CN203769124U - Concrete filled steel tube core column reinforcement prefabrication assembly type shear wall unit - Google Patents

Concrete filled steel tube core column reinforcement prefabrication assembly type shear wall unit Download PDF

Info

Publication number
CN203769124U
CN203769124U CN201420056332.7U CN201420056332U CN203769124U CN 203769124 U CN203769124 U CN 203769124U CN 201420056332 U CN201420056332 U CN 201420056332U CN 203769124 U CN203769124 U CN 203769124U
Authority
CN
China
Prior art keywords
concrete
steel tube
core column
shear wall
circular
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420056332.7U
Other languages
Chinese (zh)
Inventor
魏建军
宋生志
袁洪志
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Jianzhu Institute
Original Assignee
Jiangsu Jianzhu Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Jianzhu Institute filed Critical Jiangsu Jianzhu Institute
Priority to CN201420056332.7U priority Critical patent/CN203769124U/en
Application granted granted Critical
Publication of CN203769124U publication Critical patent/CN203769124U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Rod-Shaped Construction Members (AREA)

Abstract

本实用新型公开了一种钢管混凝土芯柱加劲预制装配式剪力墙单元,属于建筑工程领域,包括双层钢筋网片,外包混凝土和拉筋,还包括多根圆钢管混凝土芯柱,多根圆钢管混凝土芯柱竖向等距离间隔固定在双层钢筋网片的腔体中;钢筋网片和钢管绑扎固定后浇筑外包混凝土构成一片剪力墙;所述的圆钢管混凝土芯柱上下两端伸出外包混凝土外,所述的圆钢管混凝土芯柱由圆钢管和浇筑填充在圆钢管腔体中的混凝土组成。本实用新型利用钢管混凝土芯柱的高承载力和高延性,有效地提高剪力墙的抗弯、抗剪和滞回耗能能力,具有较好的抗震性能。该构件施工工艺简单,通过工厂预制、现场拼装,可以保证建筑物的整体质量,提高施工作业速度,降低劳动作业强度。

The utility model discloses a prefabricated prefabricated shear wall unit with stiffened steel tube concrete core column, which belongs to the field of construction engineering and includes double-layer steel bar mesh, outsourcing concrete and tension bars, and also includes a plurality of circular steel tube concrete core columns, a plurality of The circular concrete-filled steel pipe core column is fixed in the cavity of the double-layer steel mesh at equal intervals vertically; the steel mesh and the steel pipe are bound and fixed, and then poured with outsourcing concrete to form a shear wall; the upper and lower ends of the circular steel pipe concrete core column Stretching out of the outsourcing concrete, the circular steel pipe concrete core column is composed of a circular steel pipe and concrete poured and filled in the cavity of the circular steel pipe. The utility model utilizes the high bearing capacity and high ductility of the steel tube concrete core column to effectively improve the bending resistance, shear resistance and hysteretic energy consumption capacity of the shear wall, and has better seismic performance. The construction process of the component is simple, and through factory prefabrication and on-site assembly, the overall quality of the building can be guaranteed, the construction speed can be improved, and the labor intensity can be reduced.

Description

一种钢管混凝土芯柱加劲预制装配式剪力墙单元A prefabricated prefabricated shear wall unit with reinforced steel tube concrete core column

技术领域 technical field

本实用新型公开了一种钢管混凝土芯柱加劲预制装配式剪力墙单元,具体是一种易于现场装配的,在工厂预制的抗震剪力墙,属于建筑工程领域。  The utility model discloses a steel pipe concrete core column stiffened prefabricated assembly type shear wall unit, in particular is an anti-seismic shear wall which is easy to assemble on site and is prefabricated in a factory, and belongs to the field of construction engineering. the

背景技术 Background technique

在建筑业快速发展的今天,对建筑提出了更高的低碳、绿色、环保、高效的建设要求,将建筑结构拆分成若干建筑构件,在工厂里进行预制,运输到现场进行拼装,从而消除了建筑施工现场的扬尘、噪声等环境污染,生产效率提高、节省大量人工成本,像造汽车一样建造房屋,掀起了一场建筑工业化的新革命。  Today, with the rapid development of the construction industry, higher construction requirements for low-carbon, green, environmentally friendly and efficient buildings are put forward. The building structure is split into several building components, prefabricated in the factory, and transported to the site for assembly. Eliminate dust, noise and other environmental pollution on the construction site, improve production efficiency, save a lot of labor costs, build houses like cars, and set off a new revolution in the industrialization of construction. the

在预制装配的建筑中,房屋的抗震是关键,常规的钢筋混凝土剪力墙中需要布置大量钢筋来抵抗地震剪力,目前国内工厂进行钢筋网片、钢筋笼等制品的加工还没有完全实现机械化,很大程度上依靠人工进行钢筋的加工和绑扎,使得剪力墙钢筋加工制作成本一直居高不下,且生产效率低下,难以供给自动化台模板生产剪力墙片的需求。因此,需要一种制作简单、工厂制作速度快和便于现场拼装的预制剪力墙,同时要求其抗剪性能不弱于普通钢筋混凝土剪力墙,从而提高工厂预制生产的效率。  In prefabricated buildings, the earthquake resistance of the house is the key. A large number of steel bars need to be arranged in the conventional reinforced concrete shear wall to resist the earthquake shear force. At present, domestic factories have not fully mechanized the processing of steel mesh, steel cage and other products. , to a large extent rely on manual processing and binding of steel bars, so that the cost of processing and manufacturing shear wall steel bars has always been high, and the production efficiency is low, making it difficult to supply the demand for automated table formwork production of shear wall pieces. Therefore, there is a need for a prefabricated shear wall that is simple to manufacture, fast in factory production and easy to assemble on site, and its shear resistance is not weaker than that of ordinary reinforced concrete shear walls, thereby improving the efficiency of factory prefabricated production. the

发明内容 Contents of the invention

本实用新型的目的在于针对现有工厂预制的普通钢筋混凝土剪力墙生产中存在的不足,提出一种钢管混凝土芯柱加劲预制装配式剪力墙单元,该方案制作方便、整体性好,工厂钢筋加工量少,现场拼接方便可靠。  The purpose of this utility model is to propose a reinforced prefabricated prefabricated shear wall unit of steel pipe concrete core column in view of the deficiencies in the production of ordinary reinforced concrete shear walls prefabricated in existing factories. The amount of steel bar processing is small, and the on-site splicing is convenient and reliable. the

本实用新型是以如下技术方案实现的:一种钢管混凝土芯柱加劲预制装配式剪力墙单元,包括双层钢筋网片,外包混凝土和拉筋,所述的双层钢筋网片由多根竖向分布的竖向钢筋、连接在多根竖向钢筋间的多根横向钢筋和两端的用于连接的预留连接筋组成;预留连接筋伸出外包混凝土外;双层钢筋网片之间用拉筋拉结固定;还包括多根圆钢管混凝土芯柱,多根圆钢管混凝土芯柱竖向等距离间隔固定在双层钢筋网片间形成的腔体中;外包 混凝土浇筑后整体包裹着钢筋网片和圆钢管混凝土芯柱上;所述的圆钢管混凝土芯柱上下两端伸出外包混凝土外,所述的圆钢管混凝土芯柱由圆钢管和现场装配时浇筑填充在圆钢管腔体中的混凝土组成。  The utility model is realized by the following technical scheme: a reinforced prefabricated prefabricated shear wall unit of steel pipe concrete core column, which includes double-layer steel mesh, outsourcing concrete and tie bars, and the double-layer steel mesh is composed of multiple Vertically distributed vertical steel bars, multiple horizontal steel bars connected between multiple vertical steel bars, and reserved connecting bars at both ends for connection; reserved connecting bars extend out of the outsourcing concrete; double-layer steel mesh It also includes a plurality of circular concrete-filled steel tube core columns, which are fixed in the cavity formed between the double-layer steel mesh sheets at equal intervals vertically; the outsourcing is wrapped as a whole after pouring concrete The steel mesh and the round concrete-filled steel tube core column; the upper and lower ends of the round concrete-filled steel tube core column extend out of the outsourcing concrete, and the round steel tube concrete core column is poured and filled in the round steel tube cavity by the round steel tube and the on-site assembly Concrete composition in the body. the

所述的圆钢管混凝土芯柱1的直径为100-200mm,圆钢管混凝土芯柱1之间的间距为圆钢管混凝土芯柱直径的6-10倍。  The diameter of the circular concrete-filled steel tube core column 1 is 100-200mm, and the distance between the circular steel tube concrete core columns 1 is 6-10 times the diameter of the circular steel tube concrete core column. the

所述的圆钢管混凝土芯柱1的上、下端伸出外包混凝土50-200mm,预留连接筋向左右侧伸出外包混凝土100-500mm。  The upper and lower ends of the circular concrete-filled steel tube core column 1 protrude from the outsourcing concrete by 50-200mm, and the reserved connecting bars protrude from the outsourcing concrete by 100-500mm to the left and right sides. the

在普通钢筋混凝土剪力墙中嵌入了钢管混凝土芯柱替换掉一部分竖向抗剪钢筋,利用钢管混凝土的高承载力和高延性,有效地提高剪力墙的抗压承载力、抗剪承载力,具有良好的抗震性等。本实用新型在工厂预制,应用时只要将剪力墙单元现场拼装即可。  The concrete-filled steel tube core column is embedded in the ordinary reinforced concrete shear wall to replace a part of the vertical shear reinforcement, and the high bearing capacity and high ductility of the steel tube concrete are used to effectively improve the compressive bearing capacity and shear bearing capacity of the shear wall , has good shock resistance, etc. The utility model is prefabricated in a factory, and the shear wall units only need to be assembled on site during application. the

本实用新型的有益效果是:本实用新型构件施工工艺简单,制作劳动量小,通过工厂预制、现场拼装,可以保证建筑物的整体质量,提高施工作业速度,降低劳动作业强度。  The beneficial effects of the utility model are: the construction process of the components of the utility model is simple, and the production labor is small. Through factory prefabrication and on-site assembly, the overall quality of the building can be guaranteed, the construction operation speed can be improved, and the labor operation intensity can be reduced. the

附图说明 Description of drawings

图1是本实用新型的结构示意图。  Fig. 1 is the structural representation of the utility model. the

图2是图1中沿A-A剖面图;  Fig. 2 is a sectional view along A-A in Fig. 1;

图3是图1中沿B-B剖面图;  Fig. 3 is a sectional view along B-B in Fig. 1;

图4是本实用新型的外观结构示意图。  Fig. 4 is a schematic diagram of the appearance structure of the utility model. the

图中:1、圆钢管混凝土芯柱,1.1、圆钢管,1.2、后浇混凝土柱芯,2、竖向钢筋,3、横向钢筋,4、预留连接筋,5、外包混凝土,6、拉筋  In the figure: 1. Circular steel tube concrete core column, 1.1. Round steel tube, 1.2. Post-cast concrete column core, 2. Vertical reinforcement, 3. Horizontal reinforcement, 4. Reserved connecting reinforcement, 5. Outsourcing concrete, 6. Pull muscle

具体实施方式 Detailed ways

下面结合附图和具体实施方式对本实用新型作进一步详细说明  Below in conjunction with accompanying drawing and specific embodiment the utility model is described in further detail

如图1所示,一种钢管混凝土芯柱加劲预制装配式剪力墙单元包括均匀分布的圆钢管混凝土芯柱1,竖向均匀分布的多根竖向钢筋2、连接在竖向钢筋间的横向钢筋3、预留连接筋4、外包混凝土5和拉筋6。圆钢管混凝土芯柱1以等间距竖向均匀排列固定在双层竖向分布钢筋2和横向钢筋3构成的网片之间,双层钢筋网片之间用拉筋6拉结固定,以保 持两层网片之间的间距不变化。如图3所示,圆钢管混凝土芯柱1由圆钢管1.1和浇筑填充在圆钢管腔体中的混凝土芯柱1.2组成。圆钢管混凝土芯柱1的直径为100-200mm,相邻圆钢管混凝土芯柱1之间的排距为6-10倍的钢管直径。  As shown in Figure 1, a prefabricated prefabricated shear wall unit with reinforced concrete-filled steel tube core columns includes uniformly distributed circular concrete-filled steel tube core columns 1, a plurality of vertical steel bars 2 evenly distributed vertically, and steel bars connected between the vertical steel bars. Transverse steel bars 3, reserved connecting bars 4, outsourcing concrete 5 and tie bars 6. The circular concrete-filled steel tube core columns 1 are arranged vertically and evenly at equal intervals and fixed between the mesh sheets composed of double-layer vertically distributed steel bars 2 and transverse steel bars 3, and the double-layer steel mesh sheets are fixed with tie bars 6 to ensure Keep the spacing between the two layers of mesh unchanged. As shown in Fig. 3, the circular steel pipe concrete core column 1 is composed of a circular steel pipe 1.1 and a concrete core column 1.2 poured and filled in the cavity of the circular steel pipe. The diameter of the circular concrete-filled steel tube core column 1 is 100-200 mm, and the row spacing between adjacent circular steel tube concrete core columns 1 is 6-10 times the diameter of the steel tube. the

如图2、图3和图4所示,钢管混凝土芯柱1固定在钢筋网片中。所述的钢筋网片之间用拉筋6连接,左右两片剪力墙相接时采用预留连接筋4连接,所述的预留连接筋4为槽型形状,选用钢筋类型与横向钢筋3一致。所述的拉筋6除了钢管混凝土芯柱1两侧为了固定住钢管混凝土芯柱1需要加密以外,其他的拉筋6间距取500mm。加密范围为500mm,加密区拉筋6间距100mm。  As shown in Fig. 2, Fig. 3 and Fig. 4, the concrete-filled steel tube core column 1 is fixed in the steel mesh sheet. The steel mesh sheets are connected with tie bars 6, and when the left and right two shear walls are connected, the reserved connecting bars 4 are used to connect. The reserved connecting bars 4 are in the shape of a groove, and the type of reinforcing bar and the transverse reinforcing bar are selected. 3 agree. Except that the two sides of the steel tube concrete core column 1 need to be densified in order to fix the steel tube concrete core column 1, the distance between the other tension bars 6 is 500mm. The densification range is 500mm, and the distance between the 6 tension bars in the densification area is 100mm. the

所述的剪力墙构件在工厂预制,预制时钢管混凝土芯柱1上下伸出模板50-200mm,方便上下剪力墙的连接。  The shear wall components are prefabricated in a factory. During prefabrication, the concrete filled steel tube core column 1 protrudes 50-200mm from the formwork up and down to facilitate the connection of the upper and lower shear walls. the

所述的预留连接筋4向左右伸出外包混凝土5约100-500mm,以方便左右剪力墙的连接。  The reserved connecting ribs 4 protrude from the outsourcing concrete 5 by about 100-500mm to the left and right, so as to facilitate the connection of the left and right shear walls. the

外包混凝土5可以采用普通混凝土、高强混凝土、钢纤维混凝土或保温混凝土等。  The outsourcing concrete 5 can adopt ordinary concrete, high-strength concrete, steel fiber concrete or thermal insulation concrete and the like. the

Claims (3)

1.一种钢管混凝土芯柱加劲预制装配式剪力墙单元,其特征在于,包括双层钢筋网片,外包混凝土(5)和拉筋(6),所述的双层钢筋网片包括多根竖向分布的竖向钢筋(2)、连接在多根竖向钢筋(2)间的多根横向钢筋(3)和两端的用于连接的预留连接筋(4);所述预留连接筋(4)的外端伸出外包混凝土(5)外;双层钢筋网片之间用拉筋(6)拉结固定;还包括多根圆钢管混凝土芯柱(1),多根圆钢管混凝土芯柱(1)竖向等距离间隔固定在双层钢筋网片间形成的腔体中;钢筋网片和钢管绑扎固定后浇筑外包混凝土(5)构成一片剪力墙;所述的圆钢管混凝土芯柱(1)两端伸出外包混凝土(5)外,所述的圆钢管混凝土芯柱(1)由圆钢管(1.1)和现场装配时浇筑填充在圆钢管腔体中的混凝土(1.2)组成。  1. a reinforced prefabricated prefabricated shear wall unit of steel tube concrete core column, is characterized in that, comprises double-layer reinforced mesh sheet, outsourcing concrete (5) and tension bar (6), and described double-layer reinforced mesh sheet comprises multiple A vertically distributed vertical reinforcing bar (2), a plurality of horizontal reinforcing bars (3) connected between multiple vertical reinforcing bars (2) and reserved connecting bars (4) for connection at both ends; the reserved The outer ends of the connecting bars (4) protrude from the outsourcing concrete (5); the double-layer steel mesh sheets are fixed with tie bars (6); also includes a plurality of round concrete-filled steel tube core columns (1), and a plurality of round The concrete-filled steel tube core column (1) is vertically fixed at equidistant intervals in the cavity formed between the double-layer steel mesh sheets; the steel mesh sheets and the steel pipes are bound and fixed, and then the outsourcing concrete (5) is poured to form a shear wall; the circular The two ends of the concrete-filled steel tube core column (1) protrude out of the outsourcing concrete (5), and the circular steel tube concrete core column (1) is composed of a circular steel tube (1.1) and concrete poured and filled in the cavity of the circular steel tube during on-site assembly ( 1.2) Composition. the 2.跟据权利要求1所述的一种钢管混凝土芯柱加劲预制装配式剪力墙单元,其特征在于,所述的圆钢管混凝土芯柱(1)的直径为100-200mm,圆钢管混凝土芯柱(1)之间的间距为圆钢管混凝土芯柱直径的6-10倍。  2. according to a kind of steel tube concrete core column stiffening prefabricated prefabricated shear wall unit according to claim 1, it is characterized in that, the diameter of described circular steel tube concrete core column (1) is 100-200mm, and the circular steel tube concrete core column The distance between the core columns (1) is 6-10 times of the diameter of the circular steel tube concrete core column. the 3.跟据权利要求1所述的一种钢管混凝土芯柱加劲预制装配式剪力墙单元,其特征在于,所述的圆钢管混凝土芯柱(1)的上、下端伸出外包混凝土50-200mm,剪力墙左右侧预留连接筋(4)伸出外包混凝土100-500mm。  3. according to a kind of concrete-filled steel tube core column stiffening prefabricated prefabricated shear wall unit according to claim 1, it is characterized in that, the upper and lower ends of the circular steel tube concrete core column (1) stretch out outsourcing concrete 50- 200mm, the left and right sides of the shear wall reserve connecting bars (4) protruding out of the outsourcing concrete by 100-500mm. the
CN201420056332.7U 2014-01-28 2014-01-28 Concrete filled steel tube core column reinforcement prefabrication assembly type shear wall unit Expired - Fee Related CN203769124U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420056332.7U CN203769124U (en) 2014-01-28 2014-01-28 Concrete filled steel tube core column reinforcement prefabrication assembly type shear wall unit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420056332.7U CN203769124U (en) 2014-01-28 2014-01-28 Concrete filled steel tube core column reinforcement prefabrication assembly type shear wall unit

Publications (1)

Publication Number Publication Date
CN203769124U true CN203769124U (en) 2014-08-13

Family

ID=51286330

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420056332.7U Expired - Fee Related CN203769124U (en) 2014-01-28 2014-01-28 Concrete filled steel tube core column reinforcement prefabrication assembly type shear wall unit

Country Status (1)

Country Link
CN (1) CN203769124U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103790266A (en) * 2014-01-28 2014-05-14 江苏建筑职业技术学院 Concrete filled steel tube core column reinforced prefabricated assembly type shear wall unit
CN105133868A (en) * 2015-09-06 2015-12-09 胡向赤 Lookout observation room placed on enclosure column formed by all-side thin-walled light wall
CN108678218A (en) * 2018-05-15 2018-10-19 孟凡林 Assembly concrete shear wall and its method of construction based on multipurpose thin-wall steel tube

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103790266A (en) * 2014-01-28 2014-05-14 江苏建筑职业技术学院 Concrete filled steel tube core column reinforced prefabricated assembly type shear wall unit
CN103790266B (en) * 2014-01-28 2016-04-13 江苏建筑职业技术学院 Steel tube concrete core pillar is put more energy into prefabricated assembled shear-wall element
CN105133868A (en) * 2015-09-06 2015-12-09 胡向赤 Lookout observation room placed on enclosure column formed by all-side thin-walled light wall
CN105133868B (en) * 2015-09-06 2018-09-21 山东海诺知识产权运营管理有限公司 It is placed in lookouts observation ward Shang the light thin-wall walled column of four sides
CN108678218A (en) * 2018-05-15 2018-10-19 孟凡林 Assembly concrete shear wall and its method of construction based on multipurpose thin-wall steel tube

Similar Documents

Publication Publication Date Title
CN103790265B (en) A kind of prefabricated assembled steel tube concrete core pillar is put more energy into the making assembly method of shear wall
CN104594561A (en) Prefabricated reinforced concrete column with high-performance concrete frame and construction method
CN203393895U (en) Novel prefabricated composite reinforced concrete wall board member
CN106121086A (en) A kind of concrete-filled steel square tubular column of band otic placode and the connecting structure of fabricated shear wall and the practice
CN103696514A (en) T-frame component and lightweight concrete body fabricated shear wall and connection structure thereof
CN105003020A (en) Ceramsite concrete metal net rack light wallboard and splicing structure thereof
CN103790266B (en) Steel tube concrete core pillar is put more energy into prefabricated assembled shear-wall element
CN106013519A (en) Straw concrete wall system in fabricated mixed structure and manufacturing method thereof
CN103711232B (en) L-shaped frame component and lightweight concrete wall prefabricated type shear wall and connection construction method
CN203769124U (en) Concrete filled steel tube core column reinforcement prefabrication assembly type shear wall unit
CN204356996U (en) The U-shaped beam of prefabricated reinforced concrete with horizontal steel diaphragm
CN103696512A (en) Z-frame component and lightweight concrete body fabricated shear wall and connection structure thereof
CN103696513A (en) Prefabricated shear wall with crossed frame member and lightweight concrete wall bodies and connection construction method
CN205012550U (en) Take hollow light partition wall board of rack and fiber reinforcement
CN104264897B (en) Alternate tooth must superimposed beam and plate
CN204357000U (en) A kind of precast and assembled reinforced concrete spinous process of the seventh cervical vertebra frame
CN204899003U (en) Take hollow light partition wall board of rack
CN204876313U (en) Take mesh frame clip heart light partition wall board
CN204919968U (en) Ceramsite concrete metal rack light weight wallboard
CN107747378A (en) The body composite board processing method of Fast Installation heat insulation decorative load-bearing one
CN103541478B (en) Lattice superposed beam and plate and construction method thereof
CN208088577U (en) A kind of day box compound shear wall of shaped steel
CN204850520U (en) Loam wall body reinforced structure
CN103541434B (en) The complete cross Combined concrete node of assembled
CN201614679U (en) Assembled building reinforced concrete precast plate

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140813

Termination date: 20150128

EXPY Termination of patent right or utility model