DE102006035242A1 - Slab track for rail vehicles and method of manufacture - Google Patents
Slab track for rail vehicles and method of manufacture Download PDFInfo
- Publication number
- DE102006035242A1 DE102006035242A1 DE200610035242 DE102006035242A DE102006035242A1 DE 102006035242 A1 DE102006035242 A1 DE 102006035242A1 DE 200610035242 DE200610035242 DE 200610035242 DE 102006035242 A DE102006035242 A DE 102006035242A DE 102006035242 A1 DE102006035242 A1 DE 102006035242A1
- Authority
- DE
- Germany
- Prior art keywords
- threshold
- height
- blocks
- rail vehicles
- slab track
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B1/00—Ballastway; Other means for supporting the sleepers or the track; Drainage of the ballastway
- E01B1/002—Ballastless track, e.g. concrete slab trackway, or with asphalt layers
- E01B1/004—Ballastless track, e.g. concrete slab trackway, or with asphalt layers with prefabricated elements embedded in fresh concrete or asphalt
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Road Paving Structures (AREA)
- Machines For Laying And Maintaining Railways (AREA)
Abstract
Feste Fahrbahn für Schienenfahrzeuge, umfassend wenigstens eine gebundene Tragschicht und darauf angeordnete Schwellen mit jeweils wenigstens einem Schwellenblock, wobei die Dicke der wenigstens einen Tragschicht unter Berücksichtigung der während des Betriebs auftretenden Lasten zur Verringerung des Materialverbrauchs verringert und die Höhe der Schwellenblöcke so gewählt ist, dass eine vorgegebene Gesamthöhe der festen Fahrbahn eingehalten wird.firm Roadway for Rail vehicles comprising at least one bonded base course and sleepers thereon, each having at least one threshold block, taking into account the thickness of the at least one support layer while operating loads to reduce material consumption decreased and the height the threshold blocks so chosen is that a predetermined total height of the fixed carriageway complies becomes.
Description
Die Erfindung betrifft eine feste Fahrbahn für Schienenfahrzeuge, umfassend wenigstens eine gebundene Tragschicht und darauf angeordnete Schwellen mit jeweils wenigstens einem Schwellenblock.The The invention relates to a fixed track for rail vehicles, comprising at least one bonded base course and thresholds thereon each with at least one threshold block.
Infrastrukturprojekte wie Fahrbahnsysteme für den Schienenverkehr durchlaufen mehrere Entwicklungsphasen, von der Planung über die Ausschreibung bis zur Ausführung und Inbetriebnahme. Die einzelnen Projektphasen können dabei weiter unterteilt werden. Innerhalb der Planung unterscheidet man zwischen der Planung des so genannten Unterbaus und der Planung des Oberbaus. Der Unterbau umfasst die Konstruktion des tragenden Erdkörpers oder eines Kunstbauwerks, etwa einer Brücke oder eines Tunnels, der Oberbau betrifft die Konstruktion zum komfortablen Abrollen des Fahrzeugrades. Da der Unterbau naturgemäß vor dem Bau des Oberbaus fertig gestellt sein muss, findet auch dessen Planung jeweils zeitlich vor dem Entwurf des Oberbaus statt. Zur Definition der Schnittstelle zwischen beiden Planungen werden für den Fall, dass der Oberbauentwurf noch nicht endgültig fertig gestellt ist und somit noch nicht alle Details und Abmessungen bekannt sind, üblicherweise konservative Annahmen getroffen. Beispielsweise wird für die Dicke der Tragschichten ein höherer Wert angenommen, das heißt die Fahrbahnplatten werden überdimensioniert. Daraus resultiert häufig eine überdimensionierte Höhe der gesamten festen Fahrbahn. Eine derartige feste Fahrbahn hält zwar allen im Betrieb auftretenden Belastungen stand, das System ist jedoch wegen der Überdimensionierung häufig technisch nicht ausgereizt und damit auch in wirtschaftlicher Hinsicht nicht optimal.infrastructure projects like roadway systems for The railways go through several stages of development, from planning over the tender until the execution and commissioning. The individual project phases can thereby be further subdivided. Within the planning one differentiates between the planning of the so-called substructure and the planning of the superstructure. The substructure includes the construction of the load-bearing terrestrial body or a work of art, such as a bridge or a tunnel, the Superstructure concerns the construction for comfortable unrolling of the Vehicle wheel. As the substructure naturally before the construction of the superstructure has to be completed, also finds its planning each time before the design of the superstructure. To define the interface between the two plans will be in the event that the superstructure design not yet final is finished and therefore not all details and dimensions are known, usually made conservative assumptions. For example, for the thickness of the Base layers a higher Value accepted, that is the carriageway slabs are oversized. This often results an oversized height of entire fixed carriageway. Although such a solid roadway holds all the loads occurring during operation, the system is however because of the oversizing often technically not exhausted and therefore also in economic terms not optimal.
Der Erfindung liegt daher die Aufgabe zugrunde, eine feste Fahrbahn für Schienenfahrzeuge anzugeben, die sowohl in technischer als auch in wirtschaftlicher Hinsicht optimiert ist.Of the Invention is therefore based on the object, a solid roadway for rail vehicles, in both technical and economic terms is optimized.
Zur Lösung dieser Aufgabe ist bei einer festen Fahrbahn für Schienenfahrzeuge der eingangs genannten Art erfindungsgemäß vorgesehen, dass die Dicke der wenigstens einen Tragschicht unter Berücksichtigung der während des Betriebs auftretenden Lasten zur Verringerung des Materialverbrauchs verringert und die Höhe der Schwellenblöcke so gewählt ist, dass eine vorgegebene Gesamthöhe der festen Fahrbahn eingehalten wird.to solution This object is at a fixed track for rail vehicles of the aforementioned Art provided according to the invention, taking into account the thickness of the at least one support layer while reduced operating loads to reduce material consumption and the height the threshold blocks so chosen is that a predetermined total height of the fixed carriageway complies becomes.
In Abkehr von der üblichen Vorgehensweise ist es möglich, in einem fortgeschrittenen Stadium der Planung Änderungen und Optimierungen vorzunehmen, insbesondere kann die Dicke einer Tragschicht nachträglich verringert werden, wobei diese Dickenverringerung natürlich im Hinblick auf die auftretenden Betriebslasten begrenzt ist. Damit eine vorgegebene Gesamthöhe der festen Fahrbahn, die ein wichtiger Systemparameter ist, eingehalten werden kann, werden Schwellenblöcke in der erforderlichen Höhe hergestellt und eingebaut.In Departure from the usual Approach is it possible at an advanced stage of planning changes and optimizations in particular, the thickness of a base layer can be subsequently reduced Of course, this reduction in thickness in terms of occurring Operating loads is limited. So that a given total height of the fixed Lane, which is an important system parameter, can be met, become threshold blocks in the required height manufactured and installed.
Die erfindungsgemäße Fahrbahn weist eine Reihe von Vorteilen auf. Da lediglich andere Schwellenblöcke eingesetzt werden, ist der Material- und Bauaufwand besonders gering, insbesondere ist er wesentlich geringer im Vergleich zum herkömmlichen Ablauf der Planung, bei dem sicherheitshalber häufig zu dicke Tragschichten festgelegt wurden. Ein weiterer Vorteil ist darin zu sehen, dass die Art und Höhe der Schwellenblöcke bei Bedarf auch relativ spät im Verlauf des Projekts geändert werden kann, dies kann ohne Weiteres erfolgen, wenn der Unterbau bereits geplant oder sogar bereits gebaut ist. In diesem Fall kann der Oberbau in technischer Hinsicht nochmals überarbeitet und optimiert werden, eine sich daraus eventuell ergebende Höhendifferenz wird durch die Wahl von Schwellenblöcken mit passender Höhe ausgeglichen.The inventive roadway has a number of advantages. Since only other threshold blocks used be, the material and construction costs are particularly low, in particular it is significantly lower compared to the conventional planning process, for safety's sake too often thick base courses were determined. Another advantage is to see that the type and height of the threshold blocks at Need also relatively late changed during the course of the project This can be done easily if the substructure already planned or even already built. In this case can the superstructure will be technically revised and optimized a resulting height difference is caused by the Choice of threshold blocks with appropriate height balanced.
Bei der erfindungsgemäßen festen Fahrbahn kann eine Schwelle einen, zwei oder mehrere Schwellenblöcke aufweisen, wobei die Schwellenblöcke üblicherweise im Wesentlichen aus Beton bestehen. Es kann vorgesehen sein, dass die Schwellenblöcke bei der erfindungsgemäßen festen Fahrbahn in der Tragschicht verankert oder lose auf die Oberfläche der Tragschicht, gegebenenfalls auf der Oberfläche der obersten Tragschicht, aufgelegt sind.at the solid according to the invention Roadway, a threshold can have one, two or more threshold blocks, the threshold blocks usually consist essentially of concrete. It can be provided that the threshold blocks in the solid according to the invention Roadway anchored in the base course or loose on the surface of the Supporting layer, optionally on the surface of the uppermost supporting layer, are hung up.
In bestimmten Fällen ist es denkbar, dass die erfindungsgemäße feste Fahrbahn Schwellenblöcke mit unterschiedlicher Höhe aufweist. Dies kann beispielsweise bei Übergängen zwischen verschiedenen Fahrbahnabschnitten auftreten. Da die Gesamthöhe der festen Fahrbahn dann variabel ist, werden jeweils passende Schwellenblöcke ausgewählt und eingebaut.In Certain cases It is conceivable that the solid pavement according to the invention with threshold blocks different height having. This can, for example, be at transitions between different Road sections occur. Since the total height of the fixed carriageway then is variable, each appropriate threshold blocks are selected and installed.
Daneben betrifft die Erfindung ein Verfahren zur Herstellung einer Festen Fahrbahn für Schienenfahrzeuge, umfassend wenigstens eine gebundene Tragschicht und darauf angeordnete Schwellen mit jeweils wenigstens einem Schwellenblock.Besides The invention relates to a method for producing a party Roadway for Rail vehicles comprising at least one bonded base course and thresholds thereon, each having at least one threshold block.
Das erfindungsgemäße Verfahren ist dadurch gekennzeichnet, dass die Dicke der wenigstens einen Tragschicht unter Berücksichtigung der während des Betriebs auftretenden Lasten zur Verringerung des Materialverbrauchs verringert und die Höhe der Schwellenblöcke so gewählt wird, dass eine vorgegebene Gesamthöhe der festen Fahrbahn eingehalten wird.The inventive method is characterized in that the thickness of the at least one Base layer under consideration while operating loads to reduce material consumption decreased and the height the threshold blocks so chosen is maintained that a predetermined total height of the fixed carriageway becomes.
Weitere Vorteile und Einzelheiten der Erfindung werden anhand von Ausführungsbeispielen unter Bezugnahme auf die Figuren erläutert. Die Figuren sind schematische Darstellungen und zeigen:Further advantages and details of the invention will be described with reference to exemplary embodiments Explained ter with reference to the figures. The figures are schematic representations and show:
Die
in
Wenn
im Laufe der Planung eine Änderung des
Fahrbahnsystems vorgenommen wird, etwa eine Optimierung der Dicke
der Fahrbahnplatte
In ähnlicher
Weise zeigt
In
den
Bei bestimmten Ausführungen der festen Fahrbahn können innerhalb eines Streckenabschnitts auch Schwellen mit unterschiedlich hohen Schwellenblöcken eingesetzt werden.at certain designs the fixed carriageway within a stretch also swells with different high threshold blocks be used.
Claims (6)
Priority Applications (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| DE200610035242 DE102006035242A1 (en) | 2006-07-26 | 2006-07-26 | Slab track for rail vehicles and method of manufacture |
| TW96124255A TW200815646A (en) | 2006-07-26 | 2007-07-04 | Fixed carriageway for rail vehicles and method of manufacturing the same |
| PCT/DE2007/001284 WO2008011867A1 (en) | 2006-07-26 | 2007-07-19 | Slab track for rail vehicles and method for manufacturing it |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| DE200610035242 DE102006035242A1 (en) | 2006-07-26 | 2006-07-26 | Slab track for rail vehicles and method of manufacture |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| DE102006035242A1 true DE102006035242A1 (en) | 2008-03-13 |
Family
ID=38695568
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| DE200610035242 Withdrawn DE102006035242A1 (en) | 2006-07-26 | 2006-07-26 | Slab track for rail vehicles and method of manufacture |
Country Status (3)
| Country | Link |
|---|---|
| DE (1) | DE102006035242A1 (en) |
| TW (1) | TW200815646A (en) |
| WO (1) | WO2008011867A1 (en) |
Families Citing this family (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE102009041112B4 (en) | 2009-09-15 | 2014-10-30 | Vossloh-Werke Gmbh | System for fastening a rail and fastening a rail |
| CN103573272A (en) * | 2013-11-12 | 2014-02-12 | 中铁二院工程集团有限责任公司 | Tunnel bottom soft stratum dynamic and static load separation tunnel structure |
| FR3062140B1 (en) * | 2017-01-20 | 2019-04-05 | Alstom Transport Technologies | WAY OF RAILWAY WITH IMPROVED PORTABILITY CAPACITY FOR URBAN RAILWAY VEHICLE |
Citations (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE10236534B3 (en) * | 2002-08-09 | 2004-05-27 | Pfleiderer Infrastrukturtechnik Gmbh & Co. Kg | Ballast-free track for manmade structures such as bridges comprises a tube divided in the separating plane between a support plate and a track plate and having sections connected by a filling allowing limited displacement of the track plate |
Family Cites Families (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE2830137A1 (en) * | 1978-07-08 | 1980-01-17 | Zueblin Ag | sleeper-less concrete railway track rail support - has parts formed as prefabricated reinforced concrete units adjustably inserted before concreting |
| DE3429413A1 (en) * | 1984-08-09 | 1986-02-20 | Alfred Kunz GmbH & Co, 8000 München | Height-adjustable and laterally adjustable superstructure for rail lines with separable covering of sleepers on a jointless plate |
| DE4430769C2 (en) * | 1994-08-30 | 2001-05-03 | Dyckerhoff & Widmann Ag | Railway superstructure with a track grating supported on a continuous support plate made of reinforced concrete |
| DE19733500A1 (en) * | 1997-08-01 | 1999-02-18 | Bahnbau Wels Gmbh | Body for supporting rails of fixed railway track on track sub-structure |
| DE19916586A1 (en) * | 1999-04-13 | 2000-10-19 | Gsg Knape Gleissanierung Gmbh | Process for renewing a track system |
| DE10319298A1 (en) * | 2003-04-29 | 2004-11-18 | Gsg Knape Gleissanierung Gmbh | Construction method for permanent way for railways, with construction of track bed incorporating antifreeze layer, sub base, concrete sub base, and thin asphalt layer to compensate for unevenness |
-
2006
- 2006-07-26 DE DE200610035242 patent/DE102006035242A1/en not_active Withdrawn
-
2007
- 2007-07-04 TW TW96124255A patent/TW200815646A/en unknown
- 2007-07-19 WO PCT/DE2007/001284 patent/WO2008011867A1/en not_active Ceased
Patent Citations (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE10236534B3 (en) * | 2002-08-09 | 2004-05-27 | Pfleiderer Infrastrukturtechnik Gmbh & Co. Kg | Ballast-free track for manmade structures such as bridges comprises a tube divided in the separating plane between a support plate and a track plate and having sections connected by a filling allowing limited displacement of the track plate |
Also Published As
| Publication number | Publication date |
|---|---|
| WO2008011867A1 (en) | 2008-01-31 |
| TW200815646A (en) | 2008-04-01 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| AT391499B (en) | RAILWAY CONSTRUCTION, ESPECIALLY FOR RAILWAY VEHICLES WITH VERY HIGH TRAVELING SPEEDS | |
| EP0715021B1 (en) | Ballastless track superstructure for at least one railway track | |
| DE2063727A1 (en) | Method for stabilizing a ballast bed | |
| DE102005026819B4 (en) | Fixed carriageway for rail vehicles | |
| EP1979541A1 (en) | Ballastless track for railway vehicles | |
| WO2008011867A1 (en) | Slab track for rail vehicles and method for manufacturing it | |
| EP1558815A1 (en) | Fixed track for rail vehicles and method for production thereof | |
| DE3429413A1 (en) | Height-adjustable and laterally adjustable superstructure for rail lines with separable covering of sleepers on a jointless plate | |
| DE10236534B3 (en) | Ballast-free track for manmade structures such as bridges comprises a tube divided in the separating plane between a support plate and a track plate and having sections connected by a filling allowing limited displacement of the track plate | |
| DE10236535B4 (en) | Process for the production of a slab track with the traverse method on bridges and other art structures | |
| AT500820B1 (en) | RAILING RAIL FOR A RAILROAD | |
| DE19952803C2 (en) | Superstructure for rail-bound public transport vehicles and method and device for its manufacture | |
| DE10220096B4 (en) | Two-block sleepers for fixed carriageway | |
| EP1486611B1 (en) | Method for making a balastless track and balastless track for a railway | |
| DE29703508U1 (en) | Slab track, mainly for the switch area | |
| DE102008048358A1 (en) | Track body molding unit | |
| DE102010030334A1 (en) | Method for rehabilitating a track system with a ballast bed | |
| EP1529134A1 (en) | Ballastless track and method for the production thereof | |
| DE69916641T2 (en) | IMPROVEMENTS ON OR WITH REGARD TO RAILWAY RAILWAYS | |
| EP1182294B1 (en) | Railway track and method for making a railway track | |
| EP1891271B1 (en) | Lifting and directing tie | |
| DE19625249A1 (en) | Positionally stable track made of precast concrete | |
| WO1996022423A1 (en) | Low-noise track element | |
| AT8067U1 (en) | RAILING RAIL FOR A RAILROAD | |
| AT512391B1 (en) | Noise protection device |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| OP8 | Request for examination as to paragraph 44 patent law | ||
| 8130 | Withdrawal |