CN203783827U - 一种新型的风力发电预制混凝土塔架构件纵缝结构 - Google Patents
一种新型的风力发电预制混凝土塔架构件纵缝结构 Download PDFInfo
- Publication number
- CN203783827U CN203783827U CN201420185674.9U CN201420185674U CN203783827U CN 203783827 U CN203783827 U CN 203783827U CN 201420185674 U CN201420185674 U CN 201420185674U CN 203783827 U CN203783827 U CN 203783827U
- Authority
- CN
- China
- Prior art keywords
- positioning
- power generation
- wind power
- positioning key
- joint structure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/728—Onshore wind turbines
Landscapes
- Wind Motors (AREA)
Abstract
本实用新型公开了一种新型的风力发电预制混凝土塔架构件纵缝结构,包括筒壁一、筒壁二,筒壁一和筒壁二的纵缝接触面上均设置有间隔分布的定位键,相邻的定位键之间为与定位键相匹配的定位键槽,所述定位键内预留连接孔道,且孔道内埋设有钢管,所述的定位键与定位键槽对位后,各定位键内孔道中的钢管处于同一竖直位置,且钢管内的通孔竖直方向上下贯穿,各钢管内贯穿的通孔中插接有一根钢棒;最后通过灌浆形式保证构件形成整体;纵缝面设置键槽,可保证纵缝的良好连接,加快了构件拼装进度和对接精度;在接触面涂抹环氧树脂既满足强度要求又可节省工期;楔形定位键可调整接触面为折线,从而增加结构之间的接触面积,对结构的受力条件较好。
Description
技术领域
本实用新型属于风力发电塔架领域,具体涉及一种新型的风力发电预制混凝土塔架构件纵缝结构。
背景技术
全球能源紧张和环境气候问题的严峻,促使各国日益重视对风能等可再生能源的开发和利用。内陆地区的风速通常比沿海地区低很多,为了给中低风速地区的风电场提供更多的发电量,风机供应商有两种主要选择:他们既可以选择安装具有更大风轮的风机,也可以把没有改造过的机组安装在更高的风塔上。高塔的选择只需增加适度的投资,便可以大幅度的提高功率输出。由于钢塔架材料特性的局限和造价决定了高混凝土塔架的必然,现浇混凝土塔架施工期较长,难以满足风场快速施工要求,预制混凝土塔架应运而生。由于交通运输对塔架结构尺寸的限制,塔架由多个预制构件拼接而成,因此,构件之间的接缝成了控制塔架安全运行的关键部位。
接缝是预制阶段施工结构的一个特殊构造,是装配式钢筋混凝土结构的最薄弱环节。预制拼接结构的受力性能和工作情况(抗震性能、整体性和稳定性)与拼接接缝处的强度以及连接的可靠度,主要取决于接缝连接的好坏。
申请号为201310112541.9的专利文件公开了一种新型的风力发电预制混凝土塔架构件纵缝结构,其方案是通过预埋锚固钢板与高强螺栓连接,通过套筒连接高强螺栓,两边套筒连接固定成整体,最后通过旋转套筒来实现预制构件的收紧。缺点是构件拼装较慢,而且结构之间的接触面积小,受力条件不好。
发明内容
本实用新型的目的是提供一种能加快预制构件的拼装进度,节省时间,施工方法简单,结构受力条件优越,施工方便的一种新型的风力发电预制混凝土塔架构件纵缝结构。
本实用新型是这样实现的,一种新型的风力发电预制混凝土塔架构件纵缝结构,包括筒壁一、筒壁二,筒壁一和筒壁二的纵缝接触面上均设置有间隔分布的的定位键,相邻的定位键之间为与定位键相匹配的定位键槽,所述定位键内预留连接孔道,且孔道内埋设有钢管,所述的定位键与定位键槽对位后,各定位键内孔道中的钢管处于同一竖直位置,且钢管内的通孔竖直方向上下贯穿,各钢管内贯穿的通孔中插接有一根钢棒。
所述的钢管外连接有与钢管垂直固定的插筋,所述插筋另一端延伸进定位键内。
所述定位键槽上涂抹1~2mm厚的用来胶接定位键的环氧树脂。
所述的定位键与定位键槽至少为两对,对位后接缝接触面为折线。
所述的定位键为呈楔形形状,底部长400mm,顶部长207mm,键高145mm;定位键槽底部长210mm,顶部长403mm,槽深145mm,筒壁一和筒壁二的厚度为30cm~50cm。
所述的钢管的长302mm,直径42mm,厚度2mm。
所述的钢棒采用HRB400,直径30mm,长3.6m。
本实用新型的有益效果是:通过预埋钢管与高强钢棒连接,两边塔筒连接固定成整体,最后通过灌浆形式保证构件形成整体;纵缝面设置键槽,可保证纵缝的良好连接,加快了构件拼装进度和对接精度,节省了时间,施工方法简单,施工方便,施工期不再利用焊接等设备,在接触面涂抹环氧树脂可以满足强度要求,又可节省工期;设置楔形定位键可调整接触面为折线,从而增加结构之间的接触面积,对结构的受力条件较好。
附图说明
下面结合实施例附图对本实用新型做进一步说明:
图1是纵缝示意图;
图2是纵缝连接形式示意图;
图中:1.纵缝;2.插筋;3.钢管;4.钢棒;5.孔道;6.定位键;7.定位键槽;8.防水胶;9-1.筒壁一;9-2.筒壁二。
具体实施方式
实施例1:
如图1和图2所示的一种新型的风力发电预制混凝土塔架构件纵缝结构,包括筒壁一9-1和筒壁二9-2的纵缝1接触面上均设置有间隔分布的的定位键6,相邻的定位键6之间为与定位键6相匹配的定位键槽7,所述定位键6内预留连接孔道5,且孔道5内埋设有钢管3,所述的定位键6与定位键槽7对位后,各定位键6内孔道5中的钢管3处于同一竖直位置,且钢管3内的通孔竖直方向上下贯穿,各钢管3内贯穿的通孔中插接有一根钢棒4。
钢管外连接有与钢管垂直固定的插筋,所述插筋另一端延伸进定位键内。
为保证构件拼装受力良好且均匀,筒壁两边的定位键6与定位键槽7相匹配,定位键6与定位键槽7至少为两对且均匀分布。所述的定位键6底部长400mm,顶部长207mm,键高145mm;定位键槽7底部长210mm,顶部长403mm,槽深145mm,筒壁厚度为30cm~50cm; 所用的钢管3长302mm,直径42mm,厚度2mm。
施工时,定位键槽7上涂抹1~2mm厚的用来胶接定位键6的环氧树脂。将定位键6与定位键槽7准确对接后,插入直径30mm,长3.6m的钢棒4固定,最后利用高强水泥浆把孔道灌注密实,保证构件形成整体。
定位键6为呈楔形形状,可调整接触面为折线,从而增加筒壁之间的接触面积,对结构的受力条件较好。
为保证强度,插入的钢棒采用HRB400。
本实用新型的有益效果是,通过预埋钢管与高强钢棒连接,两边塔筒连接固定成整体,最后通过灌浆形式保证构件形成整体;纵缝面设置键槽,可保证纵缝的良好连接,加快了构件拼装进度和对接精度,节省了时间,施工方法简单,施工方便,施工期不再利用焊接等设备,在接触面涂抹环氧树脂可以满足强度要求,又可节省工期;设置楔形定位键可调整接触面为折线,从而增加结构之间的接触面积,对结构的受力条件较好。
Claims (7)
1. 一种新型的风力发电预制混凝土塔架构件纵缝结构,包括筒壁一(9-1)、筒壁二(9-2),其特征在于:筒壁一(9-1)和筒壁二(9-2)的纵缝(1)接触面上均设置有间隔分布的的定位键(6),相邻的定位键(6)之间为与定位键(6)相匹配的定位键槽(7),所述定位键(6)内预留连接孔道(5),且孔道(5)内埋设有钢管(3),所述的定位键(6)与定位键槽(7)对位后,各定位键(6)内孔道(5)中的钢管(3)处于同一竖直位置,且钢管(3)内的通孔竖直方向上下贯穿,各钢管(3)内贯穿的通孔中插接有一根钢棒(4)。
2.如权利要求1所述的一种新型的风力发电预制混凝土塔架构件纵缝结构,其特征在于:所述的钢管(3)外连接有与钢管(3)垂直固定的插筋(2),所述插筋(2)另一端延伸进定位键(6)内。
3.如权利要求1所述的一种新型的风力发电预制混凝土塔架构件纵缝结构,其特征在于:所述定位键槽(7)上涂抹1~2mm厚的用来胶接定位键(6)的环氧树脂。
4.如权利要求1所述的一种新型的风力发电预制混凝土塔架构件纵缝结构,其特征在于:所述的定位键(6)与定位键槽(7)至少为两对,对位后接缝接触面为折线。
5.如权利要求1或3所述的一种新型的风力发电预制混凝土塔架构件纵缝结构,其特征在于:所述的定位键(6)为呈楔形形状,底部长400mm,顶部长207mm,键高145mm;定位键槽(7)底部长210mm,顶部长403mm,槽深145mm,筒壁一(9-1)和筒壁二(9-2)的厚度为30cm~50cm。
6.如权利要求1所述的一种新型的风力发电预制混凝土塔架构件纵缝结构,其特征在于:所述的钢管的长302mm,直径42mm,厚度2mm。
7.如权利要求1所述的一种新型的风力发电预制混凝土塔架构件纵缝结构,其特征在于:所述的钢棒采用HRB400,直径30mm,长3.6m。
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201420185674.9U CN203783827U (zh) | 2014-04-17 | 2014-04-17 | 一种新型的风力发电预制混凝土塔架构件纵缝结构 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201420185674.9U CN203783827U (zh) | 2014-04-17 | 2014-04-17 | 一种新型的风力发电预制混凝土塔架构件纵缝结构 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN203783827U true CN203783827U (zh) | 2014-08-20 |
Family
ID=51320020
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201420185674.9U Expired - Lifetime CN203783827U (zh) | 2014-04-17 | 2014-04-17 | 一种新型的风力发电预制混凝土塔架构件纵缝结构 |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN203783827U (zh) |
Cited By (10)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104265582A (zh) * | 2014-09-26 | 2015-01-07 | 国电联合动力技术有限公司 | 一种采用楔环连接的结构及含有其的风电机组塔筒 |
| CN106087706A (zh) * | 2016-07-22 | 2016-11-09 | 中铁第四勘察设计院集团有限公司 | 预制体湿接缝连接结构及其湿接干作施工方法 |
| CN106438214A (zh) * | 2016-10-08 | 2017-02-22 | 霍尔果斯新国金新能源科技有限公司 | 用于风力发电机的塔筒 |
| CN106640538A (zh) * | 2016-10-08 | 2017-05-10 | 霍尔果斯新国金新能源科技有限公司 | 塔筒构件及其灌浆方法 |
| CN106949017A (zh) * | 2017-05-05 | 2017-07-14 | 同济大学建筑设计研究院(集团)有限公司 | 一种风电机组下部分片预制混合塔架 |
| CN107023442A (zh) * | 2017-06-08 | 2017-08-08 | 北京建筑大学 | 一种预制混凝土塔筒的连接方式 |
| EP3502466A1 (en) | 2017-12-19 | 2019-06-26 | Nordex Energy Spain, S.A.U. | Wind turbine tower with reinforcing elements |
| CN111287904A (zh) * | 2018-12-06 | 2020-06-16 | 深圳京创重工特种工程有限公司 | 塔筒构件及具有其的混凝土塔筒 |
| CN115182850A (zh) * | 2022-07-28 | 2022-10-14 | 上海风领新能源有限公司 | 圆形截面装配式自提升风电塔筒及其建造工艺 |
| CN115217721A (zh) * | 2022-07-28 | 2022-10-21 | 上海风领新能源有限公司 | 八边形截面装配式自提升风电塔筒及其建造工艺 |
-
2014
- 2014-04-17 CN CN201420185674.9U patent/CN203783827U/zh not_active Expired - Lifetime
Cited By (12)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104265582A (zh) * | 2014-09-26 | 2015-01-07 | 国电联合动力技术有限公司 | 一种采用楔环连接的结构及含有其的风电机组塔筒 |
| CN106087706A (zh) * | 2016-07-22 | 2016-11-09 | 中铁第四勘察设计院集团有限公司 | 预制体湿接缝连接结构及其湿接干作施工方法 |
| CN106087706B (zh) * | 2016-07-22 | 2018-04-03 | 中铁第四勘察设计院集团有限公司 | 预制体湿接缝连接结构及其湿接干作施工方法 |
| CN106438214A (zh) * | 2016-10-08 | 2017-02-22 | 霍尔果斯新国金新能源科技有限公司 | 用于风力发电机的塔筒 |
| CN106640538A (zh) * | 2016-10-08 | 2017-05-10 | 霍尔果斯新国金新能源科技有限公司 | 塔筒构件及其灌浆方法 |
| CN106949017A (zh) * | 2017-05-05 | 2017-07-14 | 同济大学建筑设计研究院(集团)有限公司 | 一种风电机组下部分片预制混合塔架 |
| CN107023442A (zh) * | 2017-06-08 | 2017-08-08 | 北京建筑大学 | 一种预制混凝土塔筒的连接方式 |
| EP3502466A1 (en) | 2017-12-19 | 2019-06-26 | Nordex Energy Spain, S.A.U. | Wind turbine tower with reinforcing elements |
| US10895089B2 (en) | 2017-12-19 | 2021-01-19 | Nordex Energy Spain, S.A.U. | Wind turbine tower with reinforcing elements |
| CN111287904A (zh) * | 2018-12-06 | 2020-06-16 | 深圳京创重工特种工程有限公司 | 塔筒构件及具有其的混凝土塔筒 |
| CN115182850A (zh) * | 2022-07-28 | 2022-10-14 | 上海风领新能源有限公司 | 圆形截面装配式自提升风电塔筒及其建造工艺 |
| CN115217721A (zh) * | 2022-07-28 | 2022-10-21 | 上海风领新能源有限公司 | 八边形截面装配式自提升风电塔筒及其建造工艺 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN203783827U (zh) | 一种新型的风力发电预制混凝土塔架构件纵缝结构 | |
| CN105386405B (zh) | 基于螺栓连接的预制节段拼装钢管混凝土桥墩 | |
| CN103867019B (zh) | 装配式体外预应力活性粉末混凝土风电塔架 | |
| CN106436748A (zh) | 一种适用于山地光伏组件的岩锚基础结构及其施工方法 | |
| CN203569582U (zh) | 一种混凝土管桩与承台的连接结构 | |
| CN103132656A (zh) | 一种预制装配墙体构件竖向钢筋连接结构 | |
| CN103233481B (zh) | 一种可灌浆连接的导管架支撑结构 | |
| CN204825619U (zh) | 装配式混凝土桥墩 | |
| CN203755778U (zh) | 装配式体外预应力活性粉末混凝土风电塔架 | |
| CN103195668B (zh) | 一种新型的风力发电预制混凝土塔架构件接缝结构及方法 | |
| CN203546911U (zh) | 一种焊接钢插片的竹网壳空心球连接节点 | |
| CN106284999A (zh) | 装配式建筑陶粒混凝土内隔墙条板安装工艺 | |
| CN103670910B (zh) | 一种分段式风力机叶片的连接装置及连接方法 | |
| CN202545136U (zh) | 体外预应力植筋连接式混凝土风电塔架 | |
| CN103015310A (zh) | 采用不抗拔-抗剪限位的节段式钢管混凝土桥墩及施工方法 | |
| CN202559816U (zh) | 体外预应力预埋锚栓连接式混凝土风电塔架 | |
| CN204311434U (zh) | 一种预制混凝土组合板桩 | |
| CN103777299B (zh) | 一种电力管道的光缆敷设辅助装置及其制作和施工方法 | |
| CN207260191U (zh) | 一种类矩形综合管廊管片连接结构 | |
| CN203783826U (zh) | 一种新型的风力发电预制混凝土塔架构件的横缝结构 | |
| CN212053215U (zh) | 一种原竹接长的结构构造 | |
| CN203213135U (zh) | 一种灌浆连接的导管架支撑结构 | |
| CN203755466U (zh) | 锈蚀钢筋混凝土框架平面节点加固装置 | |
| CN202989763U (zh) | 采用不抗拔-抗剪限位的节段式钢管混凝土桥墩 | |
| CN218060410U (zh) | 一种直螺栓横向连接预制管廊 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CX01 | Expiry of patent term | ||
| CX01 | Expiry of patent term |
Granted publication date: 20140820 |