CN203903830U - Small framework quickly-assembled jack for equipment - Google Patents
Small framework quickly-assembled jack for equipment Download PDFInfo
- Publication number
- CN203903830U CN203903830U CN201420252097.0U CN201420252097U CN203903830U CN 203903830 U CN203903830 U CN 203903830U CN 201420252097 U CN201420252097 U CN 201420252097U CN 203903830 U CN203903830 U CN 203903830U
- Authority
- CN
- China
- Prior art keywords
- arm
- equipment
- base
- framework
- column
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
Description
技术领域 technical field
本实用新型涉及电力设备作业过程中的辅助设备,具体为一种架构快装式小型设备起重器。 The utility model relates to auxiliary equipment in the operation process of electric power equipment, in particular to a quick-installed small equipment lifter with a structure.
背景技术 Background technique
一直以来,电力系统变电设备技术改造工程中,常遇到因作业环境所限而不能使用大型起重设备的工作现场,即不能使用起重吊车和斗臂车的作业现场,比如220kV刀闸、110kV刀闸、35kV刀闸、电流互感器、室外10kV电容器刀闸的更换等设备布置密集,且使用大型起重设备安全距离不足的施工现场。现有的工作方法是:使用大量人工从设备架构上拆下后,再由人力搬走,没有现场适用的起重设备,不仅存在着安全隐患,而且易发生损坏被拆卸设备的现象。 For a long time, in the technical transformation project of power system transformation equipment, we often encounter work sites where large-scale lifting equipment cannot be used due to the limitation of the working environment, that is, work sites where lifting cranes and arm trucks cannot be used, such as 220kV knife gates , 110kV knife switch, 35kV knife switch, current transformer, outdoor 10kV capacitor switch switch and other equipment are densely arranged, and the construction site where the safety distance of large lifting equipment is insufficient. The existing working method is: use a lot of labor to dismantle it from the equipment structure, and then move it away by manpower. There is no suitable lifting equipment on site, which not only has potential safety hazards, but also easily damages the disassembled equipment.
其缺点是:(1)劳动强度大,现场作业不规范。(2)大量使用人工,从高层布置的架构拆卸,存在安全隐患。(3)如果要动用起重设备,一是需要扩大停电范围,引起不必要的停电,使电网效益蒙受损失;二是动用起重设备用来更换小型设备有些“大材小用”。 Its disadvantages are: (1) The labor intensity is high, and the on-site operation is not standardized. (2) A large amount of labor is used to disassemble from the high-level structure, which has potential safety hazards. (3) If you want to use lifting equipment, first, you need to expand the scope of power outages, causing unnecessary power outages, and causing losses to the power grid; second, using lifting equipment to replace small equipment is somewhat "overkill".
发明内容 Contents of the invention
本实用新型解决的技术问题是电力系统变电设备技术改造工程中,针对小型设备的起重。 The technical problem solved by the utility model is the lifting of small-sized equipment in the technical transformation project of power system substation equipment.
本实用新型是采用如下技术方案实现的: The utility model is realized by adopting the following technical solutions:
一种架构快装式小型设备起重器,包括固定安装于电力设备架构上的底座,所述底座上固定安装一立柱,所述立柱的顶部活动套装有转动杆,所述转动杆固定支撑有转动座,所述转动座固定连接有用于起吊重物的一级臂,所述一级臂内活动套装有二级臂,所述二级臂的端部安装有定滑轮,所述一级臂的外壁固定安装有小型电机,所述电机的输出轴驱动滚筒旋转,所述滚筒上缠绕有吊绳,所述吊绳绕过定滑轮后连接有吊钩。 A frame quick-installed small equipment lifter, including a base fixedly installed on the power equipment structure, a column is fixedly installed on the base, a rotating rod is movably fitted on the top of the column, and the rotating rod is fixedly supported by The rotating seat is fixedly connected with a first-stage arm for lifting heavy objects, a second-stage arm is movable in the first-stage arm, fixed pulleys are installed at the end of the second-stage arm, and the first-stage arm A small motor is fixedly installed on the outer wall of the motor, and the output shaft of the motor drives the drum to rotate, and a suspension rope is wound on the drum, and the suspension hook is connected after the suspension rope goes around the fixed pulley.
工作时,电力系统变电设备技术改造工程中,因作业环境所限而不能使用大型起重设备的工作现场,即不能使用起重吊车和斗臂车的作业现场,首先将本发明起重器的底座牢固的固定在电力设备架构上,由于立柱的顶部活动套装有转动杆,故旋转转动座,调整好起吊位置,通过控制电机使吊钩上升或下降,来达到起吊设备的目的。同时,通过调整二级臂伸出一级臂的位置,调节起吊的水平距离。 During work, in the power system substation equipment technical transformation project, the work site where large-scale hoisting equipment cannot be used due to the limitation of the work environment, that is, the work site where lifting cranes and bucket trucks cannot be used, firstly use the lifting device of the present invention The base is firmly fixed on the power equipment structure. Since the top of the column is equipped with a rotating rod, the rotating base is rotated to adjust the lifting position, and the lifting hook is lifted or lowered by controlling the motor to achieve the purpose of lifting the equipment. At the same time, adjust the horizontal distance of lifting by adjusting the position where the secondary arm extends out of the primary arm.
本实用新型设计合理,通过研制一种能在电力设备架构上固定安装的小型起重装置(指由8-16cm规格槽钢焊接的电力设备架构),起重重量≦200kg,即能保证现场作业的安全又节省了人力提高了工作效率,而且施工现场整齐有序,从而达到起吊效果良好、作业现场文明的目标。 The utility model has a reasonable design. By developing a small lifting device that can be fixedly installed on the power equipment structure (referring to the power equipment structure welded by 8-16cm channel steel), the lifting weight is ≦200kg, which can ensure the on-site operation. It saves manpower and improves work efficiency, and the construction site is neat and orderly, so as to achieve the goal of good lifting effect and civilized work site.
附图说明 Description of drawings
图1是本实用新型的结构示意图。 Fig. 1 is the structural representation of the utility model.
图中,1-固定卡具,2-固定板,3-底座,4-电力设备架构,5-立柱,6-转动座,7-一级臂,8-二级臂,9-电机,10-吊绳,11-吊钩,12-滚筒,13-定滑轮,14-转动杆。 In the figure, 1-fixing fixture, 2-fixing plate, 3-base, 4-power equipment structure, 5-column, 6-rotating seat, 7-first-level arm, 8-secondary arm, 9-motor, 10 -lifting rope, 11-hook, 12-roller, 13-fixed pulley, 14-rotating bar.
具体实施方式 Detailed ways
下面结合附图对本实用新型的具体实施例进行详细说明。 Specific embodiments of the present utility model will be described in detail below in conjunction with the accompanying drawings.
一种架构快装式小型设备起重器,如图1所示,包括固定安装于电力设备架构4上的底座3,所述底座3上固定安装一立柱5,所述立柱5的顶部活动套装有转动杆14,所述转动杆14固定支撑有转动座6,所述转动座6固定连接有用于起吊重物的一级臂7,所述一级臂7内活动套装有二级臂8,所述二级臂8的端部安装有定滑轮13,所述一级臂7的外壁固定安装有小型电机9,所述电机9的输出轴驱动滚筒12旋转,所述滚筒12上缠绕有吊绳10,所述吊绳10绕过定滑轮13后连接有吊钩11。 A frame quick-installed small equipment lifter, as shown in Figure 1, includes a base 3 fixedly installed on the power equipment frame 4, a column 5 is fixedly installed on the base 3, and the top of the column 5 is movable There is a rotating rod 14, and the rotating rod 14 is fixedly supported with a rotating seat 6, and the rotating seat 6 is fixedly connected with a primary arm 7 for lifting heavy objects, and a secondary arm 8 is movable in the primary arm 7, A fixed pulley 13 is installed on the end of the secondary arm 8, and a small motor 9 is fixedly installed on the outer wall of the primary arm 7. The output shaft of the motor 9 drives the drum 12 to rotate, and the drum 12 is wound with a suspension. The rope 10 is connected with the hook 11 after the suspension rope 10 goes around the fixed pulley 13.
具体实施时,所述底座3的四个边角部分别通过螺栓固定连接在两条平行的固定板2上,所述固定板2通过固定卡具1固定安装在电力设备架构4上。 During specific implementation, the four corners of the base 3 are respectively fixedly connected to two parallel fixing plates 2 by bolts, and the fixing plates 2 are fixedly installed on the power equipment frame 4 through the fixing fixture 1 .
所述立柱5与底座3的连接处焊接若干加强板,进一步增加起重器的稳定性。 A number of reinforcing plates are welded at the connection between the column 5 and the base 3 to further increase the stability of the jack.
所述一级臂7和二级臂8之间可以通过定位销定位,保证在起吊过程中二级臂不会突然缩回至一级臂内,影响起吊的顺利进行。 The primary arm 7 and the secondary arm 8 can be positioned by positioning pins to ensure that the secondary arm will not suddenly retract into the primary arm during the lifting process, which will affect the smooth progress of the lifting.
所示立柱5的高度为1m,一级臂7的长度为1m。 The column 5 shown has a height of 1 m and the primary arm 7 has a length of 1 m.
Claims (4)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201420252097.0U CN203903830U (en) | 2014-05-17 | 2014-05-17 | Small framework quickly-assembled jack for equipment |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201420252097.0U CN203903830U (en) | 2014-05-17 | 2014-05-17 | Small framework quickly-assembled jack for equipment |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN203903830U true CN203903830U (en) | 2014-10-29 |
Family
ID=51778118
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201420252097.0U Expired - Fee Related CN203903830U (en) | 2014-05-17 | 2014-05-17 | Small framework quickly-assembled jack for equipment |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN203903830U (en) |
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105398971A (en) * | 2015-12-08 | 2016-03-16 | 张志良 | Hoisting device |
| CN105621287A (en) * | 2014-10-31 | 2016-06-01 | 无锡晟欧船舶设备有限公司 | Telescoping boom structure |
| CN106744385A (en) * | 2016-11-24 | 2017-05-31 | 国家电网公司 | Extra-high voltage series compensation platform device lifts portable repairing device |
| CN107686061A (en) * | 2017-10-12 | 2018-02-13 | 上海遨拓深水装备技术开发有限公司 | A kind of LARS systems for detecting ROV under water suitable for reservoir power station |
| CN109467015A (en) * | 2018-11-20 | 2019-03-15 | 国网安徽省电力有限公司蚌埠供电公司 | Small split type electric lifting device |
-
2014
- 2014-05-17 CN CN201420252097.0U patent/CN203903830U/en not_active Expired - Fee Related
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105621287A (en) * | 2014-10-31 | 2016-06-01 | 无锡晟欧船舶设备有限公司 | Telescoping boom structure |
| CN105398971A (en) * | 2015-12-08 | 2016-03-16 | 张志良 | Hoisting device |
| CN106744385A (en) * | 2016-11-24 | 2017-05-31 | 国家电网公司 | Extra-high voltage series compensation platform device lifts portable repairing device |
| CN107686061A (en) * | 2017-10-12 | 2018-02-13 | 上海遨拓深水装备技术开发有限公司 | A kind of LARS systems for detecting ROV under water suitable for reservoir power station |
| CN109467015A (en) * | 2018-11-20 | 2019-03-15 | 国网安徽省电力有限公司蚌埠供电公司 | Small split type electric lifting device |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN203903830U (en) | Small framework quickly-assembled jack for equipment | |
| CN203159047U (en) | Hydraulic span and height adjustable gantry crane | |
| CN203998708U (en) | A kind of simple and easy controller switching equipment lifting appliance | |
| CN205294663U (en) | Hoisting device for isolation switch | |
| CN103730231A (en) | Transformer top cover lifting device | |
| CN203845689U (en) | Indoor assembled large-scale equipment hoisting device | |
| CN201882847U (en) | Hoisting tool of pole-mounted transformer | |
| CN205381932U (en) | Cable well cover board is carried and is drawn device of taking one's place | |
| CN205312921U (en) | Transformer on -load switch suspended core instrument | |
| CN102946065B (en) | Employing electric substation pipe bus bar column insulator more changing device realizes the method for post insulator replacing | |
| CN204237458U (en) | The laborsaving lifting utensil of a kind of electrical equipment | |
| CN217921154U (en) | Portable hoisting tool | |
| CN203284128U (en) | Hoisting tool of main mechanism of switch blade | |
| CN205312922U (en) | 1000kV cluster benefit equipment is repaiied examination special use and is lifted by crane instrument | |
| CN203699735U (en) | Hydraulic assembly type lifting device | |
| CN107069508B (en) | Auxiliary tool for replacing post insulator of isolating switch under 110kV | |
| CN203889988U (en) | Electric hoisting device for disconnecting switch | |
| CN203434492U (en) | Combination-type electric hoisting apparatus | |
| CN202924668U (en) | Hydraulic rod erecting device | |
| CN202025638U (en) | Suspension frame for on-load voltage regulation switch of transformer | |
| CN102570325B (en) | A kind of light hoisting device for converting station | |
| CN205381879U (en) | A lift by crane instrument for 35 -110kV isolator overhauls | |
| CN205170254U (en) | Tripod hoisting accessory | |
| CN103326264B (en) | Single-column vertical-telescopic-type outdoor high-voltage alternating replacing options | |
| CN203230220U (en) | Stand for assembling and disassembling electric pole |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20141029 |