[go: up one dir, main page]

CN203440803U - Offshore platform - Google Patents

Offshore platform Download PDF

Info

Publication number
CN203440803U
CN203440803U CN201320476342.1U CN201320476342U CN203440803U CN 203440803 U CN203440803 U CN 203440803U CN 201320476342 U CN201320476342 U CN 201320476342U CN 203440803 U CN203440803 U CN 203440803U
Authority
CN
China
Prior art keywords
panel
hydraulic cylinder
hole
panels
offshore platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201320476342.1U
Other languages
Chinese (zh)
Inventor
贺波
阮志栋
吴雪平
干卓君
徐晓
陈勇
张国锐
赵小鹏
支交平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jessn Marine Equipment Co ltd
Victory Marine Equipment Co ltd
Original Assignee
Ningbo Jessn Ocean Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningbo Jessn Ocean Development Co Ltd filed Critical Ningbo Jessn Ocean Development Co Ltd
Priority to CN201320476342.1U priority Critical patent/CN203440803U/en
Application granted granted Critical
Publication of CN203440803U publication Critical patent/CN203440803U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Foundations (AREA)

Abstract

The utility model discloses an offshore platform, comprising a barge and a positioning post; the barge is provided with a first through hole; a lifting mechanism is arranged above the first through hole; the positioning post is arranged in the lifting mechanism and the first through hole in a penetrating mode; the lifting mechanism comprises two first panels; the two first panels are connected together by a plurality of first hydraulic cylinders; the two first panels are respectively provided with a second through hole penetrated by the positioning post; supports are arranged at two sides of the second through hole and are fixed on the first panels; the supports are hinged to bent tooth blocks; the tooth blocks are hinged to second cylinders hinged onto the first panels; the positioning post comprises a post type steel structural frame; a plurality of support rods are arranged in the frame; racks are arranged at two opposite outside surfaces of the frame; the tooth blocks and the racks are matched. The offshore platform is simple in structure, convenient to control, and can work in a deeper sea area, and the same barge can bear longer support rods.

Description

A kind of offshore platform
Technical field
The utility model relates to ocean engineering and shipbuilding technical field, relates in particular to a kind of offshore platform.
Background technology
Along with scientific and technological level development, the mankind deeply visit and get resource to ocean gradually, and when resource is got in spy, must need to arrange offshore platform at sea, and offshore platform mainly comprises fixed offshore platform and floating offshore platform.
Fixed offshore platform immobilizes position within whole useful life period, and its form has a formula, guy wire formula and gravity etc.Stake formula platform consists of cushion cap and pile foundation.Pile foundation has the kinds such as timber, piling bar and reinforced concrete pile, while constructing, it is squeezed into seabed, and cushion cap has been installed on it.Guy wire formula platform claims again lashing tower platform, and a prefabricated head tower is placed on seafloor foundation piece, with cable wire, along different directions grappling tension, forms.Gravity platform is to occupy stably on the firm stratum of seabed by the weight of platform self, and the ability of resisting storm and wave attack is strong.
Floating offshore platform is a kind of large-scale buoyancy aid, and what have can move, and what have does not move.Transportable floating platform, claims again movable platform, and it is that the needs that must often change place for adapting to the operations on the sea such as exploration, construction, maintenance grow up.Conventional floating offshore platform be bottom-supported platform (also claiming floatable platform) to be used for the more shallow ,Qi top, waters of the depth of water be spar deck, bottom is the buoyancy tank that doubles as mat, middle for column or truss support.During operation, toward the interior water filling of buoyancy tank, make it to be located seabed; After operation, water in case is extracted out, platform relies on the buoyancy of self to rise.2. jack-up unit adaptation depth of water scope is larger, is a barge when floating state, and its four sides are equipped with some column types or truss framed leg, with gear, tooth bar or hydraulic mechanism, control lifting.During operation, put down spud leg and insert seabed certain depth, thereby hull bottom is held out to the water surface, become spar deck.After operation, fall hull, pull up spud leg, can the extremely new place of towage.Spud leg bottom is with the title mat jack-up unit of box-shaped mat, not with the title pitching pile jack-up unit of mat.3. semisubmersible platform is used for the marine site that the depth of water is larger, also upper strata spar deck, lower floor's float structure, middle standing pillar or truss three parts, consists of.Lower floor's float structure divides again two kinds of pontoon formula and floating box types, and pontoon formula is more conducive to navigation, therefore the newly-built semisubmersible platform of boat certainly, adopts two pontoon formulas.During this platform operation, in partially surfaced condition, adopt anchoring location or dynamic positioning.After operation, discharge the water in ballast tank, float up to towage water line, can receive anchor displacement.The minority semisubmersible platform of past construction has the function of bottom-sitting type concurrently, also can in phytal zone, be located seabed and carry out operation.4. boat form platform (being drill ship) is on common boats and ships, to add a job platform, and boats and ships have dividing of monomer and binary, generally can, from boat, adopt anchoring to locate or dynamic positioning during operation.Current transportable floating platform should be with the most use in submarine oil and natural gas exploration.The complex structure of traditional jack-up unit, operate very inconvenient, reference column is all generally solid, reference column is solid mainly considers the anti-pressure ability inserting behind seabed, and because reference column length is longer, so the weight of reference column is larger, therefore barge during floating state need to have very large buoyancy guarantee barge to float on the surface, therefore very high to the manufacture requirement of barge, or can only be furnished with shorter reference column, jack-up unit can only be used in more shallow marine site.
Summary of the invention
The utility model is not enough for prior art, a kind of offshore platform is provided, this offshore platform structure is simple, convenient control, and can be equipped with more profound reference column, alleviate the weight of reference column, can just can be furnished with the reference column more lengthening in the situation that do not improve the floating force of barge, can in the marine site of more deepening, use.
In order to solve the problems of the technologies described above, the utility model is solved by following technical proposals: a kind of offshore platform, comprise barge and some reference columns, on described barge, be provided with some the first through holes, described in each, the first through hole top is provided with lifting mechanism, described reference column is located in described lifting mechanism and described the first through hole, described lifting mechanism comprises two the first panels, between two the first panels, by some the first hydraulic cylinders, link together, described the first hydraulic cylinder is all vertical with two described the first panels arbitrarily, on two described the first panels, be all provided with for the second through hole through described reference column, described the second through hole both sides are provided with bracing frame, support frame as described above is fixed on described the first panel, support frame as described above is hinged with block teeth, described block teeth are bending-like, on described block teeth, be hinged with the second hydraulic cylinder, described the second hydraulic cylinder is hinged on described the first panel, support frame as described above and block teeth, block teeth and the second hydraulic cylinder, the second hydraulic cylinder is identical with the hinged direction of the first panel, described reference column comprises a pillar steel work framework, in described framework, be provided with some support bars, described some support bars comprise pressure-bearing post, described pressure-bearing post two ends be provided with for increase and described framework between the second panel of contact surface, on relative two lateral surfaces of described framework, be provided with tooth bar, described block teeth coordinate with described tooth bar.
In technique scheme, preferred, between described pressure-bearing post and described the second panel, be provided with some reinforcing ribs.
In technique scheme, preferred, described the first panel is the outside frame type steel plate structure that is coated with steel plate.
In technique scheme, preferred, in described framework, be also provided with the 3rd panel, on described the 3rd panel, be provided with some third through-holes, described support bar is located in described third through-hole.
In technique scheme, preferred, described framework bottom is provided with hemispherical projections, and described hemispherical projections side extends some fins.Arrange when hemispherical projections and fin make reference column seabed interaction and easily stretch into seabed, and play guide effect in the process stretching into seabed at reference column.
In technique scheme, preferred, described the first hydraulic cylinder two ends are rotatably connected to the first fixed block, and described the first fixed block is fixed on described the first panel, and the direction that described the first hydraulic cylinder two ends are rotationally connected with the first fixed block is mutually vertical.
The utility model compared with prior art, there is following beneficial effect: the utility model by simple hydraulic system structure to the reference column operation of stretching, and it is convenient to control, reference column boring adopts they sup-port, having reduced weight provides cost savings, and make the barge of formed objects can carry longer support bar, the marine site work that can more deepen.
Accompanying drawing explanation
Fig. 1 is the overall structure schematic diagram of the utility model embodiment.
Fig. 2 is the structural representation of barge.
Fig. 3 is the part-structure schematic diagram of reference column.
Fig. 4 is reference column internal construction schematic diagram.
Fig. 5 is the structural representation of support bar.
Fig. 6 is the structural representation of reference column and lifting mechanism junction.
Fig. 7 is the partial enlarged drawing in Fig. 6.
Fig. 8 is the structural representation of removing the first panel of outside steel plate.
The specific embodiment
Below in conjunction with accompanying drawing and the specific embodiment, the utility model is described in further detail: referring to Fig. 1 to Fig. 8, a kind of offshore platform, comprise barge 1 and four reference columns 2, on described barge 1, be provided with four the first through holes 11, described in each, the first through hole 11 tops are provided with lifting mechanism 3, described reference column 2 is located in described lifting mechanism 3 and described the first through hole 11, described lifting mechanism 3 comprises two the first panels 31, between two the first panels 31, by eight the first hydraulic cylinders 32, link together, described the first hydraulic cylinder 32 is all vertical with two described the first panels 31 arbitrarily, described the first hydraulic cylinder 32 two ends are rotatably connected to the first fixed block 37, described the first fixed block 37 is fixed on described the first panel 31, described the first hydraulic cylinder 32 two ends are mutually vertical with the direction that the first fixed block 37 is rotationally connected, on two described the first panels 31, be all provided with for the second through hole 33 through described reference column 2, described the second through hole 33 both sides are provided with bracing frame 34, support frame as described above 34 is fixed on described the first panel 31, support frame as described above 34 is hinged with block teeth 35, described block teeth 35 are bending-like, on described block teeth 35, be hinged with the second hydraulic cylinder 36, described the second hydraulic cylinder 36 is hinged on described the first panel 31.Support frame as described above 34 is identical with the hinged direction of block teeth 35, block teeth 35 and the second hydraulic cylinder 36, the second hydraulic cylinder 36 and the first panel 31.In order to alleviate total quality and the installation that facilitates the first hydraulic cylinder 32, the second hydraulic cylinder 36 and bracing frame 34, described the first panel 31 is the outside frame type steel plate structure that is coated with steel plate.
Described reference column 2 is arranged on described barge 1 through described the first through hole 11 and the second through hole 33, in order to alleviate quality, described reference column 2 comprises a pillar steel work framework 21, in described framework 21, be provided with some support bars 22, described some support bars 22 comprise pressure-bearing post 221, described pressure-bearing post 221 two ends be provided with for increase and described framework 21 between the second panel 222 of contact surface, between described pressure-bearing post 221 and described the second panel 222, be provided with some reinforcing ribs 223, for convenient location when the interior installation support bar 22 of framework 21, in described framework 21, be also provided with the 3rd panel 24, on described the 3rd panel 24, be provided with some third through-holes 241, described support bar 22 is located in described third through-hole 241, on relative two lateral surfaces of described framework 21, be provided with tooth bar 23, described block teeth 35 coordinate described reference column 2 are fixed on described barge 1 with described tooth bar 23, described framework 21 seabed interaction places, bottom are provided with hemispherical projections 25, described hemispherical projections 25 sides extend some fins 26, arrange and when hemispherical projections 25 and fin 26 make reference column 2 seabed interaction, easily stretch into seabed, and play guide effect in the process stretching into seabed at reference column 2.
Described the first hydraulic cylinder 32 and the second hydraulic cylinder 36 are all connected with oil pump and control device.
This offshore platform dragged to precalculated position by ship before work, resistance while dragging in order to reduce barge 1, originally reference column 2 is positioned at and is not stretched into the water surface topmost by block teeth 35 clampings, after arriving precalculated position, the second hydraulic cylinder 36 of top shrinks and makes the block teeth 35 of top unclamp tooth bar 23, then the first hydraulic cylinder 32 extends, the second hydraulic cylinder 36 of top extends the block teeth 35 clamping tooth bars 23 that make top, then the second hydraulic cylinder 36 of below shrinks and makes the block teeth 35 of below unclamp tooth bar 32, then the first hydraulic cylinder 32 shrinks, the relative barge 1 of reference column 2 is moved downward, then the second hydraulic cylinder 36 of below extends, make the block teeth 35 of below block tooth bar 23, repeat so operation, until reference column 2 stretches into seabed, again barge 1 plane is carried away to the water surface afterwards.When platform need to be shifted to other places, adopt contrary operation that reference column 2 is extracted and promoted from seabed.

Claims (6)

1. an offshore platform, comprise barge (1) and some reference columns (2), on described barge (1), be provided with some the first through holes (11), described in each, the first through hole (11) top is provided with lifting mechanism (3), described reference column (2) is located in described lifting mechanism (3) and described the first through hole (11), it is characterized in that: described lifting mechanism (3) comprises two the first panels (31), between two the first panels (31), by some the first hydraulic cylinders (32), link together, described the first hydraulic cylinder (32) is all vertical with two described the first panels (31) arbitrarily, on two described the first panels (31), be all provided with for the second through hole (33) through described reference column (2), described the second through hole (33) both sides are provided with bracing frame (34), support frame as described above (34) is fixed on described the first panel (31), support frame as described above (34) is hinged with block teeth (35), described block teeth (35) are bending-like, on described block teeth (35), be hinged with the second hydraulic cylinder (36), described the second hydraulic cylinder (36) is hinged on described the first panel (31), support frame as described above (34) and block teeth (35), block teeth (35) and the second hydraulic cylinder (36), the second hydraulic cylinder (36) is identical with the hinged direction of the first panel (31), described reference column (2) comprises a pillar steel work framework (21), in described framework (21), be provided with some support bars (22), described some support bars (22) comprise pressure-bearing post (221), described pressure-bearing post (221) two ends are provided with the second panel (222) for contact surface between increase and described framework (21), on relative two lateral surfaces of described framework (21), be provided with tooth bar (23), described block teeth (35) coordinate with described tooth bar (23).
2. a kind of offshore platform as claimed in claim 1, is characterized in that: between described pressure-bearing post (221) and described the second panel (222), be provided with some reinforcing ribs (223).
3. a kind of offshore platform as claimed in claim 1, is characterized in that: described the first panel (31) is the outside frame type steel plate structure that is coated with steel plate.
4. a kind of offshore platform as claimed in claim 1, it is characterized in that: in described framework (21), be also provided with the 3rd panel (24), on described the 3rd panel (24), be provided with some third through-holes (241), described support bar (22) is located in described third through-hole (241).
5. a kind of offshore platform as claimed in claim 1, is characterized in that: described framework (21) bottom is provided with hemispherical projections (25), and described hemispherical projections (25) side extends some fins (26).
6. a kind of offshore platform as claimed in claim 1, it is characterized in that: described the first hydraulic cylinder (32) two ends are rotatably connected to the first fixed block (37), it is upper that described the first fixed block (37) is fixed on described the first panel (31), and described the first hydraulic cylinder (32) two ends are mutually vertical with the direction that described the first fixed block (37) is rotationally connected.
CN201320476342.1U 2013-08-06 2013-08-06 Offshore platform Expired - Lifetime CN203440803U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320476342.1U CN203440803U (en) 2013-08-06 2013-08-06 Offshore platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320476342.1U CN203440803U (en) 2013-08-06 2013-08-06 Offshore platform

Publications (1)

Publication Number Publication Date
CN203440803U true CN203440803U (en) 2014-02-19

Family

ID=50091868

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320476342.1U Expired - Lifetime CN203440803U (en) 2013-08-06 2013-08-06 Offshore platform

Country Status (1)

Country Link
CN (1) CN203440803U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103397623A (en) * 2013-08-06 2013-11-20 宁波捷胜海洋开发有限公司 Offshore platform
CN105952573A (en) * 2016-06-29 2016-09-21 王祖合 Smooth-flow pontoon hugging type power generation device

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103397623A (en) * 2013-08-06 2013-11-20 宁波捷胜海洋开发有限公司 Offshore platform
CN103397623B (en) * 2013-08-06 2015-11-04 捷胜海洋装备股份有限公司 A kind of offshore platform
CN105952573A (en) * 2016-06-29 2016-09-21 王祖合 Smooth-flow pontoon hugging type power generation device

Similar Documents

Publication Publication Date Title
CN107542101B (en) Construction method of offshore four-buoy-buoyancy tank combined foundation structure
EP3464733B1 (en) A seabed supported unit and method to provide a shallow water drilling terminal
CN201695381U (en) Three-cylindrical foundation one-legged mooring platform
CN201172814Y (en) Shallow sea self-lifting production testing work platform
CN111469992A (en) Floating offshore wind power structure foundation with damping effect and stability control method
CN107630461B (en) A combined offshore four-pontoon pontoon foundation structure and its construction method
CN102285429A (en) Floating type supporting structure for marine windmill
US7328747B2 (en) Integrated buoyancy joint
US4265568A (en) Gravity base, jack-up platform - method and apparatus
CN114855865B (en) Tensioning type fan foundation anchored on rock-based seabed and arrangement method
CN104727336A (en) Construction method of large single-pipe pile foundation of shallow-sea wind power plant
CN212243735U (en) Floating type offshore wind power structure foundation with damping effect
CN201268389Y (en) Multifunctional construction platform
CN102409650A (en) Installation method of shallow water ocean jacket platform
CN200971492Y (en) Pile submarine drilling basal disc with suction
CN106364633A (en) Semi-submersible type ocean platform and implementation method of optimized heaving effect of semi-submersible type ocean platform
CN103397623B (en) A kind of offshore platform
CN203440803U (en) Offshore platform
CN203473217U (en) Supporting rod of offshore platform positioning column
CN203486110U (en) Buoyant-tower-type ocean platform
CN201087343Y (en) Improved tension leg ocean oil gas producing platform
CN104417726A (en) Offshore floating vessel construction method
CN104802950A (en) Self-elevating type underwater floater tension leg platform and establishing method thereof
KR20100036826A (en) Marine structure and the construction method
CN220662780U (en) Mobile self-help anchoring and positioning maritime work platform

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: JESSN OCEAN EQUIPMENT CO., LTD.

Free format text: FORMER NAME: JESSN OCEAN EQUIPMENT LTD.

Owner name: JESSN OCEAN EQUIPMENT LTD.

Free format text: FORMER NAME: NINGBO GESSN OCEAN EXPLOITATION CO., LTD.

CP01 Change in the name or title of a patent holder

Address after: 315806 No. 206 Tiantai Mountain Road, Beilun District, Zhejiang, Ningbo

Patentee after: JESSN MARINE EQUIPMENT Co.,Ltd.

Address before: 315806 No. 206 Tiantai Mountain Road, Beilun District, Zhejiang, Ningbo

Patentee before: Victory Marine Equipment Co.,Ltd.

Address after: 315806 No. 206 Tiantai Mountain Road, Beilun District, Zhejiang, Ningbo

Patentee after: Victory Marine Equipment Co.,Ltd.

Address before: 315806 No. 206 Tiantai Mountain Road, Beilun District, Zhejiang, Ningbo

Patentee before: NINGBO JESSN OCEAN DEVELOPMENT Co.,Ltd.