DE102009039570B4 - Reinforcement for a foundation element and method for creating the foundation element and foundation element - Google Patents
Reinforcement for a foundation element and method for creating the foundation element and foundation element Download PDFInfo
- Publication number
- DE102009039570B4 DE102009039570B4 DE200910039570 DE102009039570A DE102009039570B4 DE 102009039570 B4 DE102009039570 B4 DE 102009039570B4 DE 200910039570 DE200910039570 DE 200910039570 DE 102009039570 A DE102009039570 A DE 102009039570A DE 102009039570 B4 DE102009039570 B4 DE 102009039570B4
- Authority
- DE
- Germany
- Prior art keywords
- reinforcement
- foundation element
- sheet
- hollow body
- metal
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/28—Stressing the soil or the foundation structure while forming foundations
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Piles And Underground Anchors (AREA)
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
Abstract
Bewehrung für ein Gründungselement (5) im Boden (3), welche Metallstäbe (12) aufweist, die zum Bilden eines Bewehrungskorbes (14) miteinander verbunden sind, an dessen Fußbereich eine Vorspanneinrichtung angeordnet ist, wobei mindestens eine Zuleitung (32) und mindestens eine Ableitung (34) zum Zu- beziehungsweise Abführen eines Fluides zu der Vorspanneinrichtung vorgesehen sind und zu einem oberen Bereich des Bewehrungskorbes (14) verlaufen, dadurch gekennzeichnet, dass die Vorspanneinrichtung einen ausdehnbaren Blechhohlkörper (30) aufweist, welcher über Halter (20) an dem Bewehrungskorb (14) befestigt ist, dass die Halter (20) eine geringere Steifigkeit als die Metallstäbe (12) aufweisen, wobei der Blechhohlkörper (30) insgesamt über die Halter (20) beim Aufblasen beweglich zu den Metallstäben (12) des Bewehrungskorbes (14) gehalten ist, und dass die Zuleitung (32) und die Ableitung (34) an dem Bewehrungskorb (14) befestigt sind.Reinforcement for a foundation element (5) in the floor (3) comprising metal bars (12) interconnected to form a reinforcing cage (14) having a biasing means disposed at the foot thereof, at least one lead (32) and at least one Discharge (34) for supplying or discharging a fluid to the biasing means are provided and extend to an upper portion of the reinforcing basket (14), characterized in that the biasing means comprises an expandable sheet metal hollow body (30), which via holders (20) on the Reinforcing cage (14) is fixed, that the holders (20) have a lower rigidity than the metal rods (12), wherein the sheet hollow body (30) in total on the holder (20) upon inflation movable to the metal bars (12) of the reinforcing basket (14 ), and that the supply line (32) and the discharge line (34) are fixed to the reinforcement cage (14).
Description
Die Erfindung betrifft eine Bewehrung für ein Gründungselement im Boden, welche Metallstäbe aufweist, die zum Bilden eines Bewehrungskorbes miteinander verbunden sind, gemäß dem Oberbegriff des Anspruchs 1.The invention relates to a reinforcement for a foundation element in the ground, which has metal rods which are interconnected to form a reinforcing cage, according to the preamble of claim 1.
Weiterhin betrifft die Erfindung ein Verfahren zum Erstellen eines Gründungselementes im Boden, wobei zunächst eine Ausnehmung im Boden erstellt wird, in welcher eine Bewehrung eingesetzt und welche mit einer aushärtbaren Verfüllmasse verfüllt wird gemäß Anspruch 11, sowie ein Gründungselement gemäß Anspruch 10.Furthermore, the invention relates to a method for creating a foundation element in the ground, wherein initially a recess is created in the ground, in which a reinforcement used and which is filled with a curable filling compound according to claim 11, and a foundation element according to claim 10.
Derartige Gründungselemente dienen zur Abtragung von größeren Vertikalkräften eines Bauwerkes in den Baugrund. Die Gründungselemente können durch Bohren als Pfähle oder mittels Schlitzwandfräsen oder Schlitzwandgreifern als Schlitzwandlamellen erstellt werden. Die erstellte Ausnehmung wird zum Bilden des Gründungselementes mit einer aushärtbaren Verfüllmasse, üblicherweise einer Beton- oder Zementmasse, verfüllt, wobei zur Erhöhung der Festigkeit eine Bewehrung aus Metallstäben eingesetzt wird.Such foundation elements are used for the removal of larger vertical forces of a building in the ground. The foundation elements can be created by drilling as piles or by trench wall trenching or diaphragm wall grabs as trench wall fins. The created recess is filled to form the foundation element with a curable filling compound, usually a concrete or cement paste, wherein a reinforcement of metal rods is used to increase the strength.
Zur Erhöhung der Tragfähigkeit ist es bekannt, das Gründungselement durch entsprechende Einrichtungen vorzuspannen. Aus der
Die Anordnung dieser Vorspanneinrichtungen, ist aufwendig und benötigt insbesondere Zeit zum exakten Positionieren und Justieren.The arrangement of these biasing devices is complex and in particular requires time for exact positioning and adjustment.
Weiter ist es bekannt, so genannte Kraftmesszellen in den Gründungselementen anzuordnen, mit welchen unmittelbar die Tragfähigkeit des Gründungselementes ermittelt werden kann, wie beispielsweise aus der
Aus der
Die
In der
Der Erfindung liegt die Aufgabe zugrunde, eine Bewehrung für ein Gründungselement, ein Verfahren zur Erstellung eines Gründungselementes und ein Gründungselement anzugeben, mit welchen besonders effizient hochtragfähige Gründungselemente im Boden hergestellt werden können.The invention has for its object to provide a reinforcement for a foundation element, a method for creating a foundation element and a foundation element with which highly efficient high-carrying foundation elements in the ground can be produced.
Die Aufgabe wird zum einen durch eine Bewehrung mit den Merkmalen des Anspruchs 1 und zum anderen mit einem Verfahren mit den Merkmalen des Verfahrensanspruchs 11 gelöst. Bevorzugte Ausführungsformen der Erfindung sind in den jeweils abhängigen Ansprüchen angegeben.The object is achieved on the one hand by a reinforcement with the features of claim 1 and on the other hand with a method having the features of the method claim 11. Preferred embodiments of the invention are specified in the respective dependent claims.
Die erfindungsgemäße Bewehrung ist dadurch gekennzeichnet, dass in einem Fußbereich des Bewehrungskorbes ein ausdehnbarer Blechhohlkörper über Halter an dem Bewegungskorb befestigt ist und dass mindestens eine Zuleitung und mindestens eine Ableitung zum Zu- bzw. Abführen eines Fluides in den Blechhohlkörper vorgesehen sind, wobei die Zuleitung und die Ableitung an dem Bewehrungskorb befestigt sind und zu einem oberen Bereich des Bewehrungskorbes verlaufen.The reinforcement according to the invention is characterized in that in a foot region of the reinforcing basket an expandable sheet metal hollow body is fastened via holders to the movement basket and that at least one supply line and at least one discharge line for supplying or discharging a fluid are provided in the hollow sheet metal body, wherein the supply line and the drain are attached to the reinforcement cage and extend to an upper region of the reinforcement cage.
Ein Grundgedanke der Erfindung kann darin gesehen werden, die Elemente des Bewehrungskorbes und die Vorspanneinrichtung als eine Einheit auszubilden. Die Elemente des Bewehrungskorbes bestehen im Wesentlichen aus Längseisen, einer umschnürenden Spiralwendel, Aussteifungsringen und einer Ringzugbewehrung. Durch die Ausbildung einer Einheit kann der Aufwand zum Einbringen der Vorspanneinrichtung ganz erheblich vereinfacht werden, da der Bewehrungskorb aus den Metallelementen stabil und einfach zu handhaben ist. Dabei sind auch die Leitungen für die Vorspanneinrichtung am Bewehrungskorb angeordnet. Mit dem Einbringen des Bewehrungskorbes wird gleichzeitig die Vorspanneinrichtung in definierter Position unterhalb des Bewehrungskorbes angeordnet, so dass eine Sohlvorspannung an der Sohle der Ausnehmung erreicht wird.A basic idea of the invention can be seen in forming the elements of the reinforcing cage and the pretensioning device as one unit. The elements of the reinforcement cage consist essentially of longitudinal bars, a spiraling spiral, stiffening rings and a ring tension reinforcement. The formation of a unit, the effort to introduce the biasing device can be considerably simplified, since the reinforcing cage is stable and easy to handle from the metal elements. In this case, the lines for the biasing device are arranged on the reinforcement cage. With the introduction of the reinforcing basket, the biasing device is arranged in a defined position below the reinforcing cage at the same time, so that a Sohlvorspannung is achieved at the sole of the recess.
Ein weiterer Aspekt der Erfindung besteht darin, dass nicht nur eine Zuleitung sondern auch eine Ableitung am Bewehrungskorb befestigt sind. Die Leitungen können als einfache Schläuche oder Rohre ausgebildet werden, welche durch den Bewehrungskorb gestützt und geschützt sind. Die Vorspanneinrichtung selbst ist als Blechhohlkörper ausgebildet, welcher einfach und kostengünstig zu fertigen ist. Another aspect of the invention is that not only a supply line but also a derivative are attached to the reinforcement cage. The conduits may be formed as simple hoses or pipes which are supported and protected by the reinforcement cage. The biasing device itself is designed as a sheet-metal hollow body, which is easy and inexpensive to manufacture.
Ein weiterer Aspekt besteht darin, dass der Blechhohlkörper bei dieser gemeinsamen Anordnung nicht direkt am Bewehrungskorb befestigt wird. Würde man die dünnwandigen, ausdehnbaren Blechhohlkörper direkt an die Längseisen oder den Aussteifungsring des Bewehrungskorbes anschweißen, könnte das dünne Blech beschädigt werden, durchbrechen oder geschwächt werden. Der Blechkörper würde dann schon bei niedrigen Drücken zerstört werden und platzen. Auf den Blechkörper wirken Drücke bis 100 bar während des Vorspannens der Sohle. Vielmehr ist der Blechhohlkörper über Halter an dem Bewehrungskorb befestigt.Another aspect is that the sheet-metal hollow body is not attached directly to the reinforcement cage in this common arrangement. If you were to weld the thin-walled, expandable sheet metal hollow body directly to the longitudinal bars or the stiffening ring of the reinforcing cage, the thin sheet could be damaged, break through or weakened. The sheet metal body would then be destroyed even at low pressures and burst. On the sheet metal body act pressures up to 100 bar during toughening of the sole. Rather, the hollow sheet body is attached via holders on the reinforcement cage.
Erfindungsgemäß verbinden die Halter den Blechhohlkörper nicht starr, insbesondere beweglich, mit den Metallstäben des Bewehrungskorbes. Durch die mittelbare Befestigung kann sich der Blechhohlkörper nach Erhärten des Betons beim Aufblasen weitgehend frei entfalten und wird nicht durch starre Befestigungspunkte zusätzlichen Zwängungen und Behinderungen ausgesetzt, welche dem Aufblähvorgang vorzeitig oder schon bei niedrigen Drücken und kleinen Füllvolumina ein Ende bereiten und zur Zerstörung des Blechhohlkörpers führen.According to the invention, the holders do not rigidly connect the sheet metal hollow body, in particular movably, to the metal bars of the reinforcing basket. Due to the indirect attachment of the sheet metal hollow body after hardening of the concrete during inflation can develop largely free and is not exposed by rigid attachment points additional constraints and disabilities, which prematurely or even at low pressures and small filling volumes prepare the inflation process and lead to the destruction of the sheet metal hollow body ,
Es ist vorgesehen, dass die Halter den Blechhohlkörper in einem Abstand zu den Metallstäben des Bewehrungskorbes halten und/oder eine geringere Steifigkeit als die Metallstäbe aufweisen. Durch dieses mittelbare Befestigen des Blechhohlkörpers an dem Bewehrungskorb in einem vorgegebenen Abstand mittels separater Halter wird sichergestellt, dass beim Aufweiten des Blechhohlkörpers der Bewehrungskorb diesen nicht beschädigt. Dabei ist der von den Haltern vorgegebene Abstand zwischen dem Blechhohlkörper und dem Bewehrungskorb größer als die maximale Ausdehnung des Blechhohlkörpers.It is envisaged that the holders hold the sheet-metal hollow body at a distance from the metal bars of the reinforcing cage and / or have a lower rigidity than the metal bars. By this indirect fastening of the sheet-metal hollow body to the reinforcing cage at a predetermined distance by means of separate holders ensures that when expanding the sheet-metal hollow body of the reinforcing cage does not damage this. In this case, the predetermined by the holders distance between the hollow sheet body and the reinforcement cage is greater than the maximum extent of the sheet metal hollow body.
Eine einfache und zugleich zuverlässige Befestigung wird erfindungsgemäß dadurch erreicht, dass die Halter Metallstreifen aufweisen, die einerseits an dem Blechhohlkörper und andererseits an den Metallstäben des Bewehrungskorbes angebracht, insbesondere angeschweißt sind. Die Metallstreifen werden dabei vorzugsweise auf der zum Bewährungskorb hingerichteten Oberseite des Blechhohlkörpers, insbesondere flächig angeschweißt. Die dünnen, biegsamen Metallstreifen können dabei in einfacher Weise gebogen und für ein Verschweißen mit dem Bewehrungskorb verformt werden. Dabei kann ein Befestigen nicht nur an den im Wesentlichen in Längsrichtung verlaufenden Metallstäben sondern auch an Quer- oder in Umfangsrichtung verlaufenden Metallstäben des Bewährungskorbes erfolgen, insbesondere an einem so genannten Fusskreuz oder einem Aussteifungsring, welche im unteren Bereich des Bewehrungskorbes angeordnet sind.A simple yet reliable attachment is inventively achieved in that the holders have metal strips which are attached on the one hand to the sheet metal hollow body and on the other hand to the metal bars of the reinforcing cage, in particular welded. In this case, the metal strips are preferably welded onto the upper side of the sheet-metal hollow body executed for the currency basket, in particular flatly. The thin, flexible metal strips can be bent in a simple manner and deformed for welding to the reinforcement cage. In this case, fastening can take place not only on the substantially longitudinally extending metal rods but also on transverse or circumferentially extending metal rods of the probation basket, in particular on a so-called base or a stiffening ring, which are arranged in the lower region of the reinforcement cage.
Nach der Erfindung ist es weiterhin bevorzugt, dass eine Mündungsöffnung der Zuleitung in den Blechhohlkörper beabstandet zu einer Mündungsöffnung der Ableitung in den Blechhohlkörper ist, wobei zumindest die Mündungsöffnung der Ableitung an einer Oberseite des Blechhohlkörpers angeordnet ist. Die Mündungsöffnung der Zuleitung kann vorzugsweise an der Unterseite oder in einem Seitenbereich des Blechhohlkörpers angeordnet sein. Vorzugsweise ist der Abstand zwischen den beiden Mündungsöffnungen nahezu so groß wie die maximale Erstreckung des Blechhohlkörpers. Dabei können die beiden Mündungsöffnungen diametral gegenüberliegend angeordnet sein. Bevorzugt ist zwischen den beiden Mündungsöffnungen ein Leitelement angeordnet, um eine Kurzschlussströmung zwischen beiden Öffnungen zu verhindern.According to the invention, it is further preferred that a mouth opening of the feed line in the sheet-metal hollow body is spaced from a mouth opening of the discharge in the sheet-metal hollow body, wherein at least the mouth opening of the discharge line is arranged on an upper side of the sheet metal hollow body. The mouth opening of the feed line can preferably be arranged on the underside or in a side region of the hollow sheet metal body. Preferably, the distance between the two mouth openings is almost as large as the maximum extent of the sheet-metal hollow body. In this case, the two mouth openings can be arranged diametrically opposite one another. Preferably, a guide element is arranged between the two mouth openings in order to prevent a short-circuit flow between the two openings.
Hierdurch wird bei der Verwendung von zwei unterschiedlichen Druckmedien mit unterschiedlichen Dichten und Viskositäten gewährleistet, dass etwa bei einem ersten Erweitern des Blechhohlkörpers durch Wasser dieses dann anschließend zuverlässig über die Ableitung durch ein zweites, selbsterhärtendes Druckmedium, etwa Zementsuspension, aus dem Hohlkörper verdrängt werden kann. Dabei ist es ein Vorteil der Erfindung, dass das erste Druckmedium beim Austausch nicht einfach in den umgebenden Bodenbereich verdrängt wird, sondern zuverlässig über die Ableitung aus dem Boden zur Erdoberfläche herausgeführt werden kann. Dies ist notwendig, um den Rücklauf zu kontrollieren und sich vom Erfolg des Austausches der Medien zu vergewissern.As a result, when using two different pressure media with different densities and viscosities it is ensured that, for example, during a first widening of the sheet metal hollow body by water, it can then be reliably displaced from the hollow body via the discharge by a second, self-hardening pressure medium, such as cement suspension. It is an advantage of the invention that the first pressure medium is not simply displaced in the exchange during the exchange in the surrounding soil area, but can be reliably led out via the discharge from the ground to the earth's surface. This is necessary to control the return and to ensure the success of the exchange of the media.
Grundsätzlich ist der Bewehrungskorb entsprechend der Form der Ausnehmung angepasst, wobei der Bewehrungskorb stets etwas kleiner als der Hohlraum ist, in welchen der Bewehrungskorb einzusetzen ist. Zum leichteren Einsetzen können an der Außenseite des Bewehrungskorbes Ableitbleche oder Abstandhalter vorgesehen sein, welche durch keilförmige Flächen ein gutes Gleiten bei einem vorgegebenen Abstand zur Hohlraumwand ermöglichen. Vorteilhafterweise ist nach Erfindung der Bewehrungskorb mit einer länglichen, säulenartigen Anordnung ausgebildet und kann beispielsweise einen runden oder rechteckigen Querschnitt aufweisen.Basically, the reinforcing cage is adapted according to the shape of the recess, wherein the reinforcing cage is always slightly smaller than the cavity in which the reinforcing cage is to be inserted. For ease of insertion Ableitbleche or spacers may be provided on the outside of the reinforcing cage, which allow a good sliding at a predetermined distance from the cavity wall by wedge-shaped surfaces. Advantageously, according to the invention, the reinforcing cage is formed with an elongate, columnar arrangement and may, for example, have a round or rectangular cross-section.
Weiter ist es nach der Erfindung vorgesehen, dass entlang zumindest eines Teilbereiches des Bewehrungskorbes mehrere Verpressleitungen angeordnet sind, welche jeweils mindestens ein Austrittsventil zum Austritt eines aushärtbaren Fluides zur Erhöhung einer Mantelreibung aufweisen. Die Verpressleitungen und die Ventile sind dabei zumindest in einem Teilbereich entlang der Länge des Bewehungskorbes angeordnet und ermöglichen ein gezieltes zusätzliches Einbringen von Zementsuspension in den Mantelbereich beziehungsweise Mantelfläche des Gründungselementes. Auf diese Weise kann die so genannte Mantelreibung zwischen der Außenseite des Gründungselementes und dem umgebenden Boden erhöht werden, wodurch die Tragfähigkeit des Gründungselementes insgesamt vergrößert werden kann. Dies ist insbesondere bei der erfindungsgemäßen Sohlvorspannung vorteilhaft, um ein vorzeitiges Heben des Gründungspfahles aus dem Boden aufgrund der aufgebrachten Vorspannung an der Sohle zu vermeiden.It is further provided according to the invention that along at least a portion of the reinforcing cage several Verpressleitungen are arranged, each of which at least one Exit valve to the outlet of a curable fluid to increase a skin friction. The injection lines and the valves are arranged at least in a partial area along the length of the Bewehungskorbes and allow a targeted additional introduction of cement suspension in the shell region or lateral surface of the foundation element. In this way, the so-called skin friction between the outside of the foundation element and the surrounding soil can be increased, whereby the carrying capacity of the foundation element can be increased as a whole. This is particularly advantageous in the case of the sole prestressing according to the invention, in order to avoid premature lifting of the foundation pile from the ground due to the applied prestressing on the sole.
Die Verpressleitungen können dabei erfindungsgemäß als Einzelverpressleitungen oder Einzelpresslanzen ausgebildet sein, welche bevorzugter Weise jeweils nur ein bis zwei Austrittsventile an deren unteren Ende aufweisen.The injection lines can be designed according to the invention as Einzelverpressleitungen or Einzelpresslanzen, which preferably each have only one to two outlet valves at the lower end.
Eine bevorzugte Weiterbildung der Erfindung besteht darin, dass jede Verpressleitung mehrere Austrittsventile aufweist. Entlang der schlauch- oder rohrförmigen Verpressleitungen sind also mehrere Austrittsventile mit einem vorgegebenen Abstand zueinander angeordnet. Dabei kann in eine derartige Verpressleitung eine verschiebbare Packereinrichtung eingebracht werden, welche durch Verschieben an das jeweilige Austrittsventil gezielt Zementleim zu diesem Austrittsventil leiten kann.A preferred embodiment of the invention is that each injection line has a plurality of outlet valves. Along the tubular or tubular Verpressleitungen therefore several outlet valves are arranged with a predetermined distance from each other. In this case, in such a Verpressleitung a displaceable packer device can be introduced, which can direct by moving cement to the respective outlet valve cement paste to this outlet valve.
Die Packereinrichtung umfasst dabei zwei zueinander beabstandete Dichtscheiben oder aufblasbare Elemente, welche einen Druckraum umschließen, der über eine Zufuhrleitung mit Zementsuspension versorgt wird.The packer device comprises two mutually spaced sealing washers or inflatable elements, which enclose a pressure chamber, which is supplied via a supply line with cement suspension.
Grundsätzlich kann das Austrittsventil in jeder geeigneten Weise ausgebildet sein. Besonders bevorzugt ist es nach der Erfindung, dass zum Bilden eines Austrittsventils in der Verpressleitung mindestens eine Austrittsöffnung vorgesehen ist, welche von einer elastischen Manschette überdeckt ist. Diese hülsenförmige Manschette kann ein Stück eines Gummischlauches sein, wobei sich die Manschette bei entsprechender Druckbeaufschlagung öffnet und den umgebenden Beton aufsprengt, so dass Zementsuspension aus der Verpressleitung über die Austrittsöffnung in den Außenbereich oder Mantel des Gründungselementes treten kann.In principle, the outlet valve can be designed in any suitable manner. It is particularly preferred according to the invention that at least one outlet opening is provided to form an outlet valve in the injection line, which is covered by an elastic sleeve. This sleeve-shaped sleeve can be a piece of a rubber hose, wherein the sleeve opens upon appropriate pressurization and the surrounding concrete breaks up, so that cement suspension from the injection line can pass through the outlet opening in the outer region or shell of the foundation element.
Eine besonders zuverlässige Betriebsweise wird erfindungsgemäß dadurch sichergestellt, dass im Bereich der Mündungsöffnung der Zuleitung und/oder Ableitung an der Außenseite des Blechhohlkörpers ein Abdeckelement angeordnet ist. Hierdurch wird der empfindliche Leitungsanschluss in den Blechhohlkörper beim späteren Verfüllen der Ausnehmung mit Beton zum Bilden des Gründungselementes geschützt.A particularly reliable mode of operation is ensured according to the invention in that a cover element is arranged in the region of the mouth opening of the supply line and / or discharge on the outside of the sheet metal hollow body. As a result, the sensitive line connection is protected in the sheet metal hollow body during later filling of the recess with concrete to form the foundation element.
Die Erfindung umfasst auch ein Gründungselement im Boden, welches mit einer Bewehrung gemäß der vorgenannten Beschreibung erstellt ist.The invention also includes a foundation element in the ground, which is created with a reinforcement according to the above description.
Der zweite Teil der Aufgabe wird nach der Erfindung durch ein Verfahren gelöst, bei dem eine Bewehrung gemäß der vorgehenden Beschreibung eingesetzt wird. Hierdurch kann ein hoch tragfähiges Gründungselement erstellt werden, bei welchem eine Sohlvorspannung in einem oder mehreren Schritten aufgebracht wird.The second part of the object is achieved according to the invention by a method in which a reinforcement according to the preceding description is used. In this way, a high-strength foundation element can be created, in which a sole bias is applied in one or more steps.
Erfindungsgemäß ist es bevorzugt, dass zunächst in der Sohle der Ausnehmung ein Sohlkörper erstellt wird, in welchen vor einem Härten des Sohlkörpers der Blechhohlkörper am Fußbereich der Bewehrung eingetaucht wird. Der Sohlkörper wird insbesondere aus einer aushärtenden Zementsuspension erstellt, wobei der Blechhohlkörper in einem noch weichen, nicht ausgehärteten Zustand in den Sohlkörper eingedrückt wird. Auf diese Weise wird eine definierte Grundfläche für den Blechhohlkörper erstellt, mit welchem eine besonders gute Verpressung der Sohle und damit eine solide Vorspannung erreicht wird.According to the invention, it is preferred that a sole body is first created in the sole of the recess, in which prior to hardening of the sole body the hollow sheet metal body is immersed in the foot region of the reinforcement. The sole body is created in particular from a hardening cement suspension, wherein the sheet-metal hollow body is pressed in a still soft, uncured state in the sole body. In this way, a defined base for the hollow sheet metal body is created, with which a particularly good compression of the sole and thus a solid bias is achieved.
Weiter ist es erfindungsgemäß, dass nach dem Verfüllen der Ausnehmung und Aushärten der Füllmasse der Blechhohlkörper durch Einleiten eines ersten Druckfluides in einem oder mehreren Schritten zur Vorspannung der Sohle das Gründungselement volumenerweitert wird. Durch diese Vorspannung der Sohle wird die Mantelreibung des Gründungselementes aktiviert und gleichzeitig eine Setzung der Sohle vorweggenommen. Auf diese Weise wird die Tragfähigkeit aufgrund einer erhöhten Spitzendruckkraft der Aufstandsfläche des Gründungselementes verbessert.It is also according to the invention that after filling the recess and curing the filling material of the hollow sheet metal body by introducing a first pressurized fluid in one or more steps for biasing the sole, the foundation element is volume expanded. By this bias of the sole, the skin friction of the foundation element is activated while anticipating a subsidence of the sole. In this way, the carrying capacity is improved due to an increased peak pressure force of the footprint of the foundation element.
Eine besonders zweckmäßige Verfahrensgestaltung besteht erfindungsgemäß darin, dass nach Erreichen der gewünschten Vorspannung das erste Druckfluid durch ein zweites Druckfluid ersetzt wird, welches aushärtet. So kann das Vorspannen zunächst durch ein nicht aushärtendes erstes Druckfluid erfolgen, insbesondere durch Wasser. Für eine verbesserte Aktivierung der Reibungskräfte kann es dabei zweckmäßig sein, dies schrittweise über einen längeren Zeitraum, etwa von einigen Tagen, durchzuführen. Die Reibungskräfte im Mantelbereich stellen das Widerlager für die aufgebrachte Spitzendruckkraft dar und es kann in manchen Böden auftreten, dass sich höhere Mantelreibungskräfte erst durch stufenweise und langsame Lasterhöhungen erreichen lassen. Wird der endgültige Zustand der Vorspannung erreicht, kann dann das nicht aushärtende Druckfluid durch ein aushärtendes zweites Druckfluid, insbesondere einer Zementsuspension, ausgetauscht werden. Dabei wird insbesondere eine Masse verwendet, welche beim Aushärten keine oder nur eine kleine Volu-menänderung erfährt. Dabei ist es insgesamt erfindungsgemäß, dass das zweite Druckfluid durch die Zuleitung in den Blechhohlkörper so lange eingeleitet wird, bis das zweite aushärtende Druckfluid auch an der Ableitung an der Oberseite des Gründungselementes austritt. Der Blechhohlkörper ist sodann zuverlässig mit dem aushärtenden Druckfluid verfüllt, so dass der Blechhohlkörper mit der erzeugten Vorspannung dauerhaft verformt bleibt.According to the invention, a particularly expedient method configuration consists in that, after the desired pretension has been reached, the first pressurized fluid is replaced by a second pressurized fluid which hardens. Thus, the biasing can be done first by a non-hardening first pressurized fluid, in particular by water. For an improved activation of the frictional forces, it may be expedient to carry this out gradually over a longer period of time, for example of a few days. The friction forces in the shell area represent the abutment for the applied peak pressure force and it can occur in some soils that higher shell friction forces can be achieved only by gradual and slow load increases. Will the final state of Preload reached, then the non-hardening pressure fluid can be replaced by a hardening second pressurized fluid, in particular a cement suspension. In this case, in particular, a mass is used which experiences no or only a small change in volume during curing. In this case, it is altogether according to the invention that the second pressure fluid is introduced through the supply line into the sheet-metal hollow body until the second hardening pressure fluid also exits at the discharge at the upper side of the foundation element. The sheet-metal hollow body is then reliably filled with the hardening pressure fluid, so that the sheet-metal hollow body remains permanently deformed with the generated bias.
Eine weitere vorteilhafte Verfahrensvariante besteht nach der Erfindung darin, dass über Verpressleitungen an der Bewehrung ein aushärtbares Fluid in den Mantelbereich des Gründungselementes zur Erhöhung der Mantelreibung eingeleitet wird. Über entsprechende Austrittsventile an den Verpressleitungen wird definiert insbesondere Zementsuspension in den Grenzbereich des Gründungselementes zum umgebenden Boden eingebracht. Hierdurch wird die Mantelreibung und damit die Tragfähigkeit des Gründungselementes erhöht. Dies wird vorzugsweise durchgeführt, bevor eine Sohlvorspannung durch Aufblasen des Blechhohlkörpers im Fußbereich des Gründungselementes erfolgt. In bestimmten Fällen kann aber das Einleiten von aushärtbarem Fluid in den Mantelbereich auch nach oder gleichzeitig mit der Sohlvorspannung erfolgen.A further advantageous variant of the method according to the invention is that a hardenable fluid is introduced into the shell region of the foundation element to increase the skin friction via injection lines to the reinforcement. By means of corresponding outlet valves on the injection lines, in particular cement suspension is introduced into the boundary region of the foundation element with respect to the surrounding soil. As a result, the skin friction and thus the carrying capacity of the foundation element is increased. This is preferably carried out before a sole prestressing takes place by inflating the sheet-metal hollow body in the foot region of the foundation element. In certain cases, however, the introduction of hardenable fluid into the jacket area can also take place after or at the same time as the sole prestressing.
Die Erfindung wird nachfolgend anhand von bevorzugten Ausführungsbeispielen weiter beschrieben, welche schematisch in den Zeichnungen dargestellt sind. In den Zeichnungen zeigen:The invention will be further described by means of preferred embodiments, which are shown schematically in the drawings. In the drawings show:
Zum Herstellen eines erfindungsgemäßen Gründungselementes
Die Bewehrung
Der Blechhohlkörper
Zum Bilden der erfindungsgemäßen Bewehrung
Die Zufuhrleitung
Zur weiteren Erhöhung der Tragfähigkeit durch Erhöhung der Mantelreibung sind an der erfindungsgemäßen Bewehrung
Zum Bilden eines Austrittsventiles
Gemäß einem erfindungsgemäßen Aspekt ist der Blechhohlkörper
Gemäß einem weiteren Aspekt der Erfindung sind die Mündungsöffnungen
Claims (15)
Priority Applications (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| DE200910039570 DE102009039570B4 (en) | 2009-09-01 | 2009-09-01 | Reinforcement for a foundation element and method for creating the foundation element and foundation element |
| RU2009135450/22U RU92873U1 (en) | 2009-09-01 | 2009-09-24 | BASE ELEMENT BASE AND BASE ELEMENT WITH SUCH FITTINGS |
| RU2009135452/22U RU91725U1 (en) | 2009-09-01 | 2009-09-24 | BASE ELEMENT BASE AND BASE ELEMENT WITH SUCH FITTINGS |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| DE200910039570 DE102009039570B4 (en) | 2009-09-01 | 2009-09-01 | Reinforcement for a foundation element and method for creating the foundation element and foundation element |
Publications (3)
| Publication Number | Publication Date |
|---|---|
| DE102009039570A1 DE102009039570A1 (en) | 2011-03-03 |
| DE102009039570A8 DE102009039570A8 (en) | 2011-06-01 |
| DE102009039570B4 true DE102009039570B4 (en) | 2013-05-16 |
Family
ID=42128046
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| DE200910039570 Expired - Fee Related DE102009039570B4 (en) | 2009-09-01 | 2009-09-01 | Reinforcement for a foundation element and method for creating the foundation element and foundation element |
Country Status (2)
| Country | Link |
|---|---|
| DE (1) | DE102009039570B4 (en) |
| RU (2) | RU92873U1 (en) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE102015213341A1 (en) * | 2015-07-16 | 2017-01-19 | DR. SPANG Ingenieurgesellschaft für Bauwesen, Geologie und Umwelttechnik mbH | Device for activating the skin friction of post-like support members |
Citations (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| GB589019A (en) * | 1938-08-01 | 1947-06-10 | Eugene Freyssinet | Improvements in and relating to jack apparatus |
| DE874125C (en) * | 1938-08-01 | 1953-04-20 | Eugene Freyssinet | Hydraulic pressure generator |
| DE2015687A1 (en) * | 1970-04-02 | 1971-10-21 | Stump Bohr GmbH, 8000 München | Load-stressed building structure in the ground |
| DE3407938A1 (en) * | 1983-03-31 | 1984-10-04 | Ulrich Dr.-Ing. Zürich Vollenweider | Method and device for testing or stabilising the foundation soil at bored piles |
| GB2159961A (en) * | 1984-06-08 | 1985-12-11 | Jorj O Osterberg | Device for testing the load-bearing capacity of concrete-filled earthen shafts |
| DE3424776A1 (en) * | 1984-07-05 | 1986-01-16 | Karl Bauer Spezialtiefbau GmbH & Co KG, 8898 Schrobenhausen | Method and device for determining the bearing capacity of piles |
| DE102006007144A1 (en) * | 2005-04-05 | 2006-10-12 | Bauer Spezialtiefbau Gmbh | Spud hoisting cushion for bored pile, comprises welded discs forming watertight bellows, with filling line for filling inside of cushion with fluid medium |
| EP1930506B1 (en) * | 2006-12-06 | 2009-08-12 | Bauer Spezialtiefbau GmbH | Load-testing element |
-
2009
- 2009-09-01 DE DE200910039570 patent/DE102009039570B4/en not_active Expired - Fee Related
- 2009-09-24 RU RU2009135450/22U patent/RU92873U1/en not_active IP Right Cessation
- 2009-09-24 RU RU2009135452/22U patent/RU91725U1/en not_active IP Right Cessation
Patent Citations (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| GB589019A (en) * | 1938-08-01 | 1947-06-10 | Eugene Freyssinet | Improvements in and relating to jack apparatus |
| DE874125C (en) * | 1938-08-01 | 1953-04-20 | Eugene Freyssinet | Hydraulic pressure generator |
| DE2015687A1 (en) * | 1970-04-02 | 1971-10-21 | Stump Bohr GmbH, 8000 München | Load-stressed building structure in the ground |
| DE3407938A1 (en) * | 1983-03-31 | 1984-10-04 | Ulrich Dr.-Ing. Zürich Vollenweider | Method and device for testing or stabilising the foundation soil at bored piles |
| GB2159961A (en) * | 1984-06-08 | 1985-12-11 | Jorj O Osterberg | Device for testing the load-bearing capacity of concrete-filled earthen shafts |
| DE3424776A1 (en) * | 1984-07-05 | 1986-01-16 | Karl Bauer Spezialtiefbau GmbH & Co KG, 8898 Schrobenhausen | Method and device for determining the bearing capacity of piles |
| DE102006007144A1 (en) * | 2005-04-05 | 2006-10-12 | Bauer Spezialtiefbau Gmbh | Spud hoisting cushion for bored pile, comprises welded discs forming watertight bellows, with filling line for filling inside of cushion with fluid medium |
| EP1930506B1 (en) * | 2006-12-06 | 2009-08-12 | Bauer Spezialtiefbau GmbH | Load-testing element |
Also Published As
| Publication number | Publication date |
|---|---|
| DE102009039570A1 (en) | 2011-03-03 |
| DE102009039570A8 (en) | 2011-06-01 |
| RU91725U1 (en) | 2010-02-27 |
| RU92873U1 (en) | 2010-04-10 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| DE102008014700A1 (en) | Corrosion-protected self-drilling anchor and method for its production | |
| DE2318842A1 (en) | DEVICE AND METHOD FOR THE FORMATION OF PILLARS IN THE SOIL | |
| DE2432708A1 (en) | TUBULAR PILE AND PROCEDURE FOR ITS GROUND IN A DRILLED HOLE | |
| DE4005032A1 (en) | Foundation pile supporting load in loose soil - has device to apply force between baseplate and pile | |
| DE3726191C2 (en) | ||
| DE102009039570B4 (en) | Reinforcement for a foundation element and method for creating the foundation element and foundation element | |
| EP0788572B1 (en) | Building underpinning process | |
| CH716469A1 (en) | Drilling head, reinforcement cage and drilling unit for making piles. | |
| EP2357317A2 (en) | Method for renovating a borehole in the soil | |
| DE69938438T2 (en) | A CONCRETE ELEMENTS AND PILLAR METHOD EMBEDDED IN CONCRETE | |
| DE10105472A1 (en) | Height-adjustable foundation for posts for traffic signs etc. has tubular holder with hollow crumple zone filled and enclosed by soft mortar encasing material | |
| EP0151389A1 (en) | Method and apparatus for constructing building elements in the soil like piles, injection anchorages, cut-off walls or similar | |
| DE102005029364B4 (en) | Precast pile and associated method for building foundation | |
| CH693934A5 (en) | Method for earth and rock anchor bore drilling uses drill crown to which drill pipe is attached to define annular space for evacuation of hardened material | |
| EP0350454A2 (en) | Process for making a tension member adapted to be anchored in the ground | |
| EP3848512B1 (en) | Method for creating a foundation element in the ground and foundation element | |
| DE3410830C2 (en) | ||
| DE102020131395B4 (en) | Method for securing a structure | |
| DE2120691A1 (en) | Method of manufacturing a composite pile | |
| DE3543059C2 (en) | ||
| DE102009033834B3 (en) | Device for lifting base plate corresponding to foundation element, comprises empty annular space, which is formed around lifting element, where annular space is limited by exterior seal made of plastic or rubber | |
| DE3400741C2 (en) | ||
| DE2105432C3 (en) | Process for the production of a longitudinally prestressed composite pile | |
| DE102007030697B4 (en) | Method and arrangement for sealing an opening in the form of a hole in a sheet pile wall | |
| DE202023103899U1 (en) | Anchoring system with interlocked grouting bodies available through partial spraying |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| OP8 | Request for examination as to paragraph 44 patent law | ||
| 8196 | Reprint of faulty title page (publication) german patentblatt: part 1a6 | ||
| OP8 | Request for examination as to paragraph 44 patent law | ||
| R018 | Grant decision by examination section/examining division | ||
| R020 | Patent grant now final |
Effective date: 20130817 |
|
| R082 | Change of representative |
Representative=s name: WUNDERLICH & HEIM PATENTANWAELTE PARTNERSCHAFT, DE |
|
| R119 | Application deemed withdrawn, or ip right lapsed, due to non-payment of renewal fee |