[go: up one dir, main page]

CN211815246U - Prevent subsiding and trade and fill alternative airport runway - Google Patents

Prevent subsiding and trade and fill alternative airport runway Download PDF

Info

Publication number
CN211815246U
CN211815246U CN201922220920.5U CN201922220920U CN211815246U CN 211815246 U CN211815246 U CN 211815246U CN 201922220920 U CN201922220920 U CN 201922220920U CN 211815246 U CN211815246 U CN 211815246U
Authority
CN
China
Prior art keywords
bentonite
layer
airport runway
section
landfill
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201922220920.5U
Other languages
Chinese (zh)
Inventor
刘朝阳
王甜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Seventh Engineering Bureau Shanghai Corp Ltd
Original Assignee
China Construction Seventh Engineering Bureau Shanghai Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Seventh Engineering Bureau Shanghai Corp Ltd filed Critical China Construction Seventh Engineering Bureau Shanghai Corp Ltd
Priority to CN201922220920.5U priority Critical patent/CN211815246U/en
Application granted granted Critical
Publication of CN211815246U publication Critical patent/CN211815246U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model provides an anti-settling alternate airport runway, which is mainly characterized in that a bentonite composite layer with obvious expansion and contraction deformation is laid at the excavation section of the alternate airport runway construction by water absorption expansion and dehydration contraction, and water content is changed; a method of CFG pile mattress layer composite foundation with large bearing capacity and small foundation settlement deformation is adopted at the landfill section of the replacement and filling alternate airport runway construction; the roadbed base layers of the excavation section and the landfill section are respectively leveled and tamped, the compaction degree reaches more than 85%, the junction of the excavation section and the landfill section is densely filled with bentonite, the surfaces of the two sections of roadbeds are leveled and smooth after treatment, and finally the roadbeds of the excavation section and the landfill section of the replacement and landfill alternate airport runway can achieve the purpose of synchronous uniform settlement, so that the safety of the replacement and landfill alternate airport runway in the using process is ensured.

Description

Prevent subsiding and trade and fill alternative airport runway
Technical Field
The utility model relates to an airport construction technical field especially relates to a prevent subsiding and trade and fill out airport runway in turn.
Background
With the development of modern society and the progress of science and technology, the living standard of people is improved, and an airplane, as a convenient and quick novel vehicle, becomes more and more the first choice of people going on a journey. The rapid development of air transportation is directly promoted by the ever-growing economic strength and the omnibearing open pattern all over the country. The construction of airports in mountainous, hilly and coastal areas also becomes a trend, wherein in the main construction works of airports, airport runways can be said to be one of the most important buildings, and their importance is also self evident. The airport runway is the construction key point in airport construction and is an important link for ensuring smooth operation of the airport. The quality of the construction quality of the airport runway also seriously influences whether the airplane can take off and land smoothly, and except the poor construction quality, the uneven settlement of the soil foundation is always a great problem for the runway construction, and particularly the uneven settlement of the airport runway caused by the alternate filling and replacement construction in mountains, hills and coastal areas is the most obvious problem. The uneven settlement of the foundation is the main reason for causing the uneven settlement of the roadbed, so that the development of the uneven settlement control research of the soil foundation has very important practical significance for the construction of airport runways.
SUMMERY OF THE UTILITY MODEL
In order to solve the problem, the utility model provides a prevent subsiding and trade and fill up airport runway in turn through laying bentonite at the excavation section, adopts CFG stake mattress pad layer composite foundation at the landfill section to the messenger trades subsiding of filling up airport runway in turn and reaches even control.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a prevent subsiding and trade and fill out airport runway in turn, include the road bed and be located the road bed packing layer on the road bed, the road bed is again including excavation section and landfill section, the bentonite composite bed has been laid to the excavation section, the landfill section is including the complex ground that has CFG stake and mattress pad layer, the CFG stake is erected in the ground, mattress pad layer is laid in the ground top, the excavation section with the juncture of landfill section is filled there is bentonite and two sections upper surfaces to be located same horizontal plane.
Preferably, a concrete structure base layer and a broken stone cushion layer are sequentially paved below the bentonite composite layer, and a mattress cushion layer is paved above the bentonite composite layer.
Preferably, the bentonite composite bed from the bottom up includes bentonite waterproof system, bentonite and bentonite crust in proper order, bentonite waterproof system from the bottom up includes non-woven fabrics layer, waterproof material layer and braided fabric layer in proper order.
Preferably, the bentonite of the bentonite composite layer has no impurities with the thickness of more than 10mm and the compactness of more than 85 percent.
Preferably, the mattress layer comprises broken stones, medium coarse sand and geogrid from bottom to top.
More preferably, the maximum particle size of the crushed stone is not more than 25 mm.
A construction method for preventing settlement and replacing alternate airport runways comprises the following steps:
1) leveling the field after the excavation of the roadbed excavation section is finished, and paving a bentonite composite layer;
2) the soil body and the broken stones of the roadbed excavation section are conveyed to a landfill section for landfill, and after a construction site is leveled, the construction of CFG piles and mattress layers is carried out;
3) and densely filling the junction of the excavation section and the landfill section with bentonite, finally enabling the excavation section and the landfill section to reach the same flat surface, and then constructing a roadbed packing layer.
Preferably, in step 1), before laying the bentonite composite layer, the base layer is leveled and tamped, after laying the gravel cushion layer on the leveled base layer, a concrete structure base layer is poured, the bentonite composite layer is laid (including construction of a bentonite waterproof system, the bentonite waterproof system comprises a non-woven fabric layer, a waterproof material layer and a woven fabric layer, then the bentonite is laid, and a layer of bentonite clay skin is laid on the surface of the bentonite for waterproof treatment), then a mattress layer is laid, and the base layer is compacted, wherein the compaction degree reaches more than 85%, the surface is smooth and smooth, and no sundries more than 2cm protrude.
Preferably, in the step 2), after landfill, a heavy vibration roller is adopted to compact and reinforce the construction site, and a test section rolling test is carried out before rolling formal construction.
Preferably, in step 2), the construction of the CFG pile is performed using a long auger drilling machine.
More preferably, the pipe drawing speed is 1.2-1.5 m/min when the pile is formed.
Preferably, in the step 2), when the mattress layer is constructed, 10-12% of stone powder or fine particles are mixed into the gravel with the maximum particle size of not more than 25mm, and the gravel is uniformly mixed and filled.
Compared with the prior art, the utility model discloses following beneficial effect has:
the bentonite in the bentonite composite layer of the excavation section has the engineering characteristics of water absorption expansion and water loss contraction, the deformation of the excavation section can be effectively controlled by the processing of a bentonite waterproof system, the bentonite waterproof system is combined with the characteristics of large bearing capacity and small deformation of the composite foundation of the CFG pile mattress layer of the landfill section, the damage to the foundation caused by overlarge settlement or uneven settlement of the foundation can be reduced by adopting a proper processing mode, the even settlement of the roadbed of the replacement and filling alternate airport runway can be realized, and the safety of the replacement and filling alternate airport runway is ensured. The utility model discloses can provide the instruction for this field, also can regard as the usefulness of this field teaching, scientific research.
Drawings
Fig. 1 is a schematic structural view of the anti-settling alternate airport runway.
In the figure, 1 is the excavation section, 2 is the landfill section, 3 is the bentonite composite bed, 4 is the CFG stake, 5 is the soil layer, 6 is the mattress layer, 7 is the roadbed packing layer.
Detailed Description
The present invention will be described in detail below with reference to the accompanying drawings and specific embodiments.
The construction materials, equipment and methods used in the present application can be implemented using existing technologies, unless otherwise specified.
As shown in figure 1, the anti-settling alternate-filling airport runway provided by the utility model comprises a roadbed and a roadbed filling layer 7 positioned on the roadbed, wherein the roadbed comprises an excavation section 1 and a filling section 2, the excavation section 1 is paved with a broken stone cushion layer, a concrete structure base layer (not shown in the figure), a bentonite composite layer 3 (comprising a bentonite waterproof system, bentonite and bentonite clay sheets) and a mattress cushion layer (not shown in the figure), wherein the bentonite waterproof system sequentially comprises a non-woven fabric layer, a waterproof material layer and a woven fabric layer from bottom to top, the system can adopt conventional materials and thickness, the landfill section 2 comprises a foundation compounded with CFG piles 4 and a mattress layer 6, the CFG piles 4 are erected in the foundation (soil layer 5), the mattress layer 6 is laid above the foundation, and bentonite is used for densely filling between the excavation section 1 and the landfill section 2, so that the upper surfaces of the two sections are positioned on the same horizontal plane.
The construction method for preventing settlement and replacing and filling alternate airport runways comprises the following steps:
the method comprises the steps of firstly, at a construction excavation section of a replacement and filling alternative airport runway, conveying soil bodies of the replacement and filling alternative airport runway construction excavation, and filling gravels into a landfill section, leveling the site after the site excavation is finished, paving a gravels cushion layer, a concrete structure base layer and a bentonite waterproof system before the bentonite is paved, paving a layer of bentonite clay skin on the surface of the bentonite for waterproof treatment after the bentonite is paved, paving a mattress cushion layer, and finally leveling and compacting the base layer by adopting equipment, wherein the compaction degree is more than 85%, the surface is level and smooth, rocks and other objects which protrude by more than 2cm cannot exist, the surface is basically dry, obvious water accumulation cannot exist, and drainage operation is carried out if the water accumulation exists. The construction of the bentonite is carried out in rainy or snowy weather, and a plastic film is used for covering when the bentonite is in rain or snow, so that the bentonite is prevented from being hydrated in advance. The backfill soil is preferably sand or soil after sieving, and the soil cannot contain impurities such as stones with the thickness of more than 10 mm. The backfill needs to be tamped (or compacted, vibrated, etc.), and the compactness of the backfill needs to be more than 85%.
The bentonite has the engineering characteristics of water absorption expansion and water loss contraction. Bentonite, in addition to deforming under load, also undergoes significant expansion and contraction deformation when the water content changes. The wet expansion deformation under the combined action of external load and soaking, and the drying shrinkage deformation under the combined action of external load and evaporation, air drying, water level reduction and the like.
And secondly, in a construction landfill section of the replacement and filling alternate airport runway, after soil and gravels of the construction excavation section of the replacement and filling alternate airport runway are buried, leveling the site, compacting and reinforcing by adopting a heavy vibration road roller, and performing a test section rolling test before rolling formal construction. And (3) leveling a construction site, lofting after measurement, and constructing the CFG pile by using a long spiral drilling machine, wherein in the construction process, a proper pile-forming construction process is selected according to the environment, and the pipe drawing speed is controlled to be 1.2-1.5 m/min. And constructing a mattress layer, wherein the mattress layer is used for coordinating the deformation of the piles and the soil between the piles, and the materials comprise medium coarse sand, broken stones and the like. The specific design form of the mattress layer comprises broken stones, medium coarse sand and geogrids from bottom to top. The maximum particle size of the gravel used in the mattress layer is not more than 25mm, 10-12% of stone powder or fine particles are mixed into the gravel, and the mixture is uniformly mixed and filled. Pebbles are not suitable for selection, the occlusion force of the pebbles is poor, and the thickness of the mattress layer is easy to be uneven due to construction disturbance. The sand adopted in the mattress layer is natural-graded medium-coarse sand and does not contain impurities such as grass roots, garbage and the like.
The CFG pile composite foundation at the construction and landfill section of the replacement and landfill alternate airport runway has not very high bearing capacity, generally not more than 200kpa, and the CFG pile composite foundation still has larger deformation because the improvement range of the compression modulus of the composite foundation is limited compared with that of a natural foundation. However, the CFG pile composite foundation has a high standard value of bearing capacity, has the properties of a rigid pile, and can well control settlement.
And thirdly, densely filling the junction of the two sections of the roadbeds by bentonite to enable the roadbeds of the excavation section and the landfill section to reach the same flat surface, and then constructing the airfield runway roadbed filling material.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (5)

1. The utility model provides a prevent subsiding and trade and fill out airport runway in turn, its characterized in that includes the road bed and is located the road bed packing layer on the road bed, the road bed includes excavation section and landfill section again, the bentonite composite bed has been laid to the excavation section, the landfill section is including the complex ground that has CFG stake and mattress pad layer, the CFG stake is erect in the ground, mattress pad layer is laid in the ground top, the excavation section with the juncture of landfill section is filled and is had bentonite and two sections upper surfaces to be located same horizontal plane.
2. The anti-settling alternate airport runway of claim 1, wherein a concrete structure base course and a gravel cushion course are laid below the bentonite composite layer in sequence, and a mattress cushion course is laid above the bentonite composite layer.
3. The anti-settling alternate airport runway of claim 1 or 2, wherein the bentonite composite layer comprises a bentonite waterproof system, bentonite and bentonite clay skin in sequence from bottom to top, and the bentonite waterproof system comprises a non-woven fabric layer, a waterproof material layer and a woven fabric layer in sequence from bottom to top.
4. The anti-settling alternate airport runway of claim 3, wherein the bentonite composite layer has no impurities of more than 10mm and has a compactness of more than 85%.
5. The anti-settling alternate airport runway of claim 1 or 2, wherein the mattress layer comprises crushed stones, medium grit and geogrids from bottom to top, the maximum particle size of the crushed stones being no greater than 25 mm.
CN201922220920.5U 2019-12-09 2019-12-09 Prevent subsiding and trade and fill alternative airport runway Expired - Fee Related CN211815246U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922220920.5U CN211815246U (en) 2019-12-09 2019-12-09 Prevent subsiding and trade and fill alternative airport runway

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922220920.5U CN211815246U (en) 2019-12-09 2019-12-09 Prevent subsiding and trade and fill alternative airport runway

Publications (1)

Publication Number Publication Date
CN211815246U true CN211815246U (en) 2020-10-30

Family

ID=73141265

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922220920.5U Expired - Fee Related CN211815246U (en) 2019-12-09 2019-12-09 Prevent subsiding and trade and fill alternative airport runway

Country Status (1)

Country Link
CN (1) CN211815246U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110820456A (en) * 2019-12-09 2020-02-21 中建七局(上海)有限公司 A kind of anti-settling replacement of alternate airport runway and its construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110820456A (en) * 2019-12-09 2020-02-21 中建七局(上海)有限公司 A kind of anti-settling replacement of alternate airport runway and its construction method

Similar Documents

Publication Publication Date Title
CN113445396B (en) High-fill road foundation filling construction method for high liquid limit soil road section
CN101153475B (en) Redbeds mudstone filled high-speed railway subgrade and construction method thereof
CN206928164U (en) A kind of drainage type concrete road
CN201095717Y (en) Red beds filled high-speed railway roadbed
CN104631254A (en) Construction method of geogrid reinforced clay edge-covered tailing subgrade
CN107419630A (en) A kind of the soft soil foundation high-filled embankment and construction method of effectively control settlement after construction
CN105297570B (en) Special soil subgrade structure and construction method thereof
CN110924254A (en) A kind of construction technology of carbonaceous shale roadbed filling
CN206902488U (en) A kind of soft soil foundation high-filled embankment of effectively control settlement after construction
CN104863031B (en) A kind of karst area ductility anti-collapse road structure and construction method thereof
CN113265924B (en) Construction method for using red bed mudstone blocks as high-fill dynamic compaction roadbed filling
CN110820456A (en) A kind of anti-settling replacement of alternate airport runway and its construction method
CN109778625A (en) A kind of express highway roadbed structure that dregs class building castoff fills
CN103276716B (en) A kind of changeover portion CFG stake and mattress layer composite foundation stabilization construction method
CN110761137B (en) Non-damage layered rolling construction method using cement-modified fine silt as roadbed filler
CN103195051B (en) Limestone soil and pervious concrete pile composite foundation and treatment method thereof
CN109183541A (en) A kind of roadbed construction method and application using gravelly sand group material
CN109537389B (en) A kind of EPS lower embankment structure and its construction method
CN111304986A (en) Construction method for treating soft foundation settlement in plateau frozen soil area
CN211815246U (en) Prevent subsiding and trade and fill alternative airport runway
CN208039220U (en) A kind of old roadbed develops the base formation of stake reinforcing in column hammer
CN214301048U (en) Light embankment
CN116219818B (en) Functional gradient composite roadbed based on full tailing powder and construction method thereof
CN111058346A (en) Carbon rock roadbed structure and construction method thereof
CN115287954B (en) Roadbed in coastal reclamation area and treatment construction method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201030