Summary of the invention:
The purpose of this utility model overcomes shortcoming of the prior art exactly, designs that a kind of winch low level is installed and work, but rig floor member and table top armamentarium all low level the driller base that utilizes the winch dynamic entirety to rise to put is installed.
The utility model is achieved through the following technical solutions:
A kind of driller base, comprise rig floor (6), column (7), pedestal (8) and batter post (15), rig floor (6) is made up of the link (18) between upper left seat (16), upper right seat (17) and two seats of honour, the upper end of column (7) is hinged on the rig floor (6), the lower end of column (7) is hinged on pedestal (8), all be shaped on an opening " rectangle " breach (19) backward on upper left seat (16), the upper right seat (17), the upper end of batter post (15) is hinged on the rig floor (6), and lower end and pedestal (8) are slidingly connected.
Rig floor (6) but member and table top armamentarium all low level install.Winch (4) installation in position is on the lower winch bearing (5) in pedestal (8) backstage, and winch bearing (5) links to each other with foreground pedestal (8).
The utility model compared with prior art both can be realized the low level installation and the work of winch, and derrick, base and drill floor equipment are all installed at low level, has reduced installation, dismounting difficulty, has shortened installation, take-down time.
The specific embodiment
1-7 describes a kind of embodiment of the present utility model in conjunction with the accompanying drawings.
A kind of driller base, comprise rig floor (6), column (7), pedestal (8) and batter post (15), rig floor (6) is made up of the link (18) between upper left seat (16), upper right seat (17) and two seats of honour, the upper end of column (7) is hinged on the rig floor (6), the lower end of column (7) is hinged on pedestal (8), all be shaped on an opening " rectangle " breach (19) backward on upper left seat (16), the upper right seat (17), the upper end of batter post (15) is hinged on the rig floor (6), and lower end and pedestal (8) are slidingly connected.
Winch (4) installation in position is on the lower winch bearing (5) in pedestal (8) backstage, and winch bearing (5) links to each other with foreground pedestal (8).Rotating disk and drive unit (9), driller control house (10), driller's concubine (11), preventer lifting beam (12) etc. all can be mounted thereto when being in low level at rig floor (6).
The derrick leg is taken root in the base bottom base, and derrick is made up of derrick body (1), man-like shelf (2), big lifting rope (3) etc., the open front type space steel frame structure that the derrick body is made up of by behind crossbeam, diagonal brace left and right each section.Derrick after low level level assembling is finished, utilize winch (4) power by the big lifting rope (3) of walking around man-like shelf (2) and derrick body (1) top sheave with derrick integral body by preceding having pulled back.
After derrick hoists and finishes, continue to utilize winch (4) power, be located at big lifting rope (14) pulling base rig floor that rig floor (6) and derrick body (1) go up conductor rope pulley (13) and rotate after by forward direction and hoist by walking around.After hoisting, base is fixed with the batter post (15) between rig floor (6) and the pedestal (8).Owing to all be shaped on an opening " rectangle " breach (19) backward on upper left seat (16), the upper right seat (17), so in base hoists process, in left and right two two " rectangle " breach (19) that can be inserted into the left and right seat of honour respectively of derrick, make rotating disk and drive unit (9), driller control house (10), driller's concubine (11), preventer lifting beam (12), a room frame and derrick outside low level such as walk on stage install and be achieved.
It is of the present utility model that to hoist, transfer process prescription as follows:
(1), at first put the left and right pedestal of base, and connect the member between two pedestals.Then the left and right seat of honour is put into respectively on two pedestals, the link of installing between two seats of honour constitutes rig floor.Connect each column between the pedestal and the seat of honour.
(2), level is installed derrick, man-like shelf is installed, rig floor surface member and equipment is installed (as rotating disk and drive unit, driller control house, driller's concubine, preventer lifting beam, a room frame etc.).
(3), put on the derrick big lifting rope, utilize winch power that derrick is drawn high the operating position.Derrick and man-like shelf are fixed.
(4), connect the base big lifting rope, utilize winch power that base is drawn high the operating position.Connecting oblique column fixes base.
(5), it is opposite with above-mentioned steps to transfer the process of derrick, base.