CN203878601U - Tower crane foundation structure - Google Patents
Tower crane foundation structure Download PDFInfo
- Publication number
- CN203878601U CN203878601U CN201420256017.9U CN201420256017U CN203878601U CN 203878601 U CN203878601 U CN 203878601U CN 201420256017 U CN201420256017 U CN 201420256017U CN 203878601 U CN203878601 U CN 203878601U
- Authority
- CN
- China
- Prior art keywords
- sole plate
- tower
- tower crane
- foundation structure
- crane
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 125000006850 spacer group Chemical group 0.000 claims description 22
- 241001417495 Serranidae Species 0.000 claims description 5
- 238000010276 construction Methods 0.000 abstract description 15
- 229910001294 Reinforcing steel Inorganic materials 0.000 abstract 1
- 238000003912 environmental pollution Methods 0.000 abstract 1
- 238000010586 diagram Methods 0.000 description 16
- 238000000034 method Methods 0.000 description 10
- 230000003014 reinforcing effect Effects 0.000 description 4
- 230000015572 biosynthetic process Effects 0.000 description 2
- 230000007547 defect Effects 0.000 description 2
- 230000003100 immobilizing effect Effects 0.000 description 2
- 239000011159 matrix material Substances 0.000 description 2
- 240000007594 Oryza sativa Species 0.000 description 1
- 235000007164 Oryza sativa Nutrition 0.000 description 1
- 229910000831 Steel Inorganic materials 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000005422 blasting Methods 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 238000001514 detection method Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000009415 formwork Methods 0.000 description 1
- 238000000465 moulding Methods 0.000 description 1
- 235000009566 rice Nutrition 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
Landscapes
- Foundations (AREA)
Abstract
The utility model provides a tower crane foundation structure. The tower crane foundation structure comprises a concrete foundation, positioning reinforcing steel bars, a foundation bottom plate and a bearing platform. By the tower crane foundation structure, the problem that the existing tower crane foundation cannot be positioned, assembled or disassembled stably and efficiently is solved, the work efficiency of construction of a tower crane is greatly improved, environmental pollution caused by construction is further reduced, and requirements on environment-friendly construction are met.
Description
Technical field
The utility model belongs to the realm of building construction, is specifically related to a kind of tower-crane foundation structure.
Background technology
At present, tower crane is applied in building field widely.Stationarity while lifting by crane object due to tower crane and safety and tower crane have direct relation, thereby the firm stable that guarantees tower crane is a ring of particularly paying attention to when tower crane construction is installed always.
Existing very general way is that concreting piece is usingd as tower crane, yet, while utilizing existing way to construct, the volume of institute's concreting piece is generally larger, during construction, also need through tying up the operations such as reinforcing bar, formwork supporting plate and concreting, this just causes the levelness that is difficult to guarantee lower margin in concrete vibrating process to a certain extent, and, after tower crane is removed, concrete foundation also needs demolition blasting separately.Obviously, there is the defects such as the low and contaminated environment of efficiency of construction in this kind of way.。
Utility model content
For overcoming the existing defect of prior art, a kind of tower-crane foundation structure is now provided, to solve existing tower crane, can not guarantee the problem of high stability and high efficiency location dismounting simultaneously, and greatly improved the operating efficiency of tower crane construction, and further reduce the environment pollution that construction causes, reach green construction requirement.
For achieving the above object, the utility model provides a kind of tower-crane foundation structure, comprising:
Be formed in concrete foundation and a plurality of bar plantings region corresponding with tower crane anchor number, in each bar planting region, be provided with many spacer barss of protrusion;
Be arranged in each bar planting region and be positioned at the sole plate at spacer bars top, all sole plates in a plurality of bar plantings region are all in same preset height; And
Be arranged on sole plate for the fixing cushion cap of tower crane anchor.
The beneficial effect of the utility model tower-crane foundation structure is,
1) by spacer bars, coordinate the structure setting of sole plate to realize levelling in construction;
2) by sole plate, coordinate the structure setting of cushion cap to realize flexible and stable location dismounting in construction.
The further improvement of the utility model tower-crane foundation structure is, also comprises the leveling layer being formed between concrete and sole plate.
The further improvement of the utility model tower-crane foundation structure is, many spacer bars rules are arranged, and sole plate is provided with a plurality of locating holes that rule is arranged, and spacer bars and locating hole are corresponding and be welded to connect one by one.
The further improvement of the utility model tower-crane foundation structure is, cushion cap is welded on sole plate, and the end face of cushion cap has locating wheel profile, for tower crane anchor, according to locating wheel profile, is fixedly connected with the end face of cushion cap.
Accompanying drawing explanation
Fig. 1 is the sectional structure schematic diagram of the utility model tower-crane foundation structure;
Fig. 2 is that the utility model spacer bars is anchored in the sectional structure schematic diagram in concrete foundation;
Fig. 3 is the plan structure schematic diagram that the utility model forms four bar planting regions;
Fig. 4 is the plan structure schematic diagram of the utility model sole plate;
Fig. 5 is the sectional structure schematic diagram of immobilizing foundation base plate on the basis of Fig. 3 and Fig. 4;
Fig. 6 fills grouting to form the sectional structure schematic diagram of leveling layer on the basis of Fig. 5;
Fig. 7 is the plan structure schematic diagram of the utility model cushion cap end face;
Fig. 8 is the fixing sectional structure schematic diagram of tower crane anchor on Fig. 6 and Fig. 7 basis.
The specific embodiment
For the benefit of the understanding to structure of the present utility model, describes below in conjunction with drawings and Examples.
With reference to Fig. 1, be the sectional structure schematic diagram of the utility model tower-crane foundation structure, as shown in Figure 1, the utility model provides a kind of tower-crane foundation structure, comprising: the formed concrete foundation 1 of once grouting; Be fixed on the many spacer barss 2 in concrete foundation 1; Be arranged at the sole plate 3 at spacer bars 2 tops; And be arranged at the cushion cap 6 on sole plate 3.
In the present embodiment, the utility model tower-crane foundation structure can be constructed according to the following steps, comprises following main process:
A. planting reinforced bar into concrete process
Can be with reference to Fig. 2, for the utility model spacer bars 2 is anchored in the cross-sectional schematic of concrete foundation 1, as shown in Figure 2, during construction, should first carry out: need, in advance according to the load needs of tower crane, calculate cross section, quantity and the anchorage depth thereof of required spacer bars 2.After to be calculated completing, just can be in the concrete foundation 1 of once grouting moulding, (reinforced hole also can be arranged by other rule forms certainly, for example to offer a plurality of reinforced holes of arranging with matrix form, rice font is arranged), the degree of depth of reinforced hole need reach the calculating setting value of anchorage depth.Then, by construction requirement, many spacer barss 2 are implanted in respectively in each reinforced hole, when reinforcing bar 2 to be positioned arrives the anchorage depth of reinforced hole, anchor and position reinforcing bar 2 makes it naturally protrude and be revealed on concrete foundation 1.Mode according to this, forms the bar planting region 8 of a rectangle.
It should be noted that because existing tower crane generally has four lower margins, therefore, with reference to Fig. 3, is the plan structure schematic diagram in four bar planting regions 8 of the utility model formation, as shown in Figure 3, repeats said process, forms four bar planting regions all around.
B. the position fixing process of sole plate 3
Can be with reference to Fig. 4, for the plan structure schematic diagram of the utility model sole plate 3, shown in Fig. 3 and Fig. 4, for each bar planting region 8, prepare in advance a block plate as sole plate 3, on this sole plate 3, need to offer can be corresponding with spacer bars 2 a plurality of locating holes 30.When implementing, can lip block be set in sole plate 3 soffit surroundings, so that sole plate 3 is supported every sky temporarily, and guarantee that each locating hole 30 is interior to there being a spacer bars 2, realize locating every sky of sole plate 3.
C. the levelling process of sole plate 3
Can be with reference to Fig. 5, sectional structure schematic diagram for the utility model immobilizing foundation base plate 3 on the basis of Fig. 3 and Fig. 4, as shown in Figure 5, for each bar planting region 8, because sole plate 3 is supported every sky temporarily, thereby self-assembling formation is every absolutely empty 4 between sole plate 3 and concrete foundation 1, whereby, can carry out to sole plate 3 accurate adjustment of levelness.Particularly, when implementing, can utilize level gauge that sole plate 3 is constantly carried out the detection of levelness and adjusted in real time, until all sole plates 3 in four bar planting regions 8 of base are all in same preset height, realize the levelling of sole plate 3 degree of precision.
D. the fixation procedure of sole plate 3
Can be with reference to Fig. 6, for the utility model is filled grouting to form the sectional structure schematic diagram of leveling layer 5 on the basis of Fig. 5, as shown in Figure 5, for each bar planting region 8, after the levelness of sole plate 3 reaches construction precision and requires, ideal situation is, the upper surface of sole plate 3 flushes with the top of spacer bars 2, now, just can first locating hole 30 and the welded top of spacer bars 2 be fixed up, again the cushion block that is supported in sole plate 3 soffit surroundings is removed, afterwards, just can every absolutely empty 4, carry out back-grouting to formed, filling and enrich every absolutely empty 4.Afterwards, between sole plate 3 and concrete foundation 1, just formed one deck leveling layer 5, with this, stable degree of sole plate 3 has been improved significantly
E. the assignment procedure of cushion cap 6
Can be with reference to Fig. 7, sectional structure schematic diagram for the utility model fixed bearing platform 6 on Fig. 6 basis, as shown in Figure 7, for each bar planting region 8, after leveling layer 5 thoroughly solidifies, just can be on sole plate 3 fixed bearing platform 6, comparatively ideally, cushion cap 6 is fixedly welded on the center of sole plate 3.
F. the assignment procedure of tower crane anchor 7
Can be with reference to Fig. 7 and Fig. 8, Fig. 7 is the plan structure schematic diagram of the utility model cushion cap 6 end faces, Fig. 8 is the utility model fixing sectional structure schematic diagram of tower crane anchor 7 on Fig. 6 and Fig. 7 basis, shown in Fig. 7 and Fig. 8, for each bar planting region 8, because the upper surface of each cushion cap 6 all has locating wheel profile 60, after cushion cap 6 is welded and fixed, tower crane anchor 7 need come by these locating wheel profiles 60 of cushion cap 6 upper surfaces the as far as possible accurately relative permanent position of tower crane anchor 7 and cushion cap 6.
In the present embodiment, concrete foundation 1 is formed in the pit excavating on ground, job site; Can select round bar as spacer bars 2, until all spacer barss 2, be fixed on after concrete foundation 1, need to form four bar planting regions 8 as shown in Figure 3, and each bar planting region 8 is interior all has the included said structure feature of the utility model tower-crane foundation structure as shown in Figure 1; Select square plate as sole plate 3, for corresponding to round bar, offer circular locating hole 30 on sole plate 3, spacer bars 2 is arranged and is welded to connect with the equal matrix of locating hole 30; And, between sole plate 3 and concrete foundation 1, through back-grouting, to fill, be formed with one deck leveling layer 5; The cushion cap 6 of ladder type is fixedly welded on the upper surface center of sole plate 3, and the upper surface of cushion cap 6 is laid with many locating wheel profiles 60, is accurately fixed on the upper surface of cushion cap 6 for tower crane anchor 7.
Complete after above-mentioned implementation process, should be able to embody the following characteristics of the utility model tower-crane foundation structure:
1) realize high efficiency structure construction, and be convenient to remove;
2) utilize common reinforcing bar and steel plate to solve a levelling difficult problem;
3) mode that forms leveling layer by back-grouting obtains firm foundation structure.
Below embodiment has been described in detail the utility model by reference to the accompanying drawings, and those skilled in the art can make many variations example to the utility model according to the above description.Thereby some details in embodiment should not form restriction of the present utility model, the utility model will be usingd scope that appended claims defines as protection domain.
Claims (4)
1. a tower-crane foundation structure, is characterized in that, comprising:
Be formed in concrete foundation and a plurality of bar plantings region corresponding with tower crane anchor, described in each, in bar planting region, be provided with many spacer barss of protrusion;
Be arranged at described in each in bar planting region and be positioned at the sole plate at described spacer bars top, all described sole plate in a plurality of described bar plantings region is all in same preset height; And
Be arranged at described in each on sole plate for the fixing cushion cap of described tower crane anchor.
2. tower-crane foundation structure according to claim 1, is characterized in that,
Also comprise the leveling layer being formed between described concrete and described sole plate.
3. tower-crane foundation structure according to claim 2, is characterized in that,
Many described spacer bars rules are arranged, and described sole plate is provided with a plurality of locating holes that rule is arranged, and described spacer bars and described locating hole are corresponding and be welded to connect one by one.
4. tower-crane foundation structure according to claim 2, is characterized in that,
Described cushion cap is welded on described sole plate, and the end face of described cushion cap has locating wheel profile.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201420256017.9U CN203878601U (en) | 2014-05-19 | 2014-05-19 | Tower crane foundation structure |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201420256017.9U CN203878601U (en) | 2014-05-19 | 2014-05-19 | Tower crane foundation structure |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN203878601U true CN203878601U (en) | 2014-10-15 |
Family
ID=51679118
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201420256017.9U Expired - Fee Related CN203878601U (en) | 2014-05-19 | 2014-05-19 | Tower crane foundation structure |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN203878601U (en) |
Cited By (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103967040A (en) * | 2014-05-19 | 2014-08-06 | 中国建筑第八工程局有限公司 | Tower crane foundation structure and construction method thereof |
| CN104674838A (en) * | 2014-12-31 | 2015-06-03 | 上海市机械施工集团有限公司 | Foundation structure of mobile tower crane and laying method of foundation structure |
| CN107473054A (en) * | 2017-08-09 | 2017-12-15 | 重庆市渝建实业股份有限公司 | Construction elevator building method for building construction |
| CN107761492A (en) * | 2017-10-27 | 2018-03-06 | 上汽大众汽车有限公司 | The installation method of concrete prefabricated module |
| CN108612125A (en) * | 2018-06-07 | 2018-10-02 | 重庆工业职业技术学院 | A kind of tower-crane foundation structure |
| CN108946526A (en) * | 2018-07-18 | 2018-12-07 | 无锡华美钼业有限公司 | Stable tower crane base |
-
2014
- 2014-05-19 CN CN201420256017.9U patent/CN203878601U/en not_active Expired - Fee Related
Cited By (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103967040A (en) * | 2014-05-19 | 2014-08-06 | 中国建筑第八工程局有限公司 | Tower crane foundation structure and construction method thereof |
| CN103967040B (en) * | 2014-05-19 | 2015-12-02 | 中国建筑第八工程局有限公司 | Tower-crane foundation structure and construction method thereof |
| CN104674838A (en) * | 2014-12-31 | 2015-06-03 | 上海市机械施工集团有限公司 | Foundation structure of mobile tower crane and laying method of foundation structure |
| CN107473054A (en) * | 2017-08-09 | 2017-12-15 | 重庆市渝建实业股份有限公司 | Construction elevator building method for building construction |
| CN107761492A (en) * | 2017-10-27 | 2018-03-06 | 上汽大众汽车有限公司 | The installation method of concrete prefabricated module |
| CN108612125A (en) * | 2018-06-07 | 2018-10-02 | 重庆工业职业技术学院 | A kind of tower-crane foundation structure |
| CN108946526A (en) * | 2018-07-18 | 2018-12-07 | 无锡华美钼业有限公司 | Stable tower crane base |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN203878601U (en) | Tower crane foundation structure | |
| CN104213565B (en) | A kind of formwork system that is applicable to large-scale deep trouth hole sty bed course and formwork thereof water smashes construction method | |
| CN107435346A (en) | A kind of grouting and reinforcing method for correcting error suitable for high building structure | |
| CN108277818A (en) | Basement top-down method Combined tower crane foundation structure and construction method | |
| CN110593266B (en) | Construction method of foundation pit ramp reinforced supporting structure under heavy-load passing condition | |
| CN105113540A (en) | Construction method for newly-built large deep foundation pit basements under protection building | |
| CN207228186U (en) | Build the slip casting composite foundation of reinforcement and rectification | |
| CN104894954A (en) | Overall mounting and constructing method of pier stud reinforcing steel bars of urban bridge | |
| CN102561721A (en) | Building jacking deviation rectifying method | |
| CN105839786B (en) | Air bearing membrane building concrete anchor pre-buried structure and its construction method | |
| CN103938649B (en) | A kind of construction method on high-rise building cavity basis | |
| CN103967040B (en) | Tower-crane foundation structure and construction method thereof | |
| CN205742249U (en) | A kind of prestressed concrete back cover cushion cap template | |
| CN113293790B (en) | Pre-leveling tower foundation and leveling construction method thereof | |
| CN113502828B (en) | Processing method for early warning of deep foundation pit | |
| CN110158602A (en) | A kind of Soft Clay deep foundation pit support excavation construction structure and construction method | |
| CN106436730A (en) | Masonry building concrete filled steel tubular column pedestal shock isolation foundation structure and construction method thereof | |
| CN115095140A (en) | Group silo slip form and method for constructing group silo by applying same | |
| CN211769949U (en) | Movable arm type tower crane underframe ballast type foundation | |
| CN105386447A (en) | Construction method for replacement support of post-cast strip in construction site | |
| CN109179222A (en) | A kind of pre-buried section gradient of derrick crane and levelness control construction method | |
| CN113931661A (en) | Secondary lining template device suitable for large-span cavity dome and construction method | |
| EP2541059A2 (en) | Footing for wind turbine towers | |
| CN203113515U (en) | Slip form jacking integrated device | |
| CN209082534U (en) | Hanging operating platform sets up device in a kind of more piece open caisson |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20141015 Termination date: 20200519 |