[go: up one dir, main page]

CN203959096U - Gas storage observation well completion string - Google Patents

Gas storage observation well completion string Download PDF

Info

Publication number
CN203959096U
CN203959096U CN201420356374.2U CN201420356374U CN203959096U CN 203959096 U CN203959096 U CN 203959096U CN 201420356374 U CN201420356374 U CN 201420356374U CN 203959096 U CN203959096 U CN 203959096U
Authority
CN
China
Prior art keywords
gas storage
well completion
tubular column
short circuit
completion tubular
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420356374.2U
Other languages
Chinese (zh)
Inventor
杨长林
黄剑华
马常星
王亚金
孙希勇
王占胜
杨晓平
陈显学
魏晓峰
吴英卫
顾彩军
周彦鹏
齐伟
肖火林
张学斌
王海兰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Petrochina Co Ltd
Original Assignee
Petrochina Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Petrochina Co Ltd filed Critical Petrochina Co Ltd
Priority to CN201420356374.2U priority Critical patent/CN203959096U/en
Application granted granted Critical
Publication of CN203959096U publication Critical patent/CN203959096U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model provides a gas storage observation well completion tubular column, including the tubular column body, top-down has concatenated upper flow nipple joint, subsurface safety valve, lower flow nipple joint, circulation sliding sleeve, first retrievable packer, first pressure gauge support cylinder, blanking plug seat short circuit and test seat short circuit on the tubular column body in proper order. The pressure gauge is fixed by arranging the pressure gauge support cylinder, so that the monitoring of the formation pressure and the temperature is realized, and the gas storage observation well completion pipe column can also perform fluid sampling analysis during the gas injection and production period so as to monitor the change of the fluid property; additionally, the utility model discloses a gas storage storehouse observation well completion tubular column can realize the multiple operation and link, reduces the operation link, avoids the secondary pollution of reservoir, can realize the purpose of accurate monitoring formation parameter.

Description

储气库观察井完井管柱Gas storage observation well completion string

技术领域technical field

本实用新型涉及一种采油(气)工艺管柱,尤其是一种储气库观察井完井管柱。The utility model relates to an oil (gas) production process pipe string, in particular to a gas storage observation well completion pipe string.

背景技术Background technique

储气库是将长输管道输送来的商品天然气重新注入地下空间而形成的一种人工气田或气藏,在多年生产运行过程中,地层压力在一定时间内呈周期变化,并且变化的幅度很大,边、底水激动也会对储气库造成影响,因此建立动态监测系统,极为重要。为观察储气库地层压力的变化,边、底水区域的压力变化以及断层的密封性,就必须部署一定数量的观察井,进行连续的压力、温度监测,同时注采气期间内每隔一段时间进行流体取样分析,监测流体性质的变化,分析是否发生气窜或储气库是否运行正常,为后期盘库和计算损耗提供基础资料。A gas storage is an artificial gas field or gas reservoir formed by reinjecting commercial natural gas from long-distance pipelines into underground space. Large, edge and bottom water agitation will also affect the gas storage, so it is extremely important to establish a dynamic monitoring system. In order to observe the change of the formation pressure of the gas storage, the pressure change of the edge and bottom water area, and the sealing of the fault, it is necessary to deploy a certain number of observation wells for continuous pressure and temperature monitoring. Perform fluid sampling and analysis in time, monitor changes in fluid properties, analyze whether gas channeling occurs or whether the gas storage is operating normally, and provide basic data for later inventory and calculation of losses.

实用新型内容Utility model content

本实用新型的目的是提供一种储气库观察井完井管柱,以用于监测储气库底层的压力和温度,并在注采气期间进行流体取样。The purpose of the utility model is to provide a gas storage observation well completion pipe string for monitoring the pressure and temperature of the bottom layer of the gas storage, and to perform fluid sampling during gas injection and production.

为达到上述目的,本实用新型提供一种储气库观察井完井管柱,包括管柱本体,所述管柱本体上自上而下依次串接有上流动短节、井下安全阀、下流动短节、循环滑套、第一可取式封隔器、第一压力计托筒、堵塞器坐落短接和测试坐落短接。In order to achieve the above purpose, the utility model provides a gas storage observation well completion pipe string, including a pipe string body, which is connected in series from top to bottom with an upper flow nipple, a downhole safety valve, a lower Flow sub, recirculation sleeve, first retractable packer, first pressure gauge holder, plug seat short and test seat short.

如上所述的储气库观察井完井管柱,其中,所述第一压力计托筒与所述堵塞器坐落短接之间还连接有第二可取式封隔器。In the gas storage observation well completion string described above, a second removable packer is also connected between the first pressure gauge holder and the plugging short.

如上所述的储气库观察井完井管柱,其中,所述堵塞器坐落短接与所述测试坐落短接之间还连接有第二压力计托筒。In the gas storage observation well completion string described above, a second pressure gauge holder is further connected between the plugr seat short and the test seat short.

如上所述的储气库观察井完井管柱,其中,所述管柱本体与所述上流动短节、井下安全阀、下流动短节、循环滑套、第一可取式封隔器、第一压力计托筒、第二可取式封隔器、堵塞器坐落短接、第二压力计托筒和测试坐落短接之间均采用气密封螺纹连接。The gas storage observation well completion tubing string as described above, wherein, the tubing body and the upper flow nipple, the downhole safety valve, the lower flow nipple, the circulating sliding sleeve, the first removable packer, Air-tight threaded connections are used between the first pressure gauge support cylinder, the second removable packer, the stopper short connection, the second pressure gauge support cylinder and the test short connection.

如上所述的储气库观察井完井管柱,其中,所述储气库观察井完井管柱还包括测压管缆,所述测压管缆与固定于所述第一压力计托筒和所述第二压力计托筒的压力计相连接并延伸至地面上。The gas storage observation well completion string as described above, wherein, the gas storage observation well completion string further includes a piezometric umbilical, and the piezometric umbilical is fixed to the first pressure gauge support The cylinder is connected to the pressure gauge of the second pressure gauge holder and extends to the ground.

如上所述的储气库观察井完井管柱,其中,所述储气库观察井完井管柱还包括设置在地面的地面控制系统,所述地面控制系统与所述测压管缆相连接。The gas storage observation well completion string as described above, wherein the gas storage observation well completion string further includes a ground control system arranged on the ground, and the ground control system is connected to the piezometer cable connect.

如上所述的储气库观察井完井管柱,其中,所述管柱本体底端连接有喇叭口。The gas storage observation well completion pipe string described above, wherein the bottom end of the pipe string body is connected with a bell mouth.

如上所述的储气库观察井完井管柱,其中,所述管柱本体是直径为88.9mm的油管。The gas storage observation well completion string described above, wherein the string body is an oil pipe with a diameter of 88.9 mm.

本实用新型的储气库观察井完井管柱的优点是,通过设置压力计托筒来固定压力计,从而实现对地层压力、温度的监测,采用本实用新型的储气库观察井完井管柱,还可在注采气期间进行流体取样分析,以监测流体性质的变化;另外,本实用新型的储气库观察井完井管柱可实现多工序联作,减少作业环节,避免储层的二次污染,能实现准确监测地层参数的目的。The advantage of the gas storage observation well completion string of the utility model is that the pressure gauge is fixed by setting the pressure gauge holder, thereby realizing the monitoring of formation pressure and temperature, and the gas storage observation well completion of the utility model is adopted The pipe string can also be used for fluid sampling and analysis during gas injection and production to monitor changes in fluid properties; in addition, the completion pipe string of the gas storage observation well of the utility model can realize multi-process joint operation, reduce operation links, and avoid storage The secondary pollution of formation can be realized, and the purpose of accurately monitoring formation parameters can be achieved.

附图说明Description of drawings

以下附图仅旨在于对本实用新型做示意性说明和解释,并不限定本实用新型的范围。其中:The following drawings are only intended to illustrate and explain the utility model schematically, and do not limit the scope of the utility model. in:

图1是本实用新型的储气库观察井完井管柱的示意图。Fig. 1 is a schematic diagram of the observation well completion string of the gas storage of the utility model.

主要元件标号说明:Explanation of main component labels:

1管柱本体          2上流动短节          3井下安全阀1 Pipe string body 2 Upper flow nipple 3 Downhole safety valve

4下流动短节        5循环滑套            6第一可取式封隔器4 Lower flow nipples 5 Circulating sliding sleeve 6 First removable packer

7第一压力计托筒    8第二可取式封隔器    9堵塞器坐落短接7 The first pressure gauge holder 8 The second removable packer 9 The plug is located and shorted

10第二压力计托筒   11测试坐落短接       12喇叭口10 The second pressure gauge holder 11 The test seat is short-circuited 12 The bell mouth

13生产管柱         15油层13 Production string 15 Oil layer

具体实施方式Detailed ways

为了对本实用新型的技术特征、目的和效果有更加清楚的理解,现对照附图说明本实用新型的具体实施方式。In order to have a clearer understanding of the technical features, purposes and effects of the utility model, the specific implementation of the utility model is now described with reference to the accompanying drawings.

如图1所示,本实用新型提供一种储气库观察井完井管柱,设于生产管柱13内,包括管柱本体1,管柱本体1上自上而下依次串接有上流动短节2、井下安全阀3、下流动短节4、循环滑套5、第一可取式封隔器6、第一压力计托筒7、堵塞器坐落短接9和测试坐落短接11,即上流动短节2、井下安全阀3、下流动短节4、循环滑套5、第一可取式封隔器6、第一压力计托筒7、堵塞器坐落短接9和测试坐落短接11通过管柱本体1串接在一起。As shown in Figure 1, the utility model provides a gas storage observation well completion pipe string, which is set in the production pipe string 13, including the pipe string body 1, and the upper pipe string body 1 is connected in series from top to bottom. Flow nipple 2, downhole safety valve 3, lower flow nipple 4, circulating sliding sleeve 5, first removable packer 6, first pressure gauge holder 7, stopper seat short 9 and test seat short 11 , that is, the upper flow nipple 2, the downhole safety valve 3, the lower flow nipple 4, the circulation sleeve 5, the first removable packer 6, the first pressure gauge holder 7, the plug seat short 9 and the test seat The shorts 11 are connected in series through the pipe string body 1 .

其中,管柱本体1采用L8013Cr不锈钢管,其具有较强的抗腐蚀性,可延长管柱的使用寿命;考虑到井下安全阀3缩径的影响,在其上下端分别配备了上流动短节2和下流动短节4,以降低扰动对井下安全阀3的影响,防止冲蚀的发生,延长井下安全阀3的使用寿命,增强管柱的安全性;循环滑套5可以实现循环洗井、掏空诱喷和循环压井;采用可取式封隔器易于解封,解封工作量小,便于后期作业,不会影响储气库的正常运行,第一可取式封隔器6可以实现对上部油层15(或工作地层或待测试地层)和油套环空的封隔;第一压力计托筒7为压力计保护装置,用于固定压力计,采用压力计来随时监测地层的温度和压力;堵塞器坐落短接9用于坐落密封隔绝工具,利用钢丝作业把堵塞器下到堵塞器坐落短接9,就可以实现封隔器坐封,也可以对管柱进行试压;测试坐落短接11工作筒位于管柱本体1底端,可根据测试需要利用钢丝作业临时下入测试仪表。Among them, the pipe string body 1 adopts L8013Cr stainless steel pipe, which has strong corrosion resistance and can prolong the service life of the pipe string; 2 and the lower flow sub-joint 4 to reduce the impact of disturbance on the downhole safety valve 3, prevent erosion, prolong the service life of the downhole safety valve 3, and enhance the safety of the pipe string; the circulation sliding sleeve 5 can realize circulation flushing , hollowing out to induce blowout and circulation killing; adopting the removable packer is easy to unseal, the workload of unsealing is small, it is convenient for later operation, and will not affect the normal operation of the gas storage. The first removable packer 6 can realize Isolation of the upper oil layer 15 (or the working formation or the formation to be tested) and the annulus of the oil jacket; the first pressure gauge holder 7 is a pressure gauge protection device for fixing the pressure gauge, and the pressure gauge is used to monitor the temperature of the formation at any time and pressure; the plug is located at the short connection 9 for sealing and isolating tools, and the plug is lowered to the plug at the short connection 9 by using steel wire operation, so that the packer can be set and the string can be tested for pressure; test The short-connected 11 work cylinder is located at the bottom of the pipe column body 1, and can be temporarily lowered into the test instrument by using steel wire operation according to the test needs.

再如图1所示,在一个较佳的技术方案中,第一压力计托筒7与堵塞器坐落短接9之间还连接有第二可取式封隔器8,即第一可取式封隔器6和第二可取式封隔器8可以分别对两个主要油层15进行封隔。As shown in Figure 1, in a preferred technical solution, a second removable packer 8 is also connected between the first pressure gauge support cylinder 7 and the bung plug 9, that is, the first removable packer. The packer 6 and the second removable packer 8 can isolate the two main oil layers 15 respectively.

进一步地,堵塞器坐落短接9与测试坐落短接11之间还连接有第二压力计托筒10。通过在第一压力计托筒7和第二压力计托筒10上固定压力计,可以分别对两个主要油层15进行压力和温度测试。但本实用新型并不以此为限,还可以根据实际需要设置多个压力计托筒和多个可取式封隔器。Further, a second pressure gauge support cylinder 10 is also connected between the plug-seat short-circuit 9 and the test-seat short-circuit 11 . By fixing pressure gauges on the first pressure gauge holder 7 and the second pressure gauge holder 10, the pressure and temperature tests of the two main oil layers 15 can be carried out respectively. But the utility model is not limited thereto, and a plurality of pressure gauge holders and a plurality of removable packers can also be arranged according to actual needs.

另外,在管柱本体1底端还连接有喇叭口12,喇叭口12可以在完井管柱下端预留较大倒角,由于其下部开口大,能够很顺利地下入和起出测试仪表或者工具。In addition, a bell mouth 12 is connected to the bottom of the pipe string body 1. The bell mouth 12 can reserve a large chamfer at the lower end of the completion pipe string. Because of its large opening at the lower part, it can be smoothly inserted into and out of the test instrument or tool.

在本实施例中,管柱本体1与上流动短节2、井下安全阀3、下流动短节4、循环滑套5、第一可取式封隔器6、第一压力计托筒7、第二可取式封隔器8、堵塞器坐落短接9、第二压力计托筒10和测试坐落短接11之间均采用气密封螺纹连接,例如VAM-TOP气密封螺纹连接,此种连接方式在承受复合载荷时仍具有完善的气密封性能,从而保证各个部件之间的气密性,同时其具有优良的抗弯、抗压、抗扭性能,操作简单,维修方便。In this embodiment, the pipe string body 1, the upper flow nipple 2, the downhole safety valve 3, the lower flow nipple 4, the circulating sliding sleeve 5, the first removable packer 6, the first pressure gauge holder 7, The second removable packer 8, the stopper short connection 9, the second pressure gauge holder 10 and the test short connection 11 are all connected with airtight threaded connections, such as VAM-TOP airtight threaded connections. The method still has perfect air-tight performance when bearing compound loads, so as to ensure the air-tightness between various components, and at the same time it has excellent bending resistance, compression resistance, torsion resistance, simple operation and convenient maintenance.

储气库观察井完井管柱还包括测压管缆,测压管缆与固定于第一压力计托筒7和第二压力计托筒10的压力计相连接并延伸至地面上,用以传输地层压力、温度等参数值,达到监测地层参数的目的,即,在地面上将毛细管和光纤预制到一根管线内,制作成测温测压管缆,采用毛细管传输压力,采用光纤传输温度,实现对井下压力和温度的监测。The gas storage observation well completion string also includes a piezometer cable, which is connected to the pressure gauges fixed on the first pressure gauge holder 7 and the second pressure gauge holder 10 and extends to the ground for To achieve the purpose of monitoring formation parameters by transmitting parameter values such as formation pressure and temperature, that is, prefabricate capillary tubes and optical fibers into a pipeline on the ground to make temperature and pressure measurement pipe cables, use capillary tubes to transmit pressure, and use optical fibers to transmit pressure. Transmit temperature to realize downhole pressure and temperature monitoring.

储气库观察井完井管柱还包括设置在地面的地面控制系统,地面控制系统例如包括相互连接的数据采集装置、数据分析装置和控制器(电脑),地面控制系统与测压管缆相连接。The gas storage observation well completion string also includes a ground control system arranged on the ground. The ground control system includes, for example, interconnected data acquisition devices, data analysis devices, and controllers (computers). connect.

另外,井下安全阀3通过钢制液控管线与地面控制系统相连接,通过控制液控管线内的液体压力,实现井下安全阀3的打开和关闭,达到井下开、关井的目的。In addition, the downhole safety valve 3 is connected to the surface control system through the steel hydraulic control pipeline, and the opening and closing of the downhole safety valve 3 is realized by controlling the liquid pressure in the hydraulic control pipeline, so as to achieve the purpose of downhole opening and closing.

在本实施例中,管柱本体1是直径为88.9mm的油管,此直径大小的管柱本体便于串接压力计托筒等部件,便于安装,且可避免异常情况下对油管的冲蚀,降低气井卸载的风险。In this embodiment, the tubing string body 1 is an oil pipe with a diameter of 88.9 mm. The tubing string body with this diameter is convenient for serially connecting pressure gauge holders and other components, which is convenient for installation, and can avoid erosion of the tubing under abnormal conditions. Reduce the risk of gas well unloading.

在使用时,将本实用新型的储气库观察井完井管柱下入生产管柱13内并固定,油管上扣扭矩在设定范围内,油管与油管、油管与各井下工具都要进行气密封检测并合格,以确保安全。采用本实用新型的储气库观察井完井管柱,不仅可以进行连续的地层压力、温度监测,同时还可以结合钢丝作业定期进行流体取样分析,来判断是否发生气窜或储气库是否运行正常,达到监测的目的,本实用新型的储气库观察井完井管柱由管柱本体1和多种井下工具组成,可实现多工序联作,减少作业环节,避免储层的二次污染,能实现准确监测地层参数的目的。此外,如果在地面连接上管线和控制系统,本实用新型的储气库观察井完井管柱还可以起到注采管柱的功能。When in use, the gas storage observation well completion string of the utility model is lowered into the production string 13 and fixed, and the oil pipe make-up torque is within the set range, the oil pipe and the oil pipe, and the oil pipe and each downhole tool must be connected The airtightness is tested and qualified to ensure safety. The observation well completion pipe string of the gas storage of the utility model can not only monitor the formation pressure and temperature continuously, but also conduct regular fluid sampling and analysis combined with steel wire operation to judge whether gas channeling occurs or whether the gas storage is in operation Normal, to achieve the purpose of monitoring, the gas storage observation well completion pipe string of the utility model is composed of the pipe string body 1 and various downhole tools, which can realize multi-process joint operation, reduce operation links, and avoid secondary pollution of the reservoir , can achieve the purpose of accurately monitoring formation parameters. In addition, if the upper pipeline and the control system are connected on the ground, the observation well completion string of the gas storage of the utility model can also play the function of the injection-production string.

以上所述仅为本实用新型示意性的具体实施方式,并非用以限定本实用新型的范围。任何本领域的技术人员,在不脱离本实用新型的构思和原则的前提下所作的等同变化与修改,均应属于本实用新型保护的范围。而且需要说明的是,本实用新型的各组成部分并不仅限于上述整体应用,本实用新型的说明书中描述的各技术特征可以根据实际需要选择一项单独采用或选择多项组合起来使用,因此,本实用新型理所当然地涵盖了与本案发明点有关的其它组合及具体应用。The above descriptions are only illustrative specific implementations of the present utility model, and are not intended to limit the scope of the present utility model. Any equivalent changes and modifications made by those skilled in the art without departing from the concept and principle of the present utility model shall fall within the protection scope of the present utility model. And it should be noted that each component of the utility model is not limited to the above-mentioned overall application, and each technical feature described in the specification of the utility model can be selected to be used alone or in combination according to actual needs. Therefore, The utility model naturally covers other combinations and specific applications related to the invention point of the case.

Claims (8)

1. a gas storage is observed well completion tubular column, comprise tubing string body, it is characterized in that, on described tubing string body, be serially connected with successively mobile pipe nipple, Down Hole Safety Valve (DHSV), current downflow pipe nipple, circulation slide sleeve, the first retrievable excluder, the first manometer from top to bottom, blanking plug is located short circuit and short circuit is located in test.
2. gas storage as claimed in claim 1 is observed well completion tubular column, it is characterized in that, described the first manometer and described blanking plug are located and between short circuit, are also connected with the second retrievable excluder.
3. gas storage as claimed in claim 1 or 2 is observed well completion tubular column, it is characterized in that, described blanking plug is located short circuit and described test and is located and between short circuit, is also connected with the second manometer.
4. gas storage as claimed in claim 3 is observed well completion tubular column, it is characterized in that, described tubing string body and described mobile pipe nipple, Down Hole Safety Valve (DHSV), current downflow pipe nipple, circulation slide sleeve, the first retrievable excluder, the first manometer, the second retrievable excluder, blanking plug are located short circuit, the second manometer and test and are located between short circuit and all adopt vapor seal to be threaded.
5. gas storage as claimed in claim 3 is observed well completion tubular column, it is characterized in that, described gas storage is observed well completion tubular column and is also comprised pressure measurement umbilical, described pressure measurement umbilical be fixed on described the first manometer and be connected and extend on ground with the pressure gauge of described the second manometer.
6. gas storage as claimed in claim 5 is observed well completion tubular column, it is characterized in that, described gas storage is observed well completion tubular column and also comprised the ground control system that is arranged on ground, and described ground control system is connected with described pressure measurement umbilical.
7. gas storage as claimed in claim 1 is observed well completion tubular column, it is characterized in that, described tubing string body bottom is connected with exit skirt.
8. gas storage as claimed in claim 1 is observed well completion tubular column, it is characterized in that, described tubing string body is that diameter is the oil pipe of 88.9mm.
CN201420356374.2U 2014-06-30 2014-06-30 Gas storage observation well completion string Expired - Fee Related CN203959096U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420356374.2U CN203959096U (en) 2014-06-30 2014-06-30 Gas storage observation well completion string

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420356374.2U CN203959096U (en) 2014-06-30 2014-06-30 Gas storage observation well completion string

Publications (1)

Publication Number Publication Date
CN203959096U true CN203959096U (en) 2014-11-26

Family

ID=51919711

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420356374.2U Expired - Fee Related CN203959096U (en) 2014-06-30 2014-06-30 Gas storage observation well completion string

Country Status (1)

Country Link
CN (1) CN203959096U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104879167A (en) * 2015-04-27 2015-09-02 中国石油天然气股份有限公司 Method for rebuilding gas storage and its layered injection-production system
CN104895536A (en) * 2015-05-12 2015-09-09 中国石油天然气股份有限公司 Injection-production gas well variable-diameter well completion method and injection-production string
CN108252703A (en) * 2016-12-27 2018-07-06 中国石油天然气股份有限公司 Well Completion Method for Layered Monitoring
CN110487475A (en) * 2018-05-15 2019-11-22 中国石油化工股份有限公司 Pressure monitoring device and method between a kind of foam slurry waiting-on-cement

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104879167A (en) * 2015-04-27 2015-09-02 中国石油天然气股份有限公司 Method for rebuilding gas storage and its layered injection-production system
CN104895536A (en) * 2015-05-12 2015-09-09 中国石油天然气股份有限公司 Injection-production gas well variable-diameter well completion method and injection-production string
CN104895536B (en) * 2015-05-12 2017-10-17 中国石油天然气股份有限公司 A method for variable-diameter completion of an injection-production gas well and an injection-production string
CN108252703A (en) * 2016-12-27 2018-07-06 中国石油天然气股份有限公司 Well Completion Method for Layered Monitoring
CN110487475A (en) * 2018-05-15 2019-11-22 中国石油化工股份有限公司 Pressure monitoring device and method between a kind of foam slurry waiting-on-cement

Similar Documents

Publication Publication Date Title
CN104132761B (en) Device and method for real-time monitoring of multi-point coal and rock mass stress
AU2015250792B2 (en) Wellhead port plug assembly
US20110247828A1 (en) Fluid displacement methods and apparatus for hydrocarbons in subsea production tubing
CN203959096U (en) Gas storage observation well completion string
CN104373098B (en) A fire-flooding layered electric ignition process string
CN113513309B (en) Tieback type electric control shaft isolation intelligent well completion tool and working method
CN208380562U (en) A kind of Multifunctional casing looks for leakage process pipe string
CN102418839A (en) Sealing detection device for threads of pipe fitting in pipeline
CN104514540B (en) Electric sealing method of bridge eccentric dispensing
CN202900175U (en) Suspension pressure gauge pressure measurement completion pipe string for gas storage
CN105089619A (en) An electric seal inspection method and electric seal inspection instrument for a bridge-type concentric injection pipe string
CN103216209B (en) Packer in tubing and casing sealing propertytest pipe
RU2357067C1 (en) Method of well head pressurising and facility for implementation of this method
CN204947554U (en) A kind of downhole high pressure sealing cable joint of water injection well
CN203572747U (en) Hydraulic-pressure-type high-pressure pressurized water tester with double plugs
CN105443113A (en) A test string for gas storage
CN204098872U (en) Electric immersible pump well tubing string and electric immersible pump well
CN203685106U (en) Hydraulic control protector
CN206130193U (en) Large -traffic changeable pressurized -water valve gear of two embolism formula high pressure of gun drilling
CN113445997B (en) A downhole isolation system high pressure closed simulation device and its use method
CN105019854B (en) A kind of sealed autoclave mould with super-pressure end construction
CN205243429U (en) Edge natural gas well well head protection and mining devices
CN202645521U (en) A gas storage horizontal well injection-production string
CN203847100U (en) Remote pressure display system for cable blowout preventing device
CN204060683U (en) Formation tester

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141126

CF01 Termination of patent right due to non-payment of annual fee