DE1094212B - Expansion unit for dismantling in steep storage and expansion methods using such expansion units - Google Patents
Expansion unit for dismantling in steep storage and expansion methods using such expansion unitsInfo
- Publication number
- DE1094212B DE1094212B DEST11047A DEST011047A DE1094212B DE 1094212 B DE1094212 B DE 1094212B DE ST11047 A DEST11047 A DE ST11047A DE ST011047 A DEST011047 A DE ST011047A DE 1094212 B DE1094212 B DE 1094212B
- Authority
- DE
- Germany
- Prior art keywords
- wall
- expansion unit
- walls
- expansion
- unit according
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims description 14
- 239000003245 coal Substances 0.000 claims description 18
- 238000005065 mining Methods 0.000 claims description 9
- 238000000605 extraction Methods 0.000 claims description 8
- 230000000694 effects Effects 0.000 claims description 2
- 230000002265 prevention Effects 0.000 claims description 2
- OKTJSMMVPCPJKN-UHFFFAOYSA-N Carbon Chemical compound [C] OKTJSMMVPCPJKN-UHFFFAOYSA-N 0.000 claims 2
- 229910052799 carbon Inorganic materials 0.000 claims 2
- 238000006073 displacement reaction Methods 0.000 claims 2
- 230000000750 progressive effect Effects 0.000 claims 1
- 238000006731 degradation reaction Methods 0.000 description 4
- 230000015556 catabolic process Effects 0.000 description 2
- 238000009412 basement excavation Methods 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 230000001680 brushing effect Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 230000003247 decreasing effect Effects 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 230000000630 rising effect Effects 0.000 description 1
- 239000002023 wood Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D23/00—Mine roof supports for step- by- step movement, e.g. in combination with provisions for shifting of conveyors, mining machines, or guides therefor
- E21D23/0052—Mine roof supports for step- by- step movement, e.g. in combination with provisions for shifting of conveyors, mining machines, or guides therefor with advancing shifting devices connected therewith
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Working Measures On Existing Buildindgs (AREA)
Description
Ausbaueinheit für den Abbau in steiler Lagerung und Ausbauverfahren unter Verwendung solcher Ausbaueinheiten Die Erfindung betrifft eine Ausbaueinheit für den Abbau insbesondere in der steilen Lagerung und Ausbauverfahren, die durch die Verwendung solcher Aushaueinheiten möglich werden.Expansion unit for dismantling in steep storage and expansion methods using such expansion units The invention relates to an expansion unit for dismantling especially in the steep storage and expansion processes that are carried out by the use of such excavation units will become possible.
Die Mechanisierung des Ausbaus auch in der steilen Lagerung wird seit Jahren angestrebt, ist jedoch in praktisch durchführbarer Weise noch nicht gelungen. Keines der bekannten Verfahren genügt gleichzeitig sowohl den sicherheitlichen Voraussetzungen, die in der steilen Lagerung von besonderer Bedeutung sind, wie der Forderung, auch eine maschinelle Gewinnung in wirtschaftlicher Weise zu ermöglichen.The mechanization of the expansion also in the steep storage is since Years of striving, but has not yet succeeded in a practically feasible manner. None of the known processes simultaneously meets both the safety requirements, which are of particular importance in steep storage, as is the requirement, too to enable machine extraction in an economical manner.
Der Grundgedanke der Erfindung besteht in der Schaffung einer Ausbaueinheit, die infolge ihrer besonderen Ausbildung in der verschiedensten Weise sowohl für die Gewinnung in schwebender und fallender wie auch in steigender Richtung verwendbar ist und in allen diesen Fällen ein unbehindertes Arbeiten sowohl an der Kohle wie am Versatz unter völliger Sicherung der Arbeiter ermöglicht.The basic idea of the invention consists in creating an expansion unit, which as a result of their special training in the most diverse ways both for the extraction can be used in a floating and falling as well as in an upward direction is and in all these cases an unhindered work both on the coal and at the offset with complete security of the workers enabled.
Ein Teil dieser Ausbaueinheit besteht aus einer den Gegenstand eines älteren, nicht zum Stand der Technik gehörenden Vorschlages, der sich auf den Abbau und die Stellung des Stoßes im Einfallen bezieht, bildenden Fahrschachtkastenwand.Part of this expansion unit consists of the subject of a older, non-state-of-the-art proposal that focuses on dismantling and relates the position of the impact in the collapse, forming the shaft box wall.
Die für den Abbau in steiler und halbsteiler Lagerung unter Schrägstellung des Kohlenstoßes bestimmte Ausbaueinheit gemäß der Erfindung ist gekennzeichnet durch die Kombination einer aus einer Mehrzahl von in Nebeneinanderanordnung starr miteinander verbundenen kastenförmigen Elementen bestehenden kohlenstoßseitigen, mittels hydraulischer Stempel zwischen dem Liegenden und dem Hangenden verspannbaren, einen Fahrschacht bildenden Wand mit einer im Abstand davon versatzseitig angeordneten, aus Einzelelementen in Nebeneinanderanordnung zusammengesetzten, ebenfalls von zwischen Liegendem und Hangendern verspannten hydraulischen Stempeln getragenen Sicherheitswand, wobei die aneinandergeführten Wände wechselweise unter jeweiliger Abstützung der einen Wand an die andere vorverlegt werden.The ones for the dismantling in steep and half-steep storage under inclined position of the coal face certain expansion unit according to the invention is characterized rigidly by combining one of a plurality of juxtaposed interconnected box-shaped elements existing coal joint side, braced between the lying and the hanging wall by means of hydraulic rams, a wall forming a lift shaft with a spaced apart from it on the offset side, composed of individual elements in side-by-side arrangement, also from between Horizontal and hanging braced hydraulic rams supported safety wall, the walls that are joined together alternately with the respective support of the one wall to be brought forward to the other.
Jede der beiden Wände und .damit die gesamte Ausbaueinheit kann durch Ansetzen oder Wegnahme von Einzelkörpern den Verhältnissen entsprechend verbreitert oder verschmälert werden. Die hydraulischen Stempel bzw. Stempelrahmen, die der Verspannung der beiden Wände dienen, sind je an eine gemeinsame Steuerung für die Zu- und Ableitung des Druckmittels angeschlossen, d. h., sie werden gemeinsam gesetzt und druckentlastet.Each of the two walls and .that the entire expansion unit can through Attachment or removal of individual bodies widened according to the circumstances or be narrowed. The hydraulic ram or ram frame that the Bracing of the two walls are used each to a common control for the Inlet and outlet of the pressure medium connected, d. i.e., they are set together and relieved of pressure.
Unabhängig davon ist in jedem von in der allgemeinen Richtung des Abbaufortschritts, gegenüber der die Wände selbst entsprechend der üblichen Stellung des Stoßes mit etwa 45° schräg verlaufen, angeordneten Schlitzen in den Einzelelementen, aus denen die Fahrschachtkastenwand zusammengesetzt ist, ein selbständig für sich setzbarer hydraulischer Stempel angeordnet. Diese selbständigen Stempel dienen einerseits der Führung der Fahrschachtkastenwand bei ihrer Vorverlegung, die jeweils um das Maß der Länge des Schlitzes erfolgt, wobei der zunächst am kohlenstoßseitigen Ende des Schlitzes gesetzte Stempel sich dann an dem vom Kohlenstoß abgewandten Ende des Schlitzes befindet, andererseits als Sicherungen, die ein Abstürzen der Fahrschachtkastenwand bei einem etwaigen Druckloswerden der diese und der die Sicherungswand verspannenden Stempel verhindert.Regardless, in each of is in the general direction of the Dismantling progress, opposite which the walls themselves according to the usual position of the joint run at an angle of about 45 °, arranged slots in the individual elements, from which the shaft box wall is composed, one on its own adjustable hydraulic ram arranged. These independent stamps serve on the one hand the guidance of the lift shaft box wall when it is moved forward, each by the Measure the length of the slot, the first being at the end on the coal joint side The punch set in the slot is then located at the end facing away from the coal face of the slot is, on the other hand, as a backup that prevents the shaft box wall from falling in the event of a depressurization of these and the securing wall bracing Stamp prevented.
An der Kohlenstoßseite der Fahrschachtkastenwand ist gegebenenfalls eine Führungsschiene für die Gewinnungsmaschine vorgesehen.On the coal face side of the lift shaft box wall is possibly a guide rail is provided for the mining machine.
Die in dem Abstand, der das Arbeiten der Verbauer in dem gebildeten Zwischenraum ermöglicht, rückwärts der Fahrschachtkastenwand liegende Sicherungswand, deren hydraulische Stempel ebenfalls gemeinsam gesetzt und druckentlastet werden, kann selbst von geringerer Höhe als die Flözmächtigkeit sein und ist dann mit verschieblichen schürzenartigen Vorrichtungen zur Abdeckung des zwischen ihr und dem Hangenden verbleibenden Raumes ausgerüstet.Those in the distance that the work of the builders in the educated Gap allows the securing wall to be located at the rear of the lift shaft box wall, whose hydraulic rams are also set together and relieved of pressure, can itself be of a lower height than the seam thickness and is then movable with apron-like devices for covering the remaining between it and the hanging wall Equipped room.
Die Sicherungswand ist mit der Fahrschachtkastenwand durch in Abständen voneinander angeordnete hydraulische Zylinder mit Kolben gekoppelt, und zwar sind die Zylinder an der einen und die Kolben an der anderen der beiden Wände befestigt. Durch entsprechende, gegebenenfalls wechselseitige gleichzeitige Beaufschlagung der Zylinderräume sämtlicher dieser hydraulischen Zylinder in bekannter Weise kann derart von der Sicherungswand aus die Fahrschachtkastenwand vorverlegt, d. h. bei streichendem und bei schwebendem Abbau vorgedrückt, bei fallendem Abbau abgesenkt werden und nach ihrem Wiedersetzei nunmehr die Sicherungswand bis auf den Anfangsabstand in dem einen Fall nachgezogen, im anderen Fall abgesenkt werden, wobei die in den Schlitzen der Fahrschachtkastenwand stehenden Einzelstempel, nachdem sie das Ende des Schlitzes erreicht haben, geraubt und am vorwärtigen Ende der Schlitze wieder gesetzt werden und dann der Zyklus von neuem beginnt.The securing wall is at intervals with the shaft box wall mutually arranged hydraulic cylinders coupled with pistons, namely are the cylinders are attached to one and the pistons to the other of the two walls. By corresponding, possibly mutual, simultaneous loading of the cylinder spaces All of these hydraulic cylinders in a known manner can be of the Securing wall moved forward from the shaft box wall, d. H. at the stroking and are pushed forward when the dismantling is pending, lowered when the dismantling is falling, and after it has been re-set, the security wall is now up to the initial distance in pulled in one case, lowered in the other case, with the in the slots the shaft box wall standing single stamp after they have reached the end of the slot have reached, robbed and put back at the forward end of the slots and then the cycle begins all over again.
Da zwischen den beiden Wänden der zur Sicherung notwendige Holzausbau eingebracht wird, muß Vorsorge dafür getroffen werden, daß die gesetzten Stempel die Sicherungswand, die ja in ihrer Längsrichtung nicht unterbrochen sein darf, um eine Gefährdung der Arbeiter durch durch etwaige Zwischenräume hindurchfallendes Material auszuschließen, passieren können. Zu diesem Zweck weist die Sicherungswand in Vorschubrichtung des Ausbaus und damit der Richtung der zu setzenden Stempelreihen verlaufende Schlitze auf, die das Passieren der Stempel ermöglichen, und die, sobald das erfolgt ist, durch die Einzelelemente der Sicherungswand miteinander verbindende Klappen geschlossen werden.Because between the two walls is the wood construction necessary for securing is introduced, care must be taken to ensure that the stamp the safety wall, which must not be interrupted in its longitudinal direction, a risk to workers from falling through any gaps Exclude material can happen. For this purpose, the security wall in the direction of advance of the expansion and thus the direction of the rows of punches to be set running slots, which allow the passage of the stamp, and which, as soon as this is done by interconnecting the individual elements of the securing wall Flaps are closed.
In den Abbildungen sind die neue Ausbaueinheit sowie Beispiele ihrer Anwendung für einige der zahlreichen durch sie ermöglichten Ausbauverfahren in der steilen Lagerung veranschaulicht.The pictures show the new expansion unit and examples of its Application for some of the numerous expansion methods in the steep storage illustrated.
Abb. 1 zeigt die Ausbaueinheit als solche.Fig. 1 shows the expansion unit as such.
Mit a ist die Fahrschachtkastenwand, mit b die Sicherungswand bezeichnet. Beide Wände in ihrer Gesamtheit, wie die sie bildenden Einzelelemente a', ä', a'. . . und b', b", b"'. . ., haben die parallelogrammartige Gestalt, die sich dadurch ergibt, daß der Abbaustoß wie üblich um etwa 45° schräg gegenüber der Verhiebrichtung, gleichgültig, ob diese schwebend bzw. fallend oder steigend ist, gestellt ist.The shaft box wall is denoted by a and the securing wall is denoted by b. Both walls in their entirety, like the individual elements a ', a', a 'that make them up. . . and b ', b ", b"'. . ., have the parallelogram-like shape, which results from the fact that the mining joint is inclined, as usual, at about 45 ° to the direction of prevention, regardless of whether it is floating, falling or rising.
Die lösbaren Verbindungen der Teile ä , ä', ä " . . . bzw. b', b", b'". . . miteinander sind in der Abbildung nur angedeutet. Jeder der ringsum bis auf die der Fahrung dienenden öffnungen geschlossenen Einzelkästen a', ä', ä" . . . der Fahrschachtkastenwand ist an einem hydraulischen Stempelrahmen c', c", c'". . ., vorzugsweise um sich Unebenheiten des Liegenden anpassen zu können, höhenverschieblich angeordnet. Sämtliche Rahmen c werden gemeinsam mit Druckmittel versorgt. Jeder Kasten weist außerdem einen in der Abbaurichtung verlaufenden Längsschlitz d auf, der das Verschieben der Gesamtanordnung relativ zu den in den Schlitzen gesetzten hydraulischen Einzelstempeln e, die von der Wand unabhängig sind, ermöglicht.The releasable connections of the parts ä , ä ', ä " ... Or b', b", b '" ... To one another are only indicated in the figure. Each of the individual boxes a ', ä', ä ". . . the shaft box wall is on a hydraulic ram frame c ', c ", c'". . ., preferably in order to be able to adapt to unevenness of the lying person, arranged to be vertically displaceable. All frames c are jointly supplied with pressure medium. Each box also has a longitudinal slot d running in the dismantling direction, which enables the overall arrangement to be displaced relative to the individual hydraulic rams e which are set in the slots and which are independent of the wall.
Die Sicherungswand b ist ebenfalls mit in der gleichen Weise gemeinsam setzbaren hydraulischen Stempelrahmen f ausgerüstet. Die beiden Wände sind durch die hydraulischen Zylinder g', g", g"'. . ., die gemeinsam betätigt werden, aneinander angeschlossen, und zwar an den Einzelelementen der Sicherungswand die Zylinder b', b", b` . . ., an den Einzelelementen der Fahrschachtkastenwand die Kolben i', i', i" . . . befestigt.The securing wall b is also equipped with hydraulic ram frames f which can be set together in the same way. The two walls are through the hydraulic cylinders g ', g ", g"'. . ., which are operated together, connected to one another, namely the cylinders b ', b ", b` ... on the individual elements of the safety wall, the pistons i', i ', i "on the individual elements of the shaft box wall. . . attached.
Die einzelnen Kästen ad, d', a"". . . weisen verschließbare öffnungen nach der Kohlenstoßseite und nach der Versatzseite auf, die den Arbeitern den Zugang zu dem Kohlenstoß wie auch zu dem Raum zwischen den beiden Wänden ermöglichen. Die Sicherungswand b weist in Abständen ebenfalls in Richtung des Abbaufortschrittes verlaufende Schlitze k', k", k` . . . auf, die rückwärts durch Klappen l', L", Z"' . . . verschlossen werden können und die den Durchtritt der zwischen den beiden Wänden während der Hereingewinnung eines Feldes am Kohlenstoß gesetzten Stempel bei der Vorverlegung der Sicherungswand und anschließend die Wiederherstellung der ununterbrochenen Abdeckung ermöglichen.The individual boxes ad, d ', a "". . . have closable openings on the coal face side and after the offset side, which allow the workers access to the coal face as well as to the space between the two walls. The security wall b also has at intervals in the direction of the degradation progress extending slots k ', k ", k`... On the backward l by flaps', L ", Z"'... Can be closed and the passage of the between the two walls during the winning of a field on the coal face set stamp when moving the security wall forward and then allow the restoration of the uninterrupted cover.
Abb. 2 zeigt in Aufsicht auf das Flöz ein Ausbauverfahren mit fallendem Verhieb anschließend an ein Abhauen, das sich von einer Kopfstrecke A zu einer Sohlstrecke B erstreckt.Fig. 2 shows a plan view of the seam with a downward slope Then prevented a cut off, which extends from a head section A to a bottom section B extends.
Die Abbildung zeigt einen bereits fortgeschrittenen Stand des Abbaus eines Feldes von gemäß dem Ausführungsbeispiel etwa 8 m Breite. Längs des mit einem Einfallen von etwa 45° gestellten Kohlenstoßes ist die neue Ausbaueinheit eingesetzt.The figure shows an advanced stage of the dismantling process a field of about 8 m width according to the embodiment. Along the with one The new expansion unit is inserted into the collapse of the coal face at about 45 °.
Unterhalb der Fahrschachtkastenwand d, die gemäß dem Ausführungsbeispiel aus vier Einzelelementen a', d', d". . . zusammengesetzt ist, ist eine durchgehende untere Schiene 7n, die die Führung für eine unterhalb der Fahrschachtkastenwand an dieser aufgehängte Gewinnungsmaschine, gemäß dem Ausführungsbeispiel eine von unten nach oben arbeitende Walzemchrämmaschine, bildet, angeordnet. Die gewonnene Kohle gleitet auf der Böschung ab.Below the driving shaft box wall d, which, d according to the embodiment of four individual elements a ', d'"... Is assembled, a continuous lower rail is 7n lead one below the elevator shaft box wall at this suspended extraction machine, according to the embodiment, a The roller shearer working from bottom to top, forms, arranged, the extracted coal slides off on the embankment.
Die Arbeitsweise, die sich durch die Verwendung der neuen Ausbaueinheit ergibt, ist hiernach ohne weiteres ersichtlich. Das Vorrücken der Ausbaueinheit erfolgt durch wechselweises Vorverlegen der Fahrschachtkastenwand und der Sicherungswand, indem nach Auskohlen eines Feldes die Fahrschachtkastenwand gegen die Bremswirkung der hydraulischen Zylinder g', g", g` . . . abgesenkt wird, wobei sich die Einzelstempel e, die sich zunächst am stoßseitigen Ende der Schlitze d befinden, bis zu deren versatzseitigem Ende verschieben bzw. die Fahrschachtkastenwand sich an diesen vorbeischiebt, worauf nach Wiedersetzei der Stempelrahmen der Fahrschachtkastenwand die Sicherungswand von den Zylindern getragen und abgebremst nachgezogen wird. Das Umsetzen der Einzelstempel kann vor oder nach Nachholen der Sicherungswand erfolgen.The way in which the new expansion unit works results can be seen immediately below. The advancement of the expansion unit takes place by alternately forwarding the lift shaft box wall and the securing wall, by countering the braking effect after a field has been charred the hydraulic cylinder g ', g ", g`... is lowered, whereby the individual ram e, which are initially located at the butt end of the slots d, up to their move the end on the offset side or the lift shaft box wall pushes past this, whereupon after resetting the stamp frame of the lift shaft box wall the security wall is carried by the cylinders and braked. Moving the individual stamps can be done before or after the securing wall is replaced.
Es ist hiernach ersichtlich, in welch einfacher Weise die Erfindung es ermöglicht, ein solches Abbauverfahren vom Beginn der Inangriffnahme des Strebs an auszuführen, indem zunächst von dem Abhauen aus ein kurzer Keil hergestellt wird, in den der erste Einzelkasten der Fahrschachtkastenwand und später der zugeordnete Teil der Sicherungswand eingebracht und mit dem Fortschritt des Abbaus in fallender Richtung fortlaufend weitere Kästen seitlich angebaut werden, bis die der beabsichtigten Abbaubreite entsprechende Gesamtlänge erzielt wird.It can be seen below how simple the invention is it enables such a mining process to begin from the start of tackling the longwall to carry out by first making a short wedge from the cut off, in which the first single box of the lift shaft box wall and later the assigned one Part of the security wall was introduced and with the progress of the dismantling in decreasing In the direction of continuously further boxes can be added laterally until the intended ones Degradation width corresponding overall length is achieved.
Die Gesamtlänge der Fahrschachtkastenwand bzw. der Sicherungswand wird mit Rücksicht darauf bemessen, daß ihre Handhabung noch einwandfrei möglich ist. Unter Umständen können natürlich auch mehrere Ausbaueinheiten gemäß der Erfindung nebeneinander, aufeinanderfolgend angeordnet werden.The total length of the landing box wall or the securing wall is dimensioned with a view to ensuring that it can still be handled properly is. Under certain circumstances, of course, several expansion units according to the invention can also be used be arranged next to each other, one after the other.
Abb. 3 zeigt ein anderes Ausführungsbeispiel, nämlich ein Ausbauverfahren mit streichendem Verhieb und überhängender Stellung des Kohlenstoßes, das nach den oben gegebenen grundsätzlichen Erläuterungen ohne weiteres verständlich ist. Es ist ersichtlich, wie, ebenfalls von einem Ab- oder Aushauen ausgehend, der Abbau in streichender Richtung unter ständigem wechselweisem Vorverlegen der Fahrschachtkastenwand und der Sicherungswand erfolgt, wobei in diesem Falle die Gewinnungsmaschine auf der gleichzeitig eine Rutsche für die Kohle bildenden Vorderfront der Fahrschachtkastenwand, die dann natürlich als durchgehende Wand ausgebildet ist, verfahren wird. Ebenfalls läßt die Abbildung erkennen, wie einfach bei diesem Abbauverfahren das laufende Einbringen und Nachführen des Bergeversatzes mit natürlichem Böschungswinkel ist.Fig. 3 shows another embodiment, namely a removal method with stroking carving and overhanging position of the coal pile, which after the The basic explanations given above are readily understandable. It it can be seen how the dismantling, also based on a cut or cut in a brushing direction with constant alternating forward movement of the lift shaft box wall and the security wall takes place, in which case the extraction machine on the at the same time a slide for the coal-forming front of the elevator shaft box wall, which is then of course designed as a continuous wall, is moved. Likewise The figure shows how easy the current degradation process is with this degradation process Bringing in and tracking the mountain offset with a natural slope angle is.
Abb. 4 zeigt die Anwendungsmöglichkeit der neuen Ausbaueinheit bei einem Abbau mit überhängendem Versatz unter Stellung des Stoßes ebenfalls auf etwa 45°.Fig. 4 shows how the new expansion unit can be used a dismantling with overhanging offset under position of the joint also to about 45 °.
Abb.5 zeigt die Herstellung eines Breitaufhauens unter Verwendung der neuen Ausbaueinheit, wobei die beiden die Ausbaueinheit bildenden Wände abwechselnd durch die Druckzylinder hochgedrückt bzw. herabgezogen werden. In diesem Falle hat die nunmehr rückwärtige Wand nur die Funktion der Abstützung beim Hochdrücken der Fahrschachtkastenwand sowie die der Bildung eines sicheren Standpunktes für die Verbauer.Figure 5 shows the production of a widening using the new expansion unit, with the two walls forming the expansion unit alternating be pushed up or pulled down by the pressure cylinder. In this case it has the now rear wall only functions as a support when pushing up the Well box wall as well as the formation of a safe position for the Installer.
Allen durch die Verwendung der neuen Ausbaueinheit ermöglichten Verfahren ist der weitere grundsätzliche Vorteil gemeinsam, daß der Abbaufortschritt beim Durchgang der Gewinnungsmaschine oder auch bei Gewinnung von Hand völlig den im Einzelfall vorliegenden Verhältnissen angepaßt, insbesondere. im Falle eines gebrächen Hangenden sehr kurz bemessen werden kann, was bei den bekannten maschinellen Ausbauverfahren nicht möglich ist.All procedures made possible by using the new expansion unit is the other basic advantage in common that the progress of the mining Passage of the extraction machine or even when extraction by hand completely the im Adapted to the given circumstances, in particular. in case of need Hanging walls can be dimensioned very short, which is the case with the known mechanical expansion methods not possible.
Die vorstehend im einzelnen beschriebenen Ausbau-bzw. Gewinnungsverfahren sind nur einige aus der Vielzahl der durch die Erfindung, die selbstverständlich nicht auf die dargestellten und beschriebenen Ausführungsformen beschränkt ist, ermöglichten Verfahren.The expansion or expansion described in detail above. Extraction process are just a few of the multitude of products that are taken for granted by the invention is not limited to the illustrated and described embodiments, enabled procedures.
Claims (9)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| DEST11047A DE1094212B (en) | 1956-04-06 | 1956-04-06 | Expansion unit for dismantling in steep storage and expansion methods using such expansion units |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| DEST11047A DE1094212B (en) | 1956-04-06 | 1956-04-06 | Expansion unit for dismantling in steep storage and expansion methods using such expansion units |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| DE1094212B true DE1094212B (en) | 1960-12-08 |
Family
ID=7455265
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| DEST11047A Pending DE1094212B (en) | 1956-04-06 | 1956-04-06 | Expansion unit for dismantling in steep storage and expansion methods using such expansion units |
Country Status (1)
| Country | Link |
|---|---|
| DE (1) | DE1094212B (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE1758697B1 (en) * | 1967-07-25 | 1971-05-13 | Georges Alacchi | Progressive hydraulic longwall mining |
-
1956
- 1956-04-06 DE DEST11047A patent/DE1094212B/en active Pending
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE1758697B1 (en) * | 1967-07-25 | 1971-05-13 | Georges Alacchi | Progressive hydraulic longwall mining |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| DE945441C (en) | Method and device for dismantling and removing steep camp sites | |
| DE1302918C2 (en) | HIKING STREET STRUCTURE | |
| DE2509810A1 (en) | PROGRESSIVE EXPANSION FOR USE IN MIGHTY FLOEZEN | |
| DE970540C (en) | Framework for progressive expansion in brown coal longwall mining | |
| DE574268C (en) | Dismantling, conveyor and displacement device | |
| DE1094212B (en) | Expansion unit for dismantling in steep storage and expansion methods using such expansion units | |
| DE1199725B (en) | Longwall construction, consisting of frame-like, height-adjustable support frames set up at a distance from one another, which can be pulled forward by means of back cylinders | |
| DE2322259B1 (en) | LINE EXPANSION FRAME FOR LINE FEEDING MACHINES | |
| DE2233751A1 (en) | HIKING EXTENSION ELEMENT | |
| DE2552817C3 (en) | Fully mechanical expansion and extraction device for coal from the steep storage in longwall mining | |
| DE19750484B4 (en) | Extraction device, in particular for the coal production in unterertätigen extraction struts | |
| DE2161291A1 (en) | Movable ceiling support, especially for mining | |
| DE976347C (en) | Longwall construction with backing machine | |
| DE1758970B1 (en) | Facility for the dismantling of flue-like deposits, especially coal flats | |
| DE2222801A1 (en) | PROGRESSIVE EXPANSION FOR EXTRACTION PLANTS AND PROCESSES FOR THE DISMANTLING OF STORAGE FACILITIES, IN PARTICULAR IN BRIEF WITH EXTRACTING MACHINE IN FRONT OF THE HEAD | |
| DE2412996C3 (en) | Process for fully mechanical coal extraction from seams stored between 50 and 100 « | |
| DE665589C (en) | Hiking pillars for quarrying | |
| DE896481C (en) | Method and device for the expansion of mine spaces in which coal extraction machines are used | |
| DE1758970C (en) | Equipment for the mining of seam-like deposits, in particular coal seams | |
| DE1217905B (en) | Guide a coal plane, especially for low and steep or semi-steep bearings | |
| DE2312557C3 (en) | Procedure for operating longwall equipment for underground mining | |
| DE1003162B (en) | Device for stamp-free pre-paving in accordance with the progressive dismantling and method for operating the device | |
| CH582282A5 (en) | Progressive excavation and filling system for trenches - has inserted shoring walls with rear wall facilitating progressive filling | |
| DE2530127C3 (en) | Shoring shield for driving tunnels, galleries and the like | |
| DE916287C (en) | Wedge-shaped sledge for laying face conveyors |