CN211173165U - Construction device for cylindrical special-shaped steel structure - Google Patents

Construction device for cylindrical special-shaped steel structure Download PDF

Info

Publication number
CN211173165U
CN211173165U CN201921781441.4U CN201921781441U CN211173165U CN 211173165 U CN211173165 U CN 211173165U CN 201921781441 U CN201921781441 U CN 201921781441U CN 211173165 U CN211173165 U CN 211173165U
Authority
CN
China
Prior art keywords
steel structure
structure unit
cylindrical
shaped steel
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921781441.4U
Other languages
Chinese (zh)
Inventor
李善文
史伟
周胜军
谈虎
董涛
熊赛江
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN201921781441.4U priority Critical patent/CN211173165U/en
Application granted granted Critical
Publication of CN211173165U publication Critical patent/CN211173165U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本实用新型涉及一种用于筒状异型钢结构的搭建装置,包括:与待搭建的筒状异型钢结构相匹配的支撑柱;安装于支撑柱底部的胎架,该胎架供支撑和拼装钢结构单元;以及安装于支撑柱顶部的起吊件,该起吊件包括可升降调节的吊具,通过该吊具与钢结构单元固定连接并上升以带动钢结构单元沿支撑柱向上移动,进而于胎架上搭建下一节钢结构单元并与上方的钢结构单元固定连接,从而拼合形成筒状异型钢结构。本实用新型有效地解决了筒状异型钢结构搭建困难的问题,施工占用的土地面积较小,且搭建的成本较低,施工效率高,同时能够保证施工质量。

Figure 201921781441

The utility model relates to a building device for a cylindrical special-shaped steel structure, comprising: a support column matched with a cylindrical special-shaped steel structure to be built; a tire frame installed at the bottom of the support column, the tire frame is used for supporting and assembling A steel structure unit; and a hoisting piece installed on the top of the support column, the hoisting piece includes a lifter that can be lifted and lowered, and is fixedly connected with the steel structure unit through the hoisting piece and rises to drive the steel structure unit to move up along the support column, and then in The next section of steel structure unit is built on the tire frame and fixedly connected with the upper steel structure unit, so as to form a cylindrical special-shaped steel structure. The utility model effectively solves the problem of difficult construction of the cylindrical special-shaped steel structure, the land area occupied by the construction is small, the construction cost is low, the construction efficiency is high, and the construction quality can be ensured at the same time.

Figure 201921781441

Description

用于筒状异型钢结构的搭建装置Construction device for cylindrical special-shaped steel structure

技术领域technical field

本实用新型涉及建筑施工领域,特指一种用于筒状异型钢结构的搭建装置。The utility model relates to the field of building construction, in particular to a building device for a cylindrical special-shaped steel structure.

背景技术Background technique

目前,随着建筑工程的高速发展,对于施工技术和施工质量的要求也越来越高,高耸双曲螺旋筒状钢结构因其美观等原因在建筑工程中被广泛应用,但这种筒状异型钢结构较为复杂,且一般高度较高,搭建的难度大,特别是当施工场地有限时,普通起重机械无法正常工作,若是采用满堂脚手架或高空散装的方法,则制作成本高昂且施工效率较低。At present, with the rapid development of construction projects, the requirements for construction technology and construction quality are getting higher and higher. The special-shaped steel structure is more complex, and generally has a high height, which makes it difficult to build. Especially when the construction site is limited, ordinary lifting machinery cannot work normally. If the method of full-scale scaffolding or high-altitude bulk is used, the production cost is high and the construction efficiency is high. lower.

实用新型内容Utility model content

本实用新型的目的在于克服现有技术的缺陷,提供一种用于筒状异型钢结构的搭建装置,解决了筒状异型钢结构搭建困难的问题,施工占用的土地面积较小,且搭建的成本较低,施工效率高,同时能够保证施工质量。The purpose of the utility model is to overcome the defects of the prior art, and to provide a construction device for a cylindrical special-shaped steel structure, which solves the problem that the cylindrical special-shaped steel structure is difficult to build, the land area occupied by the construction is small, and the construction The cost is low, the construction efficiency is high, and the construction quality can be guaranteed.

实现上述目的的技术方案是:The technical solution to achieve the above purpose is:

本实用新型提供了一种用于筒状异型钢结构的搭建装置,该筒状异型钢结构由若干钢结构单元拼装而成,该搭建装置包括:The utility model provides a construction device for a cylindrical special-shaped steel structure, wherein the cylindrical special-shaped steel structure is assembled by a plurality of steel structure units, and the construction device comprises:

与待搭建的筒状异型钢结构相匹配的支撑柱;Support columns matching the cylindrical shaped steel structure to be built;

安装于支撑柱底部的胎架,该胎架供支撑和拼装钢结构单元;以及a tire frame mounted on the bottom of the support column for supporting and assembling the steel structural unit; and

安装于支撑柱顶部的起吊件,该起吊件包括可升降调节的吊具,通过该吊具与钢结构单元固定连接并上升以带动钢结构单元沿支撑柱向上移动,进而于胎架上搭建下一节钢结构单元并与上方的钢结构单元固定连接,从而拼合形成筒状异型钢结构。A hoisting piece installed on the top of the support column, the hoisting piece includes a lifter that can be lifted and lowered, and is fixedly connected to the steel structure unit through the lifter and rises to drive the steel structure unit to move up along the support column, and then build up and down on the tire frame. A section of steel structure unit is fixedly connected with the upper steel structure unit to form a cylindrical special-shaped steel structure.

本实用新型采用一种用于筒状异型钢结构的搭建装置,利用胎架直接搭建套设于支撑柱的钢结构单元,进而利用吊具将该钢结构单元向上移动设定距离,再搭建下一节钢结构单元,将该钢结构单元与上一节钢结构单元固定连接,进而利用吊具将该两节钢结构单元一同向上吊起,直至所有钢结构单元相互连接以拼合形成筒状异型钢结构,不需要设置满堂脚手架,钢结构单元的连接位置在胎架顶部即靠近地面的位置,且施工较为安全,解决了筒状异型钢结构搭建困难的问题,施工占用的土地面积较小,且搭建的成本较低,施工效率高,同时能够保证施工质量。The utility model adopts a building device for a cylindrical special-shaped steel structure, uses a tire frame to directly build a steel structure unit sleeved on a support column, and then uses a hanger to move the steel structure unit upward by a set distance, and then build a lower One section of steel structure unit, the steel structure unit is fixedly connected with the previous section of steel structure unit, and then the two steel structure units are lifted up together with a sling until all the steel structure units are connected to each other to form a cylindrical special shape The steel structure does not need to set up scaffolding. The connection position of the steel structure unit is at the top of the tire frame, which is close to the ground, and the construction is relatively safe, which solves the problem of difficult construction of the cylindrical special-shaped steel structure. And the construction cost is low, the construction efficiency is high, and the construction quality can be guaranteed.

本实用新型用于筒状异型钢结构的搭建装置的进一步改进在于,该胎架截面呈环状,包括套设于支撑柱的筒体、间隔安装于筒体的横撑以及支撑于横撑与筒体的斜撑;A further improvement of the utility model for the erection device of the cylindrical special-shaped steel structure lies in that the cross section of the tire frame is annular, and includes a cylindrical body sleeved on the support column, a cross brace installed on the cylindrical body at intervals, and a cross brace supported on the cross brace and the cross brace. The diagonal brace of the cylinder;

该钢结构单元包括若干钢条,该钢条通过点焊的方式临时固定于横撑,进而该钢条相互焊接以形成钢结构单元,并解除钢条与横撑的连接。The steel structure unit includes a plurality of steel bars, the steel bars are temporarily fixed to the cross brace by spot welding, and then the steel bars are welded to each other to form the steel structure unit, and the connection between the steel bars and the cross brace is released.

本实用新型用于筒状异型钢结构的搭建装置的进一步改进在于,该横撑和斜撑可拆卸地安装于筒体。The further improvement of the utility model for the erection device of the cylindrical special-shaped steel structure lies in that the transverse brace and the diagonal brace are detachably installed on the cylinder body.

本实用新型用于筒状异型钢结构的搭建装置的进一步改进在于,该支撑柱的顶部预埋有部分露出的固定件,该固定件的露出部分固定有水平梁,该水平梁远离固定件的一端向支撑柱外凸伸,该起吊件安装于水平梁的凸伸部分。A further improvement of the utility model for the erection device of the cylindrical special-shaped steel structure is that a partially exposed fixing piece is pre-embedded at the top of the support column, and the exposed part of the fixing piece is fixed with a horizontal beam, and the horizontal beam is far from the side of the fixing piece. One end protrudes out of the support column, and the hoisting piece is installed on the protruding part of the horizontal beam.

本实用新型用于筒状异型钢结构的搭建装置的进一步改进在于,该吊具上设置有若干向外凸伸的支杆,通过该支杆对应与钢结构单元连接。A further improvement of the utility model for the erection device of the cylindrical special-shaped steel structure lies in that the hanger is provided with a plurality of outwardly protruding support rods, through which the support rods are correspondingly connected with the steel structure unit.

本实用新型用于筒状异型钢结构的搭建装置的进一步改进在于,该支撑柱位于胎架上方的侧壁可拆卸地安装有限位杆,通过限位杆穿过被吊起的钢结构单元,以防止被吊起的钢结构单元坠落。A further improvement of the utility model for the erection device of the cylindrical special-shaped steel structure lies in that a limit rod is detachably installed on the side wall of the support column located above the tire frame, and the limit rod passes through the suspended steel structure unit, To prevent the suspended steel structure unit from falling.

本实用新型用于筒状异型钢结构的搭建装置的进一步改进在于,该起吊件为顶升液压油缸,且与吊具通过钢绞线连接。The further improvement of the utility model for the erection device for the cylindrical special-shaped steel structure lies in that the hoisting piece is a jacking hydraulic oil cylinder, and is connected with the hoisting device through a steel strand.

附图说明Description of drawings

图1为本实用新型用于筒状异型钢结构的搭建装置的整体剖视图。FIG. 1 is an overall cross-sectional view of a construction device for a cylindrical special-shaped steel structure according to the present invention.

图2为本实用新型用于筒状异型钢结构的搭建装置的使用状态示意图。FIG. 2 is a schematic diagram of the use state of the construction device for the cylindrical special-shaped steel structure of the present invention.

图3为本实用新型用于筒状异型钢结构的搭建装置的俯视图,其中省略了右侧的胎架结构。FIG. 3 is a top view of a construction device for a cylindrical special-shaped steel structure of the present invention, wherein the right side frame structure is omitted.

图4为本实用新型用于筒状异型钢结构的搭建装置中吊具部分的放大示意图。FIG. 4 is an enlarged schematic view of the part of the spreader in the construction device for the cylindrical special-shaped steel structure of the present invention.

具体实施方式Detailed ways

下面结合附图和具体实施例对本实用新型作进一步说明。The present utility model will be further described below in conjunction with the accompanying drawings and specific embodiments.

本实用新型采用一种用于筒状异型钢结构的搭建装置,利用胎架直接搭建套设于支撑柱的钢结构单元,进而利用吊具将该钢结构单元向上移动设定距离,再搭建下一节钢结构单元,将该钢结构单元与上一节钢结构单元固定连接,进而利用吊具将该两节钢结构单元一同向上吊起,直至所有钢结构单元相互连接以拼合形成筒状异型钢结构,不需要设置满堂脚手架,钢结构单元的连接位置在胎架顶部即靠近地面的位置,且施工较为安全,解决了筒状异型钢结构搭建困难的问题,施工占用的土地面积较小,且搭建的成本较低,施工效率高,同时能够保证施工质量。下面结合附图对本实用新型用于筒状异型钢结构的搭建装置进行说明。The utility model adopts a building device for a cylindrical special-shaped steel structure, uses a tire frame to directly build a steel structure unit sleeved on a support column, and then uses a hanger to move the steel structure unit upward by a set distance, and then build a lower One section of steel structure unit, the steel structure unit is fixedly connected with the previous section of steel structure unit, and then the two steel structure units are lifted up together with a sling until all the steel structure units are connected to each other to form a cylindrical special shape The steel structure does not need to set up scaffolding. The connection position of the steel structure unit is at the top of the tire frame, which is close to the ground, and the construction is relatively safe, which solves the problem of difficult construction of the cylindrical special-shaped steel structure. And the construction cost is low, the construction efficiency is high, and the construction quality can be guaranteed. The following describes the construction device of the utility model for the cylindrical special-shaped steel structure with reference to the accompanying drawings.

参阅图1,图1为本实用新型用于筒状异型钢结构的搭建装置的整体剖视图。下面结合图1,对本实用新型用于筒状异型钢结构的搭建装置进行说明。Referring to FIG. 1 , FIG. 1 is an overall cross-sectional view of a construction device for a cylindrical special-shaped steel structure of the present invention. The following describes the construction device of the present invention for a cylindrical special-shaped steel structure with reference to FIG. 1 .

结合图1和图2所示,本实用新型提供了一种用于筒状异型钢结构的搭建装置,该筒状异型钢结构21由若干钢结构单元211拼装而成,该搭建装置包括:1 and 2, the utility model provides a construction device for a cylindrical special-shaped steel structure, the cylindrical special-shaped steel structure 21 is assembled by a plurality of steel structure units 211, and the construction device includes:

与待搭建的筒状异型钢结构21相匹配的支撑柱11;The support column 11 matched with the cylindrical special-shaped steel structure 21 to be built;

安装于支撑柱11底部的胎架12,该胎架12供支撑和拼装钢结构单元211;以及The tire frame 12 installed at the bottom of the support column 11, the tire frame 12 is used for supporting and assembling the steel structure unit 211; and

安装于支撑柱11顶部的起吊件13,该起吊件13包括可升降调节的吊具131,通过该吊具131与钢结构单元211固定连接并上升以带动钢结构单元211沿支撑柱11向上移动,进而于胎架12上搭建下一节钢结构单元211并与上方的钢结构单元211固定连接,从而拼合形成筒状异型钢结构21。The hoisting piece 13 is installed on the top of the support column 11 , the hoisting piece 13 includes a lifter 131 that can be lifted and lowered, and is fixedly connected to the steel structure unit 211 through the lifter 131 and rises to drive the steel structure unit 211 to move upward along the support column 11 . Then, the next section of steel structure unit 211 is built on the tire frame 12 and fixedly connected with the upper steel structure unit 211 , so as to form a cylindrical special-shaped steel structure 21 by splicing.

进一步的,该起吊件13为提升液压油缸,该提升液压油缸通过钢绞线132与吊具131连接,通过液压油缸驱动钢绞线132向上移动以带动吊具131上升。Further, the hoisting member 13 is a lifting hydraulic cylinder, which is connected to the spreader 131 through the steel strand 132 , and the hydraulic cylinder drives the steel strand 132 to move upward to drive the spreader 131 to rise.

较佳地,结合图4所示,该吊具131上设置有若干向外凸伸的支杆,通过该支杆对应与钢结构单元211连接,以保持钢绞线132竖直,即通过多个节点与钢结构单元211固定连接,使得吊具131与钢结构单元211的连接更加稳定,也能够防止起吊过程中钢构件单元211发生晃动。Preferably, as shown in FIG. 4 , the hanger 131 is provided with a plurality of struts protruding outward, and the struts are correspondingly connected to the steel structure unit 211 to keep the steel strand 132 upright, that is, through multiple struts. Each node is fixedly connected with the steel structure unit 211, so that the connection between the spreader 131 and the steel structure unit 211 is more stable, and the steel structure unit 211 can be prevented from shaking during the lifting process.

作为本实用新型的一较佳实施方式,该胎架12截面呈环状,包括套设于支撑柱11的筒体121、间隔安装于筒体121的横撑122以及支撑于横撑122与筒体121的斜撑123;As a preferred embodiment of the present invention, the cross-section of the tire frame 12 is annular, and includes a cylindrical body 121 sleeved on the support column 11 , a cross brace 122 installed on the cylindrical body 121 at intervals, and a cross brace 122 and the cylindrical body supported by the cross brace 122 . The diagonal brace 123 of the body 121;

该钢结构单元211包括若干钢条,该钢条通过点焊的方式临时固定于横撑122,进而该钢条相互焊接以形成钢结构单元211,并解除钢条与横撑122的连接。The steel structure unit 211 includes a plurality of steel bars, the steel bars are temporarily fixed to the cross brace 122 by spot welding, and then the steel bars are welded to each other to form the steel structure unit 211 , and the connection between the steel bars and the cross brace 122 is released.

具体的,该横撑122和斜撑123可拆卸地安装于筒体121。Specifically, the transverse support 122 and the diagonal support 123 are detachably installed on the cylinder body 121 .

较佳地,该横撑122和斜撑123可通过螺栓连接的方式安装于筒体121,也可采用焊接的方式安装于筒体121,采用焊接方式时,钢结构单元211安装完成后割断横撑122和斜撑123与筒体121的连接,待下一节钢结构单元211搭建前将横撑122和斜撑123焊接于筒体121。Preferably, the cross brace 122 and the diagonal brace 123 can be installed on the cylinder body 121 by bolting, or can be installed on the cylinder body 121 by welding. For the connection between the brace 122 and the diagonal brace 123 and the cylinder body 121 , the transverse brace 122 and the diagonal brace 123 are welded to the cylinder body 121 before the next section of the steel structure unit 211 is built.

进一步的,结合图3所示,该支撑柱11的顶部预埋有部分露出的固定件14,该固定件14的露出部分固定有水平梁141,该水平梁141远离固定件14的一端向支撑柱11外凸伸,该起吊件13安装于水平梁141的凸伸部分。Further, as shown in FIG. 3 , a partially exposed fixing member 14 is pre-embedded at the top of the support column 11 , and a horizontal beam 141 is fixed to the exposed portion of the fixing member 14 , and an end of the horizontal beam 141 away from the fixing member 14 supports the support The column 11 protrudes outward, and the hoisting member 13 is installed on the protruding part of the horizontal beam 141 .

进一步的,该支撑柱11位于胎架12上方的侧壁可拆卸地安装有限位杆,通过限位杆穿过被吊起的钢结构单元211,以防止被吊起的钢结构单元211坠落。Further, a limit rod is detachably installed on the side wall of the support column 11 above the tire frame 12, and the limit rod passes through the lifted steel structure unit 211 to prevent the lifted steel structure unit 211 from falling.

较佳地,该支撑柱11位于胎架12上方的侧壁预埋有部分露出的预埋件,通过限位杆焊接于预埋件的方式将限位杆安装于支撑柱11。Preferably, a partially exposed embedded part is embedded in the side wall of the support column 11 above the tire frame 12 , and the limit rod is installed on the support column 11 by welding the limit rod to the embedded part.

本实用新型的一具体实施方式如下:A specific embodiment of the present utility model is as follows:

根据待搭建的筒状异型钢结构21的尺寸浇筑混凝土以形成相匹配的支撑柱11,将胎架12安装于支撑柱11靠近地面的外侧壁上,在支撑柱11的顶部预埋固定件14并在固定件14上安装部分向外凸伸的水平梁141,在水平梁141的凸伸部分安装起吊件13;Concrete is poured according to the size of the cylindrical special-shaped steel structure 21 to be built to form the matching support column 11 , the tire frame 12 is installed on the outer side wall of the support column 11 near the ground, and the top of the support column 11 is pre-embedded with a fixing member 14 and install the horizontal beam 141 partially protruding outward on the fixing member 14, and install the hoisting member 13 on the protruding part of the horizontal beam 141;

提供钢条,将钢条与横撑122点焊连接以暂时固定钢条的位置,根据设计图纸将钢条相互焊接,从而于胎架12上形成钢结构单元211,将起吊件13的吊具131与该钢结构单元2111固定连接,进而断开横撑122与钢条的连接,并拆卸横撑122与斜撑123,利用起吊件13驱动吊具131带动该钢结构单元211沿支撑柱11向上移动设定距离;Provide steel bars, connect the steel bars to the cross braces 122 by spot welding to temporarily fix the position of the steel bars, and weld the steel bars to each other according to the design drawings, so as to form the steel structure unit 211 on the tire frame 12, and attach the hoisting tool of the hoisting member 13 to each other. 131 is fixedly connected with the steel structure unit 2111, and then the connection between the cross brace 122 and the steel bar is disconnected, and the cross brace 122 and the diagonal brace 123 are disassembled, and the hoisting member 13 is used to drive the hanger 131 to drive the steel structural unit 211 along the support column 11. Move up the set distance;

该钢结构单元211吊升到位后,将一限位杆穿过钢结构单元211并安装于支撑柱11,以防止钢结构单元211坠落,在吊升下一节钢结构单元211前,拆除限位杆,以防止限位杆阻挡钢结构单元211向上移动;After the steel structure unit 211 is lifted into place, a limit rod is passed through the steel structure unit 211 and installed on the support column 11 to prevent the steel structure unit 211 from falling. Before lifting the next steel structure unit 211, remove the limit rod position rod to prevent the limit rod from blocking the upward movement of the steel structure unit 211;

提供钢条,搭建下一节钢结构单元211,将该钢结构单元211的顶部与上一节钢结构单元211的底部固定连接,利用起吊件13驱动吊具131带动已连接的钢结构单元211一同沿支撑柱向上移动设定距离,再搭建并连接下一节钢结构单元211,最终搭建形成筒状异型钢结构21;Provide steel bars, build the next section of steel structure unit 211, connect the top of the steel structure unit 211 to the bottom of the previous section of steel structure unit 211, and use the hoisting member 13 to drive the spreader 131 to drive the connected steel structure unit 211 Together, move up a set distance along the support column, then build and connect the next steel structure unit 211, and finally build a cylindrical special-shaped steel structure 21;

拆除支撑柱11并将吊具131松开顶部的钢结构单元211,使得筒状异型钢结构21与该搭建装置脱离,搭建过程中由于钢结构单元211套设于支撑柱11,因此相邻两节钢结构单元211始终位于一直线上,能够保证施工的精度要求,另外搭建时全程于支撑柱11附近施工,占用的空间较小,且不需要大型起吊机,降低了搭建成本。Remove the support column 11 and release the hanger 131 from the steel structure unit 211 at the top, so that the cylindrical special-shaped steel structure 21 is separated from the construction device. The steel section structure unit 211 is always located in a straight line, which can ensure the accuracy of the construction. In addition, the whole process of construction is carried out near the support column 11, which takes up less space and does not require a large crane, which reduces the construction cost.

以上结合附图实施例对本实用新型进行了详细说明,本领域中普通技术人员可根据上述说明对本实用新型做出种种变化例。因而,实施例中的某些细节不应构成对本实用新型的限定,本实用新型将以所附权利要求书界定的范围作为本实用新型的保护范围。The present invention has been described in detail above with reference to the embodiments of the accompanying drawings, and those of ordinary skill in the art can make various modifications to the present invention according to the above description. Therefore, some details in the embodiments should not be construed to limit the present invention, and the present invention will take the scope defined by the appended claims as the protection scope of the present invention.

Claims (7)

1. The utility model provides a build device for tube-shape deformed steel structure, a serial communication port, tube-shape deformed steel structure is assembled by a plurality of steel structural unit and is formed, it includes to build the device:
the supporting column is matched with the cylindrical deformed steel structure to be built;
the jig frame is arranged at the bottom of the support column and used for supporting and assembling the steel structure unit; and
the lifting device comprises a lifting device capable of being adjusted in a lifting mode, the lifting device is fixedly connected with the steel structure unit and ascends to drive the steel structure unit to move upwards along the supporting column, and then the next section of steel structure unit is built on the jig frame and is fixedly connected with the steel structure unit above the steel structure unit, so that the cylindrical special-shaped steel structure is formed by splicing.
2. The building device for the cylindrical special-shaped steel structure according to claim 1, wherein the cross section of the jig frame is annular, and the jig frame comprises a cylinder body sleeved on the supporting column, cross braces arranged on the cylinder body at intervals and inclined braces supported on the cross braces and the cylinder body;
the steel structure unit includes a plurality of billet, the billet is fixed in through spot welding's mode temporarily the stull, and then the billet welds each other in order to form steel structure unit, and removes the billet with the connection of stull.
3. A building set for a cylindrical deformed steel structure according to claim 2, characterised in that the wales and the wales are detachably mounted to the drum.
4. The building device for the cylindrical profiled steel structure as claimed in claim 1, wherein a fixing part with a part exposed is embedded in the top of the supporting column, a horizontal beam is fixed on the exposed part of the fixing part, one end of the horizontal beam far away from the fixing part protrudes out of the supporting column, and the hoisting part is mounted on the protruding part of the horizontal beam.
5. The building device for the cylindrical profiled steel structure as claimed in claim 1, wherein a plurality of outwardly protruding struts are arranged on the hanger and correspondingly connected with the steel structure units through the struts.
6. The building device for the cylindrical profiled steel structure as claimed in claim 1, wherein a limiting rod is detachably mounted on the side wall of the supporting column above the jig frame, and the suspended steel structure unit is prevented from falling through the limiting rod.
7. The building device for the cylindrical special-shaped steel structure according to claim 1, wherein the lifting piece is a lifting hydraulic oil cylinder and is connected with the lifting appliance through a steel strand.
CN201921781441.4U 2019-10-23 2019-10-23 Construction device for cylindrical special-shaped steel structure Expired - Fee Related CN211173165U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921781441.4U CN211173165U (en) 2019-10-23 2019-10-23 Construction device for cylindrical special-shaped steel structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921781441.4U CN211173165U (en) 2019-10-23 2019-10-23 Construction device for cylindrical special-shaped steel structure

Publications (1)

Publication Number Publication Date
CN211173165U true CN211173165U (en) 2020-08-04

Family

ID=71808000

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921781441.4U Expired - Fee Related CN211173165U (en) 2019-10-23 2019-10-23 Construction device for cylindrical special-shaped steel structure

Country Status (1)

Country Link
CN (1) CN211173165U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110685445A (en) * 2019-10-23 2020-01-14 中国建筑第八工程局有限公司 Building device for cylindrical special-shaped steel structure and construction method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110685445A (en) * 2019-10-23 2020-01-14 中国建筑第八工程局有限公司 Building device for cylindrical special-shaped steel structure and construction method thereof

Similar Documents

Publication Publication Date Title
CN203813323U (en) Folding bracing frame for power transmission line crossing rack
CN204644884U (en) High pier over-form construction reinforced bar installs mobile stock
CN203499229U (en) Operating platform for construction of elevator shaft
CN102134833B (en) Construction method for hoisting and disassembling bailey truss
CN211173165U (en) Construction device for cylindrical special-shaped steel structure
CN210316599U (en) A curtain wall annular track for roof frame beams
CN211057778U (en) Reinforcing steel bar cage for anti-slide pile
CN107055367A (en) The central jack-up system of internally climbing tower crane
CN211173007U (en) Novel tripod of encorbelmenting
CN210483094U (en) Inverted triangle pipe truss lifting device
CN204492133U (en) A kind of easy insulated column construction tool frame
CN202689498U (en) Liftable scaffold for simple and easy building outer wall
CN202655839U (en) Movable pipe truss assembling clamping fixture
CN107720580B (en) Quick construction hoisting device and method for boiler construction water-cooled wall
CN110685445A (en) Building device for cylindrical special-shaped steel structure and construction method thereof
CN207332305U (en) Climbing frame in a kind of king-post construction
CN202969961U (en) Curtain wall plate vertical hanging tool
CN209556330U (en) Construction operation platform for elevator
CN221116795U (en) Retaining wall steel form hoisting assembly
CN204624379U (en) For promoting the balancing lift of guidepost
CN217581121U (en) Novel liftable external hanging rack
CN206129292U (en) Novel landing stage platform truck
CN207498986U (en) Pipe gallery Quick Release formwork erecting structure
CN215976843U (en) Light bridge outlet construction work platform
CN206591797U (en) A kind of scaffold for building

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200804

CF01 Termination of patent right due to non-payment of annual fee