CN203903928U - Boom lifting device - Google Patents

Boom lifting device Download PDF

Info

Publication number
CN203903928U
CN203903928U CN201420295484.2U CN201420295484U CN203903928U CN 203903928 U CN203903928 U CN 203903928U CN 201420295484 U CN201420295484 U CN 201420295484U CN 203903928 U CN203903928 U CN 203903928U
Authority
CN
China
Prior art keywords
suspension rod
lifting
base plate
support
boom
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201420295484.2U
Other languages
Chinese (zh)
Inventor
李开
孙巨伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SEPCO1 Electric Power Construction Co Ltd
Original Assignee
SEPCO1 Electric Power Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SEPCO1 Electric Power Construction Co Ltd filed Critical SEPCO1 Electric Power Construction Co Ltd
Priority to CN201420295484.2U priority Critical patent/CN203903928U/en
Application granted granted Critical
Publication of CN203903928U publication Critical patent/CN203903928U/en
Anticipated expiration legal-status Critical
Withdrawn - After Issue legal-status Critical Current

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The utility model relates to a boom lifting device. The boom lifting device comprises a bottom plate, two supports installed on the two sides of the upper end of the bottom plate, adjusting plates with the bottoms installed on the supports through hinge pins II in a rotating mode, a jacking support arranged at the upper end of the bottom plate, and two jacks arranged below the jacking support and on the two sides of the bottom plate. Two flexible connection devices are fixed to the lower end of the jacking support, and the adjusting plates are fixed inside the flexible connection devices in a sliding mode. A hole with the diameter larger than the outer diameter of a boom is formed in the middle of the bottom plate, and the boom is locked by nuts after penetrating through the hole. After the boom is fixed to the bottom plate through the nuts, the jacks can drive the jacking support to ascend or descend, the jacking support ascends or descends and utilizes the adjusting plates to drive the bottom plate to drive the boom to ascend or descend through the flexible connection devices, and therefore adjustment of the elevation of equipment under the boom is achieved conveniently. Thus, the shortcoming that adjustment through a traditional chain block is inconvenient is overcome, and the safety is improved.

Description

Suspension rod bont
Technical field
The utility model relates to hanging apparatus suspension rod elevated height device.
Background technology
The heat distribution pipeline in the field such as factory, building, the suspension bracket of equipment must be adjusted the absolute altitude of equipment under its suspension rod after installing, by adjusting the suspension rod of suspension bracket, just realizing equipment under suspension rod reaches designed elevation, adjusting at present suspension rod and equipment absolute altitude generally adopts chain and tackle block that the device height under suspension rod is promoted, then at the height of adjusting suspension rod, the method operation is more, can not disposable equipment absolute altitude be adjusted, workmen need repeatedly adjust check equipment and suspension rod absolute altitude, operation is loaded down with trivial details, and dangerous large.
Summary of the invention
The utility model is in order to overcome the deficiency of above technology, provide a kind of adjustment quick, assemble suspension rod bont flexibly.
The utility model overcomes the technical scheme that its technical matters adopts:
This suspension rod bont, two bearings, bottom that comprise base plate, are installed on both sides, base plate upper end are rotated the regulating plate that is installed on bearing, are arranged at the lifting-up support of base plate upper end and are arranged at lifting-up support below and be positioned at two jacks of base plate both sides by bearing pin II, described lifting-up support lower end is fixed with two articulating devices, described regulating plate is slidably fixed in articulating device, the middle part of described base plate is provided with the hole that diameter is greater than suspension rod external diameter, and suspension rod is through passing through nut locking behind hole.
Above-mentioned articulating device comprises two slide plate groups that are individually fixed in lifting-up support lower end, described each slide plate group is made up of two connecting panels that are vertically installed on lifting-up support lower end and be parallel to each other, spacing between two connecting panels in described each slide plate group and the gauge of regulating plate match, described connecting panel and regulating plate are respectively arranged with some pin-and-holes from top to bottom, and described regulating plate slides to be plugged in slide plate group and by bearing pin I and inserts in pin-and-hole and be connected and fixed.
For the convenient suspension rod that is suitable for different size, above-mentioned bearing is installed on base plate by bolt.
In order to shorten return trip time, above-mentioned jack is lifting screw.
In order to improve driving efficiency, above-mentioned jack is hydraulic jack.
In order to prevent that bearing pin from departing from, the tail end of above-mentioned bearing pin II is provided with spring cotter II.
In order to prevent that bearing pin from departing from, the tail end of above-mentioned bearing pin I is provided with spring cotter I.
The beneficial effects of the utility model are: after suspension rod is fixed on base plate by nut, can drive lifting-up support to promote or landing by jack, the lifting of lifting-up support utilizes regulating plate to drive base plate to drive suspension rod to realize by articulating device and promotes or landing, realized easily the adjustment work of equipment absolute altitude under suspension rod.Due to this suspension rod bont assembling flexibly and adjust regulating plate connecting length therein by articulating device, the lifting of suspension rod that can different size easy to use.Therefore overcome the inconvenience that traditional chain block is adjusted, and improved safety.
Brief description of the drawings
Fig. 1 is main TV structure schematic diagram of the present utility model;
Fig. 2 is side-looking structural representation of the present utility model;
In figure, 1. lifting-up support 2. jack 3. connecting panel 4. bearing pin I 5. spring cotter I 6. regulating plate 7. base plate 8. hole 9. suspension rod 10. nut 11. bearing 12. bolt 13. bearing pin II 14. spring cotter II 15. pin-and-holes.
Detailed description of the invention
Below in conjunction with accompanying drawing 1, accompanying drawing 2, the utility model is described further.
This suspension rod bont, two bearings 11, bottom that comprise base plate 7, are installed on base plate 7 both sides, upper end are rotated the regulating plate 6 that is installed on bearing 11, are arranged at the lifting-up support 1 of base plate 7 upper ends and are arranged at lifting-up support 1 below and be positioned at two jacks 2 of base plate 7 both sides by bearing pin II 13, lifting-up support 1 lower end is fixed with two articulating devices, regulating plate 6 is slidably fixed in articulating device, the middle part of base plate 7 is provided with the hole 8 that diameter is greater than suspension rod 9 external diameters, and suspension rod 9 is rear by nut 10 lockings through hole 8.After suspension rod 9 is fixed on base plate 7 by nut 10, can drive lifting-up support 1 promote or land by jack 2, the lifting of lifting-up support 1 utilizes regulating plate 6 to drive base plate 7 to drive suspension rod 9 to realize by articulating device and promotes or landing, realized easily the adjustment work of 9 times equipment absolute altitudes of suspension rod.Due to this suspension rod bont assembling flexibly and adjust regulating plate 6 connecting length therein by articulating device, the lifting of suspension rod 9 that can different size easy to use.Therefore overcome the inconvenience that traditional chain block is adjusted, and improved safety.
Above-mentioned articulating device comprises two slide plate groups that are individually fixed in lifting-up support 1 lower end, each slide plate group is made up of two connecting panels 3 that are vertically installed on lifting-up support 1 lower end and be parallel to each other, spacing between two connecting panels 3 in each slide plate group and the gauge of regulating plate 6 match, connecting panel 3 and regulating plate 6 are respectively arranged with some pin-and-holes 15 from top to bottom, and regulating plate 6 slides to be plugged in slide plate group and by bearing pin I 4 and inserts in pin-and-hole 15 and be connected and fixed.Slide in slide plate group by regulating plate 6, can adjust according to the jack of different tonnages 2 spacing of lifting-up support 1 and base plate 7, after adjusting to the right place, make regulating plate 6 and the pin-and-hole 15 on connecting panel 3 coincide, insert afterwards after bearing pin I 4 and can realize and being connected and fixed, adjustment work is simple and convenient.
Bearing 11 can be installed on base plate 7 by bolt 12.Therefore the suspension rod of corresponding different size, can conveniently unload bearing 11 from base plate 7, then change the base plate 7 of respective model.Further improve the Applicable scope of this suspension rod bont.
Jack 2 can be lifting screw.Lifting screw is by manpower by screw pair transmission, and screw rod or ut socket are lifted part as top.Lifting screw is supported weight by screw thread self-locking effect, simple structure, but driving efficiency is low, but it can support weight for a long time.Jack 2 can be also hydraulic jack, hydraulic jack compact conformation, and steadily jacking weight, hoisting capacity maximum reaches 1000 tons, 1 meter of stroke, driving efficiency is higher, can save operative employee's labour intensity.
The tail end of bearing pin II 13 and bearing pin I 4 can be respectively arranged with spring cotter II 14 and spring cotter I 5, can be by fixing to bearing pin II 13 and bearing pin I 4 by spring cotter II 14 and spring cotter I 5, prevent that bearing pin II 13 and bearing pin I 4 from departing from the dangerous situation causing and occurring.

Claims (7)

1. a suspension rod bont, it is characterized in that: comprise base plate (7), be installed on two bearings (11) of base plate (7) both sides, upper end, the regulating plate (6) being installed on bearing (11) is rotated in bottom by bearing pin II (13), be arranged at the lifting-up support (1) of base plate (7) upper end and be arranged at lifting-up support (1) below and be positioned at two jacks (2) of base plate (7) both sides, described lifting-up support (1) lower end is fixed with two articulating devices, described regulating plate (6) is slidably fixed in articulating device, the middle part of described base plate (7) is provided with the hole (8) that diameter is greater than suspension rod (9) external diameter, suspension rod (9) is through passing through nut (10) locking behind hole (8).
2. suspension rod bont according to claim 1, it is characterized in that: described articulating device comprises two slide plate groups that are individually fixed in lifting-up support (1) lower end, described each slide plate group is made up of two connecting panels (3) that are vertically installed on lifting-up support (1) lower end and be parallel to each other, spacing between two connecting panels (3) in described each slide plate group and the gauge of regulating plate (6) match, described connecting panel (3) and regulating plate (6) are respectively arranged with some pin-and-holes (15) from top to bottom, described regulating plate (6) slides to be plugged in slide plate group and by bearing pin I (4) and inserts in pin-and-hole (15) and be connected and fixed.
3. suspension rod bont according to claim 1 and 2, is characterized in that: described bearing (11) is installed on base plate (7) by bolt (12).
4. suspension rod bont according to claim 3, is characterized in that: described jack (2) is lifting screw.
5. suspension rod bont according to claim 3, is characterized in that: described jack (2) is hydraulic jack.
6. suspension rod bont according to claim 1, is characterized in that: the tail end of described bearing pin II (13) is provided with spring cotter II (14).
7. suspension rod bont according to claim 2, is characterized in that: the tail end of described bearing pin I (4) is provided with spring cotter I (5).
CN201420295484.2U 2014-06-05 2014-06-05 Boom lifting device Withdrawn - After Issue CN203903928U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420295484.2U CN203903928U (en) 2014-06-05 2014-06-05 Boom lifting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420295484.2U CN203903928U (en) 2014-06-05 2014-06-05 Boom lifting device

Publications (1)

Publication Number Publication Date
CN203903928U true CN203903928U (en) 2014-10-29

Family

ID=51778216

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420295484.2U Withdrawn - After Issue CN203903928U (en) 2014-06-05 2014-06-05 Boom lifting device

Country Status (1)

Country Link
CN (1) CN203903928U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103991826A (en) * 2014-06-05 2014-08-20 山东电力建设第一工程公司 Hanging rod lifting device
CN115741581A (en) * 2022-11-29 2023-03-07 徐州徐工基础工程机械有限公司 Pin shaft assembling device

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103991826A (en) * 2014-06-05 2014-08-20 山东电力建设第一工程公司 Hanging rod lifting device
CN103991826B (en) * 2014-06-05 2016-02-03 山东电力建设第一工程公司 Suspension rod bont
CN115741581A (en) * 2022-11-29 2023-03-07 徐州徐工基础工程机械有限公司 Pin shaft assembling device
CN115741581B (en) * 2022-11-29 2023-12-05 徐州徐工基础工程机械有限公司 Pin shaft assembling device

Similar Documents

Publication Publication Date Title
US9562367B2 (en) Utility tower lifting apparatus and method
CN202181179U (en) Crane counterweight self-dismounting device
CN108328509A (en) A kind of building machinery material elevator with safe spacing function
CN106865421A (en) transporting and hoisting device
CN107500209A (en) A kind of novel double-mast platform for working aloft
CN203903928U (en) Boom lifting device
CN202897920U (en) Combined type jack
CN204434191U (en) A kind of electric power facility hanging apparatus
CN105600689A (en) Stretching lifting apparatus
CN103991826B (en) Suspension rod bont
CN202367690U (en) Multipurpose wheel pulling device
CN204265331U (en) A kind of fuel line hanger
CN211594794U (en) Small and medium-sized crane frame
CN102983517B (en) A kind of integral installation device for transformer test bench
CN106703509B (en) Suspension type fence hoisting equipment and hoisting method thereof
CN201448062U (en) Fast moving drilling machine derrick
CN208103826U (en) Transformer body jacking system
CN206850247U (en) A kind of power distribution cabinet base of lift
CN203402880U (en) Detachable hoist frame
CN213445762U (en) Assembled building element hoist device
CN205773094U (en) A kind of drive axle test bed lifting device
CN203212276U (en) Jack with bolts
CN207450771U (en) A kind of petroleum vapor recovery tank body support construction
CN202648784U (en) Lifting and descending device of electronic ground scale body
CN219633704U (en) Substation equipment overhauls platform

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20141029

Effective date of abandoning: 20160203

C25 Abandonment of patent right or utility model to avoid double patenting