CN2828568Y - Water supply pre-supercharging device for steam boiler - Google Patents
Water supply pre-supercharging device for steam boiler Download PDFInfo
- Publication number
- CN2828568Y CN2828568Y CN 200520115422 CN200520115422U CN2828568Y CN 2828568 Y CN2828568 Y CN 2828568Y CN 200520115422 CN200520115422 CN 200520115422 CN 200520115422 U CN200520115422 U CN 200520115422U CN 2828568 Y CN2828568 Y CN 2828568Y
- Authority
- CN
- China
- Prior art keywords
- booster pump
- boiler
- check
- valves
- pump
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 title claims abstract description 37
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 8
- 239000010959 steel Substances 0.000 claims abstract description 8
- 230000001105 regulatory effect Effects 0.000 claims description 12
- 230000009466 transformation Effects 0.000 abstract description 3
- 238000010276 construction Methods 0.000 description 1
- 238000005260 corrosion Methods 0.000 description 1
- 230000007797 corrosion Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
Landscapes
- Jet Pumps And Other Pumps (AREA)
Abstract
Description
一、技术领域 本实用新型涉及一种安在除氧器至给水泵的管道上、对给水进行预先加压的增压装置,属锅炉设备范围。1. Technical Field This utility model relates to a booster device installed on the pipeline from the deaerator to the feed water pump to pre-pressurize the feed water, which belongs to the scope of boiler equipment.
二、背景技术 蒸汽锅炉给水泵的功用在于将除氧器内已除氧的高温水泵入锅炉内,为确保给水泵正常工作,锅炉房整体工艺布局配置上,必须满足其理论要求的最小气蚀余量,因受设计、施工及运行中泵前管道内部锈蚀缩径过水阻损增大等诸多不利因素影响,常导致给水泵气蚀并引发故障而停运。2. Background technology The function of the steam boiler feedwater pump is to pump the high-temperature water that has been deoxygenated in the deaerator into the boiler. In order to ensure the normal operation of the feedwater pump, the overall process layout of the boiler room must meet its theoretical requirements for minimum cavitation The margin is affected by many unfavorable factors such as corrosion, shrinking diameter, and increased water resistance loss inside the pipeline in front of the pump during design, construction, and operation, which often lead to cavitation of the feed water pump and cause failure and outage.
三、发明内容3. Contents of the invention
本实用新型的任务是提供一种新型给水预增压装置,将该装置安于除氧器与给水泵之间的管道上,可实现对锅炉给水的预增压,有效提高给水泵吸入口处压力,确保给水泵正常工作。该给水预增压装置既可用于新建锅炉,因空间位置受限无法满足给水泵必须的气蚀余量,又可用于老锅炉给水系统技术改造。The task of this utility model is to provide a new type of feed water pre-pressurization device. The device is installed on the pipeline between the deaerator and the feed water pump, which can realize the pre-pressurization of the boiler feed water and effectively improve the feed water pump suction. pressure to ensure that the water pump is working properly. The feed water pre-pressurization device can be used not only for newly-built boilers, which cannot meet the necessary cavitation allowance of feed water pumps due to limited space, but also for technical transformation of old boiler feed water systems.
本实用新型是以如下方式完成的:将增压泵与止回阀并联后串接于除氧器与锅炉给水泵之间的给水管路中,增压泵、止回阀与给水水流同向,调压溢流阀设在增压泵出口之后以实现预增压力控制,在调压溢流阀之后设有止回阀,增压泵流量大于锅炉给水泵,溢流水经止回阀沿溢流回水管流回除氧器。增压泵、调压溢流阀、止回阀由钢构管道连通并固定为一体。由上述增压泵、调压溢流阀、止回阀、钢构管道共同构成蒸汽锅炉给水预增压装置。The utility model is completed in the following manner: the booster pump and the check valve are connected in series in the feed water pipeline between the deaerator and the boiler feed water pump, and the booster pump, the check valve and the feed water flow in the same direction , the pressure regulating and overflow valve is set after the outlet of the booster pump to realize pre-increasing pressure control, and a check valve is arranged after the pressure regulating and overflow valve, the flow rate of the booster pump is greater than that of the boiler feed water pump, and the overflow water passes through the check valve along the overflow The return pipe flows back to the deaerator. The booster pump, the pressure regulating overflow valve and the check valve are connected and fixed as a whole by the steel structure pipeline. The steam boiler feed water pre-pressurization device is composed of the above-mentioned booster pump, pressure regulating overflow valve, check valve and steel structure pipeline.
本实用新型具有如下优点:The utility model has the following advantages:
1、增压泵可连续运行,无论锅炉给水泵启动与否,皆可实现对锅炉给水的预增压,有效提高给水泵吸入口处压力。1. The booster pump can run continuously, regardless of whether the boiler feedwater pump is started or not, it can realize the pre-pressurization of the boiler feedwater, effectively increasing the pressure at the suction port of the feedwater pump.
2、当增压泵故障停止运行时,与其并联的止回阀可作为旁路开启,满足锅炉给水需求。2. When the booster pump fails and stops running, the check valve connected in parallel with it can be opened as a bypass to meet the boiler feed water demand.
3、既可用于新建锅炉,因空间位置受限无法满足给水泵必须的气蚀余量,又可用于老锅炉给水系统技术改造。3. It can be used not only for new boilers, which cannot meet the necessary cavitation allowance of feed water pumps due to limited space, but also for technical transformation of old boiler water supply systems.
四、附图说明 本附图为示意简图,管路中的阀门省略未画。4. Description of drawings This drawing is a schematic diagram, and the valves in the pipeline are omitted.
五、具体实施方式5. Specific implementation
以下将结合附图对发明作进一步的详细描述:The invention will be described in further detail below in conjunction with the accompanying drawings:
将增压泵[1]与止回阀[3]并联后串接于除氧器与锅炉给水泵之间的给水管路[6]中,增压泵[1]、止回阀[3]与给水水流同向,调压溢流阀[2]设在增压泵出口之后以实现预增压力控制,在调压溢流阀[2]之后设有止回阀[4],增压泵流量大于锅炉给水泵,溢流水经止回阀[4]沿溢流回水管[7]流回除氧器。增压泵[1]、调压溢流阀[2]、止回阀[3][4]由钢构管道[5]连通并固定为一体。由上述增压泵[1]、调压溢流阀[2]、止回阀[3][4]、钢构管道[5]共同构成蒸汽锅炉给水预增压装置。Connect the booster pump [1] and the check valve [3] in parallel and connect them in series to the water supply pipeline [6] between the deaerator and the boiler feed water pump. The booster pump [1], the check valve [3] In the same direction as the feed water flow, the pressure regulating overflow valve [2] is set after the outlet of the booster pump to realize pre-increasing pressure control, and a check valve [4] is installed after the pressure regulating overflow valve [2], and the booster pump The flow rate is greater than that of the boiler feed water pump, and the overflow water flows back to the deaerator through the check valve [4] along the overflow return pipe [7]. The booster pump [1], the pressure regulating overflow valve [2] and the check valve [3] [4] are connected and fixed as a whole by the steel pipeline [5]. The above-mentioned booster pump [1], pressure regulating and overflow valve [2], check valve [3] [4], and steel pipe [5] jointly constitute a steam boiler feed water pre-pressurization device.
Claims (3)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN 200520115422 CN2828568Y (en) | 2005-07-15 | 2005-07-15 | Water supply pre-supercharging device for steam boiler |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN 200520115422 CN2828568Y (en) | 2005-07-15 | 2005-07-15 | Water supply pre-supercharging device for steam boiler |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN2828568Y true CN2828568Y (en) | 2006-10-18 |
Family
ID=37080124
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN 200520115422 Expired - Fee Related CN2828568Y (en) | 2005-07-15 | 2005-07-15 | Water supply pre-supercharging device for steam boiler |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN2828568Y (en) |
Cited By (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN101846105A (en) * | 2010-06-11 | 2010-09-29 | 华北电力科学研究院(西安)有限公司 | Anti-cavitation protection device of feedwater pump |
| CN106556136A (en) * | 2016-11-29 | 2017-04-05 | 无锡市锡源锅炉有限公司 | A kind of pressure combustion boiler residual neat recovering system |
| CN106595324A (en) * | 2016-11-29 | 2017-04-26 | 无锡市锡源锅炉有限公司 | Biofuel boiler timing dust removal and afterheat recovery system |
| CN106594779A (en) * | 2016-11-29 | 2017-04-26 | 无锡市锡源锅炉有限公司 | Biofuel boiler smoke discharge afterheat utilization system |
| CN106594705A (en) * | 2016-11-29 | 2017-04-26 | 无锡市锡源锅炉有限公司 | Pneumatic detecting type exhaust heat recovering system of bio-fuel boiler |
| CN106765037A (en) * | 2016-11-29 | 2017-05-31 | 无锡市锡源锅炉有限公司 | One kind is with self-cleaning bio-fuel type boiler exhaust smoke waste-heat utilization system |
| CN106765038A (en) * | 2016-11-29 | 2017-05-31 | 无锡市锡源锅炉有限公司 | A kind of biological fuel boiler afterheat utilizing system based on flue gas pressures detection cleaning |
| CN106765262A (en) * | 2016-11-29 | 2017-05-31 | 无锡市锡源锅炉有限公司 | A kind of bio-fuel type boiler waste heat recovery system |
| CN111322603A (en) * | 2020-04-15 | 2020-06-23 | 西安热工研究院有限公司 | Boiler cooling and pressure reducing starting system and method for subcritical header pipe water supply system |
-
2005
- 2005-07-15 CN CN 200520115422 patent/CN2828568Y/en not_active Expired - Fee Related
Cited By (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN101846105A (en) * | 2010-06-11 | 2010-09-29 | 华北电力科学研究院(西安)有限公司 | Anti-cavitation protection device of feedwater pump |
| CN106556136A (en) * | 2016-11-29 | 2017-04-05 | 无锡市锡源锅炉有限公司 | A kind of pressure combustion boiler residual neat recovering system |
| CN106595324A (en) * | 2016-11-29 | 2017-04-26 | 无锡市锡源锅炉有限公司 | Biofuel boiler timing dust removal and afterheat recovery system |
| CN106594779A (en) * | 2016-11-29 | 2017-04-26 | 无锡市锡源锅炉有限公司 | Biofuel boiler smoke discharge afterheat utilization system |
| CN106594705A (en) * | 2016-11-29 | 2017-04-26 | 无锡市锡源锅炉有限公司 | Pneumatic detecting type exhaust heat recovering system of bio-fuel boiler |
| CN106765037A (en) * | 2016-11-29 | 2017-05-31 | 无锡市锡源锅炉有限公司 | One kind is with self-cleaning bio-fuel type boiler exhaust smoke waste-heat utilization system |
| CN106765038A (en) * | 2016-11-29 | 2017-05-31 | 无锡市锡源锅炉有限公司 | A kind of biological fuel boiler afterheat utilizing system based on flue gas pressures detection cleaning |
| CN106765262A (en) * | 2016-11-29 | 2017-05-31 | 无锡市锡源锅炉有限公司 | A kind of bio-fuel type boiler waste heat recovery system |
| CN111322603A (en) * | 2020-04-15 | 2020-06-23 | 西安热工研究院有限公司 | Boiler cooling and pressure reducing starting system and method for subcritical header pipe water supply system |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN110454249A (en) | A Zero-Output Heating System and Adjustment Method for Low Pressure Cylinders of Double Back Pressure Steam Turbines | |
| CN2828568Y (en) | Water supply pre-supercharging device for steam boiler | |
| CN214371843U (en) | Energy-saving circulating water system | |
| CN203605211U (en) | Water feeding system of boiler | |
| CN205347323U (en) | Coke oven crude gas sensible heat recovery system that does not stop production and to examine and repair steam pocket | |
| CN201163019Y (en) | System connection device for low temperature economizer | |
| CN207702444U (en) | A kind of feed water system of boiler | |
| CN111520205B (en) | A system and method for recovering excess pressure and excess heat in a back pressure heating unit | |
| CN212106401U (en) | An energy-saving rolling mill hydraulic system | |
| CN212777304U (en) | Temperature-reducing water system | |
| CN209511978U (en) | A kind of thermal power plant heat exchangers for district heating drainage control system | |
| CN207776012U (en) | Plateau water tank type tap water supply system | |
| CN205636910U (en) | Public water supply equipment who is equipped with pump has been increased | |
| CN201322354Y (en) | High rise building no-subpressure heating device | |
| CN203906301U (en) | Condensate pump for turboset and condensate system | |
| CN201433423Y (en) | A box-type pipe network superimposed pressure water supply equipment | |
| CN209026802U (en) | A kind of vacuum dust cather system | |
| CN206527158U (en) | A kind of milling train high pressure backwater throttling arrangement | |
| CN108194433A (en) | Electromechanical static pressure actuating system | |
| CN206504315U (en) | Water-bound in waste heat boiler high-pressure system | |
| CN201269235Y (en) | Hydraulic energy-saving oil supply system of miniature hydraulic excavator | |
| CN203869020U (en) | Water supply system for combined-cycle waste heat boiler of heat supply unit | |
| CN203321944U (en) | Unit water inlet emergency gate integrated type hydraulic hoist system | |
| CN209355223U (en) | A kind of conjunction pumping system for Combined Cycle Heat Recovery Boiler | |
| CN208238301U (en) | Cold water heat pump unit |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| C56 | Change in the name or address of the patentee |
Owner name: YINTAI YUHUANGDING HOSPITAL Free format text: FORMER NAME OR ADDRESS: ZHANG WANGCAI; PATENTEE |
|
| CP03 | Change of name, title or address |
Address after: 264000, No. 20 East Ding Feng Road, Shandong, Yantai Patentee after: Yantai Yuhuangding Hospital Address before: 264000 general affairs office, Yu Huang Ding hospital, 20 Huang Ding Dong Road, Yantai, Shandong Co-patentee before: Jing Renmao Patentee before: Zhang Wangcai Co-patentee before: Zhang Wanghe |
|
| C19 | Lapse of patent right due to non-payment of the annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |