DE102006011652B4 - Two-step hollow-bar composite anchor for adhesive cartridges and adhesive granules - Google Patents
Two-step hollow-bar composite anchor for adhesive cartridges and adhesive granules Download PDFInfo
- Publication number
- DE102006011652B4 DE102006011652B4 DE200610011652 DE102006011652A DE102006011652B4 DE 102006011652 B4 DE102006011652 B4 DE 102006011652B4 DE 200610011652 DE200610011652 DE 200610011652 DE 102006011652 A DE102006011652 A DE 102006011652A DE 102006011652 B4 DE102006011652 B4 DE 102006011652B4
- Authority
- DE
- Germany
- Prior art keywords
- anchor
- hollow bar
- adhesive
- sealing
- hollow
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000000853 adhesive Substances 0.000 title claims abstract description 55
- 230000001070 adhesive effect Effects 0.000 title claims abstract description 53
- 239000002131 composite material Substances 0.000 title claims abstract description 48
- 239000008187 granular material Substances 0.000 title claims abstract description 7
- 238000007789 sealing Methods 0.000 claims abstract description 41
- 239000000203 mixture Substances 0.000 claims abstract description 24
- 238000001125 extrusion Methods 0.000 claims abstract description 22
- 239000004848 polyfunctional curative Substances 0.000 claims abstract description 20
- 239000011435 rock Substances 0.000 claims abstract description 10
- 238000009792 diffusion process Methods 0.000 claims abstract description 8
- 238000009434 installation Methods 0.000 claims abstract description 8
- 238000005520 cutting process Methods 0.000 claims abstract description 6
- 238000011010 flushing procedure Methods 0.000 claims abstract description 6
- 238000002156 mixing Methods 0.000 claims abstract description 4
- 230000004888 barrier function Effects 0.000 claims abstract description 3
- 238000010276 construction Methods 0.000 claims abstract description 3
- 238000000034 method Methods 0.000 claims description 19
- 239000003292 glue Substances 0.000 claims description 18
- 239000011888 foil Substances 0.000 claims description 13
- 230000009172 bursting Effects 0.000 claims description 10
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 10
- 230000008569 process Effects 0.000 claims description 8
- 239000004820 Pressure-sensitive adhesive Substances 0.000 claims description 7
- 230000001960 triggered effect Effects 0.000 claims description 4
- 230000000694 effects Effects 0.000 claims description 3
- 238000004873 anchoring Methods 0.000 claims description 2
- 238000011049 filling Methods 0.000 claims description 2
- 238000006243 chemical reaction Methods 0.000 claims 1
- 230000004580 weight loss Effects 0.000 claims 1
- 238000005553 drilling Methods 0.000 description 14
- 238000004519 manufacturing process Methods 0.000 description 5
- 239000004570 mortar (masonry) Substances 0.000 description 4
- 238000003860 storage Methods 0.000 description 4
- 239000000126 substance Substances 0.000 description 4
- 238000002347 injection Methods 0.000 description 3
- 239000007924 injection Substances 0.000 description 3
- 230000009467 reduction Effects 0.000 description 3
- 238000009412 basement excavation Methods 0.000 description 2
- 238000005429 filling process Methods 0.000 description 2
- 239000008202 granule composition Substances 0.000 description 2
- 239000000314 lubricant Substances 0.000 description 2
- 238000005065 mining Methods 0.000 description 2
- 239000007787 solid Substances 0.000 description 2
- 238000012549 training Methods 0.000 description 2
- 230000005641 tunneling Effects 0.000 description 2
- 238000010009 beating Methods 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 239000003245 coal Substances 0.000 description 1
- 230000001143 conditioned effect Effects 0.000 description 1
- 230000006378 damage Effects 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000007598 dipping method Methods 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 238000009826 distribution Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000003780 insertion Methods 0.000 description 1
- 230000037431 insertion Effects 0.000 description 1
- 230000007246 mechanism Effects 0.000 description 1
- 238000005457 optimization Methods 0.000 description 1
- 239000004033 plastic Substances 0.000 description 1
- 230000002028 premature Effects 0.000 description 1
- 238000003825 pressing Methods 0.000 description 1
- 230000002265 prevention Effects 0.000 description 1
- 238000012797 qualification Methods 0.000 description 1
- 238000005507 spraying Methods 0.000 description 1
- 230000006641 stabilisation Effects 0.000 description 1
- 238000011105 stabilization Methods 0.000 description 1
- 230000003068 static effect Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D20/00—Setting anchoring-bolts
- E21D20/02—Setting anchoring-bolts with provisions for grouting
- E21D20/021—Grouting with inorganic components, e.g. cement
- E21D20/023—Cartridges; Grouting charges
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D20/00—Setting anchoring-bolts
- E21D20/02—Setting anchoring-bolts with provisions for grouting
- E21D20/025—Grouting with organic components, e.g. resin
- E21D20/026—Cartridges; Grouting charges
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Chemical & Material Sciences (AREA)
- Inorganic Chemistry (AREA)
- Joining Of Building Structures In Genera (AREA)
Abstract
Hohlstabverbundanker für den Einsatz im Berg,- Tunnel,- Tief- und Felsbau, ohne Zwischenmittel wie zusätzliche Innenkanäle zur Spülung oder Absaugung von Bohrklein und ohne ein Innenrohr als Klebermagazin zur Montage in zwei Schrittfolgen nach Hauptpatent
Description
Die
Erfindung betrifft einen Zweischritt-Hohlstabverbundanker, für Ein- oder
Zweikomponenten, Kleberpatronen oder Klebergranulat für Hohlstabvoll- oder
Teilverbundanker, zum kostengünstigen
und sichereren Ausbau von Hohlräumen
im Berg-, Tunnel-, Tief- und Felsbau nach Hauptpatent
Kleber, Mörtel oder Granulatgemisch wird in der Ankerhohlstabbohrung, ohne Zwischenmittel wie ein Innenrohr als Klebermagazin, das von einem Spülkanal umgeben ist, vorkonfektioniert eingelagert und direkt aus der Hohlstabbohrung mit einem Kolben ausgepresst.Glue, mortar or granule mixture is in the anchor hollow bar bore, without intermediate means like an inner tube as an adhesive magazine, which is surrounded by a flushing channel is, stored in prefabricated and directly from the hollow bar bore squeezed out with a piston.
Da die Herstellung der Bohrungen in den gezogenen oder gepressten Ankerrohren gewissen Toleranzen unterliegen und die Oberfläche der Bohrung mit Zunder und ähnlichen Ablagerungen aus der Fertigung behaftet sind, wird für den Auspressvorgang eine Oberflächenverbesserung mit Gleitmitteln vorgesehen, die mit Inlinerfolien, eingeschobenen Gleitschläuchen, einem Dünnbettrohr, mit aufgebrachten Gleitmitteln in der Bohrung durch Tauchen oder Spritzen erfolgen kann.There the production of the holes in the drawn or pressed anchor tubes subject to certain tolerances and the surface of the hole with scale and similar Deposits from production are afflicted, is for the Auspressvorgang a surface Optimization provided with lubricants, with inliner films, inserted Gleitschläuchen, a thin-bed pipe, with applied lubricants in the hole by dipping or Spraying can be done.
In einer Ausführung wird zwischen einem Auspresskolben im Ankerfuß, mit Dicht- und Schublamellen und zwischen einer Mischer-Dichtpatrone im Ankerkopf, die in der Hohlstabbohrung vorkonfektioniert eingebrachte Kleberpatrone vor Masseverlust durch Diffundierung geschützt.In an execution is between an extrusion piston in the anchor foot, with sealing and Schublamellen and between a mixer-sealing cartridge in the anchor head, which in the Hollow rod hole prefabricated introduced adhesive cartridge Mass loss protected by diffusion.
Mit dem Auspressvorgang wird durch die intensive Vermischung die chemische Aushärtung in dem Ringraum zwischen Ankerrohr und Gebirge, nach Einsatz des Hohlstabankers für eine Teil- oder Vollverklebung in der Ankerbohrung, ausgelöst.With the Auspressvorgang is the intensive mixing of the chemical curing in the annulus between anchor tube and mountains, after using the Hollow bar anchor for Partial or Vollverklebung in the anchor hole, triggered.
In der weiteren Ausführung kommt es bei Aufbringen eines definierten Wasserhochdruckes, auf einem im Hohlstab befindlichen Auspresskolben mit Dichtfunktion, zum Ansprechen eines Berstventils.In the further execution it occurs when applying a defined high pressure water, on an extrusion piston in the hollow rod with sealing function, to respond to a burst valve.
Der in der Hohlstabbohrung befindliche Kleber/Mörtel, als Druck-Granulatklebermischung oder als Kleberpaste ohne Kunststoffschläuche eingefüllt, verflüssigt sich vor dem Berstventil und vermischt sich mit dem im Granulat- oder in der Kleberpaste eingelagerten Härter, tritt über den Ankerkopf aus und füllt den Ringraum zur chemisch angestoßenen Aushärtung zwischen Ankerschaft und Bohrlochwand, z. B. bei Vollverbundankern über die gesamte Bohrlochlänge bis zum Ankerfuß.Of the in the hollow bar bore adhesive / mortar, as pressure-Granulatklebermischung or filled in as glue paste without plastic hoses, liquefies in front of the bursting valve and mixes with the stored in the granule or in the adhesive paste Harder, occurs over the anchor head and fills the annulus for chemically initiated curing between anchor shaft and borehole wall, e.g. B. in Vollverbundankern over the entire borehole length to to the anchor foot.
Mit der Anordnung der Verlagerung der Klebermassen zwischen dem Auspresskolben mit den Dicht- und Schublamellen und dem Berstventil wird der Masseverlust des Klebers durch Diffundierung bei langen Lagerzeiten verhindert.With the arrangement of the displacement of the adhesive masses between the extrusion piston with the sealing and thrust blades and the bursting valve, the mass loss prevents the adhesive from diffusing through long storage times.
Nach dem Aushärtevorgang im Ringraum, bei einer Teil- oder Vollverklebung des Hohlstabverbundankers, wird mit dem Ankeradapter auf die, mit einer Brechsicherung versehenen vormontierten Ankermutter, ein maximales Drehmoment aufgegeben, mit dem diese Muttersicherung abschert und damit anzeigt, dass die erforderliche Sicherung des Gebirges mit dem gewählten Anpressdruck zwischen Ankerplatte und Gebirge, erreicht ist.To the curing process in the annulus, in a partial or full bonding of the hollow bar composite anchor, is with the anchor adapter on the, provided with a breakage protection pre-assembled anchor nut, a maximum torque abandoned, with which shears off this nut fuse, indicating that the required Securing the mountains with the selected contact pressure between Anchor plate and mountains, is reached.
Beschreibungdescription
Der Ankerkopf besitzt in einer Ausführung die zur Diffundierungsverhinderung, vor der Auspressvorrichtung eingebaute und mit einer Folie gekapselte Mischer-Dichtpatrone, die nach dem Aufreißen als statische Mischeinrichtung beim Einsatz von Kleberpatronen in Folienschläuchen mit integriertem Härterspiralschlauch wirkt. Bei längeren Lagerzeiten wird die Kleberpatrone von der Ankerkopf- und Fußseite gegen Masseverlust durch Diffundierung der Klebersäule geschützt.Of the Anchor head has in one embodiment the for diffusing prevention, built in front of the squeezing device and with a film encapsulated mixer-sealing cartridge, which after the Rip as a static mixing device when using adhesive cartridges in film tubes with integrated hardener spiral hose acts. For longer Storage times is the adhesive cartridge from the anchor head and foot side against Mass loss protected by diffusion of the adhesive column.
In einer weiteren Ausführung wird der vorkonfektionierte Kleber als Granulatgemisch direkt in der Hohlstabbohrung als Klebermagazin ohne Zusatzrohr, Spülkanäle, Folienschlauch eingebracht und nach der Erreichung eines definierten Druckes mit einem Auspresskolben über ein Berstventil zur chemischen Aushärtung in den Ringraum verpresst.In another embodiment the prefabricated adhesive is used as a granulate mixture directly in the Hollow bar hole as adhesive magazine without additional pipe, flushing channels, film tube introduced and after the achievement of a defined pressure with an extrusion piston over a bursting valve for chemical curing pressed into the annulus.
Der Ankerfuß wird bei beiden Ausführungen mit dem Ankersetzadapter, der den Anker, ohne Spülung mit einem Ausräummeißel für restliches Bohrklein drehend in das Bohrloch schiebt und in sich einen hydraulisch verschiebbaren Dispenserzylinder trägt, mit dem die Aufgabe des Druckwassers bzw. auch die Dichtfunktion am Ankerfuß erfolgt, der Auspressvorgang des vorkonfektionierten Klebers, mit einer vordimensionierten Menge Druckwasser eingeleitet.Of the Anchor foot becomes in both versions with the anchor grid adapter, restoring the anchor, without flushing with a scraper Turning cuttings into the borehole and pushing them into a hydraulic hole slidable dispenser cylinder carries, with the task of Pressurized water or the sealing function takes place at the anchor foot, the Auspressvorgang the prefabricated adhesive, with a pre-dimensioned Amount of pressurized water introduced.
Nach der Aushärtezeit des Klebergemisches, wird mit einem definierten Drehmoment das Anziehen der Ankermutter über eine Brechbolzensicherung als Spannelement zur weiteren Sicherung und Verbindung der Gebirgsschichten mit der Ankerplatte vorgenommen.To the curing time of the adhesive mixture is tightened with a defined torque the anchor nut over a breaking bolt safety as a clamping element for further security and Connection of the mountain layers made with the anchor plate.
Stand der TechnikState of the art
Selbstbohrende
Verbundanker mit chemischen Klebern sind als Injektionsanker mit/ohne
einem zusätzlichen
Klebermagazin zur Stabilisierung von Räumen im Berg- und Tunnelbau,
im Tief- und Tagebau von Fels- und Stützwänden bekannt und in den Schriften
Mit diesen Verbundankern wird die Ankerbohrung je nach Gesteinshärte mit Nass- oder Trockenbohrverfahren hergestellt. Ein zusätzlicher Spül- oder Absaugkanal zur Abförderung von Bohrklein aus der Bohrung ist dabei mit den vorgenannten Ankersystemen erforderlich. Dabei wird nach der Herstellung der Ankerbohrung aus einem zusätzlichen Innenrohr, das als Klebermagazin dient, der Kleber und Härter über Trenneinrichtungen zu der Spül- oder Absaugleitung, im Ringraum zwischen Anker und Gebirge verpresst.With Depending on the hardness of the rock, the anchoring bore will be communicated to these composite anchors Wet or dry drilling method produced. An additional one Rinsing or Suction channel for removal Cuttings from the hole is doing with the aforementioned anchor systems required. It is made after the production of the anchor hole an additional inner tube, which serves as an adhesive magazine, the adhesive and hardener on separating devices to the Rinsing or Suction line, pressed in the annulus between anchor and mountains.
Diese bisher bekannten Verbundanker können nur mit drehenden Bohrverfahren für die Herstellung der Ankerbohrung eingesetzt werden und haben eine im Bohrloch verbleibende und damit verlorene Bohrkrone. Die Unterscheidungsmerkmale der verschiedenen Verfahren werden mit den betriebswirtschaftlichen Eignungen nachfolgend dargestellt: These previously known composite anchor can only with rotating drilling method for the production of the anchor hole be used and have a remaining in the well and thus lost drill bit. The distinguishing features of the various Procedures will follow with the business qualifications shown:
1. Vollstabverbundanker unter Anwendung des Patronenverfahrens:1. Full bar composite anchor under application the cartridge procedure:
Bei diesem Verfahren wird ein an der Außenseite gerippter Vollstab in ein vorher erstelltes und mit Schlauch-in-Schlauch-Klebepatronen gefülltes Bohrloch mit geringer Vorschubgeschwindigkeit und hoher Drehzahl eingedreht.at This method is a ribbed on the outside solid rod in a pre-made and with tube-in-tube adhesive cartridges filled Drill hole with low feed rate and high speed screwed.
Der Ankerkopf zerstört die Kleberpatronen und mischt Kleber und Härter. Das Klebergemisch wird durch die Ankerstange verdrängt und füllt den Ringraum zwischen Ankerstab und Bohrlochwand bis zum Ankerfuß.Of the Anchored head destroyed the glue cartridges and mixes glue and hardener. The glue mixture is displaced by the anchor rod and fill the annulus between anchor rod and borehole wall to the anchor foot.
Das Einbringen des Ankers mit Bohren, Einbringen der Klebesäule, Einbringen des Ankers, ist arbeitsintensiv und stellt hohe Qualitätsansprüche sowohl an die eingesetzte Maschinentechnik als auch an die Ausbildung und Disziplin des Personals mit der Einhaltung der vorgeschriebenen Drehzahlen und der Vorschubgeschwindigkeit.The Insertion of the anchor with drilling, introduction of the adhesive column, introduction of the anchor, is labor intensive and sets high quality standards both to the used machine technology as well as to the training and Discipline of the staff with the observance of the prescribed Speeds and the feed rate.
Dadurch bedingt ist die Einbauqualität des Ankers fehleranfällig, was im Extremfall zur Gefährdung der Standsicherheit der Grubenbaue führen kann, da die verwendeten Kleberpatronen bei zu langen Lagerzeiten durch das Diffundieren der Chemie an Masse verlieren und dadurch beim Einbau abknicken, im Bohrloch aufreißen und der Aushärteprozess dadurch zu früh einsetzt.Thereby conditioned is the quality of installation the anchor prone to error, what in extreme cases endangered The stability of the mines can lead, as the used Adhesive cartridges due to diffusion due to too long storage times lose the chemistry of the mass and thereby bend during installation, tear in the borehole and the curing process too early starts.
Eine Mechanisierung/Automatisierung der Arbeitsvorgänge zum Einbringen solcher Anker ist bis jetzt, insbesondere für Einsatzfälle im geschichteten Gestein, nicht gelungen. Dies führt dazu, dass derartige Vortriebe wenig leistungsfähig sind, da die Zeit für das Einbringen eines derartigen Ankers bei ca. 5 Minuten liegt.A Mechanization / automation of operations for introducing such Anchor is until now, especially for applications in layered rock, failed. this leads to In addition, such propulsions are less powerful, since the time for the introduction such an anchor is about 5 minutes.
Zusätzlich sind die Arbeitsvorgänge mit ständigem händischem Werkzeugwechsel, wie Verbindung Bohrhammer/Bohrstange lösen, Einstecken des Ankersetzschlüssels, Einstecken des Ankers usw. mit Risiken für das eingesetzte Personal verbunden, da das Verfahren einen dauernden Aufenthalt von Personen im nicht gesicherten Gefahrenbereich des Vortriebs erfordert. Eine Risikominderung ist beim derzeitigen Stand der Technik nur bedingt möglich.In addition are the work processes with constant händischem Tool change, such as connection of rotary hammer / boring bar, inserting the Anchor setting key Inserting the anchor etc. with risks for the employed personnel connected, since the procedure a permanent residence of persons in the unsecured danger area of propulsion requires. A Risk reduction is only conditionally possible with the current state of the art.
Auf Vollstabanker in Verbindung mit dem Füllmörtelverfahren bei dem der Mörtel in das Bohrloch gepumpt wird, wird in der hier aufgeführten Be schreibung nicht gesondert eingegangen, da diese als Ausbauanker im Streckenvortrieb bis jetzt nicht eingesetzt werden.On Solid bar anchors in connection with the mortar filling method in which the mortar in The borehole is pumped, is in the description described here not separately received, as these as expansion anchor in the route propulsion not used until now.
2. Selbstbohrende Verbundanker mit integriertem Klebermagazin:2. Self-drilling composite anchor with integrated adhesive magazine:
Selbstbohrende Verbundanker mit integriertem Klebermagazin sind bekannt und werden als Ausbauanker alternativ zum Vollstabverbundanker eingesetzt, da diese Ausführung Bohrstange und Anker in einem sind. Der Anker ist mit einer verlorenen Bohrkrone ausgestattet, die äußere Form des Ankerrohres als Bohrstange gewährleistet die Abführung von Bohrklein während des Bohrvorganges.self-drilling Composite anchors with integrated adhesive magazine are known and will used as an expansion anchor as an alternative to the full-bar composite anchor, there this execution Boring bar and anchor are in one. The anchor is with a lost drill bit equipped, the outer shape the anchor tube as a boring bar ensures the discharge of Cuttings during of the drilling process.
Der Hohlstab beinhaltet ein zusätzliches Innenrohr, das den vorkonfektionierten Kleber und Härter enthält. Zwischen Innenrohr und Innendurchmesser des Hohlstabs befindet sich der Spülkanal, der zur Spülung mit Luft, Wasser oder Luftwassergemisch während des Bohrvorgangs genutzt wird.Of the Hollow bar includes an additional Inner tube containing the prefabricated adhesive and hardener. Between Inner tube and inner diameter of the hollow rod is the flushing channel, the rinse used with air, water or air-water mixture during the drilling process becomes.
Nach der Herstellung der Bohrung wird aus dem zusätzlichen Innenrohr der Kleber und Härter, durch Beaufschlagung mit Wasserdruck, ausgepresst. Das Klebergemisch tritt über Bohrungen am Ankerkopf aus und füllt den Ringraum zwischen Anker und Bohrlochwand.To The production of the hole is made from the additional inner tube of the adhesive and hardener, through Pressurized with water pressure, squeezed out. The adhesive mixture passes through holes at the anchor head and fills the annulus between anchor and borehole wall.
Diese selbstbohrenden Verbundanker mit integriertem Innenrohr als Klebermagazin, eignen sich aufgrund ihrer Konstruktion nur für drehende Bohrverfahren. Drehendes Bohren lässt sich jedoch nur im begrenzten Umfang, in Abhängigkeit von den Gesteinseigenschaften, zu maximal 30% aller Einsatzfälle im Streckenvortrieb einsetzen und sind daher nicht geeignet, die unter 1. beschriebenen, mit dem Patronenverfahren eingebrachten Vollstabverbundanker, zu ersetzen.These self-drilling composite anchors with integrated inner tube as adhesive magazine, are due to their design only for rotating drilling. Rotary drilling, however, can be used only to a limited extent, depending on the rock properties, to a maximum of 30% of all applications in the route propulsion and are therefore not suitable, described in 1., introduced with the cartridge method Vollstabverbun thanks, to replace.
Ein Einsatz des aufwendigen und damit kostenintensiven Ankers bei Gesteinseigenschaften, die drehendes Bohren nicht zulassen und bei denen der Selbstbohranker, nachträglich in ein schlagend – bzw. drehschlagend hergestelltes Bohrloch eingebracht wird, ist betriebswirtschaftlich nicht zu rechtfertigen.One Use of the complex and thus cost-intensive anchor for rock properties, do not allow rotary drilling and where the self-drilling anchor, later in a beating - or Drehschlagend produced wellbore is introduced, is economical unjustifiable.
3. Hohlstabinjektionsanker:3. Hollow bar injection anchor:
Hohlstabinjektionsanker sind als Selbstbohranker, oder als nachträglich in vorher hergestellte Bohrlöcher einzubringende Anker bekannt. Durch den Hohlstab wird ein außerhalb des Bohrlochs hergestelltes Klebergemisch in den Ringraum zwischen Außenwand des Hohlstabs und Bohrlochwand als Verfüllverfahren mit und ohne Druck geleitet. Das Verfüllverfahren ist verfahrenstechnisch mengenaufwendig, kosten- und zeitintensiv. Diese Nachteile werden durch die sehr gute Einbauqualität des Ankers in der Praxis nicht ausgeglichen.Hollow rod injection anchor are to be introduced as Selbstbohranker, or as subsequently in previously prepared holes Anchor known. Through the hollow rod is made outside the well Adhesive mixture in the annulus between outer wall of the hollow bar and borehole wall as a filling process directed with and without pressure. The filling process is procedural Volume-consuming, costly and time-consuming. These disadvantages will be by the very good quality of installation of the anchor is not balanced in practice.
4. Zusammenfassung zu 1., 2. und 3.:4. Summary of 1st, 2nd and 3rd:
Da keines der beschriebenen Verfahren, den heutigen betriebswirtschaftlichen und sicherheitstechnischen Anforderungen in vollem Umfang gerecht wird und andere Ankerarten wie z. B. Spreizhülsenanker und Reibrohranker vor allem für Anwendungen im Steinkohlenbergbau nur bedingt in Frage kommen, ergibt sich die Notwendigkeit zur Entwicklung eines alternativer Ankersystems:There None of the described methods, today's business management and safety requirements in full and other anchor types such. B. expansion sleeve anchor and Reibrohranker especially for Applications in the coal industry come only partially in question results the need to develop an alternative anchor system:
Der Zweischritt-Hohlstabverbundanker.The two-step hollow bar composite anchor.
Aufgabenstellung:Task:
Der Erfindung liegt die Aufgabe zu Grunde, einen Hohlstabverbundanker zu schaffen, mit dem die bisher zeit- und kostenintensive, sowie mit Qualitäts- und Sicherheitsproblemen behafteten Verbundankersysteme abgelöst werden können. Das System muss eine Minimierung der Einbauzeit, Leistungssteigerung mit guter Einbauqualität als Hohlstabvollverbundanker, die Senkung des Personalaufwandes und eine Verringerung der Unfallgefahr durch eine Bedienung aus dem abgesicherten Bereich des Streckenvortriebes gewährleisten.Of the Invention is the object of a Hohlstabverbundanker to create, with the previously time-consuming and cost-intensive, as well as with quality and safety problems associated shear anchor systems are replaced can. The system must minimize installation time, increase performance with good quality of installation as a hollow bar fully composite anchor, the reduction of personnel costs and a reduction of the risk of accidents by an operator ensure the safe area of the route propulsion.
Das ist mit dem erfindungsgemäßen Zweischritt-Hohlstabvoll- oder Teilverbundanker möglich, dessen Einbau in zwei Schritten erfolgt:The with the two-step hollow bar according to the invention or partial composite anchor possible whose Installation in two steps:
1. Schritt: Herstellen einer Ankerbohrung mit definiertem Durchmesser mittels eines leistungsfähigen Bohrverfahrens in Abhängigkeit von den Gesteinseigenschaften, drehend, schlagend oder drehschlagend.1. Step: Make an anchor hole with a defined diameter by means of a powerful Drilling method depending from rock features, turning, hitting or turning.
2. Schritt: Einbringen des vorkonfektionierten Hohlstabvollverbundankers mittels Ankeradapter und Auspressen der vorkonfektionierten Klebersäule mit Wasserhochdruck mittels einer Dispensertülle und nach dem Aushärten das abgesicherte Anziehen der Ankermutter mit einem maximalen Drehmoment.Second Step: Introduce the prefabricated hollow bar composite anchor using an anchor adapter and pressing out the prefabricated adhesive column with high pressure water by means of a dispenser grommet and after curing the safe tightening of the anchor nut with a maximum torque.
Das hier beschriebene Ankersystem ist ideal für eine künftige Vollmechanisierung/Automatisierung des Einbringvorgangs, mit Bohrlafetten aus dem abgesicherten Vortriebsraum geeignet, so dass Gefahren für das Personal sowohl beim Handling als auch durch nachbrechendes Gestein vermieden werden. Der chemische Aushärtevorgang wird mit Kleberpatronen, mit Druckkleber- oder Granulatgemisch durch einen aufgebrachten Druck im Ringraum ausgelöst und mit der Diffusionssperre gegen Masseverlust wird eine überlange Lagerzeit der vorkonfektionierten Ankerelemente erreicht.The Anchor system described here is ideal for future full mechanization / automation the Einbringvorgangs, with drill carriages from the secured driving space suitable, so that risks for the staff both in handling and by nachbrechendes Rocks are avoided. The chemical curing process is carried out with glue cartridges, with pressure-sensitive adhesive or granule mixture by an applied Pressure in the annulus triggered and with the diffusion barrier against loss of mass becomes an overlong Storage time of pre-assembled anchor elements reached.
Eine
Vorkonfektionierung der Klebersäule
im Hohlstab ist in der Schrift mit dem
Diese Aufgabe wird mit den Merkmalen des Oberbegriffes im Anspruch 1 gelöst. Weiterbildungen sind in den Unteransprüchen dargelegt, Einzelheiten und Vorteile der Erfindung ergeben sich aus der Beschreibung und Darstellung in den folgenden Zeichnungen.These Task is solved with the features of the preamble in claim 1. Trainings are in the subclaims set forth, details and advantages of the invention will become apparent from the description and illustration in the following drawings.
Kurzbeschreibung der Zeichnungen.Brief description of the drawings.
Ausführungsbeispiele.Embodiments.
Der
Folienschlauch
Beim
Auspressvorgang mit dem Auspresskolben
Der
Auspresskolben
Der
Folienschlauch
Bei
Aufgabe einer definierten Wasserhochdruckmenge
Der
verflüssigte
Granulat-Druckkleber
Die
Montage aller Einbauteile
Zwischen
der Mischer-Dichtpatrone
- 11
-
Ankerkopf,
zu
2 Anchor head, too2 - 22
- HohlstabverbundankerHollow bar shear connectors
- 33
-
Kleberpatrone,
zu
2 Glue cartridge, too2 - 44
-
Folienschlauch,
zu
3 Foil hose, too3 - 55
-
Härterspirale,
zu
3 Hardener spiral, too3 - 66
-
Mischer-Dichtpatrone,
zu
2 Mixer-sealing cartridge, too2 - 77
-
Anlagefläche, zu
6 Investment area, too6 - 88th
-
Hohlstabbohrung,
zu
2 Hollow bar bore, too2 - 99
-
Gleitbahn,
zu
2 und8 Slideway, too2 and8th - 1010
-
Ausräummeißel, zu
2 und23 Clearing chisel, too2 and23 - 1111
-
Auspresskanäle, zu
10 Extrusion channels, too10 - 1212
-
Kleber,
zu
10 Glue, too10 - 1313
-
Verbindungsmechanik,
zu
2 und10 Connecting mechanism, too2 and10 - 1414
-
Ankerbohrung,
zu
2 und32 Anchor hole, too2 and32 - 1515
-
Patronenverschluss,
zu
3 Cartridge lock, too3 - 1616
-
Auspresskolben,
zu
1 ,8 und24 Extrusion piston, too1 .8th and24 - 1717
-
Dichtlamellen,
zu
16 Sealing blades, too16 - 1818
-
Schublamellen,
zu
16 Schublamellen, too16 - 1919
-
Auflagerring,
zu
6 Bearing ring, too6 - 2020
-
Endlage,
Auspresskolben, zu
16 End position, extrusion piston, closed16 - 2121
-
Wasserhochdruck,
definierte Menge, zu
8 High pressure, defined quantity, too8th - 2222
-
Außengewinde,
zu
2 und32 External thread, too2 and32 - 2323
-
Ausräummeißel, Seitenansicht,
zu
10 Excavation chisel, side view, to10 - 2424
-
Ankerkopf,
zu
2 Anchor head, too2 - 2525
-
Granulat-Druckklebergemisch
mit Härter,
zu
24 Granulated pressure-sensitive adhesive mixture with hardener, too24 - 2626
-
Berstventil,
zu
24 Bursting valve, too24 - 2727
-
Ausräummeißel, zu
24 Clearing chisel, too24 - 2828
-
Ausströmkanäle, zu
27 Outflow channels, too27 - 2929
-
Venturieffekt,
zu
28 Venturi effect, too28 - 3030
-
Meißelspitze,
zu
27 Chisel tip, too27 - 3131
-
Ringraum,
zu
14 Annulus, too14 - 3232
- HohlstabverbundankerHollow bar shear connectors
- 3333
-
Dispensertülle, zu
2 und32 Dispenser spout, too2 and32 - 3434
-
Klebergemisch,
ohne Folienschlauch, zu
32 Adhesive mixture, without film tube, too32 - 3535
-
Dichtfolie,
zu
6 Sealing film, too6 - 3636
-
Ausräummeißel, zu
32 Clearing chisel, too32 - 3737
-
Ankerkopf,
zu
32 Anchor head, too32 - 3838
-
Sicherungsplatte,
zu
32 Locking plate, too32 - 3939
-
Ringspalt,
zu
38 Annular gap, too38 - 4040
-
Federtopf,
selbstsichernd, zu
37 Spring pot, self-locking, too37 - 4141
-
Auspressöffnungen,
zu
40 Extrusion openings, too40 - 4242
-
Kragenrand,
zu
40 Collar edge, too40 - 4343
-
Innenseite,
Federtopf, zu
40 Inside, spring pot, too40 - 4444
-
Verteilerrippen,
zu
6 Distribution ribs, too6 - 4545
- Gebirgemountains
- 4646
-
Kleberpaste,
zu
2 und32 Glue paste, too2 and32 - 4747
-
Härter, chemisch
eingelagert, zu
46 Hardener, chemically incorporated, too46 - 4848
-
Schrägschnitt,
zu
37 Diagonal cut, too37 - 4949
-
Bohrung,
zu
38 Bore, too38 - 5050
-
Widerlager,
zu
6 Abutment, too6 - 5151
-
Dehnschlitze,
zu
40 Stretch slots, too40 - 5252
-
Dichtebene,
zu
6 Density level, too6 - 5353
-
Ankerfuß, zu
32 Anchor foot, too32 - 5454
-
Inlinerfolie,
zu
8 Inliner film, too8th - 5555
-
Dünnbettrohr,
zu
8 Thin bed pipe, too8th
Claims (21)
Priority Applications (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| DE102006006748A DE102006006748B4 (en) | 2006-01-16 | 2006-02-12 | Two step-liner hollow rod Fully bonded anchor |
| DE200610011652 DE102006011652B4 (en) | 2006-02-12 | 2006-03-11 | Two-step hollow-bar composite anchor for adhesive cartridges and adhesive granules |
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| DE102006006748A DE102006006748B4 (en) | 2006-01-16 | 2006-02-12 | Two step-liner hollow rod Fully bonded anchor |
| DE200610011652 DE102006011652B4 (en) | 2006-02-12 | 2006-03-11 | Two-step hollow-bar composite anchor for adhesive cartridges and adhesive granules |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| DE102006011652A1 DE102006011652A1 (en) | 2007-09-20 |
| DE102006011652B4 true DE102006011652B4 (en) | 2010-10-21 |
Family
ID=38374753
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| DE200610011652 Expired - Fee Related DE102006011652B4 (en) | 2006-01-16 | 2006-03-11 | Two-step hollow-bar composite anchor for adhesive cartridges and adhesive granules |
Country Status (1)
| Country | Link |
|---|---|
| DE (1) | DE102006011652B4 (en) |
Families Citing this family (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE102008001904A1 (en) | 2008-05-21 | 2009-11-26 | Hilti Aktiengesellschaft | Setting method for anchoring a fastener |
| DE102009056089A1 (en) | 2009-11-30 | 2011-06-01 | Werner P. Dipl.-Ing. Berwald | Rotatable impact-resistance single phase self drilling mixer anchor and two phase cartridge spiral mixer anchor i.e. hollow bar anchor, has solid rods provided in extruded cartridge pipe at heavy duty anchor for double anchor load |
| DE102010014612A1 (en) | 2010-04-10 | 2011-10-13 | Werner P. Berwald | Hollow rod shear connector e.g. two-phase anchor, for use in e.g. inclined roadway construction, has armature tube coated with addition mixed filling material, where clamping path is affiliated with anchor member through clamping sleeve |
| DE102011018241A1 (en) | 2011-04-20 | 2012-10-25 | Werner Berwald | Method for manufacturing anchor setting process with capsule-sleeve mill, involves pushing capsule pipe together with capsule-sleeve mill on anchor head, with rotation movement of anchor head into anchor bore |
| DE102012016083A1 (en) | 2012-06-12 | 2014-01-16 | Werner P. Berwald | Method for producing rock bolt used as self-drilling bolt used for e.g. mining application, involves forming strip into tubular body after profiling and/or structuring, and shortening tubular body to length desired for tubular bolt element |
| DE102014005773A1 (en) | 2014-04-23 | 2015-10-29 | Werner Paul Berwald | Single- and two-phase self-drilling coat heavy-duty anchor as cartridge or injection anchor in turn-key design. Production and setting process |
| DE102016011292A1 (en) | 2016-01-26 | 2017-07-27 | Werner Paul Berwald | Profiled seamless anchor systems, manufacturing and setting methods. |
| DE102020134856A1 (en) * | 2020-12-23 | 2022-06-23 | JMBG GmbH + Co KG | Hollow bar composite anchor with improved setting ability |
Citations (11)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US4055051A (en) * | 1976-01-08 | 1977-10-25 | The United States Of America As Represented By The Secretary Of The Interior | Unitary drill bit and roof bolt |
| DE3100730A1 (en) * | 1980-02-12 | 1981-12-24 | Rolf 7000 Stuttgart Deimold | Method of supporting and/or stabilising excavation walls in civil engineering, mining and tunnelling, apparatus for carrying out the method, and stabilising anchor sitting in a borehole in the excavation wall |
| DE29900432U1 (en) * | 1999-01-13 | 1999-04-22 | Schran Bergbau Baumaschinen Bo | Mountain anchor system |
| DE10017763A1 (en) * | 2000-04-10 | 2001-10-11 | Hilti Ag | Tube anchor for mining/tunneling has a drill head and inner pistons to hold the mortar mass to be pressed out wholly through passage openings in a simple operation |
| DE10017750A1 (en) * | 2000-04-10 | 2001-10-11 | Hilti Ag | Mountain anchors |
| DE10017751A1 (en) * | 2000-04-10 | 2001-10-11 | Hilti Ag | Mountain anchors |
| DE10301968A1 (en) * | 2003-01-20 | 2004-07-29 | Hilti Ag | Fixing element used in the mining/tunnel construction industry comprises a mortar composition and a channel section arranged in an inner tube held by spacers between the outer wall of the inner tube and the inner wall of a receiving body |
| DE10321175B3 (en) * | 2003-05-12 | 2004-08-26 | Carbotech Fosroc Gmbh | Injection ground anchor, to stabilize walls in mining and tunneling, has an inner channel with at least one chamber to hold the mixed cement to be pressed out into the borehole |
| DE10336040A1 (en) * | 2003-08-01 | 2005-03-10 | Hilti Ag | rock bolts |
| DE10336043A1 (en) * | 2003-08-01 | 2005-03-17 | Hilti Ag | Xings |
| DE102004023668A1 (en) * | 2004-05-13 | 2005-12-15 | Hilti Ag | fastener |
-
2006
- 2006-03-11 DE DE200610011652 patent/DE102006011652B4/en not_active Expired - Fee Related
Patent Citations (11)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US4055051A (en) * | 1976-01-08 | 1977-10-25 | The United States Of America As Represented By The Secretary Of The Interior | Unitary drill bit and roof bolt |
| DE3100730A1 (en) * | 1980-02-12 | 1981-12-24 | Rolf 7000 Stuttgart Deimold | Method of supporting and/or stabilising excavation walls in civil engineering, mining and tunnelling, apparatus for carrying out the method, and stabilising anchor sitting in a borehole in the excavation wall |
| DE29900432U1 (en) * | 1999-01-13 | 1999-04-22 | Schran Bergbau Baumaschinen Bo | Mountain anchor system |
| DE10017763A1 (en) * | 2000-04-10 | 2001-10-11 | Hilti Ag | Tube anchor for mining/tunneling has a drill head and inner pistons to hold the mortar mass to be pressed out wholly through passage openings in a simple operation |
| DE10017750A1 (en) * | 2000-04-10 | 2001-10-11 | Hilti Ag | Mountain anchors |
| DE10017751A1 (en) * | 2000-04-10 | 2001-10-11 | Hilti Ag | Mountain anchors |
| DE10301968A1 (en) * | 2003-01-20 | 2004-07-29 | Hilti Ag | Fixing element used in the mining/tunnel construction industry comprises a mortar composition and a channel section arranged in an inner tube held by spacers between the outer wall of the inner tube and the inner wall of a receiving body |
| DE10321175B3 (en) * | 2003-05-12 | 2004-08-26 | Carbotech Fosroc Gmbh | Injection ground anchor, to stabilize walls in mining and tunneling, has an inner channel with at least one chamber to hold the mixed cement to be pressed out into the borehole |
| DE10336040A1 (en) * | 2003-08-01 | 2005-03-10 | Hilti Ag | rock bolts |
| DE10336043A1 (en) * | 2003-08-01 | 2005-03-17 | Hilti Ag | Xings |
| DE102004023668A1 (en) * | 2004-05-13 | 2005-12-15 | Hilti Ag | fastener |
Also Published As
| Publication number | Publication date |
|---|---|
| DE102006011652A1 (en) | 2007-09-20 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| EP0546128B1 (en) | Injection pipe and process for setting a rock anchor | |
| EP3004547B1 (en) | A self-drilling rock bolt assembly and method of installation | |
| DE102005050929B4 (en) | Method for setting rock anchors | |
| DE102007014905A1 (en) | Double anchor system, as two-phase cartridge mixing anchor, with hollow and solid bar profile | |
| DE2707238B2 (en) | Corrosion-protected tension member for a prestressable anchor in solid rock | |
| DE102010063098A1 (en) | rock bolt | |
| EP2503096A2 (en) | Rock bolt | |
| DE10301968A1 (en) | Fixing element used in the mining/tunnel construction industry comprises a mortar composition and a channel section arranged in an inner tube held by spacers between the outer wall of the inner tube and the inner wall of a receiving body | |
| DE102007006277A1 (en) | Rock anchor with flow geometry for mortar | |
| DE102010014612A1 (en) | Hollow rod shear connector e.g. two-phase anchor, for use in e.g. inclined roadway construction, has armature tube coated with addition mixed filling material, where clamping path is affiliated with anchor member through clamping sleeve | |
| DE102006011652B4 (en) | Two-step hollow-bar composite anchor for adhesive cartridges and adhesive granules | |
| EP0524223B1 (en) | Injection drilling anchor | |
| DE102006006748B4 (en) | Two step-liner hollow rod Fully bonded anchor | |
| DE10321175B3 (en) | Injection ground anchor, to stabilize walls in mining and tunneling, has an inner channel with at least one chamber to hold the mixed cement to be pressed out into the borehole | |
| EP2487328A2 (en) | Rock bolt | |
| DE102006046762A1 (en) | Hollow bar shear connector e.g. cartridge anchor for use in e.g. mining, has crack valve provided at side of anchor head, plunger positioned at side of anchor base, and outer surface temporarily coated with filled glue e.g. nano adhesive | |
| DE4128154C2 (en) | Injection tube and method for placing a rock anchor | |
| EP2850284A1 (en) | System for drilling and for placing rock bolts | |
| EP2366869A2 (en) | Self-drilling anchor | |
| AT259462B (en) | Method for attaching an anchor, in particular for components in the ground, mountains or the like, and anchors for carrying out this method | |
| DE3208470A1 (en) | Rock-stabilising method with tubular anchor or tubular nail | |
| WO2013174681A1 (en) | Rock anchor | |
| DE102011078769A1 (en) | rock bolt | |
| DE102014005773A1 (en) | Single- and two-phase self-drilling coat heavy-duty anchor as cartridge or injection anchor in turn-key design. Production and setting process | |
| DE8800265U1 (en) | Device for injecting injection material |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| AF | Is addition to no. |
Ref document number: 102006006748 Country of ref document: DE Kind code of ref document: P |
|
| 8120 | Willingness to grant licences paragraph 23 | ||
| 8110 | Request for examination paragraph 44 | ||
| AF | Is addition to no. |
Ref document number: 102006006748 Country of ref document: DE Kind code of ref document: P |
|
| 8364 | No opposition during term of opposition | ||
| R119 | Application deemed withdrawn, or ip right lapsed, due to non-payment of renewal fee | ||
| R119 | Application deemed withdrawn, or ip right lapsed, due to non-payment of renewal fee |