DE102009037310A1 - Rail storage with cover bodies for flexible bus route and method for their production - Google Patents

Rail storage with cover bodies for flexible bus route and method for their production Download PDF

Info

Publication number
DE102009037310A1
DE102009037310A1 DE102009037310A DE102009037310A DE102009037310A1 DE 102009037310 A1 DE102009037310 A1 DE 102009037310A1 DE 102009037310 A DE102009037310 A DE 102009037310A DE 102009037310 A DE102009037310 A DE 102009037310A DE 102009037310 A1 DE102009037310 A1 DE 102009037310A1
Authority
DE
Germany
Prior art keywords
cover body
rail
rail mounting
cover
mounting according
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
DE102009037310A
Other languages
German (de)
Inventor
Martin Hanisch
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
EDILON SEDRA GmbH
EDILON) (SEDRA GmbH
Original Assignee
EDILON SEDRA GmbH
EDILON) (SEDRA GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by EDILON SEDRA GmbH, EDILON) (SEDRA GmbH filed Critical EDILON SEDRA GmbH
Priority to DE102009037310A priority Critical patent/DE102009037310A1/en
Priority to EP10172208.0A priority patent/EP2295635B1/en
Publication of DE102009037310A1 publication Critical patent/DE102009037310A1/en
Ceased legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B1/00Ballastway; Other means for supporting the sleepers or the track; Drainage of the ballastway
    • E01B1/002Ballastless track, e.g. concrete slab trackway, or with asphalt layers
    • E01B1/004Ballastless track, e.g. concrete slab trackway, or with asphalt layers with prefabricated elements embedded in fresh concrete or asphalt
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B1/00Ballastway; Other means for supporting the sleepers or the track; Drainage of the ballastway
    • E01B1/002Ballastless track, e.g. concrete slab trackway, or with asphalt layers
    • E01B1/007Ballastless track, e.g. concrete slab trackway, or with asphalt layers with interlocking means to withstand horizontal forces
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2/00General structure of permanent way
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B21/00Track superstructure adapted for tramways in paved streets

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Railway Tracks (AREA)
  • Bearings For Parts Moving Linearly (AREA)

Abstract

Die Erfindung betrifft eine Schienenlagerung (12a), (12b) für einen Gleisabschnitt (10) mit zwei in Querrichtung (Q) beabstandet angeordneten Schienen (11). Die Schienen (11) sind auf einer von einem Grundkörper (14) gebildeten Grundschicht (13) in einem Aufnahmeraum (19) angeordnet. Der Aufnahmeraum (19) wird in Querrichtung (Q) von jeweils einer Seitenfläche (23) eines Deckkörpers (16) begrenzt. Deckkörper (16) und Grundkörper (14) sind vorzugsweise aus Beton hergestellt. Die Deckkörper (16) sind Bestandteil einer Deckschicht (15). Zwischen den Deckkörpern (16) und der Oberseite (20) des Grundkörpers (14) ist eine Verbindungsschicht (17) vorhanden, mittels der eine stoffschlüssige Verbindung zwischen den Deckkörpern (16) und dem Grundkörper (14) hergestellt ist. Zusätzlich greifen die Deckkörper (16) und der Grundkörper (14) im Bereich der Verbindungsschicht (17) formschlüssig ineinander, um auf die Deckkörper (16) einwirkende Querkräfte über den Grundkörper (14) abstützen zu können. Eine solche Schienenlagerung (12a), (12b) kann besonders einfach und kostengünstig repariert oder saniert werden.The invention relates to a rail mounting (12a), (12b) for a track section (10) with two rails (11) spaced apart in the transverse direction (Q). The rails (11) are arranged on a base layer (13) formed by a base body (14) in a receiving space (19). The receiving space (19) is delimited in the transverse direction (Q) by a respective side surface (23) of a cover body (16). Cover body (16) and base body (14) are preferably made of concrete. The cover body (16) is part of a cover layer (15). Between the cover bodies (16) and the top side (20) of the base body (14) there is a connecting layer (17), by means of which a material connection between the cover bodies (16) and the base body (14) is produced. In addition, the cover body (16) and the base body (14) interlock in the area of the connecting layer (17) in order to be able to support transverse forces acting on the cover body (16) via the base body (14). Such a rail mounting (12a), (12b) can be repaired or refurbished in a particularly simple and cost-effective manner.

Description

Die Erfindung betrifft eine Schienenlagerung für einen Gleisabschnitt mit zwei in Querrichtung mit Abstand angeordneten Schienen und außerdem ein Verfahren zur Herstellung einer solchen Schienenlagerung. Bei dem Gleisabschnitt handelt es sich um eine sogenannte feste Fahrbahn, das heißt um einen schotterlosen Gleisabschnitt. Dieser Gleisabschnitt dient insbesondere gleichzeitig als Fahrbahn, insbesondere als Bustrasse, auf dem die Busse in Schienenrichtung fahren.The The invention relates to a rail support for a track section with two transversely spaced rails and furthermore a method for producing such a rail mounting. at the track section is a so-called fixed carriageway, that means around a ballastless track section. This Track section is used in particular as a lane, in particular as a bus route on which the buses run in the direction of the rail.

Eine Schienenlagerung und ein Verfahren zu deren Herstellung ist aus der DE 201 18 343 U1 bekannt. Diese Schienenlagerung weist zwei im Querschnitt gesehen U-förmige Trogelemente auf, deren Innenraum den Aufnahmeraum für jeweils eine Schiene darstellt. Die Trogelemente sind an einer Trägeranordnung befestigt. Die Trägeranordnung wird über Ständerelemente auf einen vorbereiteten Untergrund aufgestellt und mit Ortbeton eingegossen. Auf das Betongussteil wird dann ein Straßenbelag aufgebracht. Die Oberkante der Trogelemente befindet sich im Querschnitt gesehen auf Höhe der Straßenbelagoberfläche.A rail mounting and a method for their production is known from DE 201 18 343 U1 known. This rail storage has two seen in cross-section U-shaped trough elements, the interior of which represents the receiving space for each rail. The trough elements are fastened to a carrier arrangement. The carrier assembly is placed on stand elements on a prepared surface and cast with in-situ concrete. On the concrete casting then a road surface is applied. The upper edge of the trough elements is seen in cross-section at the height of the road surface.

Eine solche Schienenlagerung hat sich bei der Neuherstellung von Gleisabschnitten bewährt. Sie soll durch die vorliegende Erfindung dahingehend verbessert werden, dass Reparatur- oder Sanierungsarbeiten insbesondere im Bereich des Straßenbelags einfach und kostengünstig durchgeführt werden können.A such rail storage has been in the new production of track sections proven. It is intended by the present invention to the effect be improved, that repair or renovation work in particular in the field of road surface easy and inexpensive can be performed.

Diese Aufgabe wird durch eine Schienenlagerung mit den Merkmalen des Patentanspruches 1 gelöst. Die Schienenlagerung weist zwei voneinander getrennte Schichten auf: Eine Grundschicht mit einem Grundkörper und eine darüber angeordnete Deckschicht mit mehreren Deckkörpern. Zwischen den Deckkörpern und dem Grundkörper ist eine Verbindungsschicht vorgesehen. Die Deckkörper können somit unabhängig voneinander einzeln auf dem Grundkörper befestigt werden. Zwischen zwei unmittelbar benachbarten Deckkörpern ist in Querrichtung ein Spalt vorgesehen. Dieser Spalt stellt einen Aufnahmeraum für eine der Schienen dar. Die Deckkörper begrenzen den Aufnahmeraum ausschließlich seitlich in Querrichtung, während der nach oben offene Aufnahmeraum nach unten durch den betreffenden Abschnitt der Oberseite des Grundkörpers begrenzt ist. Die Oberseite der Deckkörper bildet vorzugsweise die Straßenbelagsoberseite. Da die Deckkörper und der Grundkörper lediglich durch eine Verbindungsschicht, die insbesondere eine stoffschlüssige Verbindung herstellt, verbunden sind, können beschädigte Deckkörper sehr einfach ausgetauscht werden, wenn dies beispielsweise auf Grund von einer Beschädigung notwendig sein sollte. Die Deckkörper können im Bereich der Verbindungsschicht ohne Beschädigung des Grundkörpers von diesem getrennt werden. Dabei wird zwar der entsprechende Deckkörper zerstört, jedoch kann sehr einfach ein neuer Deckkörper eingesetzt und wieder stoffschlüssig mit dem Grundkörper verbunden werden. Als Verbindungsmasse zwischen Deckkörpern und Grundkörper dient beispielsweise eine Zementemulsion.These The object is achieved by a rail mounting with the features of claim 1 solved. The rail support has two separate ones Layers on: A base coat with a base body and an overlying cover layer with a plurality of cover bodies. Between the cover bodies and the main body is a connection layer is provided. The cover bodies can thus independently of each other individually on the body be attached. Between two immediately adjacent cover bodies a gap is provided in the transverse direction. This gap represents one Reception room for one of the rails. The cover body limit the receiving space exclusively laterally in the transverse direction, while the upwardly open recording room down through the relevant section of the top of the body is limited. The top of the cover body preferably forms the road surface top. Because the cover body and the basic body merely by a connecting layer, which in particular produces a material connection, can be connected, damaged cover body be exchanged very easily, if for example because of from damage should be necessary. The cover body can be in the area of the tie layer without damage of the main body are separated from this. It will Although the corresponding cover body destroyed, however can be used very easily a new cover body and again cohesively connected to the body. As a compound between cover bodies and body For example, a cement emulsion is used.

Zwischen der Unterseite eines Deckkörpers und der Oberseite des Grundkörpers kann mindestens ein Abstützteil vorgesehen sein, das fest mit dem Deckkörper oder dem Grundkörper verbunden ist und in eine zugeordnete Abstützöffnung am Deckkörper oder am Grundkörper hineinragt. Ein solches Abstützteil kann auf den Deckkörper einwirkende Längs- und Querkräfte aufnehmen und am Grundkörper abstützen. Auf diese Weise kann die Bewegung eines Deckkörpers in Querrichtung durch auftretende Querkräfte verhindert oder auf ein zulässiges Maß begrenzt werden. Solche Längs- oder Querkräfte entstehen beispielsweise durch quer zu den Schienen fahrenden Straßenverkehr, in Kurven durch ein über den Gleisabschnitt fahrendes Schienenfahrzeug oder durch Beschleunigungs- bzw. Verzögerungskräfte bei in Längsrichtung entlang der Schienen fahrenden Fahrzeugen.Between the underside of a cover body and the top of the Basic body can be provided at least one support part be that firmly with the cover body or the base body is connected and in an associated support opening protruding on the cover body or on the body. Such a support member may be on the cover body take up acting longitudinal and lateral forces and supported on the body. This way you can the movement of a cover body in the transverse direction by occurring Transverse forces prevented or at a permissible level Measure be limited. Such longitudinal or transverse forces arise, for example, from road traffic moving transversely to the rails, in curves through a rail vehicle moving over the track section or by acceleration or deceleration forces in longitudinally along the rails moving vehicles.

Dabei ist es möglich, zwischen einem Deckkörper und dem Grundkörper mehrere Abstützteile vorzusehen. Diese können in Längsrichtung der Schienen mit Abstand zueinander angeordnet werden. Vorzugsweise sind die Abstützteile in Querrichtung gesehen mittig unterhalb des Deckkörpers angeordnet. Es können auch zwei oder mehr Abstützteile in Querrichtung nebeneinander vorgesehen sein. Der Abstand vom Rand des Deckkörpers der beiden äußeren Abstützteile und der Abstand zwischen zwei Abstützteilen ist dabei vorzugsweise gleich groß.there is it possible between a cover body and provide the base body several support parts. These can be used in the longitudinal direction of the rails Be spaced apart. Preferably, the support parts seen in the transverse direction, centrally below the cover body arranged. There may also be two or more support parts be provided side by side in the transverse direction. The distance from the edge the cover body of the two outer support parts and the distance between two supporting parts is preferably the same large.

Die Abstützteile sind vorzugsweise fest mit dem Deckkörper verbunden und insbesondere an diesem angeformt. Die Abstützöffnung ist vorzugsweise am Grundkörper vorgesehen. Abstützteil und Abstützöffnung weisen korrespondierende Querschnitte auf. Im Querschnitt können das Abstützteil und die Abstützöffnung kreisrund konturiert sein. Die Schienenlagerung ist vorzugsweise spurstangenlos ausgeführt. Oberhalb des Grundkörpers sind zwischen den Aufnahmeräumen bzw. zwischen den Schienen lediglich Deckkörper vorhanden. Zusätzliche mechanische Verbindungsteile zwischen den Schienen, insbesondere Spurstangen aus Stahl sind nicht vorhanden. Dies vereinfacht den Aufbau und erlaubt über dies den unabhängigen Austausch von Schienenstücken ohne die zwischen den Schienen vorhandenen Deckkörper entfernen zu müssen.The Supporting parts are preferably fixed to the cover body connected and in particular integrally formed on this. The support hole is preferably provided on the base body. supporting part and support opening have corresponding cross sections on. In cross section, the support member and the support opening be contoured circular. The rail mounting is preferably designed without a rod. Above the main body are between the receiving spaces or between the rails only cover body available. Additional mechanical connecting parts between the rails, especially tie rods made of steel are not available. This is simplified the construction and allows about this the independent Replacement of rail sections without the existing between the rails To remove the cover body.

Wenn die Oberseite der Deckkörper die Straßenbelagoberfläche bildet, kann diese eine Struktur und/oder eine Einfärbung aufweisen. Beispielsweise können in die Oberseite der Deckkörper Fugen eingearbeitet sein, sodass optisch der Eindruck von aneinander liegenden Bodenplatten entsteht. Die Oberfläche kann aufgeraut bzw. uneben sein, um eine ausreichende Rutschfestigkeit zu gewährleisten. Beispielsweise können Rillen, Noppen oder andere beliebige Oberflächenstrukturen ausgebildet sein. Eine Einfärbung der Deckkörperoberfläche dient der optischen Anpassung an die umgebenden Straßen oder Wege.If the top of the cover body is the road forms enbelagoberfläche, this may have a structure and / or a coloring. For example, joints may be incorporated in the top of the cover body, so that visually creates the impression of adjacent floor panels. The surface may be roughened or uneven to ensure sufficient slip resistance. For example, grooves, nubs or other arbitrary surface structures may be formed. A coloring of the cover body surface serves the optical adaptation to the surrounding streets or paths.

In Längsrichtung unmittelbar aneinander anschließende Deckkörper können zur Erhöhung der Stabilität über eine Dübelverbindung miteinander verbunden sein. Zusätzlich zu einer solchen Dübelverbindung kann eine stoffschlüssige Verbindung durch eine Verbindungsmasse zwischen den der Körpern vorgesehen sein.In Longitudinally immediately adjacent Cover bodies can be used to increase stability a dowel joint be connected to each other. additionally To such a dowel connection can be a cohesive Connection by a bonding compound between the bodies be provided.

Zur Vermeidung von Körperschallausbreitung über die Schienen und den darunter angeordneten Grundkörper kann dieser von dem ihn umgebenden Unterbau durch eine Dämpfungsschicht getrennt sein. Beispielsweise können unterhalb und seitlich vom Grundkörper Dämpfungsmatten angeordnet sein.to Avoidance of structure-borne noise propagation over the Rails and the underlying body can be this by the surrounding substructure by a damping layer be separated. For example, below and to the side of Main body damping mats be arranged.

Im Folgenden werden bevorzugte Ausführungsbeispiele der Schienenlagerung sowie des Verfahrens zur Herstellung der Schienenlagerung anhand der beigefügten Zeichnung näher erläutert. Aus der Beschreibung und den Patentansprüchen ergeben sich weitere Merkmale der Erfindung. Die Beschreibung beschränkt sich auf wesentliche Merkmale der Erfindung sowie sonstiger Gegebenheiten. Die Zeichnung ist ergänzend heranzuziehen. Es zeigen:in the Below are preferred embodiments of the rail mounting and the method for producing the rail bearing based the accompanying drawings explained. From the description and the claims arise further features of the invention. The description is limited to essential features of the invention and other conditions. The drawing is to be used as a supplement. Show it:

1 eine schematische weise Teildarstellung einer ersten Ausführungsform einer Schienlagerung im Querschnitt, 1 a schematic partial representation of a first embodiment of a rail bearing in cross section,

2 zwei in Längsrichtung unmittelbar benachbarte Deckkörper im Bereich ihrer Verbindungsstelle in schematischer Seitenansicht, 2 two in the longitudinal direction immediately adjacent cover body in the region of their junction in a schematic side view,

3 eine schematische Querschnittsdarstellung eines weiteren Ausführungsbeispiels der Schienenlagerung, 3 a schematic cross-sectional view of another embodiment of the rail storage,

4 eine Detaildarstellung des Aufnahmeraums mit Schiene nach dem ersten oder zweiten Ausführungsbeispiel der 1 oder 3, 4 a detailed representation of the receiving space with rail according to the first or second embodiment of the 1 or 3 .

5 zwei in Längsrichtung unmittelbar aneinander angrenzende Deckkörper in schematischer Draufsicht, 5 two cover bodies in the longitudinal direction directly adjoining each other in a schematic plan view,

6 eine schematische Querschnittsdarstellung eines abgewandelten Ausführungsbeispiels der Schienenlagerung nach 3 und 6 a schematic cross-sectional view of a modified embodiment of the rail mounting according to 3 and

7a, 7b, 7c verschiedene Querschnittsformen eines Vorsprungs an einem Haltestellenstein aus 6 in schematischer Ansicht. 7a . 7b . 7c various cross-sectional shapes of a projection on a stop stone 6 in a schematic view.

1 zeigt den Querschnitt durch einen Gleisabschnitt 10 mit zwei in Längsrichtung L parallel verlaufenden Schienen 11, die in Querrichtung Q mit Abstand zueinander gelagert sind. Die Lagerung der beiden Schienen 11 erfolgt durch eine Schienenlagerung 12, wobei 1 eine erste Schienenlagerung 12a zeigt. 1 shows the cross section through a track section 10 with two longitudinally parallel L rails 11 , which are mounted in the transverse direction Q at a distance from each other. The storage of the two rails 11 done by a rail storage 12 , in which 1 a first rail storage 12a shows.

Die erste Schienenlagerung 12a weist eine Grundschicht 13 mit einem Grundkörper 14 und eine oberhalb der Grundschicht 13 angeordneten Deckschicht 15 mit mehreren Deckkörpern 16 auf. Zwischen der Grundschicht 13 und Deckschicht 15 ist eine Verbindungsschicht 17 vorgesehen.The first rail storage 12a has a base layer 13 with a basic body 14 and one above the base layer 13 arranged cover layer 15 with several cover bodies 16 on. Between the base layer 13 and topcoat 15 is a tie layer 17 intended.

Die Deckkörper 16 der Deckschicht 15 sind durch eine stoffschlüssige Verbindung auf der Oberseite 20 des Grundkörpers 14 befestigt. Die stoffschlüssige Verbindung kann mittels einer Verbindungsmasse, beispielsweise Pulyurethan, vorzugsweise 2-Kompunenten-Polyurethan, hergestellt werden. Dadurch entsteht eine Mörtel- oder Klebefuge zwischen den Deckkörpern 16 und dem Grundkörper 14, die die Verbindungsschicht 17 bildet.The cover body 16 the topcoat 15 are by a material connection on the top 20 of the basic body 14 attached. The cohesive connection can be produced by means of a bonding compound, for example, polyurethane, preferably 2-component polyurethane. This creates a mortar or adhesive joint between the cover bodies 16 and the body 14 that the connecting layer 17 forms.

Bei der ersten Schienenlagerung 12a sind in Querrichtung Q drei Decksteine 16 nebeneinander mit Abstand angeordnet, sodass einander zugewandte Seitenflächen 23 von jeweils zwei benachbarte Decksteine 16 seitlich in Querrichtung Q einen Aufnahmeraum 19 für jeweils eine Schiene 11 begrenzen. Die Aufnahmeräume 19 sind für das Einsetzen der Schienen 11 nach oben hin offen. Unten begrenzt die Oberseite 20 des Grundköpers 14 die Aufnahmeräume 19. Der unterhalb des jeweiligen Aufnahmeraums 19 befindliche Abschnitt der Oberseite 20 des Grundkörpers 14 bildet den Boden 18 des Aufnahmeraums 19.At the first rail storage 12a are in the transverse direction Q three capstones 16 arranged side by side with spacing, so that side faces facing each other 23 each of two adjacent capstones 16 laterally in the transverse direction Q a receiving space 19 for one rail each 11 limit. The recording rooms 19 are for inserting the rails 11 open at the top. Bottom limits the top 20 of the main body 14 the recording rooms 19 , The below the respective recording room 19 located section of the top 20 of the basic body 14 forms the soil 18 of the recording room 19 ,

Der Grundkörper 14 weist im Wesentlichen eine konstante Höhe auf. Die den Deckkörpern 16 und den Aufnahmeräumen 19 zugewandte Oberseite 20 ist im Querschnitt des Gleisabschnitts 10 gesehen eben ausgebildet. Zusätzlich zur stoffschlüssigen Verbindung besteht eine Quer- und/oder Längskräfte abstützende Kopplung zwischen den Deckkörpern 16 und dem Grundkörper 14. Hierfür sind zwischen dem Grundkörper 14 und jedem Deckkörper 16 wenigstens ein und beispielsgemäß mehrere Abstützteile 21 vorhanden. Bei der ersten Schienenlagerung 12a sind die Abstützteile 21 fest am jeweiligen Deckkörper 16 vorgesehen und vorzugsweise angeformt. Die Deckkörper 16 sind als gegossene Betonteile ausgeführt, wobei die Abstützteile 21 beim Herstellen der Deckkörper 16 ausgebildet werden. Sie bestehen daher ebenfalls aus Beton. Die Abstützteile 21 sind im Querschnitt kreisrund ausgebildet. Sie greifen in Abstützöffnungen 22 ein, die von der Oberseite 20 her in den Grundkörper 14 eingebracht sind. Die Abstützöffnungen 22 sind an die Querschnittskontur der Abstützteile 21 angepasst. Sie können durch Sackbohrlöcher gebildet sein, wenn ein bereits bestehender Grundkörper 14 verwendet wird. Alternativ ist es bei einem vor Ort mit Ortbeton gegossenen Grundkörper 14 die Abstützöffnungen 22 durch entsprechende Verschalungen auszusparen, sodass die Abstützöffnungen 22 bereits beim Gießen des Grundkörpers 14 entstehen.The main body 14 essentially has a constant height. The cover bodies 16 and the recording rooms 19 facing top 20 is in the cross section of the track section 10 seen just trained. In addition to the cohesive connection there is a transverse and / or longitudinal forces supporting coupling between the cover bodies 16 and the body 14 , For this are between the main body 14 and every cover body 16 at least one and example according to several support parts 21 available. At the first rail storage 12a are the support parts 21 firmly on the respective cover body 16 provided and preferably formed. The cover body 16 are as cast concrete parts executed, wherein the support parts 21 when producing the cover body 16 be formed. They therefore also consist of concrete. The support parts 21 are circular in cross section. They reach into support openings 22 one from the top 20 forth in the body 14 are introduced. The support openings 22 are to the cross-sectional contour of the support parts 21 customized. They can be formed by blind holes, if an existing body 14 is used. Alternatively, it is in a cast with on-site concrete base body 14 the support openings 22 by appropriate formwork auszusparen, so that the support openings 22 already during the casting of the body 14 arise.

Zwischen den Abstützöffnungen 22 und den Abstützteilen 21 der Deckkörper 16 kann ebenfalls ein Verbindungsmittel zur stoffschlüssigen Verbindung vorhanden sind, wie dies in 1 schematische veranschaulicht ist. Zwischen der Innenfläche der Abstützöffnung 22 und dem zugeordneten Abstützteil 21 kann eine Verbindungsfuge vorgesehen sein. Beispielsgemäß ist eine solche Verbindungsfuge mit Verbindungsmittel um die Matelfläche des Abstützteils 21 und/oder zwischen dem Grund der Abstützöffnung 22 und der Stirnfläche am unteren freien Ende des Abstützteils 21 vorhanden.Between the support openings 22 and the support parts 21 the cover body 16 can also be a connecting means for material connection are present, as in 1 is illustrated schematically. Between the inner surface of the support hole 22 and the associated support member 21 may be provided a connecting joint. According to the example, such a connecting joint with connecting means is around the matel surface of the supporting part 21 and / or between the bottom of the support opening 22 and the end face at the lower free end of the support part 21 available.

Hierfür kann es erforderlich sein die Höhe des Abstützteils 21 an die Tiefe der Abstützöffnung 22 anzupassen.This may require the height of the support part 21 to the depth of the support hole 22 adapt.

An jedem Deckkörper 16 sind in Längsrichtung L mehrere Abstützteile 21 angeordnet, die insbesondere regelmäßig beabstandet sind. Beispielsgemäß sind die Abstützteile 21 in Längsrichtung L auf einer Linie angeordnet. Sie befinden sich in Querrichtung Q gesehen in etwa mittig am Deckkörper 16.At each cover body 16 are in the longitudinal direction L several support parts 21 arranged, which are in particular regularly spaced. According to the example, the support parts 21 arranged in the longitudinal direction L on a line. They are located in the transverse direction Q seen approximately in the middle of the cover body 16 ,

Die Abstützteile 21 bestehen aus demselben Material wie der Deckkörper 16 und der Grundkörper 14, beispielsgemäß aus Beton.The support parts 21 consist of the same material as the cover body 16 and the main body 14 made of concrete, for example.

In Abwandlung zum bevorzugten Ausführungsbeispiel könnten die Abstützteile 21 auch eine beliebige andere Querschnittskontur aufweisen. Ein kreisrunder Querschnitt vereinfacht jedoch die Herstellung, weil insbesondere die Abstützöffnungen 22 durch einfache Bohrlöcher hergestellt werden können. Die Anzahl und Größe der Abstützelemente 21 richtet sich danach, welche Querkräfte in Querrichtung Q auf die Deckkörper 16 ausgeübt werden können, die dann durch die formschlüssige Verbindung mit dem Grundkörper 14 abgestützt werden. Dadurch wird die stoffschlüssige Verbindung zwischen Deckkörper 16 und Grundkörper 14 weniger stark belastet und übermäßige Querbewegungen der Deckkörper 16 vermieden. Die Lebensdauer der Schienenlagerung 12 ist somit erhöht.In a modification to the preferred embodiment, the support parts could 21 also have any other cross-sectional contour. However, a circular cross section simplifies the production, because in particular the support openings 22 can be made by simple drill holes. The number and size of the support elements 21 depends on which lateral forces in the transverse direction Q on the cover body 16 can be exercised, which then by the positive connection with the body 14 be supported. As a result, the cohesive connection between the cover body 16 and basic body 14 less heavily loaded and excessive transverse movements of the cover body 16 avoided. The life of the rail storage 12 is thus increased.

Bei der ersten Schienenlagerung 12a sind die Abstützteile 21 an den Deckkörpern 16 angeformt. Die Verbindung der Abstützteile 21 mit den Deckkörpern 16 könnte auch durch eine stoffschlüssige Verbindungsmasse, beispielsweise durch ein Klebe- und/oder Mörtelverbindung hergestellt werden. In einer weiteren Abwandlung könnten die Abstützteile auch von der Oberseite 20 des Grundkörpers 14 hervorspringen und in Abstützöffnungen an den Deckkörpern 16 eingreifen. Ferner könnten auch in Querrichtung Q nebeneinander oder in Querrichtung Q sowie in Längsrichtung L versetzt zueinander mehrere Abstützelemente zwischen einem Deckkörper 16 und dem Grundkörper 14 vorhanden sein. Auch beliebige Kombinationen der hier beschriebenen Ausführungsmöglichkeiten können verwendet werden.At the first rail storage 12a are the support parts 21 on the cover bodies 16 formed. The connection of the support parts 21 with the cover bodies 16 could also be made by a cohesive bonding compound, for example by an adhesive and / or mortar connection. In a further modification, the support parts could also from the top 20 of the basic body 14 jump out and in support openings on the cover bodies 16 intervention. Further, in the transverse direction Q adjacent to each other or in the transverse direction Q and in the longitudinal direction L offset to each other a plurality of supporting elements between a cover body 16 and the body 14 to be available. Any combinations of the embodiments described here can be used.

Zwei in Längsrichtung L unmittelbar aufeinander folgende Deckkörper 16 können an ihren Stirnseiten 25 über eine Dübelverbindung 26 mit einem oder mehreren Betondübeln 27 verbunden sein. Zusätzlich ist zwischen den Stirnseiten 25 der Deckkörper 16 eine Verbindungsmasse unter Bildung einer Fuge vorhanden, sodass auch eine stoffschlüssige Verbindung besteht. Auch hier kann beispielsweise Zementemulsion zur Herstellung der stoffschlüssigen Verbindung eingefüllt und ausgehärtet werden. Abhängig von der in Querrichtung Q gemessenen Breite der zu verbindenden Deckkörper 16 können zwei bis vier Betondübel 27 für jede Dübelverbindung 26 verwendet werden.Two in the longitudinal direction L immediately following cover body 16 can on their faces 25 via a dowel connection 26 with one or more concrete dowels 27 be connected. Additionally is between the front sides 25 the cover body 16 a bonding compound to form a joint, so that there is a cohesive connection. Here, too, for example cement emulsion can be filled and cured for the production of the cohesive connection. Depending on the width measured in the transverse direction Q of the cover body to be joined 16 can have two to four concrete dowels 27 for every dowel connection 26 be used.

Die Oberseite 30 der Deckkörper 16 bildet einen Abschnitt der Straßenoberfläche. Im Querschnitt gesehen verläuft die Oberseite 30 der Deckkörper 16 nicht genau horizontal, sondern ist gegenüber der horizontalen geneigt, um den Wasserablauf in die gewünschte Richtung zu bewirken. Dies ist in der Zeichnung durch die Pfeile P angedeutet, die die Abflussrichtung des Wassers und damit die Neigung der Oberseite 30 der Deckkörper 16 angeben. Die Entwässerung erfolgt bei der ersten Schienenlagerung 12a jeweils zu den Schienen 11 hin. Die Oberseite 30 der beiden äußeren Deckkörper 16 ist daher jeweils in Querrichtung Q zur an grenzenden Schiene 11 geneigt. Die Oberseite 30 des zwischen den Schienen 11 vorgesehenen mittleren Deckkörpers 16ist ausgehend von der Längsmittelebene E des Deckkörpers 16 in Querrichtung Q jeweils zur betreffenden Schiene 11 nach links und rechts abfallend ausgeführt.The top 30 the cover body 16 forms a section of the road surface. Seen in cross section, the top runs 30 the cover body 16 not exactly horizontal, but is inclined relative to the horizontal, to effect the flow of water in the desired direction. This is indicated in the drawing by the arrows P, which are the discharge direction of the water and thus the inclination of the top 30 the cover body 16 specify. The drainage takes place at the first rail storage 12a each to the rails 11 out. The top 30 the two outer cover body 16 is therefore in the transverse direction Q to the adjacent rail 11 inclined. The top 30 between the rails 11 provided middle cover body 16 is starting from the longitudinal center plane E of the cover body 16 in the transverse direction Q in each case to the relevant rail 11 running down to the left and right.

Die Oberseite 30 der Deckkörper 16 kann ferner eine Struktur aufweisen. Auf diese Weise kann der Deckkörper an das Straßenbild angepasst werden und zudem eine rutschfeste Oberfläche bereitstellen. In 5 ist schematisch eine Ausgestaltungsmöglichkeit der Oberseite 30 der Deckkörper 16 dargestellt. Dort wurde eine Struktur in die Oberseite 30 eingebracht, die optisch mit Fugen verlegten Bodenplatten gleicht. Die in der Oberseite 30 eingebrachten Bodenplattenbereiche 32 sind dabei durch fugenähnliche Vertiefungen 31 voneinander getrennt. Die Bodenplattenbereiche 32 sind nicht glatt ausgeführt, sondern mit einer Struktur versehen, um eine ausreichende Rutschfestigkeit zu gewährleisten. Beispielsweise können die Bodenplattenbereiche 32 noppen- oder rillenähnliche Unebenheiten aufweisen oder auf beliebige andere Weise aufgeraut sein.The top 30 the cover body 16 may further have a structure. In this way, the cover body can be adapted to the street scene and also provide a non-slip surface. In 5 is schematically a possible embodiment of the top 30 the cover body 16 shown. There was a structure in the upper page 30 introduced, which resembles optically laid with joints bottom plates. The one in the top 30 introduced bottom plate areas 32 are here by joint-like depressions 31 separated from each other. The bottom plate areas 32 are not smooth, but provided with a structure to ensure sufficient slip resistance. For example, the bottom plate areas 32 have pimple or groove-like bumps or roughened in any other way.

Es ist auch möglich die Oberseite 30 der Deckkörper 16 einzufärben, um die Farbgebung an den übrigen Straßenbelag bzw. die Umgebung optisch anzupassen.It is also possible the top 30 the cover body 16 to color in order to visually adapt the color scheme to the rest of the road surface or the environment.

Unterhalb und seitlich des Grundkörpers 14 kann eine Dämpfungsschicht 35 vorhanden sein, die von einer oder mehreren Dämpfungsmatten 36 gebildet ist. Die Dämpfungsschicht 35 dient dazu, Schwingungen des Grundkörpers 14 nicht in einen den Grundkörper 14 umgebenden Untergrund zu übertragen bzw. die Übertragung zu dämpfen. Bei der ersten Schienenlagerung 12a ist ein im Querschnitt wannenförmiger Betonuntergrund 37 vorhanden. In die Ausnehmung des Betonuntergrunds 37 ist der Grundkörper 14 eingesetzt, wobei Zwischen Betonuntergrund 37 und Grundkörper 14 die Dämpfungsmatten 36 angeordnet sind. Die vertikal verlaufenden Dämpfungsmatten 36 sind an ihrem oberen Ende durch eine zwischen dem Grundkörper 14 und dem Betonuntergrund 37 vorgesehene Abschlussfuge 38 verschlossen, um Beschädigungen der Dämpfungsmatten 36 zu vermeiden. Der Grundkörper 14 erstreckt sich in Querrichtung Q im Wesentlichen unterhalb der in Querrichtung Q nebeneinander angeordneten Deckkörper 16, wobei die beiden äußeren Deckkörper 16 bei der ersten Schienenlagerung 12a jeweils geringfügig über den Grundkörper 14 hinausragen und die Abschlussfuge 38 zumindest teilweise überdecken.Below and to the side of the main body 14 can be a cushioning layer 35 be present, by one or more damping mats 36 is formed. The damping layer 35 serves to oscillations of the body 14 not in one's main body 14 to transmit surrounding ground or to attenuate the transmission. At the first rail storage 12a is a cross-section trough-shaped concrete substrate 37 available. In the recess of the concrete underground 37 is the main body 14 used, with intermediate concrete substrate 37 and basic body 14 the damping mats 36 are arranged. The vertical damping mats 36 are at their upper end by one between the main body 14 and the concrete underground 37 provided final joint 38 closed to damage the damping mats 36 to avoid. The main body 14 extends in the transverse direction Q substantially below the cover body arranged side by side in the transverse direction Q. 16 , wherein the two outer cover body 16 at the first rail storage 12a each slightly above the body 14 protrude and the final joint 38 cover at least partially.

In Querrichtung Q neben den äußeren Deckkörpern 16 kann eine weitere Dämpfungsmatte 36 vorhanden sein, um die Schwingungsübertragung von den Deckkörpern 16 in den benachbarten Belag 39 zu verringern. Diese Dämpfungsmatte 36 schließt vertikal an die zwischen Grundkörper 14 und Betonuntergrund 37 vertikal angeordnete Dämpfungsmatte 36 bzw. die Abschlussfuge 38 an und ist im Bereich der Oberseite 30 des Deckkörpers durch eine Abschlussfuge 38 abgedeckt.In the transverse direction Q next to the outer cover bodies 16 can be another damping mat 36 be present to the vibration transmission from the cover bodies 16 in the adjacent surface 39 to reduce. This cushioning mat 36 connects vertically to the between body 14 and concrete underground 37 vertically arranged damping mat 36 or the final joint 38 and is in the area of the top 30 the cover body through a Abschlussfuge 38 covered.

Die Schienen 11 sind in den jeweiligen Aufnahmeraum 19 mittels einer Vergussmasse eingegossen. Als Vergussmasse dient beispielsweise Polyurethan. Zur Verringerung des Volumens des Aufnahmeraums 19 und zur Einsparung von Vergussmaße können Füllkörper 40 im Aufnahmeraum 19 vorgesehen sein. Ferner können ein oder mehrere Leerrohre 41 entlang der Schienen 11 im Aufnahmeraum 19 verlegt werden, durch die insbesondere elektrische Leitungen geführt werden können. Im Aufnahmeraum 19 unterhalb der Schiene 11 kann eine Einfederungsmatte 42 auf den Boden 18 des Aufnahmeraums 19 aufgeklebt sein. Die Einfederungsmatte 42 dient zur Dämpfung von Schwingungen, die ein Schienenfahrzeug beim Überfahren der Schienen hervorruft.The rails 11 are in the respective recording room 19 Cast in by means of a potting compound. As potting compound, for example, polyurethane is used. To reduce the volume of the receiving space 19 and to save potting dimensions can filler 40 in the recording room 19 be provided. Furthermore, one or more conduits 41 along the rails 11 in the recording room 19 be laid, can be guided by the particular electrical lines. In the recording room 19 below the rail 11 can be a compression mat 42 on the ground 18 of the recording room 19 be glued on. The bounce mat 42 serves to dampen vibrations that a rail vehicle causes when driving over the rails.

Die Herstellung der ersten Schienenlagerung 12a erfolgt folgendermaßen:
Zunächst wird eine sogenannte Sauberkeitsschicht beispielsweise aus Sand bereitgestellt. Auf diese Sauberkeitsschicht wird der plattenförmige Teil des Betonuntergrunds 37 mit Ortbeton gegossen. In dem Bereich, in dem der Grundköper 14 entstehen soll, wird die Dämpfungsmatte 36 auf die Platte des Betonuntergrunds 37 aufgelegt, die im Querschnitt nach 1 gesehen im Wesentlichen horizontal verläuft. Dieser Bereich, in dem der Grundköper 14 entstehen soll, wird anschließend verschalt, anschließend wird der Grundkörper 14 gegossen. Nach dem Aushärten des Grundkörpers 14 wird die Schalung entfernt und es werden seitlich am Grundkörper 14 im Wesentlichen vertikal verlaufende Dämpfungsmatten 36 angeordnet. Danach werden seitlich Betonkörper des Betonuntergrunds 37 bis auf Höhe der Oberseite 20 des Grundkörpers 14 mit Ortbeton gegossen. Die Dämpfungsschicht 35 wird auf Höhe der Oberseite 20 des Grundkörpers 14 mit einer Abschlussfuge 38 zwischen Betonuntergrund 37 und Grundkörper 14 abgeschlossen.
The production of the first rail storage 12a is done as follows:
First, a so-called cleanliness layer is provided, for example, of sand. On this layer of cleanliness is the plate-shaped part of the concrete substrate 37 cast with in-situ concrete. In the area where the basic body 14 should emerge, the damping mat 36 on the plate of the concrete underground 37 hung up, in the cross-section after 1 Seen essentially horizontally. This area in which the basic body 14 should arise, is then boarded, then the body 14 cast. After curing of the body 14 The formwork is removed and it will be on the side of the body 14 essentially vertically extending damping mats 36 arranged. Thereafter, concrete bodies of the concrete substrate are laterally 37 up to the height of the top 20 of the basic body 14 cast with in-situ concrete. The damping layer 35 will be at the height of the top 20 of the basic body 14 with a closing joint 38 between concrete underground 37 and basic body 14 completed.

Sofern die Abstützöffnungen 22 nicht bereits durch eine entsprechende Verschalung beim Gießen des Grundkörpers 14 erzeugt wurden, werden nachfolgend die Abstützöffnungen 22 in Form von Sackbohrlöchern von der Oberseite 20 her in den Grundkörper 14 eingebracht. Die Deckkörper 16 werden stoffschlüssig unter Bildung einer Verbindungsschicht 17 mit dem Grundkörper 14 verbunden, wobei an den Deckkörpern 16 vorgesehene Abstützteile 21 in die zugehörigen Abstützöffnungen 22 am Grundkörper 14 eingreifen. Jeweils zwei Deckkörper 16 sind in Querrichtung Q mit Abstand zueinander angeordnet, wodurch ihre einander zugewandten Seitenflächen 23 in Querrichtung Q jeweils einen Aufnahmeraum 19 für eine der beiden Schienen 11 begrenzen. Der Boden des betreffenden Aufnahmeraums 19 wird durch den darunter liegenden Abschnitt der Oberseite 20 des Grundkörpers 14 gebildet. Somit ist ein nach oben offener Aufnahmeraum 19 entstanden, in den anschließend die Schienen 11 eingesetzt und eingegossen werden können. Dies wird wie folgt durchgeführt:
Zunächst wird auf den Boden 18 des Aufnahmeraums 19 der Einfederungsstreifen 42 geklebt. Im Anschluss daran wird die Schiene 11 in den Aufnahmeraum 19 eingesetzt und in Ihrer Höhe justiert, beispielsweise mit Hilfe von Höhenausgleichsscheiben. Die Oberkante der Schiene 11 ragt dabei etwas aus dem Aufnahmeraum 19 heraus. Zusammen mit der Schiene 11 können auch Füllkörper 40 und/oder Leerrohre 41 in den Aufnahmeraum 19 eingesetzt werden. Anschließend werden noch eventuell vorhandene Fugen verschlossen, beispielsweise zwischen zwei in Längsrichtung L aneinander stoßenden Deckkörpern 16, und die Schiene 11 wird mit Hilfe einer Vergussmasse eingegossen. Als Vergussmasse kann beispielsweise Polyurethan verwendet werden. Abhängig vom verwendeten Schienentyp kann es notwendig sein, den Aufnahmeraum 19 zwischen der Schiene 11 und einem angrenzenden Deckkörper 16 nur zum Teil auszugießen, wenn ein Freiraum für einen Spurkranz des Zugrades benötigt wird. Die Vergussmasse fixiert die Schiene 11 im Aufnahmeraum 19 und fließt auch zwischen die Einfederungsmatte 42 und den Schienenfuß. In 4 ist ein Ausschnitt des Aufnahmeraums 19 im Detail dargestellt.
If the support openings 22 not already by a corresponding shuttering when casting the body 14 were generated, the support openings are below 22 in the form of blind holes from the top 20 forth in the body 14 brought in. The cover body 16 be cohesively to form a tie layer 17 with the main body 14 connected, wherein on the cover bodies 16 provided support parts 21 in the associated support openings 22 at the base body 14 intervention. Two cover bodies each 16 are arranged in the transverse direction Q at a distance from each other, whereby their mutually facing side surfaces 23 in the transverse direction Q each have a receiving space 19 for one of the two rails 11 limit. The floor of the relevant recording room 19 is through the underlying section of the top 20 of the basic body 14 educated. Thus, an upwardly open recording room 19 emerged, then in the rails 11 can be used and poured. This is done as follows:
First, it is on the ground 18 of the recording room 19 the compression strip 42 glued. Following this, the rail will 11 in the recording room 19 used and adjusted in height, at For example, with the help of height compensation discs. The top edge of the rail 11 juts something out of the recording room 19 out. Together with the rail 11 can also fillings 40 and / or empty pipes 41 in the recording room 19 be used. Subsequently, any existing joints are closed, for example, between two in the longitudinal direction L abutting cover bodies 16 , and the rail 11 is poured with the help of a potting compound. As a potting compound, for example, polyurethane can be used. Depending on the rail type used, it may be necessary to use the receiving space 19 between the rail 11 and an adjacent cover body 16 pour out only partially, if a clearance for a flange of the train wheel is needed. The potting compound fixes the rail 11 in the recording room 19 and also flows between the bounce mat 42 and the rail foot. In 4 is a section of the recording room 19 shown in detail.

Seitlich der äußersten Deckkörper 16 des Gleisabschnitts 10 wird beispielsgemäß eine weitere Dämpfungsmatte 36 angeordnet, die die Deckkörper 16 von einem später aufzubringenden Belag 39 zur Schwingungsdämpfung trennt. Im Bereich der Oberseite 30 der Deckkörper – also im Bereich der Straßenoberfläche – sind die Dämpfungsmatten 36 mit einer Abschlussfuge 38 zwischen Deckkörper 16 und Belag 39 abgedeckt.Side of the outer cover body 16 of the track section 10 For example, according to another damping mat 36 arranged the covering bodies 16 from a later to be applied surface 39 separates for vibration damping. In the area of the top 30 the cover body - ie in the area of the road surface - are the damping mats 36 with a closing joint 38 between cover body 16 and topping 39 covered.

3 zeigt eine abgewandelte Ausführungsform der Schienenlagerung 12 in Form einer zweiten Schienenlagerung 12b. Der Aufbau entspricht im Wesentlichen der ersten Schienenlagerung 12a, wobei im Folgenden lediglich die Unterschiede erläutert werden. Im Übrigen wird auf die vorstehende Beschreibung im Zusammenhang mit der ersten Schienenlagerung 12a verwiesen. 3 shows a modified embodiment of the rail mounting 12 in the form of a second rail storage 12b , The structure essentially corresponds to the first rail mounting 12a , in which only the differences are explained below. Incidentally, the above description in connection with the first rail storage 12a directed.

Im Unterschied zur ersten Schienenlagerung 12a ist bei der zweiten Schienenlagerung 12b keine Dämmschicht 35 vorhanden. Der Grundkörper 14 ist direkt auf verdichtete Untergrundschichten 45, 46 aufgebracht und beispielsweise durch Ortbeton gegossen. Im Grundkörper 14 können Bewehrungselemente 47 zur Erhöhung der Stabilität des Grundkörpers 14 vorgesehen sein. Bei dem Gleisabschnitt 10 aus 3 sind zwei parallele Gleise 48 mit jeweils zwei Schienen 11 vorgesehen. Jedes der beiden Gleise 48 weist drei in Querrichtung Q vorgesehene Deckkörper 16 auf, zwischen denen die Aufnahmeräume 19 für die Schienen 11 gebildet sind. Die beiden inneren Deckkörper 16 jedes Gleises 48 stoßen unmittelbar aneinander an und sind im Anstoßbereich verfugt, beispielsweise mit Hilfe von Polyurethan. Auch in Längsrichtung L aneinanderstoßende Deckkörper 16 sind durch eine Polyurethan-Fuge verbunden. Im Anschluss an die beiden äußeren Decksteine 16 der beiden Gleise 48 ist beispielsgemäß ein mehrschichtiger Belag 49 vorgesehen. Die Entwässerungsrichtung P der beiden in Querrichtung äußersten Deckkörper 16 erfolgt anders als bei der ersten Schienenlagerung 12a von der Schiene 11 weg zum an den jeweiligen Deckkörper 16 angrenzenden Belag 49 hin. Deren Oberseiten 30 sind entsprechend von der benachbarten Schiene 11 weg in Querrichtung Q abfallend geneigt. Ansonsten entspricht die zweite Schienenanordnung 12b dem Aufbau der ersten Schienenanordnung 12a. Bei der Herstellung der zweiten Schienenanordnung 12b wird der Grundkörper 14 ohne Dämpfungsschicht 35 auf die Untergrundschichten 45, 46 mit Hilfe von Ortbeton gegossen. Die übrige Herstellung der ersten Schienenanordnung 12a.In contrast to the first rail storage 12a is at the second rail storage 12b no insulation layer 35 available. The main body 14 is directly on compacted underground layers 45 . 46 applied and poured, for example by in-situ concrete. In the main body 14 can reinforcing elements 47 to increase the stability of the body 14 be provided. At the track section 10 out 3 are two parallel tracks 48 with two rails each 11 intended. Each of the two tracks 48 has three in the transverse direction Q provided cover body 16 on, between which the recording rooms 19 for the rails 11 are formed. The two inner cover bodies 16 every track 48 abut directly on each other and are grouted in the abutment area, for example with the help of polyurethane. Also in the longitudinal direction L abutting cover body 16 are connected by a polyurethane joint. Following the two outer capstones 16 the two tracks 48 is, for example, a multilayer coating 49 intended. The drainage direction P of the two outermost cover body in the transverse direction 16 takes place differently than with the first rail storage 12a from the rail 11 away to the respective cover body 16 adjacent surface 49 out. Their tops 30 are correspondingly from the adjacent rail 11 off in the transverse direction Q sloping inclined. Otherwise, the second rail arrangement corresponds 12b the structure of the first rail assembly 12a , In the manufacture of the second rail assembly 12b becomes the basic body 14 without cushioning layer 35 on the underground layers 45 . 46 cast using in-situ concrete. The rest of the production of the first rail assembly 12a ,

6 zeigt eine weitere Ausführungsform der Schienenlagerung 12 in Form einer dritten Schienenlagerung 12c, die im Wesentlichen der zweiten Schienenlagerung 12b nach 3 entspricht, sodass auf die vorstehende Beschreibung hinsichtlich Aufbau und Herstellung verwiesen wird. Der Unterschied der dritten Schienenlagerung 12c gegenüber der ersten und zweiten Schienenlagerung 12b besteht in der Form des in Querrichtung Q äußersten Deckkörpers 16, der einen vom äußeren Rand des Deckkörpers 16 nach oben ragenden Vorsprung 50 aufweist. Dieser abgewandelte Deckkörpers 16 wird im Bereich von Bushaltestellen auf dem Gleisabschnitt 10 verwendet und stellt einen Haltestellenstein 51 dar. Auf der den Schienen 11 zugewandten Seite weist der Vorsprung 50 eine in Querrichtung geneigte Seitenfläche 52 auf. 6 shows a further embodiment of the rail mounting 12 in the form of a third rail storage 12c , which is essentially the second rail storage 12b to 3 corresponds, so that reference is made to the above description in terms of design and manufacture. The difference of the third rail storage 12c opposite the first and second rail storage 12b consists in the shape of the outermost in the transverse direction Q cover body 16 , one from the outer edge of the cover body 16 upward projection 50 having. This modified cover body 16 is in the range of bus stops on the track section 10 used and represents a stop stone 51 On the rails 11 facing side, the projection 50 a laterally inclined side surface 52 on.

Der Haltestellenstein 51 mit dem Vorsprung 50 dient dazu das Anfahren eines nicht schienengebundenen Fahrzeugs, insbesondere eines Busses, an die Haltestelle zu vereinfachen. Der Fahrzeugführer kann sehr nahe an den Vorsprung 50 heranfahren. Durch die Schrägfläche 52 werden die Reifen beim Auffahren des Fahrzeugs auf den Vorsprung 50 nicht beschädigt. Beim Auffahren mit einem lenkbaren Rad auf die Schrägfläche 52 übt diese auf Rad des Fahrzeugs eine Kraft aus, die das Rad in eine in Längsrichtung L ausgerichtete Stellung drückt. Sofern der Fahrer am Lenkrad dieser Kraft nachgibt, wird dadurch das Überfahren des Vorsprungs 50 verhindert. Das Fahrzeug wird im Wesentlichen in Längsrichtung L ausgerichtet. Das Fahrzeug kann somit sehr einfach mit den Rädern nahe an den Vorsprung 50 gebracht werden und zugleich kann ein versehentliches Überfahren des Vorsprungs 50 vermieden werden. Die dabei auf den Haltestellenstein 51 wirkende Querkraft wird über die Abstützteile 21 am Grundkörper 14 abgestützt.The stop stone 51 with the lead 50 serves to start a non-railbound vehicle, especially a bus, to simplify the stop. The driver can be very close to the lead 50 drive up. Due to the inclined surface 52 the tires are on the projection when the vehicle 50 not damaged. When driving with a steerable wheel on the inclined surface 52 this exerts on the wheel of the vehicle from a force that presses the wheel in a longitudinal direction L oriented position. If the driver gives way to this force on the steering wheel, this will override the projection 50 prevented. The vehicle is aligned substantially in the longitudinal direction L. The vehicle can thus very easily with the wheels close to the projection 50 can be brought and at the same time can accidentally override the projection 50 be avoided. The thereby on the stop stone 51 acting lateral force is on the support parts 21 at the base body 14 supported.

Der Neigungswinkel α gegenüber der Horizontalen kann in etwa zwischen 25° und 75° betragen. Im Querschnitt gesehen kann der Vorsprung 50 zum Beispiel dreieckförmig konturiert sein (7b) oder die Form eines rechtwinkeligen Trapezes aufweisen (7a). Die Schrägfläche 52 kann unter Bildung von Kanten oder durch Radien abgerundet in die benachbarten Abschnitte der Oberseite 30 des Haltestellensteins 51 übergehen. Ein mit Radien versehener Flächenübergang ist in 7c veranschaulicht. Auch ein Vorsprung 50 mit einer abgestuften Schrägfläche 52' kann vorgesehen werden, wie dies in 7a durch die gestrichelte Linie angedeutet ist.The angle of inclination α relative to the horizontal can be approximately between 25 ° and 75 °. Seen in cross section, the projection 50 for example triangular shaped ( 7b ) or the shape of a rectangular trapezium ( 7a ). The inclined surface 52 may be rounded to the adjacent sections of the top, forming edges or radii 30 of the stop stone 51 pass. A radiused surface transition is in 7c illustrated. Also a lead 50 with a stepped inclined surface 52 ' can be provided as in 7a is indicated by the dashed line.

Als Haltestellensteine 51 ausgeführte Deckkörper 16 sind in Haltestellenbereichen des Gleisabschnitts 10 vorgesehen. Solche Haltestellenbereiche können anhängig von den jeweiligen örtlichen Gegebenheiten auf einer oder auf beiden Seiten des Gleisabschnitts 10 vorhanden sein.As stop stones 51 executed cover body 16 are in stop areas of the track section 10 intended. Such stop areas may be pending on local conditions on one or both sides of the track section 10 to be available.

Die Deckkörper 16 und insbesondere die Haltestellensteine 51 werden bevorzugterweise durch ein vorgefertigtes Fertigteil gebildet, das aus Beton, insbesondere Stahlbeton, in einem Betonfertigteilwerk hergestellt und vor Ort eingesetzt wird. Eine aufwendige Verschalung zur Erstellung der Vorsprünge 50 bei den Haltestellensteinen 51 kann dadurch vermieden werden. Die Deckkörper 16 bzw. Haltestellensteine 51 sind zusammenhängend als einheitliches Teil gegossen.The cover body 16 and especially the stop stones 51 are preferably formed by a prefabricated finished part, which is made of concrete, especially reinforced concrete, in a precast concrete factory and used on site. An elaborate shuttering to create the projections 50 at the stop stones 51 can be avoided. The cover body 16 or stop stones 51 are cast together as a unitary part.

Die Erfindung betrifft eine Schienenlagerung 12a, 12bfür einen Gleisabschnitt 10 mit zwei in Querrichtung Q beabstandet angeordneten Schienen 11. Die Schienen 11 sind auf einer von einem Grundkörper 14 gebildeten Grundschicht 13 in einem Aufnahmeraum 19 angeordnet. Der Aufnahmeraum 19 wird in Querrichtung Q von jeweils einer Seitenfläche 23 eines Deckkörpers 16 begrenzt. Deckkörper 16 und Grundkörper 14 sind vorzugsweise aus Beton hergestellt. Die Deckkörper 16 sind Bestandsteil einer Deckschicht 15. Zwischen den Deckkörpern 16 und der Oberseite 20 des Grundkörpers 14 ist eine Verbindungsschicht 17 vorhanden, mittels der eine stoffschlüssige Verbindung zwischen den Deckkörpern 16 und dem Grundkörper 14 hergestellt ist. Zusätzlich greifen die Deckkörper 16 und der Grundkörper 14 im Bereich der Verbindungsschicht 17 formschlüssig ineinander, um auf die Deckkörper 16 einwirkende Querkräfte über den Grundkörper 14 abstützen zu können. Eine solche Schienenlagerung 12a, 12b kann besonders einfach und kostengünstig repariert oder saniert werden.The invention relates to a rail mounting 12a . 12b for a track section 10 with two transversely spaced Q spaced rails 11 , The rails 11 are on one of a body 14 formed base layer 13 in a recording room 19 arranged. The recording room 19 becomes transverse direction Q of one side surface each 23 a cover body 16 limited. cover body 16 and basic body 14 are preferably made of concrete. The cover body 16 are part of a cover layer 15 , Between the cover bodies 16 and the top 20 of the basic body 14 is a tie layer 17 present, by means of a cohesive connection between the cover bodies 16 and the body 14 is made. In addition, the cover body grab 16 and the main body 14 in the area of the bonding layer 17 form-fit into each other to access the cover body 16 acting lateral forces on the body 14 to be able to support. Such a rail storage 12a . 12b can be repaired or refurbished in a particularly simple and cost-effective manner.

BezugszeichenlisteLIST OF REFERENCE NUMBERS

1010
Gleisabschnitttrack section
1111
Schienerail
1212
Schienenlagerungrail support
12a12a
erste Schienenlagerungfirst rail support
12b12b
zweite Schienenlagerungsecond rail support
12c12c
dritte Schienenlagerungthird rail support
1313
Grundschichtbase layer
1414
Grundkörperbody
1515
Deckschichttopcoat
1616
Deckkörpercover body
1717
Verbindungsschichtlink layer
1818
Boden von 19ground from 19
1919
Aufnahmeraumaccommodation space
2020
Oberseite v. 14top v. 14
2121
Abstützteilsupporting part
2222
Abstützöffnungsupport hole
2323
Seitenfläche v. 16side surface v. 16
2525
Stirnseiten v. 16front sides v. 16
2626
Dübelverbindungdowel joint
2727
Betondübelconcrete anchors
3030
Oberseite v. 16top v. 16
3131
Fugenähnliche VertiefungSimilar joints deepening
3232
BodenplattenbereichBottom plate portion
3535
Dämpfungsschichtdamping layer
3636
Dämpfungsmattedamping mat
3737
BetonuntergrundConcrete base
3838
AbschlussfugeAbschlussfuge
3939
Belagcovering
4040
Füllkörperpacking
4141
Leerrohrconduit
4242
EinfederungsmatteEinfederungsmatte
4545
UntergrundschichtBackground layer
4646
UntergrundschichtBackground layer
4747
Bewehrungselementreinforcing element
4848
Gleistrack
5050
Vorsprunghead Start
5151
HaltestellensteinStops Stone
5252
Schrägflächesloping surface
αα
Neigungswinkeltilt angle
LL
Längsrichtunglongitudinal direction
PP
Pfeil (Entwässerungsrichtung)arrow (Dewatering direction)
QQ
Querrichtungtransversely

ZITATE ENTHALTEN IN DER BESCHREIBUNGQUOTES INCLUDE IN THE DESCRIPTION

Diese Liste der vom Anmelder aufgeführten Dokumente wurde automatisiert erzeugt und ist ausschließlich zur besseren Information des Lesers aufgenommen. Die Liste ist nicht Bestandteil der deutschen Patent- bzw. Gebrauchsmusteranmeldung. Das DPMA übernimmt keinerlei Haftung für etwaige Fehler oder Auslassungen.This list The documents listed by the applicant have been automated generated and is solely for better information recorded by the reader. The list is not part of the German Patent or utility model application. The DPMA takes over no liability for any errors or omissions.

Zitierte PatentliteraturCited patent literature

  • - DE 20118343 U1 [0002] - DE 20118343 U1 [0002]

Claims (20)

Schienenlagerung für einen Gleisabschnitt mit in Querrichtung (Q) mit Abstand angeordneten Schienen (11), mit einem unterhalb der Schienen (11) angeordneten Grundkörper (14), mit mehreren auf der Oberseite (20) des Grundkörpers (14) angeordneten auf dem Grundkörper (14) befestigten Deckkörpern (16), wobei zwischen zwei in Querrichtung (Q) unmittelbar benachbarten Deckkörpern (16) ein nach oben offener Aufnahmeraum (19) für eine der Schienen (11) gebildet ist.Rail support for a track section with transversely spaced (Q) rails ( 11 ), with one below the rails ( 11 ) arranged body ( 14 ), with several on the top ( 20 ) of the basic body ( 14 ) arranged on the base body ( 14 ) attached cover bodies ( 16 ), wherein between two transversely (Q) immediately adjacent cover bodies ( 16 ) an upwardly open receiving space ( 19 ) for one of the rails ( 11 ) is formed. Schienenlagerung nach Anspruch 1, dadurch gekennzeichnet, dass die Deckkörper (16) mittels einer aushärtbaren Verbindungsmasse (17) unter Bildung einer stoffschlüssigen Verbindung auf dem Grundkörper (14) befestigt sind.Rail mounting according to claim 1, characterized in that the cover body ( 16 ) by means of a curable bonding compound ( 17 ) forming a cohesive connection on the base body ( 14 ) are attached. Schienenlagerung nach Anspruch 1, dadurch gekennzeichnet, dass die den Aufnahmeraum (19) begrenzenden Deckkörper (16) mit Abstand zueinander angeordnet sind, so dass ihre dem Aufnahmeraum (19) zugeordneten Seitenflächen (23) den Aufnahmeraum (19) in Querrichtung (Q) begrenzen.Rail mounting according to claim 1, characterized in that the receiving space ( 19 ) limiting cover body ( 16 ) are arranged at a distance from each other, so that their the receiving space ( 19 ) associated side surfaces ( 23 ) the recording room ( 19 ) in the transverse direction (Q). Schienenlagerung nach Anspruch 1, dadurch gekennzeichnet, dass der Boden (18) des Aufnahmeraums (19) von dem darunter liegenden Abschnitt der Oberseite (20) des Grundkörpers (14) gebildet ist.Rail support according to claim 1, characterized in that the floor ( 18 ) of the recording room ( 19 ) from the underlying portion of the top ( 20 ) of the basic body ( 14 ) is formed. Schienenlagerung nach Anspruch 1, dadurch gekennzeichnet, dass zwischen dem Deckkörper (16) und der Oberseite (20) des Grundkörpers (14) mindestens ein Abstützteil (21) vorgesehen ist, das fest mit dem Deckkörper (14) oder dem Grundkörper (14) verbunden ist und in eine zugeordnete Abstützöffnung (22) am Deckkörper (16) oder am Grundkörper (14) hinein ragt.Rail mounting according to claim 1, characterized in that between the cover body ( 16 ) and the top ( 20 ) of the basic body ( 14 ) at least one support part ( 21 ) is provided, fixed to the cover body ( 14 ) or the basic body ( 14 ) and in an associated support opening ( 22 ) on the cover body ( 16 ) or on the main body ( 14 ) protrudes into it. Schienenlagerung nach Anspruch 5, dadurch gekennzeichnet, dass zwischen dem Deckkörper (16) und dem Grundkörper (14) mehrere Abstützteile (21) vorhanden sind, die in Längsrichtung (L) mit Abstand zueinander angeordnet sind.Rail mounting according to claim 5, characterized in that between the cover body ( 16 ) and the basic body ( 14 ) several support parts ( 21 ) are present, which are arranged in the longitudinal direction (L) at a distance from each other. Schienenlagerung nach Anspruch 5 oder 6, dadurch gekennzeichnet, dass das Abstützteil (21) oder die Abstützteile (21) in Querrichtung (Q) gesehen mittig am Deckkörper (16) angeordnet ist bzw. sind.Rail mounting according to claim 5 or 6, characterized in that the support part ( 21 ) or the supporting parts ( 21 ) in the transverse direction (Q) seen in the middle of the cover body ( 16 ) is arranged or are. Schienenlagerung nach Anspruch 5, dadurch gekennzeichnet, dass das Abstützteil (21) fest mit dem Deckkörper (16) verbunden und insbesondere an diesem angeformt ist.Rail mounting according to claim 5, characterized in that the supporting part ( 21 ) fixed to the cover body ( 16 ) and in particular is integrally formed on this. Schienenlagerung nach Anspruch 5, dadurch gekennzeichnet, dass das Abstützteil (21) aus demselben Material besteht wie der Deckkörper (16) und/oder der Grundkörper (14).Rail mounting according to claim 5, characterized in that the supporting part ( 21 ) consists of the same material as the cover body ( 16 ) and / or the basic body ( 14 ). Schienenlagerung nach Anspruch 5, dadurch gekennzeichnet, dass das Abstützteil (21) und die Abstützöffnung (22) einen kreisrunden Querschnitt aufweisen.Rail mounting according to claim 5, characterized in that the supporting part ( 21 ) and the support opening ( 22 ) have a circular cross-section. Schienenlagerung nach Anspruch 1, dadurch gekennzeichnet, dass die Schienenlagerung (12a, 12b) spurstangenlos ausgeführt ist.Rail mounting according to claim 1, characterized in that the rail mounting ( 12a . 12b ) is designed without a rod. Schienenlagerung nach Anspruch 1, dadurch gekennzeichnet, dass die Oberseite (30) der Deckkörper (16) einen Teil der Straßenbelagoberseite bildet.Rail mounting according to claim 1, characterized in that the upper side ( 30 ) the cover body ( 16 ) forms part of the pavement top. Schienenlagerung nach Anspruch 1, dadurch gekennzeichnet, dass ein im Bereich einer Haltestelle für nicht-schienengebundene Fahrzeuge vorgesehener Deckkörper (16, 51) einen von seinem Rand nach oben ragenden Vorsprung (50) aufweist, der auf seiner der Schiene (11) zugewandten Seite eine in Querrichtung (Q) geneigte Schrägfläche (52) aufweist.Rail mounting according to claim 1, characterized in that a provided in the region of a stop for non-rail vehicles cover body ( 16 . 51 ) a protruding from its edge projection ( 50 ), which on its rail ( 11 ) facing side in the transverse direction (Q) inclined inclined surface ( 52 ) having. Schienenlagerung nach Anspruch 1, dadurch gekennzeichnet, dass die Oberseite (30) der Deckkörper (16) eine Struktur (31, 32) und/oder eine Einfärbung aufweist.Rail mounting according to claim 1, characterized in that the upper side ( 30 ) the cover body ( 16 ) a structure ( 31 . 32 ) and / or has a coloring. Schienenlagerung nach Anspruch 1, dadurch gekennzeichnet, dass in Längsrichtung (L) unmittelbar benachbarte Deckkörper (16) über eine Dübelverbindung (26) miteinander verbunden sind.Rail mounting according to claim 1, characterized in that in the longitudinal direction (L) immediately adjacent cover body ( 16 ) via a dowel connection ( 26 ) are interconnected. Schienenlagerung nach Anspruch 1, dadurch gekennzeichnet, dass zwischen dem Grundkörper (14) und dem benachbarten Untergrund (37) eine Dämpfungsschicht (35) angeordnet ist.Rail mounting according to claim 1, characterized in that between the base body ( 14 ) and the neighboring subsoil ( 37 ) a damping layer ( 35 ) is arranged. Schienenlagerung nach Anspruch 1, dadurch gekennzeichnet, dass die Schienen (11) in den jeweils zugeordneten Aufnahmeraum (19) eingegossen sind.Rail mounting according to claim 1, characterized in that the rails ( 11 ) in the respectively assigned receiving space ( 19 ) are poured. Verfahren zur Herstellung eines Gleisabschnitts mit in Querrichtung (Q) mit Abstand angeordneten Schienen (11), wobei ein Grundkörper (14) mit einer Oberseite (20) bereit gestellt wird, wobei mehrere Deckkörper (16) auf der Oberseite (20) des Grundkörpers (14) angeordnet und am Grundkörper (14) befestigt werden, wobei zur Bildung eines Aufnahmeraums (19) für eine Schiene (11) zwei in Querrichtung (Q) unmittelbar benachbarte Deckkörper (16) mit Abstand auf dem Grundkörper (14) angeordnet werden, wodurch der nach oben offene Aufnahmeraum (19) entsteht.Method for producing a track section with transversely spaced tracks (Q) ( 11 ), where a basic body ( 14 ) with a top side ( 20 ), wherein several cover bodies ( 16 ) on the top ( 20 ) of the basic body ( 14 ) and at the base body ( 14 ), wherein to form a receiving space ( 19 ) for a rail ( 11 ) two in the transverse direction (Q) immediately adjacent cover body ( 16 ) at a distance on the base body ( 14 ), whereby the upwardly open recording room ( 19 ) arises. Verfahren nach Anspruch 18, dadurch gekennzeichnet, dass die Deckkörper (16) auf dem Grundkörper (14) angeordnet und mit diesem unter Verwendung einer aushärtbaren Verbindungsmasse (17) stoffschlüssig verbunden werden.A method according to claim 18, characterized in that the cover body ( 16 ) on the base body ( 14 ) and with this using a curable bonding compound ( 17 ) are materially connected. Verfahren nach Anspruch 18, dadurch gekennzeichnet, dass die Schienen (11) in den jeweiligen Aufnahmeraum (19) eingegossen werden.Method according to claim 18, characterized in that the rails ( 11 ) into the respective recording room ( 19 ) are poured.
DE102009037310A 2009-08-14 2009-08-14 Rail storage with cover bodies for flexible bus route and method for their production Ceased DE102009037310A1 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
DE102009037310A DE102009037310A1 (en) 2009-08-14 2009-08-14 Rail storage with cover bodies for flexible bus route and method for their production
EP10172208.0A EP2295635B1 (en) 2009-08-14 2010-08-06 Rail bearing with covers for flexible bus section and method for producing same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE102009037310A DE102009037310A1 (en) 2009-08-14 2009-08-14 Rail storage with cover bodies for flexible bus route and method for their production

Publications (1)

Publication Number Publication Date
DE102009037310A1 true DE102009037310A1 (en) 2011-02-17

Family

ID=43034137

Family Applications (1)

Application Number Title Priority Date Filing Date
DE102009037310A Ceased DE102009037310A1 (en) 2009-08-14 2009-08-14 Rail storage with cover bodies for flexible bus route and method for their production

Country Status (2)

Country Link
EP (1) EP2295635B1 (en)
DE (1) DE102009037310A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3460125A1 (en) * 2017-09-26 2019-03-27 Süß Joachim Railway track construction

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE20118343U1 (en) 2001-11-12 2002-01-10 INFUNDO GmbH, 80999 München Trough element for tracks in the form of a fixed track

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SE434862B (en) * 1980-01-30 1984-08-20 A Betong Ab SETTING UP TO ARRANGEMENT FOR PLAN CROSSING PLATFOR AT A TRANSFER TRANSFER TO RAILWAY SAVINGS
US5535948A (en) * 1995-07-05 1996-07-16 Omni Products, Inc. Concrete grade crossing panels having integral elastomeric seals
US5813602A (en) * 1997-07-03 1998-09-29 Omni Products, Inc. Securing edge protectors for concrete grade crossing panels having integral elastomeric seals
US6427925B1 (en) * 2000-08-15 2002-08-06 Century Precast, L.L.C. Prefabricated railway track system
DE20102083U1 (en) * 2001-02-02 2001-05-31 Dresdner Verkehrsbetriebe AG, 01129 Dresden Joint closure between a rail and a plaster covering
BE1014311A5 (en) * 2001-07-25 2003-08-05 Vanhonacker Patrick Rail support system for railway in highways and analysis system for such a rail.

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE20118343U1 (en) 2001-11-12 2002-01-10 INFUNDO GmbH, 80999 München Trough element for tracks in the form of a fixed track

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3460125A1 (en) * 2017-09-26 2019-03-27 Süß Joachim Railway track construction

Also Published As

Publication number Publication date
EP2295635B1 (en) 2016-10-19
EP2295635A3 (en) 2013-03-13
EP2295635A2 (en) 2011-03-16

Similar Documents

Publication Publication Date Title
EP0663470B1 (en) Process for obtaining a superstructure for railway tracks
EP0357161B1 (en) Railway platform
DE3826096A1 (en) Kit for the construction of platforms
AT505789B1 (en) Rail bones with glued bumps
DE10325166B4 (en) Track construction for rail vehicles, especially railways
DE19620731A1 (en) Rigid track for rail vehicles across bridges
DE10004194C2 (en) Process for the production of a fixed railroad track on a bridge
EP1558815A1 (en) Fixed track for rail vehicles and method for production thereof
EP1048783A1 (en) Railway track and its construction method
DE19741059C1 (en) Method for producing solid rail bed
DE4007710A1 (en) Railway track-laying system in tunnel - forms floor with same transverse inclination as track
DE102007028978B4 (en) Rail track for rail vehicles
EP2295635B1 (en) Rail bearing with covers for flexible bus section and method for producing same
EP1216326B1 (en) Method for producing a soundproofed track
EP2166149B2 (en) Unit of railway structure part
EP0905319A2 (en) Railway track and its construction method
DE29721515U1 (en) Track superstructure without longitudinal joints
DE102004008357B4 (en) rail carriageway
AT500876B1 (en) METHOD FOR MANUFACTURING A FIXED RAILWAY RAILWAY
DE202009018562U1 (en) rail support
EP0814197B1 (en) Track in stable position made of precast concrete parts
EP1331310A2 (en) Elastical support system for a grooved rail
DE10221626A1 (en) Permanent way track for a magnetically levitating train has steel carrier units for the stator assembly, at the support structure, with exact positioning of the stator sections
DE102010045454A1 (en) Bridge superstructure with external reinforcement
AT510523B1 (en) RAILWAY WITH A TRACKBOARD