DE102008013828A1
DE102008013828A1 DE102008013828A DE102008013828A DE102008013828A1 DE 102008013828 A1 DE102008013828 A1 DE 102008013828A1 DE 102008013828 A DE102008013828 A DE 102008013828A DE 102008013828 A DE102008013828 A DE 102008013828A DE 102008013828 A1 DE102008013828 A1 DE 102008013828A1
Authority
DE
Germany
Prior art keywords
tower
crane
crane according
pulley system
longitudinal overlap
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
DE102008013828A
Other languages
German (de)
Inventor
Frank Burgdorf
Kurt Rücker
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
KSD KRANSYSTEME GmbH
Original Assignee
KSD KRANSYSTEME GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by KSD KRANSYSTEME GmbH filed Critical KSD KRANSYSTEME GmbH
Priority to DE102008013828A priority Critical patent/DE102008013828A1/en
Priority to DE502009000246T priority patent/DE502009000246D1/en
Priority to EP09003429A priority patent/EP2100843B1/en
Priority to AT09003429T priority patent/ATE493365T1/en
Publication of DE102008013828A1 publication Critical patent/DE102008013828A1/en
Withdrawn legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/18Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes
    • B66C23/26Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes for use on building sites; constructed, e.g. with separable parts, to facilitate rapid assembly or dismantling, for operation at successively higher levels, for transport by road or rail
    • B66C23/28Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes for use on building sites; constructed, e.g. with separable parts, to facilitate rapid assembly or dismantling, for operation at successively higher levels, for transport by road or rail constructed to operate at successively higher levels
    • B66C23/30Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes for use on building sites; constructed, e.g. with separable parts, to facilitate rapid assembly or dismantling, for operation at successively higher levels, for transport by road or rail constructed to operate at successively higher levels with frameworks composed of telescopic elements
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/18Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes
    • B66C23/26Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes for use on building sites; constructed, e.g. with separable parts, to facilitate rapid assembly or dismantling, for operation at successively higher levels, for transport by road or rail
    • B66C23/34Self-erecting cranes, i.e. with hoisting gear adapted for crane erection purposes
    • B66C23/342Self-erecting cranes, i.e. with hoisting gear adapted for crane erection purposes with telescopic elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Transportation (AREA)
  • Mechanical Engineering (AREA)
  • Jib Cranes (AREA)

Abstract

The crane has a tower (2) with lower, middle and upper tower parts (21-23), where the part (23) is movable to extend the tower-height from a position with large longitudinal overlap with the part (21) into another position with small overlap. The part (22) is slidable along the parts (21, 23) to move the part (22) from a lower position exhibiting large longitudinal overlap with the part (21) into an upper position with small overlap. The part (22) is longitudinally slidable against the part (23) to move the part (23) into a third position exhibiting a longitudinal overlap with the part (22). An independent claim is also included for a method for moving a crane tower.

Description

Die vorliegende Erfindung betrifft einen Kran mit einem Turm, der sich aus mehreren ineinander verschiebbar geführten Turmteilen zusammensetzt gemäß dem Oberbegriff des Patentanspruchs 1. Außerdem betrifft die vorliegende Erfindung auch ein Verfahren zum Ausfahren des Turms eines solchen Krans.The The present invention relates to a crane having a tower that extends from several telescopically guided tower parts composed according to the preamble of the claim 1. In addition, the present invention also relates to a method for extending the tower of such a crane.

Bei einem beispielsweise aus der DE-PS 1168617 bekannten Kran besteht der Turm aus mindestens zwei teleskopartig ineinander verschiebbaren Turmteilen. Das Turmteil mit dem größten Aufnahmequerschnitt ist hier als Außenteil bezeichnet und bildet im aufgerichteten Zustand die Basis des Turms, während das im Außenteil geführte Innenteil mit einem Teleskopiermechanismus im Außenteil bis zur Erreichung der vorgesehene Betriebsstellung verschoben wird. Um die Ausfahrbewegung des Innenteils zur Erreichung einen Stellung mit vergrößerter Lasthakenhöhe fortsetzen zu können, wird wiederum das Außenteil durch Anbau einer Verlängerung erhöht, bevor das Innenteil mit dem gleichen Teleskopiermechanismus weiter in eine höhere Betriebsstellung hochgehievt wird.For example, from the DE-PS 1168617 known crane, the tower consists of at least two telescopically movable tower parts. The tower part with the largest receiving cross-section is referred to here as the outer part and in the erected state forms the base of the tower, while the guided in the outer part of the inner part is moved with a telescoping mechanism in the outer part until the intended operating position. In order to continue the extension movement of the inner part to achieve a position with increased load hook height, in turn, the outer part is increased by mounting an extension before the inner part is hoisted up with the same telescoping mechanism in a higher operating position.

Der Anbau dieser Verlängerung bedeutet einen erheblichen zusätzlichen Montageaufwand, weil die Verlängerungsteile auf der Baustelle erst in Montageposition gehoben und dann am Außenteil durch Montagepersonal fest verankert werden müssen. Die zu verbauenden Verlängerungsteile werden separat an die Baustelle verfrachtet, was einen zusätzlichen Transportaufwand bedeutet.Of the Cultivating this extension means a significant extra Assembly work, because the extension parts at the construction site First raised in mounting position and then on the outer part by assembly personnel must be firmly anchored. The extension parts to be installed are shipped separately to the site, resulting in additional transportation means.

Zudem sind aus dem Stand der Technik Kräne bekannt, deren Lasthakenhöhe durch Einfügung zusätzlicher Außen- und/oder Innenturmschüsse vergrößert werden kann. In diesen Fällen spricht man von sogenannten Kletterkränen, die die Möglichkeit bieten, die Lasthakenhöhe dem Baustellenfortschritt anzupassen.moreover Cranes are known from the prior art, the load hook height by insertion of additional external and / or Inner tower shots can be enlarged. In these cases one speaks of so-called climbing cranes, which offer the possibility, the load hook height to adapt to the progress of the construction site.

So beschreibt die DE-PS 2930161 einen zusammenklappbaren Schnellmontagekran mit einem die Basis des aufgerichteten Turms bildenden Außenturm und einem darin teleskopartig verschiebbaren Innenturm, dessen Lasthakenhöhe durch Aufstockung des Außen- und/oder Innenturms vergrößert werden kann. Zur Aufstockung des Außenturms ist der obere Seilrollenträger vom Außenturm abnehmbar und wird mit Hilfe des eigenen Kranlasthakens hochgefahren. Zusätzliche U-förmige Turmelemente, die um den Innenturm herum durch ein vertikale, schwenkbare Konstruktion geschlossen werden, werden dann am obere Teil des Außenturms befestigt. Der Seilrollenträger wird am oberen Teil des eingefügten Außenturmelements wiederbefestigt. Zur Aufstockung des Innenturms wird der Teleskopierantrieb am Fuß des Innenturms gelöst und heruntergefahren. Ein zusätzliches Turmelement wird dann durch eine seitliche Öffnung des Außenturms zwischen Teleskopierantrieb und unterem Teil des Innenturms verbracht und befestigt.That's how it describes DE-PS 2930161 a collapsible rapid-erecting crane with an outer tower forming the base of the erected tower and an inner tower telescopically displaceable therein, the load hook height of which can be increased by topping up the outer and / or inner towers. To top up the outer tower, the upper pulley support is removable from the outer tower and is raised with the help of its own crane lifting hook. Additional U-shaped tower elements, which are closed around the inner tower by a vertical, pivotable construction, are then attached to the upper part of the outer tower. The pulley carrier is re-attached to the upper part of the inserted external alarm element. To increase the inner tower, the telescopic drive at the foot of the inner tower is released and shut down. An additional tower element is then spent and secured by a lateral opening of the outer tower between Teleskopierantrieb and lower part of the inner tower.

In der DE-PS 2730724 wird ebenfalls eine Methode zur Aufstockung eines Vertikalgefüges durch Einbringung zusätzlicher Turmelemente beschrieben. Dazu ist der Kran mit einer Aufstockvorrichtung versehen, die als Teleskoplerkäfig bezeichnet wird. In den Teleskopierkäfig ist ein Hub- und Führungssystem integriert, mit dem nach Trennung des Turms ein oberes Turmteil komplett um einen Zwischenraum angehoben wird, so dass seitlich ein zusätzliches Turmelement eingeführt werden kann. Zur seitlichen Einführung dieser Turmelemente ist am Teleskopierkäfig außerdem ein horizontales Schienensystem vorgesehen.In the DE-PS 2730724 Also, a method for increasing a vertical structure by introducing additional tower elements is described. For this purpose, the crane is provided with a Aufstockvorrichtung, which is referred to as a telescopic cage. In the telescoping cage, a lifting and guiding system is integrated, with the separation of the tower, an upper tower part is completely raised by a gap, so that laterally an additional tower element can be introduced. For lateral introduction of these tower elements, a horizontal rail system is also provided on the telescoping cage.

Solche Methoden zur sogenannten Aufstockung der Turmhöhe eines Turmkrans durch Einbringung zusätzlicher Turmschüsse sind heute wert verbreitet. Zum einen ist aber eine solche Aufstockung mit hohem zusätzlichen Montageaufwand verbunden. Die zusätzlich eingebrachten Turmschüsse müssen an Außen- und/oder Innenturmteilen angeschlossen werden, was sowohl ein zusätzliches Sicherheitsrisiko für das Montagepersonal auf der Baustelle bedeutet, die dafür den Turm besteigen müssen, als auch eine hohe zusätzliche Stillstandszeit mit sich bringt. Eine Minimierung der Stillstandszeit ist aber, insbesondere bei Schnellmontagekränen, die für schnellstmöglichen und flexiblen Einsatz auf der Baustelle entwickelt wurden, ein wichtiges wirtschaftliches Einsatzkriterium.Such Methods for the so-called increase in the tower height of a Tower cranes by introducing additional tower shots are common today. On the one hand, there is such an increase high additional assembly costs connected. The additional introduced tower shots must be sent to and / or internal tower parts, which is both an additional Safety risk for assembly personnel at the construction site means, which have to climb the tower, as well as a high extra downtime with it brings. A minimization of downtime is but, in particular on fast-erecting cranes, for the fastest possible and flexible use have been developed at the construction site, an important one economic application criterion.

Zum anderen sind bedingt durch die nachteilige Methode der Aufstockung die Turmschüsse meist aus einer U-förmigen Konstruktion, die erst durch eine vertikale, schwenkbare Konstruktion um den Innenturm herum geschlossen werden müssen, oder im Außenturm sind Öffnungen gelassen, in die zusätzliche Turmschüsse seitlich eingeführt werden. Beides ist aus beanspruchungstechnischer Sicht von Nachteil, weil zusätzliche potentielle Schwachstellen im Form der schwenkbaren Verriegelung oder in Form der seitlichen Öffnungen in das Turmsystem eingebracht werden.To the others are due to the disadvantageous method of topping up the tower shots mostly from a U-shaped construction, the first through a vertical, pivotable construction around the inner tower must be closed around, or in the outer tower openings are left in the additional tower shots be introduced laterally. Both are from stress technology View of disadvantage, because additional potential weaknesses in the Shape of the pivotable lock or in the form of the side openings be introduced into the tower system.

Weiterhin werden insbesondere die Vorzüge eines kompakt transportierbaren Schnellmontagekrans in gewisser Weise aufgehoben, wenn zusätzlich zum Kran noch Turmschüsse zur Aufstockung an die Baustelle gefahren werden müssen, was nicht immer auf demselben Transportzug möglich sein wird.Farther In particular, the merits of a compact transportable Fast-erecting crane lifted in some ways, if in addition to the crane still tower shots to be added to the construction site must be driven, which is not always on the same transport train will be possible.

Des weiteren sind die bestehenden Lösungen zur Aufstockung mit Hilfe einer Aufstockvorrichtung – wie zum Beispiel eines Teleskopierkäfigs – mit dem Nachteil verbunden, dass eine zusätzliche teure Vorrichtung mit einem zusätzlichen Teleskopierantrieb an den Kran angebracht werden muss. Vor allem für kleine Baukräne – wie insbesondere Schnellmontagekräne – sind solche Aufstockvorrichtungen unwirtschaftlich.Furthermore, the existing solutions to increase with the help of an extension device - such as a Telescoping cage - with associated with the disadvantage that an additional expensive device with an additional telescopic drive must be attached to the crane. Especially for small construction cranes - in particular high-speed cranes - such Aufstockvorrichtungen are uneconomical.

Demzufolge werden zur Zeit vor allem bei als Schnellmontagekränen ausgebildeten Kränen, die gestellten Forderungen hinsichtlich schneller und einfacher Montage im Falle einer notwendig werdenden zusätzlichen Erhöhung der Lasthakenhöhe durch die für Kletterkräne gängigen Methoden der Turmaufstockung nicht erfüllt.As a result, are currently mainly used as quick assembly cranes trained cranes, the demands made regarding quick and easy installation in case of becoming necessary additional increase of the load hook height the usual methods for climbing cranes the tower top not met.

Der Teleskopturm eines Schnellmontagekrans ist in der Regel zweiteilig und besteht aus Außenturm und Innenturm, wobei der Innenturm im Außenturm teleskopartig verschiebbar und in der Straßentransportstellung vollständig in den Außenturm eingefahren ist, um die maximal zulässigen Straßentransportmaße eines Lastzuges samt Ladung von 20,75 m Länge, 2,55 m Breite und 4 m Höhe gemäß § 22 StVO nicht zu überschreiten. Die Folge davon ist, dass Schnellmontagekräne mit einem Außen- und einem Innenturm in voll austeleskopierter Betriebsstellung eine Hakenhöhe von 28 m zumeist nicht überschreiten, bedingt durch die vom Straßentransport herrührende Limitierung der Längen der Einzelturmteile.Of the Telescopic tower of a fast-erecting crane is usually in two parts and consists of external tower and internal tower, with the internal tower in the outer tower telescopically movable and in the road transport position completely retracted into the outer tower, the maximum permitted road transport dimensions a lorry with load of 20.75 m length, 2.55 m width and 4 m height according to § 22 StVO not to be exceeded. The consequence of this is that fast-erecting cranes with an outer and an inner tower in fully telescoped Operating position usually not exceed a hook height of 28 m, conditioned by the road transport Limitation of the lengths of the single tower parts.

Aufgabe der vorliegenden Erfindung ist es daher, einen Kran nach dem Oberbegriff des Patentanspruchs 1 zu schaffen, der in einfacher Weise das Erreichen einer weiteren Betriebsstellung mit vergrößerter Lasthakenhöhe zulässt.task The present invention is therefore a crane according to the preamble of claim 1 to achieve the achievement in a simple manner another operating position with enlarged Load hook height allows.

Diese Aufgabe wird gelöst durch die kennzeichnenden Merkmale des Patentanspruchs 1.These Task is solved by the characterizing features of claim 1

Vorteilhafte Ausführungsformen ergeben sich aus den Unteransprüchen.advantageous Embodiments emerge from the subclaims.

Der erfindungsgemäße Kran weist ein zusätzliches drittes Turmteil auf, der im folgenden auch mittleres Turmteil genannt wird. Die drei Turmteile sind ineinander geführt und besitzen einen vorzugsweise rechteckigen Querschnitt mit einem freien Innenquerschnitt. Dabei weist das mittlere Turmteil einen freien Innenquerschnitt auf, der größer ist als die Außenabmessungen der anderen beiden Turmteile, so dass er diese im Querschnitt umgreift.Of the Crane according to the invention has an additional third tower part, which in the following also called middle tower part becomes. The three tower parts are guided into each other and own a preferably rectangular cross section with a free inner cross section. In this case, the middle tower part has a free inner cross section on, which is larger than the outer dimensions the other two tower parts, so that he encompasses these in cross section.

In vollständig einteleskopierter Stellung des Turms – zum Beispiel in waagerecht gekippter Straßentransportstellung – umgreift das mittlere Turmteil über seine komplette Längserstreckung in seinem Inneren die beiden anderen Turmteile und erhöht daher im demontierten Transportzustand nur unwesentlich das Transportvolumen des Krans.In completely telescoped position of the tower - for Example in horizontally tilted road transport position - encompassing the middle part of the tower over its entire length in its interior the two other tower parts and raised Therefore, in the disassembled transport condition only insignificantly the transport volume of the crane.

Zur Erreichung einer zusätzlichen dritten Position mit einer maximalen Lasthakenhöhe von etwa 36 m fungiert dieses mittlere Turmteil gleichsam als Muffe, die unteres Turmteil und oberes Turmteil miteinander verbindet und damit eine zusätzliche Arbeitshöhe von etwa 8 m zur Verfügung stellt, ohne das hierfür dem zusätzlichen dritten Turmteil auch noch zusätzliche Montagetechnik, zum Beispiel in Form eines separaten Teleskopierantriebs mit angeschlossenen Übertragungsmitteln, im Kranturm beigefügt werden müssten.to Achieving an additional third position with a maximum load hook height of about 36 m acts this middle Tower part as a socket, the lower part of the tower and the upper part of the tower connects together and thus an additional working height of about 8 m provides without this the additional third tower part also additional Assembly technology, for example in the form of a separate Teleskopierantriebs with attached transmission means, attached in the crane tower would have to be.

Vielmehr erfolgt die zur Erreichung einer zusätzlichen Kranlasthakenhöhe notwendige Verschiebung des mittleren Turmteil allein über das Hubseil-Flaschenzugsystem des Kranlasthakens, der am mittleren Turmteil zu diesem Zweck eingehangen wird.Much more takes place to achieve an additional crane hook height necessary shift of the middle tower part alone over the hoist rope pulley system of crane lifting hook, which at middle Tower part is mounted for this purpose.

Der Vorteil der vorliegende Erfindung liegt also darin, dass eine zusätzliche Betriebsposition mit vergrößerter Lasthakenhöhe für einen Kran mit teleskopierbarem Turm bereitgestellt wird, indem ein zusätzliches drittes Turmteil in den Turm integriert wird, das im vollständig einteleskopierten Transportzustand des Krans nur einen unwesentlichen zusätzlichen Raumbedarf erfordert.Of the Advantage of the present invention is therefore that an additional Operating position with increased load hook height provided for a telescopic tower crane is added to the tower by adding an additional third tower section is integrated, in the fully einteleskopierten transport state the crane only an insignificant additional space requires.

Durch dieses dritte Turmteil wird der Turm aber nicht zu einem in bekannter Weise dreifach ineinander teleskopierbaren Vertikalgefüge. Für diesen Fall würde das Ausfahren des mittleren und des oberen Turmteils zunächst aus dem stationären unteren Turmteil und dann wiederum abschließend das Ausfahren des oberen aus dem mittleren Turmteil jeweils einen eigenen Teleskopierantrieb mit zugeordneten Übertragungsmitteln, zum Beispiel in Form von Seilflaschenzugsystemen, für das mittlere Turmteil und für das obere Turmteil separat erforderlich werden lassen. Im Vergleich zum konventionellen zweifach teleskopierbaren Kran würde ein solcher dreifach ineinander teleskopierbarer Kran nur mit signifikant gestiegenen Fertigungskosten und außerdem nur mit einem zusätzlichen Anstieg an Gewicht und Volumen wegen der zusätzlich zu integrierenden Montagetechnik zu realisieren sein.By This third part of the tower will not make the tower one of the better known Way triple telescoping vertical structure. In this case, the extension of the middle and the upper tower part first out of the stationary one lower part of the tower and then in turn the extension the upper from the middle part of the tower each have their own telescopic drive with associated transmission means, for example in shape of pulley systems, for the middle part of the tower and separately required for the upper tower section. Compared to the conventional double telescopic crane such a threefold would telescope into each other Crane only with significantly increased manufacturing costs and besides only with an additional increase in weight and volume to implement the additional to be integrated mounting technology be.

In vorteilhafter Weise ist bei der vorliegenden Erfindung das dritte, mittlere Turmteil derart gestaltet, dass der Kran eine zusätzliche Betriebsposition mit vergrößerter Lasthakenhöhe erreicht und dabei aber weiterhin nur über die bekannte Montagetechnik eines konventionellen zweifach teleskopierbaren Turms verfügt.In Advantageously, in the present invention, the third, middle tower part designed such that the crane an additional Operating position with increased load hook height achieved and still only on the well-known Assembly technology of a conventional double-telescopic tower features.

Dabei erfolgt beim erfindungsgemäßen Kran das Ausfahren des oberen Turmteils weiterhin mit der bekannten Montagetechnik – vorzugsweise über ein Montageseil-Flaschenzugsystem – wie beim konventionellen zweifach teleskopierbaren Kranturm, mit dem einzigen Unterschied, dass das obere Turmteil nicht aus dem, unteren sondern aus dem mittleren Turmteil ausgefahren wird. Dafür ist der obere Bereich des mittleren Turmteils beim erfindungsgemäßen Kran genauso konstruiert wie der obere Bereich des unteren Turmteils eines konventionellen zweifach teleskopierbaren Kranturms. Diese übereinstimmende Gestaltung betrifft die Innenabmessungen und Führungen für das im Inneren verschiebbare obere Turmteil und die angebrachte Montagetechnik, zum Beispiel in Form von Seilflaschenrollen zum Umlenken des Montageseils, damit das obere Turmteil bis zu diesem Bereich ausgefahren werden kann.In the crane according to the invention, the extension of the upper tower part continues to be carried out with the known assembly technology - preferably via a mounting-part pulley system - as in the conventional double-telescopic crane tower, with The only difference is that the upper part of the tower is not extended out of the lower part but out of the middle part of the tower. For this, the upper part of the middle tower part of the crane according to the invention is constructed in the same way as the upper part of the lower part of the tower of a conventional double telescopic crane tower. This matching design relates to the internal dimensions and guides for the inside displaceable upper tower part and the attached assembly technique, for example in the form of pulley rollers for deflecting the mounting part, so that the upper tower part can be extended to this area.

Zum Erreichen einer höchsten Betriebsposition wird in einem Zwischenschritt das mittlere Turmteil zunächst entlang der Außenkanten von unterem und oberem Turmteil nach oben verschoben. Diese Verschiebung erfolgt vorteilhafterweise ebenfalls nicht über zusätzlich in den Kranturm eingebrachte Montagetechnik sondern allein mit Hilfe des eigenen, vorzugsweise über ein Hubseil-Flaschenzugsystem angetriebenen, Kranlasthakens, der dafür an das mittlere Turmteil eingehangen wird.To the Achieving a highest operating position will result in a Intermediate step along the middle part of the tower the outer edges of the lower and upper tower part upwards postponed. This shift is advantageously also not over additionally installed in the crane tower mounting technology but alone with the help of your own, preferably over a hoist rope pulley system driven, crane load hook for it is attached to the middle part of the tower.

Dabei ist es weiterhin von Vorteil, dass keine zusätzlichen Turmschüsse von außen in den Kranturm eingefügt werden mussten. Beim erfindungsgemäßen Kran ist es nur notwendig, den bereits integrierten zusätzlichen Turmteil mit dem Kranlasthaken hochzuschieben. Diese Verschiebung kann ohne großen zusätzlichen Zeit- und Montageaufwand erfolgen.there It is also advantageous that no additional tower shots had to be inserted from outside into the crane tower. With the crane according to the invention it is only necessary the already integrated additional tower section with the Move crane hook up. This shift can be done without big additional time and assembly costs.

Die letzte Teleskopierbewegung zum Erreichen der höchsten Betriebsposition ist das neuerliche Ausfahren des oberen Turmteils aus dem mittleren Turmteil. Dies kann wiederum mit der bekannten Montagetechnik, vorzugsweise einem Seilflaschenzugsystem, geschehen.The last telescopic movement to reach the highest operating position is the recent extension of the upper part of the tower from the middle Tower section. This can in turn with the known assembly technique, preferably a pulley system, done.

In einer weiteren vorteilhaften Ausführung der vorliegenden Erfindung wird das Hubseil – Flaschenzugsystem und das Montageseil – Flaschenzugsystem des Krans über einen gemeinsamen, wechselweise koppelbaren, bzw. entkoppelbaren Antrieb gesteuert. Der Kran bietet auf diese Weise, obwohl er weiterhin nur über einen einzigen Antrieb verfügt, trotzdem den Vorteil eine Betriebsposition mit vergrößerter Kranlasthakenhöhe erreichen zu können. Die mit dem einzigen Antrieb verbundenen zusätzlichen Vorteile, was Platz-, Gewichts- und vor allem Kostenersparnis angeht, bleiben dabei aber erhalten.In a further advantageous embodiment of the present invention Invention is the hoist - pulley system and the Assembly part - pulley system of crane over a common, mutually coupled or decoupled Drive controlled. The crane offers in this way, although he continues only has a single drive, anyway the advantage of an operating position with enlarged Crane hook height to reach. With the single drive associated additional benefits, in terms of space, weight and especially cost savings, remain but received.

Die Erfindung wird nachstehend anhand eines in den Zeichnungen dargestellten Ausführungsbeispiels näher erläutert.The Invention is described below with reference to an illustrated in the drawings Embodiment explained in more detail.

Es zeigt:It shows:

1 eine Seitenansicht auf einen erfindungsgemäßen Kran in seiner voll austeleskopierten Betriebsstellung, 1 a side view of a crane according to the invention in its fully telescoped operating position,

2 einen Schnitt durch den Kranturm der 1 längs der Linie II-II, 2 a section through the crane tower of 1 along the line II-II,

3a3d schematische Darstellungen der aufeinanderfolgenden Phasen beim Austeleskopieren des Kranturms, 3a - 3d schematic representations of the successive phases during telescoping of the crane tower,

4a7d Darstellungen des Krans in den vier Ausfahrstufen der 3a3d 4a - 7d Representations of the crane in the four extension stages of the 3a - 3d

1 stellt einen erfindungsgemäßen Kran 1 in der höchsten Betriebsstellung, das heißt mit voll austeleskopiertem Turm 2, dar. Der Kran 1 besitzt einen vertikal aufgerichteten teleskopierbaren Turm 2, der aus drei Turmteilen 21, 22, 23 besteht, nämlich einem unteren Turmteil 21, der auf einer mit Zentralballast bestückten Plattform 7 angebracht ist, einem mit dem unteren Turmteil 21 im oberen Bereich überlappend verbundenen mittleren Turmteil 22 und einem mit dem mittleren Turmteil 22 im oberen Bereich überlappend verbundenen oberen Turmteil 23. Das obere Turmteil 23 trägt einen horizontalen Ausleger 3, einen mit Gegengewicht bestückten horizontalen Gegenausleger 4 und eine aus zwei schräg zusammenlaufenden Stangen bestehende Turmspitze 8. Ausleger 3 und Gegenausleger 4 sind gegenüber dem oberen Ende der Turmspitze 8 durch Abspannseile abgestützt. Die Turmspitze 8 ist wiederum mit der Plattform 7 über Abspannstangen verbunden. 1 represents a crane according to the invention 1 in the highest operating position, that is with fully telescoped tower 2 , The crane 1 has a vertically erected telescopic tower 2 which consists of three tower parts 21 . 22 . 23 exists, namely a lower part of the tower 21 on a platform equipped with a central ballast 7 is attached, one with the lower part of the tower 21 in the upper area overlapping connected middle tower part 22 and one with the middle part of the tower 22 in the upper area overlapping connected upper tower section 23 , The upper part of the tower 23 carries a horizontal boom 3 , a horizontal counter-jib equipped with counterweight 4 and a spire consisting of two obliquely converging rods 8th , boom 3 and counter-jib 4 are opposite the top of the spire 8th supported by guy ropes. The spire 8th is in turn with the platform 7 connected via guy rods.

Bei dem untendrehenden Kran 1 ist die Plattform 7 drehbar gelagert. Dazu ist die Plattform 7 mit einem hier nicht dargestellten mit Drehantrieb versehenen Drehkranz verbunden. Auf dem Ausleger 3 ist eine in den 4a bis 7d dargestellte entlang der Auslegerlängserstreckungsachse horizontal verfahrbare Laufkatze 5 angeordnet, an welcher der Kranlasthaken 6 über ein Hubseil 44 angelenkt ist.At the bottom turning crane 1 is the platform 7 rotatably mounted. This is the platform 7 connected to a turntable, not shown here, with a rotary drive. On the boom 3 is one in the 4a to 7d represented along the boom longitudinal extension axis horizontally movable trolley 5 arranged on which the crane hook 6 over a hoist rope 44 is articulated.

Als Schnellmontagekran wird der in 1 dargestellte Kran 1 aus einer horizontalen Transportstellung mit voll einteleskopiertem Turm 2 und mit am Turm 2 anliegendem, eingeklapptem Ausleger 3 und Gegenausleger 4, in die hier dargestellte vertikale Betriebsstellung zunächst aufgerichtet, bevor der Turm 2 bei horizontal ausgeklapptem Ausleger 3 und Gegenausleger 4 auf verschiedene Höhe bis zur hier dargestellten höchsten Betriebsposition voll austeleskopiert wird.As a rapid assembly crane, the in 1 illustrated crane 1 from a horizontal transport position with fully telescoped tower 2 and with at the tower 2 adjoining, folded out boom 3 and counter-jib 4 , in the illustrated here vertical operating position, first erected before the tower 2 with horizontally extended boom 3 and counter-jib 4 is fully telescoped to different heights up to the highest operating position shown here.

Der Ausleger 3 ist zweiteilig und wird während des Aufrichtvorgangs in der Luft in die horizontale Betriebsstellung ausgeklappt.The boom 3 is in two parts and is unfolded during the erection process in the air in the horizontal operating position.

Auf der Plattform 7 sind vorzugsweise die in den 4a bis 7d dargestellten Antriebe 50 und Seiltrommeln 31, 41 für das Montagewerk zum Aufrichten und Austeleskopieren des Krans 1 und für das Hubwerk, das im Betriebszustand die Heb- und Senkbewegungen des Kranlasthakens 6 antreibt, angebracht.On the platform 7 are preferably in the 4a to 7d shown drives 50 and cable drums 31 . 41 for the assembly plant for erecting and telescoping the crane 1 and for the hoist, which in the operating state, the lifting and lowering movements of the crane lifting hook 6 drives, appropriate.

Die Turmteile 21, 22, 23 bestehen aus einer gitterartigen Seitenwandkonstruktion mit freiem Innenquerschnitt, so dass die Turmteile 21, 22, 23 sich teleskopartig ineinander verschieben lassen. Das mittlere Turmteil 22 ist von den drei Turmteilen 21, 22, 23 dasjenige mit dem größten freien Innenquerschnitt und umgreift in der hier dargestellten voll austeleskopierten Betriebsstellung des Krans 1 das untere Turmteil 21 und das obere Turmteil 23 jeweils im Querschnitt (vergl. Querschnittsdarstellung aus 2) und verbindet auf diese Weise unteres Turmteil 21 und oberes Turmteil 23 muffenartig miteinander.The tower parts 21 . 22 . 23 consist of a grid-like sidewall construction with free inner cross-section, so that the tower parts 21 . 22 . 23 telescope into each other. The middle part of the tower 22 is from the three tower parts 21 . 22 . 23 the one with the largest free inner cross section and encompasses in the fully telescoped operating position of the crane shown here 1 the lower part of the tower 21 and the upper part of the tower 23 in each case in cross section (see cross-sectional illustration 2 ) and connects in this way lower part of the tower 21 and upper tower part 23 muffed together.

Zu diesem Zweck ist das mittlere Turmteil 22 in seinem unteren Bereich durch eine lösbare Bolzenverriegelung 64 mit dem unteren Turmteil 21 in dessen oberem Bereich fest verbunden. In seinem oberen Bereich ist das mittlere Turmteil 22 wiederum durch eine lösbare Bolzenverbindung 65 mit dem oberen Turmteil 23 in dessen unterem Bereich fest verbunden.For this purpose, the middle tower part 22 in its lower part by a releasable bolt lock 64 with the lower part of the tower 21 firmly connected in the upper area. In its upper area is the middle part of the tower 22 again by a releasable bolt connection 65 with the upper part of the tower 23 firmly connected in its lower part.

Somit liegt im voll austeleskopierten Zustand ein Bereich entlang der Längserstreckung des Turms 2 vor, der nur aus dem mittleren Turmteil 23 gebildet ist, und zwar zwischen der Oberkante des unteren Turmteils 21 und der Unterkante des oberen Turmteils 23. Durch das zusätzliche mittlere Turmteil 22 wird also eine Verlängerung der Turmhöhe des Krans 1 und damit der maximalen Kranlasthakenhöhe erreicht.Thus, in the fully telescoped condition, there is an area along the length of the tower 2 in front, only from the middle part of the tower 23 is formed, between the upper edge of the lower tower part 21 and the lower edge of the upper tower section 23 , Through the additional middle tower part 22 So is an extension of the tower height of the crane 1 and thus reaches the maximum crane load hook height.

2 stellt einen Querschnitt entlang der Linie II-II durch den Kranturm aus 1, also durch die Ebene der Bolzenverriegelung zwischen mittlerem Turmteil 22 und oberem Turmteil 23, dar. Beide Turmteile 22, 23 weisen einen rechtwinkligen, annähernd quadratischen Querschnitt mit rechtwinklig zueinander angeordneten Seitenwänden und einem freien Innenquerschnitt auf. Dabei ist das obere Turmteil 23 innerhalb des mittleren Turmteils 22 geführt. Zu diesem Zweck weist das mittlere Turmteil 22 an seinen vier Innenkanten vier in Längserstreckungsrichtung des Turms 2 verlaufende Gleitkufen 66 auf, die an die Außengeometrie des oberen Turmteils 23 angepasst sind. Diese Gleitkufen 66 bestehen aus einem im Querschnitt gesehen L-förmigen Winkelprofil und sind von den Innenwänden des mittleren Turmteils 22 nach innen versetzt, so dass das obere Turmteil 23 mit seinen vier Außenkanten passgenau in den Innenkanten der vier Gleitkufen 66 des mittleren Turmteils 22 unter Bildung einer vertikalen Gleitführung gelagert ist, wodurch seitliche Verschiebungen zwischen den beiden Turmteilen 22, 23 ausgeschlossen sind. 2 represents a cross section along the line II-II through the crane tower 1 , So through the level of bolt locking between the middle part of the tower 22 and upper tower part 23 , Both parts of the tower 22 . 23 have a rectangular, approximately square cross section with mutually perpendicular side walls and a free inner cross section. Here is the upper part of the tower 23 within the middle part of the tower 22 guided. For this purpose, the middle tower part 22 four at its four inner edges in the longitudinal direction of the tower 2 running skids 66 on the outside geometry of the upper tower part 23 are adjusted. These skids 66 consist of a cross-sectionally L-shaped angle profile and are of the inner walls of the central tower part 22 offset inwards so that the upper tower part 23 with its four outer edges fitting in the inner edges of the four skids 66 the middle part of the tower 22 is mounted to form a vertical slide, whereby lateral displacements between the two tower parts 22 . 23 excluded are.

Des Weiteren ist aus 2 erkennbar wie durch zwei gegenüberliegende Gleitkufen 66 jeweils ein Bolzen 65 vom mittleren Turmteil 22 ausgehend in die Seitenwände des oberen Turmteils 23 eingerastet ist. Durch diese beiden Bolzen 65 wird verhindert, dass das obere Turmteil 23 sich relativ zum mittleren Turmteil 22 vertikal, das heißt in einer Ebene senkrecht zur Bildebene von 2, bewegen kann. Auf diese Weise ist also garantiert, dass das obere Turmteil 23 fallsicher mit dem mittleren Turmteil 22 verriegelt ist. Zur Entriegelung können die beiden Bolzen 65 wieder nach außen zurückgezogen werden, so dass sie nicht mehr in das obere Turmteil 23 eingreifen und das obere Turmteil 23 somit wieder lose gegenüber dem mittleren Turmteil 22 ist.Furthermore, it is off 2 recognizable as by two opposing skids 66 one bolt each 65 from the middle part of the tower 22 starting in the side walls of the upper part of the tower 23 is engaged. Through these two bolts 65 will prevent the upper part of the tower 23 relative to the middle part of the tower 22 vertically, that is in a plane perpendicular to the image plane of 2 , can move. In this way it is guaranteed that the upper part of the tower 23 if safe with the middle part of the tower 22 is locked. For unlocking the two bolts 65 be withdrawn again to the outside, so that they are no longer in the upper part of the tower 23 engage and the upper part of the tower 23 thus again loose against the middle part of the tower 22 is.

3a bis 3d zeigen die vier Teleskopierphasen des erfindungsgemäßen Krans 1. Die vier Darstellungen aus 3 sind zur Vereinfachung und besseren Sichtbarmachung des wesentlichen Kerns der vorliegenden Erfindung stark schematisiert. Zudem wurden die Darstellungen auf die drei Turmteile 21, 22, 23 des Krans beschränkt. 3a to 3d show the four telescopic phases of the crane according to the invention 1 , The four illustrations 3 are highly schematic for simplicity and better visualization of the essence of the present invention. In addition, the representations were on the three tower parts 21 . 22 . 23 of the crane.

In den 4a bis 7d sind die zugehörigen Betriebsstellungen zu den in den 3a bis 3d noch schematisiert dargestellten vier Teleskopierphasen in einer detaillierteren Gesamtdarstellung des Krans 1 jeweils abgebildet. Die 4a, 5a, 6a, 7a zeigen jeweils eine Isometrieansicht und die 4b, 5b, 6b, 7b eine korrespondierende kleinere Seitenansicht des Krans 1.In the 4a to 7d are the associated operating positions to those in the 3a to 3d still schematically illustrated four Teleskopierphasen in a more detailed overall view of the crane 1 each shown. The 4a . 5a . 6a . 7a each show an isometric view and the 4b . 5b . 6b . 7b a corresponding smaller side view of the crane 1 ,

Im Folgenden werden nun anhand der 3a bis 7b die Teleskopierbewegungen eines erfindungsgemäßen Krans 1 erläutert.The following are now based on the 3a to 7b the Teleskopierbewegungen a crane of the invention 1 explained.

In seiner untersten Betriebsstellung (3a, 4a, b) ist das obere Turmteil 23 noch fast über seine komplette Längserstreckung in das untere Turmteil 21 eingefahren und das mittlere Turmteil 22 umgreift wiederum über fast seine komplette Längserstreckung das untere Turmteil 21 und damit auch das obere Turmteil 23.In its lowest operating position ( 3a . 4a , b) is the upper part of the tower 23 almost over its entire longitudinal extent in the lower part of the tower 21 retracted and the middle part of the tower 22 again encompasses the lower part of the tower over almost its entire length 21 and thus also the upper part of the tower 23 ,

Der freie Innenquerschnitt des mittleren Turmteils 22 ist dabei jeweils an das untere Turmteil 21 und an das obere Turmteil 23 angepasst. Über den größten Teil seiner Längserstreckung an der Unterkante beginnend weist das mittlere Turmteil 22 einen freien Innenquerschnitt auf, der an das untere Turmteil 21 angepasst ist. Im oberen Endbereich weist das mittlere Turmteil 22 entsprechend der Querschnittsdarstellung aus 2 eine Verjüngung auf einen kleineren freien Innenquerschnitt auf, der an das obere Turmteil 23 angepasst ist, wobei das obere Turmteil 23 mit seinem Endbereich aus dem unteren Turmteil 21 herausragt. Allerdings befindet sich der größte Teil der Längserstreckung des oberen Turmteils 23 noch einteleskopiert im Inneren des unteren Turmteils 21.The free inner cross section of the middle part of the tower 22 is in each case at the lower tower part 21 and to the upper part of the tower 23 customized. The middle part of the tower begins over most of its length at the lower edge 22 a free inner cross-section on the lower part of the tower 21 is adjusted. In the upper end area has the middle part of the tower 22 according to the cross-sectional view 2 a taper on a smaller free inner cross-section on the upper part of the tower 23 is adjusted, the upper part of the tower 23 with its end area from the lower tower part 21 protrudes. However, most of the length of the upper part of the tower is located 23 still einteleskopiert inside the lower part of the tower 21 ,

Das mittlere Turmteil 22 weist in etwa die gleiche Länge wie das obere Turmteil 23 auf und die Oberkante des mittleren Turmteils 22 schließt dabei in etwa bündig mit der Oberkante des oberen Turmteils 23 ab. Oberes und mittleres Turmteil 22, 23 sind dabei jeweils fallsicher am unteren Turmteil 21 befestigt. Zwischen oberem und mittlerem Turmteil 22, 23 besteht im einteleskopierten Zustand keine feste Verbindung.The middle part of the tower 22 has approximately the same length as the upper part of the tower 23 on and the top of the middle part of the tower 22 Closes approximately flush with the upper edge of the upper part of the tower 23 from. Upper and middle tower part 22 . 23 are each case safe at the lower part of the tower 21 attached. Between upper and middle tower part 22 . 23 there is no fixed connection in the telescoped state.

Die Ausfahrbewegungen des oberen Turmteils 23 erfolgen über ein eigenes Montageseil-Flaschenzugsystem 30. Dieses Montageseil-Flaschenzugsystem 30 verfügt allerdings über keinen separaten Antrieb, sondern teilt sich einen gemeinsamen Antrieb 50 mit dem Hubseil-Flaschenzugsystem 40 des Krans 1. Je nach dem, ob das Montageseil-Flaschenzugsystem 30 oder das Hubseil-Flaschenzugsystem 40 des Krans 1 angetrieben werden soll, wird die zugehörige Montageseiltrommel 31 oder die Hubseiltrommel 41 mit dem Antrieb 50 gekoppelt. Seiltrommeln 31, 41 und gemeinsamer Antrieb 50 befinden sich dabei vorteilhafterweise auf der unteren Plattform 7 des Krans 1.The extension movements of the upper tower part 23 take place via a separate assembly unit pulley system 30 , This assembly part pulley system 30 However, it has no separate drive, but shares a common drive 50 with the hoist rope pulley system 40 of the crane 1 , Depending on whether the assembly part pulley system 30 or the hoist pulley system 40 of the crane 1 is to be driven, the associated mounting drum 31 or the hoist drum 41 with the drive 50 coupled. cable drums 31 . 41 and joint drive 50 are located advantageously on the lower platform 7 of the crane 1 ,

Die Seilrollen 32, 33 des Montageseil-Flaschenzugsystems 30 sind im unteren Bereich des oberen Turmteils 23 und im oberen Bereich des mittleren Turmteils 22 angebracht, so dass das obere Turmteil 23 aus dem mittleren Turmteil 22, und damit auch aus dem unteren Turmteil 21, nach Einschaltung des Montageseil-Flaschenzugsystems 30 herausteleskopiert werden kann.The pulleys 32 . 33 of the assembly part pulley system 30 are in the lower part of the upper part of the tower 23 and in the upper part of the middle part of the tower 22 attached so that the upper tower part 23 from the middle part of the tower 22 , and thus from the lower part of the tower 21 , after switching on the assembly unit pulley system 30 can be herausteleskopkop.

Zum Erreichen einer nächst höheren mittleren Betriebsstellung wird ein Ausgleichsgewicht 9 am Kranlasthaken 6 eingehangen, um den Turm 2 momentenfrei zu stellen. Nach Lösen der Verbindung 61 zwischen oberem und unterem Turmteil 23, 21 wird das obere Turmteil 23 über das Montageseil-Flaschenzugsystem 30 aus einer Position mit großer Längsüberlappung mit dem unteren Turmteil 21 in eine zweite Position mit geringer Längsüberlappung mit dem unteren Turmteil 21, und damit auch mit dem mittleren Turmteil 22, ausgefahren. Diese mittlere Betriebsstellung ist in der 3b sowie in der 5a als Isometrieansicht und 5 b als Seitenansicht dargestellt.To achieve a next higher average operating position is a balance weight 9 at the crane hook 6 mounted to the tower 2 torque free. After releasing the connection 61 between the upper and lower part of the tower 23 . 21 becomes the upper tower part 23 via the assembly part pulley system 30 from a position with large longitudinal overlap with the lower tower part 21 in a second position with little longitudinal overlap with the lower tower part 21 , and thus with the middle part of the tower 22 , extended. This middle operating position is in the 3b as well as in the 5a as an isometric view and 5 b shown as a side view.

Zum Ausfahren des oberen Turmteils 23 ist die Montageseiltrommel 31 mit dem Antrieb 50 gekoppelt und die Hubseiltrommel 41 vom Antrieb 50 entkoppelt. Das Hubseil 44 kann mit dem Ausfahren des oberen Turmteils 23 von der Hubseiltrommel 41 frei nachlaufen, da mit zunehmender Kranhöhe auch der Bedarf an freier Hubseillänge zunimmt.To extend the upper part of the tower 23 is the mounting drum 31 with the drive 50 coupled and the hoist drum 41 from the drive 50 decoupled. The hoist rope 44 can with the extension of the upper tower part 23 from the hoist drum 41 Free run, as with increasing crane height and the need for free Hubseillänge increases.

Beim Erreichen der in 5a, b dargestellten Endposition in der mittleren Betriebsstellung wird das obere Turmteil 23 in seinem unteren Bereich über eine lösbare Querbolzenverbindung 62 mit dem unteren Turmteil 21 fallsicher verriegelt. Das mittlere Turmteil 22 verbleibt gegenüber dem oberen Turmteil unverbunden und lose.When reaching the in 5a , b shown end position in the middle operating position is the upper part of the tower 23 in its lower part via a detachable transverse bolt connection 62 with the lower part of the tower 21 if locked securely. The middle part of the tower 22 remains unconnected to the upper part of the tower and loose.

Das obere Turmteil 23 ist im unteren Endbereich seiner Längserstreckung noch im unteren Turmteil 21 geführt und hier fallsicher befestigt. In einem direkt daran anschließenden kurzen Bereich seiner Längserstreckung ist das obere Turmteil 23 weiterhin im verjüngten Querschnitt des oberen Endbereiches des mittleren Turmteils 22 geführt. Nach dem Ausfahren ragt aber nun der größte Teil der Längserstreckung des oberen Turmteils 23 aus dem unteren und mittleren Turmteil 21, 22 nach oben heraus.The upper part of the tower 23 is in the lower end of its longitudinal extension still in the lower part of the tower 21 guided and secured here if safe. In a directly adjoining short section of its longitudinal extent is the upper part of the tower 23 furthermore in the tapered cross-section of the upper end region of the middle tower part 22 guided. After extension but now projects the largest part of the longitudinal extent of the upper part of the tower 23 from the lower and middle tower part 21 . 22 upwards.

Um das Ausfahren des oberen Turmteils 23 zur Erreichung einer noch höheren Kranlasthakenhöhe fortsetzen zu können, ist es notwendig, einen Zwischenschritt einzulegen. Dieser Zwischenschritt ist in der 3c und in den 6a, b dargestellt. Dazu wird nach Abhängen des Ausgleichsgewichts 9 der Kranlasthaken 6 über die Laufkatze 5 direkt an den Kranturm 2 gefahren und der Kranlasthaken 6 am mittleren Turmteil 22 eingehangen. Das Montageseil-Flaschenzugsystem 30 ist vom Antrieb 50 entkoppelt und das Hubseil-Flaschenzugsystem 40 ist mit dem Antrieb 50 gekoppelt. Die fallsichere Verbindung 63 des mittleren Turmteils 22 mit dem unteren Turmteil 21 wird gelöst, so dass das mittlere Turmteil 22 nur noch am Kranlasthaken 6 hängt.To extend the upper part of the tower 23 To be able to continue to achieve an even higher crane hook height, it is necessary to insert an intermediate step. This intermediate step is in the 3c and in the 6a , b shown. This is done after suspending the balance weight 9 the crane hook 6 over the trolley 5 directly to the crane tower 2 driven and the crane hook 6 at the middle part of the tower 22 hooked. The assembly part pulley system 30 is from the drive 50 decoupled and the hoist rope pulley system 40 is with the drive 50 coupled. The fail-safe connection 63 the middle part of the tower 22 with the lower part of the tower 21 is solved, leaving the middle tower part 22 only on the crane hook 6 hangs.

Nach Einschaltung des Antriebs 50 wird über das Hubseil-Flaschenzugsystem 40 des Kranlasthakens 6 der mittlere Turmteil 22 entlang des unteren Turmteils 21 und des oberen Turmteils 23 nach oben gezogen, und zwar genauer gesagt aus seiner unteren Position (5a, b), bei der das mittlere Turmteil 22 eine große Längsüberlappung mit dem unteren Turmteil 21 und eine geringe Längsüberlappung mit dem oberen Turmteil 23 aufgewiesen hat, in eine obere Position (6a, b), bei der das mittlere Turmteil 22 nun nur noch eine kleine Längsüberlappung mit dem unteren Turmteil 21 und eine große Längsüberlappung mit dem oberen Turmteil 23 aufweist. In der in den 6a, b dargestellten oberen Position des mittleren Turmteils 22 liegt die Oberkante des mittleren Turmteils 22 wieder in etwa mit der Oberkante des oberen Turmteils 23 bündig. Während des Hochziehens des mittleren Turmteils mit dem Kranlasthaken ist es notwendig, dass das Montageseil 34 von der Montageseiltrommel 31 frei nachlaufen kann, denn die Montageseilrollen 33 am oberen Ende des mittleren Turmteils 22 vergrößern ihren Abstand zu den ortsfest bleibenden Montageseilrollen 32 am unteren Ende des oberen Turmteils 23, wodurch der Bedarf an freier Montageseillänge größer wird. In seiner oberen Position gemäß 6a, b wird das mittlere Turmteil 22 in seinem unteren Bereich wieder an das untere Turmteil 21 in dessen oberem Bereich durch eine Querbolzenverbindung 64 fallsicher verriegelt.After switching on the drive 50 is via the hoist rope pulley system 40 the crane load hook 6 the middle part of the tower 22 along the lower part of the tower 21 and the upper part of the tower 23 pulled upwards, more precisely from its lower position ( 5a , b), at the middle tower part 22 a large longitudinal overlap with the lower tower part 21 and a slight longitudinal overlap with the upper tower part 23 in an upper position ( 6a , b), at the middle tower part 22 now only a small longitudinal overlap with the lower part of the tower 21 and a large longitudinal overlap with the upper tower part 23 having. In the in the 6a , b shown upper position of the middle tower part 22 lies the upper edge of the middle part of the tower 22 again roughly with the upper edge of the upper part of the tower 23 flush. During the pulling up of the middle tower part with the crane hook, it is necessary that the mounting part 34 from the mounting drum 31 can run free, because the mounting rollers 33 at the upper end of the middle part of the tower 22 increase their distance too the stationary mounting roller parts 32 at the lower end of the upper part of the tower 23 , which increases the need for free mounting pitch. In its upper position according to 6a , b becomes the middle part of the tower 22 in its lower part back to the lower part of the tower 21 in its upper part by a cross bolt connection 64 if locked securely.

Um nun die höchste Betriebsstellung (7a, b) zu erreichen, wird entsprechend des Übergangs von der ersten (3a) zur zweiten (3b) Phase in 3, also entsprechend des Übergangs von 4 zu 5, das obere Turmteil 23 aus dem mittleren Turmteil 22 über das Montageseil-Flaschenzugsystem 30 herausteleskopiert. Dazu wird der Turm 2 durch Einhängen eines Ausgleichsgewichtes 9 am Kranlasthaken 6 wieder momentenfrei gestellt, der Antrieb 50 mit der Montageseiltrommel 31 gekoppelt und von der Hubseiltrommel 41 entkoppelt. Das obere Turmteil 23 wird nun so weit aus dem mittleren Turmteil 22 herausteleskopiert, dass das obere Turmteil 23 vollständig aus dem unteren Turmteil 21 herausgefahren ist und nur noch mit dem mittleren Turmteil 22 in dessen oberem Bereich überlappt. In der vollständig ausgefahrenen Stellung gemäß 7a, b ist das obere Turmteil 23 in seinem unteren Bereich nun fallsicher am mittleren Turmteil 22 in dessen oberem Bereich durch eine Querbolzenverbindung 65 fallsicher verriegelt. Eine direkte Verbindung zwischen oberem Turmteil 23 und unterem Turmteil 21 besteht nicht mehr.Order now the highest operating position ( 7a , b) to achieve, in accordance with the transition from the first ( 3a ) to the second ( 3b ) Phase in 3 , so according to the transition from 4 to 5 , the upper part of the tower 23 from the middle part of the tower 22 via the assembly part pulley system 30 telescoped out. This is the tower 2 by hanging a balance weight 9 at the crane hook 6 again torque-free, the drive 50 with the mounting drum 31 coupled and from the hoist drum 41 decoupled. The upper part of the tower 23 will now be so far from the middle part of the tower 22 that the upper part of the tower 23 completely from the lower part of the tower 21 has moved out and only with the middle part of the tower 22 overlaps in its upper area. In the fully extended position according to 7a , b is the upper part of the tower 23 in its lower part now falls securely on the middle part of the tower 22 in its upper part by a cross bolt connection 65 if locked securely. A direct connection between the upper part of the tower 23 and lower part of the tower 21 does not exist anymore.

Während das mittlere Turmteil 22 in der unteren Betriebsstellung (4a, b) und in der mittleren Betriebsstellung (5a, b) ein nicht tragendes Element, das vom oberen Turmteil 23 lose ist, darstellt, ist es in der höchsten Betriebsstellung (1 und 7a, b) zu einem tragenden Verbindungselement geworden, das eine zusätzliche Ausfahrhöhe des Krans 1 ermöglicht.While the middle part of the tower 22 in the lower operating position ( 4a , b) and in the middle operating position ( 5a , b) a non-supporting element, that of the upper part of the tower 23 is in the highest operating position ( 1 and 7a , b) become a load-bearing connecting element, which has an additional extension height of the crane 1 allows.

Abschließend soll erwähnt werden, dass die 1 bis 7 b ein Ausführungsbeispiel der vorliegenden Erfindung darstellen, auf die die vorliegende Erfindung aber keinesfalls beschränkt ist.Finally, it should be mentioned that the 1 to 7 b illustrate an embodiment of the present invention to which the present invention is by no means limited.

Die Erfindung ist indessen auch auf alle anderen Krantypen mit einem teleskopierbaren Turm, wie Kräne in Vollmastkonstruktion (zum Beispiel Autokräne), stationäre Kräne (zum Beispiel auf Fundamentanker), Kräne mit beliebigen Auslegerkonstruktionen (Laufkatzausleger entsprechend 4a bis 7b, aber auch Wippausleger, Knickausleger etc.), Flat-Top Kräne, etc. anwendbar.However, the invention is also applicable to all other types of crane with a telescopic tower, such as cranes in Vollmastkonstruktion (for example, cranes), stationary cranes (for example, on foundation anchors), cranes with any boom designs (trolley boom accordingly 4a to 7b , but also luffing jib, cantilever etc.), flat-top cranes, etc. applicable.

ZITATE ENTHALTEN IN DER BESCHREIBUNGQUOTES INCLUDE IN THE DESCRIPTION

Diese Liste der vom Anmelder aufgeführten Dokumente wurde automatisiert erzeugt und ist ausschließlich zur besseren Information des Lesers aufgenommen. Die Liste ist nicht Bestandteil der deutschen Patent- bzw. Gebrauchsmusteranmeldung. Das DPMA übernimmt keinerlei Haftung für etwaige Fehler oder Auslassungen.This list The documents listed by the applicant have been automated generated and is solely for better information recorded by the reader. The list is not part of the German Patent or utility model application. The DPMA takes over no liability for any errors or omissions.

Zitierte PatentliteraturCited patent literature

  • - DE 1168617 [0002] - DE 1168617 [0002]
  • - DE 2930161 [0005] - DE 2930161 [0005]
  • - DE 2730724 [0006] - DE 2730724 [0006]

Claims (23)

Kran (1) mit einem Turm (2), der sich aus mehreren ineinander verschiebbar geführten Turmteilen (21, 22, 23) zusammensetzt und einen Ausleger (3) trägt, wobei der Turm (2) ein feststehendes unteres Turmteil (21) und ein am unteren Turmteil (21) längsverschiebliches oberes Turmteil (23) umfasst, und wobei das obere Turmteil (23) zur Vergrößerung der Turmhöhe aus einer ersten Position mit großer Längsüberlappung mit dem unteren Turmteil (21) in eine zweite Position mit geringer Längsüberlappung ausfahrbar ist, gekennzeichnet durch ein mittleres Turmteil (22), das entlang des unteren Turmteils (21) und des oberen Turmteils (23) längsverschieblich ist zum Ausfahren des mittleren Turmteils (22) aus einer unteren Position mit großer Längsüberlappung mit dem unteren Turmteil (21) in eine obere Position mit geringer Längsüberlappung, und gegenüber dem das obere Turmteil (23) längsverschieblich ist zum Ausfahren des oberen Turmteils (23) in eine dritte Position mit einer Längsüberlappung mit dem mittleren Turmteil (22) und ohne Längsüberlappung mit dem unteren Turmteil (21).Crane ( 1 ) with a tower ( 2 ), which consists of several telescopically guided tower parts ( 21 . 22 . 23 ) and a boom ( 3 ), the tower ( 2 ) a fixed lower part of the tower ( 21 ) and one at the lower part of the tower ( 21 ) longitudinally displaceable upper tower part ( 23 ), and wherein the upper part of the tower ( 23 ) for increasing the tower height from a first position with large longitudinal overlap with the lower tower part ( 21 ) is extendable into a second position with little longitudinal overlap, characterized by a middle tower part ( 22 ), along the lower part of the tower ( 21 ) and the upper part of the tower ( 23 ) is longitudinally displaceable for extending the middle part of the tower ( 22 ) from a lower position with large longitudinal overlap with the lower tower part ( 21 ) in an upper position with little longitudinal overlap, and with respect to the upper part of the tower ( 23 ) is longitudinally displaceable for extending the upper part of the tower ( 23 ) in a third position with a longitudinal overlap with the middle tower part ( 22 ) and without longitudinal overlap with the lower part of the tower ( 21 ). Kran nach Anspruch 1, dadurch gekennzeichnet, dass das mittlere Turmteil (22) über mindestens einen Teil seiner Längserstreckungsrichtung das untere Turmteil (21) und das obere Turmteil (23) im Querschnitt umgreift.Crane according to claim 1, characterized in that the middle tower part ( 22 ) over at least a part of its longitudinal direction, the lower tower part ( 21 ) and the upper part of the tower ( 23 ) engages in cross section. Kran nach Anspruch 1 oder 2, dadurch gekennzeichnet, dass das untere Turmteil (21) mit seiner Innenseite eine Längsführung für das obere Turmteil (23) bildet.Crane according to claim 1 or 2, characterized in that the lower tower part ( 21 ) with its inside a longitudinal guide for the upper part of the tower ( 23 ). Kran nach einem der Ansprüche 1 bis 3, dadurch gekennzeichnet, dass das untere Turmteil (21) mit seiner Außenseite eine Längsführung für das mittlere Turmteil (22) bildet.Crane according to one of claims 1 to 3, characterized in that the lower tower part ( 21 ) with its outside a longitudinal guide for the middle part of the tower ( 22 ). Kran nach einem der Ansprüche 1 bis 4, dadurch gekennzeichnet, dass das obere Turmteil (23) mit seiner Außenseite eine Längsführung für das mittlere Turmteil (22) bildet.Crane according to one of claims 1 to 4, characterized in that the upper part of the tower ( 23 ) with its outside a longitudinal guide for the middle part of the tower ( 22 ). Kran nach einem der Ansprüche 1 bis 5, dadurch gekennzeichnet, dass das mittlere Turmteil (22) im oberen Längsabschnitt mit seiner Innenseite eine Längsführung für das obere Turmteil (23) bildet.Crane according to one of claims 1 to 5, characterized in that the middle tower part ( 22 ) in the upper longitudinal section with its inner side a longitudinal guide for the upper part of the tower ( 23 ). Kran nach einem der Ansprüche 1 bis 6, dadurch gekennzeichnet, dass das obere Turmteil (23) in seiner ersten und/oder zweiten Position am unteren Turmteil (21) fallsicher verriegelt ist.Crane according to one of claims 1 to 6, characterized in that the upper part of the tower ( 23 ) in its first and / or second position at the lower part of the tower ( 21 ) if locked securely. Kran nach einem der Ansprüche 1 bis 7, dadurch gekennzeichnet, dass das mittlere Turmteil (22) in seiner oberen Position am unteren Turmteil (21) fallsicher verriegelt ist.Crane according to one of claims 1 to 7, characterized in that the middle tower part ( 22 ) in its upper position at the lower part of the tower ( 21 ) if locked securely. Kran nach einem der Ansprüche 1 bis 8, dadurch gekennzeichnet, dass das mittlere Turmteil (22) lose gegenüber dem oberen Turmteil (23) in dessen erster und zweiter Position ist.Crane according to one of claims 1 to 8, characterized in that the middle part of the tower ( 22 ) loosely opposite the upper part of the tower ( 23 ) in its first and second positions. Kran nach einem der Ansprüche 1 bis 9, dadurch gekennzeichnet, dass das obere Turmteil (23) in seiner dritten Position mit dem mittleren Turmteil (22) fallsicher verriegelt ist.Crane according to one of claims 1 to 9, characterized in that the upper part of the tower ( 23 ) in its third position with the middle part of the tower ( 22 ) if locked securely. Kran nach einem der Ansprüche 7 bis 10, dadurch gekennzeichnet, dass zur Verriegelung eine lösbare Bolzenquerverbindung (65) zwischen den Turmteilen (21, 22, 23) vorgesehen ist.Crane according to one of claims 7 to 10, characterized in that for locking a detachable bolt transverse connection ( 65 ) between the tower parts ( 21 . 22 . 23 ) is provided. Kran nach einem der Ansprüche 1 bis 11, dadurch gekennzeichnet, dass der Turm (2) durch Anordnung von Ausgleichsgewichten (9) oder Abspannseilen während der Ausfahrbewegungen von mittlerem (22) und oberem (23) Turmteil momentenfrei ist.Crane according to one of claims 1 to 11, characterized in that the tower ( 2 ) by arranging balancing weights ( 9 ) or guy ropes during the extension movements of middle ( 22 ) and upper ( 23 ) Tower part is torque-free. Kran nach einem der Ansprüche 1 bis 12, gekennzeichnet durch ein erstes Seilflaschenzugsystem (30) zum Ausfahren des oberen Turmteils (23) in seine zweite und dritte Position.Crane according to one of claims 1 to 12, characterized by a first cable pulley system ( 30 ) for extending the upper part of the tower ( 23 ) in its second and third position. Kran nach Anspruch 13, dadurch gekennzeichnet, dass das Seil (34) des ersten Seilflaschenzugsystems (30) zwischen unteren Seilrollen (32) im unteren Bereich des oberen Turmteils (23) und oberen Seilrollen (33) im oberen Bereich des mittleren Turmteils (22) mehrfach umgelenkt ist.Crane according to claim 13, characterized in that the rope ( 34 ) of the first pulley system ( 30 ) between lower pulleys ( 32 ) in the lower part of the upper part of the tower ( 23 ) and upper pulleys ( 33 ) in the upper area of the middle part of the tower ( 22 ) is deflected several times. Kran nach einem der Ansprüche 1 bis 14, gekennzeichnet durch ein zweites Seilflaschenzugsystem (40) zum Heben und Senken des Kranlasthakens (6).Crane according to one of claims 1 to 14, characterized by a second cable pulley system ( 40 ) for lifting and lowering the crane lifting hook ( 6 ). Kran nach Anspruch 15, dadurch gekennzeichnet, dass das erste (30) und zweite (40) Seilflaschenzugsystem einen gemeinsamen Antrieb (50) besitzen, der wechselweise mit dem ersten (30) oder zweiten (40) Seilflaschenzugsystem koppelbar ist.Crane according to claim 15, characterized in that the first ( 30 ) and second ( 40 ) Pulley system a common drive ( 50 ), which alternately with the first ( 30 ) or second ( 40 ) Pulley system can be coupled. Kran nach Anspruch 16, dadurch gekennzeichnet, dass zum Ausfahren des oberen Turmteils (23) das erste Seilflaschenzugsystem (30) mit dem Antrieb (50) gekoppelt ist und das zweite Seilflaschenzugsystem (40) vom Antrieb (50) entkoppelt ist, so dass das zweite Seil (44) frei nachläuft.Crane according to claim 16, characterized in that for extending the upper part of the tower ( 23 ) the first cable pulley system ( 30 ) with the drive ( 50 ) and the second cable pulley system ( 40 ) from the drive ( 50 ) is decoupled, so that the second rope ( 44 ) runs free. Kran nach einem der Ansprüche 1 bis 17, dadurch gekennzeichnet, dass das mittlere Turmteil (22) mit Hilfe des eigenen Kranlasthakens (6) von seiner unteren Position in seine obere Position hebbar ist.Crane according to one of claims 1 to 17, characterized in that the middle tower part ( 22 ) with the help of the own crane load hook ( 6 ) is liftable from its lower position to its upper position. Kran nach Anspruch 16 und 18, dadurch gekennzeichnet, das zum Heben des mittleren Turmteils (22) das zweite Seilflaschenzugsystem (40) mit dem Antrieb (50) gekoppelt ist und das erste Seilflaschenzugsystem (30) vom Antrieb (50) entkoppelt ist, so dass das erste Seil (34) frei nachläuft.Crane according to claim 16 and 18, characterized in that for lifting the middle tower part ( 22 ) the second cable pulley system ( 40 ) With the drive ( 50 ) and the first cable pulley system ( 30 ) from the drive ( 50 ) is decoupled so that the first rope ( 34 ) runs free. Kran nach einem der Ansprüche 1 bis 19, dadurch gekennzeichnet, dass der Kran (1) ein untendrehender Turmdrehkran ist, der vorzugsweise als Schnellmontagekran von einer gedrungenen waagerechten Straßentransportstellung in eine senkrechte Betriebsstellung schwenkbar ist.Crane according to one of claims 1 to 19, characterized in that the crane ( 1 ) is an undulating rotary tower crane, which is preferably pivotable as a quick-erecting crane from a squat horizontal road transport position in a vertical operating position. Verfahren zum Ausfahren eines Kranturms (2) gemäß einem der Patentansprüche 1 bis 20, gekennzeichnet durch folgende Schritte: a) Das obere Turmteil (23) wird aus einer ersten Position mit großer Längsüberlappung mit dem unteren Turmteil (21) in eine zweite Position mit geringer Längsüberlappung ausgefahren. b) Das obere Turmteil (23) wird am unteren Turmteil (21) fallsicher verriegelt. c) Das mittlere Turmteil (22) wird aus einer unteren Position mit großer Längsüberlappung mit dem unteren Turmteil (21) in eine obere Position mit geringer Längsüberlappung gehoben. d) Das mittlere Turmteil (22) wird am unteren Turmteil (21) fallsicher verriegelt. e) Das obere Turmteil (23) wird aus einer zweiten Position in eine dritte Position mit einer Längsüberlappung mit dem mittleren Turmteil (22) und ohne Längsüberlappung mit dem unteren Turmteil (21) ausgefahren. f) Das obere Turmteil (23) wird am mittleren Turmteil (22) fallsicher verriegelt.Method for extending a crane tower ( 2 ) according to one of the claims 1 to 20 characterized by the following steps: a) the upper part of the tower ( 23 ) is from a first position with large longitudinal overlap with the lower tower part ( 21 ) extended to a second position with little longitudinal overlap. b) The upper part of the tower ( 23 ) is at the lower part of the tower ( 21 ) if locked securely. c) The middle part of the tower ( 22 ) is from a lower position with large longitudinal overlap with the lower part of the tower ( 21 ) is raised to an upper position with little longitudinal overlap. d) The middle part of the tower ( 22 ) is at the lower part of the tower ( 21 ) if locked securely. e) The upper part of the tower ( 23 ) is moved from a second position to a third position with a longitudinal overlap with the middle part of the tower ( 22 ) and without longitudinal overlap with the lower part of the tower ( 21 ) extended. f) The upper part of the tower ( 23 ) is at the middle part of the tower ( 22 ) if locked securely. Verfahren nach Anspruch 21, dadurch gekennzeichnet, dass Ausgleichsgewichte (9) am Kranlasthaken (6) eingehängt werden, um den Turm (2) während der Ausfahrbewegungen von oberem Turmteil (23) momentenfrei zu stellen.Method according to claim 21, characterized in that balance weights ( 9 ) on the crane hook ( 6 ) to the tower ( 2 ) during the extension movements of the upper part of the tower ( 23 ) torque-free. Verfahren nach Anspruch 21 oder 22, dadurch gekennzeichnet, dass das mittlere Turmteil (22) mit dem Kranlasthaken (6) aus seiner unteren Position in seine obere Position gehoben wird.A method according to claim 21 or 22, characterized in that the middle part of the tower ( 22 ) with the crane load hook ( 6 ) is raised from its lower position to its upper position.
DE102008013828A 2008-03-12 2008-03-12 Crane with telescopic tower Withdrawn DE102008013828A1 (en)

Priority Applications (4)

Application Number Priority Date Filing Date Title
DE102008013828A DE102008013828A1 (en) 2008-03-12 2008-03-12 Crane with telescopic tower
DE502009000246T DE502009000246D1 (en) 2008-03-12 2009-03-10 Crane with telescopic tower
EP09003429A EP2100843B1 (en) 2008-03-12 2009-03-10 Crane with telescopic tower
AT09003429T ATE493365T1 (en) 2008-03-12 2009-03-10 CRANE WITH TELESCOPIC TOWER

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE102008013828A DE102008013828A1 (en) 2008-03-12 2008-03-12 Crane with telescopic tower

Publications (1)

Publication Number Publication Date
DE102008013828A1 true DE102008013828A1 (en) 2009-09-24

Family

ID=40688370

Family Applications (2)

Application Number Title Priority Date Filing Date
DE102008013828A Withdrawn DE102008013828A1 (en) 2008-03-12 2008-03-12 Crane with telescopic tower
DE502009000246T Active DE502009000246D1 (en) 2008-03-12 2009-03-10 Crane with telescopic tower

Family Applications After (1)

Application Number Title Priority Date Filing Date
DE502009000246T Active DE502009000246D1 (en) 2008-03-12 2009-03-10 Crane with telescopic tower

Country Status (3)

Country Link
EP (1) EP2100843B1 (en)
AT (1) ATE493365T1 (en)
DE (2) DE102008013828A1 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3495312A1 (en) * 2017-12-09 2019-06-12 Klaus Rösel Lifting device and method for using the lifting device
CN114592697A (en) * 2022-03-19 2022-06-07 马婕妮 Method for constructing waterless hot spring exercise health-preserving environment

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1168617B (en) 1961-02-14 1964-04-23 Weitz S A Ets Tower crane
DE2730724A1 (en) 1976-07-09 1978-01-12 Potain Sa DEVICE FOR INCREASING A VERTICAL STRUCTURE THAT CONSISTS OF ELEMENTS ARRANGED ON TOP OF OTHER
DE2930161A1 (en) 1978-07-28 1980-02-07 Potain Sa EXTENDING MAST CRANE

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2039540A5 (en) * 1969-04-11 1971-01-15 Noly Jean
DE4107344A1 (en) * 1991-03-07 1992-09-10 Liebherr Werk Biberach Gmbh TELESCOPICABLE TOWER OF A MOBILE OR TOWER TURNING CRANE

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1168617B (en) 1961-02-14 1964-04-23 Weitz S A Ets Tower crane
DE2730724A1 (en) 1976-07-09 1978-01-12 Potain Sa DEVICE FOR INCREASING A VERTICAL STRUCTURE THAT CONSISTS OF ELEMENTS ARRANGED ON TOP OF OTHER
DE2930161A1 (en) 1978-07-28 1980-02-07 Potain Sa EXTENDING MAST CRANE

Also Published As

Publication number Publication date
EP2100843A1 (en) 2009-09-16
ATE493365T1 (en) 2011-01-15
EP2100843B1 (en) 2010-12-29
DE502009000246D1 (en) 2011-02-10

Similar Documents

Publication Publication Date Title
EP3548413B1 (en) Lift facility and method for erecting a lift facility
EP4253300B1 (en) Construction site device with climbing formwork and elevator system
WO2019068469A1 (en) METHOD FOR CONSTRUCTING AN ELEVATOR WITH INCREASING EFFICIENT LIFTING HEIGHT
EP1857670A1 (en) Method and system for erecting a wind turbine tower consisting of tower segments
DE102011116189B3 (en) Load handling device for raising rotor blade of wind energy plant to mounting position, has support assembly having supporting surface projected in vertical plane to make contact of rotor blade or attaching element with support assembly
DE102017101113B3 (en) Telescopic boom with pole tensioning system for a mobile crane and guying method
EP2707322A1 (en) Rotating tower crane
EP1404606A1 (en) Mobile crane comprising a telescopic principal jib
EP3464754B1 (en) Climbing device for carrying out a movement relative to a tower and method for producing a tower
EP3274288B1 (en) Crane tower
DE102009018689B4 (en) Boom element for a hoist
DE102008062648B4 (en) Telescopic crane jib
WO2019076786A1 (en) METHOD FOR CONSTRUCTING A TOWER, TOWER SEGMENT, SUPPLY STRUCTURE AND TOWER
DE10062517C2 (en) telescopic boom
DE102013011173B4 (en) Method for assembling a crane as well as articulation, telescopic boom and crane
EP2035314B1 (en) Lifting platform and method for setting up a lifting platform
EP2100843B1 (en) Crane with telescopic tower
DE4445165C2 (en) Method and stick tree for erecting lattice masts
DE102022128653B4 (en) Mobile crane with lattice boom, lattice boom and method for assembling such a crane
DE102021109947A1 (en) Railing, scaffolding, methods of erecting a scaffolding, and using a railing in a scaffolding
EP4001553B1 (en) Jury mast guide and method of operating a temporary structure with a jury mast using such a jury mast guide
DE3911044C2 (en)
DE2029016A1 (en) Tower crane
DE1481911A1 (en) Mobile lifting frame
EP4656876A1 (en) Supply structure which extends upwards in the tower interior of a tower of a wind turbine and method for erecting same

Legal Events

Date Code Title Description
OP8 Request for examination as to paragraph 44 patent law
R120 Application withdrawn or ip right abandoned

Effective date: 20120703