Coupling system for coal-charging smoke treatment and coke oven flue gas purification of top-loading coke oven Download PDF

Info

Publication number
CN211035810U
CN211035810U CN201922124868.3U CN201922124868U CN211035810U CN 211035810 U CN211035810 U CN 211035810U CN 201922124868 U CN201922124868 U CN 201922124868U CN 211035810 U CN211035810 U CN 211035810U
Authority
CN
China
Prior art keywords
smoke
coke oven
coal
flue gas
charging
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201922124868.3U
Other languages
Chinese (zh)
Inventor
王满
李旭东
杨忠义
王明登
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Acre Coking and Refractory Engineering Consulting Corp MCC
Original Assignee
Acre Coking and Refractory Engineering Consulting Corp MCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Acre Coking and Refractory Engineering Consulting Corp MCC filed Critical Acre Coking and Refractory Engineering Consulting Corp MCC
Priority to CN201922124868.3U priority Critical patent/CN211035810U/en
Application granted granted Critical
Publication of CN211035810U publication Critical patent/CN211035810U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P20/00Technologies relating to chemical industry
    • Y02P20/10Process efficiency
    • Y02P20/129Energy recovery, e.g. by cogeneration, H2recovery or pressure recovery turbines

Landscapes

  • Coke Industry (AREA)

Abstract

本实用新型涉及一种顶装焦炉装煤烟尘处理与焦炉烟气净化耦合系统,包括导烟三通A、导烟三通B、烟气燃烧装置、风机、焦炉烟气脱硫脱硝装置、焦炉烟气余热回收装置;桥管上设煤气切断阀;导烟三通B与导烟三通A的连接管上设烟气切断阀;各个炭化室的导烟三通B的对应接口串联后组成炉顶装煤烟尘管道;所述炉顶装煤烟尘管道通过烟尘输送管道依次连接烟气燃烧装置、风机、焦炉烟气脱硫脱硝装置、焦炉烟气余热回收装置及烟囱。本实用新型能够有效避免顶装焦炉装煤过程中产生的烟尘导入煤气系统而出现的煤气净化系统及设备顺行不利、焦油产品质量降低等问题,促进煤调湿工艺的应用,提高焦炉烟气脱硝效率的同时降低运行能耗。

Figure 201922124868

The utility model relates to a coupling system for top-loading coke oven coal-loading smoke dust treatment and coke oven flue gas purification, including a smoke guide tee A, a smoke guide tee B, a smoke combustion device, a fan, a coke oven flue gas desulfurization and denitrification device, and a coke oven flue gas waste heat recovery device; a gas shut-off valve is arranged on the bridge pipe; a smoke guide tee B and a smoke guide tee A connecting pipe are provided with a smoke shut-off valve; the corresponding interfaces of the smoke guide tees B of each carbonization chamber are connected in series to form a furnace top coal-loading smoke dust pipeline; the furnace top coal-loading smoke dust pipeline is sequentially connected to the smoke combustion device, the fan, the coke oven flue gas desulfurization and denitrification device, the coke oven flue gas waste heat recovery device and the chimney through a smoke dust conveying pipeline. The utility model can effectively avoid the problems of the gas purification system and equipment being unfavorable in smooth operation and the reduction of tar product quality caused by the smoke generated in the process of top-loading coke oven coal-loading being introduced into the gas system, promote the application of coal humidity adjustment technology, improve the efficiency of coke oven flue gas denitrification and reduce the operating energy consumption.

Figure 201922124868

Description

顶装焦炉装煤烟尘处理与焦炉烟气净化耦合系统Coupling system of coal-loading soot treatment and coke oven flue gas purification in top-loading coke ovens

技术领域technical field

本实用新型涉及煤焦化技术领域,尤其涉及一种顶装焦炉装煤烟尘处理与焦炉烟气净化耦合系统。The utility model relates to the technical field of coal coking, in particular to a coupling system for the treatment of coal-loaded smoke and dust in a top-loading coke oven and the purification of coke oven flue gas.

背景技术Background technique

在炼焦生产中,应用最为广泛的是蓄热式焦炉,从装煤的方式上,通常可分为顶装焦炉和捣固焦炉两类。无论是顶装焦炉还是捣固焦炉,其炼焦用煤料的装入基本上都是采用热装方式,即在炭化室处于高温状态下向炭化室内装入炼焦用煤。在装煤过程中,装入炭化室的煤料与炭化室炽热内壁接触或在炭化室内高温环境下会瞬间产生大量烟气,产生的大量烟气中会携带一定量的煤料颗粒。为了防止或减少向炭化室装煤过程中产生的大量烟尘从炭化室内外逸而对周围环境造成的污染,针对装煤过程,通常采用Proven、OPR等无烟装煤工艺,或利用高压氨水喷射结合对炉顶外逸烟尘、机侧炉门外逸烟尘捕集后再通过装煤除尘系统净化的工艺。In coking production, the most widely used regenerative coke oven is usually divided into two types: top-loading coke oven and tamping coke oven. Whether it is a top-loading coke oven or a tamping coke oven, the coking coal is basically charged by hot charging, that is, when the coking chamber is at a high temperature, the coking coal is charged into the coking chamber. In the process of coal loading, the coal loaded into the carbonization chamber will contact with the hot inner wall of the carbonization chamber or a large amount of flue gas will be generated instantaneously in the high temperature environment of the carbonization chamber, and a certain amount of coal particles will be carried in the generated large amount of flue gas. In order to prevent or reduce the pollution to the surrounding environment caused by the escape of a large amount of smoke and dust from the carbonization chamber during the coal charging process, for the coal charging process, an anthracite coal charging process such as Proven and OPR is usually used, or high-pressure ammonia injection is used. Combined with the process of collecting the escaping smoke and dust from the top of the furnace and the escaping smoke and dust from the furnace door on the side of the machine, and then purifying it through the coal charging and dust removal system.

对于Proven、OPR等无烟装煤工艺,其是在炭化室顶部的装煤孔利用装煤机械进行有效密封,同时通过提高焦炉煤气集气管的吸力,在炭化室内形成微负压,将装煤时产生的大量烟尘通过与焦炉煤气集气管相连通的上升管、桥管导入集气管,从而实现无烟装煤操作。在这个过程中,虽然装煤时产生的烟气被导入煤气系统,但其携带的煤尘也被带入煤气系统,在通过桥管时,大部分煤尘被用于煤气降温的氨水洗涤下来而随着焦油氨水进入焦油中,在后续的焦油氨水分离过程中形成焦油渣,还有一部分煤尘进入到后续的初冷器及电捕焦油器中,会增加初冷器的运行阻力、降低初冷器的冷却效率,同时因煤尘进入焦油,会降低焦油的质量,生成一定量需要专门处理的焦油渣。For anthracite coal charging processes such as Proven and OPR, the coal charging hole at the top of the carbonization chamber is effectively sealed by a coal charging machine. A large amount of smoke and dust generated during coal is introduced into the gas collecting pipe through the rising pipe and bridge pipe connected with the coke oven gas gas collecting pipe, so as to realize the smokeless coal charging operation. In this process, although the flue gas generated during coal charging is introduced into the gas system, the coal dust carried by it is also brought into the gas system. When passing through the bridge pipe, most of the coal dust is washed down by ammonia water used for gas cooling. As the tar ammonia water enters the tar, tar residue is formed in the subsequent separation process of the tar ammonia water, and a part of the coal dust enters the subsequent primary cooler and electric tar catcher, which will increase the operating resistance of the primary cooler and reduce the The cooling efficiency of the primary cooler, at the same time, because the coal dust enters the tar, the quality of the tar will be reduced, and a certain amount of tar residue that needs special treatment will be generated.

对于利用高压氨水喷射结合对炉顶外逸烟尘、机侧炉门外逸烟尘捕集后再通过装煤除尘系统净化的工艺,一方面,需要在装煤时在炭化室顶部的装煤孔利用装煤机械进行有效密封,利用装煤车上设置的或机侧炉门上方设置的装煤烟尘捕集设施对外逸的装煤烟尘进行捕集,再将捕集的烟尘通过除尘管道送入装煤除尘系统中进行净化处理,为此需要建设相应的装煤除尘地面站系统或车载装煤除尘系统,运行时也需要消耗一定量的水、压缩空气、蒸汽、电能等动力介质。另一方面,在装煤炭化室对应的桥管处或邻近炭化室对应的桥管处,需要设置高压氨水喷射设施,利用高压氨水喷射形成的吸力,将装煤过程中产生的大部分烟尘通过上升管、桥管导入集气管,为此需要设置高压氨水系统,在高压氨水系统运行时消耗一定量的电能的同时,被带入煤气系统的煤尘仍然会给后续的煤气净化系统带来前述的不利影响以及降低焦油的质量等相关问题。For the process of using high-pressure ammonia injection combined with the collection of smoke and dust from the top of the furnace and the smoke and dust from the furnace door on the side of the machine, and then purifying through the coal charging and dust removal system, on the one hand, it is necessary to use the coal charging hole at the top of the carbonization chamber when coal is charged. The coal-charging machinery is effectively sealed, and the coal-charging smoke and dust collection facilities installed on the coal-charging truck or above the furnace door on the side of the machine are used to capture the escaping coal-loading smoke and dust, and then the captured smoke and dust are sent to the loading unit through the dust removal pipeline. Purification is carried out in the coal dust removal system. For this reason, it is necessary to build a corresponding coal charging dust removal ground station system or a vehicle-mounted coal charging dust removal system. A certain amount of water, compressed air, steam, electricity and other power media are also consumed during operation. On the other hand, at the bridge pipe corresponding to the coal-loading chamber or the bridge pipe adjacent to the carbonization chamber, a high-pressure ammonia water injection facility needs to be set up to use the suction formed by the high-pressure ammonia water injection to pass most of the smoke and dust generated during the coal charging process through the The riser pipe and bridge pipe are introduced into the gas collecting pipe. For this purpose, a high-pressure ammonia water system needs to be set up. While the high-pressure ammonia water system consumes a certain amount of electric energy during operation, the coal dust brought into the gas system will still bring the aforementioned effects to the subsequent gas purification system. adverse effects and related problems such as reducing the quality of tar.

随着焦化行业的发展以及对节能降耗的愈加重视,对入炉煤在装入炭化室之前通过干燥预热等手段降低入炉煤水分的煤调湿技术受到了业内的关注,人们试图通过煤调湿技术降低炼焦能耗,但在实施该项技术的实践中,不可避免地遇到了因煤料水分变少而导致装煤过程中被导入煤气系统的煤尘大量增加的问题,煤尘的大量增加给后续的煤气净化系统的顺行和焦油质量均带来了严重影响,往往因此而使众多企业对煤调湿技术的使用望而却步,使煤调湿技术的推广遭遇较大阻力。With the development of the coking industry and the increasing emphasis on energy saving and consumption reduction, the coal humidity control technology that reduces the moisture content of the coal entering the furnace by drying and preheating before being loaded into the coking chamber has attracted the attention of the industry. The coal humidity control technology reduces the energy consumption of coking, but in the practice of implementing this technology, it is inevitable to encounter the problem of a large increase in the coal dust introduced into the gas system during the coal charging process due to the reduction of coal moisture. The large increase of coal has a serious impact on the follow-up gas purification system and the quality of tar. Therefore, many enterprises are often discouraged from using coal humidity control technology, and the promotion of coal humidity control technology encounters great resistance.

从整个炼焦过程看,若对装煤时产生的烟气全部回收,可以回收约2~4%的煤气。现有的装煤烟尘治理工艺,虽然将装煤时产生的部分或全部烟气导入了煤气系统,实现了煤气资源的有效回收,但也带来了上述问题,而且此时烟气温度较低,烟气中水分含量较高,有效的煤气成分不高,同时由于烟气导入系统产生的吸力,会增加烟气中氧气的含量,对后续的煤气净化系统的安全运行也具有一定的威胁。From the perspective of the entire coking process, if all the flue gas generated during coal charging is recovered, about 2 to 4% of the gas can be recovered. The existing coal charging smoke and dust treatment process, although part or all of the flue gas generated during coal charging is introduced into the gas system to achieve effective recovery of gas resources, but it also brings the above problems, and the temperature of the flue gas is relatively low at this time. , the moisture content in the flue gas is high, and the effective gas composition is not high. At the same time, due to the suction generated by the flue gas introduction system, the oxygen content in the flue gas will be increased, which also poses a certain threat to the safe operation of the subsequent gas purification system.

对于焦炉烟气的净化,通常由于焦炉烟气温度偏低,在进行焦炉烟气脱硝时,往往需要采用价格昂贵且脱硝效率偏低的催化剂,在需要达到超低排放指标时,经常需要通过将加热炉燃烧燃气产生高温废气掺混到焦炉烟气中以提高焦炉烟气温度的方式,使其满足使用脱硝效率较高、价格偏低的催化剂的需要,明显增加了建设投资和长期的运行能耗。For the purification of coke oven flue gas, usually due to the low temperature of coke oven flue gas, it is often necessary to use expensive catalysts with low denitration efficiency when denitrifying coke oven flue gas. It is necessary to increase the temperature of the coke oven flue gas by mixing the high-temperature waste gas generated by the combustion of the heating furnace gas into the coke oven flue gas, so as to meet the needs of using catalysts with high denitration efficiency and low price, which significantly increases the construction investment. and long-term operating energy consumption.

综上所述,为了有效避免装煤过程中由装煤烟尘治理引起的上述问题同时解决焦炉烟气温度偏低问题,提高煤气净化系统的顺行性和焦油质量,促进煤调湿等节能技术的推广实施,提高焦炉烟气净化效率,有必要针对装煤过程产生的烟尘采用新的技术路线和技术手段,开发一种新的装煤烟尘处理工艺。To sum up, in order to effectively avoid the above-mentioned problems caused by the control of coal charging smoke and dust during the coal charging process, and at the same time solve the problem of low coke oven flue gas temperature, improve the gas purification system's antegrade performance and tar quality, and promote coal humidity control and other energy saving. In order to promote the implementation of technology and improve the purification efficiency of coke oven flue gas, it is necessary to adopt a new technical route and technical means for the soot generated in the coal charging process, and develop a new coal charging soot treatment process.

发明内容SUMMARY OF THE INVENTION

本实用新型提供了一种顶装焦炉装煤烟尘处理与焦炉烟气净化耦合系统,能够有效避免顶装焦炉装煤过程中产生的烟尘导入煤气系统而出现的煤气净化系统及设备顺行不利、焦油产品质量降低等问题,促进煤调湿工艺的应用,提高焦炉烟气脱硝效率的同时降低运行能耗。The utility model provides a coupling system for the treatment of coal-loading smoke and dust in a top-loading coke oven and coke oven flue gas purification, which can effectively avoid the gas purification system and equipment that occur when the smoke and dust generated during the coal-charging process of the top-loading coke oven are introduced into the gas system. In order to improve the denitrification efficiency of coke oven flue gas and reduce the energy consumption of operation, it will promote the application of coal humidity control technology.

为了达到上述目的,本实用新型采用以下技术方案实现:In order to achieve the above object, the utility model adopts the following technical solutions to realize:

顶装焦炉装煤烟尘处理与焦炉烟气净化耦合系统,包括导烟三通A、导烟三通B、烟气燃烧装置、风机、焦炉烟气脱硫脱硝装置、焦炉烟气余热回收装置;顶装焦炉的炭化室顶部设上升管,上升管的中部通过桥管连接集气管,桥管上设煤气切断阀;所述上升管的顶部设导烟三通A,导烟三通A的接口一、接口二相对设置,且两者的中心连线与上升管的轴线同轴,接口一与上升管的顶部开口相连,接口二设水封阀;所述导烟三通B的接口一与导烟三通A的接口三通过连接管道一相连,连接管道一上设烟气切断阀;所述导烟三通B的接口二、接口三分别通过连接管道二与对应侧相邻炭化室导烟三通B的对应接口相连,各个炭化室的导烟三通B的对应接口串联后组成炉顶装煤烟尘管道;所述炉顶装煤烟尘管道通过烟尘输送管道依次连接烟气燃烧装置、风机、焦炉烟气脱硫脱硝装置、焦炉烟气余热回收装置及烟囱。Top-loading coke oven coal-loading soot treatment and coke oven flue gas purification coupling system, including flue gas tee A, flue gas tee B, flue gas combustion device, fan, coke oven flue gas desulfurization and denitrification device, coke oven flue gas waste heat Recovery device; the top of the carbonization chamber of the top-loading coke oven is provided with a rising pipe, the middle of the rising pipe is connected to the gas collecting pipe through a bridge pipe, and a gas cut-off valve is arranged on the bridge pipe; The first interface and the second interface through A are arranged opposite to each other, and the center connecting line of the two is coaxial with the axis of the rising pipe, the first interface is connected with the top opening of the rising pipe, and the second interface is provided with a water sealing valve; The first interface of the smoke guide tee is connected with the interface three of the smoke guide tee A through the connecting pipe one, and a flue gas cut-off valve is arranged on the connecting pipe one; The corresponding interfaces of the smoke guide tee B adjacent to the carbonization chamber are connected, and the corresponding interfaces of the smoke guide tee B of each carbonization chamber are connected in series to form a coal-loading soot pipe on the furnace top; Gas combustion device, fan, coke oven flue gas desulfurization and denitrification device, coke oven flue gas waste heat recovery device and chimney.

所述烟气燃烧装置为体积不小于3m3的烟气燃烧室,烟气燃烧室的侧壁上设有点火装置和助燃气体引入口。The flue gas combustion device is a flue gas combustion chamber with a volume of not less than 3 m 3 , and an ignition device and a combustion-supporting gas introduction port are arranged on the side wall of the flue gas combustion chamber.

所述焦炉烟气脱硫脱硝装置的烟气入口通过焦炉烟气管道连接顶装焦炉的总烟道,靠近焦炉烟气脱硫脱硝装置的焦炉烟气管道上设燃烧烟气入口,风机的入口与烟气燃烧装置的高温烟气出口相连,风机的出口与燃烧烟气入口相连。The flue gas inlet of the coke oven flue gas desulfurization and denitrification device is connected to the general flue of the top-loading coke oven through the coke oven flue gas pipeline, and the combustion flue gas inlet is set on the coke oven flue gas pipeline close to the coke oven flue gas desulfurization and denitrification device. The inlet of the fan is connected with the high-temperature flue gas outlet of the flue gas combustion device, and the outlet of the fan is connected with the combustion flue gas inlet.

沿烟气流动方向,所述炉顶装煤烟尘管道的起始端与集气管通过连通管相连,连通管上设平衡阀。Along the flue gas flow direction, the initial end of the coal-loading soot pipe on the top of the furnace is connected with the gas collecting pipe through a communication pipe, and a balance valve is arranged on the communication pipe.

还包括设置在炉顶装煤车上的炉顶装煤密封装置,如图3、图4所示,所述炉顶装煤密封装置为套筒式炉顶装煤密封装置,由自内向外依次设置的内套筒、滑动套筒、密封连接套筒及外套筒组成,所述内套筒为下煤通道,其顶部与装煤车的煤斗出料口相连;滑动套筒能够沿内套筒竖直滑动;密封连接套筒通过外套筒与煤斗相连接,密封连接套筒的底端设球面结构与装煤孔座配合实现对装煤孔的密封;外套筒上设有可伸缩柔性连接结构。It also includes a furnace top coal charging sealing device arranged on the furnace top coal charging vehicle, as shown in Figure 3 and Figure 4, the furnace top coal charging sealing device is a sleeve type furnace top coal charging sealing device, from the inside to the outside. The inner sleeve, the sliding sleeve, the sealing connection sleeve and the outer sleeve are arranged in sequence, the inner sleeve is a coal lowering channel, and the top of the inner sleeve is connected with the coal hopper discharge port of the coal charging truck; The inner sleeve slides vertically; the sealing connection sleeve is connected with the coal hopper through the outer sleeve, and the bottom end of the sealing connection sleeve is provided with a spherical structure to cooperate with the coal charging hole seat to seal the coal charging hole; There is a retractable flexible connection structure.

与现有技术相比,本实用新型的有益效果是:Compared with the prior art, the beneficial effects of the present utility model are:

1)提高煤气净化系统的顺行能力,提升煤气和焦油品质;1) Improve the antegrade ability of the gas purification system and improve the quality of gas and tar;

通过将焦炉装煤时产生的带有大量煤尘的烟气单独收集处理,避免了携带大量煤尘的烟气进入煤气净化系统,消除了因烟气中携带煤尘造成煤气初冷装置阻力增加、冷却能力降低因素,提高煤气净化系统的顺行能力,同时提高了煤气的品质和收集到的焦油的质量,减少了焦油渣的产生。By collecting and processing the flue gas with a large amount of coal dust generated when the coke oven is charged with coal, the flue gas carrying a large amount of coal dust is prevented from entering the gas purification system, and the resistance of the gas primary cooling device caused by the coal dust in the flue gas is eliminated. Increase the cooling capacity and reduce the factors, improve the forward capacity of the gas purification system, improve the quality of the gas and the quality of the collected tar, and reduce the production of tar residue.

2)降低装煤烟尘治理投资和运行费用;2) Reduce the investment and operation cost of coal-loading soot control;

通过将焦炉装煤时产生的带有大量煤尘的烟气单独收集处理,省却了高压氨水、Proven、OPR等无烟装煤系统,同时也无需建设现有技术中的装煤除尘系统,可显著降低项目建设的投资和系统长期运行的能耗。By separately collecting and processing the flue gas with a large amount of coal dust generated when the coke oven is charged with coal, the high-pressure ammonia, Proven, OPR and other anthracite coal charging systems are omitted, and the coal charging and dust removal system in the prior art is also not required to be constructed. It can significantly reduce the investment of project construction and the energy consumption of long-term operation of the system.

3)充分利用煤气资源,提高焦炉烟气净化效率,降低焦炉烟气净化运行成本;3) Make full use of gas resources, improve the efficiency of coke oven flue gas purification, and reduce the operating cost of coke oven flue gas purification;

通过将焦炉装煤时产生的带有大量煤尘的烟气单独收集并燃烧后掺入焦炉烟气中,一方面提高了焦炉烟气的温度,可提高焦炉烟气净化效率,降低焦炉烟气净化运行成本,另一方面利用焦炉烟气余热回收装置对净化处理后的焦炉烟气的余热进行回收,不但实现了低品质煤气资源的有效利用,降低了高品质焦炉煤气的消耗,还能够有效回收余热余能。The flue gas with a large amount of coal dust generated when the coke oven is charged with coal is separately collected and mixed into the coke oven flue gas after being burned. Reduce the operating cost of coke oven flue gas purification. On the other hand, the coke oven flue gas waste heat recovery device is used to recover the waste heat of the purified coke oven flue gas, which not only realizes the effective use of low-quality gas resources, but also reduces the high-quality coke oven gas resources. It can also effectively recover waste heat and waste energy.

4)提高煤气净化系统运行的安全性;4) Improve the safety of gas purification system operation;

相对于现有技术中利用高压氨水喷射产生的吸力或提高煤气集气管中的吸力将装煤时产生的烟气导入煤气净化系统的工艺,本实用新型利用风机将焦炉装煤时产生的带有大量煤尘的烟气单独收集处理,不必考虑因烟气收集系统吸力过大而引起进入煤气净化系统中的氧气含量超标给煤气净化系统的安全带来严重威胁的问题,在保证装煤过程对产生的烟尘进行有效捕集的同时,提高了煤气净化系统运行的安全性。Compared with the prior art process of introducing the flue gas generated during coal charging into the gas purification system by utilizing the suction generated by high-pressure ammonia water injection or increasing the suction in the gas collecting pipe, the utility model utilizes the fan to charge the coke oven with the gas generated during coal charging. The flue gas with a large amount of coal dust is collected and processed separately, and it is not necessary to consider the problem that the oxygen content entering the gas purification system exceeds the standard due to the excessive suction of the flue gas collection system, which poses a serious threat to the safety of the gas purification system. While effectively capturing the generated smoke and dust, the operation safety of the gas purification system is improved.

5)有利于煤调湿工艺的应用与推广;5) It is beneficial to the application and promotion of coal humidity control technology;

通过将焦炉装煤时产生的带有大量煤尘的烟气单独收集,消除了因实施煤调湿技术而在装煤时产生烟尘中煤尘大量增加对煤气净化系统的影响,解除了煤调湿技术实施时产生的“副作用”对煤调湿工艺应用的束缚,将有利于煤调湿工艺的应用与推广。By collecting the flue gas with a large amount of coal dust generated when the coke oven is charged with coal separately, the influence of a large increase in the coal dust in the flue gas generated when the coal is charged due to the implementation of the coal humidity control technology on the gas purification system is eliminated. The "side effects" produced by the implementation of the humidity control technology restrict the application of the coal humidity control process, which will be beneficial to the application and promotion of the coal humidity control process.

附图说明Description of drawings

图1是本实用新型所述顶装焦炉装煤烟尘处理与焦炉烟气净化耦合系统的结构示意图。FIG. 1 is a schematic structural diagram of the coupling system of the top-loading coke oven charging soot treatment and coke oven flue gas purification according to the present invention.

图2是本实用新型所述上升管与集气管、炉顶装煤导烟管道连接关系示意图。Figure 2 is a schematic diagram of the connection relationship between the riser pipe and the gas collecting pipe and the furnace top coal-loading smoke guide pipe according to the present invention.

图3是本实用新型所述炉顶装煤密封装置工作状态示意图一(装煤前)。Fig. 3 is a schematic diagram 1 (before coal charging) of the working state of the furnace top coal charging sealing device according to the present invention.

图4是本实用新型所述炉顶装煤密封装置工作状态示意图二(装煤中)。Fig. 4 is the schematic diagram 2 of the working state of the furnace top coal charging sealing device according to the present utility model (in the process of charging coal).

图中:1.顶装焦炉 2.炉顶装煤密封装置 21.煤斗 22.内套筒 23.滑动套筒 24.密封连接套筒 25.外套筒 26.可伸缩柔性连接结构 27.球面结构 3.上升管 4.煤气切断阀 5.导烟三通A 6.烟气切断阀 7.导烟三通B 8.烟气燃烧装置 9.风机 10.焦炉烟气脱硫脱硝装置 11.焦炉烟气余热回收装置 12.平衡阀 13.烟尘输送管道 14.烟囱 15.集气管16.水封阀 17.入炉煤 18.装煤孔In the figure: 1. Top-loading coke oven 2. Coal-loading sealing device on the top of the furnace 21. Coal hopper 22. Inner sleeve 23. Sliding sleeve 24. Sealing connection sleeve 25. Outer sleeve 26. Retractable flexible connection structure 27 .Spherical structure 3. Rising pipe 4. Gas cut-off valve 5. Flue gas guide tee A 6. Flue gas cut-off valve 7. Smoke guide tee B 8. Flue gas combustion device 9. Fan 10. Coke oven flue gas desulfurization and denitrification device 11. Coke oven flue gas waste heat recovery device 12. Balance valve 13. Soot conveying pipeline 14. Chimney 15. Gas collecting pipe 16. Water sealing valve 17. Coal into the furnace 18. Coal loading hole

具体实施方式Detailed ways

下面结合附图对本实用新型的具体实施方式作进一步说明:The specific embodiments of the present utility model will be further described below in conjunction with the accompanying drawings:

如图1、图2所示,本实用新型所述顶装焦炉装煤烟尘处理与焦炉烟气净化耦合系统,包括导烟三通A 5、导烟三通B 7、烟气燃烧装置8、风机9、焦炉烟气脱硫脱硝装置10、焦炉烟气余热回收装置11;顶装焦炉1的炭化室顶部设上升管3,上升管3的中部通过桥管连接集气管15,桥管上设煤气切断阀4;所述上升管3的顶部设导烟三通A 5,导烟三通A 5的接口一、接口二相对设置,且两者的中心连线与上升管3的轴线同轴,接口一与上升管3的顶部开口相连,接口二设水封阀16;所述导烟三通B 7的接口一与导烟三通A5的接口三通过连接管道一相连,连接管道一上设烟气切断阀6;所述导烟三通B 7的接口二、接口三分别通过连接管道二与对应侧相邻炭化室导烟三通B 7的对应接口相连,各个炭化室的导烟三通B 7的对应接口串联后组成炉顶装煤烟尘管道;所述炉顶装煤烟尘管道通过烟尘输送管道13依次连接烟气燃烧装置8、风机9、焦炉烟气脱硫脱硝装置10、焦炉烟气余热回收装置11及烟囱14。As shown in Figures 1 and 2, the top-loading coke oven coal-loading soot treatment and coke oven flue gas purification coupling system of the present invention includes a smoke-conducting tee A5, a smoke-conducting tee B7, and a flue gas combustion device. 8. Fan 9, coke oven flue gas desulfurization and denitrification device 10, coke oven flue gas waste heat recovery device 11; the top of the carbonization chamber of the top-mounted coke oven 1 is provided with a rising pipe 3, and the middle of the rising pipe 3 is connected to the gas collecting pipe 15 through a bridge pipe, A gas cut-off valve 4 is arranged on the bridge pipe; a smoke guide tee A5 is arranged on the top of the riser pipe 3, and the first and second interfaces of the smoke guide tee A5 are arranged oppositely, and the central connection line of the two is connected to the riser pipe 3 The axis of the pipe is coaxial, the first interface is connected with the top opening of the rising pipe 3, and the second interface is provided with a water seal valve 16; A flue gas cut-off valve 6 is set on the first connecting pipe; the second and third interfaces of the smoke guiding tee B7 are respectively connected with the corresponding interfaces of the smoke guiding tee B7 of the adjacent carbonization chamber on the corresponding side through the connecting pipe two, and each carbonization The corresponding interfaces of the smoke-conducting tee B7 of the chamber are connected in series to form a furnace top-loading coal-loaded soot pipeline; the furnace-top coal-loaded soot pipeline is sequentially connected to the flue gas combustion device 8, the fan 9, and the coke oven flue gas desulfurization through the soot conveying pipeline 13. The denitration device 10 , the coke oven flue gas waste heat recovery device 11 and the chimney 14 .

煤气切断阀4可以采用现有技术中的水封阀,也可以是能够通过开启和关闭实现上升管3与集气管15之间煤气通道的导通和切断功能的任何形式的装置。水封阀16采用现有常规使用的上升管水封阀。The gas shut-off valve 4 can be a water-sealing valve in the prior art, or can be any form of device capable of conducting and shutting off the gas passage between the riser 3 and the gas collecting pipe 15 by opening and closing. The water seal valve 16 adopts the conventionally used riser water seal valve.

所述连接管道一、烟尘输送管道13均倾斜设置,能够避免装煤烟尘中的煤尘在烟尘通道内沉积而使烟尘通道堵塞。The first connecting pipe and the soot conveying pipe 13 are all inclined, which can prevent the coal dust in the soot from loading coal from depositing in the soot passage and block the soot passage.

所述烟气燃烧装置8为体积不小于3m3的烟气燃烧室,烟气燃烧室的侧壁上设有点火装置和助燃气体引入口。装煤烟尘在风机9的作用下进入烟气燃烧装置8的烟气燃烧室内,通过点火装置将装煤烟尘与引入的助燃气体混合物点燃,装煤烟尘中的煤气成分和煤尘燃烧时产生大量高温废气,煤尘燃烧剩余的灰尘在烟气燃烧室内沉降到底部,高温废气通过烟尘输送管道13与来自焦炉加热系统燃烧产生的焦炉烟气汇合。The flue gas combustion device 8 is a flue gas combustion chamber with a volume of not less than 3 m 3 , and an ignition device and a combustion-supporting gas inlet are provided on the side wall of the flue gas combustion chamber. The coal-loading soot enters the flue gas combustion chamber of the flue gas combustion device 8 under the action of the fan 9, and the mixture of the coal-loading soot and the introduced combustion-supporting gas is ignited by the ignition device. The high-temperature waste gas and the dust remaining from the combustion of coal dust settle to the bottom in the flue gas combustion chamber, and the high-temperature waste gas is combined with the coke oven flue gas produced by the combustion of the coke oven heating system through the flue dust conveying pipeline 13 .

所述焦炉烟气脱硫脱硝装置10的烟气入口通过焦炉烟气管道连接顶装焦炉1的总烟道,靠近焦炉烟气脱硫脱硝装置10的焦炉烟气管道上设燃烧烟气入口,风机9的入口与烟气燃烧装置8的高温烟气出口相连,风机9的出口与燃烧烟气入口相连。The flue gas inlet of the coke oven flue gas desulfurization and denitrification device 10 is connected to the general flue of the top-loading coke oven 1 through the coke oven flue gas pipeline, and combustion smoke is installed on the coke oven flue gas pipeline close to the coke oven flue gas desulfurization and denitrification device 10. The gas inlet, the inlet of the fan 9 is connected with the high temperature flue gas outlet of the flue gas combustion device 8, and the outlet of the fan 9 is connected with the combustion flue gas inlet.

沿烟气流动方向,所述炉顶装煤烟尘管道的起始端与集气管15通过连通管相连,连通管上设平衡阀12。通过设置平衡阀12,消除运行时风机9可能出现的喘振问题,保障风机9安全稳定的运行。Along the flow direction of the flue gas, the initial end of the coal-loading soot pipe on the top of the furnace is connected with the gas collecting pipe 15 through a communication pipe, and a balance valve 12 is arranged on the communication pipe. By setting the balance valve 12, the possible surge problem of the fan 9 during operation is eliminated, and the safe and stable operation of the fan 9 is guaranteed.

本实用新型所述顶装焦炉装煤烟尘处理与焦炉烟气净化耦合系统,还包括设置在炉顶装煤车上的炉顶装煤密封装置2,所述炉顶装煤密封装置2为套筒式炉顶装煤密封装置,由自内向外依次设置的内套筒22、滑动套筒23、密封连接套筒24及外套筒25组成,所述内套筒22为下煤通道,其顶部与装煤车的煤斗21出料口相连;滑动套筒23能够沿内套筒22竖直滑动;密封连接套筒24通过外套筒25与煤斗21相连接,密封连接套筒24的底端设球面结构27与装煤孔座配合实现对装煤孔18的密封;外套筒25上设有可伸缩柔性连接结构26。The top-loading coke oven coal-loading soot treatment and coke oven flue gas purification coupling system of the utility model further comprises a furnace-top coal-loading sealing device 2 arranged on the furnace-top coal-charging vehicle. The furnace-top coal-loading sealing device 2 It is a sleeve type furnace top coal charging sealing device, which consists of an inner sleeve 22, a sliding sleeve 23, a sealing connection sleeve 24 and an outer sleeve 25 which are sequentially arranged from the inside to the outside. The inner sleeve 22 is the lower coal passage. , the top of which is connected with the discharge port of the coal hopper 21 of the coal charging truck; the sliding sleeve 23 can slide vertically along the inner sleeve 22; the sealing connection sleeve 24 is connected with the coal hopper 21 through the outer sleeve 25, and the sealing connection sleeve The bottom end of the barrel 24 is provided with a spherical surface structure 27 to cooperate with the coal charging hole seat to seal the coal charging hole 18 ; the outer sleeve 25 is provided with a retractable flexible connection structure 26 .

在装煤时,炭化室内产生的烟尘在密封连接套筒24底端与装煤孔座之间的球面密封及风机9造成的负压作用下无法从装煤孔18外逸,从而实现装煤过程的无烟装煤。与现有炉顶装煤密封装置不同的是,本实用新型采用密封连接套筒24与装煤孔座球面配合密封的形式,在防止装煤烟尘外逸的同时,可有效避免对装煤烟尘捕集过程中环境空气的吸入,提高装煤烟尘捕集和处理系统的安全性。During coal charging, the soot generated in the carbonization chamber cannot escape from the coal charging hole 18 under the action of the spherical seal between the bottom end of the sealing connection sleeve 24 and the coal charging hole seat and the negative pressure caused by the fan 9, thereby realizing coal charging Process of anthracite charging. Different from the existing furnace top coal charging sealing device, the utility model adopts the form of the sealing connecting sleeve 24 and the spherical surface of the coal charging hole seat to cooperate and seal, which can effectively prevent the coal charging smoke and dust from escaping. The inhalation of ambient air during the capture process improves the safety of the coal-loading soot capture and treatment system.

所述外套筒25上还可以设置烟尘导出口,将滑动套筒23与密封连接套筒24之间的环形通道作为导烟通道,通过烟尘导出口与装煤车上的烟尘收集管道相连,烟尘收集管道另外连接烟气燃烧装置8。The outer sleeve 25 can also be provided with a fume and dust lead-out port, and the annular channel between the sliding sleeve 23 and the sealed connection sleeve 24 is used as a fume guide channel, and is connected to the fume and dust collection pipe on the coal charging truck through the fume and dust lead-out port, The smoke and dust collection duct is additionally connected to the flue gas combustion device 8 .

本实用新型所述顶装焦炉装煤烟尘处理与焦炉烟气净化耦合系统的工艺过程如下:The technical process of the top-loading coke oven loading coal soot treatment and coke oven flue gas purification coupling system of the utility model is as follows:

1)向炭化室内装煤操作开始前,通过关闭桥管上的煤气切断阀4将对应炭化室的上升管3与集气管15隔断,同时关闭水封阀16,使上升管3与大气隔绝,避免装煤时产生的装煤烟尘误入煤气净化系统;1) Before starting the coal charging operation into the carbonization chamber, the riser pipe 3 corresponding to the carbonization chamber is cut off from the gas collecting pipe 15 by closing the gas shut-off valve 4 on the bridge pipe, and the water seal valve 16 is closed at the same time to isolate the riser pipe 3 from the atmosphere, To avoid the coal loading smoke and dust generated during coal loading from entering the gas purification system by mistake;

2)炉顶装煤车移动到待装煤炭化室的上方,打开该炭化室对应的装煤孔盖后,将滑动套筒23、密封连接套筒24降下,通过密封连接套筒24底端的球面结构27与装煤孔座组成的球面密封结构对装煤孔18进行密封;保障装煤时炭化室内产生的装煤烟尘通过装煤孔18逸散到顶装焦炉1周围而造成环境污染;2) The top coal charging truck is moved to the top of the coalification chamber to be loaded. After opening the corresponding coal charging hole cover of the carbonization chamber, the sliding sleeve 23 and the sealing connection sleeve 24 are lowered, and the sliding sleeve 23 and the sealing connection sleeve 24 are lowered. The spherical sealing structure composed of the spherical surface structure 27 and the coal charging hole seat seals the coal charging hole 18; it ensures that the coal charging soot generated in the carbonization chamber during coal charging escapes to the surroundings of the top charging coke oven 1 through the coal charging hole 18 and causes environmental pollution;

3)开启待装煤炭化室对应的的烟气切断阀6,使其上升管3与炉顶装煤烟尘管道连通;此时在风机9的作用下,在炭化室内形成一定的负压,有利于装煤时产生的装煤烟尘被有效捕集;3) Open the flue gas cut-off valve 6 corresponding to the coalification chamber to be installed, so that the rising pipe 3 is connected with the coal smoke and dust pipeline on the top of the furnace; at this time, under the action of the fan 9, a certain negative pressure is formed in the carbonization chamber, and there are It is conducive to the effective capture of the coal loading smoke and dust generated during coal loading;

4)装煤时产生的大量烟尘在风机9的作用下依次通过上升管3、导烟三通A 5、烟气切断阀6、导烟三通B 7、炉顶装煤烟尘管道进入烟气燃烧装置8,在烟气燃烧装置8内,烟气中的煤尘和可燃成分与引入的助燃气体发生燃烧反应,生成的高温烟气在风机9的作用下进入焦炉烟气脱硫脱硝装置10上游的焦炉烟气管道内与焦炉烟气混合,使焦炉烟气温度提升并随之进入焦炉烟气脱硫脱硝装置10进行脱硫脱硝处理,经过净化后的烟气进入焦炉烟气余热回收装置11回收余热,然后通过烟囱14排放;4) Under the action of the fan 9, a large amount of smoke and dust generated during coal charging enters the flue gas through the riser pipe 3, the smoke guide tee A 5, the flue gas cut-off valve 6, the smoke guide tee B 7, and the coal-loading smoke and dust pipe on the top of the furnace. Combustion device 8, in the flue gas combustion device 8, the coal dust and combustible components in the flue gas undergo a combustion reaction with the introduced combustion-supporting gas, and the generated high-temperature flue gas enters the coke oven flue gas desulfurization and denitration device 10 under the action of the fan 9 The upstream coke oven flue gas pipeline is mixed with coke oven flue gas to raise the temperature of coke oven flue gas and then enter the coke oven flue gas desulfurization and denitrification device 10 for desulfurization and denitrification treatment, and the purified flue gas enters the coke oven flue gas The waste heat recovery device 11 recovers the waste heat, and then discharges it through the chimney 14;

由于混合后的焦炉烟气温度有一定的提升,有利于采用催化效率更高、运行更稳定可靠的脱硝催化剂,在提高脱硝效果的同时降低脱硝系统的运行费用。经过净化后的焦炉烟气进入焦炉烟气余热回收装置11回收余热;Since the temperature of the mixed coke oven flue gas has a certain increase, it is beneficial to use a denitration catalyst with higher catalytic efficiency and more stable and reliable operation, which can improve the denitration effect and reduce the operating cost of the denitration system. The purified coke oven flue gas enters the coke oven flue gas waste heat recovery device 11 to recover waste heat;

5)装煤结束后,滑动套筒23及密封连接套筒24升起,炉顶装煤车驶离,对应的装煤孔18通过装煤孔盖密封;此时,打开对应的煤气切断阀4,将上升管3与集气管15重新连通;关闭之前打开的烟气切断阀6,使上升管3与炉顶装煤烟尘管道之间的通道隔断。此时炭化室内煤料在无氧环境下进入干馏过程,在煤料稳定的状态下,干馏产生的煤气仅携带极少的粉尘,因此在非装煤期间导入煤气净化系统的煤气对后续的净化处理设施由粉尘带来的不利影响基本消除,焦油的质量也必将得到大幅提升。5) After the coal charging is completed, the sliding sleeve 23 and the sealing connection sleeve 24 are lifted, the furnace top coal charging truck is driven away, and the corresponding coal charging hole 18 is sealed through the coal charging hole cover; at this time, the corresponding gas shut-off valve is opened 4. Reconnect the rising pipe 3 with the gas collecting pipe 15; close the previously opened flue gas shut-off valve 6 to cut off the passage between the rising pipe 3 and the furnace top coal-loading soot pipe. At this time, the coal material in the carbonization chamber enters the dry distillation process in an oxygen-free environment. When the coal material is stable, the gas produced by dry distillation carries only a small amount of dust. Therefore, the gas introduced into the gas purification system during the non-coal charging period will be used for subsequent purification. The adverse effects of dust in treatment facilities will be basically eliminated, and the quality of tar will also be greatly improved.

采用具有烟尘收集管道的炉顶装煤密封装置2时,装煤过程中,装煤孔18处的一部分烟尘由滑动套筒23与密封连接套筒24之间的导烟通道导出,经烟尘收集管道送入烟气燃烧装置8内进行净化处理。When the furnace top coal charging sealing device 2 with the soot collecting pipe is used, during the coal charging process, a part of the soot at the coal charging hole 18 is led out from the flue guide channel between the sliding sleeve 23 and the sealing connection sleeve 24, and is collected by the soot. The pipeline is sent into the flue gas combustion device 8 for purification treatment.

以上所述,仅为本实用新型较佳的具体实施方式,但本实用新型的保护范围并不局限于此,任何熟悉本技术领域的技术人员在本实用新型揭露的技术范围内,根据本实用新型的技术方案及其实用新型构思加以等同替换或改变,都应涵盖在本实用新型的保护范围之内。The above description is only a preferred embodiment of the present invention, but the protection scope of the present invention is not limited to this. Equivalent replacement or modification of the new technical solution and its utility model concept shall be included within the protection scope of the present utility model.

Claims (5)

1. The coupling system for coal-charging smoke dust treatment and coke oven flue gas purification of the top-loading coke oven is characterized by comprising a smoke guide tee joint A, a smoke guide tee joint B, a flue gas combustion device, a fan, a coke oven flue gas desulfurization and denitrification device and a coke oven flue gas waste heat recovery device; the top of a carbonization chamber of the top-mounted coke oven is provided with an ascending pipe, the middle part of the ascending pipe is connected with a gas collecting pipe through a bridge pipe, and the bridge pipe is provided with a gas cut-off valve; the top of the ascending pipe is provided with a smoke guide tee joint A, a first connector and a second connector of the smoke guide tee joint A are oppositely arranged, the central connecting line of the smoke guide tee joint A and the first connector is coaxial with the axis of the ascending pipe, the first connector is connected with the top opening of the ascending pipe, and the second connector is provided with a water seal valve; the first connector of the smoke guide tee joint B is connected with the third connector of the smoke guide tee joint A through a first connecting pipeline, and a smoke stop valve is arranged on the first connecting pipeline; the second and third interfaces of the smoke guide tee joint B are respectively connected with the corresponding interfaces of the smoke guide tee joint B of the adjacent carbonization chambers on the corresponding side through the second connecting pipeline, and the corresponding interfaces of the smoke guide tee joints B of the carbonization chambers are connected in series to form a coal charging smoke dust pipeline on the top of the furnace; the furnace top coal charging smoke pipeline is sequentially connected with a smoke combustion device, a fan, a coke oven smoke desulfurization and denitrification device, a coke oven smoke waste heat recovery device and a chimney through a smoke conveying pipeline.
2. The top loaded coke oven coaling smoke treatment and coke oven flue gas purification coupled system of claim 1, wherein the flue gas combustion device is not less than 3m in volume3The side wall of the flue gas combustion chamber is provided with an ignition device and a combustion-supporting gas inlet.
3. The top-loading coke oven coaling smoke dust treatment and coke oven smoke purification coupling system of claim 1, wherein the smoke inlet of the coke oven smoke desulfurization and denitrification device is connected with the main flue of the top-loading coke oven through a coke oven smoke pipeline, the coke oven smoke pipeline close to the coke oven smoke desulfurization and denitrification device is provided with a combustion smoke inlet, the inlet of the fan is connected with the high-temperature smoke outlet of the smoke combustion device, and the outlet of the fan is connected with the combustion smoke inlet.
4. The coupling system for treating coal-charging flue dust and purifying coke oven flue gas of a top-charging coke oven according to claim 1, wherein along the flow direction of the flue gas, the starting end of the coal-charging flue dust pipeline on the top of the top is connected with a gas collecting pipe through a communicating pipe, and the communicating pipe is provided with a balance valve.
5. The coupling system for coal-charging smoke dust treatment and coke oven smoke purification of the top-charging coke oven as claimed in claim 1, further comprising a top coal-charging sealing device arranged on the top coal-charging car, wherein the top coal-charging sealing device is a sleeve type top coal-charging sealing device and consists of an inner sleeve, a sliding sleeve, a sealing connecting sleeve and an outer sleeve which are sequentially arranged from inside to outside, the inner sleeve is a coal feeding channel, and the top of the inner sleeve is connected with a coal hopper discharge port of the coal-charging car; the sliding sleeve can vertically slide along the inner sleeve; the bottom end of the sealing connecting sleeve is provided with a spherical structure which is matched with the coal charging hole seat to realize the sealing of the coal charging hole; the outer sleeve is provided with a telescopic flexible connecting structure.
CN201922124868.3U 2019-12-02 2019-12-02 Coupling system for coal-charging smoke treatment and coke oven flue gas purification of top-loading coke oven Active CN211035810U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922124868.3U CN211035810U (en) 2019-12-02 2019-12-02 Coupling system for coal-charging smoke treatment and coke oven flue gas purification of top-loading coke oven

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922124868.3U CN211035810U (en) 2019-12-02 2019-12-02 Coupling system for coal-charging smoke treatment and coke oven flue gas purification of top-loading coke oven

Publications (1)

Publication Number Publication Date
CN211035810U true CN211035810U (en) 2020-07-17

Family

ID=71567216

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922124868.3U Active CN211035810U (en) 2019-12-02 2019-12-02 Coupling system for coal-charging smoke treatment and coke oven flue gas purification of top-loading coke oven

Country Status (1)

Country Link
CN (1) CN211035810U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110746994A (en) * 2019-12-02 2020-02-04 中冶焦耐(大连)工程技术有限公司 Coupling system and process for coal-charging smoke treatment and coke oven flue gas purification of top-loading coke oven

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110746994A (en) * 2019-12-02 2020-02-04 中冶焦耐(大连)工程技术有限公司 Coupling system and process for coal-charging smoke treatment and coke oven flue gas purification of top-loading coke oven

Similar Documents

Publication Publication Date Title
CN206646064U (en) A kind of dry coke quenching auxiliary
CN102878822B (en) Device and method for purifying and recycling furnace gas of hermetic ore smelting furnace
CN102746859B (en) Leakage-free coaling and coke pushing combined smoke purifying and recycling system and technology for coke oven
CN211035805U (en) Top-mounted coke oven coal-charging smoke treatment system
CN110746993A (en) Coupling system and process of tamping coke oven charging soot treatment and coke oven flue gas purification
CN107894173A (en) A kind of full negative pressure coke stoving process of flue gas self-circulation type and system
CN110813504A (en) Blast furnace coal injection and pulverization system with drying furnace removed and working method thereof
CN110760321B (en) System and process for treating coal-charging smoke dust of top-loading coke oven
CN211035810U (en) Coupling system for coal-charging smoke treatment and coke oven flue gas purification of top-loading coke oven
CN107447072A (en) A kind of steelmaking converter flue gas dust collecting system
CN102391883A (en) Tamping coal charging dust removal system and working method thereof
CN1966730A (en) Method for treating converter flue gas
CN110746994A (en) Coupling system and process for coal-charging smoke treatment and coke oven flue gas purification of top-loading coke oven
CN211420053U (en) Tamping coke oven coal-charging smoke dust treatment system
CN211035811U (en) Coupling system of tamping coke oven charging soot treatment and coke oven flue gas purification
CN202398249U (en) Calcium carbide furnace tail gas mixing purification system utilizing bag dedusting
CN204939414U (en) A kind of emission-control equipment
CN2752264Y (en) Biabsorption combustion type smokeless coaling apparatus
CN201115857Y (en) Tamping coke oven side-installed coal smoke-eliminating and dust-collecting device
CN214991325U (en) Fine coal powder recycling system for fine coal pyrolysis
CN201952392U (en) Comprehensive dust-removal system for discharging coke and charging coal of coke oven
CN208791548U (en) A kind of coke dry quenching furnace prestores section pressure and adjusts a desorption tube
CN202885579U (en) Closed submerged arc furnace gas purification recycling device
CN202688267U (en) Leakage-free smoke dust purifying and recycling treatment system for coke pushing and coal loading of coke oven