CN2449081Y - Multi-transportation bin type pump - Google Patents
Multi-transportation bin type pump Download PDFInfo
- Publication number
- CN2449081Y CN2449081Y CN 00257609 CN00257609U CN2449081Y CN 2449081 Y CN2449081 Y CN 2449081Y CN 00257609 CN00257609 CN 00257609 CN 00257609 U CN00257609 U CN 00257609U CN 2449081 Y CN2449081 Y CN 2449081Y
- Authority
- CN
- China
- Prior art keywords
- coal
- coal chute
- chute
- pump
- compensating type
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000003245 coal Substances 0.000 claims abstract description 46
- 238000005243 fluidization Methods 0.000 claims abstract description 10
- 239000000843 powder Substances 0.000 claims abstract description 6
- 239000012530 fluid Substances 0.000 claims description 8
- 239000000463 material Substances 0.000 claims description 5
- 238000002347 injection Methods 0.000 claims description 4
- 239000007924 injection Substances 0.000 claims description 4
- TVFDJXOCXUVLDH-RNFDNDRNSA-N cesium-137 Chemical compound [137Cs] TVFDJXOCXUVLDH-RNFDNDRNSA-N 0.000 claims description 3
- 238000001914 filtration Methods 0.000 claims description 3
- 238000007789 sealing Methods 0.000 claims description 3
- 238000005245 sintering Methods 0.000 claims description 3
- 239000002184 metal Substances 0.000 claims 1
- 230000005540 biological transmission Effects 0.000 abstract description 6
- 239000007921 spray Substances 0.000 abstract description 5
- 238000005516 engineering process Methods 0.000 abstract description 3
- 238000005299 abrasion Methods 0.000 abstract description 2
- 238000005273 aeration Methods 0.000 abstract 1
- 230000001105 regulatory effect Effects 0.000 abstract 1
- 239000002817 coal dust Substances 0.000 description 16
- 238000010410 dusting Methods 0.000 description 2
- 239000007789 gas Substances 0.000 description 2
- 238000012423 maintenance Methods 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 239000007769 metal material Substances 0.000 description 2
- 229940098458 powder spray Drugs 0.000 description 2
- 230000033228 biological regulation Effects 0.000 description 1
- 238000009835 boiling Methods 0.000 description 1
- 239000004568 cement Substances 0.000 description 1
- 238000006243 chemical reaction Methods 0.000 description 1
- 230000007423 decrease Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000002309 gasification Methods 0.000 description 1
- 239000008187 granular material Substances 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000005272 metallurgy Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 230000008520 organization Effects 0.000 description 1
- 238000003908 quality control method Methods 0.000 description 1
Images
Landscapes
- Air Transport Of Granular Materials (AREA)
Abstract
The utility model belongs to the improvement of the coal spray technology of a bin type pump, which is the special equipment of a blast furnace. The concrete improved solution of the utility model is that the number of coal chutes of the existing basic structure are increased to more than 2, generally to 3-6; different caliber corresponds to different coal spray quantity; the aeration structure in the coal chutes is adopted, and therefore, the fluidization quality is higher, the transmission of concentration is increased, the abrasion of the pipelines is reduced, and the control precision and the regulating speed of coal spray quantity are increased. One pump of the utility model can provide concentrated phase coal powder for a plurality of blast furnace spray stations, and the utilization rate of the equipment and the operation quality has larger improvement.
Description
The utility model belongs to a middle device that uses in a kind of special equipment, particularly blast furnace PCI technology of granular material transmission.
Metallurgy industry and cement industry all relate to coal dust to be made and the coal powder injection burning process.Making from coal dust that the back carries to injecting station is a key link of wherein using, coal dust fluidised form gasification need be transferred mutually could guarantee to spray coal dust all even control freely.Cone pump promptly is that the coal dust fluidization becomes the key equipment that concentrated phase transmits.But the coal dust after fluidization is handled has flow behavior, thereby can be transported to the injecting station of blast furnace under the pressure of cone pump by pipeline.Fluidised maintenance is the assurance of good transmission, and for making the maintenance fluidised form of coal dust in the transmission course, the coal dust that present applied technology needs to enter coal chute is added high pressure draught in the transmission process outside the storehouse, to guarantee the fluidization of coal dust under the respective concentration.Tonifying Qi is incompatible to the coal powder injection specification requirement outside single conveying of taking at present and the storehouse, when the quantitative changeization of particularly dusting is big, it adapts to regulates slowly, high-quality control procedure in the unfavorable modern production, particularly simultaneously when the pulverized coal injection of different injecting coal quantity demands, its control and conversion are very complicated, do not fit into need of production practice.
The purpose of this utility model provides a kind of multiplex new-type cone pump, with quick adjustment that adapts to the Coal powder spray amount or the blast furnace work of supplying with a plurality of different needs injecting coal quantities simultaneously.
Improvement project of the present utility model is on the structure of original tubbiness warehouse, and Cang Ding and the feeding inlet structure of storing Pulverized Coal Bin in the reservation work as it and replenish coal dust when the cone pump material level reaches certain position automatically in pump.Be provided with fluidization air chamber and fluid bed at the bottom of the storehouse, gases at high pressure form coal dust boiling fluidization from the fluid bed ejection after entering air chamber by pipeline, form the concentrated phase fluidised form.Coal chute is set above fluid bed, and under the pressure of coal dust and high pressure draught, the fluidization coal dust enters coal chute and transfers to injecting station.The new organization plan that improved plan is taked is in the direct tonifying Qi in the coal feed point place of coal chute end, forms the concrete measure of tonifying Qi in the storehouse, makes the coal dust that enters coal chute keep better fluidization.And the number of coal chute is increased to more than 2.The scheme that reality is executed is that 3-6 coal chute is directly arranged in the fluid bed top, evenly distributes, and each coal chute all walks abreast blowdown pipe is set, and the effective diameter of each coal chute is all variant, to adapt to the needs of different flow transmission.Also can adapt to the big numerical value change adjustment of coal-feeding quantity.
How further specify goal of the invention of the present utility model below in conjunction with accompanying drawing realizes:
Fig. 1 is a structural representation of the present utility model.
Fig. 2 is interior making-up air device schematic diagram.
Wherein 1 represent the tubbiness warehouse, the 1A representative connects the charging aperture of Pulverized Coal Bin, 1B is the fluidization air chamber, and 2 is fluid bed, and 3 is high-pressure air pipe, 4 is coal chute, 5 represent the electromagnetic type control valve, and the filtering material that 4A forms for the metal material sintering, 4B are blowdown pipe, 4C is the sealing locating sleeve, and 6 is the sensor of caesium-137 ray level-sensing device.
Interior gas compensating type coal chute 4 is one of key improvements of the present utility model, the structure that it adopted is to inlay the filtering material 4A of a metal material sintering on the distolateral wall of the coal powder entrance of coal chute 4, upright side by side blowdown pipe 4B forms by seal-packed sleeve pipe 4C location.The high pressure draught that blowdown pipe 4B blows out not only can be mended into the tolerance that enters coal chute from coal chute 4 sidewalls, and makes the coal dust material that enters pipeline enter better fluidized state.Can realize by adjusting the Coal powder spray amount is finely tuned simultaneously to air compensation.Cooperate the setting of the different coal chutes of many bores, the amount of dusting adjusting and the fine adjustments that can finish large span combine, implement accurate fast regulation and control, performance accuracy is improved greatly, simultaneously can also supply concentrated phase different coal dusts respectively, utilization rate of equipment and installations is improved greatly to the blast furnace of a plurality of different amounts.
The every coal chute 4 of this novel cone pump is all mixed independently electromagnetic type adjusting pump.By the automatic adjusting of cpu control circuit, make the utilization rate and the bigger raising of operational quality of whole device.Usually set up caesium-137 ray level sensor 6 that corresponding information is imported CPU in the warehouse outside, can realize the automation control of whole system, reach higher efficient and control accuracy.
The utility model design and the cone pump made can transmit the coal dust of different discharge rates simultaneously to 2-3 seat blast furnace, use easy to adjust, the control accuracy height, can realize the concentrated phase conveying, air consumption reduces greatly, and the pipeline abrasion is little, makes the overall operation cost that by a relatively large margin decline be arranged.
Claims (5)
1, the novel cone pump of a kind of multiplexing, tubbiness warehouse (1) top is provided with and stores the charging aperture (1A) that Pulverized Coal Bin links to each other, the bottom is provided with fluidization air chamber (1B) and fluid bed (2), air chamber (1B) is communicated with high-pressure air source, fluid bed (2) top is provided with convey coal pipe blast-furnace coal powder injection station outside the pump storehouse, it is characterized in that being located at fluid bed top coal chute and take interior gas compensating type coal chute (4), set coal chute (4) is more than 2.
2,, it is characterized in that set interior gas compensating type coal chute (4) is 3-6, all supporting high pressure tonifying Qi of each coal chute (4) pipeline according to the said novel cone pump of claim 1.
3, according to the said novel cone pump of claim 1, gas compensating type coal chute (4) is inlaid with the filtering material (4A) of metal sintering in it is characterized in that at coal powder entrance place sidewall, and sealing locating sleeve (4C) parcel is arranged, blowdown pipe (4B) inserts in the sealing locating sleeve (4C), forms gas compensating type structure in the sidewall of coal chute (4) termination.
4,, it is characterized in that all independent electromagnetic type control valve (5) that is equipped with of gas compensating type coal chute (4) in every pipe according to claim 1 or 2 said novel cone pumps.
5,, it is characterized in that warehouse (1) is outside equipped with caesium-137 ray level-sensing device sensor (6) according to the said novel cone pump of claim 1.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN 00257609 CN2449081Y (en) | 2000-10-27 | 2000-10-27 | Multi-transportation bin type pump |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN 00257609 CN2449081Y (en) | 2000-10-27 | 2000-10-27 | Multi-transportation bin type pump |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN2449081Y true CN2449081Y (en) | 2001-09-19 |
Family
ID=33614079
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN 00257609 Expired - Fee Related CN2449081Y (en) | 2000-10-27 | 2000-10-27 | Multi-transportation bin type pump |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN2449081Y (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN1945121B (en) * | 2005-10-04 | 2012-04-04 | 西门子燃料气化技术有限责任两合公司 | Method and equipment for controlling and conveying dust fuel in a mobile suspended dust gasification device |
| CN102901115A (en) * | 2012-10-31 | 2013-01-30 | 山西蓝天环保设备有限公司 | High-moisture pulverized coal conveying system |
-
2000
- 2000-10-27 CN CN 00257609 patent/CN2449081Y/en not_active Expired - Fee Related
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN1945121B (en) * | 2005-10-04 | 2012-04-04 | 西门子燃料气化技术有限责任两合公司 | Method and equipment for controlling and conveying dust fuel in a mobile suspended dust gasification device |
| CN102901115A (en) * | 2012-10-31 | 2013-01-30 | 山西蓝天环保设备有限公司 | High-moisture pulverized coal conveying system |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| RU2496854C2 (en) | System for continuous fuel feed to reactor for coal gasification | |
| CN101254861B (en) | Fine coal dense phase conveying system of fusion reducing furnace | |
| CN101921886B (en) | Method for controlling coal injecting rate of blast furnace | |
| SA02230227B1 (en) | Process for transporting granular solids | |
| CN201416899Y (en) | Solid fuel supply device of non-metal industrial furnace | |
| CN105177200A (en) | Blast furnace coal injection system and control method thereof | |
| CN201962257U (en) | Dry coal powder pressurizing and dense-phase transporting system | |
| CN110803526A (en) | Feeding and conveying system and method for smelting reduction furnace | |
| CN2449081Y (en) | Multi-transportation bin type pump | |
| CN100453430C (en) | Energy saving method of granular material pneumatic conveying system and its device | |
| CN1138097C (en) | Multiway dense coal power phase conveying system for industrial furnaces | |
| CN214934074U (en) | Pneumatic conveying equipment for return ores and return cokes for iron-making blast furnace | |
| CN205664408U (en) | Two thorax kilns jetting system | |
| CN214032566U (en) | A smelting reduction process reducing agent injection system | |
| CN201448862U (en) | Ceramic kiln fuel supply system adopting dilute phase pneumatic conveying | |
| WO2009144521A8 (en) | Steelmaking facility comprising a direct reduction plant and an electric-arc furnace | |
| CN102491093A (en) | Positive pressure pneumatic transmission system and method | |
| CN201161834Y (en) | Concentrated phase multipath fluidization blowing tank | |
| CN209259067U (en) | A kind of material shunting device | |
| CN107091483B (en) | A kind of double thorax kiln injection systems | |
| CN209259002U (en) | CFB unit is delivered coal system | |
| KR100393764B1 (en) | Apparatus of controlling a coal feed quantity in a blast furnace | |
| KR101587660B1 (en) | Apparatus for controlling pulverized coal injection | |
| CN220541122U (en) | Pulverized coal injection conveying equipment for double-hearth kiln | |
| CN2937115Y (en) | Fuel supply device for melting glass with solid fuel |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| C19 | Lapse of patent right due to non-payment of the annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |