[go: up one dir, main page]

CN212151303U - A hoisting balancer and crane - Google Patents

A hoisting balancer and crane Download PDF

Info

Publication number
CN212151303U
CN212151303U CN202020355125.7U CN202020355125U CN212151303U CN 212151303 U CN212151303 U CN 212151303U CN 202020355125 U CN202020355125 U CN 202020355125U CN 212151303 U CN212151303 U CN 212151303U
Authority
CN
China
Prior art keywords
hoisting
plate
balancer
holes
board
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020355125.7U
Other languages
Chinese (zh)
Inventor
郭华
孟志铎
张冲
李海宽
王艳超
毛占昕
吴敬浩
李鑫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shougang Jingtang United Iron and Steel Co Ltd
Original Assignee
Shougang Jingtang United Iron and Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shougang Jingtang United Iron and Steel Co Ltd filed Critical Shougang Jingtang United Iron and Steel Co Ltd
Priority to CN202020355125.7U priority Critical patent/CN212151303U/en
Application granted granted Critical
Publication of CN212151303U publication Critical patent/CN212151303U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

本实用新型公开了一种吊装平衡器及天车,属于吊车技术领域。所述吊装平衡器包括:第一吊装板及第二吊装板;所述第一吊装板固定设置在所述第二吊装板的中部;所述第一吊装板上开设有第一吊装孔,所述第二吊装板的两端开设有两个第二吊装孔;两个所述第二吊装孔的圆心在同一水平线上;所述第一吊装孔与两个所述第二吊装孔以“品”字形分布。本实用新型吊装平衡器及天车可以避开缓冲器的阻碍,完成车轮吊装工作,节约检修人工工时费用消耗,同时避免安全事故发生。

Figure 202020355125

The utility model discloses a hoisting balancer and a crane, which belong to the technical field of cranes. The hoisting balancer includes: a first hoisting board and a second hoisting board; the first hoisting board is fixedly arranged in the middle of the second hoisting board; the first hoisting board is provided with a first hoisting hole, so The two ends of the second hoisting plate are provided with two second hoisting holes; the centers of the two second hoisting holes are on the same horizontal line; ” glyph distribution. The hoisting balancer and the crane of the utility model can avoid the obstruction of the buffer, complete the hoisting work of the wheels, save the labor cost and cost of maintenance, and avoid the occurrence of safety accidents at the same time.

Figure 202020355125

Description

一种吊装平衡器及天车A hoisting balancer and crane

技术领域technical field

本实用新型涉及吊车技术领域,特别涉及一种吊装平衡器及天车。The utility model relates to the technical field of cranes, in particular to a hoisting balancer and a crane.

背景技术Background technique

京唐公司炼钢部厂房内480/80t天车是炼钢工序中十分重要的辅助设备。对于连贯的生产节奏来说,铸造吊的日常检修维护时间越短越好,检修质量及效率越高越好。The 480/80t crane in the steelmaking department workshop of Jingtang Company is a very important auxiliary equipment in the steelmaking process. For a consistent production rhythm, the shorter the daily maintenance time of the casting crane, the better, and the higher the maintenance quality and efficiency, the better.

但是,当480/80t天车的第一组大车轮更换时,需要跨越端部2.5米长的缓冲器方可将车轮顺利移除,但是缓冲器的存在影响车轮吊装效率及安全,造成检修进度迟缓,并存在安全风险。However, when the first set of large wheels of the 480/80t crane is replaced, a buffer with a length of 2.5 meters across the end is required to remove the wheel smoothly. However, the existence of the buffer affects the efficiency and safety of wheel hoisting, resulting in the progress of maintenance. sluggish and a security risk.

实用新型内容Utility model content

本实用新型提供一种吊装平衡器及天车,解决了或部分解决了现有技术中天车的车轮组移动困难,存在安全隐患的技术问题。The utility model provides a hoisting balancer and a crane, which solves or partially solves the technical problems that the wheel group of the crane is difficult to move and has potential safety hazards in the prior art.

为解决上述技术问题,本实用新型提供了一种吊装平衡器包括:第一吊装板及第二吊装板;所述第一吊装板固定设置在所述第二吊装板的中部;所述第一吊装板上开设有第一吊装孔,所述第二吊装板的两端开设有两个第二吊装孔;两个所述第二吊装孔的圆心在同一水平线上;所述第一吊装孔与两个所述第二吊装孔以“品”字形分布。In order to solve the above technical problems, the utility model provides a hoisting balancer comprising: a first hoisting board and a second hoisting board; the first hoisting board is fixedly arranged in the middle of the second hoisting board; the first hoisting board The hoisting plate is provided with a first hoisting hole, and the two ends of the second hoisting plate are provided with two second hoisting holes; the circle centers of the two second hoisting holes are on the same horizontal line; the first hoisting hole and the The two second hoisting holes are distributed in a "pin" shape.

进一步地,所述第一吊装板与所述第二吊装板的连接处通过圆角过渡。Further, the connection between the first hoisting plate and the second hoisting plate is transitioned through rounded corners.

进一步地,所述第一吊装板与所述第二吊装板的拐角处均通过圆角过渡。Further, the corners of the first hoisting board and the second hoisting board are all transitioned through rounded corners.

进一步地,所述第一吊装板的厚度为16-24mm。Further, the thickness of the first hoisting plate is 16-24mm.

进一步地,所述第二吊装板的厚度为16-24mm。Further, the thickness of the second hoisting plate is 16-24mm.

进一步地,所述第一吊装孔与两个所述第二吊装孔的直径均为30-36mm。Further, the diameters of the first hoisting hole and the two second hoisting holes are both 30-36 mm.

进一步地,两个所述第二吊装孔圆心之间的间距为600-700mm。Further, the distance between the centers of the two second hoisting holes is 600-700mm.

本实用新型还提供一种天车,包括所述吊装平衡器。The utility model also provides a crane, which includes the hoisting balancer.

本申请实施例中提供的一个或多个技术方案,至少具有如下技术效果或优点:One or more technical solutions provided in the embodiments of this application have at least the following technical effects or advantages:

由于第一吊装板固定设置在第二吊装板的中部,第一吊装板上开设有第一吊装孔,第二吊装板的两端开设有两个第二吊装孔,两个第二吊装孔的圆心在同一水平线上,第一吊装孔与两个第二吊装孔以“品”字形分布,所以,使用时将第一吊装孔拴挂卸扣及吊装绳(吊装绳的另一端与汽车吊连接),两个第二吊装孔通过卸扣及吊装绳拴挂车轮组,通过两个第二吊装孔将吊装绳分开,“骑”在缓冲器上,沿缓冲器方向将车轮向外移出或向内移入时,可使吊装绳扣避开缓冲器的阻碍,顺利完成车轮吊装工作,节约检修人工工时费用消耗,同时避免安全事故发生。Because the first hoisting plate is fixed in the middle of the second hoisting plate, the first hoisting plate is provided with the first hoisting hole, the two ends of the second hoisting plate are provided with two second hoisting holes, and the two second hoisting holes are The center of the circle is on the same horizontal line, and the first hoisting hole and the two second hoisting holes are distributed in the shape of "pin". Therefore, when using, the first hoisting hole is tied to the shackle and the hoisting rope (the other end of the hoisting rope is connected to the car crane.) ), the two second hoisting holes are tied to the wheel group through the shackle and the hoisting rope, and the hoisting rope is separated through the two second hoisting holes, "riding" on the buffer, and moving the wheel outward or toward the buffer along the direction of the buffer. When it is moved in, the hoisting rope buckle can avoid the obstruction of the buffer, successfully complete the wheel hoisting work, save the labor cost of maintenance, and avoid the occurrence of safety accidents.

附图说明Description of drawings

图1为本实用新型实施例提供的吊装平衡器的结构示意图。FIG. 1 is a schematic structural diagram of a hoisting balancer provided by an embodiment of the present invention.

具体实施方式Detailed ways

参见图1,本实用新型实施例提供了一种吊装平衡器包括:第一吊装板1及第二吊装板2。Referring to FIG. 1 , an embodiment of the present invention provides a hoisting balancer including: a first hoisting plate 1 and a second hoisting plate 2 .

第一吊装板1固定设置在第二吊装板2的中部。The first hoisting board 1 is fixedly arranged in the middle of the second hoisting board 2 .

第一吊装板1上开设有第一吊装孔1-1,第二吊装板2的两端开设有两个第二吊装孔2-1。The first hoisting plate 1 is provided with a first hoisting hole 1-1, and both ends of the second hoisting plate 2 are provided with two second hoisting holes 2-1.

两个第二吊装孔2-1的圆心在同一水平线上。The centers of the two second hoisting holes 2-1 are on the same horizontal line.

第一吊装孔1-1与两个第二吊装孔2-1以“品”字形分布。The first hoisting hole 1-1 and the two second hoisting holes 2-1 are distributed in a "pin" shape.

本申请具体实施方式由于第一吊装板1固定设置在第二吊装板2的中部,第一吊装板1上开设有第一吊装孔1-1,第二吊装板2的两端开设有两个第二吊装孔2-1,两个第二吊装孔2-1的圆心在同一水平线上,第一吊装孔1-1与两个第二吊装孔2-1以“品”字形分布,所以,使用时将第一吊装孔1-1拴挂卸扣及吊装绳(吊装绳的另一端与汽车吊连接),两个第二吊装孔2-1通过卸扣及吊装绳拴挂车轮组,通过两个第二吊装孔2-1将吊装绳分开,“骑”在缓冲器上,沿缓冲器方向将车轮向外移出或向内移入时,可使吊装绳扣避开缓冲器的阻碍,顺利完成车轮吊装工作,节约检修人工工时费用消耗,同时避免安全事故发生。DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Since the first hoisting plate 1 is fixedly arranged in the middle of the second hoisting plate 2 , the first hoisting plate 1 is provided with a first hoisting hole 1 - 1 , and the two ends of the second hoisting plate 2 are provided with two hoisting holes 1 - 1 . The second hoisting hole 2-1, the centers of the two second hoisting holes 2-1 are on the same horizontal line, the first hoisting hole 1-1 and the two second hoisting holes 2-1 are distributed in the shape of "pin", so, When in use, the first hoisting hole 1-1 is tied to the shackle and the hoisting rope (the other end of the hoisting rope is connected to the car crane), and the two second hoisting holes 2-1 are tied to the wheel group through the shackle and the hoisting rope, The two second hoisting holes 2-1 separate the hoisting rope, "ride" on the buffer, and move the wheel outward or inward along the direction of the buffer, so that the hoisting rope buckle can avoid the obstacle of the buffer and smoothly Complete the wheel hoisting work, save the labor cost of maintenance, and avoid safety accidents at the same time.

在本实施方式中,第一吊装板1可与第二吊装板2一体成型。In this embodiment, the first suspension plate 1 and the second suspension plate 2 may be integrally formed.

具体地,第一吊装板1与第二吊装板2的连接处通过圆角过渡,避免应力集中。Specifically, the connection between the first hoisting plate 1 and the second hoisting plate 2 is transitioned through rounded corners to avoid stress concentration.

第一吊装板1与第二吊装板2的拐角处均通过圆角过渡,避免应力集中。The corners of the first hoisting plate 1 and the second hoisting plate 2 are all transitioned through rounded corners to avoid stress concentration.

具体地,第一吊装板1的厚度为16-24mm,保证强度满足吊装需求,同时,重量小,倒运方便。Specifically, the thickness of the first hoisting plate 1 is 16-24 mm, which ensures that the strength meets the hoisting requirements, and at the same time, the weight is small, and the reverse transportation is convenient.

第二吊装板2的厚度为16-24mm,保证强度满足吊装需求,同时,重量小,倒运方便。The thickness of the second hoisting plate 2 is 16-24mm, which ensures that the strength can meet the hoisting requirements, and at the same time, the weight is small and the reverse transportation is convenient.

具体地,第一吊装孔1-1与两个第二吊装孔2-1的直径均为30-36mm,便于拴挂卸扣及吊装绳。Specifically, the diameters of the first hoisting hole 1-1 and the two second hoisting holes 2-1 are both 30-36 mm, which is convenient for attaching the shackle and the hoisting rope.

具体地,两个第二吊装孔2-1圆心之间的间距为600-700mm,可以避开下方缓冲器底座的干扰。Specifically, the distance between the centers of the two second hoisting holes 2-1 is 600-700 mm, which can avoid the interference of the buffer base below.

本申请还提供一种天车,该天车包括吊装平衡器,该天车的吊装平衡器的具体结构参照上述实施例,由于本吊装平衡器采用上述所有实施例的全部技术方案,因此至少具有上述实施例技术方案所带来的有益效果,在此不再一一赘述。The present application also provides a crane, which includes a hoisting balancer. The specific structure of the hoisting balancer of the crane can refer to the above-mentioned embodiments. Since the hoisting balancer adopts all the technical solutions of the above-mentioned embodiments, it has at least The beneficial effects brought by the technical solutions of the above embodiments will not be repeated here.

最后所应说明的是,以上具体实施方式仅用以说明本实用新型的技术方案而非限制,尽管参照实例对本实用新型进行了详细说明,本领域的普通技术人员应当理解,可以对本实用新型的技术方案进行修改或者等同替换,而不脱离本实用新型技术方案的精神和范围,其均应涵盖在本实用新型的权利要求范围当中。Finally, it should be noted that the above specific embodiments are only used to illustrate the technical solutions of the present invention and not to limit them. Although the present invention has been described in detail with reference to examples, those of ordinary skill in the art should The technical solutions can be modified or equivalently replaced without departing from the spirit and scope of the technical solutions of the present invention, and they should all be included in the scope of the claims of the present invention.

Claims (8)

1.一种吊装平衡器,其特征在于,包括:第一吊装板及第二吊装板;1. A hoisting balancer is characterized in that, comprising: a first hoisting plate and a second hoisting plate; 所述第一吊装板固定设置在所述第二吊装板的中部;the first hoisting plate is fixedly arranged in the middle of the second hoisting plate; 所述第一吊装板上开设有第一吊装孔,所述第二吊装板的两端开设有两个第二吊装孔;The first hoisting plate is provided with a first hoisting hole, and both ends of the second hoisting plate are provided with two second hoisting holes; 两个所述第二吊装孔的圆心在同一水平线上;The centers of the two second hoisting holes are on the same horizontal line; 所述第一吊装孔与两个所述第二吊装孔以“品”字形分布。The first hoisting hole and the two second hoisting holes are distributed in a "pin" shape. 2.根据权利要求1所述的吊装平衡器,其特征在于:2. The hoisting balancer according to claim 1 is characterized in that: 所述第一吊装板与所述第二吊装板的连接处通过圆角过渡。The connection between the first hoisting board and the second hoisting board is transitioned through rounded corners. 3.根据权利要求1所述的吊装平衡器,其特征在于:3. hoisting balancer according to claim 1, is characterized in that: 所述第一吊装板与所述第二吊装板的拐角处均通过圆角过渡。The corners of the first hoisting board and the second hoisting board are all transitioned through rounded corners. 4.根据权利要求1所述的吊装平衡器,其特征在于:4. The hoisting balancer according to claim 1 is characterized in that: 所述第一吊装板的厚度为16-24mm。The thickness of the first hoisting plate is 16-24mm. 5.根据权利要求1所述的吊装平衡器,其特征在于:5. The hoisting balancer according to claim 1 is characterized in that: 所述第二吊装板的厚度为16-24mm。The thickness of the second hoisting plate is 16-24mm. 6.根据权利要求1所述的吊装平衡器,其特征在于:6. The hoisting balancer according to claim 1 is characterized in that: 所述第一吊装孔与两个所述第二吊装孔的直径均为30-36mm。The diameters of the first hoisting hole and the two second hoisting holes are both 30-36 mm. 7.根据权利要求1所述的吊装平衡器,其特征在于:7. The hoisting balancer according to claim 1 is characterized in that: 两个所述第二吊装孔圆心之间的间距为600-700mm。The distance between the centers of the two second hoisting holes is 600-700mm. 8.一种天车,其特征在于,包括如权利要求1-7任意一项所述的吊装平衡器。8. A crane, characterized in that it comprises the hoisting balancer according to any one of claims 1-7.
CN202020355125.7U 2020-03-19 2020-03-19 A hoisting balancer and crane Active CN212151303U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020355125.7U CN212151303U (en) 2020-03-19 2020-03-19 A hoisting balancer and crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020355125.7U CN212151303U (en) 2020-03-19 2020-03-19 A hoisting balancer and crane

Publications (1)

Publication Number Publication Date
CN212151303U true CN212151303U (en) 2020-12-15

Family

ID=73715647

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020355125.7U Active CN212151303U (en) 2020-03-19 2020-03-19 A hoisting balancer and crane

Country Status (1)

Country Link
CN (1) CN212151303U (en)

Similar Documents

Publication Publication Date Title
CN108275561B (en) Active lower shaft rotation hoisting tool
CN202936092U (en) Lifting tool of wind power tower barrel
CN201301169Y (en) Lifting device special for cathode carbon block
CN212151303U (en) A hoisting balancer and crane
CN203079516U (en) Detachable type hoisting balance beam
CN203486756U (en) Lifting tool suitable for I-shaped steel
CN205114799U (en) Handling and dual purpose electromagnet of upset slab
CN2855992Y (en) Towing rope bogie of tower crane
CN203781677U (en) Trial mass device of crane
CN102992180A (en) Marine 100-ton lifting hook group
CN203295033U (en) Lifting frame
CN219567331U (en) Load trolley anti-falling device suitable for inverted triangle arm
CN208071105U (en) A kind of more suspension centre hanging beams
CN107738986A (en) Complete non-maintaining simple and easy hoisting system manually
CN208166359U (en) A power cable lifting tool
CN201099586Y (en) Crane lifting device
CN205634699U (en) Belt hoist device of rail is pressed to delivery formula
CN204737589U (en) A hoist that is used for large -scale tower upright to hoist
CN206783114U (en) The hanging beam of steel box-girder
CN104355232A (en) Steering frame turnover device
CN204847843U (en) Hoist traveling carriage bearing structure
CN107840240B (en) Hanging beam
CN205132933U (en) Two load trolley structure of tower crane
CN201567156U (en) Improved electric single-beam crane structure
CN203738006U (en) Large casting lifting and turning structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant