[go: up one dir, main page]

CN216909062U - A spring-grip dumb-bells for aerobics exercises strength training - Google Patents

A spring-grip dumb-bells for aerobics exercises strength training Download PDF

Info

Publication number
CN216909062U
CN216909062U CN202220224056.5U CN202220224056U CN216909062U CN 216909062 U CN216909062 U CN 216909062U CN 202220224056 U CN202220224056 U CN 202220224056U CN 216909062 U CN216909062 U CN 216909062U
Authority
CN
China
Prior art keywords
handle
wall
fixedly connected
clamping
bin
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202220224056.5U
Other languages
Chinese (zh)
Inventor
聂晶
付雪营
边爽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huanghe Science and Technology College
Original Assignee
Huanghe Science and Technology College
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huanghe Science and Technology College filed Critical Huanghe Science and Technology College
Priority to CN202220224056.5U priority Critical patent/CN216909062U/en
Application granted granted Critical
Publication of CN216909062U publication Critical patent/CN216909062U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Percussion Or Vibration Massage (AREA)

Abstract

The utility model relates to a spring-grip dumb-bells for aerobics exercises strength training, which comprises a first handle, a second handle, an elastic belt and a clamping component, wherein the first handle is connected with the second handle; the one end and the first handle of elastic webbing are connected, the other end and the second handle of elastic webbing are connected, first handle and second handle can be fixed to the chucking subassembly, first handle includes first handle storehouse, a first pressure strip, first blend stop and first handle, the second handle includes second handle storehouse, the second pressure strip, second blend stop and second handle, this structure has two kinds of user states, when carrying out the grip training, the second handle is aimed at to first handle, because the second handle adopts the rubber material, certain elasticity has, press the second handle with strength through the finger, thereby can reach the purpose of training. The pull training between two arms can be carried out, when the pull training is carried out, the first handle and the second handle are respectively gripped by two hands, and the aim of training the pull of the two arms is achieved through the elasticity of the elastic belt.

Description

一种用于健美操力量训练的握力器A Gripper for Aerobics Strength Training

技术领域technical field

本实用新型涉及健美操器材技领域,具体涉及一种用于健美操力量训练的握力器。The utility model relates to the technical field of aerobics equipment, in particular to a gripping device used for aerobics strength training.

背景技术Background technique

健美操是一项集体操、舞蹈、音乐、健身、娱乐于一体的体育项目。在健美操训练过程中通常需要进行手部力量训练,以锻炼手部肌肉线条、增加手臂肌肉力量,进而可以提高手部动作的控制能力、灵活性、平衡性和优美性。手部力量的训练需要辅以握力器、拉力带等器具,但是相关技术中,握力器和拉力带为相互独立的器件,收纳时二者需要单独放置,占用的空间较大。Aerobics is a sports event that integrates gymnastics, dance, music, fitness and entertainment. In the process of aerobics training, hand strength training is usually required to exercise hand muscle lines and increase arm muscle strength, thereby improving the control, flexibility, balance and gracefulness of hand movements. The training of hand strength needs to be supplemented with instruments such as grips and tension belts. However, in the related art, the grips and tension belts are independent devices, and they need to be placed separately during storage, which takes up a lot of space.

实用新型内容Utility model content

本实用新型的目的是提供一种用于健美操力量训练的握力器,以解决不能同时实现拉力和握力的问题。The purpose of this utility model is to provide a gripping device for aerobics strength training, so as to solve the problem that the pulling force and the gripping force cannot be realized at the same time.

为实现上述目的,本实用新型采用如下技术方案:To achieve the above object, the utility model adopts the following technical solutions:

一种用于健美操力量训练的握力器,包括,第一手柄、第二手柄、弹性带和卡紧组件;A gripping device for aerobics strength training, comprising a first handle, a second handle, an elastic band and a clamping component;

所述第一手柄包括第一手柄仓、第一压紧板、第一挡条和第一手柄把,所述第一手柄仓一端开口,所述手柄长上开设有两个第一安装孔,所述第一手柄仓的另一端与所述第一手柄把固定连接,所述第一压紧板位于所述第一手柄仓内,所述第一压紧板的数量为两个,两个所述第一压紧板分别与所述第一手柄仓的侧壁铰接,所述第一挡条的数量为两个,所述第一挡条分别插接在所述第一安装孔内,所述第一挡条用于挤压所述第一压紧板远离铰接位置的一端,所述第一手柄把采用橡胶材质;The first handle includes a first handle compartment, a first pressing plate, a first stop bar and a first handle handle, one end of the first handle compartment is open, and two first installation holes are opened on the handle length. The other end of the first handle compartment is fixedly connected to the first handle handle, the first pressing plate is located in the first handle compartment, and the number of the first pressing plate is two, two The first pressing plates are respectively hinged with the side walls of the first handle compartment, the number of the first blocking bars is two, and the first blocking bars are respectively inserted into the first installation holes, The first blocking bar is used to squeeze one end of the first pressing plate away from the hinged position, and the first handle is made of rubber;

所述第二手柄包括第二手柄仓、第二压紧板、第二挡条和第二手柄把,所述第二手柄仓一端开口,所述第二手柄仓开口一端能够对准所述第一手柄仓开口一端,所述手柄长上开设有两个第二安装孔,所述第二手柄仓的另一端与所述第二手柄把固定连接,所述第二压紧板位于所述第二手柄仓内,所述第二压紧板的数量为两个,两个所述第二压紧板分别与所述第二手柄仓的侧壁铰接,所述第二挡条的数量为两个,所述第二挡条分别插接在所述第二安装孔内,所述第二挡条用于挤压所述第二压紧板远离铰接位置的一端,所述第二手柄把采用橡胶材质;The second handle includes a second handle compartment, a second pressing plate, a second blocking bar and a second handle handle, one end of the second handle compartment is open, and one end of the opening of the second handle compartment can be aligned with the first handle. One end of a handle compartment is open, two second installation holes are opened on the handle, the other end of the second handle compartment is fixedly connected with the second handle, and the second pressing plate is located on the first In the second handle compartment, the number of the second pressing plates is two, the two second pressing plates are respectively hinged with the side wall of the second handle compartment, and the number of the second blocking bars is two The second blocking bars are respectively inserted into the second installation holes, the second blocking bars are used to squeeze the end of the second pressing plate away from the hinged position, and the second handle handle adopts rubber material;

所述弹性带的数量为两个,两个弹性带平行设置,弹性带的一端所述第一压紧板连接,所述弹性带的另一端与所述第二压紧板连接;The number of the elastic bands is two, the two elastic bands are arranged in parallel, one end of the elastic band is connected to the first pressing plate, and the other end of the elastic band is connected to the second pressing plate;

所述卡紧组件用于固定所述第一手柄和所述第二手柄。The clamping assembly is used for fixing the first handle and the second handle.

进一步地,所述弹性带的两端为环形,弹性带的两端分别套设于所述第一压紧板和第二压紧板上。Further, both ends of the elastic band are annular, and the two ends of the elastic band are respectively sleeved on the first pressing plate and the second pressing plate.

进一步地,所述第一手柄仓包括第一壁、第二壁、第三壁、第四壁、第五壁,所述第一壁、第二壁、第三壁和第四壁依次连接形成方形框,所述第五壁和所述第一壁、第二壁、第三壁和第四壁均固定连接形成底面,所述第五壁的两端与所述第一手柄把的两端固定连接,所述第一安装孔开设于第一壁上,与所述第一壁对应的第三壁上,于第一安装孔的对应位置固定连接有第一限位环,所述第一限位环内的第三壁上开设有第一限位槽。Further, the first handle compartment includes a first wall, a second wall, a third wall, a fourth wall, and a fifth wall, and the first wall, the second wall, the third wall and the fourth wall are connected in sequence to form A square frame, the fifth wall is fixedly connected to the first wall, the second wall, the third wall and the fourth wall to form a bottom surface, and the two ends of the fifth wall are connected to the two ends of the first handle handle. Fixed connection, the first installation hole is opened on the first wall, and on the third wall corresponding to the first wall, a first limit ring is fixedly connected at the corresponding position of the first installation hole, the first A first limiting groove is opened on the third wall in the limiting ring.

进一步地,所述第一挡条为三棱柱,所述第一安装孔为圆形,所述第一挡条一端与所述第一安装孔转动连接,所述第一挡条的另一端位于所述第一限位环内,所述第一挡条与所述第一限位环转动连接,所述第一限位槽为三角形,所述第一限位槽用于与所述第一挡条的下端卡接。Further, the first blocking bar is a triangular prism, the first mounting hole is circular, one end of the first blocking bar is rotatably connected with the first mounting hole, and the other end of the first blocking bar is located in the first mounting hole. In the first limiting ring, the first blocking strip is rotatably connected with the first limiting ring, the first limiting groove is triangular, and the first limiting groove is used for connecting with the first limiting ring. The lower end of the retaining bar is snapped.

进一步地,所述第二手柄仓包括第六壁、第七壁、第八壁、第九壁、第十壁,所述第六壁、七壁、第八壁和第九壁依次连接形成方形框,所述第十壁和所述第六壁、第七壁、第八壁和第九壁均固定连接形成底面,所述第十壁的两端与所述第二手柄把的两端固定连接,所述第二安装孔开设于第六壁上,与所述第六壁对应的第八壁上,于第二安装孔的对应位置固定连接有第二限位环,所述第二限位环内的第八壁上开设有第二限位槽。Further, the second handle compartment includes a sixth wall, a seventh wall, an eighth wall, a ninth wall, and a tenth wall, and the sixth wall, the seventh wall, the eighth wall and the ninth wall are sequentially connected to form a square. frame, the tenth wall, the sixth wall, the seventh wall, the eighth wall and the ninth wall are all fixedly connected to form a bottom surface, and the two ends of the tenth wall are fixed with the two ends of the second handle connection, the second installation hole is opened on the sixth wall, and on the eighth wall corresponding to the sixth wall, a second limit ring is fixedly connected at the corresponding position of the second installation hole, and the second limit A second limiting groove is opened on the eighth wall in the position ring.

进一步地,所述第二挡条为三棱柱,所述第二安装孔为圆形,所述第二挡条一端与所述第二安装孔转动连接,所述第二挡条的另一端位于所述第二限位环内,所述第二挡条与所述第二限位环转动连接,所述第二限位槽为三角形,所述第二限位槽用于与所述第二挡条的下端卡接。Further, the second blocking bar is a triangular prism, the second mounting hole is circular, one end of the second blocking bar is rotatably connected with the second mounting hole, and the other end of the second blocking bar is located in the second mounting hole. In the second limiting ring, the second blocking strip is rotatably connected with the second limiting ring, the second limiting groove is triangular, and the second limiting groove is used for connecting with the second limiting ring. The lower end of the retaining bar is snapped.

进一步地,所述卡紧组件的数量为两个,两个所述卡紧组件位于第一手柄的两侧,所述卡紧组件包括卡紧头和卡紧块,所述卡紧头与所述第一手柄仓的一侧铰接,所述卡紧头上开设有卡接孔,所述卡紧块与所述第二手柄仓的一侧固定连接,所述卡接孔用于与所述卡接块卡接。Further, the number of the clamping assemblies is two, the two clamping assemblies are located on both sides of the first handle, and the clamping assemblies include a clamping head and a clamping block, and the clamping head is connected to the One side of the first handle compartment is hinged, the clamping head is provided with a clamping hole, the clamping block is fixedly connected to one side of the second handle compartment, and the clamping hole is used for connecting with the The snap block is snapped.

进一步地,所述第二手柄仓的开口位置固定连接有导向沿。Further, a guide edge is fixedly connected to the opening position of the second handle compartment.

本实用新型的有益效果:The beneficial effects of the present utility model:

本结构有两种使用状态,在进行握力训练时,第一手柄仓的开口端对准第二手柄仓的开口端,将弹性带放到第一手柄仓和第二手柄仓内,并且采用卡紧组件将第一手柄仓和第二手柄仓固定,在使用时,将手指放置到第一手柄把内,第一手柄仓和第二手柄仓位于靠近首先的位置,用手掌的根部抵住第二手柄把,由于第二手柄把采用橡胶材质,具有一定的弹性,通过手指用力,从而能够达到训练的目的。The structure has two usage states. During grip training, the open end of the first handle compartment is aligned with the open end of the second handle compartment, the elastic band is placed in the first handle compartment and the second handle compartment, and the The tightening assembly fixes the first handle compartment and the second handle compartment. When in use, put your fingers into the first handle handle, the first handle compartment and the second handle compartment are located near the first position, and the root of the palm is used to press the first handle compartment. The second handle handle, because the second handle handle is made of rubber material, has a certain elasticity, and the purpose of training can be achieved by the force of the fingers.

还可以进行两个手臂之间的拉力训练,在进行拉力训练时,第一手柄和第二手柄相互远离,两只手分别抓紧第一手柄和第二手柄,通过弹性带的弹力达到训练两个手臂拉力的目的。It is also possible to perform tension training between the two arms. During the tension training, the first handle and the second handle are kept away from each other, and the two hands are respectively grasping the first handle and the second handle, and the elastic force of the elastic belt can reach the training two. The purpose of the arm pull.

附图说明Description of drawings

图1是一种用于健美操力量训练的握力器在握力训练状态下的结构示意图;Fig. 1 is a kind of structural schematic diagram of the grip strength device used for aerobics strength training under grip strength training state;

图2是一种用于健美操力量训练的握力器中第一手柄的结构示意图;Fig. 2 is a kind of structural representation of the first handle in the grip device for aerobics strength training;

图3是一种用于健美操力量训练的握力器中第一手柄的截面示意图;Fig. 3 is a kind of cross-sectional schematic diagram of the first handle in the grip device for aerobics strength training;

图4是一种用于健美操力量训练的握力器中第二手柄的结构示意图;Fig. 4 is a kind of structural representation of the second handle in the grip device for aerobics strength training;

图5是一种用于健美操力量训练的握力器在拉力训练状态下的结构示意图。FIG. 5 is a schematic structural diagram of a grip device used for aerobics strength training in the state of tension training.

图中各标记对应的名称:The names corresponding to the marks in the figure:

1-第一手柄;11-第一手柄把;12-第一手柄仓;121-第一壁;122-第二壁; 123-第三壁;124-第四壁;125-第五壁;2-第二手柄;21-第二手柄把;22-第二手柄仓;221-第六壁;222-第七壁;223-第八壁;224-第九壁;225-第十壁; 23-导向沿;3-弹性带;41-卡紧头;411-卡接孔;51-第一挡条;52-第一限位环;53-第一压紧板;6-第一安装盖;7-第二安装盖;81-第二挡条;82-第二限位环;83-第二压紧板。1-first handle; 11-first handle handle; 12-first handle compartment; 121-first wall; 122-second wall; 123-third wall; 124-fourth wall; 125-fifth wall; 2- the second handle; 21- the second handle; 22- the second handle compartment; 221- the sixth wall; 222- the seventh wall; 223- the eighth wall; 224- the ninth wall; 225- the tenth wall; 23-Guiding edge; 3-Elastic band; 41-Clamping head; 411-Clamping hole; 51-First stop bar; 52-First limit ring; 53-First pressing plate; 6-First installation Cover; 7-Second installation cover; 81-Second blocking bar; 82-Second limiting ring; 83-Second pressing plate.

具体实施方式Detailed ways

下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述。The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention.

本实用新型的实施例:Embodiments of the present utility model:

一种用于健美操力量训练的握力器,包括,第一手柄1、第二手柄2、弹性带3和卡紧组件;弹性带3的一端和第一手柄1连接,弹性带3的另一端和第二手柄2连接,卡紧组件能够固定第一手柄1和第二手柄2。A gripping device for aerobics strength training, comprising, a first handle 1, a second handle 2, an elastic band 3 and a clamping assembly; one end of the elastic band 3 is connected with the first handle 1, and the other end of the elastic band 3 Connected with the second handle 2 , the clamping assembly can fix the first handle 1 and the second handle 2 .

第一手柄1包括第一手柄仓12、第一压紧板53、第一挡条51和第一手柄把11,第一手柄仓12一端开口,手柄长上开设有两个第一安装孔,第一手柄仓12的另一端与第一手柄把11固定连接,第一压紧板53位于第一手柄仓12内,第一压紧板53的数量为两个,两个第一压紧板53分别与第一手柄仓12的侧壁铰接,第一挡条51的数量为两个,第一挡条51分别插接在第一安装孔内,第一挡条51用于挤压第一压紧板53远离铰接位置的一端,第一手柄把11采用橡胶材质。The first handle 1 includes a first handle compartment 12, a first pressing plate 53, a first blocking bar 51 and a first handle handle 11. One end of the first handle compartment 12 is open, and two first installation holes are opened on the handle length. The other end of the first handle compartment 12 is fixedly connected to the first handle handle 11, the first pressing plate 53 is located in the first handle compartment 12, the number of the first pressing plates 53 is two, and the two first pressing plates 53 are hinged with the side walls of the first handle compartment 12 respectively, the number of the first blocking bars 51 is two, the first blocking bars 51 are respectively inserted into the first installation holes, and the first blocking bars 51 are used to squeeze the first One end of the pressing plate 53 away from the hinged position, the first handle handle 11 is made of rubber.

第一手柄仓12包括第一壁121、第二壁122、第三壁123、第四壁124、第五壁125,第一壁121、第二壁122、第三壁123和第四壁124依次连接形成方形框,第五壁125和第一壁121、第二壁122、第三壁123和第四壁124均固定连接形成底面,一个第一压紧板53与第二壁122靠近第五壁125的位置铰接,另一个第一压紧板53与第四壁124,靠近第五壁125的位置铰接,第五壁125 的两端与第一手柄把11的两端固定连接,第一安装孔开设于第一壁121上;与第一壁121对应的第三壁123上,于第一安装孔的对应位置固定连接有第一限位环52,第一限位环52内的第三壁123上开设有第一限位槽。The first handle compartment 12 includes a first wall 121 , a second wall 122 , a third wall 123 , a fourth wall 124 , a fifth wall 125 , a first wall 121 , a second wall 122 , a third wall 123 and a fourth wall 124 Connect sequentially to form a square frame, the fifth wall 125 and the first wall 121, the second wall 122, the third wall 123 and the fourth wall 124 are all fixedly connected to form the bottom surface, a first pressing plate 53 and the second wall 122 are close to the first The position of the fifth wall 125 is hinged, and the other first pressing plate 53 is hinged with the fourth wall 124 near the fifth wall 125. The two ends of the fifth wall 125 are fixedly connected to the two ends of the first handle 11. A mounting hole is opened on the first wall 121; on the third wall 123 corresponding to the first wall 121, a first limiting ring 52 is fixedly connected at the corresponding position of the first mounting hole. A first limiting groove is defined on the third wall 123 .

第一挡条51为三棱柱,第一安装孔为圆形,第一挡条51一端与第一安装孔转动连接,第一挡条51的另一端位于第一限位环52内,第一挡条51与第一限位环52转动连接,第一限位槽为三角形,并且第一限位槽的一个角正对第五壁125,第一限位槽用于与第一挡条51的下端卡接。The first blocking bar 51 is a triangular prism, and the first installation hole is circular. The blocking bar 51 is rotatably connected with the first limiting ring 52 , the first limiting groove is triangular, and one corner of the first limiting groove faces the fifth wall 125 , and the first limiting groove is used for connecting with the first blocking bar 51 . the lower end of the clip.

弹性带3的两端为环形,弹性带3的两端分别套设于第一压紧板53和第二压紧板83上。Both ends of the elastic band 3 are annular, and the two ends of the elastic band 3 are respectively sleeved on the first pressing plate 53 and the second pressing plate 83 .

两个第一压紧板53的连接关系相同,这里对一个弹性带3和一个第一压紧板53的连接关系进行描述,在弹性带3与第一手柄连接时,首先将弹性带3的一端套设于第一压紧板53上,在套设完成后,将第一压紧板53的活动端靠近第五壁125,将弹性带3的一部分压到第一压紧板53和第五壁125之间同时将第一挡条51插入到第一安装孔内,并且将第一挡条51的下端放置到第一限位环52内,并且转动第一挡条51,在转动过程中第一挡条51进一步挤压第一压紧板53,当转动到第一挡条51的下端刚好插入到第一限位槽内时,停止转动,将第一挡条51下端与第一限位槽卡接,从而使得第一压紧板53对弹性带3的压紧效果更好。The connection relationship between the two first pressing plates 53 is the same. Here, the connection relationship between an elastic band 3 and a first pressing plate 53 is described. When the elastic band 3 is connected with the first handle, the first One end is sleeved on the first pressing plate 53. After the sleeve is completed, the movable end of the first pressing plate 53 is close to the fifth wall 125, and a part of the elastic band 3 is pressed against the first pressing plate 53 and the first pressing plate 53. The first blocking bar 51 is inserted into the first installation hole between the five walls 125 at the same time, and the lower end of the first blocking bar 51 is placed in the first limiting ring 52, and the first blocking bar 51 is rotated. The first blocking bar 51 further squeezes the first pressing plate 53. When the lower end of the first blocking bar 51 is just inserted into the first limiting groove, the rotation is stopped, and the lower end of the first blocking bar 51 is aligned with the first stopper. The limiting groove is clamped, so that the first pressing plate 53 has a better pressing effect on the elastic band 3 .

在压紧完成后,第一安装孔上卡接第一安装盖6,第一安装盖6能够防止第一挡条51从第一安装孔滑出,同时第一安装盖6能够防止在使用过程中第一安装孔刮伤手指。After the pressing is completed, the first installation cover 6 is clamped on the first installation hole. The first installation cover 6 can prevent the first blocking bar 51 from sliding out of the first installation hole, and at the same time, the first installation cover 6 can prevent the first installation cover 6 from slipping out of the first installation hole during use. The first mounting hole in the middle scratches your fingers.

第二手柄2与第一手柄1的相似,只有细微差别,下面进行详细描述。The second handle 2 is similar to the first handle 1 with only minor differences, which will be described in detail below.

第二手柄2包括第二手柄仓22、第二压紧板83、第二挡条81和第二手柄把21,第二手柄仓22一端开口,第二手柄仓22的开口位置固定连接有导向沿 23,第二手柄仓22开口一端能够对准第一手柄仓12开口一端,手柄长上开设有两个第二安装孔,第二手柄仓22的另一端与第二手柄把21固定连接,第二压紧板83位于第二手柄仓22内,第二压紧板83的数量为两个,两个第二压紧板83分别与第二手柄仓22的侧壁铰接,第二挡条81的数量为两个,第二挡条 81分别插接在第二安装孔内,第二挡条81用于挤压第二压紧板83远离铰接位置的一端,第二手柄把21采用橡胶材质。The second handle 2 includes a second handle compartment 22, a second pressing plate 83, a second blocking bar 81 and a second handle handle 21. One end of the second handle compartment 22 is open, and a guide is fixedly connected to the opening of the second handle compartment 22. Along 23, the open end of the second handle compartment 22 can be aligned with the open end of the first handle compartment 12, the handle length is provided with two second installation holes, and the other end of the second handle compartment 22 is fixedly connected with the second handle handle 21, The second pressing plates 83 are located in the second handle compartment 22, and the number of the second pressing plates 83 is two. The two second pressing plates 83 are hinged with the side walls of the second handle compartment 22 respectively. The number of 81 is two, the second blocking bars 81 are respectively inserted into the second installation holes, the second blocking bars 81 are used to squeeze the end of the second pressing plate 83 away from the hinged position, and the second handle 21 is made of rubber. material.

第二手柄仓22包括第六壁221、第七壁222、第八壁223、第九壁224、第十壁225,第六壁221、七壁、第八壁223和第九壁224依次连接形成方形框,第十壁225和第六壁221、第七壁222、第八壁223和第九壁224均固定连接形成底面,一个第二压紧板83与第七壁222靠近第十壁225的位置铰接,另一个第二压紧板83与第九壁224,靠近第十壁225的位置铰接,第十壁225的两端与第二手柄把21的两端固定连接,第二安装孔开设于第六壁221上,与第六壁221对应的第八壁223上,于第二安装孔的对应位置固定连接有第二限位环82,第二限位环82内的第八壁223上开设有第二限位槽。The second handle compartment 22 includes a sixth wall 221, a seventh wall 222, an eighth wall 223, a ninth wall 224, and a tenth wall 225. The sixth wall 221, the seventh wall, the eighth wall 223 and the ninth wall 224 are connected in sequence A square frame is formed, the tenth wall 225, the sixth wall 221, the seventh wall 222, the eighth wall 223 and the ninth wall 224 are all fixedly connected to form a bottom surface, and a second pressing plate 83 and the seventh wall 222 are close to the tenth wall The position of 225 is hinged, and the other second pressing plate 83 is hinged with the ninth wall 224 near the tenth wall 225. The two ends of the tenth wall 225 are fixedly connected with the two ends of the second handle 21. The second installation A hole is opened on the sixth wall 221, and on the eighth wall 223 corresponding to the sixth wall 221, a second limiting ring 82 is fixedly connected at the corresponding position of the second mounting hole. A second limiting groove is defined on the wall 223 .

第二挡条81为三棱柱,第二安装孔为圆形,第二挡条81一端与第二安装孔转动连接,第二挡条81的另一端位于第二限位环82内,第二挡条81与第二限位环82转动连接,第二限位槽为三角形,并且第一限位槽的一个角正对第五壁125,第二限位槽用于与第二挡条81的下端卡接。The second blocking bar 81 is a triangular prism, the second mounting hole is circular, one end of the second blocking bar 81 is rotatably connected with the second mounting hole, the other end of the second blocking bar 81 is located in the second limiting ring 82, the second The blocking bar 81 is rotatably connected with the second limiting ring 82 , the second limiting groove is triangular, and one corner of the first limiting groove is facing the fifth wall 125 , and the second limiting groove is used for connecting with the second blocking bar 81 . the lower end of the clip.

两个第二压紧板83的连接关系相同,这里对一个弹性带3和一个第二压紧板83的连接关系进行描述,在弹性带3与第二手柄2连接时,首先将弹性带3 的一端套设于第二压紧板83上,在套设完成后,将第二压紧板83的活动端靠近第十壁225,将弹性带3的一部分压到第二压紧板83和第十壁225之间同时将第二挡条81插入到第二安装孔内,并且将第二挡条81的下端放置到第二限位环82内,并且转动第二挡条81,在转动过程中第二挡条81进一步挤压第二压紧板83,当转动到第二挡条81的下端刚好插入到第二限位槽内时,停止转动,将第二挡条81下端与第二限位槽卡接,从而使得第二压紧板83对弹性带3的压紧效果更好。The connection relationship between the two second pressing plates 83 is the same, and the connection relationship between one elastic band 3 and one second pressing plate 83 is described here. When the elastic band 3 is connected with the second handle 2, the elastic band 3 is first One end of the second pressing plate 83 is sleeved on the second pressing plate 83. After the sleeve is completed, the movable end of the second pressing plate 83 is close to the tenth wall 225, and a part of the elastic band 3 is pressed against the second pressing plate 83 and the tenth wall 225. Between the tenth wall 225, the second blocking bar 81 is inserted into the second mounting hole at the same time, and the lower end of the second blocking bar 81 is placed in the second limiting ring 82, and the second blocking bar 81 is rotated. During the process, the second blocking bar 81 further presses the second pressing plate 83. When the lower end of the second blocking bar 81 is just inserted into the second limiting groove, the rotation is stopped, and the lower end of the second blocking bar 81 is aligned with the first stopper. The two limiting grooves are snapped together, so that the second pressing plate 83 has a better pressing effect on the elastic band 3 .

在压紧完成后,第二安装孔上卡接第二安装盖7,第二安装盖7能够防止第二挡条81从第二安装孔滑出,同时安装盖能够防止在使用过程中第二安装孔刮伤手指。After the pressing is completed, the second installation cover 7 is clamped on the second installation hole. The second installation cover 7 can prevent the second blocking bar 81 from sliding out of the second installation hole, and the installation cover can prevent the second installation cover 7 from sliding out of the second installation hole during use. Mounting holes scratch your fingers.

第二手柄的结构与第一手柄的结构的差别仅限于导向沿23,第二手柄仓22 的开口位置固定连接有导向沿23,通过导向沿23能够使第一手柄仓12和第二手柄仓22在组合时更加容易对准。The difference between the structure of the second handle and the structure of the first handle is only limited to the guide edge 23. The opening position of the second handle compartment 22 is fixedly connected with the guide edge 23, and the first handle compartment 12 and the second handle compartment can be connected by the guide edge 23. 22 is easier to align when combined.

卡紧组件的数量为两个,两个卡紧组件分别位于第一手柄的两侧,这里对一个夹紧组件进行描述,卡紧组件包括卡紧头41和卡紧块,卡紧头41与第一手柄仓12的一侧铰接,卡紧头41上开设有卡接孔411,卡紧块与第二手柄仓 22的一侧固定连接,卡接孔411用于与卡接块卡接。在第一手柄仓12和第二手柄仓22处于组合状态时,通过卡紧头41和夹紧块的配合,第一手柄仓12和第二手柄仓22之间的连接效果更好,同时也方便分离。The number of clamping assemblies is two, and the two clamping assemblies are located on both sides of the first handle respectively. Here, a clamping assembly is described. The clamping assembly includes a clamping head 41 and a clamping block. The clamping head 41 and One side of the first handle compartment 12 is hinged, the clamping head 41 is provided with a clamping hole 411, the clamping block is fixedly connected to one side of the second handle compartment 22, and the clamping hole 411 is used for clamping with the clamping block. When the first handle compartment 12 and the second handle compartment 22 are in the combined state, through the cooperation of the clamping head 41 and the clamping block, the connection effect between the first handle compartment 12 and the second handle compartment 22 is better. Easy to separate.

本结构有两种使用状态,在进行握力训练时,第一手柄仓12的开口端对准第二手柄仓22的开口端,将弹性带3放到第一手柄仓12和第二手柄仓22内,并且采用卡紧组件将第一手柄仓12和第二手柄仓22固定,在使用时,将手指放置到第一手柄把11内,第一手柄仓12和第二手柄仓22位于靠近首先的位置,用手掌的根部抵住第二手柄把21,由于第二手柄把21采用橡胶材质,具有一定的弹性,通过手指用力,从而能够达到训练的目的。This structure has two usage states. During grip training, the open end of the first handle compartment 12 is aligned with the open end of the second handle compartment 22, and the elastic band 3 is placed in the first handle compartment 12 and the second handle compartment 22. inside, and the first handle compartment 12 and the second handle compartment 22 are fixed by the clamping assembly, when in use, put your fingers into the first handle handle 11, the first handle compartment 12 and the second handle compartment 22 are located close to the first handle compartment 11. The second handle handle 21 is pressed against the base of the palm. Since the second handle handle 21 is made of rubber material, it has a certain elasticity, and the purpose of training can be achieved through the force of the fingers.

还可以进行两个手臂之间的拉力训练,在进行拉力训练时,第一手柄1和第二手柄2相互远离,两只手分别抓紧第一手柄1和第二手柄2,通过弹性带3 的弹力达到训练两个手臂拉力的目的。You can also perform tension training between the two arms. During the tension training, the first handle 1 and the second handle 2 are far away from each other, and the two hands respectively grasp the first handle 1 and the second handle 2. Elasticity achieves the purpose of training the pulling force of both arms.

本实用新型不局限于上述最佳实施方式,任何人在本实用新型的启示下都可得出其他各种形式的产品,但不论在其形状或结构上作任何变化,凡是具有与本申请相同或相近似的技术方案,均落在本实用新型的保护范围之内。The present utility model is not limited to the above-mentioned best embodiment, and anyone can obtain other various forms of products under the inspiration of the present utility model, but no matter if any changes are made in its shape or structure, any product with the same characteristics as the present application or similar technical solutions, all fall within the protection scope of the present invention.

Claims (8)

1. A spring-grip dumb-bells for strength training of aerobics exercises, which is characterized by comprising a first handle, a second handle, an elastic belt and a clamping component;
the first handle comprises a first handle bin, two first compression plates, two first barrier strips and a first handle, one end of the first handle bin is open, two first mounting holes are formed in the length of the handle, the other end of the first handle bin is fixedly connected with the first handle, the first compression plates are located in the first handle bin, the number of the first compression plates is two, the two first compression plates are respectively hinged with the side wall of the first handle bin, the number of the first barrier strips is two, the first barrier strips are respectively inserted into the first mounting holes, the first barrier strips are used for extruding one end, far away from the hinged position, of the first compression plate, and the first handle is made of rubber;
the second handle comprises a second handle bin, two pressing plates, two blocking strips and a second handle, one end of the second handle bin is open, one end of the second handle bin opening can be aligned to one end of the first handle bin opening, the handle is provided with two second mounting holes in length, the other end of the second handle bin is fixedly connected with the second handle, the second pressing plates are located in the second handle bin, the number of the second pressing plates is two, the two second pressing plates are respectively hinged with the side wall of the second handle bin, the number of the second blocking strips is two, the second blocking strips are respectively inserted into the second mounting holes, the second blocking strips are used for extruding one end, far away from the hinged position, of the second pressing plates, and the second handle is made of rubber;
the number of the elastic belts is two, the two elastic belts are arranged in parallel, one end of each elastic belt is connected with the first compression plate, and the other end of each elastic belt is connected with the second compression plate;
the clamping assembly is used for fixing the first handle and the second handle.
2. The spring-grip dumb-bells for aerobics exercises strength training of claim 1, wherein both ends of the elastic band are ring-shaped, and both ends of the elastic band are respectively sleeved on the first pressing plate and the second pressing plate.
3. The grip of claim 1, wherein the first handle compartment comprises a first wall, a second wall, a third wall, a fourth wall, and a fifth wall, the first wall, the second wall, the third wall, and the fourth wall are sequentially connected to form a square frame, the fifth wall and the first wall, the second wall, the third wall, and the fourth wall are all fixedly connected to form a bottom surface, two ends of the fifth wall are fixedly connected to two ends of the first handle grip, the first mounting hole is formed in the first wall, the third wall corresponding to the first wall is fixedly connected to a first limiting ring, and a first limiting groove is formed in the third wall in the first limiting ring.
4. The hand-muscle developer for training body building exercises as claimed in claim 3, wherein the first barrier is a triangular prism, the first mounting hole is circular, one end of the first barrier is rotatably connected with the first mounting hole, the other end of the first barrier is located in the first limit ring, the first barrier is rotatably connected with the first limit ring, the first limit groove is triangular, and the first limit groove is used for being clamped with the lower end of the first barrier.
5. The hand-muscle developer for training of body building exercises, according to claim 1, wherein the second handle chamber comprises a sixth wall, a seventh wall, an eighth wall, a ninth wall and a tenth wall, the sixth wall, the seventh wall, the eighth wall and the ninth wall are sequentially connected to form a square frame, the tenth wall, the sixth wall, the seventh wall, the eighth wall and the ninth wall are fixedly connected to form a bottom surface, two ends of the tenth wall are fixedly connected with two ends of the second handle grip, the second mounting hole is formed in the sixth wall, a second limit ring is fixedly connected to a corresponding position of the second mounting hole in the eighth wall corresponding to the sixth wall, and a second limit groove is formed in the eighth wall in the second limit ring.
6. The hand-muscle developer for training body building exercises as claimed in claim 5, wherein the second barrier strip is a triangular prism, the second mounting hole is circular, one end of the second barrier strip is rotatably connected with the second mounting hole, the other end of the second barrier strip is located in the second limiting ring, the second barrier strip is rotatably connected with the second limiting ring, the second limiting groove is triangular, and the second limiting groove is used for being clamped with the lower end of the second barrier strip.
7. The spring-grip dumb-bells for aerobics exercises strength training as claimed in claim 1, wherein the number of the clamping components is two, the two clamping components are positioned at two sides of the first handle, the clamping components comprise clamping heads and clamping blocks, the clamping heads are hinged with one side of the first handle bin, clamping holes are formed in the clamping heads, the clamping blocks are fixedly connected with one side of the second handle bin, and the clamping holes are used for being clamped with the clamping blocks.
8. The spring-grip dumb-bells for aerobics exercises strength training as claimed in claim 1, wherein the opening of said second handle compartment is fixedly connected with a guiding edge.
CN202220224056.5U 2022-01-25 2022-01-25 A spring-grip dumb-bells for aerobics exercises strength training Expired - Fee Related CN216909062U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220224056.5U CN216909062U (en) 2022-01-25 2022-01-25 A spring-grip dumb-bells for aerobics exercises strength training

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220224056.5U CN216909062U (en) 2022-01-25 2022-01-25 A spring-grip dumb-bells for aerobics exercises strength training

Publications (1)

Publication Number Publication Date
CN216909062U true CN216909062U (en) 2022-07-08

Family

ID=82264596

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220224056.5U Expired - Fee Related CN216909062U (en) 2022-01-25 2022-01-25 A spring-grip dumb-bells for aerobics exercises strength training

Country Status (1)

Country Link
CN (1) CN216909062U (en)

Similar Documents

Publication Publication Date Title
US8128541B2 (en) Exercise grip device
US4105200A (en) Hand and finger exercise device
US6241644B1 (en) Flexible exercise device for continuously increased tension
US20090197742A1 (en) Exercise Grip Device
US20120208683A1 (en) Exercise Grip Device
US2926911A (en) Muscle and vascular system hand exercising instrument
CN216909062U (en) A spring-grip dumb-bells for aerobics exercises strength training
CN205569630U (en) Multi -functional chest expander
JP2009285430A (en) Upper half body power trainer
CN205108888U (en) Shank stretching device
CN220125435U (en) Chest expander of adjustable rubber band quantity
US10188895B1 (en) Weight exerciser with flexible perimeter grip band
US11433269B1 (en) Exercise apparatus
CN206777738U (en) Hand-held spring-grip
JP3080871U (en) Gloves for grip training
CN108126323A (en) A kind of rehabilitation department hand trainer
JP3166339U (en) Small isometric exercise equipment
CN204469132U (en) A kind of spring-grip
CN214158440U (en) Chest expander with safety protection structure
JPH06339546A (en) Finger tip exercising apparatus
CN216497329U (en) A spring-grip dumb-bells for aerobics exercises strength training
CN222218553U (en) A hand exerciser
CN204092960U (en) A kind of wrist power refers to force trainer
CN205759460U (en) Chest expander
KR101701411B1 (en) Hand grip for baseball player

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220708