Method for creating a drainage device next to the glass of a railway line Download PDF

Info

Publication number
DE102009007226A1
DE102009007226A1 DE102009007226A DE102009007226A DE102009007226A1 DE 102009007226 A1 DE102009007226 A1 DE 102009007226A1 DE 102009007226 A DE102009007226 A DE 102009007226A DE 102009007226 A DE102009007226 A DE 102009007226A DE 102009007226 A1 DE102009007226 A1 DE 102009007226A1
Authority
DE
Germany
Prior art keywords
trench
work
track
drainage
work car
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
DE102009007226A
Other languages
German (de)
Other versions
DE102009007226B4 (en
Inventor
Ralf Zuercher
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to DE102009007226A priority Critical patent/DE102009007226B4/en
Priority to EP10001020A priority patent/EP2213794A3/en
Publication of DE102009007226A1 publication Critical patent/DE102009007226A1/en
Application granted granted Critical
Publication of DE102009007226B4 publication Critical patent/DE102009007226B4/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2/00General structure of permanent way
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B29/00Laying, rebuilding, or taking-up tracks; Tools or machines therefor
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B29/00Laying, rebuilding, or taking-up tracks; Tools or machines therefor
    • E01B29/32Installing or removing track components, not covered by the preceding groups, e.g. sole-plates, rail anchors
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B37/00Making, maintaining, renewing, or taking-up the ballastway or the track, not provided for in a single one of groups E01B27/00 - E01B35/00
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F3/00Dredgers; Soil-shifting machines
    • E02F3/04Dredgers; Soil-shifting machines mechanically-driven
    • E02F3/18Dredgers; Soil-shifting machines mechanically-driven with digging wheels turning round an axis, e.g. bucket-type wheels
    • E02F3/181Dredgers; Soil-shifting machines mechanically-driven with digging wheels turning round an axis, e.g. bucket-type wheels including a conveyor
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F5/00Dredgers or soil-shifting machines for special purposes
    • E02F5/02Dredgers or soil-shifting machines for special purposes for digging trenches or ditches
    • E02F5/06Dredgers or soil-shifting machines for special purposes for digging trenches or ditches with digging elements mounted on an endless chain
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F5/00Dredgers or soil-shifting machines for special purposes
    • E02F5/02Dredgers or soil-shifting machines for special purposes for digging trenches or ditches
    • E02F5/12Dredgers or soil-shifting machines for special purposes for digging trenches or ditches with equipment for back-filling trenches or ditches

Landscapes

  • Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • General Engineering & Computer Science (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

Zum Erstellen einer Entwässerungseinrichtung neben dem Gleis 1 einer Bahnstrecke wird zunächst aus dem Erdreich 12 ein Graben 4 ausgehoben. Anschließend werden in den ausgehobenen Graben 4 Entwässerungs- oder Drainagerohre 24 sowie Verfüllmaterial 27 sowie ggf. ein Filtervlies 21 eingegeben. Die entsprechenden Einrichtungen sind dabei auf einem oder mehreren Arbeitswagen 2 angeordnet, welche während der Arbeiten kontinuierlich vorwärts bewegt wird.To create a drainage device next to the track 1 of a railway line, a trench 4 is first excavated from the ground 12. Then 4 drainage or drainage pipes 24 and filling material 27 and possibly a filter fabric 21 are entered into the excavated trench. The corresponding devices are arranged on one or more work car 2, which is continuously moved forward during the work.

Description

Die Erfindung betrifft ein Verfahren zum Erstellen einer Entwässerungseinrichtung neben dem Gleis einer Bahnstrecke nach dem Oberbegriff des Anspruchs 1.The The invention relates to a method for creating a drainage device next to the track of a railway line according to the preamble of the claim 1.

Neben den Gleisen von Bahnstrecken befinden sich oftmals Entwässerungseinrichtungen. Es handelt sich hierbei um zum Gleis parallele Gräben mit wasserführenden Verfüllungen sowie mit Entwässerungs- oder Drainagerohren.Next The tracks of railway lines are often drainage facilities. These are parallel to the track with trenches water-bearing backfilling as well as with drainage or drainage pipes.

Bislang werden derartige Entwässerungseinrichtungen dadurch hergestellt, daß herkömmliche Baumaschinen, insbesondere Bagger, sowie Transportmittel, insbesondere Bahnwagen oder Lastkraftwagen, eingesetzt werden. Der Bagger hebt dabei zunächst aus dem Erdreich einen zum Gleis parallelen Graben aus. Anschließend werden in den ausgehobenen Graben Entwässerungs- oder Drainagerohre verlegt. Schließlich wird Verfüllmaterial eingegeben. Auch ein Filtervlies kann eingebracht werden.So far become such drainage facilities manufactured by using conventional construction machinery, in particular excavators, as well as means of transport, in particular railway carriages or trucks. The excavator lifts it out first the ground a trench parallel to the track. Then be in the dug ditch drainage or laid drainage pipes. Finally, backfilling material entered. A filter fleece can also be introduced.

Der Nachteil bei diesem bekannten Verfahren zur Erstellung einer Entwässerungseinrichtung besteht darin, daß es diskontinuierlich, nämlich taktweise durchgeführt wird. Dabei sind die einzelnen Arbeitsaufwendungen entsprechend hoch. Die einzelnen Arbeitsschritte sind aufgrund der taktweisen Bauweise nicht besonders effektiv und ermöglichen es nicht, die Reihung der Arbeitsschritte in einer kontinuierlichen Folge umzusetzen.Of the Disadvantage of this known method for creating a drainage device consists in that it discontinuous, viz cyclically performed becomes. The individual workloads are corresponding high. The individual steps are due to the cyclic design not very effective and allow it not, the sequence of work steps in a continuous Consequence implement.

Desweiteren ist durch diese Bauweise bei größeren Tiefen ein sogenannter Verbau erforderlich, welcher die Seitenwände des ausgehobenen Grabens stützt. Dieser Verbau muß mittels eines Baggers oder einem anderen Hubgerät in die Baugrube eingebaut werden. Entsprechend dem Arbeitsfortschritt muß der Verbau dann wieder anschließend taktweise ausgebaut werden. Auch hier sind aufgrund des taktweisen Arbeitsverfahrens große Vorhaltelängen des Verbaus erforderlich. Denn es muß immer die Länge eines Arbeitstaktes vorgehalten, eingebaut und wieder ausgebaut werden, bevor der nächste Arbeitstakt mit der vorgehaltenen Schalungsmenge beginnen kann. Ein weiterer Nachteil des taktweisen Verbaus besteht darin, daß er erst nach der Herstellung des Aushubs eingebracht werden kann. Dadurch ist aber die Gefahr des Einsturzes des seitlichen Erdreichs des Grabens bis zur Einhüllung des Verbaus gegeben. Dies bedeutet aber, daß stetig in den Gräben nachgearbeitet werden muß, um das einstürzende Erdreich zu entfernen.Furthermore is by this design at greater depths a so-called shoring is required, which the side walls of Excavated trench supports. This shoring must by means of an excavator or other lifting device installed in the pit become. According to the progress of the work then the shoring then again clockwise get extended. Again, due to the intermittent work process size Vorhaltelängen of the Verbaus required. Because it always has the length of one Working cycle reserved, installed and rebuilt, before the next Working cycle can start with the provided shuttering quantity. Another disadvantage of the cyclical Verbaus is that he only after the preparation of the excavation can be introduced. This is but the danger of the collapse of the lateral soil of the trench until wrapping given to the Verbaus. This means, however, that worked continuously in the trenches must become, around the collapsing Remove soil.

Oft muß auch ein Filtervlies eingebaut werden, um die Filterstabilität des eingebauten Grabenmaterials gegenüber dem anstehenden Erdreich zu gewährleisten. Dies erfordert einen weiteren, manuellen Arbeitsschritt im taktweisen Umbauverfahren.Often must also a filter fleece to be installed to the filter stability of the built-in Trench material opposite to ensure the upcoming soil. This requires a further, manual step in the intermittent Reconstruction process.

Schließlich ist die Vermessung zur Herstellung des Grabens bislang reine Handarbeit. Die Genauigkeit und Einhaltung von Toleranzen ist Sache eines erfahrenen Baggerfahrers und kann nicht automatisiert durchgeführt werden.Finally is the survey for the production of the trench hitherto purely manual work. The accuracy and compliance with tolerances is a matter of an experienced Excavator driver and can not be carried out automatically.

Der Erfindung liegt daher die Aufgabe zugrunde, ein schnelleres und effektiveres Verfahren zum Erstellen einer Entwässerungseinrichtung neben dem Gleis einer Bahnstrecke zu schaffen.Of the The invention is therefore based on the object, a faster and more effective method of creating a drainage device besides the Track to create a railway line.

Die technische Lösung ist gekennzeichnet durch die Merkmale im Kennzeichen des Anspruchs 1.The technical solution is characterized by the features in the characterizing part of claim 1.

Dadurch ist ein Verfahren mit einer entsprechenden Maschine zur schnellen und effektiven Herstellung einer Entwässerungseinrichtung neben dem Gleis einer Bahnstrecke geschaffen. Die Maschine ist dabei schienengebunden sowie eigenständig in ihrer Handhabung und Arbeitsweise. Die Maschine dient einzig und allein dem Erstellen der Entwässerungseinrichtung neben dem Gleis einer Bahnstrecke. Diese Maschine zur Durchführung des Verfahrens kann dabei alle erforderlichen Arbeitsschritte zur Herstellung von Entwässerungsgräben kontinuierlich und in Reihung ausführen. Es sind dies zunächst der Aushub des Grabens, die Verlegung der Entwässerungs- oder Drainagerohre, der eventuelle Einbau eines Filtervlieses sowie der Einbau sämtlicher Verfüllschichten wie Kies, Drainagekies, Abdeckmaterial oder dgl. Die Maschine führt dabei sämtliche Verbrauchsstoffe, die in einer oder mehreren Schichtleistungen ausgeführt werden, mit sich und transportiert diese automatisch oder teilautomatisch an den Einbauort. Konstruktionsbedingt können die entsprechenden Bahnwägen mit ihren Oberbauten gemeinsam oder in verschiedenen Abhängigkeiten angesteuert werden. Sie können je nach Konstruktion auch als ein gemeinsamer Arbeitswagen verbaut werden.Thereby is a method with a corresponding machine for fast and effectively producing a drainage device next to the track created a railway line. The machine is railbound as well as independently in their handling and operation. The machine is unique and just creating the drainage facility next to the Railway of a railway line. This machine to carry out the The process can all the necessary steps for the production of drainage ditches continuously and perform in sequence. These are first digging the trench, laying the drainage or drainage pipes, the possible installation of a filter fleece and the installation of all fill layers Such as gravel, drainage gravel, covering material or the like. The machine leads all Consumables, which are carried out in one or more shift performances, with them and transported automatically or semi-automatically to the installation site. Due to the design of the corresponding railway wagons with their superstructures together or in different dependencies be controlled. You can Depending on the construction, also installed as a common work car become.

Die Grundidee der Weiterbildung gemäß Anspruch 2 liegt in der Verwendung einer entsprechenden Grabenaushebeinrichtung in einem gleisgebundenen bzw. gleisgeführten, kontinuierlichen Verfahren zum Ausheben eines zu einem Gleis parallelen Grabens einer Bahnstrecke. Die Aushubeinrichtung führt den Aushub des U-förmigen Grabens so genau und kontinuierlich durch, daß keine separaten Verfüllarbeiten mehr erforderlich sind. Bei der Verwendung einer Fräseinrichtung entspricht dabei vorzugsweise die Breite des Grabens exakt dem auszuhebenden Kanal. Dieses Ausheben des Grabens erfolgt während des Ablaufs der Maschinentätigkeit kontinuierlich. Der Vorteil liegt in einer kontinuierlichen Arbeitsweise mit dadurch verbundenen hohen Leistungsansätzen in einem einzigen Arbeitsgang. Der Aushub erfolgt dabei mittels einer entsprechenden Aushubeinrichtung sowohl in Erdschichten als auch optional in Gesteinsschichten, je nach Bedarf und Anforderung der örtlichen Gegebenheiten. Somit ist ein kontinuierliches Ausführen aller Arbeitsschritte in einem Durchgang und auch bei großen Entfernungen zum Gleis außerhalb des Gleisbereiches gewährleistet. Die technische Realisierung sieht somit vor, daß es sich um ein kontinuierliches Aushubverfahren des Grabens handelt. Dies bedeutet, daß der Arbeitswagen auf dem Gleis kontinuierlich fährt und daß auf diesem Arbeitswagen eine entsprechende Aushubeinrichtung angeordnet ist, welche während der Vorwärtsbewegung des Arbeitswagens synchron den Graben aushebt und das Aushubmaterial sofort dem Arbeitswagen oder einem vor- oder nachgeschalteten anderen Arbeitswagen oder einem Arbeitswagen auf einem Parallelgleis zuführt. Somit ist eine schienengebundene Aushubeinrichtung in Form einer eigenständigen, schweren Maschine auf dem Arbeitswagen geschaffen, welche einen kontinuierlichen Aushub insbesondere mittels einer Fräse in große Tiefen von mehreren Metern sowie mit großen Entfernungen zur Gleisachse von mehreren Metern gewährleistet. Das Aushubmaterial wird dabei direkt im Anschluß an den Aushub in einem kontinuierlichen Arbeitsgang entsorgt. Das Aushubmaterial kann dabei mittels eines Förderbands zu herkömmlichen vorgeschalteten oder nachgeschalteten oder auf einem Nachbargleis befindlichen Bahnwagen oder auf andere Transportmittel, wie Lastkraftwagen, mittels des Förderbandes verladen werden.The basic idea of the development according to claim 2 lies in the use of a corresponding trench lifting device in a track-bound or track-guided, continuous method for excavating a trench of a railway line parallel to a track. The excavator performs the excavation of the U-shaped trench so accurately and continuously that no separate backfilling is required. When using a milling device preferably corresponds to the width of the trench exactly the channel to be excavated. This excavation of the trench is carried out continuously during the course of the machine activity. The advantage is a continuous operation with associated high power rates in a single operation. The excavation takes place by means of a corresponding excavation installation both in earth strata and optionally in rock strata, according to requirements and local conditions. Thus, a continuous execution of all steps in a single pass and even at long distances to the track outside the track area is guaranteed. The technical realization thus provides that it is a continuous excavation of the trench. This means that the work car travels continuously on the track and that a corresponding excavating device is arranged on this work car, which synchronously digs out the trench during the forward movement of the work car and the excavated material immediately on the work car or a preceding or downstream other work car or a work car a parallel track feeds. Thus, a rail-mounted excavator in the form of a stand-alone, heavy machine on the work car created that ensures a continuous excavation in particular by means of a router in great depths of several meters and with long distances to the track axis of several meters. The excavated material is disposed of directly after the excavation in a continuous operation. The excavated material can be loaded by means of a conveyor belt to conventional upstream or downstream or located on a neighboring track railway cars or other means of transport, such as trucks, by means of the conveyor belt.

Eine bevorzugte Weiterbildung schlägt gemäß Anspruch 3 vor, daß das Aushubmaterial durch die Aushubeinrichtung abgefräst wird. Es handelt sich somit um eine gleisgeführte bzw. gleisgebundene Grabenfräse. Das Abfräsen hat den Vorteil, daß dadurch ein kontinuierliches Arbeitsfluß im Sinne der kontinuierlichen Vorwärtsbewegung des Arbeitswagens gewährleistet ist.A preferred training proposes according to claim 3 that the Excavated material is milled by the excavating device. It is thus a track-guided or track-bound trencher. The milling has the advantage that it a continuous workflow in the Sense of continuous forward motion of the work car is.

Die technische Realisierung der Grabenfräse sieht gemäß der Weiterbildung in Anspruch 4 vor, daß als Fräseinrichtung ein endlos umlaufendes Band oder eine endlos umlaufende Kette oder dgl. verwendet wird, welche mit Fräselementen bestückt ist. Der Vorteil einer derartigen Fräseinrichtung besteht darin, daß ein kontinuierlicher Aushub bis in großen Tiefen von mehreren Metern sowie mit großen seitlichen Entfernungen zum Gleis von mehreren Metern möglich ist. Dabei ist die Fräseinrichtung vorzugsweise auswechselbar. Durch unterschiedlich breite Fräseinrichtungen können somit auf einfache Weise unterschiedlich breite Gräben ausgehoben werden.The technical realization of the trencher looks according to the development in claim 4, that as milling device an endlessly circulating band or an endlessly circulating chain or Like. Is used, which is equipped with cutting elements. The advantage of such a milling device is that a continuous excavation up to great depths of several meters as well as with big ones lateral distances to the track of several meters is possible. Here is the milling device preferably interchangeable. By different width milling equipment can Thus, different widths ditches are easily excavated.

Dabei entspricht gemäß der Weiterbildung in Anspruch 5 die Breite der Fräseinrichtung vorzugsweise der Breite des auszuhebenden Grabens. Dies bedeutet, daß in einem einzigen Arbeitsgang mit einem einzigen Vorwärtstrieb der Fräseinrichtung der Graben entsprechend den geforderten Dimensionierungen ausgehoben werden kann.there corresponds according to the development in claim 5, the width of the milling device preferably the width of the trench to be excavated. This means, that in a single operation with a single forward drive the milling device the trench dug according to the required dimensions can be.

Eine bevorzugte Weiterbildung schlägt gemäß Anspruch 6 vor, daß die Aushubeinrichtung an einem quer zur Bewegungsrichtung des Arbeitswagens teleskopierbaren Ausleger angeordnet ist. Dieser auskragendes Ausleger, an dessen Ende sich die Aushubeinrichtung, insbesondere die Fräseinrichtung befindet, hat den Vorteil, daß große Entfernungen zwischen dem Gleis und dem auszuhebenden Graben überbrückt werden können, und zwar Entfernungen von mehreren Metern. Die Fräseinrichtung kann dabei schwenkbar sein, um dadurch Hindernisse beispielsweise in Form von Masten umfahren zu können. Die stabile Führung der Aushubeinrichtung wird durch die Kompaktbauweise des Arbeitswagens mit dem entsprechenden Aufbau für die Aushubeinrichtung erreicht. Das Gewicht der vorbeschriebenen Einheit dient dabei dazu, dem Kippmoment der auskragenden Aushubeinrichtung entgegenzuwirken. Das Gewicht kann hierbei auch optional variabel gewählt werden, indem beispielsweise der Arbeitswagen mit Zusatzgewichten ausgerüstet wird. Somit ist ein kontinuierliches Ausführen sämtlicher Arbeitsschritte in einem Durchgang auch bei großer zeitlicher Entfernung zum Gleis gewährleistet.A preferred training proposes according to claim 6 that the Excavation device on a transverse to the direction of movement of the work car telescopic boom is arranged. This cantilever boom, at the end of which the excavating device, in particular the milling device has the advantage that long distances between the track and the trench to be excavated, and Although distances of several meters. The milling device can be pivoted be around it obstacles, for example in the form of masts to be able to. The stable leadership the excavating device is due to the compact design of the work car with the appropriate structure for reached the excavation. The weight of the unit described above serves to the tilting moment of the overhanging excavating device counteract. The weight can also be optionally variable chosen By, for example, the work car with additional weights equipped becomes. Thus, a continuous execution of all steps in a passage even at large time distance to the track guaranteed.

Die Weiterbildung gemäß Anspruch 7 hat den Vorteil, daß auf technisch einfache Weise sehr große Tiefen von mehreren Metern ausgehoben werden können. Außerdem ist eine Möglichkeit zum Umfahren von Hindernissen geschaffen. Somit können die Teleskoparme die Fräseinrichtung in ihrer geforderten Lage hinsichtlich Höhe und Richtung sowie hinsichtlich der Neigung durch eine entsprechende Verschwenkbewegung halten.The Training according to claim 7 has the advantage that on technically simple way very large depths of several meters can be dug. Furthermore is a possibility created for avoiding obstacles. Thus, the Telescopic arms the milling device in their required position in terms of height and direction as well as in terms of Keep the inclination by a corresponding pivoting movement.

Die Auswechselbarkeit der Aushubeinrichtung am Arbeitswagen gemäß der Weiterbildung in Anspruch 8 hat den Vorteil, daß entsprechend den variablen Baustellenanforderungsprofilen entsprechende Aushubeinrichtungen eingesetzt werden können. Die Auswechselbarkeit hat aber auch den Vorteil, daß andere Werkzeuge als Aushubeinrichtungen als optionale Zusatzlösung angebaut werden können, beispielsweise Bohrgeräte oder Verdichtgeräge oder sonstige Werkzeuge jeglicher Art.The Interchangeability of the excavating device on the work cart according to the development in claim 8 has the advantage that according to the variable Construction site requirement profiles corresponding excavation facilities can be used. The interchangeability but also has the advantage that others Tools as excavation equipment attached as an optional additional solution can be for example, drills or compactors or other tools of any kind.

Die Weiterbildung gemäß Anspruch 9 hat den Vorteil, daß die Positionierung der Aushubeinrichtung, insbesondere der Fräseinrichtung automatisch hinsichtlich Höhe und Seitenlage sowie hinsichtlich der Neigung automatisch reguliert wird, ohne daß die Grabenmaße von Hand vermessen werden müssen. So kann die automatische Neigungsregulierung der Fräseinrichtung beispielsweise über Lasersteuerung in Abhängigkeit von der Tiefe sowie Breite des auszuhebenden Grabens erfolgen. Somit kann die komplette Vorrichtung die Arbeitsabläufe teilautomatisch oder vollautomatisch insbesondere mittels einer Lasersteuerung steuern.The development according to claim 9 has the advantage that the positioning of the excavating device, in particular the milling device is automatically automatically adjusted in terms of height and lateral position and in terms of inclination, without the trench dimensions must be measured by hand. Thus, the automatic inclination regulation of the milling device can take place, for example, via laser control as a function of the depth and width of the trench to be excavated. Thus, the entire device can control the work processes semi-automatic or fully automatic, in particular by means of a laser control.

Das Zuführen des Aushubmaterials zum Arbeitswagen kann gemäß der Weiterbildung in Anspruch 10 mittels eines Förderbandes erfolgen. Somit ist die gleisgebundene bzw. gleisgeführte Aushubeinrichtung insbesondere in Form einer Grabenfräse mit einer Förderbandtechnik dahingehend kombiniert, daß eine direkte Abförderung des Aushubmaterials auf ein angeschlossenes Förderband im kontinuierlichen Arbeitsgang erfolgt.The Respectively the excavated material to the work car can claim according to the development 10 by means of a conveyor belt respectively. Thus, the track-bound or track-guided excavating device in particular in the form of a trencher with a conveyor belt technology combined in that a direct discharge of the excavated material on a connected conveyor belt in the continuous Operation takes place.

Vorzugsweise ist dabei gemäß der Weiterbildung in Anspruch 11 das Förderband um eine vertikale Achse verschwenkbar. Auf diese Weise kann das Aushubmaterial sowohl auf Bahnwagen vor Kopf oder aber auch auf ein Nachbargleisfahrzeug oder einen Straßenlastkraftwagen verladen werden.Preferably is in accordance with the training in claim 11, the conveyor belt pivotable about a vertical axis. That way that can Excavation material both on railway wagons in front of head or on loading a neighboring track vehicle or a road truck become.

Die Weiterbildung gemäß Anspruch 12 sieht einen Bunkerwagen für das Verfüllmaterial vor. Die Förderwagen geben dabei das Fördermaterial aus dem Bunkerwagen auf Förderbänder ab. Dabei können bei Bedarf mehrere Bunkerwagen in Reihe gekoppelt werden, um genügend Verfüllmaterial transportieren zu können. Die Weiterbildung sieht somit vor, daß der Arbeitswagen einen Bevorratungsbehälter für das Verfüllmaterial aufweist, welches in den Graben eingebracht wird. Mittels einer entsprechenden Transporteinrichtung oder mittels entsprechenden Transporteinrichtungen werden die Verfüllmaterialien, wie beispielsweise Kies, dem Graben zugeführt. Dabei können auch mehrere Lagen unterschiedlicher Materialien eingebaut werden. Die Materialien der unterschiedlichen Lagen werden dabei über Förderbänder angeführt. Bei Bedarf können mehrere Förderbänder parallel betrieben werden.The Training according to claim 12 sees a bunker car for the backfill material in front. The trams give it the funding from the bunker car on conveyor belts. It can If required, several bunker cars are coupled in series to provide enough backfill material to be able to transport. The development thus provides that the work car a storage container for the backfill material which is introduced into the trench. By means of a corresponding transport device or by means of appropriate Transport facilities become the filling materials, such as Gravel fed to the ditch. It can also several layers of different materials are installed. The materials of the different layers are led by conveyor belts. at Demand can be several Conveyor belts in parallel operate.

Gesteuert und geführt wird die entsprechende Einbaueinheit über den automatischen oder teilautomatischen Oberwagen des Arbeitswagens.controlled and guided is the corresponding installation unit via the automatic or semi-automatic upper carriage of the work car.

Eine bevorzugte Weiterbildung schlägt Anspruch 13 dahingehend vor, daß nach dem Aushub des Grabens das seitliche Erdreich des Grabens durch seitliche Stützbretter gestützt wird. Diese Stützbretter bestehen vorzugsweise aus Blech oder Stahl. Dies ist insbesondere bei größeren Tiefen von Vorteil, wo die Gefahr sehr groß ist, daß Erdreich einbricht. Die Grundidee besteht somit darin, daß während des Vortriebs der Arbeitswagen eine automatische Mitführung eines Verbaus erfolgt. Dies bedeutet, daß der Verbau nur für die gerade zu bearbeitende Länge vorgehalten werden muß und daß dieser Verbau kontinuierlich dem Arbeitstempo des kontinuierlichen Verfahrens mitgeführt wird. Zu diesem Zweck ist die Stützeinrichtung vorzugsweise an einem teleskopierbar auskragenden Arm angeordnet, welcher die Stützbretter exakt in dem ausgegrabenen Kanal positionieren kann. Ein wesentlicher Aspekt ist dabei, daß diese seitlichen Stützbretter synchron mit dem Vorwärtstrieb der Arbeitswagen mitgeführt werden. Dies bedeutet, daß sofort nach dem Ausheben des Grabens die Stützbretter zur Wirkung gelangen und den Graben gegen seitliches Zusammenfallen schützen. Diese Stützbretter definieren somit einen sogenannten laufenden Verbau. Die seitlichen Stützbretter können dabei durch ein U-förmiges Profil definiert sein. Der Boden (oder die Decke) bildet somit die starre bauliche Verbindung zwischen den beiden seitlichen Stützbrettern. Dieser Boden bzw. die Decke braucht sich dabei nicht über die gesamte Länge dieser Stützeinrichtung zu erstrecken. Es reicht aus, daß der Boden nur über eine Teillänge ausgebildet ist. Dort, wo sich kein Boden befindet, kann dann beispielsweise der Kies für die Abdeckung des Bodens des Grabens eingebracht werden. Sind dann die beiden seitlichen Stützbretter noch durch einen horizontalen, stegartigen Abstreifer miteinander verbunden, kann der eingebrachte Kies geglättet und ggf. verdichtet werden.A preferred training proposes Claim 13 to the effect that after the excavation of the trench through the lateral soil of the trench lateral support boards supported becomes. These support boards are preferably made of sheet metal or steel. This is special at greater depths an advantage, where the danger is very great, that soil is breaking down. The basic idea is thus that during the Propulsion of the work car an automatic entrainment of a Shoring done. This means that the shoring just for the straight length to be processed must be held and that this shoring continuously the pace of the continuous process carried becomes. For this purpose, the support device preferably arranged on a telescopically projecting arm, which the support boards can position exactly in the excavated channel. An essential Aspect is that this lateral support boards synchronous with the forward drive the work car carried become. This means that immediately after digging the trench, the support boards come into effect and protect the trench from collapsing laterally. These supporting boards thus define a so-called ongoing shoring. The lateral ones supporting boards can doing so by a U-shaped profile be defined. The floor (or ceiling) thus forms the rigid one structural connection between the two lateral support boards. This floor or the ceiling does not need it over the whole length this support device to extend. It is sufficient that the soil only over one Part length formed is. Where there is no ground, then, for example the gravel for the cover of the bottom of the trench are introduced. Are then the two side support boards still connected by a horizontal, web-like scraper, The applied gravel can be smoothed and possibly compressed.

Die Weiterbildung gemäß Anspruch 14 schlägt die zuvor bereits erwähnte Variante vor, daß der dem Boden des Grabens aufgegebene Kies von einem Abstreifer geglättet und ggf. verdichtet wird. Dies bedeutet, daß zunächst dem Boden der Kies oder dgl. aufgegeben wird, wobei der mitgeführte Abstreifer den Kies abzieht und erforderlichenfalls vorverdichtet. Dies stellt somit eine Möglichkeit dar, um ohne großen Aufwand dem ausgehobenen Graben das Bodenmaterial zuzuführen. Es ist lediglich erforderlich, daß von einem entsprechenden Vorratsbehälter des Arbeitswagens der dort bevorratete Kies beispielsweise mittels eines Transportbandes dem Graben zugeführt wird.The Training according to claim 14 hits the previously mentioned Variant ago, that the The gravel abandoned by the gravel was smoothed by a scraper and possibly compressed. This means that first the bottom of the gravel or Like. Is abandoned, the entrained scraper pulls off the gravel and, if necessary, pre-compressed. This therefore represents a possibility to be without big Effort to feed the excavated soil the soil material. It is only necessary that of a corresponding reservoir of the work car, the gravel stored there, for example by means of a conveyor belt is fed to the trench.

Wie zuvor bereits ebenfalls ausgeführt, ist der Abstreifer gemäß der Weiterbildung in Anspruch 15 vorzugsweise an den Stützbrettern des laufenden Verbaus zur Abstützung des seitlichen Erdreichs ausgebildet. Dies stellt eine technisch einfache Maßnahme einerseits zum Abstützen des seitlichen Erdreichs und andererseits zum Abstreifen des aufgegebenen Kieses dar.As previously also executed, is the scraper according to the development in claim 15 preferably on the support boards of the ongoing Verbaus for support formed of the lateral soil. This represents a technical simple measure on the one hand for supporting of the lateral soil and on the other hand for stripping the abandoned Gravel

Eine weitere Weiterbildung schlägt gemäß Anspruch 16 die Bevorratung der Entwässerungs- oder Drainagerohre auf dem Arbeitswagen vor. Dabei können die bevorrateten Entwässerungs- oder Drainagerohre mittels einer entsprechenden Zuführeinrichtung dem Graben zugeführt werden. Als Zuführeinrichtung kann beispielsweise ein Förderband dienen, welches seitlich neben dem Arbeitswagen schräg in Richtung Graben verläuft. Dadurch werden die Entwässerungs- oder Drainagerohre gewissermaßen schräg von hinten dem Graben zugeführt. Die entsprechende Einbauvorrichtung der Entwässerungs- oder Drainagerohre kann zusätzlich als laufender Verbau zur seitlichen Abstützung des Erdreichs dienen. Es ist aber auch grundsätzlich denkbar, daß die Einbauvorrichtung mit den zuvor beschriebenen Seitenbrettern gleich im Anschluß an die Aushubeinrichtung miteinander kombiniert werden, daß also bereits dort der Einbau der Entwässerungs- oder Drainagerohre erfolgt, nachdem zuvor im Bereich dieser Seitenbretter der Bodensplit aufgegeben worden ist. Hierdurch kann im optimalen Fall ein Oberwagen weniger erforderlich sein. Die Funktionen und Prinzipien der beiden vorbeschriebenen Einheiten bleiben jedoch gleich. Sie sind lediglich in einer Einrichtung im Bereich des Grabens miteinander vereinigt. Grundsätzlich kann für die Entwässerungs- oder Drainagerohre ein spezieller Transportwagen vorgesehen sein. Hier können die vom Werk ab palettierten oder speziell nachpalettierten Entwässerungs- oder Drainagerohre mittels eines Portalkrans zu einem Ablegewagen transportiert werden. Dieser Ablegewagen ist somit mit der vorbeschriebenen Zuführeinrichtung ausgestattet. Der Portalkran fährt hierbei auf seinen Schienenrädern auf Flankenschienen der in Reihe gekoppelten Bahnwagen. Der Portalkran ist dabei mit einer Palettengabel oder einer anderweitigen Hubeinrichtung ausgestattet, welche zum Transport der palettierten, Entwässerungs- oder Drainagerohre in der Lage sind. Der Ablegewagen nimmt sich aus den Paletten eine fraktionierte Einheit an Entwässerungs- oder Drainagerohre und legt diese auf einem Querförderband ab. Das Querförderband transportiert die Entwässerungs- oder Drainagerohre zu einem Übergabeförderband. Da die Entwässerungs- oder Drainagerohre auf Standardpaletten lagern, muß nach Leerung dieser Palette ein schnelles Wegräumen möglich sein. Hierzu kann ein zusätzliches Querförderband die Palette sofort nach Leerung aus dem Ablagebereich für die neue, gefüllte Palette gefahren werden. Damit ist sichergestellt, daß ein kontinuierlicher Arbeitsfortschritt gewährleistet ist. Um eine kontinuierliche Versorgung mit Entwässerungs- oder Drainagerohre zu gewährleisten, können mehrere Transportwagen für die Entwässerungs- oder Drainagerohre ohne Ablegewagen zusätzlich aufgereiht werden. Ein Portalkran fährt zum Transport der Paletten jeweils über eine Schiene von Wagen zu Wagen. Er kann sowohl die alten Paletten aber auch die neuen Paletten zum vorgesehenen Arbeitsplatz transportieren.A further development proposes according to claim 16, the storage of drainage or drainage pipes on the work car. The stocked drainage or drainage pipes can be supplied to the trench by means of a corresponding feeder. As a feeder, for example, serve a conveyor belt, which extends laterally next to the work car obliquely in the direction trench. As a result, the drainage or drainage pipes are fed to a certain extent obliquely from behind the trench. The corresponding installation device of the drainage tion or drainage pipes can also serve as a running shoring for lateral support of the soil. But it is also conceivable in principle that the mounting device with the side boards described above are immediately after the excavation combined with each other, so that there is already the installation of drainage or drainage pipes, after previously been abandoned in the area of these side boards of the split floor. As a result, an upper carriage may be less necessary in the optimal case. However, the functions and principles of the two units described above remain the same. They are only united in a facility in the ditch area. In principle, a special transport vehicle can be provided for the drainage or drainage pipes. Here, the drainage or drainage pipes, which have been palletised or specially post-palletized from the factory, can be transported by means of a gantry crane to a laying trolley. This Ablegewagen is thus equipped with the above-described feeder. The gantry crane moves here on its rail wheels on flank rails of train carriages coupled in series. The gantry crane is equipped with a pallet fork or other lifting device, which are capable of transporting the palletized, drainage or drainage pipes. The depositing trolley picks up a fractionated unit of drainage or drainage pipes from the pallets and places them on a cross conveyor. The cross conveyor transports the drainage or drainage pipes to a transfer conveyor. Since the drainage or drainage pipes are stored on standard pallets, a quick evacuation must be possible after emptying this pallet. For this purpose, an additional cross conveyor the pallet can be driven immediately after emptying from the storage area for the new, filled pallet. This ensures that a continuous work progress is guaranteed. In order to ensure a continuous supply of drainage or drainage pipes, several transport trolleys for the drainage or drainage pipes can be additionally strung without trolleys. A gantry crane moves from one wagon to another to transport the pallets. He can transport both the old pallets and the new pallets to the intended workstation.

Die Weiterbildung gemäß Anspruch 17 schlägt die automatische Zuführung eines Filtervlieses vor. Der Filtervlies ist auf dem Arbeitswagen in Form einer Vliesrolle bevorratet und kann von dort aus abgerollt und automatisch der Einbaustelle zugeführt werden.The Training according to claim 17 beats the automatic feeder a filter fleece before. The filter fleece is on the work cart stored in the form of a nonwoven roll and can be rolled from there and automatically fed to the installation site.

Die Weiterbildung gemäß Anspruch 18 schlägt vor, daß am Schluß das eingegebene Verfüllmaterial nachverdichtet und/oder geglättet wird.The Training according to claim 18 beats before that on Stop that entered filling material densified and / or smoothed becomes.

Die Weiterbildung gemäß Anspruch 19 schlägt vor, daß die Maschine sämtliche vermessungstechnisch relevanten Tätigkeiten über eine entsprechende Positionssteuerung, insbesondere Lasersteuerung selbständig ausführen kann. Dies betrifft den Abstand zum Gleis, die Höhenlage der U-förmigen Kanalelemente sowie die Seitenlage des Kanals, ebenso die Verrückung des Kanals während des Arbeitsvorganges, nämlich das Verziehen während der Vorwärtsbewegung. Somit ist die Vermessung zur Herstellung des Grabens sowie weiterer Arbeiten nicht mehr reine Handarbeit und die Genauigkeit und Einhaltung von Toleranzen nicht mehr Sache eines erfahrenen Baggerfahrers. Vielmehr erfolgt die Vermessung des Grabens automatisch. Somit ermöglicht die Einrichtung alle vermessungstechnischen Leistungen sowohl nach Handbetrieb, vorzugsweise aber auch vollautomatisch. Dies bedeutet, daß im vollautomatischen Modus die relevanten Maße, der Abstand zum Gleis, Neigung des Grabens, Verziehung des Grabens in Längsrichtung, Verziehung des Grabens in der Höhe, durch eine entsprechende Positionserkennungseinrichtung, insbesondere durch eine Lasersteuerung ermittelt werden.The Training according to claim 19 beats before that the Machine all measurement-relevant activities via a corresponding position control, In particular, laser control can run independently. This concerns the Distance to the track, the altitude the U-shaped Channel elements and the lateral position of the channel, as well as the displacement of the Channels during the Working process, namely warping during the forward movement. Thus, the survey for the production of the trench and others No longer work purely by hand and the accuracy and compliance Tolerances no longer a matter of an experienced excavator driver. Rather, the measurement of the trench is done automatically. Thus, the Installation of all surveying services both after manual operation, but preferably also fully automatic. This means that in fully automatic Mode the relevant dimensions, the distance to the track, inclination of the trench, distortion of the trench longitudinal, Distortion of the ditch in height, by a corresponding position detection device, in particular be determined by a laser control.

Ein Ausführungsbeispiel einer Vorrichtung zur Durchführung des Verfahrens zum Erstellen einer Entwässerungseinrichtung neben dem Gleis einer Bahnstrecke wird nachfolgend anhand der Zeichnungen beschrieben. In diesen zeigt:One embodiment a device for implementation the method for creating a drainage device next to the Track of a railway line is described below with reference to the drawings described. In these shows:

1 eine Einzelansicht der Vorrichtung zum Ausheben eines Grabens; 1 a single view of the device for digging a trench;

2 einen Schnitt entlang der Linie A-A in 1; 2 a section along the line AA in 1 ;

3 eine schematische Seitenansicht der Vorrichtung zum Erstellen einer Entwässerungseinrichtung; 3 a schematic side view of the device for creating a drainage device;

4a einen Schnitt entlang der Linie B-B in 3; 4a a section along the line BB in 3 ;

4b einen Schnitt entlang der Linie C-C in 3; 4b a section along the line CC in 3 ;

4c einen Schnitt entlang der Linie D-D in 3; 4c a section along the line DD in 3 ;

5 einen Bunkerwagen für die Materialien; 5 a bunker wagon for the materials;

6 einen weiteren Bunkerwagen für die Materialien mit einem Übergabeförderband. 6 another bunker wagon for the materials with a transfer conveyor.

Zunächst ist in den 1 und 2 die Vorrichtung zum Ausheben eines Grabens in einer Einzelansicht dargestellt.First, in the 1 and 2 the device for digging a trench shown in a single view.

Auf einem Gleis 1 einer Bahnstrecke ist ein Arbeitswagen 2 mit einem Oberbau 3 verfahrbar. Aufgabe dieses Arbeitswagens 2 mit einem entsprechenden Werkzeug ist es, mit Abstand seitlich neben dem Gleis 1 einen Graben 4 auszuheben.On a track 1 a railway line is a work car 2 with a superstructure 3 traversable. Task of this work car 2 with an appropriate tool, it is by far the side of the track 1 a ditch 4 dig.

Zu diesem Zweck ist ein am Oberbau 3 des Arbeitswagens 2 seitlich auskragender, teleskopierbarer Ausleger 5 vorgesehen. Am äußeren Ende dieses Auslegers 5 befindet sich eine Aushubeinrichtung 6. Diese Aushubeinrichtung 6 ist als Fräseinrichtung 7 in Form eines endlos umlaufendes Bandes 8 mit darauf befindlichen Fräselementen 9 ausgebildet.For this purpose, one is at the superstructure 3 of the work cart 2 laterally projecting, telescopic boom 5 intended. At the outer end of this jib 5 there is an excavation facility 6 , This excavating device 6 is as a milling device 7 in the form of an endless circulating band 8th with milling elements on it 9 educated.

Weiterhin ist ein Förderband 10 vorgesehen. Dieses mündet mit seinem vorderen Ende oberhalb eines – nicht dargestellten – weiteren Arbeitswagens 2 auf dem gleichen Gleis 1 oder auf einem Nachbargleis. Dieses Förderband 10 ist um eine vertikale Achse verschwenkbar.Furthermore, a conveyor belt 10 intended. This opens with its front end above a - not shown - another work car 2 on the same track 1 or on a neighboring track. This conveyor belt 10 is pivotable about a vertical axis.

Die Funktionsweise der Grabenaushubvorrichtung ist wie folgt:
Zunächst bringt der teleskopierbare Ausleger 5 die Fräseinrichtung 7 der Aushubeinrichtung 6 in den richtigen seitlichen Abstand bezüglich des Gleises 1. Es ist aber genau die Stelle, wo der Graben 4 ausgehoben werden soll.
The operation of the trenching apparatus is as follows:
First, the telescopic boom brings 5 the milling device 7 the excavating device 6 in the correct lateral distance with respect to the track 1 , But it is exactly the place where the ditch 4 to be dug.

Anschließend wird die Fräseinrichtung 7 mittels eines entsprechenden Antriebs nach unten verschwenkt, und zwar mit einem Neigungswinkel, wie er in 1 erkennbar ist. Durch das endlos umlaufende Band 8 wird mittels der Fräselemente 9 das Erdreich abgefräst, so daß der Graben 4 entsteht. Wesentlich dabei ist, daß sich während dieses Fräsvorganges der Arbeitswagen 2 kontinuierlich vorwärts bewegt. Dies bedeutet, daß während dieses Vorwärtstriebs des Arbeitswagens 2 das Erdreich kontinuierlich mittels der Fräseinrichtung 7 abgefräst wird und somit entsprechend dem Vorwärtstrieb des Arbeitswagens 2 der Graben 4 geschaffen wird. Durch eine Höhenverstellung des Auslegers 5 an seinem Oberbau 3 des Arbeitswagens 2 und/oder durch die Neigung der Fräseinrichtung 7 kann die Tiefe des Grabens 4 vorherbestimmt werden. Die Steuerung erfolgt dabei vorzugsweise automatisch mittels einer Laserpositioniereinrichtung.Then the milling device 7 pivoted by a corresponding drive down, with an inclination angle, as in 1 is recognizable. Through the endless circulating band 8th is by means of the milling elements 9 milled the soil, leaving the ditch 4 arises. It is essential that during this milling process of the work car 2 continuously moving forward. This means that during this forward drive of the work car 2 the soil continuously by means of the milling device 7 is milled and thus according to the forward drive of the work car 2 the ditch 4 is created. By a height adjustment of the boom 5 at his superstructure 3 of the work cart 2 and / or by the inclination of the milling device 7 can the depth of the trench 4 be predetermined. The control is preferably carried out automatically by means of a laser positioning.

Das von der Fräseinrichtung 7 abgefräste Aushubmaterial 11 wird dem Förderband 10 aufgegeben. Dieses Förderband 10 wird um seine vertikale Achse derart verschwenkt, daß das vordere Ende dieses Förderbands 10 das Aushubmaterial 11 in einen entsprechenden Vorratsbehälter abwirft. Es kann sich dabei um den Arbeitswagen 2, um einen dahinter oder davor befindlichen Arbeitswagen 2, um einen Arbeitswagen 2 auf einem Nachbargleis oder um einen Lastkraftwagen handeln.That of the milling device 7 milled excavated material 11 gets the conveyor belt 10 given up. This conveyor belt 10 is pivoted about its vertical axis such that the front end of this conveyor belt 10 the excavated material 11 dumped into a corresponding reservoir. It can be the work car 2 to a behind or in front of the work car 2 to a work car 2 on a neighboring track or around a truck.

Nachdem in das Erdreich 12 der Graben 4 eingebracht worden ist, besteht die Gefahr, daß das seitliche Erdreich 12 in den Graben 4 einbricht. Aus diesem Grunde ist im Anschluß an die Aushubeinrichtung 6 eine Abstützeinrichtung 13 für die Seitenwände des Grabens 4 vorgesehen. Zu diesem Zweck dient ein U-Profil mit seitlichen Stützbrettern 4. Dieses ist an einem teleskopierbaren Kragarm 15 derart angeordnet, daß das U-Profil derart in den Graben 4 ragt, daß die seitlichen Stützbretter 14 seitlich am Graben 4 anliegen und das Erdreich 12 stützen. Wesentlich dabei ist, daß dieser durch die Stützbretter 14 gebildete Verbau synchron mitfährt. Dies bedeutet, daß sofort hinter der Aushubeinrichtung 6 die Stützbretter 14 nachgeführt werden. Eine weitere Besonderheit des die Stützbretter 14 definierenden U-Profils ist, daß dieses nur im vorderen Bereich einen Boden aufweist (welcher die Stützbretter 14 starr beabstandet), während im hinteren Bereich der Boden weggelassen ist.After getting into the soil 12 the ditch 4 has been introduced, there is a risk that the lateral soil 12 in the ditch 4 breaks. For this reason, following the excavation 6 a support device 13 for the side walls of the trench 4 intended. For this purpose, a U-profile with lateral support boards is used 4 , This is on a telescopic cantilever 15 arranged such that the U-profile in such a way in the trench 4 sticks out that the lateral support boards 14 at the side of the ditch 4 abutment and the soil 12 support. It is essential that this through the support boards 14 formed Verbau synchronously mitfährt. This means that immediately behind the excavator 6 the support boards 14 be tracked. Another special feature of the support boards 14 defining U-profile is that this only in the front area has a bottom (which the support boards 14 rigidly spaced), while the bottom is omitted in the rear area.

Denn diesem bodenlosen Bereich des U-Profils wird Kies 16 zugeführt. Dieser ist in einem Bevorratungsbehälter 17 bevorratet. Dieser definiert zusammen mit einer Transporteinrichtung 18 in Form eines Förderbandes eine Kiesaufgabeeinrichtung 19.Because this bottomless area of the U-profile is gravel 16 fed. This is in a storage container 17 stored. This defines together with a transport device 18 in the form of a conveyor belt, a gravel application device 19 ,

Die Funktionsweise ist dabei wie folgt:
Der in dem Bevorratungsbehälter 17 bevorratete Kies 16 wird über die schräg nach vorne gerichtete Transporteinrichtung 18 in Form des Förderbandes dem Graben 4 zugeführt, und zwar im Bereich des U-Profils, welches die seitlichen Stützbretter 14 definiert. Konkret wird der Kies 16 demjenigen Bereich des U-Profils zugeführt, welcher keinen Boden aufweist. Dies bedeutet, daß der Kies 16 direkt dem Untergrund des ausgehobenen Grabens 4 zugeführt wird.
The functionality is as follows:
The in the storage container 17 stockpiled gravel 16 is via the obliquely forward transport device 18 in the form of the conveyor belt the ditch 4 fed, in the area of the U-profile, which the side support boards 14 Are defined. Specifically, the gravel 16 supplied to that region of the U-profile, which has no bottom. This means that the gravel 16 directly to the underground of the excavated trench 4 is supplied.

Allerdings befindet sich am hinteren Ende der beiden Stützbretter 14 ein quer verlaufender Abstreifer 20. Dieser streicht den darunter durchziehenden Kies 16 glatt und verdichtet ihn gegebenenfalls.However, located at the rear end of the two support boards 14 a transverse scraper 20 , This sweeps the passing below gravel 16 smooth and compact it if necessary.

Nachdem der Graben 4 in dem Erdreich 12 erstellt worden ist und nachdem auch der Graben 4 auf die vorbeschriebene Art und Weise seitlich abgestützt worden ist, können nunmehr die Einzelelemente der Entwässerungseinrichtung eingebracht werden.After the ditch 4 in the soil 12 has been created and also the trench 4 has been laterally supported in the manner described above, now the individual elements of the drainage device can be introduced.

So ist gezeigt, wie ein Filtervlies 21 eingebracht wird. Dieses ist dabei auf dem Arbeitswagen 2 auf einer Rolle 22 bevorratet. Das Filtervlies 21 wird von dieser Rolle 22 abgerollt und automatisch dem Graben 4 zugeführt. Die zugehörige Einbaueinheit 23, welche auch die seitlichen Stützbretter 14 zum Abstützen des Grabens 4 definiert, wird über den Oberwagen mittels des Auslegers in Form des Tragearms 15 gesteuert.This shows how a filter fleece 21 is introduced. This is on the work car 2 on a roll 22 stored. The filter fleece 21 will from this role 22 unrolled and automatically digging 4 fed. The associated installation unit 23 which also have the side support boards 14 for supporting the trench 4 Defined, is about the superstructure by means of the boom in the form of the support arm 15 controlled.

Weiterhin ist ein Lager für die einzubauenden Entwässerungs- oder Drainagerohre 24 vorgesehen. Diese werden mittels einer Einbaueinrichtung 25 dem Graben 4 zugeführt und dort eingebaut. Die seitliche Zuführung der Entwässerungs- oder Drainagerohre 24 auf dem Arbeitswagen 2 erfolgt dabei über eine Querfördereinrichtung 26.Furthermore, a warehouse for the drainage or drainage pipes to be installed 24 intended. These are by means of a mounting device 25 the ditch 4 fed and installed there. The lateral supply of drainage or drainage pipes 24 on the work cart 2 takes place via a cross conveyor 26 ,

Schließlich wird der Graben 4 noch mit Verfüllmaterial 27 aufgefüllt. Hierzu dient eine Verfüllmaterialeinbringeinrichtung 28. Bei dem Verfüllmaterial 27 kann es sich um Kies oder um anderes Material handeln. Das Verfüllmaterial wird dabei aus entsprechenden Bevorratungsbehältern 29 mittels einer Transporteinrichtung 30 in Form eines Förderbandes der Verfüllmaterialeinbringeinrichtung 28 zugeführt. Dabei können auch mehrere Lagen unterschiedlicher Materialien eingebaut werden, wenn entsprechende Einbringeinrichtungen in Reihe hintereinander angeordnet sind. Bei Bedarf können auch mehrere Transporteinrichtungen 30 parallel betrieben werden.Finally, the ditch 4 still with backfill material 27 refilled. This purpose is served by a filling material introduction device 28 , In the backfill material 27 it can be gravel or other material. The filling material is from corresponding storage containers 29 by means of a transport device 30 in the form of a conveyor belt of the backfill feed device 28 fed. In this case, a plurality of layers of different materials can be installed if corresponding insertion devices are arranged in series one behind the other. If necessary, several transport facilities 30 operated in parallel.

Gesteuert und geführt wird die Verfüllmaterialeinbringeinrichtung 28 über den automatischen oder teilautomatischen Oberwagen. Es sei hier angemerkt, daß konstruktionsbedingt die verschiedenen Oberwagen auch gemeinsam oder in verschiedenen Abhängigkeiten angesteuert werden können. Grundsätzlich sind hier die unterschiedlichsten Varianten denkbar. So ist es auch möglich, auf ein und demselben Arbeitswagen 2 die unterschiedlichsten Aufbauten mit ihren Oberwagen für die entsprechenden Funktionen anzuordnen. Es ist aber auch denkbar, daß für jede einzelne Funktion jeweils ein eigener Arbeitswagen 2 vorgesehen ist. Auch können mehrere Funktionen auf einem Arbeitswagen vereinigt sein, andere Funktionseinheiten können dann auf anderen Arbeitswagen 2 angeordnet sein.The filling material introduction device is controlled and guided 28 via the automatic or semi-automatic superstructure. It should be noted here that, by design, the various superstructures can also be controlled together or in different dependencies. Basically, the most diverse variants are conceivable here. So it is also possible on one and the same work car 2 to arrange the most varied superstructures with their superstructure for the corresponding functions. But it is also conceivable that for each individual function each have their own work car 2 is provided. Also, several functions can be combined on a work car, other functional units can then on other work car 2 be arranged.

Schließlich kann optional noch ein Nachverdichter 31 oder Glätter nachgeschaltet sein.Finally, optionally, a re-compressor 31 or smoother be downstream.

11
Gleistrack
22
Arbeitswagentrolley
33
Oberbausuperstructure
44
Grabendig
55
Auslegerboom
66
Aushubeinrichtungexcavator
77
Fräseinrichtungmilling device
88th
Bandtape
99
Fräselementmilling element
1010
Förderbandconveyor belt
1111
Aushubmaterialexcavated material
1212
Erdreichsoil
1313
Abstützeinrichtungsupport means
1414
Stützbrettsupport board
1515
Kragarmcantilever
1616
SplitSplit
1717
Bevorratungsbehälterstorage container
1818
Transporteinrichtungtransport means
1919
SplitaufgabeeinrichtungSplit feeder
2020
Abstreiferscraper
2121
Filtervliesfilter fabric
2222
Rollerole
2323
Einbaueinheitinstallation unit
2424
Entwässerungs- oder Drainagerohrdrainage or drainage pipe
2525
Zuführ- und EinbaueinrichtungFeed and feed installing means
2626
QuerfördereinrichtungCross conveyor
2727
Verfüllmaterialbackfill
2828
VerfüllmaterialeinbringeinrichtungVerfüllmaterialeinbringeinrichtung
2929
Bevorratungsbehälterstorage container
3030
Transporteinrichtungtransport means
3131
Nachverdichterboosters

Claims (19)

Verfahren zum Erstellen einer Entwässerungseinrichtung neben dem Gleis (1) einer Bahnstrecke, bei dem zunächst aus dem Erdreich (12) ein Graben (4) ausgehoben wird und bei dem anschließend in den ausgehobenen Graben (4) Entwässerungs- oder Drainagerohre (24) sowie Verfüllmaterial (27) sowie ggf. ein Filtervlies (21) eingegeben werden, dadurch gekennzeichnet, daß ein oder mehrere, auf dem Gleis (1) verfahrbare Arbeitswagen (2) verwendet werden, welche/r in Fahrtrichtung gesehen hintereinander zunächst eine Aushubeinrichtung (6) sowie anschließend Einrichtungen zum Einbringen der Entwässerungs- oder Drainagerohre (24) sowie des Verfüllmaterials (27) aufweisen/aufweist und welche/r während der Arbeiten kontinuierlich vorwärtbewegt werden/wird.Method for creating a drainage device next to the track ( 1 ) of a railway track, at first from the ground ( 12 ) a ditch ( 4 ) and then in the excavated trench ( 4 ) Drainage or drainage pipes ( 24 ) as well as filling material ( 27 ) and possibly a filter fleece ( 21 ), characterized in that one or more, on the track ( 1 ) movable work car ( 2 ) are used, which seen in the direction of travel successively first an excavating device ( 6 ) and subsequently means for introducing the drainage or drainage pipes ( 24 ) as well as the filling material ( 27 ) and which are continuously advanced during the work. Verfahren nach dem vorhergehenden Anspruch, dadurch gekennzeichnet, daß auf dem auf dem Gleis (1) verfahrbaren Arbeitswagen (2) eine Aushubeinrichtung (6) angeordnet ist, welche vom Arbeitswagen (2) aus den Graben (4) aushebt, daß der Arbeitswagen (2) während des Aushebens des zum Gleis parallelen Grabens (4) kontinuierlich vorwärtsbewegt und dabei gleichzeitig der Aushub kontinuierlich durchgeführt wird und daß das Aushubmaterial (11) nach dem Aushub kontinuierlich dem Arbeitswagen (2) oder einem anderen, auf dem Gleis (2) oder einem Nachbargleis verfahrenbaren Arbeitswagen (2) zugeführt wirdMethod according to the preceding claim, characterized in that on the track ( 1 ) movable work car ( 2 ) an excavating device ( 6 ) arranged by the work car ( 2 ) from the ditch ( 4 ) states that the work car ( 2 ) during excavation of the trench parallel to the track ( 4 ) is continuously advanced while the excavation is carried out continuously and that the excavated material ( 11 ) after excavation continuously the work car ( 2 ) or another, on the track ( 2 ) or a neighboring track traversable work car ( 2 ) is supplied Verfahren nach dem vorhergehenden Anspruch, dadurch gekennzeichnet, daß das Aushubmaterial (11) durch die Aushubeinrichtung (6) abgefräst wird.Method according to the preceding claim, characterized in that the excavated material ( 11 ) by the excavating device ( 6 ) is milled. Verfahren nach Anspruch 3, dadurch gekennzeichnet, daß zum Abfräsen eine Fräseinrichtung (7) mit einem endlos umlaufenden Band (8) oder Kette mit darauf angeordneten Fräselementen (9) verwendet wird.Method according to claim 3, characterized in that for milling a milling device ( 7 ) with an endlessly circulating band ( 8th ) or chain with milled elements ( 9 ) is used. Verfahren nach Anspruch 4, dadurch gekennzeichnet, daß die Breite der Fräseinrichtung (7) der Breite des auszuhebenden Grabens (4) entspricht.Method according to claim 4, characterized in that the width of the milling device ( 7 ) the width of the trench to be excavated ( 4 ) corresponds. Verfahren nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, daß die Aushubeinrichtung (6) an einem quer zur Bewegungsrichtung des Arbeitswagens (2) teleskopierbaren Ausleger (5) angeordnet ist.Method according to one of the preceding claims, characterized in that the excavating device ( 6 ) on a transversely to the direction of movement of the work vehicle ( 2 ) telescopic boom ( 5 ) is arranged. Verfahren nach Anspruch 6, dadurch gekennzeichnet, daß der teleskopierbare Ausleger (5) und/oder die Aushubeinrichtung (6) an dem teleskopierbaren Ausleger (5) höhenverstellbar angeordnet ist.Method according to claim 6, characterized in that the telescopic boom ( 5 ) and / or the excavating device ( 6 ) on the telescopic boom ( 5 ) is arranged adjustable in height. Verfahren nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, daß die Aushubeinrichtung (6) auswechselbar am Arbeitswagen (2) angeordnet ist.Method according to one of the preceding claims, characterized in that the excavating device ( 6 ) replaceable on the work car ( 2 ) is arranged. Verfahren nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, daß der Aushubeinrichtung (6) eine Positionsmeßeinrichtung zur Positionsbestimmung bezüglich des Gleises (1) zugeordnet ist.Method according to one of the preceding claims, characterized in that the excavating device ( 6 ) a position measuring device for determining the position relative to the track ( 1 ) assigned. Verfahren nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, daß zum Zuführen des Aushubmaterials (11) zum Arbeitswagen (2) ein Förderband (10) vorgesehen ist, dem das Aushubmaterial (11) von der Aushubeinrichtung (6) aufgegeben wird.Method according to one of the preceding claims, characterized in that for feeding the excavated material ( 11 ) to the work car ( 2 ) a conveyor belt ( 10 ), to which the excavated material ( 11 ) from the excavating device ( 6 ) is abandoned. Verfahren nach Anspruch 10, dadurch gekennzeichnet, daß das Förderband (10) um eine vertikale Achse verschwenkbar ist.Method according to claim 10, characterized in that the conveyor belt ( 10 ) is pivotable about a vertical axis. Verfahren nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, daß die Verfüllmaterialeingabeeinrichtung (28) einen Bevorratungsbehälter (29) für das Verfüllmaterial (27) auf dem Arbeitswagen (2) sowie eine von dem Bevorratungsbehälter (29) ausgehende sowie im Graben (4) mündende Transporteinrichtung (30) aufweist.Method according to one of the preceding claims, characterized in that the filling material input device ( 28 ) a storage container ( 29 ) for the filling material ( 27 ) on the work cart ( 2 ) and one of the storage container ( 29 ) outgoing as well as in the ditch ( 4 ) transporting facility ( 30 ) having. Verfahren nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, daß im Bereich zwischen der Aushubstelle des Grabens (4) und der Zuführung des Verfüllmaterials (27) zum Auffüllen des Grabens (4) am Schluß die Seitenwände des Grabens (4) durch seitliche Stützbretter (14) gestützt werden, welche an einem Kragarm (15) des Arbeitswagens (2) angeordnet sind und synchron mitgeführt werden.Method according to one of the preceding claims, characterized in that in the region between the excavation point of the trench ( 4 ) and the feeding of the filling material ( 27 ) to fill the trench ( 4 ) at the end the side walls of the trench ( 4 ) by lateral support boards ( 14 ) supported by a cantilever ( 15 ) of the work cart ( 2 ) are arranged and synchronously carried. Verfahren nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, daß das in den Graben (4) eingebrachte Verfüllmaterial (27) von einem Abstreifer (20) geglättet und ggf. verdichtet wird, wobei der Abstreifer (20) fest mit dem Arbeitswagen (2) verbunden ist und synchron mitgeführt wird.Method according to one of the preceding claims, characterized in that the in the trench ( 4 ) infill material ( 27 ) of a scraper ( 20 ) is smoothed and compressed if necessary, wherein the scraper ( 20 ) fixed to the work cart ( 2 ) is connected and synchronously carried. Verfahren nach den Ansprüchen 13 und 14, dadurch gekennzeichnet, daß der Abstreifer (20) an den Stützbrettern (14) angeordnet ist.Process according to claims 13 and 14, characterized in that the scraper ( 20 ) on the support boards ( 14 ) is arranged. Verfahren nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, daß die Entwässerungs- oder Drainagerohre (24) auf dem Arbeitswagen (2) bevorratet werden und von dort aus mittels einer Zuführ- und Einbaueinrichtung (23) dem Graben (4) zugeführt und in diesem eingebaut werden.Method according to one of the preceding claims, characterized in that the drainage or drainage pipes ( 24 ) on the work cart ( 2 ) and from there by means of a feeding and installation device ( 23 ) the ditch ( 4 ) are fed and installed in this. Verfahren nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, daß zum automatischen Zuführen eines Filtervlieses (21) dieses in Form von Rollen (22) auf dem Arbeitswagen (2) bevorratet ist.Method according to one of the preceding claims, characterized in that for automatically feeding a filter fleece ( 21 ) this in the form of rolls ( 22 ) on the work cart ( 2 ) is stored. Verfahren nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, daß am Schluß das eingegebene Verfüllmaterial (27) nachverdichtet und/oder geglättet wird.Method according to one of the preceding claims, characterized in that at the end the input filling material ( 27 ) is densified and / or smoothed. Verfahren nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, daß vermessungstechnisch relevante Arbeiten mittels einer Positionserkennungseinrichtung mit zugeordneter Steuerung durchgeführt werden.Method according to one of the preceding claims, characterized characterized in that surveying technology relevant work by means of a position detection device be performed with associated control.
DE102009007226A 2009-02-03 2009-02-03 Method for creating a drainage device next to the track of a railway line Expired - Fee Related DE102009007226B4 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
DE102009007226A DE102009007226B4 (en) 2009-02-03 2009-02-03 Method for creating a drainage device next to the track of a railway line
EP10001020A EP2213794A3 (en) 2009-02-03 2010-02-02 Method for producing a water drainage device beside the track of a rail section

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE102009007226A DE102009007226B4 (en) 2009-02-03 2009-02-03 Method for creating a drainage device next to the track of a railway line

Publications (2)

Publication Number Publication Date
DE102009007226A1 true DE102009007226A1 (en) 2010-08-12
DE102009007226B4 DE102009007226B4 (en) 2012-11-22

Family

ID=42133410

Family Applications (1)

Application Number Title Priority Date Filing Date
DE102009007226A Expired - Fee Related DE102009007226B4 (en) 2009-02-03 2009-02-03 Method for creating a drainage device next to the track of a railway line

Country Status (2)

Country Link
EP (1) EP2213794A3 (en)
DE (1) DE102009007226B4 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102011010420A1 (en) * 2011-02-04 2012-08-09 Michael Stelley Device and method for the construction and processing of track systems

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
ES2410779B1 (en) * 2011-09-05 2014-09-10 Enrique RECA BLANCO MACHINE FOR THE PLACEMENT OF PREFABRICATED CHANNELS IN TIDES, WITH RECOVERY SYSTEM OF GRAVES AND ZAHORRAS
FR3006276B1 (en) * 2013-06-03 2016-08-19 Soc Nat Des Chemins De Fer Francais Sncf RAILWAY EQUIPMENT SUITABLE FOR REALIZING CIVIL ENGINEERING WORK
CN109082949A (en) * 2018-09-20 2018-12-25 深圳大行同宇科技有限公司 A kind of multifunction module formula track pedestal
CN114457783A (en) * 2022-03-03 2022-05-10 中交一公局集团有限公司 Processing structure of coastal soft foundation and construction method thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4713898A (en) * 1985-12-16 1987-12-22 Loram Maintenance Of Way, Inc. Railroad mounted trench digger
DE4234442A1 (en) * 1992-10-13 1994-04-14 Brosi Harald Dipl Ing Fh Method of filling pipe trenches with concrete - involves keeping dry concrete ingredients in silo on vehicle which is brought to trench edge and then adding water to mixture in mixing and conveying machine just before pouring
US5435081A (en) * 1992-05-25 1995-07-25 Franz Plasser Bahnbaumaschinen-Industriegesellschaft Ballast plow
DE10102328A1 (en) * 2000-02-24 2001-10-04 Ems Gleisbau Gmbh & Co Kg Concrete foundation pouring machine for construction of foundation for edge of railway platform uses hopper with strickle board attached to frame sliding along track

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2646185B1 (en) * 1989-04-19 1991-06-21 Dariel Andre GUIDING DEVICE OF A MACHINE FOR HOLLOW-TRUCKING OR LAYING LINEAR OBJECTS PARALLEL TO A DRIVING VEHICLE
DE19858151A1 (en) * 1998-12-16 2000-06-21 Heilit & Woerner Bau Ag Excavator for ditches and embankments has a cutting attachment fitted to the arm of a conventional excavator and with adjustment to angle the cutting head
DE10307753B4 (en) * 2003-02-19 2015-10-29 Felix Kunzewitsch Method and device for laying pipelines
DE10337977B3 (en) * 2003-06-30 2004-12-16 Kommanditgesellschaft Ems Gleisbau Gmbh & Co. Arrangement for producing excavation and laying cable channel along tracks has movable with jib, bucket that protrudes into ground with profile inclined forwards and downwards in working direction
DE102007010101B4 (en) * 2007-03-02 2012-07-05 Geschw. Balter Bauunternehmung Gmbh Method for producing a supply line duct and train consisting of vehicles for carrying out the method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4713898A (en) * 1985-12-16 1987-12-22 Loram Maintenance Of Way, Inc. Railroad mounted trench digger
US5435081A (en) * 1992-05-25 1995-07-25 Franz Plasser Bahnbaumaschinen-Industriegesellschaft Ballast plow
DE4234442A1 (en) * 1992-10-13 1994-04-14 Brosi Harald Dipl Ing Fh Method of filling pipe trenches with concrete - involves keeping dry concrete ingredients in silo on vehicle which is brought to trench edge and then adding water to mixture in mixing and conveying machine just before pouring
DE10102328A1 (en) * 2000-02-24 2001-10-04 Ems Gleisbau Gmbh & Co Kg Concrete foundation pouring machine for construction of foundation for edge of railway platform uses hopper with strickle board attached to frame sliding along track

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102011010420A1 (en) * 2011-02-04 2012-08-09 Michael Stelley Device and method for the construction and processing of track systems

Also Published As

Publication number Publication date
EP2213794A2 (en) 2010-08-04
EP2213794A3 (en) 2012-10-03
DE102009007226B4 (en) 2012-11-22

Similar Documents

Publication Publication Date Title
DE3035910C2 (en)
AT519075B1 (en) Method and device for laying cables and/or the like.
DE68912167T2 (en) Method and device for expanding tunnels.
EP2054552B1 (en) Method and device for renewing a ballast bed
EP1964973B1 (en) Method for manufacturing a supply line channel and train consisting of vehicles for executing the method
DE2529135C2 (en) Track construction train for the renewal of a railway line
DE102009007226B4 (en) Method for creating a drainage device next to the track of a railway line
EP2213792B1 (en) Method for laying U-shaped channel elements beside the track of a rail section
EP0056497A1 (en) Frame wagon in a train for the subsoil stabilization of railway tracks
DE102009007222B4 (en) Track vehicle for excavating a trench parallel to a track on railway lines
DE2937205C2 (en) Longitudinal sewer machine
EP2758633B1 (en) Shield driving device
DE4011907A1 (en) Roadway heading chamber for temporary support of mining tunnel - comprises front and rear sections with roof supports and back-filled support all carried on framework
EP0585657A1 (en) Device for replacing soil, especially next to roads and buildings
WO2013011083A2 (en) Finished-part track for an inclined conveyor system for mining trucks
DE4341418A1 (en) Process and device for the rehabilitation of railway track systems
EP0230667B1 (en) Method for the stripe-wise removal of subsoil layers, especially non-rigid ones
DE2021839C3 (en) Device for driving advancing structures
DE3739680A1 (en) MACHINE AND METHOD FOR CONTINUOUSLY RELEASING STONE OD. DGL. AND RECOVERY OF THE SOLVED, CRUSHED PLANT IN THE MINING, EARTH AND TUNNEL CONSTRUCTION
DE1915091A1 (en) Method and device for the production of channels using the diaphragm wall method
DE3442871C2 (en)
DE19623454C2 (en) Process for producing and shoring trenches
DE4412002A1 (en) Narrow frontage machine for suspended mining of inclined coal seams
DE19547511A1 (en) Railway track substructure servicing method
DE1658767A1 (en) Tunneling facility

Legal Events

Date Code Title Description
OP8 Request for examination as to paragraph 44 patent law
R016 Response to examination communication
R018 Grant decision by examination section/examining division
R020 Patent grant now final

Effective date: 20130223

R082 Change of representative

Representative=s name: MEPAT PATENTANWAELTE, DR. MEHL-MIKUS, GOY, DR., DE

R119 Application deemed withdrawn, or ip right lapsed, due to non-payment of renewal fee