten in der Blockchain verschlüsselt gespeichert werden, so dass nur autorisierte Benutzer der Blockchain, insbesondere der Hersteller, der Betreiber und/oder Servicetechniker der Gebäudeinstallation, Zugang zu den Daten der Blockchain oder nur jeweils auf Teile der Daten der Blockchain Zugang haben.According to a preferred embodiment, the method further comprises that the data is stored in encrypted form in the blockchain, so that only authorized blockchain users, in particular the manufacturer, operator and / or service technician of the building installation, have access to the blockchain data or only in each case Parts of the blockchain data have access.
Weitere Vorteile und Merkmale der vorliegenden Erfindung werden aus der nachfolgenden Beschreibung bevorzugter Ausführungsformen deutlich, die in Verbindung mit den beigefügten Figuren gegeben wird. In den Figuren ist Folgendes dargestellt:
-
1a bis1i zeigen Benutzerschnittstellen einer Software zur Erhebung von Planungsdaten einer Gebäudeinstallation. -
2 zeigt schematisch einen Teil eines Projektfiles betreffend eine Mengen- und Typenermittlung. -
3 zeigt schematisch einen Teil des Projektfiles betreffend Kundenreklamationen. -
4 zeigt schematisch einen Teil des Projektfiles betreffend Bewegungssensorik. -
5 zeigt schematisch einen Teil des Projektfiles betreffend Lichtsensor-Profile. -
6 zeigt schematisch einen Teil des Projektfiles betreffend Umgebungseinflüsse. -
7 zeigt schematisch einen Teil des Projektfiles betreffend Sensorauswahl. -
8 zeigt schematisch einen Teil des Projektfiles betreffend Planungsdatei. -
9 zeigt schematisch einen Teil des Projektfiles betreffend Temperaturprofile. -
10 zeigt schematisch einen Teil des Projektfiles betreffend Schnittstellen. -
11 zeigt schematisch einen Teil des Projektfiles betreffend Applikationsprofil. -
12 zeigt schematisch einen Teil des Projektfiles betreffend Werksparametrierung. -
13 zeigt schematisch einen Teil des Projektfiles betreffend Planungsabgleich-Lichtsensorik. -
14 zeigt schematisch einen Teil des Projektfiles betreffend Störeinflüsse. -
15 zeigt schematisch einen Teil des Projektfiles betreffend Reklamationsmanagement.
-
1a to1i show user interfaces of a software for collecting planning data of a building installation. -
2nd shows schematically a part of a project file regarding a quantity and type determination. -
3rd shows schematically a part of the project file regarding customer complaints. -
4th shows schematically a part of the project file regarding motion sensors. -
5 shows schematically a part of the project file regarding light sensor profiles. -
6 shows schematically a part of the project file regarding environmental influences. -
7 shows schematically a part of the project file regarding sensor selection. -
8th shows schematically a part of the project file regarding the planning file. -
9 shows schematically a part of the project file regarding temperature profiles. -
10th shows schematically a part of the project file regarding interfaces. -
11 shows schematically a part of the project file regarding the application profile. -
12 shows schematically a part of the project file regarding factory parameterization. -
13 shows schematically a part of the project file regarding planning adjustment light sensors. -
14 shows schematically a part of the project file regarding interference. -
15 shows schematically a part of the project file regarding complaint management.
Bezugnehmend auf die
Bei der Planung werden entsprechend dem Planungsprogramm jedem Betriebsmittel eine eindeutige Kennzeichnung zugewiesen. Auch die Betriebsmittelkennzeichnung wird in dem Datenfile automatisch gespeichert. Sie können im nächsten Schritt der Bestellphase der Anlage Verwendung finden. Vorzugsweise wird aus dem Daten-File eine Stückliste erstellt, welche die exakten Angaben der Anzahl und des Typs der benötigten Beleuchtungseinrichtungen sowie ggf. weitere Sensorik oder anderer Gebäudetechnik umfasst. Eine Verbindung zu einem Warenwirtschaftssystem kann automatisch hergestellt werden. Ferner kann eine Beschreibung des Leistungsumfangs ausgegeben werden. Darin sind alle Produkte, Anlagen, Funktionen, Garantieleistungen und Montage- und Betriebnahmeleistungen aufgelistet. Die Daten sind sowohl für den Kunden der Anlage als auch für den Anbieter ersichtlich.When planning, each piece of equipment is assigned a unique identifier in accordance with the planning program. The equipment identification is also automatically saved in the data file. They can be used in the next step of the ordering phase of the system. A parts list is preferably created from the data file, which includes the exact details of the number and type of the lighting devices required and, if appropriate, further sensors or other building technology. A connection to an ERP system can be established automatically. A description of the scope of services can also be output. It lists all products, systems, functions, warranty services and installation and commissioning services. The data is visible to both the customer of the system and the provider.
Erfolgt die Bestellung der Produkte aus dem Angebot, werden alle relevanten Daten bei Bedarf an das Warenwirtschaftssystem exportiert, um alle relevanten Einkaufs- und Beschaffungsinformationen zu bekommen. Alle darin abgelegten Informationen zu Produkten und Einstellungen ggf. notwendigen Inbetriebnahme-Dienstleistungen sind auf einen Blick ersichtlich.If the products are ordered from the offer, all relevant data are exported to the ERP system if necessary in order to obtain all relevant purchasing and procurement information. All of the information on products and settings that may be required can be seen at a glance.
Automatisch nach der Bestellung werden mögliche Termine für Service-Dienstleistungen abgestimmt. Alle verfügbaren ServiceMitarbeiter werden automatisch mit Hilfe eines Kalenders ausgesucht. Eine optimale Auslastung des Personals wird dadurch ermöglicht.Possible dates for service are automatically coordinated after the order. All available service employees are automatically selected using a calendar. This enables optimal utilization of the staff.
Während der Produktion der Produkte der Gebäudeinstallation werden alle notwendigen Daten aus dem Daten-File ausgelesen und die Produkte können beispielsweise mit einem Aufkleber entsprechen markiert werden. Jedes Produkt und sein späterer Installationsort ist damit eindeutig identifizierbar.During the production of the building installation products, all necessary data are read from the data file and the products can be marked with a sticker, for example. Each product and its later installation location can thus be clearly identified.
Aus dem Daten-File können ferner alle relevanten Informationen zur Parametrierung der Anlage abgelesen werden. Beispielsweise können die vorher spezifizierten An- und Ausschaltzeiten sowie Nachlaufzeiten und Dimm-Level an dem betreffenden Produkt gespeichert werden. Dies erleichtert die Montage der Produkte durch einen Servicetechniker vor Ort. Aus der Identifikation des Produkts kann unmittelbar auf dem Montageort geschlossen werden. Falls vor oder während der Installation der Anlage noch Änderungen vorgenommen werden, werden diese ebenfalls in dem Daten-File erfasst, so dass auch später jederzeit nachvollziehbar ist, welche Produkte an welchem Ort installiert worden sind.All relevant information for parameterizing the system can also be read from the data file. For example, the previously specified switch-on and switch-off times as well as run-on times and dimming levels can be saved on the relevant product. This simplifies the assembly of the products by a service technician on site. From the identification of the product, conclusions can be drawn directly at the installation site. If changes are made before or during the installation of the system, these are also recorded in the data file, so that it can also be traced later, which products have been installed at which location.
Nach Inbetriebnahme der Anlage können sich die Betriebsgeräte selbst überprüfen und einen aktuellen Fehlerzustand melden, welcher ebenfalls in das Daten-File abgelegt wird. Auf diese Weise können geeignete Maßnahmen durch Servicetechniker ergriffen werden. Ein Austausch eines defekten Betriebsmittels kann direkt erfolgen. Beispiele für die Erfassung von Messwertdaten, welche auf einen Fehler schließen lassen, sind in den
Eine Besonderheit der Erfindung besteht ferner darin, dass über die Planungsphase hinaus alle relevanten Daten der Gebäudeinstallation in der Blockchain erhalten werden. Im Folgenden wird beschrieben, welche weiteren Daten gemäß Ausführungsformen der Erfindung in der Blockchain noch gespeichert werden und wie deren technische Implikation auf ein Verfahren ist, welches zum Warten, Verändern, ggf. Reparieren, und schließlich zum Entsorgen der Gebäudeinstallationen vorgesehen ist.Another special feature of the invention is that, beyond the planning phase, all the relevant building installation data is retained in the blockchain. The following describes what further data is still stored in the blockchain in accordance with embodiments of the invention and how its technical implication is for a method which is provided for maintenance, modification, possibly repair, and finally for the disposal of the building installations.
Das Projektfile (in den Figuren auch als IQ-Projekt-File bezeichnet), welches in der Blockchain enthalten ist, kann insbesondere Daten hinsichtlich von Mengen und Typen von Sensoren in der Gebäudeinstallation umfassen (siehe
Die Daten in dem Projektfile erlauben es, Ansprüche bei einer Kundenreklamation geltend zu machen. Dazu ist in dem Projektfile die werkseitige Parametrierung, der Rücklieferzustand, abgefragte Fehler der Kundenanlage und ein Datenabgleich auf ähnliche Fehler enthalten. Aus diesen Daten lässt sich ermitteln, ob eine Fehlfunktion einer Komponente in der Gebäudeinstallation auf eine falsche Programmierung zurückzuführen ist. Insbesondere ist nachvollziehbar, ob der Rücklieferzustand der ursprünglichen Werksparametrierung entspricht, um das Feststellen eines Fehlers nachzuweisen. Ferner können Fehler an der Kundenanlage, die beispielsweise durch einen Selbsttest der Komponenten ermittelt und das Projektfile geschrieben worden sind, aus dem Projektfile direkt ermittelt werden. Darüber ist es auch möglich, aufgrund eines Datenabgleichs mit ähnlichen Fehlerbildern festzustellen, ob auch andere Komponenten der Anlage Anlass zur Reklamation liefern. Noch bevor ein Totalausfall der entsprechenden Komponenten vorliegt, kann aus den Datenabgleich mit ähnlichen Fehlern geschlossen werden, welche Teile der Anlage von einem möglichen Fehler betroffen sind, um Reparaturmaßnahmen zu ergreifen und ggf. Garantieansprüche geltend zu machen.The data in the project file allow claims to be made in the event of a customer complaint. For this purpose, the factory parameterization, the return state, queried errors of the customer system and a data comparison for similar errors are contained in the project file. This data can be used to determine whether a malfunction of a component in the building installation is due to incorrect programming. In particular, it is understandable whether the return delivery status corresponds to the original factory parameterization in order to prove the detection of an error. Furthermore, errors in the customer system, which have been determined, for example, by a self-test of the components and the project file has been written, can be determined directly from the project file. It is also possible to use a data comparison with similar error patterns to determine whether other components of the system also give rise to complaints. Even before there is a total failure of the corresponding components, it can be concluded from the data comparison with similar errors which parts of the system are affected by a possible error in order to take repair measures and, if necessary, to make warranty claims.
Bezug nehmend auf
In den
Im Teil des Projektfiles betreffend der Schnittstellen werden insbesondere die Signalqualität und die Signalstärke von sowohl den Steuerleitungen als auch der Netzspannungsversorgung aufgezeichnet. Die Daten dienen dazu, um eine Fehleranalyse im Hinblick auf mögliche Datenübertragungsfehler oder Ausfälle von Komponenten wegen einem instabilen Versorgungsnetz durchführen zu können. Schließlich sind in
Die in
Schließlich ist in Bezug auf
Die vorhergehend beschriebenen Teile des Projektfiles in der Blockchain sind nicht abschließend. Es können weitere Daten erhoben. Es kann allerdings auch vorgesehen sein, dass nur Teile der Daten erhoben werden.The parts of the project file in the blockchain described above are not exhaustive. Further data can be collected. However, it can also be provided that only parts of the data are collected.
Mögliche Anwendung finden das Verfahren, das Computerprogramm und das Netzwerk der Erfindung in vielen Bereichen. Die Netzwerkkomponenten lassen sich an vielen Orten verbauen, z.B. an oder in einer anderen Komponente einer Gebäudeinstallation, in einer Abhängdecke, einer Betondecke, einer Leuchtbauwand, im Erdreich oder Beton. Als Gebäude in dieser Anmeldung werden jede Form von Bauwerken bezeichnet, einschließlich Wohn- und Bürohäusern, Produktionshallen sowie Straßen und Wege. Der Einsatzbereich kann die Sanierung von Bestandsanlagen oder den Neubau betreffen. Die Komponenten können innerhalb der Gebäude oder im Außenbereich der Gebäude verbaut werden.The method, the computer program and the network of the invention can be used in many areas. The network components can be installed in many places, e.g. on or in another component of a building installation, in a false ceiling, a concrete ceiling, a light wall, in the ground or concrete. Buildings in this application refer to any form of construction, including residential and office buildings, production halls, and streets and paths. The area of application can relate to the renovation of existing systems or new buildings. The components can be installed inside the building or outside the building.
Claims (16)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP19214035.8A EP3664012A1 (en) | 2018-12-06 | 2019-12-06 | Projector file for lighting installations |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE102018009603 | 2018-12-06 | ||
DE102018009603.4 | 2018-12-06 |
Publications (1)
Publication Number | Publication Date |
---|---|
DE102019103887A1 true DE102019103887A1 (en) | 2020-06-10 |
Family
ID=70776413
Family Applications (8)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE102019103896.0A Withdrawn DE102019103896A1 (en) | 2018-12-06 | 2019-02-15 | Analysis tool for evaluating lighting system requirements and recording data |
DE102019103889.8A Pending DE102019103889A1 (en) | 2018-12-06 | 2019-02-15 | Coupling and uncoupling of data and data transport via electrical supply lines for lighting systems |
DE102019103893.6A Withdrawn DE102019103893A1 (en) | 2018-12-06 | 2019-02-15 | Upgradable stage concept for lighting systems |
DE102019103887.1A Withdrawn DE102019103887A1 (en) | 2018-12-06 | 2019-02-15 | Project file for lighting systems |
DE102019105173.8A Pending DE102019105173A1 (en) | 2018-12-06 | 2019-02-28 | Automatic indoor-outdoor light sensor |
DE102019105164.9A Pending DE102019105164A1 (en) | 2018-12-06 | 2019-02-28 | Light control through luminaire cover |
DE102019105159.2A Withdrawn DE102019105159A1 (en) | 2018-12-06 | 2019-02-28 | SYSTEM AND METHOD FOR DRIVING AN AUTONOMOUS VEHICLE |
DE102019105206.8A Withdrawn DE102019105206A1 (en) | 2018-12-06 | 2019-03-01 | Automatically switching lighting system for a building with optional connection to an LMS or BMS system for analysis and control purposes |
Family Applications Before (3)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE102019103896.0A Withdrawn DE102019103896A1 (en) | 2018-12-06 | 2019-02-15 | Analysis tool for evaluating lighting system requirements and recording data |
DE102019103889.8A Pending DE102019103889A1 (en) | 2018-12-06 | 2019-02-15 | Coupling and uncoupling of data and data transport via electrical supply lines for lighting systems |
DE102019103893.6A Withdrawn DE102019103893A1 (en) | 2018-12-06 | 2019-02-15 | Upgradable stage concept for lighting systems |
Family Applications After (4)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE102019105173.8A Pending DE102019105173A1 (en) | 2018-12-06 | 2019-02-28 | Automatic indoor-outdoor light sensor |
DE102019105164.9A Pending DE102019105164A1 (en) | 2018-12-06 | 2019-02-28 | Light control through luminaire cover |
DE102019105159.2A Withdrawn DE102019105159A1 (en) | 2018-12-06 | 2019-02-28 | SYSTEM AND METHOD FOR DRIVING AN AUTONOMOUS VEHICLE |
DE102019105206.8A Withdrawn DE102019105206A1 (en) | 2018-12-06 | 2019-03-01 | Automatically switching lighting system for a building with optional connection to an LMS or BMS system for analysis and control purposes |
Country Status (1)
Country | Link |
---|---|
DE (8) | DE102019103896A1 (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102023124475A1 (en) * | 2023-09-11 | 2025-03-13 | Weidmüller Interface GmbH & Co. KG | Lighting arrangement for a tower of a wind turbine and operating method for such a lighting arrangement |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4831546A (en) * | 1986-05-16 | 1989-05-16 | Hitachi, Ltd. | Method and apparatus for assisting layout design |
Family Cites Families (24)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE19645184A1 (en) * | 1996-11-02 | 1998-05-07 | Abb Patent Gmbh | Switching device for staircase lighting |
DE29903828U1 (en) * | 1999-03-03 | 1999-07-01 | Gebr. Merten GmbH & Co. KG, 51674 Wiehl | Modular presence detector system |
US7417556B2 (en) * | 2001-04-24 | 2008-08-26 | Koninklijke Philips Electronics N.V. | Wireless addressable lighting method and apparatus |
DE102004058051B3 (en) * | 2004-12-01 | 2006-08-31 | Abb Research Ltd. | Wireless movement alarm unit/actuator system, has transmitter to transmit system status signals from alarm units to actuator, where signals relate to system activity condition, system component condition, system position and information |
DE102005012826A1 (en) * | 2005-03-17 | 2006-09-21 | Hella Kgaa Hueck & Co. | Sensor arrangement for a motor vehicle |
CN100438517C (en) * | 2006-04-30 | 2008-11-26 | 中国移动通信集团公司 | Family gateway equipment |
DE102009010180A1 (en) * | 2009-02-23 | 2010-10-28 | Osram Gesellschaft mit beschränkter Haftung | Lighting device with at least one semiconductor light source |
US9041295B2 (en) * | 2009-04-09 | 2015-05-26 | Tridonic Jennersdorf Gmbh | Integrated LED and sensor device |
US8143567B2 (en) * | 2009-05-21 | 2012-03-27 | Hubbell Incorporated | Ambient light control system |
US8644166B2 (en) * | 2011-06-03 | 2014-02-04 | Asoka Usa Corporation | Sensor having an integrated Zigbee® device for communication with Zigbee® enabled appliances to control and monitor Zigbee® enabled appliances |
EP2702835B1 (en) * | 2011-04-29 | 2019-03-20 | Osram Sylvania Inc. | Hybrid reflector including lightguide for sensor |
DE102012202148A1 (en) * | 2012-02-13 | 2013-08-14 | Trilux Gmbh & Co. Kg | Lighting system |
DE102012003576B4 (en) * | 2012-02-27 | 2024-05-08 | HELLA GmbH & Co. KGaA | Vehicle with detection device for lighting conditions |
WO2014001965A1 (en) * | 2012-06-27 | 2014-01-03 | Koninklijke Philips N.V. | Methods and apparatus for automatically adapting light output of a lighting unit |
JP6469697B2 (en) * | 2013-09-10 | 2019-02-13 | フィリップス ライティング ホールディング ビー ヴィ | Method and apparatus for automatic commissioning of a source of coded light |
DE102013219011A1 (en) * | 2013-09-20 | 2015-03-26 | Osram Gmbh | Sensor unit for light control |
WO2015117186A1 (en) * | 2014-02-05 | 2015-08-13 | Ellumination Pty Ltd | A solar lighting system |
EP3075215B1 (en) * | 2014-03-19 | 2017-05-10 | Philips Lighting Holding B.V. | Multi-modal sensing |
US10045427B2 (en) * | 2014-09-29 | 2018-08-07 | Philips Lighting Holding B.V. | System and method of autonomous restore point creation and restoration for luminaire controllers |
DE102016108853A1 (en) * | 2015-12-22 | 2017-06-22 | Steinel Gmbh | Method for controlling the brightness of interior lighting and lighting control system |
DE202016100586U1 (en) * | 2016-02-05 | 2017-05-10 | Zumtobel Lighting Gmbh | Trunking system with several controllable light band modules |
DE102016110456A1 (en) * | 2016-03-29 | 2017-10-05 | Abb Ag | Method and device for picking a building automation system |
DE102017103344B4 (en) * | 2017-02-17 | 2019-07-11 | Steinel Gmbh | Motion-controlled luminaire device with lens areas integrated in the lampshade |
ES2860776T3 (en) * | 2017-09-07 | 2021-10-05 | Signify Holding Bv | Interior positioning system for moving objects |
-
2019
- 2019-02-15 DE DE102019103896.0A patent/DE102019103896A1/en not_active Withdrawn
- 2019-02-15 DE DE102019103889.8A patent/DE102019103889A1/en active Pending
- 2019-02-15 DE DE102019103893.6A patent/DE102019103893A1/en not_active Withdrawn
- 2019-02-15 DE DE102019103887.1A patent/DE102019103887A1/en not_active Withdrawn
- 2019-02-28 DE DE102019105173.8A patent/DE102019105173A1/en active Pending
- 2019-02-28 DE DE102019105164.9A patent/DE102019105164A1/en active Pending
- 2019-02-28 DE DE102019105159.2A patent/DE102019105159A1/en not_active Withdrawn
- 2019-03-01 DE DE102019105206.8A patent/DE102019105206A1/en not_active Withdrawn
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4831546A (en) * | 1986-05-16 | 1989-05-16 | Hitachi, Ltd. | Method and apparatus for assisting layout design |
Non-Patent Citations (1)
Title |
---|
Blockchain. Aus: Wikipedia, der freien Enzyklopädie; Bearbeitungsstand: 25.11.2018 um 17:245 Uhr; URL: https://de.wikipedia.org/w/index.php?title=Blockchain&oldid=183068350 [abgerufen am 30.09.2019] * |
Also Published As
Publication number | Publication date |
---|---|
DE102019105159A1 (en) | 2020-06-10 |
DE102019105173A1 (en) | 2020-06-10 |
DE102019103893A1 (en) | 2020-06-10 |
DE102019105206A1 (en) | 2020-06-10 |
DE102019103889A1 (en) | 2020-06-10 |
DE102019103896A1 (en) | 2020-06-10 |
DE102019105164A1 (en) | 2020-06-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP3467597B1 (en) | Method and system for commissioning and/or the maintenance of a control device for field devices for automation of buildings | |
DE112017000687T5 (en) | Device management device, device management system, computer readable medium and device management method | |
DE112004000432T5 (en) | Generation of data for marking the operational status of machines | |
DE112016006796B4 (en) | LIFT REMOTE MAINTENANCE ASSISTANCE SYSTEM AND LIFT REMOTE MAINTENANCE ASSISTANCE PROCEDURE | |
EP3783581B1 (en) | Method for allocating a smoke alarm to be registered and a corresponding smoke alarm management system | |
EP2671122B1 (en) | Automated planning of control equipment of a technical system | |
DE102011001614A1 (en) | Method for logically linking sensors and actuators as part of the commissioning of an installation system | |
DE102019103887A1 (en) | Project file for lighting systems | |
DE102011052840A1 (en) | Methods, devices and articles of manufacture for testing process control systems | |
DE102008050167A1 (en) | Method and system for analyzing operating conditions | |
CH698777B1 (en) | Management system for technical and / or structural works. | |
EP3664012A1 (en) | Projector file for lighting installations | |
EP3664381B1 (en) | Analysis tool for evaluating demand and recording data of lighting installations | |
EP3951524A1 (en) | Method for operating a system and system coupled to a number of production stations for producing a product | |
EP1657670A1 (en) | System and method for the control of the state and progress of technical processes or a technical project | |
EP2778414B1 (en) | Measurement value standardisation | |
EP3895091B1 (en) | Method for exchanging a component in a passenger transport system and device used to implement the method | |
EP2399176A1 (en) | Method and system for engineering an automation of at least part of a technical installation | |
DE102019112330A1 (en) | Procedure for condition monitoring, condition assessment and maintenance of refrigerated cabinets | |
DE102008048985A1 (en) | Automation system's test e.g. bus test, performing method for e.g. organization task, involves comparing testing result with reference result deviated from specification data, and implementing or importing data in testing program | |
DE102018122398A1 (en) | SYSTEMS AND METHOD FOR EVALUATING CONFIGURATION FILES ASSOCIATED TO A PROCESS CONTROL SYSTEM | |
DE19800448C2 (en) | Monitoring system | |
DE102012110623A1 (en) | Measuring device for performing measurement, control and testing during processing of food, stores measurement results through operator entered data or information when task includes called process | |
EP3664380B1 (en) | Upgradable stage concept for lighting systems | |
EP3633476B1 (en) | Method, device and system for transmitting machine information to a service device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
R163 | Identified publications notified | ||
R081 | Change of applicant/patentee |
Owner name: SITECO GMBH, DE Free format text: FORMER OWNER: SITECO BELEUCHTUNGSTECHNIK GMBH, 83301 TRAUNREUT, DE |
|
R082 | Change of representative |
Representative=s name: BOEHMERT & BOEHMERT ANWALTSPARTNERSCHAFT MBB -, DE |
|
R119 | Application deemed withdrawn, or ip right lapsed, due to non-payment of renewal fee |